ML092120239: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML092120239
| number = ML092120239
| issue date = 07/31/2009
| issue date = 07/31/2009
| title = 2009/07/31-Commission Memorandum and Order (CLI-09-16)
| title = Commission Memorandum and Order (CLI-09-16)
| author name = Bates A
| author name = Bates A
| author affiliation = NRC/SECY
| author affiliation = NRC/SECY
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION COMMISSIONERS:
 
Gregory B. Jaczko, Chairman Dale E. Klein Kristine L. Svinicki
COMMISSIONERS:
                                                              )
Gregory B. Jaczko, Chairman  
In the Matter of                                               )
 
                                                              )
Dale E. Klein  
SOUTHERN NUCLEAR OPERATING CO.                                 )  Docket Nos. 52-025-COL &
 
                                                              )                52-026-COL (Vogtle Electric Generating Plant, Units 3 and 4)              )
Kristine L. Svinicki  
                                                              )
 
CLI-09-16 MEMORANDUM AND ORDER This proceeding concerns the application of Southern Nuclear Operating Company (SNC) for a combined license (COL) under 10 C.F.R. Part 52 to construct and operate two new nuclear reactor units (proposed Units 3 and 4) at the Vogtle Electric Generating Plant (Vogtle) site in Georgia. The NRC Staff (Staff) and SNC have appealed LBP-09-3, an Atomic Safety and Licensing Board decision granting the intervention petition filed by five organizationsthe Center for a Sustainable Coast, Savannah Riverkeeper, the Southern Alliance for Clean Energy, Atlanta Womens Action for New Directions, and the Blue Ridge Environmental Defense League (collectively, Intervenors).1 Intervenors oppose the appeals filed by SNC and the Staff.2 We 1
In the Matter of  
See Southern Nuclear Operating Companys Brief in Support of Appeal of LBP-09-03 (Mar. 14, 2009)(SNC Appeal); NRC Staff Notice of Appeal of LBP-09-03, Memorandum and Order (Ruling on Standing and Contention Admissibility), and Accompanying Brief (Mar. 16, 2009)(Staff Appeal).
 
2 See Joint Intervenors Brief in Opposition of Appeal (Mar. 24, 2009).
SOUTHERN NUCLEAR OPERATING CO.  
 
(Vogtle Electric Generating Plant, Units 3 and 4)
 
) )
)
)
)
)
)   
 
Docket Nos. 52-025-COL &
52-026-COL  
 
CLI-09-16 MEMORANDUM AND ORDER This proceeding concerns the application of Southern Nuclear Operating Company (SNC) for a combined license (COL) under 10 C.F.R. Part 52 to construct and operate two new  
 
nuclear reactor units (proposed Units 3 and 4) at the Vogtle Electric Generating Plant (Vogtle)  
 
site in Georgia. The NRC Staff (Staff) and SNC have appealed LBP-09-3, an Atomic Safety and  
 
Licensing Board decision granting the intervention petition filed by five organizations-the
 
Center for a Sustainable Coast, Savannah Riverkeeper, the Southern Alliance for Clean Energy, Atlanta Women's Action for New Directions, and the Blue Ridge Environmental Defense League (collectively, Intervenors).
1 Intervenors oppose the appeals filed by SNC and the Staff.
2 We 1 See Southern Nuclear Operating Company's Brief in Support of Appeal of LBP-09-03 (Mar. 14, 2009)(SNC Appeal); NRC Staff Notice of Appeal of LBP-09-03, Memorandum and Order (Ruling on Standing and Contention Admissibility), and Accompanying Brief (Mar. 16, 2009)(Staff Appeal). 2 See Joint Intervenors' Brief in Opposition of Appeal (Mar. 24, 2009).
decline to disturb the Board's decision to admit Contention SAFETY-1.
I. BACKGROUND On March 5, 2009, the Board issued LBP-09-3, which found that Intervenors had demonstrated standing and had submitted one admissible contention, Contention SAFETY-1.
3  Based on these findings, the Board granted the intervention petition.
In proposed Contention SAFETY-1, Intervenors argued that SNC's COL application was
 
insufficient because it failed to address long-term storage of low-level radioactive waste (LLRW)
 
at the Vogtle site. The contention is founded on the premise that, following closure of the
 
Barnwell, South Carolina disposal site to waste generated outside the Atlantic Compact, there
 
currently is no licensed facility in the United States that is available to accept and dispose of
 
certain LLRW that would be generated by the operation of Vogtle Units 3 and 4. As originally
 
proffered, the contention stated:
SNC's [COL application] is incomplete because the FSAR [Final Safety Analysis Report] fails to consider how SNC will comply with NRC regulations governing
 
storage and disposal of LLRW in the event an off-site waste disposal facility
 
remains unavailable when [Vogtle] Units 3 and 4 begin operations.
4  The Board rejected the portion of the contention relating to disposal of LLRW, reiterating that issues governing disposal pursuant to 10 C.F.R. Part 61 are not within the scope of COL
 
proceedings, 5 but otherwise admitted a virtually identical version of the contention:
3 Southern Nuclear Operating Co. (Vogtle Electric Generating Plant, Units 3 and 4), LBP-09-3, 69 NRC __ (Mar. 5, 2009)(slip op.). In addition, the Board referred to us its ruling declining to
 
admit Contentions MISC-1 and MISC-2. We recently declined to review the referred rulings. 


decline to disturb the Boards decision to            admit Contention SAFETY-1.
I. BACKGROUND On March 5, 2009, the Board issued LBP-09-3, which found that Intervenors had demonstrated standing and had submitted one admissible contention, Contention SAFETY-1.3 Based on these findings, the Board granted the intervention petition.
In proposed Contention SAFETY-1, Intervenors argued that SNCs COL application was insufficient because it failed to address long-term storage of low-level radioactive waste (LLRW) at the Vogtle site. The contention is founded on the premise that, following closure of the Barnwell, South Carolina disposal site to waste generated outside the Atlantic Compact, there currently is no licensed facility in the United States that is available to accept and dispose of certain LLRW that would be generated by the operation of Vogtle Units 3 and 4. As originally proffered, the contention stated:
SNCs [COL application] is incomplete because the FSAR [Final Safety Analysis Report] fails to consider how SNC will comply with NRC regulations governing storage and disposal of LLRW in the event an off-site waste disposal facility remains unavailable when [Vogtle] Units 3 and 4 begin operations.4 The Board rejected the portion of the contention relating to disposal of LLRW, reiterating that issues governing disposal pursuant to 10 C.F.R. Part 61 are not within the scope of COL proceedings,5 but otherwise admitted a virtually identical version of the contention:
3 Southern Nuclear Operating Co. (Vogtle Electric Generating Plant, Units 3 and 4), LBP-09-3, 69 NRC __ (Mar. 5, 2009)(slip op.). In addition, the Board referred to us its ruling declining to admit Contentions MISC-1 and MISC-2. We recently declined to review the referred rulings.
Southern Nuclear Operating Co. (Vogtle Electric Generating Plant, Units 3 and 4), CLI-09-13, 69 NRC __ (June 25, 2009)(slip op.).
Southern Nuclear Operating Co. (Vogtle Electric Generating Plant, Units 3 and 4), CLI-09-13, 69 NRC __ (June 25, 2009)(slip op.).
4 Petition for Intervention at 14 (Nov. 17, 2008).
4 Petition for Intervention at 14 (Nov. 17, 2008).
5 LBP-09-3, 69 NRC __ (slip op. at 25).
5 LBP-09-3, 69 NRC __ (slip op. at 25).
SNC's [COL application] is incomplete because the FSAR fails to provide any detail as to how SNC will comply with NRC regulations governing storage of
LLRW in the event an off-site waste disposal facility remains unavailable when
[Vogtle] Units 3 and 4 begin operations.
6  As reformulated, the Board admitted this contention as one of omission, finding that the contention and its foundation were "sufficient to establish a genuine material dispute adequate


