ML101620416: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML101620416
| number = ML101620416
| issue date = 03/28/2010
| issue date = 03/28/2010
| title = Summer 2005-301 Draft Sim/In-Plant JPMs (Section 5)
| title = 301 Draft Sim/In-Plant JPMs (Section 5)
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPSF-025NRC START AND LOAD "A" EMERGENCY DIESEL GENERATOR APPROVAL:
{{#Wiki_filter:V.C. SUMMER NUCLEAR STATION v.C.
APPROVAL DATE: REV NO: 6 CANDIDATE EXAMINER:
JOB PERFORMANCE MEASURE
THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of12 TASK: 064-003-01-01 LOAD THE DIESEL GENERATOR TASK STANDARD:
                                ]PM JPM        JPSF-025NRC JPSF-O25NRC START AND LOAD START    LOAD "A" A EMERGENCY EMERGENCY DIESEL DIESEL GENERATOR GENERATOR APPROVAL:         APPROVAL DATE:
Examinee trips diesel due to overload.
REVNO:
The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.
REV NO: 6 CANDIDATE EXAMiNER:
PREFERRED EVALUATION LOCATION SIMULATOR  
EXAMINER:
THIS JPM IS NOT APPROVED
: Tuesday, Tuesday, December December 06, 06, 2005 2005                                                Page 11 f Page    of12 12
 
TASK:
TASK:
064-003-01 -01 064-003-01-01              LOAD THE LOAD   THE DIESEL DIESEL GENERATOR GENERATOR TASK STANDARD:
TASK    STANDARD:
Examinee trips Examinee   trips diesel diesel due due to  overload. The to overload. The use of applicable use of applicable Human Human Performance Performance Tools Tools (3-way (3-way communications, self communications,    self checking, checking, peer peer checking, checking, phonetic phonetic alphabet, alphabet, etc) etc) and and industrial industrial safety safety practices practices meets expectations.
meets  expectations.
PREFERRED EVALUATION PREFERRED       EVALUATION LOCATION LOCATION                    PREFERRED EVALUATION PREFERRED        EVALUATION METHOD  METHOD SIMULATOR SIMULATOR                                                           PERFORM PERFORM


==REFERENCES:==
==REFERENCES:==


SSCB-IV-7 SOP-306 TOOLS: Calculator PREFERRED EVALUATION METHOD PERFORM DIESEL GENERATOR POWER FACTOR, CURRENT VS. LOAD EMERGENCY DIESEL GENERATOR SOP-306, EMERGENCY DIESEL GENERATOR EVALUATION TIME 25 TIME CRITICAL No lOCFR55: 45(a)8 CANDIDATE:
==REFERENCES:==
TIME START: TIME FINISH: PERFORMANCE RATING: SAT: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:
SSCB-IV-7 SSCB-IV-7                  DIESEL  GENERATOR POWER DIESEL GENERATOR         POWER FACTOR, FACTOR, CURRENT CURRENT VS. VS. LOAD LOAD SOP-306 SOP-306                    EMERGENCY DIESEL EMERGENCY      DIESEL GENERATOR GENERATOR TOOLS:          Calculator Calculator SOP-306, EMERGENCY SOP-306,     EMERGENCY DIESEL  DIESEL GENERATOR GENERATOR EVALUATION TIME EVALUATION                              25         TIME CRITICAL         No       10CFR55:
SIGNATURE DATE COMMENTS:
10CFR55: 45(a)8 CANDIDATE:
Tuesday, December 06, 2005 Page 2 0/12 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
CANDIDATE:                                                                      TIME START:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
TIME FINISH:
PERFORMANCE RATING:
PERFORMANCE                            SAT:             UNSAT:
QUESTION GRADE:                     PERFORMANCE EXAMINER EXAMINER::
SIGNATURE                   DATE COMMENTS:
COMMENTS:
Tuesday, December Tuesday, December 06, 06, 2005 2005                                                                              Page   0/12 Page 22 of 12
 
INSTRUCTIONS TO INSTRUCTIONS              TO OPERATOR OPERATOR READ TO READ     TO OPERATOR:
OPERATOR:
WHEN II TELL WHEN     TELL YOU YOU TO     BEGIN, YOU TO BEGIN,    YOU ARE ARE TO    PERFORM THE TO PERFORM     THE ACTIONS ACTIONS ASAS DIRECTED DIRECTED IN  IN THE THE INITIATING INITIATING CUES. II WILL CUES. WILL DESCRIBE DESCRIBE THE  THE GENERAL GENERAL CONDITIONS CONDITIONS UNDER UNDER WHICH WHICH THIS THIS TASK TASK IS IS TO TO BEBE PERFORMED PERFORMED AND   PROVIDE THE AND PROVIDE      THE NECESSARY NECESSARY TOOLS          WITH WHICH TOOLS WITH     WHICH TO TO PERFORM PERFORM THIS THIS TASK.
TASK. BEFORE BEFORE STARTING, STARTING, II WILL   EXPLAIN THE WILL EXPLAIN            INITIAL CONDITIONS, THE INITIAL     CONDITIONS, WHICH WHICH STEPS STEPS TOTO SIMULATE SIMULATE OROR DISCUSS, DISCUSS, ANDAND PROVIDE PROVIDE INITIATING CUES.
INITIATING    CUES. WHEN WHEN YOU YOU COMPLETE COMPLETE THE  THE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE THE OBJECTIVE OBJECTIVE FOR FOR THIS THIS JOB JOB PERFORMANCE MEASURE PERFORMANCE        MEASURE WILL   WILL BE BE SATISFIED.
SATISFIED.
CONSIDERATIONS:
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
INITIAL CONDITION: The plant is operating at 100% power with normal AC power available to Maintenance Work Week. Relay testing is in progress all buses. It is A2 Maintenance on 11 DA which has necessitated the removal of 11 DA from NORMAL NORMAL and EMERGENCY feed. Station and Operations Management Management have given approval for this work due to recent OE concerning maintenance of these A DIG relays. "A" D/G is to be started and loaded onto bus 11 DA. Bus 11 DA will then be divorced from its NORMAL and EMERGENCY power sources until completion of testing. All pre-start check steps have been completed.
The plant is operating at 100% power with normal AC power available to all buses. It is A2 Maintenance Work Week. Relay testing is in progress on 1 DA which has necessitated the removal of 1 DA from NORMAL and EMERGENCY feed. Station and Operations Management have given approval for this work due to recent OE concerning maintenance of these relays. "A" DIG is to be started and loaded onto bus 1 DA. Bus 1 DA will then be divorced from its NORMAL and EMERGENCY power sources until completion of testing. All pre-start check steps have been completed.
INITIATING CUES: CRS directs starting and loading of "A"         A DIG D/G per SOP-306, Section IV.A, Steps 2.2.j thru 2.5.
INITIATING CUES: CRS directs starting and loading of "A" DIG per SOP-306, Section IV.A, Steps 2.2.j thru 2.5. HAND jPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 0/12
HAND JPMjPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
]PM BRIEFING SHEET OPERATOR INSTRUCTIONS:
Tuesday, December Tuesday,          06, 2005 December 06,  2005                                                                          Page       12 0/12 Page 33 of
 
                                          ]PM BRIEFING SHEET JPM OPERA TOR iNSTRUCTIONS:
OPERATOR     INSTRUCTIONS:
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
INITIAL CONDITION: The plant is operating at 100% power with normal AC power available to all buses. It is A2 Maintenance Work Week. Relay testing is in progress on 11 DA which has necessitated the removal of 1 1 DA from NORMAL and EMERGENCY feed. Station and Operations Management have given approval for this work due to recent OE concerning maintenance of these A DIG is to be started and loaded onto bus 11 DA. Bus 11 DA will relays. "A" then be divorced from its NORMAL and EMERGENCY power sources until completion of testing. All pre-start check steps have been completed.
The plant is operating at 100% power with normal AC power available to all buses. It is A2 Maintenance Work Week. Relay testing is in progress on 1 DA which has necessitated the removal of 1 DA from NORMAL and EMERGENCY feed. Station and Operations Management have given approval for this work due to recent OE concerning maintenance of these relays. "A" DIG is to be started and loaded onto bus 1 DA. Bus 1 DA will then be divorced from its NORMAL and EMERGENCY power sources until completion of testing. All pre-start check steps have been completed.
INITIATING CUES:                                                 A DIG CRS directs starting and loading of "A"   D/G per SOP-306, Section IV.A, lV.A, Steps 2.2.j thru 2.5.
INITIATING CUES: CRS directs starting and loading of "A" DIG per SOP-306, Section IV.A, Steps 2.2.j thru 2.5. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 oJ12 STEPS CR SEQ STEP: 1 STEP STANDARD:
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
No Yes Depress the GEN RELAYS RESET Pushbutton DG A GEN RELAYS RESET Pushbutton is Depressed CUES: SAT COMMENTS:
Tuesday, December 06, 2005                                                                         Page 4 oJ12 of 12
CR SEQ STEP: 2 No Yes Momentarily place the EXCITER Switch to RESET CUES: COMMENTS:
 
CR SEQ STEP: 3 UNSAT STEP STANDARD:
STEPS CR SEQ         STEP:       11                              STEP STANDARD:
DG A EXCITER SWITCH taken to RESET STEP STANDARD:
No  Yes No Yes       Depress the GEN RELAYS Depress          RELAYS RESET RESET Pushbutton Pushbutton DG DG A GEN GEN RELAYS RELAYS RESET RESET Pushbutton Pushbutton is is Depressed Depressed CUES:                                                                       SAT UNSAT UNSA T COMMENTS:
SAT UNSAT No Yes Ensure DG A AUTOSTART NOT READY (XCP-DG A AUTO START NOT READY alarm is 636 1-2) Annunciator is clear clear CUES: SAT UNSAT COMMENTS:
CR SEQ         STEP:       2                               STEP STANDARD:
Tuesday, December 06, 2005 PageS of12 CR SEQ No No CUES: STEP: 4 Verify AnQunciator XCP-636 1-2, DG A AUTOSTART NOT READY, is clear. COMMENTS:
No Yes       Momentarily place the EXCITER Switch to      DG A EXCITER SWITCH taken to RESET RESET CUES:                                                                       SAT UNSAT UNSA T COMMENTS:
CR SEQ No No STEP: 5 The READY FOR AUTO START light is illuminated at the DIG Local Control Panel STEP STANDARD:
CR SEQ         STEP:       3                               STEP STANDARD:
Verifies Annunciator XCP-636 1-2, DG A AUTOSTART NOT READY, is clear. STEP STANDARD:
No Yes       Ensure DG A AUTOSTART NOT READY (XCP- DG A AUTO START NOT READY alarm is 636 1-2) Annunciator is clear               clear CUES:                                                                       SAT UNSAT UNSA T COMMENTS:
SAT UNSAT Calls the IB operator and verifies the "READY FOR AUTO START" light is lit at the "A" DIG Local Control Panel. CUES: SAT CUE: When requested, as the IB operator, inform the operator that the "READY FOR UNSAT AUTO START" light is lit at the "A" DIG Local Control Panel. COMMENTS:
Tuesday, December 06, 2005                                                         PageS Page 5 of of12 12
CR SEQ STEP: 6 Ye Yes Place "A" Diesel Generator TEST switch to START. CUES: COMMENTS:
 
Tuesday, December 06, 2005 STEP STANDARD:
CR SEQ CR              STEP:       44                                      STEP STANDARD:
Momentarily rotates "A" Diesel Generator TEST switch to the START position.
No No No  No      Verify AnQunciator Verify  Annunciator XCP-636 1-2, 1-2, DG DG A          Verifies Annunciator XCP-636 Verifies              XCP-636 1-2, 1 -2, DG DG A A AUTOSTART NOT  NOT READY, READY, is is clear.
SAT UNSAT Page 60f12 CR SEQ STEP: 7 No Yes Verify DIG starts and accelerates to 58.9 -61.1 Hertz and 6800-7600 volts. CUES: STEP STANDARD:
clear.          AUTOSTART NOT AUTOSTART      NOT READY, READY, is is clear.
DG A VOLTS indicates 6800-7600 volts and FREQUENCY indicates 58.9 -61.1 Hertz. SAT CUE: For purposes of time compression, examiner should inform examinee that 10 UNSAT minutes has elapsed since the DIG was started. This in reference to Note 2.4 in the procedure  
clear.
.. COMMENTS:
CUES:                                                                                      SAT UNSAT UNSA T COMMENTS:
CR SEQ No No CUES: STEP: 8 Ensure VOLT REG switch is in AUTO. COMMENTS:
CR SEQ         STEP:       5                                       STEP STANDARD:
CR SEQ STEP: 9 Ye Yes Place the DG A SYNC SEL switch in DSL. CUES: COMMENTS:
No No        The READY FOR AUTO START light is                               lB operator and verifies the Calls the IB illuminated at the DIG Local Control Panel           READY FOR AUTO START" "READY                START light is lit at A DIG the "A" D/G Local Control Panel.
Tuesday, December 06, 2005 STEP STANDARD:
CUES:                                                                                     SAT CUE: When requested, as the IB   lB operator, inform the operator that the "READY READY FOR             UNSAT START light is lit at the "A" AUTO START"                        A DIG D/G Local Control Panel.
VOLT REG switch for the 'A' DIG indicates AUTO. STEP STANDARD:
COMMENTS:
SAT UNSAT DG A SYNC SEL switch indicates DSL. SAT UNSAT Page 7 of 12 CR SEQ No No CUES: STEP: 10 Monitor voltage on 1 DA SYNC VOLTS and SYNC VOLTS. COMMENTS:
CR SEQ         STEP:       6                                     STEP STANDARD:
CR SEQ Ye No CUES: STEP: 11 Adjust SYNC VOLTS to slightly higher than 1 DA SYNC VOLTS using VOLT REG RAISE LOWER. NOTE: Only critical if adjustment is necessary.
Ye Yes               A Diesel Generator TEST switch to Place "A"                                                                 A Diesel Generator Momentarily rotates "A" START.                                              TEST switch to the START position.
CUES:                                                                                     SAT UNSAT UNSA  T COMMENTS:
Tuesday, December 06, 2005 December 06, 2005                                                                          Page 660f12 of 12
 
CR SEQ         STEP:       7                                 STEP STANDARD:
No Yes       Verify DIG starts and accelerates to 58.9 -
                                                        -    DG A VOLTS indicates 6800-7600 volts volts, 61.1 Hertz and 6800-7600 volts.                 and FREQUENCY indicates 58.9 - 61.1-Hertz.
CUES:                                                                                SAT CUE: For purposes of time compression, examiner should inform examinee that 10 UNSAT minutes has elapsed since the DIG was started. This in reference to Note 2.4 in the procedure..
procedure  ..
COMMENTS:
CR SEQ         STEP:       8                                  STEP STANDARD:
No No        Ensure VOLT REG switch is in AUTO.             VOLT REG switch for the 'A'A DIG indicates AUTO.
CUES:                                                                                SAT UNSAT UNSA T COMMENTS:
CR SEQ         STEP:       9                                 STEP STANDARD:
Ye Yes       Place the DG A SYNC SEL switch in DSL.         DG A SYNC SEL switch indicates DSL.
CUES:                                                                                 SAT UNSAT UNSA T COMMENTS:
Tuesday, December 06, 2005                                                                   Page 7 of 12
 
CR SEQ CR    SEQ        STEP:
STEP:       10 10                                 STEP STEP STANDARD:
STANDARD:
No No No  No      Monitor voltage Monitor    voltage on   DA SYNC on 11 DA SYNC VOLTS VOLTS and and  Locates 11 DA Locates    DA SYNC SYNC VOLTS VOLTS andand SYNC SYNC SYNC VOLTS.
SYNC      VOLTS.                                   VOLTS meters VOLTS    meters and  monitors voltage.
and monitors  voltage.
CUES:
CUES:                                                                                  SAT SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ CR              STEP:       11 11                                  STEP STANDARD:
Ye NoNo                SYNC VOLTS Adjust SYNC     VOLTS to to slightly slightly higher higher than VOLT REGREG RAISE  LOWER switch RAISE LOWER    switch used used to 11 DA SYNC VOLTS using VOLT REG RAISE             adjust DG 'A'A SYNC VOLTS slightly higher LOWER.                                           than 11 DA SYNC VOLTS. Only critical if adjustment is necessary.
CUES:                                                                                  SAT NOTE: Only critical if adjustment is necessary.                                    UNSAT COMMENTS:
CR SEQ          STEP:      12                                  STEP STANDARD:
Ye No        Adjust Diesel Generator "A"  A frequency to          A SPEED switch used to adjust DIG DG 'A' synch roscope to rotate slowly in the cause synchroscope                                              SYNCH ROSCOPE rotates speed so that SYNCHROSCOPE FAST direction using SPEED switch.                slowly in the FAST direction.
CUES:                                                                                  SAT UNSAT UNSA T COMMENTS:
Tuesday, December December 06, 06, 2005 2005                                                                    Page 88 of Page    of12 12
 
CR SEQ CR    SEQ      STEP:
STEP:      13 13                                STEP STEP STANDARD:
STANDARD:
Ye Yes Ye  Yes    When synchroscope When    synchroscope isis in  proper position, in proper position,  When synchroscope When    synchroscope isis between between 1111 close BUS close  BUS 11 DA DA DG DG FEED FEED breaker.
breaker.          oclock and o'clock  and 12 12 o'clock, oclock, closes closes BUS BUS 11 DA DA DG DG FEED FEED breaker.
breaker.
CUES:
CUES:                                                                                  SAT SAT UNSAT 1JNSA T COMMENTS:
CR SEQ CR              STEP:      14 14                                STEP STANDARD:
No Yes      Verify breaker 11 DA DG FEED breaker closed. Bus 11 DA DG FEED breaker breaker indicates red light ON, green light OFF.
light CUES:                                                                                  SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      15                                STEP STANDARD:
No Yes      Using the SPEED Switch, adjust load as          DG A SPEED Switch is used to adjust necessary while monitoring KILOWATTS            KILOWATTS Meter, AMPS Meter and Meter, AMPS Meter and KILOVARS Meter            KILOVARS Meter as necessary. Should raise load to between 850 and 1000 1000 KW.
CUES:                                                                                  SAT CUE: For purposes of time compression, examiner should inform examexaminee        10 UNSAT inee that 10 minutes has elapsed after raising load to between 850 and 1000 1000 KW..
KW ..
COMMENTS:
Tuesday, December 06, 2005 December 06, 2005                                                                      Page 9 of Page  of 12 12
 
