Line 3: |
Line 3: |
| | issue date = 03/20/2008 | | | issue date = 03/20/2008 |
| | title = Technical Specifications 3.7, Plant Systems, Pages 3 .7 .4-1 Through 3 .7 .4-3, Quad Cities Units 1 and 2, to CR Habitability Amendment | | | title = Technical Specifications 3.7, Plant Systems, Pages 3 .7 .4-1 Through 3 .7 .4-3, Quad Cities Units 1 and 2, to CR Habitability Amendment |
| | author name = Wiebe J S | | | author name = Wiebe J |
| | author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2 | | | author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2 |
| | addressee name = Pardee C G | | | addressee name = Pardee C |
| | addressee affiliation = Exelon Generation Co, LLC | | | addressee affiliation = Exelon Generation Co, LLC |
| | docket = 05000237, 05000249, 05000254, 05000265 | | | docket = 05000237, 05000249, 05000254, 05000265 |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:3.7 PLANT SYSTEMS 3.7.4 Control Room Emergency Ventilation (CREV) System LCO 3.7.4 The CREV System shall be OPERABLE. ACTIONS CONDITION A. CREV System inoperable in MODE 1, 2, or 3 for reasons other than Condition B. B. CREV system inoperable due to inoperable CRE boundary in MODE l, 2, or 3. --------------NOTE------------------- | | {{#Wiki_filter:CREV System 3 .7 .4 3 .7 PLANT SYSTEMS 3 .7 .4 Control Room Emergency Ventilation (CREV) System LCO 3 .7 .4 The CREV System shall be OPERABLE . |
| The main control room envelope (CRE) boundary may be opened intermittently under administrative control. ------------------------------------- | | --------------NOTE------------------- |
| APPLICABILITY | | The main control room envelope (CRE) boundary may be opened intermittently under administrative control . |
| : MODES l, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs). REQUIRED ACTION Restore CREV System to OPERABLE status. AND B.2 AND B.3 Initiate action to implement mitigating actions. Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits. Restore CRE boundary to OPERABLE status. COMPLETION TIME 7 days Immediately 24 hours 90 days CREV System 3.7.4 (continued) | | APPLICABILITY : MODES l, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs) . |
| Quad Cities 1 and 2 3.7.4-1 Amendment No. | | ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. CREV System inoperable Restore CREV System 7 days in MODE 1, 2, or 3 for to OPERABLE status . |
| D. Quad Cities 1 and 2 3.7.4-2 COMPLETION TIME 12 hours 36 hours Immediately Immediately CREV System 3.7.4 Amendment No. CREV System inoperable during movement of recently irradiated LCO ------------
| | reasons other than Condition B . |
| NOTE ---__----___- | | B. CREV system Initiate action to Immediately inoperable due to implement mitigating inoperable CRE actions . |
| 3.0.3 is not applicable. fuel assemblies in the secondary containment D.1 Suspend movement of or during OPDRVs. recently irradiated fuel assemblies in the secondary containment. CREV System inoperable due to an inoperable AND CRE boundary during movement of recently D.2 Initiate action to irradiated fuel suspend OPDRVs. assemblies in the secondary containment or during OPDRVs. ACTIONS (continued) | | boundary in MODE l, 2, or 3 . AND B .2 Verify mitigating 24 hours actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits . |
| CONDITION REQUIRED ACTION C. Required Action and C.l Be in MODE 3. associated Completion Time of Condition A or AND B not met in MODE l, 2, or 3. C.2 Be in MODE 4.