to warrant further inquiry."
SNCs [COL application] is incomplete        because the FSAR fails to provide any detail as to how SNC will comply with NRC regulations governing storage of LLRW in the event an off-site waste disposal facility remains unavailable when
7 The Board distinguished the contention before it from a similar contention in the Bellefonte COL proceeding, which we recently rejected.
[Vogtle] Units 3 and 4 begin operations.6 As reformulated, the Board admitted this contention as one of omission, finding that the contention and its foundation were sufficient to establish a genuine material dispute adequate to warrant further inquiry.7 The Board distinguished the contention before it from a similar contention in the Bellefonte COL proceeding, which we recently rejected.8 II. DISCUSSION We will give substantial deference to a Boards rulings on contention admissibility in the absence of clear error or abuse of discretion.9 At issue here are the requirements of 10 C.F.R. § 52.79(a)(3), which states as follows:
8 II. DISCUSSION We will give substantial deference to a Board's rulings on contention admissibility in the absence of clear error or abuse of discretion.
(a)     The [COL] application must contain a final safety analysis report that describes the facility, presents the design bases and the limits on its operation, and presents a safety analysis of the structures, systems, and components of the facility as a whole. The final safety analysis report shall include the following information, at a level of information sufficient to enable the Commission to reach a final conclusion on all safety matters that must be resolved by the Commission before issuance of a combined 6
9     At issue here are the requirements of 10 C.F.R. § 52.79(a)(3), which states as follows:
Id. (slip op., App. A).
(a) The [COL] application must contain a final safety analysis report that describes the facility, presents the design bases and the limits on its  
 
operation, and presents a safety analysis of the structures, systems, and  
 
components of the facility as a whole. The final safety analysis report  
 
shall include the following information, at a level of information sufficient  
 
to enable the Commission to reach a final conclusion on all safety matters  
 
that must be resolved by the Commission before issuance of a combined 6 Id. (slip op., App. A).
7 Id. (slip op. at 20).
7 Id. (slip op. at 20).
8 Tennessee Valley Authority (Bellefonte Nuclear Power Plant, Units 3 and 4), LBP-08-16, 68 NRC 361, 413-15 (2008), rev'd , CLI-09-3, 69 NRC __ (Feb. 17, 2009) (slip op. at 13). In particular, the Board observed that the contention admitted in the Bellefonte proceeding focused exclusively on the regulations governing waste disposal, whereas Contention SAFETY-1 also  
8 Tennessee Valley Authority (Bellefonte Nuclear Power Plant, Units 3 and 4), LBP-08-16, 68 NRC 361, 413-15 (2008), revd, CLI-09-3, 69 NRC __ (Feb. 17, 2009) (slip op. at 13). In particular, the Board observed that the contention admitted in the Bellefonte proceeding focused exclusively on the regulations governing waste disposal, whereas Contention SAFETY-1 also was grounded in 10 C.F.R. Parts 20 and 52. LBP-09-3, 69 NRC __ (slip op. at 23).
 
9 See Crow Butte Resources, Inc. (License Renewal for In Situ Leach Facility, Crawford, Nebraska), CLI-09-9, 69 NRC __ (May 18, 2009) (slip op. at 4); AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-06-24, 64 NRC 111, 121 (2006); Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-99-10, 49 NRC 318, 324 (1999); Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), ALAB-855, 24 NRC 792, 795 (1986).
was grounded in 10 C.F.R. Parts 20 and 52. LBP-09-3, 69 NRC __ (slip op. at 23).
9 See Crow Butte Resources, Inc. (License Renewal for In Situ Leach Facility, Crawford, Nebraska), CLI-09-9, 69 NRC __ (May 18, 2009) (slip op. at 4); AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-06-24, 64 NRC 111, 121 (2006);
Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-99-10, 49 NRC 318, 324 (1999); Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), ALAB-855, 24 NRC 792, 795 (1986).
license: . . .
 
(3) The kinds and quantities of radioactive materials expected to be produced in the operation and the means for controlling and limiting radioactive
 
effluents and radiation exposures within the limits set forth in part 20 of
 
this chapter . . . .
 
The Board agreed with Intervenors' assertion, raised in their reply filing, that this regulation requires COL applicants to consider long-term onsite LLRW storage, and reasoned, "we do not see how, if offsite disposal for LLRW remains unavailable, a COL applicant could
 
address compliance with 10 CFR Part 20 limits in accordance with section 52.79(a)(3) without
 
addressing what it intends to do with the LLRW . . . expected to be produced in the operation of
 
the proposed units."
10  On appeal, SNC argues that several factors compel reversal of the Board's decision.
First, SNC relies on our recent decision in Bellefonte , and, particularly, argues that the contention rejected in that COL proceeding is substantively identical to the contention at issue


here.11 Second, SNC argues that our regulations do not require COL applicants to address long-term LLRW storage.
license: . . .
12 Third, SNC claims that the COL application does, in fact, address the potential availability of long-term LLRW storage at the Vogtle site.
(3)    The kinds and quantities of radioactive materials expected to be produced in the operation and the means for controlling and limiting radioactive effluents and radiation exposures within the limits set forth in part 20 of this chapter . . . .
13 The arguments submitted by the Staff overl ap those made by SNC. First, the Staff argues that the Board erred in admitting SAFETY-1 as a contention of omission, because the 10 LBP-09-3, 69 NRC __ (slip op. at 24).
The Board agreed with Intervenors assertion, raised in their reply filing, that this regulation requires COL applicants to consider long-term onsite LLRW storage, and reasoned, we do not see how, if offsite disposal for LLRW remains unavailable, a COL applicant could address compliance with 10 CFR Part 20 limits in accordance with section 52.79(a)(3) without addressing what it intends to do with the LLRW . . . expected to be produced in the operation of the proposed units.10 On appeal, SNC argues that several factors compel reversal of the Boards decision.
First, SNC relies on our recent decision in Bellefonte, and, particularly, argues that the contention rejected in that COL proceeding is substantively identical to the contention at issue here.11 Second, SNC argues that our regulations do not require COL applicants to address long-term LLRW storage.12 Third, SNC claims that the COL application does, in fact, address the potential availability of long-term LLRW storage at the Vogtle site.13 The arguments submitted by the Staff overlap those made by SNC. First, the Staff argues that the Board erred in admitting SAFETY-1 as a contention of omission, because the 10 LBP-09-3, 69 NRC __ (slip op. at 24).
11 SNC Appeal at 8.
11 SNC Appeal at 8.
12 Id. at 10. 13 Id. at 12-13.
12 Id. at 10.
asserted missing information is available in the COL application.
13 Id. at 12-13.
14  Second, the Staff claims that Petitioners failed to demonstrate that the contention is legally or factually material to
 