CR SEQ CR    SEQ        STEP:
STEP:        16 16                                STEP STEP STANDARD:
STANDARD:
No No No  No        Place DIG Place    DIG 'A'  SYNC SEL A SYNC  SEL switch switch in in OFF.
OFF.      DG A DG  A SYNC SYNC SEL SEL switch switch indicates indicates OFF.
OFF.
CUES:
CUES:                                                                                    SAT SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ          STEP:          17                                STEP STANDARD:
No Yes No            Using the Using    the VOLT VOLT REG REG RAISE-LOWER RAISE-LOWER Switch, Switch, DG A VOLT REG DG          REG RAISE-LOWER RAISE-LOWER Switch Switch is is adjust KILOVARS adjust    KILOVARS                                used to adjust KILOVARS used          KILO VARS CUES:                                                                                    SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:          18                                STEP STANDARD:
No Yes        Utilizing Enclosure C, estimate the present load Uses Enclosure C to estimate current 11 DA on 1 1 DA.                                        KW loading (approximately 2850 pluspIus or minus 50 KW).
CUES:                                                                                    SAT UNSAT UNSA T COMMENTS:
Tuesday, Decein her 06, December    06, 2005 2005                                                                  Page 10 Page    of 12 100/12
 
SOP-306 SO P-306 ENCLOSURE ENCLOSURE C  C PAGE PAGE 11 OF OF 11 REVISION REVISION 16 16 EQUIPMENT KW TRAIN A EQUIPMENT      KW RATINGS RATINGS KW                                                            KW EQUIPMENT EQUIPMENT                      RATING                      EQUIPMENT EQUIPMENT                        RATING Component Cooling Water Pump -- Slow (Y)
                                        --                A= = 205    RBCUs -- Slow (N)
Fast(N)
Fast (N)                              Fast (Y  = 1)
(Y=1)                              187 Service Water Pump                                      A= = 531    AB Charcoal Exhaust Fan                        (2) == 204 Service Water Booster Pump                                (No)      FHB Exhaust Fan                                    46 Charging Pump                                          A = 686 A=686        HVAC Chilled Water Pump                          AA=40
                                                                                                                            = 40 RHR Pump                                                  (No)      HVAC Chiller                                      280 Emergency Feedwater Pump                                  (No)      XMC 1DA2X                                          180 RB Spray Pump                                            (No)      XMC1DA2Y                                          142 142 Spent Spent Fuel Cooling Cooling Pump                              50        XMC1DA2Z                                          107 107 UPS UPS Inverter Inverter                                          106 106      XMC1EA1X                                            77 77 CHG CHG AA Pzr Pzr Backup Heaters Heaters                                  (No)
(No)      TOTAL                                        :::::2850 KW 2850 L _____________
Note Note 1:      The actual 1: The          KW Rating actual KW        may be Rating may be varied by adjusting varied by adjusting the the number number of of heaters heaters in in service.
service.
 
CR SEQ CR    SEQ      STEP:
STEP:        19 19                                          STEP STEP STANDARD:
STANDARD:
No Yes No  Yes    Using the Using        SPEEDSwitch, the SPEED              adjust DG Switch, adjust  DG A  A load load      Operator attempts Operator    attempts to to increase increase load load and and until the until the estimated estimated XSW1 XSW1 DADA load load isis being being        will will be be unable unable toto control control KW KW since    the DIG since the    DIG carried by carried      DG A.
by DG    A.                                      will  malfunction. Indicated will malfunction. Indicated KW 1KW will will increase increase to  approximately 5000 to approximately    5000 KWKW with with the operator the  operator unable unable to  control DIG to control  D/G load.
load.
CUES:                                                                                                SAT CUE: For purposes of time compression, examiner should inform examinee that 10                  10 UNSAT minutes has minutes  has elapsed.
elapsed. The A DIG      load will increase due D/G load                  due to the inserted inserted malfunction malfunction load increase once load  increase is is started started...
COMMENTS:
COMMENTS:
CR SEQ Ye No CUES: STEP: 12 Adjust Diesel Generator "A" frequency to cause synchroscope to rotate slowly in the FAST direction using SPEED switch. COMMENTS:
CR SEQ         STEP:       20                                          STEP STANDARD:
Tuesday, December 06, 2005 STEP STANDARD:
Ye Yes       Operator trips the "A" A DG                               "A" A DG is tripped CUES:                                                                                               SAT CUE: Examiner ends the JPM at this point                                                         UNSAT COMMENTS:
Locates 1 DA SYNC VOLTS and SYNC VOLTS meters and monitors voltage. STEP STANDARD:
Examiner ends JPM at this point.
SAT UNSAT VOLT REG RAISE LOWER switch used to adjust DG 'A' SYNC VOLTS slightly higher than 1 DA SYNC VOLTS. Only critical if adjustment is necessary.
Tuesday, December Tuesday, December 06, 06, 2005 2005                                                                                  Page 11 Page    of12 11 of 12
STEP STANDARD:
 
SAT UNSAT DG 'A' SPEED switch used to adjust DIG speed so that SYNCHROSCOPE rotates slowly in the FAST direction.
JPM    SETUP SHEET JPM SETUP         SHEET JPM NO:
SAT UNSAT Page 8 of12 CR SEQ STEP: 13 Ye Yes When synchroscope is in proper position, close BUS 1 DA DG FEED breaker. CUES: COMMENTS:
]PM   NO: JPSF-025NRC JPSF-O25NRC DESCRIPTION:
CR SEQ STEP: 14 STEP STANDARD:
DESCRIPTION:            START  AND LOAD START AND   LOAD "A" A EMERGENCY EMERGENCY DIESEL DIESEL GENERATOR GENERATOR ICSET:
When synchroscope is between 11 o'clock and 12 o'clock, closes BUS 1 DA DG FEED breaker. STEP STANDARD:
IC SET: 10  10(100%
SAT UNSAT No Yes Verify breaker 1 DA DG FEED breaker closed. Bus 1 DA DG FEED breaker indicates red light ON, green light OFF. CUES: COMMENTS:
(100%
CR SEQ STEP: 15 No Yes Using the SPEED Switch, adjust load as necessary while monitoring KILOWATTS Meter, AMPS Meter and KILOVARS Meter CUES: STEP STANDARD:
INSTRUCTIONS:
SAT UNSAT DG A SPEED Switch is used to adjust KILOWATTS Meter, AMPS Meter and KILOVARS Meter as necessary.
INSTRUCTIONS:
Should raise load to between 850 and 1000 KW. SAT CUE: For purposes of time compression, examiner should inform examinee that 10 UNSAT minutes has elapsed after raising load to between 850 and 1000 KW .. COMMENTS:
: 1. When student is
Tuesday, December 06, 2005 Page 9 of 12 CR SEQ No No CUES: STEP: 16 Place DIG 'A' SYNC SEL switch in OFF. COMMENTS:
: 1.                  is ready; RUN RUN
CR SEQ No Yes CUES: STEP: 17 Using the VOLT REG RAISE-LOWER Switch, adjust KILOVARS COMMENTS:
: 2. Insert malfunction when examinee
CR SEQ STEP: 18 STEP STANDARD:
: 2. Insert                      examinee raises from 950 KWKW to 2250      (514 RPM-518 2250 KW (514   RPM-518 RPMRPM over over 10 10 minutes.)
DG A SYNC SEL switch indicates OFF. STEP STANDARD:
minutes.)
SAT UNSAT DG A VOLT REG RAISE-LOWER Switch is used to adjust KILOVARS STEP STANDARD:
SAT UNSAT No Yes Utilizing Enclosure C, estimate the present load Uses Enclosure C to estimate current 1 DA on 1 DA. KW loading (approximately 2850 plus or minus 50 KW). CUES: SAT UNSAT COMMENTS:
Tuesday, December 06, 2005 Page 100/12 TRAIN A EQUIPMENT KW RATINGS KW EQUIPMENT RATING EQUIPMENT Component Cooling Water Pump --Slow (Y) A = 205 RBCUs --Slow (N) Fast (N) Fast (Y = 1) Service Water Pump A = 531 AB Charcoal Exhaust Fan Service Water Booster Pump (No) FHB Exhaust Fan Charging Pump A=686 HVAC Chilled Water Pump RHR Pump (No) HVAC Chiller Emergency Feedwater Pump (No) XMC 1DA2X RB Spray Pump (No) XMC1DA2Y Spent Fuel Cooling Pump 50 XMC1DA2Z UPS Inverter 106 XMC1EA1X Pzr Backup Heaters (No) TOTAL L _____________
--------Note 1: The actual KW Rating may be varied by adjusting the number of heaters in service. SOP-306 ENCLOSURE C PAGE 1 OF 1 REVISION 16 KW RATING 187 (2) = 204 46 A=40 280 180 142 107 77 :::::2850 KW CHG A CR SEQ STEP: 19 No Yes Using the SPEED Switch, adjust DG A load until the estimated XSW1 DA load is being carried by DG A. CUES: STEP STANDARD:
Operator attempts to increase load and will be unable to control KW since the DIG will malfunction.
Indicated KW will increase to approximately 5000 KW with the operator unable to control DIG load. SAT CUE: For purposes of time compression, examiner should inform examinee that 10 UNSAT minutes has elapsed. The A DIG load will increase due to the inserted malfunction once load increase is started .. COMMENTS:
CR SEQ STEP: 20 Ye Yes Operator trips the "A" DG CUES: CUE: Examiner ends the JPM at this point COMMENTS:
Examiner ends JPM at this point. Tuesday, December 06, 2005 STEP STANDARD: "A" DG is tripped SAT UNSAT Page 11 of12 JPM SETUP SHEET ]PM NO: JPSF-025NRC DESCRIPTION:
START AND LOAD "A" EMERGENCY DIESEL GENERATOR IC SET: 10 (100% INSTRUCTIONS:  
: 1. When student is ready; RUN 2. Insert malfunction when examinee raises from 950 KW to 2250 KW (514 RPM-518 RPM over 10 minutes.)
COMMENTS:
COMMENTS:
JPM Initial Condition of "Cylinder Monitoring" was intentionally used to prevent requiring STP-125.002 attachments from having to be available.
JPM Initial Condition of "Cylinder   Monitoring was intentionally used Cylinder Monitoring"                  used to prevent requiring STP-125.002 attachments from having to be available. Also to prevent having to have a stopwatch available. This is too much effort to test the same skills as in SOP-306.
Also to prevent having to have a stopwatch available.
Tuesday, December Tuesday, December 06, 06, 2005 2005                                                                    Page 12 of Page 12 of12 12
This is too much effort to test the same skills as in SOP-306. Tuesday, December 06, 2005 Page 12 of 12   
 
V.C. SUMMER v.C. SUMMER NUCLEAR  NUCLEAR STATION  STATION JOB      PERFORMANCE MEASURE JOB PERFORMANCE                      MEASURE JPM
                                  ]PM        JPSF-059 JPSF-059 ALTERNATE ISOLATION ALTERNATE ISOLATION OF OF RUPTUREDS/G RUPTURED S/G ('e (C' MSIV)
MSIV)
APPROVAL:
APPROVAL:          APPROVAL DATE:
APPROVAL    DATE:
REVNO:
REV NO: 1111 CANDIDATE CANDIDATE EXAMINER:
EXAMJNER:
THIS JPM IS NOT APPROVED Tuesday, December06, Tuesday, December 06, 2005 2005                                                  Page11 of Page  of12 12


v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPSF-059 ALTERNATE ISOLATION OF RUPTUREDS/G
TASK:
('e' MSIV) APPROVAL:
TASK STANDARD:
APPROVAL DATE: REV NO: 11 CANDIDATE EXAMJNER:
The 'e' C S/G is completely isolated from the 'A' A and 'B' B S/G's S/Gs per EOP-4.0, steps 3.a - 3h, and step 3.i
THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of12 TASK: TASK STANDARD:
                                                                                            -                3.1 alternate actions. The use of applicable Human Performance Tools (3-way communications, self-checking, peer checking, phonetic alphabet, etc.) and industrial safety practices meets expectations.
The 'e' S/G is completely isolated from the 'A' and 'B' S/G's per EOP-4.0, steps 3.a -3h, and step 3.i alternate actions. The use of applicable Human Performance Tools (3-way communications, checking, peer checking, phonetic alphabet, etc.) and industrial safety practices meets expectations.
PREFERRED EVALUATION LOCATION                                 PREFERRED EVALUATION METHOD SIMULATOR                                                         PERFORM
PREFERRED EVALUATION LOCATION SIMULATOR  


==REFERENCES:==
==REFERENCES:==
EOP-4.0                  STEAM GENERATOR TUBE RUPTURE TOOLS:            EOP-4.0 EVALUATION TIME                      20        TIME CRITICAL          NO      JOCFR55: 45(A}6 10CFR55:    45(A)6 CANDIDATE:                                                                  TIME START:
TIME FINISH:
PERFORMANCE RATING:                  SAT:            UNSAT:
QUESTION GRADE:                    PERFORMANCE EXAMINER:
SIGNATURE              DATE COMMENTS:
Tuesday, December O6 06, 2005                                                                      Page 22 of 0/12 12


EOP-4.0 TOOLS: EOP-4.0 EVALUATION TIME 20 CANDIDATE:
INSTRUCTIONS TO INSTRUCTIONS              TO OPERATOR OPERATOR READ TO READ    TO OPERATOR:
PERFORMANCE RATING: SAT: PREFERRED EVALUATION METHOD PERFORM STEAM GENERATOR TUBE RUPTURE TIME CRITICAL NO lOCFR55: 45(A}6 TIME START: TIME FINISH: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:
OPERATOR:
SIGNATURE DATE COMMENTS:
WHEN II TELL WHEN      TELL YOU YOU TO      BEGIN, YOU TO BEGIN,   YOU ARE ARE TOTO PERFORM PERFORM THE THE ACTIONS ACTIONS ASAS DIRECTED DIRECTED IN  IN THE THE INITIATING INITIATING CUES. WILL  DESCRIBE      THE  GENERAL CUES. I WILL DESCRIBE THE GENERAL CONDITIONS     CONDITIONS UNDERUNDER WHICH WHICH THIS THIS TASK TASK ISIS TO TO BEBE PERFORMED PERFORMED AND PROVIDE AND    PROVIDE THE      NECESSARY TOOLS THE NECESSARY         TOOLS WITH WITH WHICH WHICH TO TO PERFORM PERFORM THIS THIS TASK.
Tuesday, December 06, 2005 Page 2 0/12 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
TASK. BEFORE BEFORE STARTING, STARTING, II WILL EXPLAIN WILL   EXPLAIN THE       INITIAL CONDITIONS, THE INITIAL    CONDITIONS, WHICHWHICH STEPS STEPS TO TO SIMULATE SIMULATE OROR DISCUSS, DISCUSS, AND AND PROVIDE PROVIDE INITIATING CUES.
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
INITIATING             WHEN YOU CUES. WHEN       YOU COMPLETE COMPLETE THE  THE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE  THE OBJECTIVE OBJECTIVE FOR FOR THISTHIS JOB JOB PERFORMANCE MEASURE PERFORMANCE        MEASURE WILL  WILL BEBE SATISFIED.
SATISFIED.
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
SAFETY    CONSIDERATIONS:
INITIAL CONDITION:
INITIAL CONDITION:
The 'C' Steam Generator has experienced a tube rupture. The crew has taken actions through step 2 of EOP-4.0. INITIATING CUES: The CRS has directed the isolation of the RUPTURED S/G per EOP-4.0, step 3. HAND ]PM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 of12
INITIAL    CONDITION: The 'C'         Steam Generator has experienced C Steam                  experienced aa tube rupture.
]PM BRIEFING SHEET OPERATOR INSTRUCTIONS:
rupture. The crew crew has has taken actions taken  actions through through step step 22 of of EOP-4.0.
EOP-4.O.
INITIATING CUES: The CRS has          has directed the isolation of the RUPTURED S/G per EOP-4.0, EOP-4.O, step 3.
HAND JPM]PM BRIEFING SHEET TO OPERATOR AT THIS TIME!
: Tuesday, Tuesday, December December 06, 06, 2005 2005                                                                          Page Page 33 of of12 12
 
                                          ]PM   BRIEFING SHEET JPM BRIEFING OPERA TOR INSTRUCTIONS:
OPERATOR CONSIDERATIONS:
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
INITIAL CONDITION:
The 'G' Steam Generator has experienced a tube rupture. The crew has taken actions through step 2 of EOP-4.0. INITIATING CUES: The GRS has directed the isolation of the RUPTURED S/G per EOP-4.0, step 3. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 of 12 STEPS CR SEQ STEP: STEP STANDARD:
INITIAL    CONDITION: The    The 'G' C Steam Steam Generator Generator has has experienced experienced aa tube tube rupture.
No Yes Place 'C' Steamline power relief in manual and 'C' Steam line PWR RELIEF SETPT controller closed. indicates manual and O. CUES: COMMENTS:
rupture. The The crew crew has has EOP-4.O.
CR SEQ STEP: 2 No Yes Adjust 'C' Steam line power relief setpoint controller to 8.85. CUES: COMMENTS:
taken actions through step 2 of EOP-4.0.
CR SEQ STEP: 3 No Yes Align 'C' Steam line power relief for power relief operation.
INITIATING CUES: The GRS       CRS has directed directed the isolation of of the RUPTURED S/G S/G per per EOP-4.0, EOP-4.O, step 3.
CUES: COMMENTS:
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU EVALUATOR SATISFACTORILY COMPLETED HAVE SATISFACTORILY                                       COMPLETED THE ASSIGNED TASK.
Tuesday, December 06, 2005 STEP STANDARD:
Tuesday,         06, 2005 December 06, Tuesday, December    2005                                                                         Page 44 of Page        12 of12
SAT UNSAT 'C' Steamline PWR RELIEF SETPT controller indicates 8.85 (1150 psig). STEP STANDARD:
 