| | AND B .3 Restore CRE boundary 90 days to OPERABLE status . |
| SURVEILLANCE REQUIREMENTS CREV System 3.7.4 Quad Cities 1 and 2 3.7.4-3 Amendment No. SURVEILLANCE -T FREQUENCY SR 3.7.4.1 Operate the CREV System for >_ 10 continuous 31 days hours with the heaters operating. SR 3.7.4.2 Perform required CREV filter testing in In accordance accordance with the Ventilation Filter with the VFTP Testing Program (VFTP). SR 3.7.4.3 Verify the CREV System isolation dampers 24 months close on an actual or simulated initiation signal. SR 3.7.4.4 Perform required CRE unfiltered air In accordance inleakage testing in accordance with the with the Control Room Envelope Habitability Program. Control Room Envelope Habitability Program}}
| | (continued) |
| | Quad Cities 1 and 2 3 .7 .4-1 Amendment No . |
| | |
| | CREV System 3 .7 .4 ACTIONS (continued) |
| | CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C .l Be in MODE 3 . 12 hours associated Completion Time of Condition A or AND B not met in MODE l, 2, or 3 . C .2 Be in MODE 4 . 36 hours D. CREV System inoperable ------------ NOTE ---__----___- |
| | during movement of LCO 3 .0 .3 is not applicable . |
| | recently irradiated fuel assemblies in the secondary containment D .1 Suspend movement of Immediately or during OPDRVs . recently irradiated fuel assemblies in the secondary containment . |
| | CREV System inoperable due to an inoperable AND CRE boundary during movement of recently D .2 Initiate action to Immediately irradiated fuel suspend OPDRVs . |
| | assemblies in the secondary containment or during OPDRVs . |
| | Quad Cities 1 and 2 3 .7 .4-2 Amendment No . |
| | |
| | CREV System 3 .7 .4 SURVEILLANCE REQUIREMENTS SURVEILLANCE |
| | -T FREQUENCY SR 3 .7 .4 .1 Operate the CREV System for >_ 10 continuous 31 days hours with the heaters operating . |
| | SR 3 .7 .4 .2 Perform required CREV filter testing in In accordance accordance with the Ventilation Filter with the VFTP Testing Program (VFTP) . |
| | SR 3 .7 .4 .3 Verify the CREV System isolation dampers 24 months close on an actual or simulated initiation signal . |
| | SR 3 .7 .4 .4 Perform required CRE unfiltered air In accordance inleakage testing in accordance with the with the Control Room Envelope Habitability Program . Control Room Envelope Habitability Program Quad Cities 1 and 2 3 .7 .4-3 Amendment No .}} |
|
---|
Category:Technical Specifications
MONTHYEARML24183A1082024-08-0808 August 2024 – Issuance of Amendment Nos. 302 and 298 Adoption of Tstf-505, Provide Risk Informed Extended Completion Times – RITSTF Initiative 4b ML24136A1322024-07-30030 July 2024 Transmittal Letter for Renewed License ML24138A0572024-06-26026 June 2024 – Issuance of Amendment Nos. 285 and 278 Application to Adopt TSTF-564, “Safety Limit Mcpr” ML23349A1622023-12-17017 December 2023 Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs ML23144A3142023-07-0606 July 2023 Issuance of Amendment Nos. 281 and 274 Transition to GNF3 Fuel (EPID L-2022-LLA-0121) - Nonproprietary ML23032A3602023-03-22022 March 2023 Issuance of Amendment Nos. 279 and 272 New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies ML22217A0442022-12-0707 December 2022 Issuance of Amendment Nos. 292 and 288 Control Rod Scram Times RS-22-065, License Amendment Request Regarding Transition to GNF3 Fuel2022-08-18018 August 2022 License Amendment Request Regarding Transition to GNF3 Fuel ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-006, Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel2022-01-20020 January 2022 Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21179A0432021-06-21021 June 2021 4 to Final Safety Analysis Report, Chapter 16, Technical Specifications ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2020-04-13013 April 2020 County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems RS-20-046, Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.32020-04-0101 April 2020 Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.3 ML18137A2712018-06-29029 June 2018 Issuance of Amendments Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies (Cac. Nos. MF9687 and MF9688; EPID L-2017-LLA-0228) (RS-17-060) RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement ML17311A1622017-12-0101 December 2017 Issuance of Amendments Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Technical Requirements Manual2017-10-19019 October 2017 Quad Cities Nuclear Power Station, Units 1 & 2, Technical Requirements Manual ML17298A4422017-10-19019 October 2017 Technical Requirements Manual ML17238A1222017-08-26026 August 2017 Transmittal of Previously Omitted Proposed Technical Specification Page 3.1-2, and Figures 2.1.1, 3.3.1, 3.3.2, 3.5.1, 3.6.1 ML17180A1212017-06-21021 June 2017 Technical Specification Bases RS-17-082, Dresden Nuclear Power Station, Units 2 & 3, Technical Specification Bases2017-06-21021 June 2017 Dresden Nuclear Power Station, Units 2 & 3, Technical Specification Bases ML17151A8002017-05-31031 May 2017 Amendment No. 82, Section 1.1 Safety Limit Bases ML16111A1042016-05-11011 May 2016 Issuance of Amendments to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core SLs (CAC Nos. MF6640-MF6644) ML15343A1262016-04-29029 April 2016 Issuance of Amendments to Amend Facility Operating License Nos. DPR-19 and DPR-25 to Revise Technical Specifications to Support Use of a New Nuclear Criticality Safety Analysis Methodology RS-16-035, County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings2016-02-0303 