the proceeding, because 10 C.F.R. § 52.79(a)(3) contains no requirement for a detailed
 
discussion of long-term, onsite storage, and Petitioners cited no other regulatory provision.
15  Finally, the Staff argues that the contention lacks an adequate basis, because Petitioners
 
confuse the issues of onsite storage and long-term disposal of LLRW and provide no legal basis
 
for the contention in the Petition.
16 We agree that the plain language of section 52.79(a)(3) does not explicitly require a description of LLRW storage for a specified duration.
17  On its face, therefore, section 52.79(a)(3) sets no quantity or time restrictions relative to onsite storage of such waste. Rather, it requires that a COL application contain information of first, the "kinds and quantities of
 
materials expected to be produced" during plant operation, and second, the "means for
 
controlling and limiting radioactive effluents and radiation exposures" to comply with Part 20
 
limits. In short, the rule pertains to how the COL applicant intends, through its design, operational organization, and procedures, to comply with relevant substantive radiation 14 NRC Staff Notice of Appeal of LBP-09-03, Memorandum and Order (Ruling on Standing and Contention Admissibility), and Accompanying Brief, at 7 (Mar. 16, 2009)(Staff Appeal).
15 Id. at 11. 16 Id. at 13-14.
17 This is also true of relevant agency guidance. In particular, the Standard Review Plan (SRP) provides two separate sets of review guidelines: one set for areas designed to accommodate
 
approximately 6 months of waste generation, and one set for longer term onsite storage (several years, but within the operational life of the plant).
See U.S. Nuclear Regulatory Commission Standard Review Plan, NUREG-0800, Section 11.4, "Solid Waste Management
 
System" (Rev. 3 Mar. 2007), at subsection III.4 (citing Branch Technical Position 11-3 for 6
 
months' storage, and SRP Appendix 11.4-A to the SRP for longer storage terms).
protection requirements in 10 C.F.R. Part 20. This includes, but is not limited to, low-level radioactive waste handling and storage. Part 20 outlines a number of radiation protection
 
requirements with which licensees must comply. For example, a licensee must use procedures
 
and controls to reduce occupational doses and doses to members of the public to levels that are
 
as low as reasonably achievable.
18  Part 20 also sets forth upper limitations on occupational doses 19 as well as dose limits for individual members of the public.
20  Ultimately, the combined license holder must comply with these requirements regardless of the amount of LLRW stored


on the site - be it one cubic foot or one thousand.
asserted missing information is available in          the COL application.14 Second, the Staff claims that Petitioners failed to demonstrate that the contention is legally or factually material to the proceeding, because 10 C.F.R. § 52.79(a)(3) contains no requirement for a detailed discussion of long-term, onsite storage, and Petitioners cited no other regulatory provision.15 Finally, the Staff argues that the contention lacks an adequate basis, because Petitioners confuse the issues of onsite storage and long-term disposal of LLRW and provide no legal basis for the contention in the Petition.16 We agree that the plain language of section 52.79(a)(3) does not explicitly require a description of LLRW storage for a specified duration.17 On its face, therefore, section 52.79(a)(3) sets no quantity or time restrictions relative to onsite storage of such waste. Rather, it requires that a COL application contain information of first, the kinds and quantities of materials expected to be produced during plant operation, and second, the means for controlling and limiting radioactive effluents and radiation exposures to comply with Part 20 limits. In short, the rule pertains to how the COL applicant intends, through its design, operational organization, and procedures, to comply with relevant substantive radiation 14 NRC Staff Notice of Appeal of LBP-09-03, Memorandum and Order (Ruling on Standing and Contention Admissibility), and Accompanying Brief, at 7 (Mar. 16, 2009)(Staff Appeal).
As such, the required information is tied to the COL applicant's particular plans for compliance through design, operational organization, and procedures. However, the scope and  
15 Id. at 11.
16 Id. at 13-14.
17 This is also true of relevant agency guidance. In particular, the Standard Review Plan (SRP) provides two separate sets of review guidelines: one set for areas designed to accommodate approximately 6 months of waste generation, and one set for longer term onsite storage (several years, but within the operational life of the plant). See U.S. Nuclear Regulatory Commission Standard Review Plan, NUREG-0800, Section 11.4, Solid Waste Management System (Rev. 3 Mar. 2007), at subsection III.4 (citing Branch Technical Position 11-3 for 6 months storage, and SRP Appendix 11.4-A to the SRP for longer storage terms).


extent of that required information on specific plans or contingency planning is not clear.
protection requirements in 10 C.F.R. Part 20.        This includes, but is not limited to, low-level radioactive waste handling and storage. Part 20 outlines a number of radiation protection requirements with which licensees must comply. For example, a licensee must use procedures and controls to reduce occupational doses and doses to members of the public to levels that are as low as reasonably achievable.18 Part 20 also sets forth upper limitations on occupational doses19 as well as dose limits for individual members of the public.20 Ultimately, the combined license holder must comply with these requirements regardless of the amount of LLRW stored on the site - be it one cubic foot or one thousand.
Moreover, we observe that the Staff appears to have taken a potentially inconsistent position on this issue in another of the COL proceedings in which it has been raised.
As such, the required information is tied to the COL applicants particular plans for compliance through design, operational organization, and procedures. However, the scope and extent of that required information on specific plans or contingency planning is not clear.
21 In the ongoing North Anna COL proceeding, the Board admitted, in part, Contention One, a low-level 18 See 10 C.F.R. § 20.1101(b).
Moreover, we observe that the Staff appears to have taken a potentially inconsistent position on this issue in another of the COL proceedings in which it has been raised.21 In the ongoing North Anna COL proceeding, the Board admitted, in part, Contention One, a low-level 18 See 10 C.F.R. § 20.1101(b).
19 See id. §§ 20.1201-20.1208.
19 See id. §§ 20.1201-20.1208.
20 See id. §§ 20.1301-20.1302.
20 See id. §§ 20.1301-20.1302. See generally NRC Regulatory Issue Summary 2008-32, Interim Low Level Radioactive Waste Storage at Reactor Sites (Dec. 30, 2008)(ADAMS accession number ML082190768), at 3-4 (stating among other things, that a licensees onsite LLRW storage facility must comply with, among other provisions, 10 C.F.R. § 20.1801 (security of stored material), occupational and public dose limits, and the Part 20 requirements for surveys and monitoring, labeling, and reports and record retention).
See generally NRC Regulatory Issue Summary 2008-32, "Interim Low Level Radioactive Waste Storage at Reactor Sites" (Dec. 30, 2008)(ADAMS  
 
accession number ML082190768), at 3-4 (stating among other things, that a licensee's onsite  
 