SAT UNSAT "C' Steam line Power Relief mode switch indicates PWR REL and the setpoint controller indicates AUTO. SAT UNSAT Page 5 of12 CR SEQ No No CUES: STEP: 4 Place both steam dump interlock switches to bypass interlock.
STEPS STEPS CR SEQ CR    SEQ      STEP:
STEP:         1                                    STEP STEP STANDARD:
STANDARD:
No Yes No  Yes      Place 'C' Place        Steamline power C Steamline   power relief relief in  manual and in manual and 'C' Steamline C Steam   line PWR PWR RELIEF RELIEF SETPT SETPT controller controller closed, closed.                                                 indicates manual indicates   manual and and O.
0.
CUES:
CUES:                                                                                        SAT UNSAT COMMENTS:
CR SEQ         STEP:         2                                     STEP STANDARD:
No Yes       Adjust 'C'   Steamline C Steam line power relief setpoint       'C' C Steamline PWR RELIEF SETPT controller controller to 8.85.                                   indicates 8.85 (1150 psig).
CUES:                                                                                       SAT UNSAT UNSA T COMMENTS:
CR SEQ         STEP:         3                                     STEP STANDARD:
No Yes             C Steam Align 'C'   Steamline line power relief for power       "C'  Steamline C Steam    line Power Relief mode switch relief operation.                                    indicates PWR REL and the setpoint controller indicates AUTO.
CUES:                                                                                       SAT UNSAT UNSA  T COMMENTS:
Tuesday, December Tuesday, December 06, 06, 2005 2005                                                                        Page 5 of Page  of12 12
 
CR SEQ CR              STEP:        4                                STEP STANDARD:
No No No  No      Place both Place  both steam dump dump interlock interlock switches switches to  Both STM DUMP Both        DUMP INTERLOCK INTERLOCK switches bypass interlock.
bypass    interlock,                            indicate BYP indicate  BYP INTLK INTLK when RCS RCS Tavg
                                                                <552F.
                                                              <552"F.
CUES:                                                                              SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:        5                                STEP STANDARD:
No Yes      Verify the 'C' C steamline power relief indicates PCV-2020 indicates red light OFF, green closed, closed.                                         light ON.
CUES:                                                                              SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:        6                                STEP STANDARD:
Ye Yes      Isolate the TDEFP steam supply from 'C' C S/G. PVG-2030 STM SPLY TO TD EFP TRN A (B) indicates closed. AO deenergizes XVG-2802B at XMC-1 DB2Y and closes XVG-2802B locally.
CUES:                                                                               SAT NOTE: Operator may have already closed XVG-2802B from MCB lAW OAP-103.4.OAP-1 03.4.      UNSAT Annunciators 622 2-3 and 623 2-3 are expected alarms for TFEFP Suto Start Defeated.
COMMENTS:
COMMENTS:
CR SEQ STEP: 5 No Yes Verify the 'C' steamline power relief indicates closed. CUES: COMMENTS:
Tuesday, December 06, 2005                                                                        of 12 Page 660/12
CR SEQ STEP: 6 STEP STANDARD:
 
Both STM DUMP INTERLOCK switches indicate BYP INTLK when RCS Tavg <552"F. STEP STANDARD:
CR SEQ         STEP:       7                                  STEP STANDARD:
SAT UNSAT PCV-2020 indicates red light OFF, green light ON. STEP STANDARD:
No Yes       Isolate blowdown from the ruptured 8/G.
SAT UNSAT Ye Yes Isolate the TDEFP steam supply from 'C' S/G. PVG-2030 STM SPLY TO TD EFP TRN A (B) indicates closed. AO deenergizes XVG-2802B at XMC-1 DB2Y and closes XVG-2802B locally. CUES: SAT NOTE: Operator may have already closed XVG-2802B from MCB lAW OAP-103.4.
S/G.          PVG-503C indicates red light OFF, green PVG-503e light ON.
UNSAT Annunciators 622 2-3 and 623 2-3 are expected alarms for TFEFP Suto Start Defeated.
CUES:                                                                                  SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      8                                  STEP STANDARD:
No Yes      Isolates main steam drains from 'e' SIG.
C 8/G.          PVT-2843C PVT              PVT-28778
                                                                    -2843e and PVT    -2877B indicate red light OFF, green light ON.
CUES:                                                                                  SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      9                                  STEP STANDARD:
No Yes      Attempts to close PVM-2801 PVM-2801C. e.                        MSIV 'e' Notes M81V  C still indicates red light ON, green light OFF.
CUES:                                                                                   SAT Operator may send someone out to locally close "e"    MSIV while proceeding.
C M81V                          UNSAT COMMENTS:
Tuesday, December 06, 2005                                                                      Page 770i12 of 12
 
CR SEQ CR              STEP:       10 10                          STEP STANDARD:
Ye Yes        Close MSIVs MSIVs for 'A' A and 'B'  SIGs.
B S/G's. PVM-2801A&B, MS PVM-2801A&B,          ISOLATION VALVE, MS ISOLATION indicates red light OFF and green light ON.
indicates CUES:                                                                            SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      11                          STEP STANDARD:
Ye Yes      Verify MS Isolation Bypass valves closed. Verifies PVM-2869A (B) (C) have closed indication (red light off and green light lit).
CUES:                                                                            SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      12                          STEP STANDARD:
Ye Yes      Isolate main steam to aux steam.          Closes PCV-2058, MS TO AUX STM, indicates red light OFF and green light ON.
CUES:                                                                            SAT UNSAT UNSA T COMMENTS:
Tuesday, December 06, 2005                                                              Page8of12 Page  8 of 12
 
CR SEQ          STEP:      13                          STEP STANDARD:
Ye Yes      Isolate sealing steam.
Isolate                                  Closes MVG-1701 MVG-1 701,, STEAM SEAL FEED FEED indicates red light OFF and green VLV, indicates light ON.
light CUES:                                                                            SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      14                          STEP STANDARD:
Ye Yes      Close main turbine stop valve before seat Closes MVG-2896A-D, SV-1 (2,3,4) BSD, drains, drains.                                  indicates red light OFF and green light ON.
CUES:                                                                            SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      15                          STEP STANDARD:
Ye Yes       Isolate steam to deaerator.               Places IPV-2231, MS/PEGGING STM TO DEAERATOR, controller in MAN and output of 0%.
CUES:                                                                            SAT UNSAT UNSA T COMMENTS:
Tuesday, December 06, 2005                                                              Page 9 of 12 0/12
 
CR SEQ          STEP:      16                      STEP STANDARD:
No Yes      Isolate steam to MSRs.
Isolate                                  MSR DCS, As MSR    DCS, MVG-2811 MVG-281 1 and XVG-2807 indicate closed.
CUES:                                                                    SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      17                      STEP STANDARD:
Ye Yes      Ensure steam dumps closed.          Places STM DUMP CNTRL controller in MAN and output of 0% and STM DUMP MODE SELECT switch to STM PRESS.
CUES:                                                                     SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      18                      STEP STANDARD:
Ye Yes      Ensure main steam drains are closed. The following valve switches are in AUTO with red light OFF and green light ON:
PVT-2870, TO MSR A&B DRN, PVT-  PVT 2851A-D, 2851  A-D, MS LINES TO TURB DRN, PVT-  PVT 271 3A-D, STEAM DUMP DRN BYP, PVT-2713A-D,                              PVT 2838A,B, HDR DRNS. Notes PVT-2875, To MSR A&B DRN indicates mid-position.
CUES:                                                                    SAT UNSAT UNSA T COMMENTS:
Tuesday, December 06, 2005                                                      Page lOofl2 100f 12
 
CR SEQ CR    SEQ        STEP:
STEP:          19 19                                        STEP STEP STANDARD:
STANDARD:
Ye Yes Ye  Yes      Direct Turbine Direct  Turbine Building Building operator operator toto complete complete      Turbine Building Turbine  Building operator operator acknowledges acknowledges ATT. 1, ATT.        including alternate 1, including  alternate isolation isolation for for PVT-PVT-     and  completes ATT.
and completes  ATT. 1, 1, including including local local 2875.
2875.                                                      valve valve XVT -2872.
XVT-2872.
CUES:
CUES:                                                                                            SAT SAT Booth operator Booth  operator acknowledges acknowledges as      TB operator, as TB  operator, to  perform An.
to perform AU. 11 of of EOP-4.0 EOP-4.O          UNSAT UNSAT isolation for PVT-2875 if directed.
including alternate isolation COMMENTS:
COMMENTS:
COMMENTS:
Tuesday, December 06, 2005 Page 60/12 CR SEQ STEP: 7 No Yes Isolate blowdown from the ruptured 8/G. CUES: COMMENTS:
Examiner ends JPM at this point.
CR SEQ STEP: 8 No Yes Isolates main steam drains from 'e' 8/G. CUES: COMMENTS:
December 06, Tuesday, December Tuesday,          06, 2005 2005                                                                              Page 11 Page    of12 11 of 12
CR SEQ STEP: 9 No Yes Attempts to close PVM-2801 e. CUES: STEP STANDARD:
 
PVG-503e indicates red light OFF, green light ON. STEP STANDARD:
JPM SETUP SHEET JPM NO: JPSF-059
SAT UNSAT PVT -2843e and PVT -2877B indicate red light OFF, green light ON. STEP STANDARD:
]PM DESCRIPTION:           ALTERNATE ISOLATION OF RUPTURED S/G ('C'      (C MSIV)
SAT UNSAT Notes M81V 'e' still indicates red light ON, green light OFF. Operator may send someone out to locally close "e" M81V while proceeding.
ICSET:
IC  SET: 10 10or328 or 328 INSTRUCTIONS:
: 1. Activate MAL-RCSOO2C MAL-RCS002C            SEVERITY=450      RAMP=30        (SGTR ON 'C' C S/G)
: 2. RUN 180 seconds EOP-1 .0 & EOP-4.0 up through step 2.
: 3. Manual SI and perform actions of EOP-1.0 when > 30% level.
C S/G when>
: 4. Throttle EFW flow to 'C'
: 5. FREEZE
: 6. Activate MAL-MSSOO6C MAL-MSS006C          SELECT=
SELECT = FAIL TO CLOSE      (C MSIV FAIL TO CLOSE)
('C' OVR-MSO77B OVR-MS077B            SELECT=ON             (2875 INDICATION FAILS TO MIDPOSITION)
(2872 is not modeled but the booth operator can tell the control room it is closed because the drain is not open)
: 7. RUN 5 seconds and acknowledge annunciators
: 8. When student is ready:
RUN
: 9. Local Operator Actions when instructed:
Steam Drain Valves:
VLV-MSO42P VLV-MS042P            SEVERITY=0 SEVERITY=O    (2875(2872)
LOA-FWMO27 LOA-FWM027            SEVERITY=-15    (IPV-2232 - Sparging Steam to DA)
Trigger #2 LOA-MSSO33 LOA-MSS033            SELECT=RACK SELECT  =RACK OUT    (RACK OUT BKR FOR MVG-2802B (STM SUPPLY TO TDEFP))
COMMENTS:
COMMENTS:
SAT UNSAT Tuesday, December 06, 2005 Page 70i12 CR SEQ STEP: 10 Ye Yes Close MSIVs for 'A' and 'B' S/G's. CUES: COMMENTS:
Tuesday, December 06, 2005                                                                   Page 12 12 of 12
CR SEQ STEP: 11 Ye Yes Verify MS Isolation Bypass valves closed. CUES: COMMENTS:
 
CR SEQ STEP: 12 Ye Yes Isolate main steam to aux steam. CUES: COMMENTS:
V.C. SUMMER NUCLEAR STATION v.C.
Tuesday, December 06, 2005 STEP STANDARD:
PERFORMANCE MEASURE JOB PERFORMANCE JPM
PVM-2801A&B, MS ISOLATION VALVE, indicates red light OFF and green light ON. STEP STANDARD:
                                ]PM        JPSF-O12NRC JPSF-012NRC DROPPED ROD DROPPED  ROD RECOVERY RECOVERY APPROVAL:         APPROVAL DATE:
SAT UNSAT Verifies PVM-2869A (B) (C) have closed indication (red light off and green light lit). STEP STANDARD:
REV  NO: 0 REVNO:
SAT UNSAT Closes PCV-2058, MS TO AUX STM, indicates red light OFF and green light ON. SAT UNSAT Page8of12 CR SEQ STEP: 13 Ye Yes Isolate sealing steam. CUES: COMMENTS:
CANDIDATE EXAMINER EXAMINER:
CR SEQ STEP: 14 Ye Yes Close main turbine stop valve before seat drains. CUES: COMMENTS:
THIS JPM IS NOT APPROVED Tuesday, December O6 Tuesday, December 06, 2005 2005                                Page 11 of Page    of10 10
CR SEQ STEP: 15 Ye Yes Isolate steam to deaerator.
CUES: COMMENTS:
Tuesday, December 06, 2005 STEP STANDARD:
Closes MVG-1701 , STEAM SEAL FEED VLV, indicates red light OFF and green light ON. STEP STANDARD:
SAT UNSAT Closes MVG-2896A-D, SV-1 (2,3,4) BSD, indicates red light OFF and green light ON. STEP STANDARD:
SAT UNSAT Places IPV-2231, MS/PEGGING STM TO DEAERATOR, controller in MAN and output of 0%. SAT UNSAT Page 9 0/12 CR SEQ STEP: 16 No Yes Isolate steam to MSRs. CUES: COMMENTS:
CR SEQ STEP: 17 Ye Yes Ensure steam dumps closed. CUES: COMMENTS:
CR SEQ STEP: 18 Ye Yes Ensure main steam drains are closed. CUES: COMMENTS:
Tuesday, December 06, 2005 STEP STANDARD:
As MSR DCS, MVG-2811 and XVG-2807 indicate closed. STEP STANDARD:
SAT UNSAT Places STM DUMP CNTRL controller in MAN and output of 0% and STM DUMP MODE SELECT switch to STM PRESS. STEP STANDARD:
SAT UNSAT The following valve switches are in AUTO with red light OFF and green light ON: PVT-2870, TO MSR A&B DRN, PVT-2851 A-D, MS LINES TO TURB DRN, PVT-2713A-D, STEAM DUMP DRN BYP, PVT-2838A,B, HDR DRNS. Notes PVT-2875, To MSR A&B DRN indicates mid-position.
SAT UNSAT Page 100f 12 CR SEQ STEP: 19 Ye Yes Direct Turbine Building operator to complete ATT. 1, including alternate isolation for PVT-2875. CUES: STEP STANDARD:
Turbine Building operator acknowledges and completes ATT. 1, including local valve XVT -2872. Booth operator acknowledges as TB operator, to perform An. 1 of EOP-4.0 including alternate isolation for PVT-2875 if directed.
SAT UNSAT COMMENTS:
Examiner ends JPM at this point. Tuesday, December 06, 2005 Page 11 of 12 JPM SETUP SHEET ]PM NO: JPSF-059 DESCRIPTION:
ALTERNATE ISOLATION OF RUPTURED S/G ('C' MSIV) IC SET: 10 or 328 INSTRUCTIONS:
: 1. Activate MAL-RCS002C
: 2. RUN 180 seconds SEVERITY=450 RAMP=30 (SGTR ON 'C' S/G) 3. Manual SI and perform actions of EOP-1.0 & EOP-4.0 up through step 2. 4. Throttle EFW flow to 'C' S/G when> 30% level. 5. FREEZE 6. Activate MAL-MSS006C OVR-MS077B SELECT = FAIL TO CLOSE ('C' MSIV FAIL TO CLOSE) SELECT=ON (2875 INDICATION FAILS TO MIDPOSITION)
(2872 is not modeled but the booth operator can tell the control room it is closed because the drain is not open) 7. RUN 5 seconds and acknowledge annunciators
: 8. When student is ready: RUN 9. Local Operator Actions when instructed:
Steam Drain Valves: VLV-MS042P SEVERITY=O (2875(2872)
LOA-FWM027 SEVERITY=-15 (IPV-2232
-Sparging Steam to DA) Trigger #2 LOA-MSS033 SELECT =RACK OUT (RACK OUT BKR FOR MVG-2802B (STM SUPPLY TO TDEFP)) COMMENTS:
Tuesday, December 06, 2005 Page 12 of 12 


v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPSF-012NRC DROPPED ROD RECOVERY APPROVAL:
TASK:
APPROVAL DATE: REV NO: 0 CANDIDATE EXAMINER:
TASK:
THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of 10 TASK: 000-003-05-01 TASK STANDARD:
000-003-05-01 000-003-05-01                RESPOND TO RESPOND     TO DROPPED DROPPED CONTROL CONTROL ROD ROD TASK STANDARD:
RESPOND TO DROPPED CONTROL ROD Manual reactor trip inserted after second control rod drops. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.
TASK    STANDARD:
PREFERRED EVALUATION LOCATION SIMULATOR PREFERRED EVALUATION METHOD PERFORM  
Manual reactor Manual  reactor trip trip inserted inserted after after second second control control rod rod drops. The use drops. The  use of of applicable applicable Human Human Performance Tools Performance    Tools (3-way (3-way communications, communications, self self checking, checking, peer peer checking, checking, phonetic phonetic alphabet, alphabet, etc) etc) and industrial and            safety practices industrial safety    practices meets meets expectations.
expectations.
PREFERRED EVALUATION LOCATION                                     PREFERRED EVALUATION METHOD SIMULATOR                                                            PERFORM


