ML072080045: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 07/27/2007 | | issue date = 07/27/2007 | ||
| title = NRC Generic Letter 2006-01: Steam Generator Tube Integrity and Associated Technical Specifications | | title = NRC Generic Letter 2006-01: Steam Generator Tube Integrity and Associated Technical Specifications | ||
| author name = Mozafari B | | author name = Mozafari B | ||
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-2 | | author affiliation = NRC/NRR/ADRO/DORL/LPLII-2 | ||
| addressee name = Stall J | | addressee name = Stall J | ||
| addressee affiliation = Florida Power & Light Co | | addressee affiliation = Florida Power & Light Co | ||
| docket = 05000389 | | docket = 05000389 | ||
| license number = NPF-016 | | license number = NPF-016 | ||
| contact person = Mozafari B | | contact person = Mozafari B, NRR/ADRO/DORL, 415-2020 | ||
| case reference number = GL-06-001, TAC MD0105 | | case reference number = GL-06-001, TAC MD0105 | ||
| document type = Letter | | document type = Letter | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:July 27, | {{#Wiki_filter:July 27, 2007 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 | ||
==SUBJECT:== | ==SUBJECT:== | ||
ST. LUCIE, UNIT 2 | ST. LUCIE, UNIT 2 - NRC GENERIC LETTER 2006-01: STEAM GENERATOR TUBE INTEGRITY AND ASSOCIATED TECHNICAL SPECIFICATIONS (TAC NO. MD0105) | ||
==Dear Mr. Stall:== | ==Dear Mr. Stall:== | ||
On January 20, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter(GL) 2006-01, | On January 20, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2006-01, Steam Generator [SG] Tube Integrity and Associated Technical Specifications | ||
[TSs] | [TSs] (see Agencywide Document Access and Management System (ADAMS) Accession No. ML060200385). This GL requested that addressees either submit a description of their program for ensuring SG tube integrity for the interval between inspections or adopt alternative TS requirements for ensuring SG tube integrity. | ||
Traveler, TSTF-449, | By letter dated February 17, 2006, Florida Power and Light Company, the licensee for St. Lucie, Unit 2, submitted a response to GL 2006-01 (ADAMS Accession No. ML060530640). This response provided a regulatory commitment to submit a request to modify the SG portion of the TSs. By application to the NRC dated May 25, 2006, the licensee requested changes to the TSs for St. Lucie, Unit 2, to adopt the alternative TS requirements for ensuring SG tube integrity (ML061510346). The new TSs were modeled after Technical Specification Task Force (TSTF) | ||
Traveler, TSTF-449, Steam Generator Tube Integrity (ML051090200). By letters dated January 22, 2007 (ML070250070) and April 16, 2007 (ML071210531), the licensee provided the NRC supplements to the original application. On May 29, 2007, the NRC staff issued Amendment No. 147 to the St. Lucie, Unit 2, Facility Operating License that approved the new SG TSs (ML071490483). | |||
The NRC staff finds the licensees adoption of new SG TSs modeled after TSTF-449 to be an acceptable and complete response to GL 2006-01. This completes the NRC staffs efforts on TAC No. MD0105. If you have any questions regarding this letter, please contact me at 301-415-2020. | |||
Sincerely, | |||
/RA/ | |||
Brenda L. Mozafari, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-389 cc: See next page | |||
ML060530640). This response provided a regulatory commitment to submit a request to modify the SG portion of the TSs. By application to the NRC dated May 25, 2006, the licensee requested changes to the TSs for St. Lucie, Unit 2, to adopt the alternative TS requirements for ensuring SG tube integrity (ML061510346). The new TSs were modeled after Technical Specification Task Force (TSTF) | ML060530640). This response provided a regulatory commitment to submit a request to modify the SG portion of the TSs. By application to the NRC dated May 25, 2006, the licensee requested changes to the TSs for St. Lucie, Unit 2, to adopt the alternative TS requirements for ensuring SG tube integrity (ML061510346). The new TSs were modeled after Technical Specification Task Force (TSTF) | ||