LLRW storage facility must comply with, among other provisions, 10 C.F.R. § 20.1801 (security  
 
of stored material), occupational and public dose limits, and the Part 20 requirements for  
 
surveys and monitoring, labeling, and reports and record retention).
21 To be sure, contested issues in this proceeding must be decided solely on the basis of information in the adjudicatory record of this proceeding. However, we monitor parallel proceedings to ensure the consistency of our decisions.
21 To be sure, contested issues in this proceeding must be decided solely on the basis of information in the adjudicatory record of this proceeding. However, we monitor parallel proceedings to ensure the consistency of our decisions.
waste contention substantively identical to Contention SAFETY-1.
22  Subsequently in the North Anna matter, the NRC Staff posed a Request for Additional Information (RAI) in which it requested that the applicant "describe the facilities planned for long-term storage of low-level
radioactive wastes projected to be generated during the operation of North Anna Unit 3, and the
operational program addressing the long-term management and storage of such wastes . . ."
23  Thereafter, the applicant provided a revision to the COL application that included its response to
the Staff's RAI, providing (among other things) for storage to accommodate "at least 10 years of
packaged Class B and C waste."
24  The NRC Staff maintains the position in North Anna , as it does here, that the contention is not material to a decision the NRC must make regarding public health or safety, because the
intervenor "does not point to any NRC regulation that requires any specific duration for planning
for long-term storage."
25  The Staff's issuance of an RAI on the very subject of long-term LLRW 22 Virginia Electric and Power Co. (Combined License Application for North Anna Unit 3), LBP-08-15, 68 NRC 294 (2008).
23 Letter from T.A. Kevern, NRC, to E.S. Grecheck, Dominion, "Request for Additional Information Letter No. 020 (SRP Sections: 09.05.01, 11.04) Related to the North Anna Unit 3
Combined License Application" (July 27, 2008)(ML082100346), NRC RAI 11.04-3. In the case
of the North Anna COL application, the staff observed that Final Safety Analysis Report (FSAR) stated that the proposed plant would not utilize temporary LLRW storage facilities to support plant operation, whereas the Economic Simplified Boiling Water Reactor Design Control
Document provides for the capacity to store the amount of LLRW that could be generated in 6
months of operation.
24 Letter from E.S. Grecheck, Dominion, to U.S. NRC Document Control Desk, "Dominion Virginia Power - North Anna Power Station Unit 3 - Combined License Application -
Submission 4" (May 21, 2009)(ML091540526). The in tervenor offered late-filed Contention Ten based on this revision to the COL application.
25 See NRC Staff's Answer to Intervenor's Amended Contention Ten (July 21, 2009), at 12 (citing 10 C.F.R. § 2.309(f)(1)(iv)). The North Anna Board has not yet ruled on the admissibility of Contention Ten, or on the applicant's related motion to dismiss the originally-admitted
Contention One. We do not comment on the resolution of those motions here, and the fact that (continued. . .)
disposal, in a proceeding with a substantively identical admitted contention, appears to conflict with its argument that the issue is immaterial to the findings that must be made on the
application.
26    In light of the above, we cannot say with confidence that the Board committed clear error
in admitting Contention SAFETY-1. We find that the adjudicatory record on Contention
SAFETY-1 would benefit from further development by the Board and the parties, particularly
with respect to the information a COL applicant should supply in order to satisfy our regulations
regarding the safety of long-term storage of low-level radioactive waste.
27 
(. . .continued) we take notice of the RAI here should not be construed as an opinion on the admissibility of Contention Ten.
See Duke Energy Corp. (Oconee Nuclear Station, Units 1, 2, and 3), CLI 11, 49 NRC 328, 336-39 (1999)(finding that issuance of an RAI does not alone establish
deficiencies in an application, and that a petitioner must do more than merely quote an RAI to
justify admission of a contention into the proceeding).
26 Cf. Office Instruction NRO-REG-101, "Processing Requests for Additional Information" (Rev.
0), at 2 ("RAIs should be directly related to the applicable requirements related to the submittal 
. . . It is expected that before the staff determines that an RAI is needed, . . . the need for additional information in order to reach a regulatory determination is clear and unambiguous
.")(emphasis added)(ML080600394).
27 As we observed in Bellefonte , contentions of this sort are application-specific. CLI-09-3, 69 NRC __ (slip op. at 11 n.42). We do not opine here on the scope of the requirements of 
10 C.F.R. § 52.79(a)(3), including any specific time frame for which a COL applicant should
address LLRW storage.
III. CONCLUSION We deny SNC's and the Staff's appeals, and decline to disturb the Board's admission of Contention SAFETY-1.
IT IS SO ORDERED.      For the Commission NRC SEAL        /RA/      ________________________      Andrew L. Bates Acting Secretary of the Commission
Dated at Rockville, Maryland, this  31 st  day of July, 2009. 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of        )
          )
SOUTHERN NUCLEAR OPERATING COMPANY    )  Docket No. 52-025-COL
          )  and 52-026-COL (Vogtle Units 3 and 4)    )    (Combined Operating License)    )
CERTIFICATE OF SERVICE
I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-09-16) have been served upon the following persons by Electronic Information Exchange.
Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Washington, DC  20555-0001 E-mail: ocaamail@nrc.gov
U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel
Mail Stop T-3 F23 Washington, DC  20555-0001
Administrative Judge
G. Paul Bollwerk, III, Chair
E-mail: gpb@nrc.gov Administrative Judge Nicholas G. Trikouros
E-mail: ngt@nrc.gov
Administrative Judge James F. Jackson E-mail: jxj2@nrc.gov jackson538@comcast.net
Law Clerk:  Wen Bu E-mail:  wen.bu@nrc.gov U.S. Nuclear Regulatory Commission Office of the Secretary of the Commission
Mail Stop O-16C1 Washington, DC  20555-0001 Hearing Docket
E-mail: hearingdocket@nrc.gov
U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O-15D-21 Washington, DC  20555-0001 Kathryn L. Winsberg, Esq.
Ann P. Hodgdon, Esq.
Sara Brock, Esq. Patrick A. Moulding, Esq.
Sarah Price, Esq.
Carol H. Lazar, Esq.
Jessica Bielecki, Esq.
Joseph Gilman, Paralegal Emily Krause E-mail:  kathryn.winsberg@nrc.gov ann.hodgdon@nrc.gov
; Sara.Kirkwood@nrc.gov
; patrick.moulding@nrc.gov
, sap1@nrc.gov jsg1@nrc.gov;Carol.Lazar@nrc.gov eik1@nrc.gov;jessica.bielecki@nrc.gov
OGC Mail Center :
OGCMailCenter@nrc.gov
2 Docket No. 52-025 and 52-026-COL COMMISSION MEMORANDUM AND ORDER (CLI-09-16)
Moanica M. Caston, Esq.
Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway P.O. Box 1295, Bin B-022 Birmingham, AL  35201-1295 E-mail: mcaston@southernco.com
Kenneth C. Hairston, Esq. M. Stanford Blanton, Esq.
Peter D. LeJeune, Esq.
Balch & Bingham LLP 1710 Sixth Avenue North Birmingham, Alabama  35203-2014
E-mail:  kchairston@balch.com; sblanton@balch.com; plejeune@balch.com Kathryn M. Sutton, Esq.
Steven P. Frantz, Esq.
Paul M. Bessette, Esq.
Diane A. Eckert, Admin. Assist.
Morgan, Lewis & Bockius, LLP
Co-Counsel for Southern Nuclear Operating Company, Inc.
1111 Pennsylvania Ave., NW Washington, DC  20004
E-mail: ksutton@morganlewis.com sfrantz@morganlewis.com pbessette@morganlewis.com deckert@morganlewis.com C. Grady Moore, III, Esq.
Balch & Bingham, LLP 1901 6 TH Avenue, Suite 2600 Birmingham, AL  35203
E-mail: gmoore@balch.com Atlanta Women's Action for New Directions (WAND), Blue Ridge Environmental Defense League (BREDL), Center for Sustainable Coast (CSC), Savannah Riverkeeper and Southern Alliance for Clean Energy (SACE)
Turner Environmental Law Clinic
Emory University School of Law 1301 Clifton Road
Atlanta, GA  30322 Lawrence Sanders, Esq.
E-mail: lsande3@emory.edu Mindy Goldstein
E-mail: magolds@emory.edu Robert B. Haemer, Esq. Pillsbury Winthrop Shaw Pittman LLP
2300 N Street, NW Washington, DC  20037-1122
E-mail: robert.haemer@pillsburylaw.com