==REFERENCES:==
==REFERENCES:==
AOP-403.6                  DROPPED CONTROL DROPPED      CONTROL ROD  ROD TOOLS:            AOP-403.6 (TO RECORD AFFECTED BANK HEIGHTS and to provide engineering numbers for limitations on rod withdrawal rates)
EVALUATION TIME                          15        TIME CRITICAL          No No      IOCFR55: 45(A)5 CANDIDATE:                                                                        TIME START:
TIME FINISH:
PERFORMANCE RATING:                      SAT:            UNSAT:
QUESTION GRADE:                    PERFORMANCE EXAMINER:
SIGNATURE                DATE COMMENTS:
Tuesday, December  06, 2005 December 06,  2005                                                                            Page 22 of Page    of 10 10


AOP-403.6 DROPPED CONTROL ROD TOOLS: AOP-403.6 (TO RECORD AFFECTED BANK HEIGHTS and to provide engineering numbers for limitations on rod withdrawal rates) EVALUATION TIME 15 TIME CRITICAL No IOCFR55: CANDIDATE:
INSTRUCTIONS TO         TO OPERATOR READ TO READ    TO OPERATOR:
TIME START: TIME FINISH: PERFORMANCE RATING: SAT: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:
OPERATOR:
SIGNATURE COMMENTS:
WHEN II TELL WHEN      TELL YOU YOU TO TO BEGIN, BEGIN, YOU YOU ARE ARE TOTO PERFORM PERFORM THETHE ACTIONS ACTIONS AS AS DIRECTED DIRECTED IN IN THE THE INITIATING INITIATING CUES. II WILL CUES. WILL DESCRIBE DESCRIBE THE  THE GENERAL GENERAL CONDITIONS CONDITIONS UNDER UNDER WHICH WHICH THIS   TASK IS THIS TASK  IS TO TO BEBE PERFORMED PERFORMED AND PROVIDE AND  PROVIDE THE THE NECESSARY NECESSARY TOOLS TOOLS WITH WITH WHICH WHICH TOTO PERFORM PERFORM THIS THIS TASK.
Tuesday, December 06, 2005 45(A)5 DATE Page 2 of 10 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
TASK. BEFORE BEFORE STARTING, STARTING, II WILL EXPLAIN EXPLAIN THETHE INITIAL INITIAL CONDITIONS, CONDITIONS, WHICH STEPSSTEPS TOTO SIMULATE SIMULATE OR OR DISCUSS, DISCUSS, ANDAND PROVIDE PROVIDE INITIATING CUES.
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
INITIATING    CUES. WHEN WHEN YOU YOU COMPLETE COMPLETE THE THE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE  THE OBJECTIVE OBJECTIVE FOR FOR THISTHIS JOB JOB PERFORMANCE MEASURE PERFORMANCE        MEASURE WILL BE     BE SATISFIED.
SATISFIED.
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
INITIAL CONDITION: Plant was operating at 75% power with all controls in automatic when F2 dropped due to a blown fuse. The blown fuse was control rod "F2" replaced in the 11AC AC power cabinet. Actions of AOP-403.6 have been completed through Step 10.
Plant was operating at 75% power with all controls in automatic when control rod "F2" dropped due to a blown fuse. The blown fuse was replaced in the 1 AC power cabinet. Actions of AOP-403.6 have been completed through Step 10. INITIATING CUES: CRS has directed NROATC to recover control rod "F-2" per AOP-403.6, starting with Step 11. HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 ofl0 jPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
INITIATING CUES: CRS has directed NROATC to recover control rod "F-2"         F-2 per AOP-403.6, starting with Step 11.
HAND JPM BRIEFING SHEET TO OPERATOR OPERA TOR AT THIS TIME!
: Tuesday, Tuesday, December December 06, 06, 2005 2005                                                                       Page 33 of Page     ofl0 10
 
jPM JPM BRIEFING SHEET OPERA TOR INSTRUCTIONS:
OPERATOR       INSTRUCTiONS:
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
SAFETY    CONSIDERATIONS:
INITIAL CONDITION:
INITIAL CONDITION:
Plant was operating at 75% power with all controls in automatic when control rod IF2" dropped due to a blown fuse. The blown fuse was replaced in the 1 AC power cabinet. Actions of AOP-403.6 have been completed through Step 10. INITIATING CUES: CRS has directed NROATC to recover control rod IF-2" per AOP-403.6, starting with Step 11. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 oflO STEPS CR SEQ STEP: STEP STANDARD:
INITIAL    CONDITION: Plant   Plant was was operating operating at at 75%
No Yes Record Step Counter readings for both groups Step counter reading for both groups in of the affected bank. Control Bank "A" have been recorded as 230 steps. CUES: COMMENTS:
75% power power with with all all controls controls in in automatic automatic when when control rod control  rod IF2" F2 dropped due to a blown blown fuse. The blown blown fuse was replaced in the 1lAG  power cabinet. Actions of AOP-403.6 have AC power                                    have been been completed through Step Step 10.
CR SEQ No Yes CUES: STEP: 2 Record PIA Converter Reading. STEP STANDARD:
10.
SAT UNSAT PIA converter reading has been recorded.
INITIATING    CUES: CRS INITIATING CUES:           CRS hashas directed directed NROATC NROATC to to recover recover control control rod  F-2 per rod IF-2"   per AOP-403.6, starting with Step 11.
Booth operator gives examinee PIA converter reading of 230 steps. COMMENTS:
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU EVALUATOR SATISFACTORILY COMPLETED HAVE SATISFACTORILY                                       COMPLETED THE ASSIGNED TASK.
SAT UNSAT CR SEQ STEP: 3 Ye Yes Rotate ROD CNTRL BANK SEL switch clockwise to the affected bank position.
Tuesday, Tuesday, December December 06, 06, 2005 2005                                                                          Page 44 of Page    oflO 10
CUES: COMMENTS:
 
Tuesday, December 06, 2005 STEP STANDARD:
STEPS STEPS CR SEQ CR    SEQ      STEP:
ROD CNTRL BANK SEL Switch has been rotated clockwise to the CBA position.
STEP:        1                                    STEP STEP STANDARD:
SAT UNSAT Page 5 of 10 CR SEQ STEP: 4 No Yes Manually reset Demand Step Counter for the affected group to zero. CUES: COMMENTS:
STANDARD:
CR SEQ STEP: 5 Ye Yes Place all Lift Coil Disconnect Switches for the affected bank, except switches for the dropped rod, to the ROD DISCONNECTED position.
No Yes No   Yes     Record Step Record     Step Counter Counter readings readings for for both both groups groups  Step counter Step counter reading reading for for both both groups groups inin of the of the affected affected bank.
STEP STANDARD:
bank.                             Control Bank Control Bank "A" A have have been been recorded recorded as as 230 steps.
The step counter for Bank A GROUP 1 has been reset to zero. STEP STANDARD:
230  steps.
SAT UNSAT All lift coil disconnect switches for Control Bank "A" rods, except Rod "F-2", have been placed in the ROD DISCONNECTED position.
CUES:
CUES: SAT As the CRS, examiner should prompt the examinee to disconnect the affected bank. UNSAT Explain that the BOP operator will watch the MCB while he accomplishes this task. COMMENTS:
CUES:                                                                                      SAT SAT UNSAT UNSA T COMMENTS:
CR SEQ STEP: 6 STEP STANDARD:
COMMENTS:
Ye Yes Withdraw the dropped rod: Drive the affected Rod F2 is moving in the outward direction.
CR SEQ         STEP:       2                                      STEP STANDARD:
bank out. CUES: SAT If rod withdrawal rate is requested "use not greater than 50 step increments not to UNSAT exceed 80% power." Rod Control System Fail Urgent Alarm will alarm. If examinee asks whether to depress the ROD CNTRL ALARM RESET switch, as the CRS, direct him to depress the switch after the rod has been realigned.
No Yes      Record PIA P/A Converter Reading.                   P/A converter reading has been recorded.
Fill in on procedure ahead of time. COMMENTS:
PIA CUES:                                                                                      SAT Booth operator gives examinee PIA   P/A converter reading of 230 steps.                 UNSAT COMMENTS:
Tuesday, December 06, 2005 Page 6 ofl0 CR SEQ STEP: 7 No Yes Verify dropped rod movement on the digital rod position indicator.
CR SEQ         STEP:       3                                     STEP STANDARD:
CUES: COMMENTS:
Ye Yes       Rotate ROD CNTRL BANK SEL switch                     ROD CNTRL BANK SEL Switch has been clockwise to the affected bank position.            rotated clockwise to the CBA position.
CR SEQ STEP: 8 STEP STANDARD:
CUES:                                                                                       SAT UNSAT UNSA    T COMMENTS:
DRPI indicator for rod "F-2" in Bank "A" is verified to be moving out in 6 step increments.
Tuesday, Tuesday, December December 06, 06, 2005 2005                                                                          Page 5 of PageS  of1010
STEP STANDARD:
 
SAT UNSAT No Yes When dropped rod moves 6 steps, then verify ONE ROD ON BOTTOM annunciator is ONE ROD ON BOTTOM annunciator clears. observed to be flashing (in the reset condition).
CR SEQ CR   SEQ         STEP:
CUES: COMMENTS:
STEP:       44                                        STEP STEP STANDARD:
CR SEQ STEP: 9 No Yes Adjust turbine load to maintain Tavg within +/- 5&deg;F of Tref. STEP STANDARD:
STANDARD:
Tavg -Tref within +/- 5&deg;F. SAT UNSAT CUES: SAT No turbine manipulations are required since TAVG will remain within 5&deg;F of Tref. UNSAT COMMENTS:
No Yes No   Yes     Manually reset Manually   reset Demand      Step Counter Demand Step             for the Counter for   the   The    step counter The step      counter forfor Bank Bank AA GROUP GROUP 11 affected group affected   group toto zero.
Tuesday, December 06, 2005 Page 7 of 10 CR SEQ STEP: 10 No Yes Continue Rod withdrawl to the demand position CUES: COMMENTS:
zero.                            has has been been reset reset to to zero.
CR SEQ Ye Yes CUES: STEP: 11 Observes that Rod F-2 stops moving at 30 steps and is apparently stuck COMMENTS:
zero.
CR SEQ STEP: 12 Ye Yes Places Rod Control Bank SelectorSwitch in manual (lAW immediate operator action from AOP-403.5)
CUES:
CUES:                                                                                                SAT UNSAT UNSA T COMMENTS:
CR SEQ CR              STEP:         5                                         STEP STANDARD:
Ye Yes         Place      Lift Coil Place all Lift       Disconnect Switches for the Coil Disconnect                            lift coil disconnect switches for Control All lift affected bank, except switches for the                   Bank "A" A rods, except Rod "F-2",
F-2, have dropped rod, to the ROD DISCONNECTED                    been placed in the ROD DISCONNECTED position.                                              position.
CUES:                                                                                                 SAT As the CRS, examiner should prompt the examinee   exam inee to disconnect the affected bank.                 UNSAT Explain that the BOP operator will watch the MCB while he accomplishes this task.
COMMENTS:
CR SEQ           STEP:         6                                         STEP STANDARD:
Ye Yes         Withdraw the dropped rod: Drive the affected           Rod F2 is moving in the outward direction.
bank out.
CUES:                                                                                                 SAT If rod withdrawal rate is requested use  "use not greater than 50 step increments not to UNSAT exceed 80% power.
power." Rod Control System Fail Urgent Alarm will alarm. If          If examinee asks whether to depress depress the ROD CNTRL ALARM RESET switch, as the CRS, direct him to depress the switch after the rod has been realigned.
Fill Fill in in on on procedure procedure ahead ahead of  of time.
COMMENTS:
Tuesday, December December 06, 06, 2005 2005                                                                                  Page 66 of Page   ofl0 10
 
CR SEQ CR   SEQ       STEP:
STEP:        77                                  STEP STEP STANDARD:
STANDARD:
No Yes No  Yes    Verify dropped Verify  dropped rodrod movement movement on on the the digital digital   DRPI indicator DRPI     indicator for for rod rod "F-2" F-2 in in Bank Bank "A" A isis rod position rod  position indicator.
indicator,                        verified to verified   to be be moving moving outout inin 66 step step increments.
increments.
CUES:
CUES:                                                                                          SAT UNSAT UNSAT COMMENTS:
CR SEQ          STEP:        8                                  STEP STANDARD:
No Yes       When dropped rod moves 6 steps, then verify       ONE ROD ON BOTTOM annunciator is ONE ROD ON BOTTOM annunciator clears. clears, observed to be flashing (in the reset condition).
CUES:                                                                                         SAT UNSAT UNSA T COMMENTS:
CR SEQ         STEP:        99                                  STEP STANDARD:
No Yes       Adjust turbine load to maintain Tavg within     +/- Tavg - Tref within +/-+/- 5&deg;F.
5&deg;FofTref.
5&deg;F of Tref.
CUES:                                                                                         SAT No turbine manipulations are required since TAVG will remain within 5&deg;F of Tref. UNSAT COMMENTS:
Tuesday, December Tuesday, December 06, 06, 2005 2005                                                                            Page 77 of Page    of10 10
 
CR  SEQ CR SEQ         STEP:
STEP:        10 10                                STEP STEP STANDARD:
STANDARD:
No Yes No   Yes     Continue Rod Continue   Rod withdrawl withdrawl to to the the demand demand     Not more Not  more than than 5050 step step increments increments or or 80%
80%
position position                                        power as power  as determined determined inin step step 66 CUES:
CUES:                                                                                   SAT SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ         STEP:         11 11                                STEP STANDARD:
STANDARD:
Ye Yes      Observes that Observes     that Rod Rod F-2 F-2 stops stops moving moving at at 30 30 notices  that rod notices that      F-2 is rod F-2      stuck is stuck steps and is apparently stuck CUES:                                                                                    SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ       STEP:         12                               STEP STANDARD:
STANDARD:
Ye Yes                                     SelectorSwitch in Places Rod Control Bank SelectorSwitch         Rod Control Bank Selector Switch.is Switch is in manual (lAW immediate operator action from     manual AOP-403.5)
CUES:                                                                                    SAT UNSAT UNSA T COMMENT COMMENTS:    S:
Tuesday, December 06, 2005 December 06, 2005                                                                        Page 88 of Page    oj 10 10
 
CR SEQ CR    SEQ        STEP:
STEP:        1313                                    STEP STEPSTANDARD:
STANDARD:
Ye Yes Ye    Yes      Observesthat Observes      thatRod RodP-6 P-6drops dropsinto intothe thecore core      Evaluatesas Evaluates    as22dropped droppedrods.
rods.
while  rodF-2 while rod    F-2remains remainsstuck stuckatat approximately3Osteps approximately30      steps CUES:
CUES:                                                                                            SAT SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ CR    SEQ        STEP:
STEP:          14 14                                      STEP STEP STANDARD:
STANDARD:
Ye Yes Ye  Yes      Inserts aa manual Inserts      manual reactor reactor trip.
trip.                    Places the Places  the manual manual reactor reactor trip trip switch switch toto the TRIP the  TRIP position.
position. Both Both Reactor Reactor Trip Trip breakers indicate breakers    indicate green  light ON, green light  ON, redred light light OFF. All OFF. All rod rod bottom bottom lights  are  lit.
lights are lit.
CUES:
CUES:
CUES:                                                                                            SAT The  examin  ee  should    insert The examinee should insert aa manualmanual reactor trip upon observing    control rod P6 UNSAT observing control              UNSAT drop. Continuing drop. Continuing to to withdraw withdraw original original dropped dropped rod more than 12 steps after the second rod second  rod is is dropped dropped constitutes constitutes failure.
COMMENTS:
COMMENTS:
COMMENTS:
Tuesday, December 06, 2005 STEP STANDARD:
Exami  ner ends Examiner  ends JPM JPM atat this this point.
Not more than 50 step increments or 80% power as determined in step 6 SAT UNSAT STEP STANDARD:
pOint.
notices that rod F-2 is stuck STEP STANDARD:
Tuesday, December 06, 2005                                                                                 Page99ofof1010 Tuesday, December 06, 2005                                                                               Page
SAT UNSAT Rod Control Bank Selector Switch.is in manual SAT UNSAT Page 8 oj 10 CR SEQ STEP: 13 Ye Yes Observes that Rod P-6 drops into the core while rod F-2 remains stuck at approximately30 steps CUES: COMMENTS:
 