Traveler, TSTF-449, | Traveler, TSTF-449, Steam Generator Tube Integrity (ML051090200). By letters dated January 22, 2007 (ML070250070) and April 16, 2007 (ML071210531), the licensee provided the NRC supplements to the original application. On May 29, 2007, the NRC staff issued Amendment No. 147 to the St. Lucie, Unit 2, Facility Operating License that approved the new SG TSs (ML071490483). | ||
The NRC staff finds the licensees adoption of new SG TSs modeled after TSTF-449 to be an acceptable and complete response to GL 2006-01. This completes the NRC staffs efforts on TAC No. MD0105. If you have any questions regarding this letter, please contact me at 301-415-2020. | |||
Sincerely, | |||
Marjan Mashhadi, Senior Attorney Florida Power & Light Company 801 Pennsylvania Avenue, NW. | /RA/ | ||
Suite 220 Washington, DC | Brenda L. Mozafari, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-389 cc: See next page DISTRIBUTION: | ||
PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrPMBMozafari RidsNrrLABClayton (Hard Copy) RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDciCsgb RidsRgn2MailCenter RidsNrrDorlDpr ADAMS ACCESSION NO: ML072080045 OFFICE LPL2-2/PM LPL2-2/LA NRR/CSGB/BC LPL2-2/BC NAME BMozafari BClayton AHiser TBoyce/ | |||
Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida | LRaghavan for DATE 07/27/2007 07/27/2007 07/27/2007 07/27/2007 Florida Power and Light Company ST. LUCIE PLANT cc: | ||
Mr. William E. Webster Mr. Christopher R. Costanzo Vice President, Nuclear Operations, Plant General Manager South Region St. Lucie Nuclear Plant Florida Power & Light Company 6351 South Ocean Drive P.O. Box 14000 Jensen Beach, Florida 34957 Juno Beach, FL 33408-0420 Mr. Terry Patterson Senior Resident Inspector Licensing Manager St. Lucie Plant St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission 6351 South Ocean Drive P.O. Box 6090 Jensen Beach, Florida 34957 Jensen Beach, Florida 34957 Don E. Grissette Craig Fugate, Director Vice President, Nuclear Training Division of Emergency Preparedness and Performance Improvement Department of Community Affairs Florida Power & Light Company 2740 Centerview Drive P.O. Box 14000 Tallahassee, Florida 32399-2100 Juno Beach, FL 33408-0420 M. S. Ross, Managing Attorney Mr. Rajiv S. Kundalkar Florida Power & Light Company Vice President - Nuclear Technical Services P.O. Box 14000 Florida Power & Light Company Juno Beach, FL 33408-0420 P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi, Senior Attorney Florida Power & Light Company Mr. J. Kammel 801 Pennsylvania Avenue, NW. Radiological Emergency Suite 220 Planning Administrator Washington, DC 20004 Department of Public Safety 6000 Southeast Tower Drive Mr. Douglas Anderson Stuart, Florida 34997 County Administrator St. Lucie County Mr. Bill Parks 2300 Virginia Avenue Operations Manager Fort Pierce, Florida 34982 St. Lucie Nuclear Plant 6351 South Ocean Drive Mr. William A. Passetti, Chief Jensen Beach, Florida 34957-2000 Department of Health Bureau of Radiation Control Mr. Seth B. Duston 2020 Capital Circle, SE, Bin #C21 Training Manager Tallahassee, Florida 32399-1741 St. Lucie Nuclear Plant 6351 South Ocean Drive Mr. Gordon L. Johnston Jensen Beach, Florida 34957-2000 Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000}} |
Latest revision as of 12:26, 13 March 2020
ML072080045 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 07/27/2007 |
From: | Mozafari B NRC/NRR/ADRO/DORL/LPLII-2 |
To: | Stall J Florida Power & Light Co |
Mozafari B, NRR/ADRO/DORL, 415-2020 | |
References | |
GL-06-001, TAC MD0105 | |
Download: ML072080045 (4) | |
Text
July 27, 2007 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
ST. LUCIE, UNIT 2 - NRC GENERIC LETTER 2006-01: STEAM GENERATOR TUBE INTEGRITY AND ASSOCIATED TECHNICAL SPECIFICATIONS (TAC NO. MD0105)
Dear Mr. Stall:
On January 20, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2006-01, Steam Generator [SG] Tube Integrity and Associated Technical Specifications
[TSs] (see Agencywide Document Access and Management System (ADAMS) Accession No. ML060200385). This GL requested that addressees either submit a description of their program for ensuring SG tube integrity for the interval between inspections or adopt alternative TS requirements for ensuring SG tube integrity.