Docket No. 52-025 and 52-026-COL COMMISSION MEMORANDUM AND ORDER (CLI-09-16)  
waste contention substantively identical to          Contention SAFETY-1.22 Subsequently in the North Anna matter, the NRC Staff posed a Request for Additional Information (RAI) in which it requested that the applicant describe the facilities planned for long-term storage of low-level radioactive wastes projected to be generated during the operation of North Anna Unit 3, and the operational program addressing the long-term management and storage of such wastes . . .23 Thereafter, the applicant provided a revision to the COL application that included its response to the Staffs RAI, providing (among other things) for storage to accommodate at least 10 years of packaged Class B and C waste.24 The NRC Staff maintains the position in North Anna, as it does here, that the contention is not material to a decision the NRC must make regarding public health or safety, because the intervenor does not point to any NRC regulation that requires any specific duration for planning for long-term storage.25 The Staffs issuance of an RAI on the very subject of long-term LLRW 22 Virginia Electric and Power Co. (Combined License Application for North Anna Unit 3), LBP-08-15, 68 NRC 294 (2008).
23 Letter from T.A. Kevern, NRC, to E.S. Grecheck, Dominion, Request for Additional Information Letter No. 020 (SRP Sections: 09.05.01, 11.04) Related to the North Anna Unit 3 Combined License Application (July 27, 2008)(ML082100346), NRC RAI 11.04-3. In the case of the North Anna COL application, the staff observed that Final Safety Analysis Report (FSAR) stated that the proposed plant would not utilize temporary LLRW storage facilities to support plant operation, whereas the Economic Simplified Boiling Water Reactor Design Control Document provides for the capacity to store the amount of LLRW that could be generated in 6 months of operation.
24 Letter from E.S. Grecheck, Dominion, to U.S. NRC Document Control Desk, Dominion Virginia Power - North Anna Power Station Unit 3 - Combined License Application -
Submission 4 (May 21, 2009)(ML091540526). The intervenor offered late-filed Contention Ten based on this revision to the COL application.
25 See NRC Staffs Answer to Intervenors Amended Contention Ten (July 21, 2009), at 12 (citing 10 C.F.R. § 2.309(f)(1)(iv)). The North Anna Board has not yet ruled on the admissibility of Contention Ten, or on the applicants related motion to dismiss the originally-admitted Contention One. We do not comment on the resolution of those motions here, and the fact that (continued. . .)


3 Barton Z. Cowan, Esq.
disposal, in a proceeding with a substantively        identical admitted contention, appears to conflict with its argument that the issue is immaterial to the findings that must be made on the application.26 In light of the above, we cannot say with confidence that the Board committed clear error in admitting Contention SAFETY-1. We find that the adjudicatory record on Contention SAFETY-1 would benefit from further development by the Board and the parties, particularly with respect to the information a COL applicant should supply in order to satisfy our regulations regarding the safety of long-term storage of low-level radioactive waste.27
Eckert Seamans Cherin & Mellott, LLC
(. . .continued) we take notice of the RAI here should not be construed as an opinion on the admissibility of Contention Ten. See Duke Energy Corp. (Oconee Nuclear Station, Units 1, 2, and 3), CLI 11, 49 NRC 328, 336-39 (1999)(finding that issuance of an RAI does not alone establish deficiencies in an application, and that a petitioner must do more than merely quote an RAI to justify admission of a contention into the proceeding).
26 Cf. Office Instruction NRO-REG-101, Processing Requests for Additional Information (Rev.
0), at 2 (RAIs should be directly related to the applicable requirements related to the submittal
. . . It is expected that before the staff determines that an RAI is needed, . . . the need for additional information in order to reach a regulatory determination is clear and unambiguous.)(emphasis added)(ML080600394).
27 As we observed in Bellefonte, contentions of this sort are application-specific. CLI-09-3, 69 NRC __ (slip op. at 11 n.42). We do not opine here on the scope of the requirements of 10 C.F.R. § 52.79(a)(3), including any specific time frame for which a COL applicant should address LLRW storage.


600 Grant Street, 44 th Floor Pittsburgh, PA  15219
III. CONCLUSION We deny SNCs and the Staffs appeals, and decline to disturb the Boards admission of Contention SAFETY-1.
IT IS SO ORDERED.
For the Commission NRC SEAL
                                                /RA/
Andrew L. Bates Acting Secretary of the Commission Dated at Rockville, Maryland, this 31st day of July, 2009.


E-mail: teribart61@aol.com
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                                      )
                                                      )
SOUTHERN NUCLEAR OPERATING COMPANY                    )            Docket No. 52-025-COL
                                                      )                    and 52-026-COL (Vogtle Units 3 and 4)                              )
(Combined Operating License)                        )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-09-16) have been served upon the following persons by Electronic Information Exchange.
Office of Commission Appellate                  U.S. Nuclear Regulatory Commission Adjudication                                  Office of the Secretary of the Commission U.S. Nuclear Regulatory Commission              Mail Stop O-16C1 Washington, DC 20555-0001                        Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov                        Hearing Docket E-mail: hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel          U.S. Nuclear Regulatory Commission Mail Stop T-3 F23                                Office of the General Counsel Washington, DC 20555-0001                        Mail Stop O-15D-21 Washington, DC 20555-0001 Administrative Judge                            Kathryn L. Winsberg, Esq.
G. Paul Bollwerk, III, Chair                    Ann P. Hodgdon, Esq.
E-mail: gpb@nrc.gov                              Sara Brock, Esq.
Patrick A. Moulding, Esq.
Administrative Judge                            Sarah Price, Esq.
Nicholas G. Trikouros                            Carol H. Lazar, Esq.
E-mail: ngt@nrc.gov                              Jessica Bielecki, Esq.
Joseph Gilman, Paralegal Administrative Judge                            Emily Krause James F. Jackson                                E-mail: kathryn.winsberg@nrc.gov E-mail: jxj2@nrc.gov                            ann.hodgdon@nrc.gov; Sara.Kirkwood@nrc.gov; jackson538@comcast.net                          patrick.moulding@nrc.gov, sap1@nrc.gov jsg1@nrc.gov;Carol.Lazar@nrc.gov Law Clerk: Wen Bu                                eik1@nrc.gov;jessica.bielecki@nrc.gov E-mail: wen.bu@nrc.gov OGC Mail Center : OGCMailCenter@nrc.gov