February 2016 County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings ML15324A4392015-12-17017 December 2015 Issuance of Amendments (CAC Nos. MF5471-MF5476) ML15268A4862015-10-0606 October 2015 Correction of Amendments Adopting Technical Specification Task Force Traveler TSTF-523 (TAC Nos. MF4436-MF4446) ML15183A3512015-08-0505 August 2015 Issuance of Amendments Concerning Adding Topical References to Technical Specifications (TAC Nos. MF3359, MF3363, MF3361, and MF3362)(RS-13-288) ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML15106A9472015-04-24024 April 2015 Correction to Amendments Regarding Battery Surveillance Requirements (TAC Nos. MF4589 and MF4590) ML14323A5222015-04-0808 April 2015 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training ML15056A7722015-03-30030 March 2015 Issuance of Amendments Regarding ML14085A5322014-07-21021 July 2014 Issuance of Amendments Adoption of TSTF-522 Ventilation System Surveillance Requirements RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.2013-12-19019 December 2013 Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. RS-13-137, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2013-09-0303 September 2013 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process RS-13-165, Request for License Amendment to Revise Battery Surveillance Requirements2013-06-10010 June 2013 Request for License Amendment to Revise Battery Surveillance Requirements RS-11-180, Quad Cities, Unit 2 - Request for Technical Specification Change for Safety Limit Minimum Critical Power Ratio2011-11-22022 November 2011 Quad Cities, Unit 2 - Request for Technical Specification Change for Safety Limit Minimum Critical Power Ratio ML1132603482011-11-22022 November 2011 Request for Technical Specification Change for Safety Limit Minimum Critical Power Ratio ML0926704882009-10-21021 October 2009 Issuance of Amendments Risk Informed Modification to Selected Required Action End States for BWR Plants ML0925101522009-10-20020 October 2009 License Amendments, Modify the Technical Specifications to Risk-informed Requirements Regarding Selected Required Action End States as Provided in Technical Specification Task Force (TSTF) Change Traveler TSTF-423, Revision 0 RS-09-036, Request for License Amendment to Technical Specification (TS) 3.4.5, RCS Leakage Detection Instrumentation, TS 5.6.5, Core Operating Limits Report (Color), and Renewed Facility Operating License2009-04-0707 April 2009 Request for License Amendment to Technical Specification (TS) 3.4.5, RCS Leakage Detection Instrumentation, TS 5.6.5, Core Operating Limits Report (Color), and Renewed Facility Operating License ML0824703052008-08-28028 August 2008 Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497 ML0824015232008-08-22022 August 2008 Tech Spec Pages for Emergency Amendment 221 Regarding Drywell Floor Drain Sump Monitoring System ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses 2024-08-08
[Table view] |
Text
CREV System 3 .7 .4 3 .7 PLANT SYSTEMS 3 .7 .4 Control Room Emergency Ventilation (CREV) System LCO 3 .7 .4 The CREV System shall be OPERABLE .
NOTE-------------------
The main control room envelope (CRE) boundary may be opened intermittently under administrative control .
APPLICABILITY : MODES l, 2, and 3, During movement of recently irradiated fuel assemblies in the secondary containment, During operations with a potential for draining the reactor vessel (OPDRVs) .
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. CREV System inoperable Restore CREV System 7 days in MODE 1, 2, or 3 for to OPERABLE status .
reasons other than Condition B .
B. CREV system Initiate action to Immediately inoperable due to implement mitigating inoperable CRE actions .
boundary in MODE l, 2, or 3 . AND B .2 Verify mitigating 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits .
AND B .3 Restore CRE boundary 90 days to OPERABLE status .
(continued)
Quad Cities 1 and 2 3 .7 .4-1 Amendment No .
CREV System 3 .7 .4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C .l Be in MODE 3 . 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or AND B not met in MODE l, 2, or 3 . C .2 Be in MODE 4 . 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D. CREV System inoperable ------------ NOTE ---__----___-
during movement of LCO 3 .0 .3 is not applicable .
recently irradiated fuel assemblies in the secondary containment D .1 Suspend movement of Immediately or during OPDRVs . recently irradiated fuel assemblies in the secondary containment .
CREV System inoperable due to an inoperable AND CRE boundary during movement of recently D .2 Initiate action to Immediately irradiated fuel suspend OPDRVs .
assemblies in the secondary containment or during OPDRVs .
Quad Cities 1 and 2 3 .7 .4-2 Amendment No .
CREV System 3 .7 .4 SURVEILLANCE REQUIREMENTS SURVEILLANCE
-T FREQUENCY SR 3 .7 .4 .1 Operate the CREV System for >_ 10 continuous 31 days hours with the heaters operating .
SR 3 .7 .4 .2 Perform required CREV filter testing in In accordance accordance with the Ventilation Filter with the VFTP Testing Program (VFTP) .
SR 3 .7 .4 .3 Verify the CREV System isolation dampers 24 months close on an actual or simulated initiation signal .
SR 3 .7 .4 .4 Perform required CRE unfiltered air In accordance inleakage testing in accordance with the with the Control Room Envelope Habitability Program . Control Room Envelope Habitability Program Quad Cities 1 and 2 3 .7 .4-3 Amendment No .