CR SEQ Ye Yes STEP: 14 Inserts a manual reactor trip. STEP STANDARD:
JPM SETUP JPM       SETUP SHEET SHEET JPM NO:
Evaluates as 2 dropped rods. STEP STANDARD:
]PM   NO: JPSF-012NRC JPSF-01 2NRC DESCRIPTION:
SAT UNSAT Places the manual reactor trip switch to the TRIP position.
DESCRIPTION:            DROPPED ROD DROPPED      ROD RECOVERY RECOVERY ICSET:
Both Reactor Trip breakers indicate green light ON, red light OFF. All rod bottom lights are lit. CUES: SAT The examinee should insert a manual reactor trip upon observing control rod P6 UNSAT drop. Continuing to withdraw original dropped rod more than 12 steps after the second rod is dropped constitutes failure. COMMENTS:
IC SET: 11   11(75%
Examiner ends JPM at this pOint. Tuesday, December 06, 2005 Page 9 of 10 JPM SETUP SHEET ]PM NO: JPSF-012NRC DESCRIPTION:
(75%
DROPPED ROD RECOVERY IC SET: 11 (75% INSTRUCTIONS:  
INSTRUCTIONS:
: 1. RUN 2. Activate:
INSTRUCTIONS:
MAL-CRF004F2 SELECT =ST ATIONARY 3. Clear MAL-CRF004F2 after rod drops. (Control rod F2 drops) 4. Control Tavg-Tref deviation within +/-1.5&deg;F with rods in AUTO 5. Place rod control in MANUAL 6. FREEZE 7. When student is ready: RUN 8. When control rod F2 is withdrawn to approximately 30 steps, insert: Trig #1 MAL-CRF007F2 SELECT =UNTRIPPABLE (Rod F2 sticks) When Rod Control is placed in Manual -Trig #2. MAL-CRF004P6 SELECT =STATIONARY COMMENTS: (Control rod P6 drops) Report PIA Converter reading is 230 steps. If a rate of rod withdrawal is requested from engineering, "use not more than 50 step increments not to exceed 80% power." Tuesday, December 06, 2005 Page 10 of 10 AOP-403.6 REVISION 2 DROPPED CONTROL ROD ACTION/EXPECTED RESPONSE 7. Provide Reactor Engineering with[} following information:
: 1. RUN
Time rod dropped: T-15 min Dropped rod location:
: 1. RUN
F-2 Initial Reactor power level: 75% Current Reactor power level: 75% Current QPTR: 1.005 8. Determine and correct the cause 0 the failure NOTE -Step 9 ALTERNATIVE ACTION This Step must be completed before continuing with Step 10 9. Obtain the following information fro Reactor Engineering:  
: 2. Activate:
: 10. Power level at which recovery is to be performed:  
: 2. Activate:
< 80% Rate of control rod movement during recovery:  
MAL-CRFOO4F2 MAL-CRF004F2           SELECT=ST SELECT  =STATIONARY ATIONARY               (Control rod (Control  rod F2 F2 drops) drops)
:::; 50 steps If necessary, reduce Reactor pown to the power level determined in SreP 9. REFER TO GOP-4, POWER OPERATION (MODE 1). PAGE 3 OF7   
: 3. Clear MAL-CRF004F2
: 3.        MAL-CRFOO4F2 afterafter rod drops.
: 4. Control Tavg-Tref deviation within +/-1.5&deg;F with rods in    in AUTO
: 5. Place rod control in MANUAL FREEZE
: 6. FREEZE
: 7. When student is ready:
7.
RUN
: 8. When control rod F2 is withdrawn to approximately approximately 30 steps, insert: Trig #1 MAL-CRFOO7F2 MAL-CRF007F2             SELECT=UN    TRIPPABLE SELECT =UNTRIPPABLE                     (Rod F2 sticks)
When Rod Control is placed in Manual - Trig #2.
MAL-CRFO MAL-CRF004P6 O4P6        SELECT=ST    ATIONARY SELECT=STATIONARY                     (Control rod P6 drops)
COMMENT COMMENTS:      S:
Report P/A PIA Converter reading isis 230 steps.
steps. IfIf aa rate of rod withdrawal is is requested from engineering, use not more than 50 step increments not to exceed 80% power.
"use                                                                power."
Tuesday, Tuesday, December December 06, 06, 2005 2005                                                                           Page 10 Page 10 of of10 10
 
AOP-403.6 AOP-403 .6 REVISION REVISION 22 DROPPED CONTROL DROPPED         CONTROL ROD ROD ACTION/EXPECTED RESPONSE ACTION/EXPECTED            RESPONSE                    ALTERNATIVE ALTERNATIVE ACTION ACTION 7.
: 7. Provide Reactor Provide              Engineering with[}
Reactor Engineering        with information:
following information:
Time rod dropped:             T-15 min mm Dropped rod Dropped     rod location:
location:      F-2 Initial Reactor power Initial level:                         75%
Current Reactor power level:                         75%
Current QPTR:                   1.005
: 8. Determine and correct the cause           04J the failure NOTEStep NOTE - Step 9 This Step must be completed before continuing with Step 10
: 9. Obtain the following information fro     frD Reactor Engineering:
Power level at which recovery is to be performed:                     <80%
                                  < 80%
Rate of control rod movement during recovery:                     :::; 50 steps 10.
: 10. If necessary, reduce Reactor powfl  pown to the power level determined in S-te    SreP
: 9. REFER TO GOP-4, POWER OPERATION (MODE 1).       1).
PAGE3OF7 PAGE 3 OF7
 
V.C. SUMMER NUCLEAR STATION v.C.
PERFORMANCE MEASURE JOB PERFORMANCE
                                ]PM JPM          JPS-O2ONRC JPS-020NRC SECURE NORMAL SECURE NORMAL LETDOWN LETDOWN AND PLACE PLACE EXCESS EXCESS LETDOWN IN LETDOWN  IN SERVICE SERVICE APPROVAL:          APPROVAL DATE:
REVNO:
REV NO: 11 CANDIDATE EXAMINER:
THIS JPM IS NOT APPROVED Tuesday, December Tuesday, December 06, 06, 2005 2005                                            Page 11 of Page    of99


v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPS-020NRC SECURE NORMAL LETDOWN AND PLACE EXCESS LETDOWN IN SERVICE APPROVAL:
TASK:
APPROVAL DATE: REV NO: 1 CANDIDATE EXAMINER:
TASK:
THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of9 TASK: 004-01 6-01 -01 ESTABLISH EXCESS LETDOWN TO VOLUME CONTROL TANK(VCT)
004-016-01 004-01        -01 6-01 -01           ESTABLISH EXCESS ESTABLISH     EXCESS LETDOWN LETDOWN TO TO VOLUME VOLUME CONTROL CONTROL TANK(VCT)
OR REACTOR COOLANT DRAIN TANK(RCDT)
TANK(VCT) OR   OR REACTOR COOLANT REACTOR     COOLANT DRAIN DRAIN TANK(RCDT)
TANK(RCDT)
TASK STANDARD:
TASK STANDARD:
Excess letdown flow is established with final excess letdown HX outlet temperature  
TASK Excess letdown Excess  letdown flow is   established with final is established      final excess letdown HX excess letdown  HX outlet temperature << 165&deg;F.
< 165&deg;F. PREFERRED EVALUATION LOCATION SIMULATOR  
outlet temperature    165&deg;F.
PREFERRED EVALUATION LOCATION                                   PREFERRED EVALUATION METHOD SIMULATOR                                                         PERFORM PERFORM


==REFERENCES:==
==REFERENCES:==
SOP-i 02 SOP-102                  CHEMICAL AND VOLUME CONTROL  CONTROL SYSTEM TOOLS:
EVALUATION TIME                        15        TIME CRITICAL        No      10CFR55:
JOCFR55: 45(A)7 CANDIDATE:                                                                    TIME START:
TIME FINISH:
PERFORMANCE RATING:                    SAT:            UNSAT:
QUESTION GRADE:                  PERFORMANCE EXAMINER:
SIGNATURE                DATE COMMENTS:
Tuesday, December Tuesday,            06, 2005 December 06,  2005                                                                        Page 22 of Page    0/99


SOP-102 TOOLS: EVALUATION TIME 15 CANDIDATE:
INSTRUCTIONS TO INSTRUCTIONS            TO OPERATOR OPERATOR READ TO READ    TO OPERATOR:
PERFORMANCE RATING: SAT: PREFERRED EVALUATION METHOD PERFORM CHEMICAL AND VOLUME CONTROL SYSTEM TIME CRITICAL No lOCFR55: 45(A)7 TIME START: TIME FINISH: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:
OPERATOR:
SIGNATURE DATE COMMENTS:
WHEN I TELL WHEN      TELL YOU YOU TO TO BEGIN, BEGIN, YOU  ARE TO YOU ARE       PERFORM THE TO PERFORM     THE ACTIONS ACTIONS ASAS DIRECTED DIRECTED IN  IN THE THE INITIATING INITIATING CUES. II WILL CUES. WILL DESCRIBE DESCRIBE THE  THE GENERAL GENERAL CONDITIONS CONDITIONS UNDER UNDER WHICH WHICH THIS   TASK IS THIS TASK    IS TO TO BEBE PERFORMED PERFORMED AND PROVIDE AND   PROVIDE THE THE NECESSARY NECESSARY TOOLS TOOLS WITH WITH WHICH WHICH TOTO PERFORM PERFORM THIS THIS TASK.
Tuesday, December 06, 2005 Page 2 0/9 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
TASK. BEFORE BEFORE STARTING, STARTING, II WILL EXPLAIN WILL   EXPLAIN THETHE INITIAL INITIAL CONDITIONS, CONDITIONS, WHICH STEPSSTEPS TOTO SIMULATE SIMULATE OR OR DISCUSS, DISCUSS, AND PROVIDE PROVIDE INITIATING CUES.
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
INITIATING    CUES. WHEN YOU COMPLETECOMPLETE THE TASK SUCCESSFULLY, SUCCESSFULLY, THE   THE OBJECTIVE OBJECTIVE FOR  FOR THIS JOB PERFORMANCE MEASURE PERFORMANCE        MEASURE WILL WILL BEBE SATISFIED.
SATISFIED.
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
CONSIDERATIONS:
Plant is at 75% power with all controls in AUTO. A letdown line leak has occurred.
INITIAL CONDITION: Plant is at 75% power with all controls in AUTO. A letdown line leak has occurred.
INITIATING CUES: The Control Room Supervisor directs removing Normal letdown from service per SOP-1 02, IV.N and establishing excess letdown to the RCDT per SOP-102, IV.C. HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page30f9 jPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
INITIATING CUES: The Control Room Supervisor directs removing Normal letdown from SOP-i 02, IV.N and establishing excess letdown to the RCDT service per SOP-1 SOP-i02, IV.C.
per SOP-102, HAND JPM BRiEFING BRIEFING SHEET TO OPERATOR AT THIS     THiS TiME!
TIME!
Tuesday, December Tuesday,          06, 2005 December 06, 2005                                                                        Page30f9 Page 3 of 9
 
JPM BRIEFING SHEET jPM                       SHEET OPERA TOR INSTRUCTIONS:
OPERATOR       INSTRUCTIONS:
CONSIDERATIONS:
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
INITiAL CONDITION:
Plant is at 75% power with all controls in AUTO. A letdown line leak has occurred.
INITIAL   CONDITION: Plant   Plant isis at at 75%
INITIATING CUES: The Control Room Supervisor directs removing Normal letdown from service per SOP-102, IV.N and establishing excess letdown to the RCDT per SOP-102, IV.C. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 of9 STEPS CR SEQ STEP: STEP STANDARD:
75% power power with with all all controls controls in in AUTO.
Ye Yes Ensure the following Orifice Isolation Valves 8149A, 8149B, & 8149C (green light on & are closed: PVT-8149A, LTDN ORIFICE A ISOL red light off) (6244-4 alarms for RML-1 (45 gpm), PVT-8149B, LTDN ORIFICE B ISOL Trouble. This is expected alarm for (60 gpm). PVT -8149C, L TDN ORIFICE C ISOL letdown isolation (60 gpm). CUES: SAT COMMENTS:
AUTO. A A letdown letdown line line leak leak has has occurred.
CR SEQ STEP: 2 No Yes Close PVT-8152, LTDN LINE ISOL. CUES: COMMENTS:
INITIATING CUES: The Control Room Supervisor       Supervisor directs directs removing removing Normal letdown from service per service per SOP-102, SOP-i 02, IV.N IV.N and establishing establishing excess excess letdown letdown to the RCDT RCDT per SOP-102, IV.C.
CR SEQ STEP: 3 No Yes Place FCV-122, CHG FLOW, in MAN and close. CUES: COMMENTS:
per              IV.C.
Tuesday, December 06, 2005 UNSAT STEP STANDARD:
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU EVALUATOR HAVE SATISFACT SATISFACTORILY               ORILY COMPLETED COMPLETED THE ASSIGNED TASK.
8152 (green light on & red light off STEP STANDARD:
Tuesday, December Tuesday,         06, 2005 December 06, 2005                                                                                 Page 44 of Page     of99
122 indicates closed SAT UNSAT SAT UNSAT PageS of9 CR SEQ 4 No Yes If necessary, close the following Charging Line Isolation Valves: a. MVG-8107, CHG LINE ISOL. b. MVG-8108, CHG LINE ISOL. CUES: STEP STANDARD:
 
not performed SAT Cue operator that closing these valves is not necessary.
STEPS STEPS CR SEQ CR    SEQ        STEP:
Verifies CCW in service UNSAT perSOP-110.
STEP:          1                                        STEP STEP STANDARD:
STANDARD:
Ye Yes Ye  Yes      Ensure the Ensure    the following following Orifice Orifice Isolation Isolation Valves Valves      8149A, 8149A, 8149B, 8149B, && 8149C 8149C (green (green light light on on &&
are closed:
are   closed: PVT-8149A, PVT-8149A, LTDNLTDN ORIFICE ORIFICE AA ISOL ISOL red red light light off) off) (6244-4 (624 4-4 alarms alarms for for RML-1 RML-1 (45 gpm),
(45          PVT-8149B, LTDN gpm), PVT-8149B,      LTDN ORIFICE ORIFICE BB ISOL ISOL  Trouble.
Trouble. This This isis expected expected alarm alarm for for (60 gpm).
(60  gpm). PVT PVT-8149C,
                                  -8149C, LLTDN    ORIFICE C TDN ORIFICE         ISOL C ISOL   letdown letdown isolation isolation (60 gpm).
(60 gpm).
CUES:
CUES:                                                                                             SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ         STEP:         2                                         STEP STANDARD:
No Yes       Close PVT-8152, LTDN LINE ISOL.                         8152 (green light on & red light off CUES:                                                                                             SAT UNSAT UNSA T COMMENTS:
CR CR SEQ         STEP:         3                                         STEP STANDARD:
No Yes       Place FCV-122, CHG FLOW, in MAN and                     122 indicates closed close.
CUES:                                                                                             SAT UNSAT UNSA  T COMMENTS:
Tuesday, Tuesday, December December O6 06, 2005 2005                                                                                  PageS Page    of9 5 of 9
 
CR SEQ          STEP~*
STEP        4                                      STEP STANDARD:
No Yes       If necessary, close the following Charging           not performed Line Isolation Valves:
: a. MVG-8107, CHG LINE ISOL.
: b. MVG-8108, CHG LINE ISOL.
CUES:                                                                                   SAT Cue operator that closing these valves is not necessary. Verifies CCW in service UNSAT per SOP-i 10.
perSOP-110.
COMMENTS:
CR SEQ          STEP:      5                                      STEP STANDARD:
No No        Checks Core Thermal power.                          Core power determined to be less than 2898 Mwt.
CUES:                                                                                  SAT cue the operator that the initial conditions for Establishing Excess Letdown have UNSAT been met COMMENTS:
CR SEQ          STEP:      6                                      STEP STANDARD:
No Yes      Ensure HCV-137 closed.                              HCV-137, XS LTDN HX, controller indicates 0% demand.
CUES:                                                                                  SAT UNSA T UNSAT COMMENTS:
Tuesday, December 06, 2005                                                                      Page 60/9 6 of 9
 
CR SEQ          STEP:      7                                STEP STANDARD:
Ye No        Place excess letdown to RCDT.                  PVM-8143, XS LTDN TO VCT OR RCDT, indicates RCDT position.
CUES:                                                                              SAT Examiners (as CRS) directs operator to send excess letdown to the RCDT.          UNSAT COMMENTS:
CR SEQ          STEP:        8                                STEP STA    NDARD:
STANDARD:
No No        Ensure MVG-9583 is open.                      MVG-9583, FROM XS L    LTDN TDN HX, indicates red light ON, green light OFF.
CUES:                                                                              SAT NOTE: step 2.3 N/A because ther is no Phase A isolation signal and step 2.4 is N/A          UNSAT because Excess letdown is being aligned to the RCDT.
COMMENTS:
COMMENTS:
CR SEQ No No CUES: STEP: 5 Checks Core Thermal power. STEP STANDARD:
CR SEQ         STEP:       99                                STEP STANDARD:
Core power determined to be less than 2898 Mwt. SAT cue the operator that the initial conditions for Establishing Excess Letdown have UNSAT been met COMMENTS:
Ye Yes       Opens PVT-8153 and PVT-8154, XS LTDN           PVT-8153 and 8154, XS LTDN ISOL, ISOL.                                         indicates red light ON, green light OFF.
CR SEQ STEP: 6 No Yes Ensure HCV-137 closed. CUES: COMMENTS:
CUES:                                                                               SAT UNSAT UNSA T COMMENTS:
Tuesday, December 06, 2005 STEP STANDARD:
Tuesday, December 06, 2005                                                                   Page 70f9 7of9
HCV-137, XS LTDN HX, controller indicates 0% demand. SAT UNSAT Page 60/9 CR SEQ Ye No CUES: STEP: 7 Place excess letdown to RCDT. STEP STANDARD:
 