[Original signed by Linda D. Lewis]                                Office of the Secretary of the Commission
2 Docket No. 52-025 and 52-026-COL COMMISSION MEMORANDUM AND ORDER (CLI-09-16)
Moanica M. Caston, Esq.                    Kenneth C. Hairston, Esq.
Southern Nuclear Operating Company, Inc. M. Stanford Blanton, Esq.
40 Inverness Center Parkway                Peter D. LeJeune, Esq.
P.O. Box 1295, Bin B-022                  Balch & Bingham LLP Birmingham, AL 35201-1295                  1710 Sixth Avenue North E-mail: mcaston@southernco.com            Birmingham, Alabama 35203-2014 E-mail: kchairston@balch.com; sblanton@balch.com; plejeune@balch.com Kathryn M. Sutton, Esq.                    C. Grady Moore, III, Esq.
Steven P. Frantz, Esq.                    Balch & Bingham, LLP Paul M. Bessette, Esq.                    1901 6TH Avenue, Suite 2600 Diane A. Eckert, Admin. Assist.            Birmingham, AL 35203 Morgan, Lewis & Bockius, LLP              E-mail: gmoore@balch.com Co-Counsel for Southern Nuclear Operating Company, Inc.
1111 Pennsylvania Ave., NW Washington, DC 20004 E-mail: ksutton@morganlewis.com sfrantz@morganlewis.com pbessette@morganlewis.com deckert@morganlewis.com Atlanta Womens Action for New Directions  Robert B. Haemer, Esq.
(WAND), Blue Ridge Environmental Defense  Pillsbury Winthrop Shaw Pittman LLP League (BREDL), Center for Sustainable    2300 N Street, NW Coast (CSC), Savannah Riverkeeper and      Washington, DC 20037-1122 Southern Alliance for Clean Energy (SACE)  E-mail: robert.haemer@pillsburylaw.com Turner Environmental Law Clinic Emory University School of Law 1301 Clifton Road Atlanta, GA 30322 Lawrence Sanders, Esq.
E-mail: lsande3@emory.edu Mindy Goldstein E-mail: magolds@emory.edu


Dated at Rockville, Maryland this 31 st day of July 2009}}
3 Docket No. 52-025 and 52-026-COL COMMISSION MEMORANDUM AND ORDER (CLI-09-16)
Barton Z. Cowan, Esq.
Eckert Seamans Cherin & Mellott, LLC 600 Grant Street, 44th Floor Pittsburgh, PA 15219 E-mail: teribart61@aol.com
[Original signed by Linda D. Lewis]
Office of the Secretary of the Commission Dated at Rockville, Maryland this 31st day of July 2009}}

Latest revision as of 11:25, 12 March 2020

Commission Memorandum and Order (CLI-09-16)
ML092120239
Person / Time
Site: Vogtle, 05000026
Issue date: 07/31/2009
From: Bates A
NRC/SECY
To:
NRC/OCM, NRC/OGC, Southern Nuclear Operating Co
SECY RAS
References
+reviewedrgj1, 52-025-COL, 52-026-COL, ASLBP 09-873-01-COL-BD01, CLI-09-16, RAS 16127
Download: ML092120239 (12)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION COMMISSIONERS:

Gregory B. Jaczko, Chairman Dale E. Klein Kristine L. Svinicki

)

In the Matter of )

)

SOUTHERN NUCLEAR OPERATING CO. ) Docket Nos. 52-025-COL &

) 52-026-COL (Vogtle Electric Generating Plant, Units 3 and 4) )

)

CLI-09-16 MEMORANDUM AND ORDER This proceeding concerns the application of Southern Nuclear Operating Company (SNC) for a combined license (COL) under 10 C.F.R. Part 52 to construct and operate two new nuclear reactor units (proposed Units 3 and 4) at the Vogtle Electric Generating Plant (Vogtle) site in Georgia. The NRC Staff (Staff) and SNC have appealed LBP-09-3, an Atomic Safety and Licensing Board decision granting the intervention petition filed by five organizationsthe Center for a Sustainable Coast, Savannah Riverkeeper, the Southern Alliance for Clean Energy, Atlanta Womens Action for New Directions, and the Blue Ridge Environmental Defense League (collectively, Intervenors).1 Intervenors oppose the appeals filed by SNC and the Staff.2 We 1

See Southern Nuclear Operating Companys Brief in Support of Appeal of LBP-09-03 (Mar. 14, 2009)(SNC Appeal); NRC Staff Notice of Appeal of LBP-09-03, Memorandum and Order (Ruling on Standing and Contention Admissibility), and Accompanying Brief (Mar. 16, 2009)(Staff Appeal).

2 See Joint Intervenors Brief in Opposition of Appeal (Mar. 24, 2009).

decline to disturb the Boards decision to admit Contention SAFETY-1.

I. BACKGROUND On March 5, 2009, the Board issued LBP-09-3, which found that Intervenors had demonstrated standing and had submitted one admissible contention, Contention SAFETY-1.3 Based on these findings, the Board granted the intervention petition.

In proposed Contention SAFETY-1, Intervenors argued that SNCs COL application was insufficient because it failed to address long-term storage of low-level radioactive waste (LLRW) at the Vogtle site. The contention is founded on the premise that, following closure of the Barnwell, South Carolina disposal site to waste generated outside the Atlantic Compact, there currently is no licensed facility in the United States that is available to accept and dispose of certain LLRW that would be generated by the operation of Vogtle Units 3 and 4. As originally proffered, the contention stated:

SNCs [COL application] is incomplete because the FSAR [Final Safety Analysis Report] fails to consider how SNC will comply with NRC regulations governing storage and disposal of LLRW in the event an off-site waste disposal facility remains unavailable when [Vogtle] Units 3 and 4 begin operations.4 The Board rejected the portion of the contention relating to disposal of LLRW, reiterating that issues governing disposal pursuant to 10 C.F.R. Part 61 are not within the scope of COL proceedings,5 but otherwise admitted a virtually identical version of the contention:

3 Southern Nuclear Operating Co. (Vogtle Electric Generating Plant, Units 3 and 4), LBP-09-3, 69 NRC __ (Mar. 5, 2009)(slip op.). In addition, the Board referred to us its ruling declining to admit Contentions MISC-1 and MISC-2. We recently declined to review the referred rulings.

Southern Nuclear Operating Co. (Vogtle Electric Generating Plant, Units 3 and 4), CLI-09-13, 69 NRC __ (June 25, 2009)(slip op.).

4 Petition for Intervention at 14 (Nov. 17, 2008).

5 LBP-09-3, 69 NRC __ (slip op. at 25).

SNCs [COL application] is incomplete because the FSAR fails to provide any detail as to how SNC will comply with NRC regulations governing storage of LLRW in the event an off-site waste disposal facility remains unavailable when

[Vogtle] Units 3 and 4 begin operations.6 As reformulated, the Board admitted this contention as one of omission, finding that the contention and its foundation were sufficient to establish a genuine material dispute adequate to warrant further inquiry.7 The Board distinguished the contention before it from a similar contention in the Bellefonte COL proceeding, which we recently rejected.8 II. DISCUSSION We will give substantial deference to a Boards rulings on contention admissibility in the absence of clear error or abuse of discretion.9 At issue here are the requirements of 10 C.F.R. § 52.79(a)(3), which states as follows:

(a) The [COL] application must contain a final safety analysis report that describes the facility, presents the design bases and the limits on its operation, and presents a safety analysis of the structures, systems, and components of the facility as a whole. The final safety analysis report shall include the following information, at a level of information sufficient to enable the Commission to reach a final conclusion on all safety matters that must be resolved by the Commission before issuance of a combined 6

Id. (slip op., App. A).