By letter dated February 17, 2006, Florida Power and Light Company, the licensee for St. Lucie, Unit 2, submitted a response to GL 2006-01 (ADAMS Accession No. ML060530640). This response provided a regulatory commitment to submit a request to modify the SG portion of the TSs. By application to the NRC dated May 25, 2006, the licensee requested changes to the TSs for St. Lucie, Unit 2, to adopt the alternative TS requirements for ensuring SG tube integrity (ML061510346). The new TSs were modeled after Technical Specification Task Force (TSTF)
Traveler, TSTF-449, Steam Generator Tube Integrity (ML051090200). By letters dated January 22, 2007 (ML070250070) and April 16, 2007 (ML071210531), the licensee provided the NRC supplements to the original application. On May 29, 2007, the NRC staff issued Amendment No. 147 to the St. Lucie, Unit 2, Facility Operating License that approved the new SG TSs (ML071490483).
The NRC staff finds the licensees adoption of new SG TSs modeled after TSTF-449 to be an acceptable and complete response to GL 2006-01. This completes the NRC staffs efforts on TAC No. MD0105. If you have any questions regarding this letter, please contact me at 301-415-2020.
Sincerely,
/RA/
Brenda L. Mozafari, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-389 cc: See next page
ML060530640). This response provided a regulatory commitment to submit a request to modify the SG portion of the TSs. By application to the NRC dated May 25, 2006, the licensee requested changes to the TSs for St. Lucie, Unit 2, to adopt the alternative TS requirements for ensuring SG tube integrity (ML061510346). The new TSs were modeled after Technical Specification Task Force (TSTF)
Traveler, TSTF-449, Steam Generator Tube Integrity (ML051090200). By letters dated January 22, 2007 (ML070250070) and April 16, 2007 (ML071210531), the licensee provided the NRC supplements to the original application. On May 29, 2007, the NRC staff issued Amendment No. 147 to the St. Lucie, Unit 2, Facility Operating License that approved the new SG TSs (ML071490483).
The NRC staff finds the licensees adoption of new SG TSs modeled after TSTF-449 to be an acceptable and complete response to GL 2006-01. This completes the NRC staffs efforts on TAC No. MD0105. If you have any questions regarding this letter, please contact me at 301-415-2020.
Sincerely,
/RA/
Brenda L. Mozafari, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-389 cc: See next page DISTRIBUTION:
PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrPMBMozafari RidsNrrLABClayton (Hard Copy) RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDciCsgb RidsRgn2MailCenter RidsNrrDorlDpr ADAMS ACCESSION NO: ML072080045 OFFICE LPL2-2/PM LPL2-2/LA NRR/CSGB/BC LPL2-2/BC NAME BMozafari BClayton AHiser TBoyce/
LRaghavan for DATE 07/27/2007 07/27/2007 07/27/2007 07/27/2007 Florida Power and Light Company ST. LUCIE PLANT cc:
Mr. William E. Webster Mr. Christopher R. Costanzo Vice President, Nuclear Operations, Plant General Manager South Region St. Lucie Nuclear Plant Florida Power & Light Company 6351 South Ocean Drive P.O. Box 14000 Jensen Beach, Florida 34957 Juno Beach, FL 33408-0420 Mr. Terry Patterson Senior Resident Inspector Licensing Manager St. Lucie Plant St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission 6351 South Ocean Drive P.O. Box 6090 Jensen Beach, Florida 34957 Jensen Beach, Florida 34957 Don E. Grissette Craig Fugate, Director Vice President, Nuclear Training Division of Emergency Preparedness and Performance Improvement Department of Community Affairs Florida Power & Light Company 2740 Centerview Drive P.O. Box 14000 Tallahassee, Florida 32399-2100 Juno Beach, FL 33408-0420 M. S. Ross, Managing Attorney Mr. Rajiv S. Kundalkar Florida Power & Light Company Vice President - Nuclear Technical Services P.O. Box 14000 Florida Power & Light Company Juno Beach, FL 33408-0420 P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi, Senior Attorney Florida Power & Light Company Mr. J. Kammel 801 Pennsylvania Avenue, NW. Radiological Emergency Suite 220 Planning Administrator Washington, DC 20004 Department of Public Safety 6000 Southeast Tower Drive Mr. Douglas Anderson Stuart, Florida 34997 County Administrator St. Lucie County Mr. Bill Parks 2300 Virginia Avenue Operations Manager Fort Pierce, Florida 34982 St. Lucie Nuclear Plant 6351 South Ocean Drive Mr. William A. Passetti, Chief Jensen Beach, Florida 34957-2000 Department of Health Bureau of Radiation Control Mr. Seth B. Duston 2020 Capital Circle, SE, Bin #C21 Training Manager Tallahassee, Florida 32399-1741 St. Lucie Nuclear Plant 6351 South Ocean Drive Mr. Gordon L. Johnston Jensen Beach, Florida 34957-2000 Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000