PVM-8143, XS LTDN TO VCT OR RCDT, indicates RCDT position.
CR SEQ          STEP:       10                                 STEP STANDARD:
Examiners (as CRS) directs operator to send excess letdown to the RCDT. COMMENTS:
No No         Directs the building operator to locally monitor communicates direction to building operator RCDT level and pump operation at XPN0007 CUES:                                                                                 SAT UNSAT UNSA T COMMENTS:
SAT UNSAT CR SEQ No No STEP: 8 Ensure MVG-9583 is open. STEP STANDARD:
CR SEQ           STEP:       11                                 STEP STANDARD:
MVG-9583, FROM XS L TDN HX, indicates red light ON, green light OFF. CUES: SAT NOTE: step 2.3 N/A because ther is no Phase A isolation signal and step 2.4 is N/A UNSAT because Excess letdown is being aligned to the RCDT. COMMENTS:
Ye Yes       Establishes excess letdown flow.                 Slowly increases demand on HCV-137 XS LTDN L                         TI-i 39, XS TDN HX CNTRL with final TI-139, LETDOWN HX OUT TEMP <      < 165&deg;F and XS LTDN LTDN TEMP HI annunciator not in alarm.
CR SEQ STEP: 9 Ye Yes Opens PVT-8153 and PVT-8154, XS LTDN ISOL. CUES: COMMENTS:
CUES:                                                                                  SAT NOTE: Receipt of the XS LLTDN/RCDT TDN/RCDT     HX COW OUT TEMP HI CCW              annunciator is not UNSAT grounds for failure of the JPM, but temperature must be reduced below 165&deg;F before completing the JPM satisfactorilly.
Tuesday, December 06, 2005 STEP STANDARD:
PVT-8153 and 8154, XS LTDN ISOL, indicates red light ON, green light OFF. SAT UNSAT Page 70f9 STEP: 10 STEP STANDARD:
CR SEQ No No Directs the building operator to locally monitor communicates direction to building operator RCDT level and pump operation at XPN0007 CUES: COMMENTS:
CR SEQ STEP: 11 Ye Yes Establishes excess letdown flow. CUES: STEP STANDARD:
SAT UNSAT Slowly increases demand on HCV-137 XS L TDN HX CNTRL with final TI-139, XS LETDOWN HX OUT TEMP < 165&deg;F and XS L TDN TEMP HI annunciator not in alarm. SAT NOTE: Receipt of the XS L TDN/RCDT HX CCW OUT TEMP HI annunciator is not UNSAT grounds for failure of the JPM, but temperature must be reduced below 165&deg;F before completing the JPM satisfactorilly.
COMMENTS:
COMMENTS:
CR SEQ STEP: 12 No Yes Checks proper RCP #1 sealleakoff flow. CUES: COMMENTS:
CR SEQ           STEP:       12                                 STEP STANDARD:
Examiner ends JPM at this point. Tuesday, December 06, 2005 STEP STANDARD:
No Yes                                 seal leakoff flow.
Checks FR-154A & B RCP SL LKOFF HI & LO RANGE normal (0.2 -5.0 gpm). SAT UNSAT Page 8 of9 JPM SETUP SHEET JPM NO: JPS-020NRC DESCRIPTION:
Checks proper RCP #1 sealleakoff                         FR-i 54A & B RCP SL LKOFF HI &
SECURE NORMAL LETDOWN AND PLACE EXCESS LETDOWN IN SERVICE IC SET: 11 (75% INSTRUCTIONS:  
Checks FR-154A LO RANGE normal (0.2 - 5.0 gpm).
: 1. RUN 2. Initialte 5 GPM letdown line leak 3. FREEZE 4. When student is ready: RUN COMMENTS:
CUES:                                                                                  SAT UNSAT COMMENTS:
Tuesday, December 06, 2005 Page90f9
Examiner ends JPM at this point.
Tuesday, Decent her 06, 2005 December                                                                              Page 8 of of99
 
JPM SETUP SHEET JPM NO: JPS-020NRC JPMNO:        JPS-O2ONRC DESCRIPTION:
DESCRiPTION:          SECURE NORMAL LETDOWN AND PLACE EXCESS LETDOWN IN SERVICE ICSET:
IC SET:     11(75%
11 (75%
INSTRUCTIONS:
: 1. RUN
: 2. Initialte lnitialte 5 GPM letdown line leak
: 3. FREEZE
: 4. When student is ready:
RUN COMMENTS:
Tuesday, December 06, 2005                                               Page90f9 Page 9 of 9
 
/
V.C. SUMMER NUCLEAR STATION v.C.
JOB PERFORMANCE MEASURE
                                ]PM JPM        JPS-068 SHIFT COMPONENT COOLING WATER TRAINS APPROVAL:          APPROVAL DATE:
REVNO:
REV NO: 7 CANDIDATE EXAMINER:
THIS JPM IS NOT APPROVED Tuesday, December 06, 2005                                      Page 1 1 of 16


v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPS-068 SHIFT COMPONENT COOLING WATER TRAINS APPROVAL:
TASK:
APPROVAL DATE: REV NO: 7 CANDIDATE EXAMINER:
008-021-01-01           SWITCH COMPONENT COOLING WATER TRAINS TASK STANDARD:
THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of 16 TASK: 008-021-01-01 SWITCH COMPONENT COOLING WATER TRAINS TASK STANDARD:
B CCW pump is supplying non-essential loads in slow speed. CCW flow to non-essentials is not The 'B' C CCW is aligned to "B" interrupted. "C"                  B Train. 'B' B charging pump is running. 'A' A Train CCW is aligned to essential loads. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.
The 'B' CCW pump is supplying non-essential loads in slow speed. CCW flow to non-essentials is not interrupted. "C" CCW is aligned to "B" Train. 'B' charging pump is running. 'A' Train CCW is aligned to essential loads. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.
PREFERRED EVALUATION LOCATION                               PREFERRED EVALUATION METHOD SIMULATOR                                                     PERFORM
PREFERRED EVALUATION LOCATION SIMULATOR  


==REFERENCES:==
==REFERENCES:==
SOP-i 02 SOP-102                CHEMICAL AND VOLUME CONTROL SYSTEM SOP-118                COMPONENT COOLING SYSTEM TOOLS:
EVALUATION TIME                    25        TIME CRITICAL        No      10CFR55:
10CFR55: 45(a)8 CANDIDATE:                                                                TIME START:
TiME FINISH:
TIME PERFORMANCE RATING:                SAT:              UNSAT:
QUESTION GRADE:                    PERFORMANCE EXAMINER:
SIGNATURE              DATE COMMENTS:
Tuesday, December 06, 2005                                                                    Page 2 of 16


TOOLS: SOP-102 SOP-118 EVALUATION TIME CANDIDATE:
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
PERFORMANCE RATING: 25 SAT: PREFERRED EVALUATION METHOD PERFORM CHEMICAL AND VOLUME CONTROL SYSTEM COMPONENT COOLING SYSTEM TIME CRITICAL No lOCFR55: 45(a)8 TIME START: TIME FINISH: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:
WHEN II TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. II WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE                   BEFORE-STARTING,
SIGNATURE DATE COMMENTS:
                                                                                                    'STARTING, II WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
Tuesday, December 06, 2005 Page 2 of 16 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE 'STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
INITIAL CONDITION: The plant is in Mode 1. "A"                                             A CCW A Train CCW is the active loop with "N pump running in slow speed. "B" B Chilled Water Pump and Chiller have been started in preparation for starting "B" B Charging Pump.
The plant is in Mode 1. "A" Train CCW is the active loop with "N CCW pump running in slow speed. "B" Chilled Water Pump and Chiller have been started in preparation for starting "B" Charging Pump. INITIATING CUES: CRS directs NROATC to perform an active CCW loop switchover to "B" Train for "A" Train maintenance per SOP-118. HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 of 16 jPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
INITIATING CUES: CRS directs NROATC to perform an active CCW loop switchover to "B"           B SOP-i 18.
A Train maintenance per SOP-118.
Train for "A" HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
Tuesday, December 06, 2005                                                                     Page 3 of 16
 
jPM BRIEFING SHEET JPM OPERATOR OPERA TOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
INITIAL CONDITION: The plant is in Mode 1. "A"       A Train CCW is the active loop ioop with "A" A CCW pump running in slow speed. "B"8 Chilled Water Pump and Chiller have B Charging Pump.
The plant is in Mode 1. "A" Train CCW is the active loop with "A" CCW pump running in slow speed. "B" Chilled Water Pump and Chiller have been started in preparation for starting "B" Charging Pump. INITIATING CUES: CRS directs NROATC to perform an active CCW loop switchover to "B" Train for "A" Train maintenance per SOP-118. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 of 16 STEP: 1 STEP STANDARD:
been started in preparation for starting "B" INITIATING CUES:         CRS directs NROATC to perform an active CCW loop switchover to "B"   8 A Train maintenance per SOP-118.
STEPS CR SEQ No No Places XPP-001 C, PUMP C, TRAIN A and Places 'c' CCW pump Train A and Train B TRAIN B ('C' CCW pump) in PULL-TO-LOCK.
Train for "A"                         SOP-i 18.
switch in PULL-TO-LOCK.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
CUES: COMMENTS:
Tuesday, December 06, 2005                                                                     Page 4 of 16
CR SEQ No No STEP: 2 Align XPP-001 C, PUMP C, to Train B per Attachment VB with the exception of racking in XSWIDB-II, CC PUMP C XPP0001 C-CC. STEP STANDARD:
 
SAT UNSAT Directs AO to align 'C' CCW pump to the 'B' loop. AO completes Attachment VB of SOP-118. CUES: SAT Booth operator initiates batch file CCCW2B. After amber "B SELECTED" light comes UNSAT on for the 'c' CCW pump Transfer Switch on 'B' Train; as the Auxiliary Operator, booth operator reports Attachment VB is complete, except for racking in the 'C' pump breaker on 'B' Train. COMMENTS:
STEPS CR SEQ          STEP:         1 1                                   STEP STANDARD:
CR SEQ STEP: 3 STEP STANDARD: No No Ensure MVB-9503B, CC TO RHR HX B, (CCW Verifies MVB-9503B, CC TO RHR HX B to the 'B' RHR heat exchanger) is open. open with indication of red light ON and green light OFF. CUES: SAT UNSAT COMMENTS:
No No                 XPP-OO1 C, PUMP C, TRAIN A and Places XPP-001                                      Places 'c' C CCW pump Train A and Train B TRAIN B ('C' (C CCW pump) in PULL-TO-LOCK.       switch in PULL-TO-LOCK.
Tuesday, December 06, 2005 Page 50f16 CR SEQ STEP: 4 Ye Yes Start one of the following in slow speed: XPP-0001 B, PUMP B CUES: COMMENTS:
CUES:                                                                                     SAT UNSAT UNSA T COMMENTS:
STEP: 5 STEP STANDARD:
CR SEQ         STEP:         2                                   STEP STANDARD:
Starts 'B' CCW Pump running in slow speed with red indicating light ON and green light OFF. Notes that starting amps decay to normal running current. STEP STANDARD:
No No        Align XPP-001 XPP-OO1 C, PUMP C, to Train B per           Directs AO to align 'C' C CCW pump to the 'B' B Attachment VB with the exception of racking          loop. AO completes Attachment VB of XSWIDB-ll, CC PUMP C in XSWIDB-II,              C XPP0001 XPP0001C-CC.
SAT UNSAT CR SEQ Ye No Start MVB-9503B, CC TO RHR HX B, stroking Places control switch for MVB-9503B in in the closed direction.
C-CC.        SOP-118.
CLOSE. Observes valve in mid-position.
CUES:                                                                                     SAT Booth operator initiates batch file CCCW2B. After amber "B SELECTED" SELECTED light comes           UNSAT on for the 'c' C CCW pump Transfer Switch on 'B'8 Train; as the Auxiliary Operator, booth operator reports Attachment VB is complete, except for racking in the 'C' C pump breaker on 'B' B Train.
CUES: SAT Per CAUTION 2.3.c and 2.3.d (SOP-118, III.B): Failure to complete Step 2.3.d in a UNSAT timely manner after reducing RHR Heat Exchanger Flow will result in a loss of flow through the running CCW Pump or excessive flow perturbations in the CCW non-essential loop. NOTE TO EVALUATOR:
COMMENTS:
Steps 5 -8 of this JPM will be performed concurrently in rapid succession.
CR SEQ         STEP:         3                                   STEP STANDARD:
No No       Ensure MVB-9503B, CC TO RHR HX B, (CCW             Verifies MVB-9503B, CC TO RHR HX B to the 'B' B RHR heat exchanger) is open.           open with indication of red light ON and green light OFF.
CUES:                                                                                     SAT UNSAT UNSA T COMMENTS:
Tuesday, December 06, 06 2005                                                                         Page 50f16 5 of 16
 
CR SEQ         STEP:       44                                      STEP STANDARD:
Ye Yes       Start one of the following in slow speed:                   'B' CCW Pump running in slow Starts B XPP-0001 B, PUMP B XPP-000i            B                             speed with red indicating light ON and green light OFF. Notes that starting amps decay to normal running current.
CUES:                                                                                     SAT UNSA T UNSAT COMMENTS:
CR SEQ         STEP:      5                                      STEP STANDARD:
Ye No       Start MVB-9503B, CC TO RHR HX B, stroking           Places control switch for MVB-9503B in in the closed direction.                             CLOSE. Observes valve in mid-position.
CUES:                                                                                     SAT IlI.B): Failure to complete Step 2.3.d in a UNSAT (SOP-i 18, III.B):
Per CAUTION 2.3.c and 2.3.d (SOP-118, timely manner after reducing RHR Heat Exchanger Flow will result in a loss of flow through the running CCW Pump or excessive flow perturbations in the CCW non-     non essential loop.
NOTE TO EVALUATOR: Steps 5 - 8 of this JPM will be performed concurrently in rapid succession.
COMMENTS:
Tuesday, December 06, 2005                                                                        Page 6 of 16
 
CR SEQ          STEP:      66                              STEP STANDARD:
Ve Yes Ye  Ves                    indicated on FI-7044, When flow, as indicated      FI-7044, HX HX B B  (Align non-essential loads loads to B
                                                                                          'B' train FLOW GPM, GPM, is between 5000 5000 gpm and 4000 CCW.) Places control for MVB COW.)                        MVB-in rapid gpm, perform the following in gpm,                                        9524B/9526B AND 9524B!9526B          MVB-9687B/9525B, LP AND MVB-9687B/9525B,            LP succession:                                  B NON-ESSEN LOAD ISOL B                        ISOL to OPEN, with indication of red light ON and green light
: 1) Open MVB-9687B!9525B,
: 1)        MVB-9687B/9525B, LP B    B NON NON-  OFF.
ESSEN LOAD ISOL.ISOL.
MVB-9524B/9526B, LP B
: 2) Open MVB-9524B/9526B,          B NON NON-ESSEN LOAD ISOL.ISOL.
CUES:                                                                              SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      7                              STEP STANDARD:
Ve Yes Ye  Ves      When flow, as indicated on FI-7044,      B Fl-7044, HX B  (Isolate non-essential loads from A 'A' train FLOW GPM, is between 5000 gpm and 4000      CCW.) Places control switches for MVB-  MVB gpm, perform the following in rapid        9524A19526A AND MVB-9687A19525A, MVB-9687N9525A, succession:                                LP AA NON-ESSEN LOAD JSOL    ISOL to CLOSE, with indication of red light OFF and green MVB-9524A/9526A, LP A NON-
: 1) Close MVB-9524A19526A,            NON    light ON.
ESSEN LOAD ISOL.
: 2) Close MVB-9687                    NON Al9525A, LP A NON-MVB-9687N9525A, ESSEN LOAD ISOL.
CUES:                                                                              SAT UNSA T UNSAT COMMENTS:
Tuesday, December 06, O6 2005                                                                  Page 7 of 16
 
CR SEQ          STEP:        8                                    STEP STANDARD:
Ye No                                    Fl7044, HX B When flow, as indicated on FI-7044,                (Align CCW TO 'A'A RHR heat exchanger.)
FLOW GPM, is between 5000 gpm and 4000              Places control switch for MVB-9503A, gpm, perform the following in rapid                CC TO RHR HX A to OPEN with indication succession:                                        of red light ON and green light OFF.
: 1) Open MVB-9503A, CC TO RHR HX A.
CUES:                                                                                    SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      99                                    STEP STANDARD:
No No        Rack in XSW1 OB11, DB1 1, CC PUMP C XPP0001 C-        Racked up in slow speed. Green light ON.
CC CCW PUMP C to complete Attachment VB
("C" (C CCW Pump breaker on 'B'  B train).
CUES:                                                                                    SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:        10                                    STEP STANDARD:
No No              XPP-0001C, Place XPP-0001    C, PUMP C, TRAIN B    B in After- Places 'c'                    B switch in C CCW pump, Train "B" Stop.                                              After-Stop.
CUES:                                                                                    SAT UNSAT UNSA T COMMENTS:
Tuesday, December 06, 2005                                                                        Page 8 of 16
 
CR SEQ          STEP:      11 ii                                  STEP STANDARD:
No No                                    1 gpm sample flow Locally verify greater than 1                    AO reports greater than 11 gpm flow on RML-2B, CCW Liquid Monitor.                    through RML-2B.
CUES:                                                                                    SAT Booth Operator reports that RML-2B flow is 5.0 gpm.                                  UNSAT COMMENTS:
CR SEQ          STEP:      12                                  STEP STASTANDARD:
NDARD:
No No        Ensure the following valves have not              The red light is ON and the green light is automatically closed due to high flow:            off for all the following:
: 1) MVG-9625, CC TO RB                            MVG-9625, MVG-9626, MVG-9583, MVG-      MVG
: 2) MVG-9626, CC TO RB                            9593A,B,&C.
: 3) MVG-9583, FROM XS L      LTDN TDN HX
: 4) MVT-9593A(B)(C), FROM RCP A(B)(C)THERM BARR CUES:                                                                                  SAT UNSA T UNSAT COMMENTS:
CR SEQ        STEP:        13                                  STEP STANDARD:
Ye Yes      Transfer the inservice Charging Pump to Train                SOP-i 02, Section III.F, Initiates SOP-102,          lII.F, Shifting SOP-102.
B per SOP-1'02.
B                                                Operating Charging Pumps CUES:                                                                                  SAT Evaluator may need to cue operator that the Initial Conditions of SOP-102, Section UNSAT IIl.F may be considered complete. Cue operator that 10 days have elapsed since III.F previous Charging Pump run.
COMMENTS:
Tuesday, December 06, 2005                                                                        Page 9 of 16
 