7 Id. (slip op. at 20).

8 Tennessee Valley Authority (Bellefonte Nuclear Power Plant, Units 3 and 4), LBP-08-16, 68 NRC 361, 413-15 (2008), revd, CLI-09-3, 69 NRC __ (Feb. 17, 2009) (slip op. at 13). In particular, the Board observed that the contention admitted in the Bellefonte proceeding focused exclusively on the regulations governing waste disposal, whereas Contention SAFETY-1 also was grounded in 10 C.F.R. Parts 20 and 52. LBP-09-3, 69 NRC __ (slip op. at 23).

9 See Crow Butte Resources, Inc. (License Renewal for In Situ Leach Facility, Crawford, Nebraska), CLI-09-9, 69 NRC __ (May 18, 2009) (slip op. at 4); AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-06-24, 64 NRC 111, 121 (2006); Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-99-10, 49 NRC 318, 324 (1999); Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), ALAB-855, 24 NRC 792, 795 (1986).

license: . . .

(3) The kinds and quantities of radioactive materials expected to be produced in the operation and the means for controlling and limiting radioactive effluents and radiation exposures within the limits set forth in part 20 of this chapter . . . .

The Board agreed with Intervenors assertion, raised in their reply filing, that this regulation requires COL applicants to consider long-term onsite LLRW storage, and reasoned, we do not see how, if offsite disposal for LLRW remains unavailable, a COL applicant could address compliance with 10 CFR Part 20 limits in accordance with section 52.79(a)(3) without addressing what it intends to do with the LLRW . . . expected to be produced in the operation of the proposed units.10 On appeal, SNC argues that several factors compel reversal of the Boards decision.

First, SNC relies on our recent decision in Bellefonte, and, particularly, argues that the contention rejected in that COL proceeding is substantively identical to the contention at issue here.11 Second, SNC argues that our regulations do not require COL applicants to address long-term LLRW storage.12 Third, SNC claims that the COL application does, in fact, address the potential availability of long-term LLRW storage at the Vogtle site.13 The arguments submitted by the Staff overlap those made by SNC. First, the Staff argues that the Board erred in admitting SAFETY-1 as a contention of omission, because the 10 LBP-09-3, 69 NRC __ (slip op. at 24).

11 SNC Appeal at 8.

12 Id. at 10.

13 Id. at 12-13.

asserted missing information is available in the COL application.14 Second, the Staff claims that Petitioners failed to demonstrate that the contention is legally or factually material to the proceeding, because 10 C.F.R. § 52.79(a)(3) contains no requirement for a detailed discussion of long-term, onsite storage, and Petitioners cited no other regulatory provision.15 Finally, the Staff argues that the contention lacks an adequate basis, because Petitioners confuse the issues of onsite storage and long-term disposal of LLRW and provide no legal basis for the contention in the Petition.16 We agree that the plain language of section 52.79(a)(3) does not explicitly require a description of LLRW storage for a specified duration.17 On its face, therefore, section 52.79(a)(3) sets no quantity or time restrictions relative to onsite storage of such waste. Rather, it requires that a COL application contain information of first, the kinds and quantities of materials expected to be produced during plant operation, and second, the means for controlling and limiting radioactive effluents and radiation exposures to comply with Part 20 limits. In short, the rule pertains to how the COL applicant intends, through its design, operational organization, and procedures, to comply with relevant substantive radiation 14 NRC Staff Notice of Appeal of LBP-09-03, Memorandum and Order (Ruling on Standing and Contention Admissibility), and Accompanying Brief, at 7 (Mar. 16, 2009)(Staff Appeal).

15 Id. at 11.

16 Id. at 13-14.

17 This is also true of relevant agency guidance. In particular, the Standard Review Plan (SRP) provides two separate sets of review guidelines: one set for areas designed to accommodate approximately 6 months of waste generation, and one set for longer term onsite storage (several years, but within the operational life of the plant). See U.S. Nuclear Regulatory Commission Standard Review Plan, NUREG-0800, Section 11.4, Solid Waste Management System (Rev. 3 Mar. 2007), at subsection III.4 (citing Branch Technical Position 11-3 for 6 months storage, and SRP Appendix 11.4-A to the SRP for longer storage terms).

protection requirements in 10 C.F.R. Part 20. This includes, but is not limited to, low-level radioactive waste handling and storage. Part 20 outlines a number of radiation protection requirements with which licensees must comply. For example, a licensee must use procedures and controls to reduce occupational doses and doses to members of the public to levels that are as low as reasonably achievable.18 Part 20 also sets forth upper limitations on occupational doses19 as well as dose limits for individual members of the public.20 Ultimately, the combined license holder must comply with these requirements regardless of the amount of LLRW stored on the site - be it one cubic foot or one thousand.

As such, the required information is tied to the COL applicants particular plans for compliance through design, operational organization, and procedures. However, the scope and extent of that required information on specific plans or contingency planning is not clear.

Moreover, we observe that the Staff appears to have taken a potentially inconsistent position on this issue in another of the COL proceedings in which it has been raised.21 In the ongoing North Anna COL proceeding, the Board admitted, in part, Contention One, a low-level 18 See 10 C.F.R. § 20.1101(b).

19 See id. §§ 20.1201-20.1208.

20 See id. §§ 20.1301-20.1302. See generally NRC Regulatory Issue Summary 2008-32, Interim Low Level Radioactive Waste Storage at Reactor Sites (Dec. 30, 2008)(ADAMS accession number ML082190768), at 3-4 (stating among other things, that a licensees onsite LLRW storage facility must comply with, among other provisions, 10 C.F.R. § 20.1801 (security of stored material), occupational and public dose limits, and the Part 20 requirements for surveys and monitoring, labeling, and reports and record retention).

21 To be sure, contested issues in this proceeding must be decided solely on the basis of information in the adjudicatory record of this proceeding. However, we monitor parallel proceedings to ensure the consistency of our decisions.

waste contention substantively identical to Contention SAFETY-1.22 Subsequently in the North Anna matter, the NRC Staff posed a Request for Additional Information (RAI) in which it requested that the applicant describe the facilities planned for long-term storage of low-level radioactive wastes projected to be generated during the operation of North Anna Unit 3, and the operational program addressing the long-term management and storage of such wastes . . .23 Thereafter, the applicant provided a revision to the COL application that included its response to the Staffs RAI, providing (among other things) for storage to accommodate at least 10 years of packaged Class B and C waste.24 The NRC Staff maintains the position in North Anna, as it does here, that the contention is not material to a decision the NRC must make regarding public health or safety, because the intervenor does not point to any NRC regulation that requires any specific duration for planning for long-term storage.25 The Staffs issuance of an RAI on the very subject of long-term LLRW 22 Virginia Electric and Power Co. (Combined License Application for North Anna Unit 3), LBP-08-15, 68 NRC 294 (2008).

23 Letter from T.A. Kevern, NRC, to E.S. Grecheck, Dominion, Request for Additional Information Letter No. 020 (SRP Sections: 09.05.01, 11.04) Related to the North Anna Unit 3 Combined License Application (July 27, 2008)(ML082100346), NRC RAI 11.04-3. In the case of the North Anna COL application, the staff observed that Final Safety Analysis Report (FSAR) stated that the proposed plant would not utilize temporary LLRW storage facilities to support plant operation, whereas the Economic Simplified Boiling Water Reactor Design Control Document provides for the capacity to store the amount of LLRW that could be generated in 6 months of operation.

24 Letter from E.S. Grecheck, Dominion, to U.S. NRC Document Control Desk, Dominion Virginia Power - North Anna Power Station Unit 3 - Combined License Application -

Submission 4 (May 21, 2009)(ML091540526). The intervenor offered late-filed Contention Ten based on this revision to the COL application.

25 See NRC Staffs Answer to Intervenors Amended Contention Ten (July 21, 2009), at 12 (citing 10 C.F.R. § 2.309(f)(1)(iv)). The North Anna Board has not yet ruled on the admissibility of Contention Ten, or on the applicants related motion to dismiss the originally-admitted Contention One. We do not comment on the resolution of those motions here, and the fact that (continued. . .)

disposal, in a proceeding with a substantively identical admitted contention, appears to conflict with its argument that the issue is immaterial to the findings that must be made on the application.26 In light of the above, we cannot say with confidence that the Board committed clear error in admitting Contention SAFETY-1. We find that the adjudicatory record on Contention SAFETY-1 would benefit from further development by the Board and the parties, particularly with respect to the information a COL applicant should supply in order to satisfy our regulations regarding the safety of long-term storage of low-level radioactive waste.27

(. . .continued) we take notice of the RAI here should not be construed as an opinion on the admissibility of Contention Ten. See Duke Energy Corp. (Oconee Nuclear Station, Units 1, 2, and 3), CLI 11, 49 NRC 328, 336-39 (1999)(finding that issuance of an RAI does not alone establish deficiencies in an application, and that a petitioner must do more than merely quote an RAI to justify admission of a contention into the proceeding).

26 Cf. Office Instruction NRO-REG-101, Processing Requests for Additional Information (Rev.

0), at 2 (RAIs should be directly related to the applicable requirements related to the submittal

. . . It is expected that before the staff determines that an RAI is needed, . . . the need for additional information in order to reach a regulatory determination is clear and unambiguous.)(emphasis added)(ML080600394).

27 As we observed in Bellefonte, contentions of this sort are application-specific. CLI-09-3, 69 NRC __ (slip op. at 11 n.42). We do not opine here on the scope of the requirements of 10 C.F.R. § 52.79(a)(3), including any specific time frame for which a COL applicant should address LLRW storage.

III. CONCLUSION We deny SNCs and the Staffs appeals, and decline to disturb the Boards admission of Contention SAFETY-1.

IT IS SO ORDERED.

For the Commission NRC SEAL

/RA/

Andrew L. Bates Acting Secretary of the Commission Dated at Rockville, Maryland, this 31st day of July, 2009.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

SOUTHERN NUCLEAR OPERATING COMPANY ) Docket No. 52-025-COL

) and 52-026-COL (Vogtle Units 3 and 4) )

(Combined Operating License) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-09-16) have been served upon the following persons by Electronic Information Exchange.

Office of Commission Appellate U.S. Nuclear Regulatory Commission Adjudication Office of the Secretary of the Commission U.S. Nuclear Regulatory Commission Mail Stop O-16C1 Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Hearing Docket E-mail: hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Mail Stop T-3 F23 Office of the General Counsel Washington, DC 20555-0001 Mail Stop O-15D-21 Washington, DC 20555-0001 Administrative Judge Kathryn L. Winsberg, Esq.

G. Paul Bollwerk, III, Chair Ann P. Hodgdon, Esq.

E-mail: gpb@nrc.gov Sara Brock, Esq.

Patrick A. Moulding, Esq.

Administrative Judge Sarah Price, Esq.

Nicholas G. Trikouros Carol H. Lazar, Esq.

E-mail: ngt@nrc.gov Jessica Bielecki, Esq.

Joseph Gilman, Paralegal Administrative Judge Emily Krause James F. Jackson E-mail: kathryn.winsberg@nrc.gov E-mail: jxj2@nrc.gov ann.hodgdon@nrc.gov; Sara.Kirkwood@nrc.gov; jackson538@comcast.net patrick.moulding@nrc.gov, sap1@nrc.gov jsg1@nrc.gov;Carol.Lazar@nrc.gov Law Clerk: Wen Bu eik1@nrc.gov;jessica.bielecki@nrc.gov E-mail: wen.bu@nrc.gov OGC Mail Center : OGCMailCenter@nrc.gov

2 Docket No.52-025 and 52-026-COL COMMISSION MEMORANDUM AND ORDER (CLI-09-16)

Moanica M. Caston, Esq. Kenneth C. Hairston, Esq.

Southern Nuclear Operating Company, Inc. M. Stanford Blanton, Esq.

40 Inverness Center Parkway Peter D. LeJeune, Esq.

P.O. Box 1295, Bin B-022 Balch & Bingham LLP Birmingham, AL 35201-1295 1710 Sixth Avenue North E-mail: mcaston@southernco.com Birmingham, Alabama 35203-2014 E-mail: kchairston@balch.com; sblanton@balch.com; plejeune@balch.com Kathryn M. Sutton, Esq. C. Grady Moore, III, Esq.

Steven P. Frantz, Esq. Balch & Bingham, LLP Paul M. Bessette, Esq. 1901 6TH Avenue, Suite 2600 Diane A. Eckert, Admin. Assist. Birmingham, AL 35203 Morgan, Lewis & Bockius, LLP E-mail: gmoore@balch.com Co-Counsel for Southern Nuclear Operating Company, Inc.

1111 Pennsylvania Ave., NW Washington, DC 20004 E-mail: ksutton@morganlewis.com sfrantz@morganlewis.com pbessette@morganlewis.com deckert@morganlewis.com Atlanta Womens Action for New Directions Robert B. Haemer, Esq.

(WAND), Blue Ridge Environmental Defense Pillsbury Winthrop Shaw Pittman LLP League (BREDL), Center for Sustainable 2300 N Street, NW Coast (CSC), Savannah Riverkeeper and Washington, DC 20037-1122 Southern Alliance for Clean Energy (SACE) E-mail: robert.haemer@pillsburylaw.com Turner Environmental Law Clinic Emory University School of Law 1301 Clifton Road Atlanta, GA 30322 Lawrence Sanders, Esq.

E-mail: lsande3@emory.edu Mindy Goldstein E-mail: magolds@emory.edu

3 Docket No.52-025 and 52-026-COL COMMISSION MEMORANDUM AND ORDER (CLI-09-16)

Barton Z. Cowan, Esq.

Eckert Seamans Cherin & Mellott, LLC 600 Grant Street, 44th Floor Pittsburgh, PA 15219 E-mail: teribart61@aol.com

[Original signed by Linda D. Lewis]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 31st day of July 2009