CR SEQ          STEP:      14                                  STEP STANDARD:
STA NDARD:
No Yes      If XSW1 DB 15, CHARGING INJ PUMP                  No action required as this breaker is XPPOO43B-CS, XPP0043B-CS, is racked down, then initiate        racked up. Operator notes green light on Attachment VD.                                    B Charging Pump breaker.
                                                                'B' CUES:                                                                                  SAT SOP-i 02 is N/A because it has been out of service for 10 days.
Step 2.1 of SOP-102                                                                UNSAT COMMENTS:
CR SEQ          STEP:      15                                  STEP STANDARD:
No Yes      Ensure XPP-43B-PP1, CHG PP B    B AUX OIL PP, Observes that red light for XPP-43B-PP1 is is running.                                        ON and green light is OFF.
CUES:                                                                                  SAT UNSA T UNSAT COMMENTS:
CR SEQ          STEP:      16                                  STEP STANDARD:
No Yes      Ensure Train B Component Cooling is              Since this action was just previously SOP-i 18.
operating per SOP-118.                          accomplished, operator should simply check off this step.
CUES:                                                                                  SAT UNSAT COMMENTS:
Tuesday, December 06, 2005                                                                    Page 10 of 16
 
CR SEQ          STEP:      17                              STEP STANDARD:
No Yes      Ensure Train B B Chill Water is operating per                              B chilled Operator should verify that 'B' SOP-501.                                      water pump and chiller are operating.
CUES:                                                                                SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      18                              STEP STANDARD:
No Yes              IPIOO152A, CHARGING PUMP B Verify IPI00152A,                      B    Directs AB Lower Level to report suction SUCTION PRESS IND, indicates pump suction    pressure on IPI00152A.
1P100152A.
pressure is greater than 15 psig (AB-388).
CUES:                                                                                SAT When requested, Booth Operator reports that charging header suction pressure is UNSAT 55 psig.
COMMENTS:
CR SEQ        STEP:        19                              STEP STANDARD:
No Yes      Start XPP-0043B, PUMP B.                      Places control switch for XPP-0043B in START and allows switch to spring-return to After-Start (mid-position). Notes breaker red light ON and green light OFF.
Also observes starting current decays to normal running current.
CUES:                                                                                SAT UNSAT UNSA T COMMENTS:
Tuesday, December 06, 2005                                                                  Page 11 of16 of 16
 
CR SEQ          STEP:      20                                STEP STANDARD:
No Yes      Verify XPP-43B-PP1, CHG PP B    B AUX OIL PP, Observes that red light goes OFF for XPP XPP-stops automatically when the Charging PUMP    43B-PP1 and that green light goes ON.
Comes up to full speed.
CUES:                                                                              SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      21                                STEP STANDARD:
No Yes      Monitor the following to verify proper pump    Notes that running current is around 42 operation:                                                                    P1-121 is amps, discharge pressure on PI-121 around 2700 psig, and that status light for
: 1) Charging Pump B  B running current is      XVG-9684B-CC shows green light OFF between 30 amps and 50 amps.                  and red light ON.
P1-121, CHG PRESS PSIG, is between 2650
: 2) PI-121, psig and 2850 psig.
: 3) XVG-9684B-CC, CCW TO CHG PP B, is open.
CUES:                                                                              SAT UNSAT UNSA T COMMENTS:
Tuesday, December 06, 2005 Tllesday,                                                                                  Page 12 of 16
 
CR SEQ          STEP:      22                            STEP STANDARD:
Ye Yes      Stop the Charging Pump being removed from  Places the control switch for 'A' A Charging service.                                  Pump breaker to STOP and allows it to spring-return to After-Stop (mid-position).
Notes that running current drops to ZERO.
CCW/CHG Pump warning tag" Places the "CCW/CHG                      tag on the control switch for 'A' A Charging Pump breaker.
CUES:                                                                            SAT CCW/CHG Pump warning tag is NOT critical.
NOTE TO EVALUATOR: Transfer of "CCW/CHG                                                UNSAT COMMENTS:
CR SEQ          STEP:      23                            STEP STANDARD:
No Yes      Verify PI-121, P1-121, CHG PRESS PSIG, is between Observes that discharge pressure on PI-  P1-2650 psig and 2850 psig.                  121 is around 2700 psig.
CUES:                                                                            SAT UNSA T UNSAT COMMENTS:
Tuesday, December 06, 2005                                                              Page 13 of16 of 16
 
CR SEQ          STEP:      24                                STEP STANDARD:
No Yes        Monitor the following for proper pump          Observes Pressurizer Level is about 60%,
operation: 1) LR-459, PZR% LEVEL & LEVEL and all three seal injection flow rates are Fl-i 30A, RCP A INJ SP. 2) FI-130A,            NJ FLO GPM.
GPM, 3) FI-Fl- approximately 8.2 gpm.
127A, RCP B  B INJ NJ FLO GPM. 4) FI-124A, RCP C INJ FLO GPM.
CUES:                                                                                  SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      25                                STEP STANDARD:
No Yes        Align Component Cooling as required by SOP-                          SOP-i 18 to complete Operator returns to SOP-118 118.                                          swapover of active loop.
CUES:                                                                                  SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      26                                STEP STANDARD:
Ye No        Secure the running Train A Component                                      XPP-0001A, Places control switch for XPP-0001    A, in Cooling Water Pump in the off going active    STOP and allows it to spring-return to loop:                                          After-Stop (mid-position). Places CHARGING PUMP IN SERVICE" "CHARGING                SERVICE tag on the
: 1) XPP-0001A, PUMP A                                              B CCW Pump breaker.
control switch for 'B' CUES:                                                                                  SAT NOTE TO EVALUATOR: Transfer of "CHARGING CHARGING PUMP IN SERVICE" SERVICE tag is NOT              UNSAT critical.
COMMENTS:
COMMENTS:
Tuesday, December 06, 2005 Page 6 of 16 CR SEQ STEP: 6 Ve Ves When flow, as indicated on FI-7044, HX B FLOW GPM, is between 5000 gpm and 4000 gpm, perform the following in rapid succession:
Tuesday, December 06, 2005                                                                   Page 14 of 16
CUES: 1) Open MVB-9687B/9525B, LP B ESSEN LOAD ISOL. 2) Open MVB-9524B/9526B, LP B ESSEN LOAD ISOL. COMMENTS:
 
CR SEQ STEP: 7 Ve Ves When flow, as indicated on FI-7044, HX B FLOW GPM, is between 5000 gpm and 4000 gpm, perform the following in rapid succession:
CR SEQ CR             STEP:       27                                  STANDARD:
CUES: 1) Close MVB-9524A19526A, LP A ESSEN LOAD ISOL. 2) Close MVB-9687 Al9525A, LP A ESSEN LOAD ISOL. COMMENTS:
Tuesday, December 06, 2005 STEP STANDARD: (Align non-essential loads to 'B' train CCW.) Places control for MVB-9524B/9526B AND MVB-9687B/9525B, LP B NON-ESSEN LOAD ISOL to OPEN, with indication of red light ON and green light OFF. STEP STANDARD:
SAT UNSAT (Isolate non-essential loads from 'A' train CCW.) Places control switches for MVB-9524A19526A AND MVB-9687A19525A, LP A NON-ESSEN LOAD ISOL to CLOSE, with indication of red light OFF and green light ON. SAT UNSAT Page 7 of 16 CR SEQ Ye No CUES: STEP: 8 When flow, as indicated on FI-7044, HX B FLOW GPM, is between 5000 gpm and 4000 gpm, perform the following in rapid succession:
: 1) Open MVB-9503A, CC TO RHR HX A. COMMENTS:
STEP: 9 STEP STANDARD: (Align CCW TO 'A' RHR heat exchanger.)
Places control switch for MVB-9503A, CC TO RHR HX A to OPEN with indication of red light ON and green light OFF. STEP STANDARD:
SAT UNSAT CR SEQ No No Rack in XSW1 OB11, CC PUMP C XPP0001 C-Racked up in slow speed. Green light ON. CC CCW PUMP C to complete Attachment VB ("C" CCW Pump breaker on 'B' train). CUES: COMMENTS:
CR SEQ STEP: 10 STEP STANDARD:
SAT UNSAT No No Place XPP-0001 C, PUMP C, TRAIN B in After-Places 'c' CCW pump, Train "B" switch in Stop. After-Stop.
CUES: SAT UNSAT COMMENTS:
Tuesday, December 06, 2005 Page 8 of 16 CR SEQ No No CUES: STEP: 11 Locally verify greater than 1 gpm sample flow on RML-2B, CCW Liquid Monitor. Booth Operator reports that RML-2B flow is 5.0 gpm. COMMENTS:
CR SEQ No No CUES: STEP: 12 Ensure the following valves have not automatically closed due to high flow: 1) MVG-9625, CC TO RB 2) MVG-9626, CC TO RB 3) MVG-9583, FROM XS L TDN HX 4) MVT-9593A(B)(C), FROM RCP A(B)(C)THERM BARR COMMENTS:
CR SEQ Ye Yes STEP: 13 Transfer the inservice Charging Pump to Train B per SOP-1'02.
STEP STANDARD:
STEP STANDARD:
AO reports greater than 1 gpm flow through RML-2B. STEP STANDARD:
No Yes No Yes     Ensure XPP-58A(B)(C), CCBP Ensure               CCBP A(B)(C) are are    Checks status Checks    status of of XPP-58A(B)(C)
SAT UNSAT The red light is ON and the green light is off for all the following: MVG-9625, MVG-9626, MVG-9583, MVG-9593A,B,&C.
XPP-58A(B)(C) Notes Notes aligned as aligned  as follows:
STEP STANDARD:
follows:                     that CCBP that  CCBP A  A is is running running with with the the control control switch in switch  in AUTO AUTO and and the the red red light light ON ON and and
SAT UNSAT Initiates SOP-102, Section III.F, Shifting Operating Charging Pumps CUES: SAT Evaluator may need to cue operator that the Initial Conditions of SOP-102, Section UNSAT III.F may be considered complete.
: 1) One pump is in AUTO and operating.
Cue operator that 10 days have elapsed since previous Charging Pump run. COMMENTS:
: 1)                                       green light OFF. Notes that the control
Tuesday, December 06, 2005 Page 9 of 16 CR SEQ STEP: 14 No Yes If XSW1 DB 15, CHARGING INJ PUMP XPP0043B-CS, is racked down, then initiate Attachment VD. CUES: STEP STANDARD:
: 2) One pump is in AUTO and not operating. switch for CCBP B is in AUTO and the red
No action required as this breaker is racked up. Operator notes green light on 'B' Charging Pump breaker. Step 2.1 of SOP-102 is N/A because it has been out of service for 10 days. COMMENTS:
: 3) One pump is OFF.                       light is OFF and green light ON. Notes  Notes that the control switch for CCBP C is in OFF and the red light is OFF and green light ON.
SAT UNSAT CR SEQ STEP: 15 STEP STANDARD:
CUES:                                                                               SAT UNSAT UNSA T COMMENTS:
No Yes Ensure XPP-43B-PP1, CHG PP B AUX OIL PP, Observes that red light for XPP-43B-PP1 is is running. ON and green light is OFF. CUES: SAT COMMENTS:
Examiner ends JPM at this point.
CR SEQ STEP: 16 No Yes Ensure Train B Component Cooling is operating per SOP-118. CUES: COMMENTS:
Tuesday, December December 06, 06, 2005 2005                                                                      15 of Page 15 Page    oj16 16
Tuesday, December 06, 2005 UNSAT STEP STANDARD:
 
Since this action was just previously accomplished, operator should simply check off this step. SAT UNSAT Page 10 of 16 CR SEQ STEP: 17 No Yes Ensure Train B Chill Water is operating per SOP-501. CUES: COMMENTS:
JPM SETUP SHEET JPM NO: JPS-068 DESCRIPTION:            SHIFT COMPONENT COOLING WATER TRAINS ICSET:
CR SEQ STEP: 18 STEP STANDARD: Operator should verify that 'B' chilled water pump and chiller are operating.
IC SET:     10 or 324 10or324 INSTRUCTIONS:
STEP STANDARD:
: 1. RUN
SAT UNSAT No Yes Verify IPI00152A, CHARGING PUMP B Directs AB Lower Level to report suction SUCTION PRESS IND, indicates pump suction pressure on IPI00152A.
: 2. Start 'B' B Chilled Water Pump and 'B' B HVAC Chiller
pressure is greater than 15 psig (AB-388).
: 3. When student is ready: RUN
CUES: SAT When requested, Booth Operator reports that charging header suction pressure is UNSAT 55 psig. COMMENTS:
: 4. When AO requested by student to complete Attachment VIB of SOP-118, SOP-i 18, enter the following:
CR SEQ STEP: 19 No Yes Start XPP-0043B, PUMP B. CUES: COMMENTS:
RUN BATCH FILE          CCCW2B LOA-CCW045 LOA-CCWO45          SELECT =RACK IN SELECT=RACK        (RACK UP 'C' C CCW PUMP BREAKER ON "B"   B TRAIN)
Tuesday, December 06, 2005 STEP STANDARD:
Places control switch for XPP-0043B in START and allows switch to spring-return to After-Start (mid-position).
Notes breaker red light ON and green light OFF. Also observes starting current decays to normal running current. SAT UNSAT Page 11 of16 CR SEQ No Yes CUES: STEP: 20 Verify XPP-43B-PP1, CHG PP B AUX OIL PP, stops automatically when the Charging PUMP Comes up to full speed. COMMENTS:
CR SEQ STEP: 21 STEP STANDARD:
Observes that red light goes OFF for XPP-43B-PP1 and that green light goes ON. STEP STANDARD:
SAT UNSAT No Yes Monitor the following to verify proper pump Notes that running current is around 42 CUES: operation:
amps, discharge pressure on PI-121 is around 2700 psig, and that status light for 1) Charging Pump B running current is XVG-9684B-CC shows green light OFF between 30 amps and 50 amps. and red light ON. 2) PI-121, CHG PRESS PSIG, is between 2650 psig and 2850 psig. 3) XVG-9684B-CC, CCW TO CHG PP B, is open. SAT UNSAT COMMENTS:
Tllesday, December 06, 2005 Page 12 of 16 CR SEQ STEP: 22 STEP STANDARD:
Ye Yes Stop the Charging Pump being removed from Places the control switch for 'A' Charging service. Pump breaker to STOP and allows it to spring-return to After-Stop (mid-position).
Notes that running current drops to ZERO. Places the "CCW/CHG Pump warning tag" on the control switch for 'A' Charging Pump breaker. CUES: SAT NOTE TO EVALUATOR:
Transfer of "CCW/CHG Pump warning tag is NOT critical.
UNSAT COMMENTS:
CR SEQ No Yes CUES: STEP: 23 Verify PI-121, CHG PRESS PSIG, is between 2650 psig and 2850 psig. COMMENTS:
Tuesday, December 06, 2005 STEP STANDARD:
Observes that discharge pressure on PI-121 is around 2700 psig. SAT UNSAT Page 13 of16 CR SEQ No Yes CUES: STEP: 24 Monitor the following for proper pump operation:  
: 1) LR-459, PZR% LEVEL & LEVEL SP. 2) FI-130A, RCP A INJ FLO GPM. 3) FI-127A, RCP B INJ FLO GPM. 4) FI-124A, RCP C INJ FLO GPM. COMMENTS:
CR SEQ STEP: 25 STEP STANDARD:
Observes Pressurizer Level is about 60%, and all three seal injection flow rates are approximately 8.2 gpm. STEP STANDARD:
SAT UNSAT No Yes Align Component Cooling as required by SOP-Operator returns to SOP-118 to complete 118. swapover of active loop. CUES: COMMENTS:
CR SEQ Ye No STEP: 26 Secure the running Train A Component Cooling Water Pump in the off going active loop: 1) XPP-0001A, PUMP A STEP STANDARD:
SAT UNSAT Places control switch for XPP-0001 A, in STOP and allows it to spring-return to After-Stop (mid-position).
Places "CHARGING PUMP IN SERVICE" tag on the control switch for 'B' CCW Pump breaker. CUES: SAT NOTE TO EVALUATOR:
Transfer of "CHARGING PUMP IN SERVICE" tag is NOT UNSAT critical.
COMMENTS:
COMMENTS:
Tuesday, December 06, 2005 Page 14 of 16 CR SEQ STEP: 27 No Yes Ensure XPP-58A(B)(C), CCBP A(B)(C) are aligned as follows: 1) One pump is in AUTO and operating.
Tuesday, December 06, O6 2005                                                             Page 16 of 16 16of16
: 2) One pump is in AUTO and not operating.
 
: 3) One pump is OFF. CUES: COMMENTS:
V. C. SUMMER NUCLEAR STATION v.C.                                     STA TION PERFORMANCE MEASURE JOB PERFORMANCE
Examiner ends JPM at this point. Tuesday, December 06, 2005 STEP STANDARD:
                                ]PM JPM        JPSF-083 JPSF-083 RESPOND TO RESPOND  TO LOSS LOSS OF OF SECONDARY SECONDARY HEAT HEAT SINK SINK APPROVAL:         APPROVAL DATE:
Checks status of XPP-58A(B)(C)
REV NO: 7 REVNO:
Notes that CCBP A is running with the control switch in AUTO and the red light ON and green light OFF. Notes that the control switch for CCBP B is in AUTO and the red light is OFF and green light ON. Notes that the control switch for CCBP C is in OFF and the red light is OFF and green light ON. SAT UNSAT Page 15 oj 16 JPM SETUP SHEET JPM NO: JPS-068 DESCRIPTION:
CANDIDATE EXAMINER:
SHIFT COMPONENT COOLING WATER TRAINS IC SET: 10 or 324 INSTRUCTIONS:
THIS JPM IS NOT APPROVED Tuesday, December Tuesday, December 06, 06, 2005 2005                                          Page 11 of Page   of11 11
: 1. RUN 2. Start 'B' Chilled Water Pump and 'B' HVAC Chiller 3. When student is ready: RUN 4. When AO requested by student to complete Attachment VIB of SOP-118, enter the following:
 
RUN BATCH FILE CCCW2B LOA-CCW045 SELECT =RACK IN (RACK UP 'C' CCW PUMP BREAKER ON "B" TRAIN) COMMENTS:
TASK:
Tuesday, December 06, 2005 Page 16 of 16 v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPSF-083 RESPOND TO LOSS OF SECONDARY HEAT SINK APPROVAL:
311-006-06-01           RESPONSE TO LOSS OF SECONDARY HEAT SINK TASK STANDARD:
APPROVAL DATE: REV NO: 7 CANDIDATE EXAMINER:
THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of11 TASK: 311-006-06-01 RESPONSE TO LOSS OF SECONDARY HEAT SINK TASK STANDARD:
Condensate flow has been established to at least one S/G via the FRV bypass valves by dumping steam via the condenser steam dumps (Power Reliefs if C-9 not available).
Condensate flow has been established to at least one S/G via the FRV bypass valves by dumping steam via the condenser steam dumps (Power Reliefs if C-9 not available).
PREFERRED EVALUATION LOCATION SIMULATOR  
PREFERRED EVALUATION LOCATION                             PREFERRED EVALUATION METHOD SIMULATOR                                                     PERFORM


==REFERENCES:==
==REFERENCES:==
EOP-15.0            RESPONSE TO LOSS OF SECONDARY HEAT SINK TOOLS:          EOP-15.0 EVALUATION TIME                  20        TIME CRITICAL CRITiCAL      No    10CFR55:
JOCFR55: 45(A)7 CANDIDATE:                                                              TIME START:
TIME FINISH:
PERFORMANCE RATING:              SAT:            UNSAT:
QUESTION GRADE:                    PERFORMANCE EXAMINER:
SIGNATURE            DATE COMMENTS:
Tuesday, December 06, 2005 luesday,                                                                                          of11 Page 2 of 11


EOP-15.0 TOOLS: EOP-15.0 EVALUATION TIME 20 CANDIDATE:
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
PERFORMANCE RATING: SAT: PREFERRED EVALUATION METHOD PERFORM RESPONSE TO LOSS OF SECONDARY HEAT SINK TIME CRITICAL No lOCFR55: 45(A)7 TIME START: TIME FINISH: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:
WHEN II TELL YOU TO BEGIN, BEGIN, YOU ARE TO PERFORM PERFORM THE ACTIONS AS DIRECTED DIRECTED IN  IN THE INITIATING INITIATING CUES. II WILL DESCRIBE DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS              IS TO BE BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, II WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
SIGNATURE DATE COMMENTS:
Tuesday, December 06, 2005 Page 2 of11 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
INITIAL CONDITION: Plant has experienced a trip from 100% due to a feedwater isolation with no EFW available. EOP-15.0 (Loss of Secondary Heat Sink) has been entered and steps 1-7 have been completed.
Plant has experienced a trip from 100% due to a feedwater isolation with no EFW available.
INITIATING CUES: The CRS directs operator to respond to loss of secondary heat sink per EOP-15.0, starting with Step 8.
EOP-15.0 (Loss of Secondary Heat Sink) has been entered and steps 1-7 have been completed.
HAND JPM jPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
INITIATING CUES: The CRS directs operator to respond to loss of secondary heat sink per EOP-15.0, starting with Step 8. HAND jPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 0/11 jPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
Tuesday, December 06 06, 2005                                                                 Page 3 of 11 0/11
SAFETY CONSIDERATIONS:
 
INITIAL CONDITION:
jPM BRIEFING SHEET JPM OPERA TOR INSTRUCTIONS:
Plant has experienced a trip from 100% due to a feedwater isolation with no EFW available.
OPERATOR SAFETY CONSIDERATIONS:
EOP-15.0 (Loss of Secondary Heat Sink) has been entered and steps 1-7 have been completed.
INITIAL CONDITION: Plant has experienced a trip from 100% due to a feedwater isolation with no EFW available. EOP-15.0 (Loss of Secondary Heat Sink) has been entered and steps 1-7 have been completed.
INITIATING CUES: The CRS directs operator to respond to loss of secondary heat sink per EOP-15.0, starting with Step 8. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 of 11 STEPS CR SEQ STEP: 1 No Yes Ensure one condensate pump is running CUES: Cue operator to keep 'A' Condensate pump running. COMMENTS:
INITIATING CUES: The CRS directs operator to respond to loss of secondary heat sink per EOP-15.0, starting with Step 8.
CR SEQ STEP: 2 No Yes Ensure two FWBP's are running CUES: Cue operator to keep 'A'& 'B' FWBPs running. COMMENTS:
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
CR SEQ STEP: 3 No Yes Ensure FW FCV's are closed. CUES: COMMENTS:
Tuesday, December 06, 2005                                                               Page 4 of 11
Tuesday, December 06, 2005 STEP STANDARD:  
 
'A' Condensate pump indicates red light ON, green light OFF. 'B' and 'C' Condensate pumps indicate red light OFF, green light ON. STEP STANDARD:
STEPS CR SEQ         STEP:       11                            STEP STANDARD:
SAT UNSAT 'A' and 'B' FWBPs indicate red light ON, green light OFF. 'e' and 'D' FWBP indicate red light OFF, green light ON. STEP STANDARD:
No Yes       Ensure one condensate pump is running       A Condensate pump indicates red light
SAT UNSAT FCV-478, 488, and 498 indicate red light OFF, green light ON. SAT UNSAT Page 5 of 11 CR SEQ STEP: 4 No Yes Place FW bypass contollers in manual and close. CUES: COMMENTS:
                                                          'A' B and 'C' ON, green light OFF. 'B'        C Condensate pumps indicate red light OFF, green light ON.
CR SEQ STEP: 5 Ye Yes Bypass FWIV signal. CUES: STEP STANDARD:
CUES:                                                                             SAT Cue operator to keep 'A' A Condensate pump running.                         UNSAT COMMENTS:
FCV-3321 ,3331 ,3341 controller red MAN light is lit and demand is O. STEP STANDARD:
CR SEQ         STEP:       2                             STEP STANDARD:
SAT UNSAT Directs CB Operator to perform step 8e of EOP-15.0.
No Yes                     FWBPs are running Ensure two FWBP's                           A and 'B'
NOTE: Booth Operator (as CB Operator) will bypass FWIVs and bypasses.
                                                          'A'    B FWBPs indicate red light ON, green light OFF. 'e'      D FWBP indicate C and 'D' red light OFF, green light ON.
CUES:                                                                             SAT Cue operator to keep 'A'&     B FWBPs running.
A& 'B'                                            UNSAT COMMENTS:
CR SEQ         STEP:       3                             STEP STANDARD:
No Yes       Ensure FW FCV'sFCVs are closed.           FCV-478, 488, and 498 indicate red light OFF, green light ON.
CUES:                                                                             SAT UNSAT UNSA T COMMENTS:
Tuesday, December 06, 2005                                                                 Page 5 of 11
 
CR SEQ CR              STEP:        4                              STEP STANDARD:
STANDARD:
No Yes No          Place FW Place  FW bypass  contollers in bypass contollers  in manual manual and and  FCV-3321 ,3331 FCV-3321        ,3331 ,3341
                                                                                    ,3341 controller controller red red MAN MAN close, close.                                        light is light   is lit lit and and demand demand is  is O.
0.
CUES:                                                                                      SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:        5                              STEP STANDARD:
Ye Yes      Bypass FWIV signal.                          Directs CB Operator to perform step 8e of EOP-1 5.0.
EOP-15.0.
CUES:                                                                                      SAT NOTE: Booth Operator (as CB Operator) will bypass FWIVs and bypasses.                  UNSAT COMMENTS:
CR SEQ          STEP:        6                              STEP STANDARD:
No Yes      Verify no steam line isolation signal.        RB PRESS HI-2      Hl-2 STM LINE ISOL (XCP-612 2-1) is not lit.
CUES:                                                                                      SAT UNSAT UNSA T COMMENTS:
December 06, 2005 Tuesday, December    2005                                                                        Page 66 of Page    of 11 11
 
CR SEQ          STEP:        7                                      STEP STANDARD:
Ye Yes                  A and 'C' Close the 'A'         MSIVs.
C MSIV's.                        PVM-2801A PVM-2801    A & C indicate red light OFF, green light ON.
CUES:                                                                                     SAT B S/G will be used to establish a heat sink. NOTE: A UNSAT Prompt the student that the 'B' Safety Injection signal may be generated during this step.
COMMENTS:
CR SEQ        STEP:        8                                      STEP STANDARD:
Ye No        Open the 'B' B MS Isolation Bypass Valve.            Both MAIN STEAM ISOL VALVES RESET TRAIN A(B) momentarily depressed.
PVM-2869B indicates red light ON, green light OFF.
CUES:                                                                                      SAT B MSIV closes UNSAT NOTE: This step is only performed and therefore only critical if the 'B' on a Isolation signal during the previous step.
COMMENTS:
CR SEQ        STEP:        9                                      STEP STANDARD:
No Yes      Place FW switches in automatic.                      PVG-1 611 A(B)(C) and FCV-PVG-1611A(B)(C)        FCV 3321 ,3331 ,3341 Train A and B switches 3321,3331,3341 indicate AUTO.
CUES:                                                                                      SAT UNSAT UNSA T COMMENTS:
Tuesday, December 06, 06 2005                                                                          Page 7 of II
 
CR SEQ        STEP:        10                                    STEP STANDARD:
Ye Yes      Reset SI.                                          Momentarily places both SI RESET TRAIN A(B) switches to the RESET position.
CUES:                                                                                      SAT NOTE: If SI signal has NOT been generated by this time, student must wait >60 UNSAT seconds to reset if the SI signal is generated later in procedure.
COMMENTS:
CR SEQ        STEP:      11                                      STEP STANDARD:
No Yes      Verify the condenser is available.                  C-9 status light is bright.
CUES:                                                                                      SAT UNSA T UNSAT COMMENTS:
CR SEQ        STEP:      12                                      STEP STANDARD:
No Yes      Open MFP turbine drain valves.                      MOV-1-5A MOV  5A indicates red light ON, green light OFF.
CUES:                                                                                      SAT A MFP will be used to establish a heat sink. NOTE: Student UNSAT Cue student that the 'A' A MFP.
only required to open drain valve for the 'A' COMMENTS:
Tuesday, December 06, 06 2005                                                                          PageS8 of11 Page   of 11
 
CR SEQ         STEP:       13                                    STEP STANDARD:
Yes No Ves                  A MFP.
Reset the 'A'                                      FWP A TRIP/RESET switch momentarily A MFP will taken to reset. Student notes 'A' not reset.
CUES:                                                                                     SAT NOTE: MFP will not reset due to the 'B' B Train FW isolation signal. Attempting to start      UNSAT another MFP would not constitute a failure.
COMMENTS:
CR SEQ         STEP:       14                                    STEP STANDARD:
Ye No Ve          Bypass the steam dump interlock when Tavg          Both STM DUMP INTERLOCK Switches bright),
is <552&deg;F (P12 interlock bright).                                BYP INTLK position.
taken to the BVP CUES:                                                                                     SAT NOTE: Only performed/critical if Tavg decreases below 552&deg;F.                          UNSAT COMMENTS:
CR SEQ          STEP:        15                                  STEP STANDARD:
Ye Ve Yes Ves                              B S/G (Opens FVC-Establish flowpath to the 'B'                      FCV-3331 controller indicates full open.
3331.
CUES:                                                                                    SAT UNSA T UNSAT COMMENTS:
Tuesday, December 06, 2005                                                                      Page 990/11 of 11
 
CR SEQ CR  SEQ        STEP:
STEP:        16 16                                    STEP STANDARD:
STEP   STANDARD:
Ye Yes Ye  Yes    Depressurize the Depressurize    the 'B' B S/G  via the S/G via  the steam steam dumps dumps  STM DUMP STM    DUMP MODE MODE SELECT SELECT Switch Switch and establish and              FW flow establish FW    flow to to the the 'B' B S/G.
S/G.          indicates STM indicates  STM PRESS.
PRESS. STM  STM DUMP DUMP CNTRL CNTRL Controller adjusted Controller  adjusted to to full full open open Bank Bank 11 steam dumps.
steam  dumps. Flow Flow indicated indicated toto "B" B SG SG on FI-486/487.
on  Fl-4861487.
CUES:                                                                                        SAT NOTE: IfIf C-9 is not available, the student may perform alternate steps NOTE:                                                                steps to dump      UNSAT steam via the Power steam            Power Reliefs.
COMMENTS:
COMMENTS:
SAT UNSAT CR SEQ STEP: 6 No Yes Verify no steam line isolation signal. CUES: COMMENTS:
Tuesday, December 06, 2005 STEP STANDARD:
RB PRESS HI-2 STM LINE ISOL (XCP-612 2-1) is not lit. SAT UNSAT Page 6 of 11 CR SEQ STEP: 7 Ye Yes Close the 'A' and 'C' MSIV's. CUES: STEP STANDARD:
PVM-2801 A & C indicate red light OFF, green light ON. SAT Prompt the student that the 'B' S/G will be used to establish a heat sink. NOTE: A UNSAT Safety Injection signal may be generated during this step. COMMENTS:
CR SEQ Ye No CUES: STEP: 8 Open the 'B' MS Isolation Bypass Valve. STEP STANDARD:
Both MAIN STEAM ISOL VALVES RESET TRAIN A(B) momentarily depressed.
PVM-2869B indicates red light ON, green light OFF. SAT NOTE: This step is only performed and therefore only critical if the 'B' MSIV closes UNSAT on a Isolation signal during the previous step. COMMENTS:
CR SEQ STEP: 9 No Yes Place FW switches in automatic.
CUES: COMMENTS:
Tuesday, December 06, 2005 STEP STANDARD:
PVG-1611A(B)(C) and FCV-3321,3331,3341 Train A and B switches indicate AUTO. SAT UNSAT Page 7 of II CR SEQ STEP: 10 Ye Yes Reset SI. CUES: STEP STANDARD:
Momentarily places both SI RESET TRAIN A(B) switches to the RESET position.
SAT NOTE: If SI signal has NOT been generated by this time, student must wait >60 UNSAT seconds to reset if the SI signal is generated later in procedure.
COMMENTS:
COMMENTS:
CR SEQ STEP: 11 No Yes Verify the condenser is available.
Examiner ends JPM at this point.
CUES: COMMENTS:
: Tuesday, Tuesday, December December 06, 06, 2005 2005                                                                          Page 10 Page  100/11 of 11
CR SEQ STEP: 12 No Yes Open MFP turbine drain valves. CUES: STEP STANDARD:
 
C-9 status light is bright. STEP STANDARD:
JPM SETUP JPM     SETUP SHEET   SHEET JPM NO:
SAT UNSAT MOV 5A indicates red light ON, green light OFF. SAT Cue student that the 'A' MFP will be used to establish a heat sink. NOTE: Student UNSAT only required to open drain valve for the 'A' MFP. COMMENTS:
jPM     NO: JPSF-083 JPSF-083 DESCRIPTION:
Tuesday, December 06, 2005 PageS of11 CR SEQ STEP: 13 No Ves Reset the 'A' MFP. STEP STANDARD:
DESCRIPTION:            RESPOND TO RESPOND        LOSS OF TO LOSS    OF SECONDARY SECONDARY HEAT    HEAT SINK SINK ICSET:
FWP A TRIP/RESET switch momentarily taken to reset. Student notes 'A' MFP will not reset. CUES: SAT NOTE: MFP will not reset due to the 'B' Train FW isolation signal. Attempting to start UNSAT another MFP would not constitute a failure. COMMENTS:
IC   SET: 10 10or325 or 325 INSTRUCTIONS:
CR SEQ Ve No CUES: STEP: 14 Bypass the steam dump interlock when Tavg is <552&deg;F (P12 interlock bright). STEP STANDARD:
INSTRUCTIONS:
Both STM DUMP INTERLOCK Switches taken to the BVP INTLK position.
Activate
NOTE: Only performed/critical if Tavg decreases below 552&deg;F. COMMENTS:
: 1. Activate 1.
SAT UNSAT CR SEQ STEP: 15 STEP STANDARD:
MAL-FWMOO3A, 003B, MAL-FWM003A,       003B, 003C 003C                                  (EFW Pump (EFW  Pump Trip)
Ve Ves Establish flowpath to the 'B' S/G (Opens FVC-FCV-3331 controller indicates full open. 3331. CUES: COMMENTS:
Trip)
Tuesday, December 06, 2005 SAT UNSAT Page 90/11 CR SEQ STEP: 16 STEP STANDARD:
MAL-PCSO13B MAL-PCS013B           SELECT= INADVERTANT SELECT=   INADVERTANT INIT INIT        (Inadvertent FW (Inadvertent FW isolation isolation ('B' (B Train))
Ye Yes Depressurize the 'B' S/G via the steam dumps STM DUMP MODE SELECT Switch and establish FW flow to the 'B' S/G. indicates STM PRESS. STM DUMP CNTRL Controller adjusted to full open Bank 1 steam dumps. Flow indicated to "B" SG on FI-486/487.
Train))
CUES: SAT NOTE: If C-9 is not available, the student may perform alternate steps to dump UNSAT steam via the Power Reliefs. COMMENTS:
: 2. RUN
Examiner ends JPM at this point. Tuesday, December 06, 2005 Page 100/11 JPM SETUP SHEET jPM NO: JPSF-083 DESCRIPTION:
: 2. RUN
RESPOND TO LOSS OF SECONDARY HEAT SINK IC SET: 10 or 325 INSTRUCTIONS:  
: 3. Perform Immediate
: 1. Activate MAL-FWM003A, 003B, 003C (EFW Pump Trip) MAL-PCS013B SELECT= INADVERTANT INIT (Inadvertent FW isolation  
: 3. Perform   Immediate Actions of   EOP-1 .0 after of EOP-1.0  after reactor reactor trip.
('B' Train)) 2. RUN 3. Perform Immediate Actions of EOP-1.0 after reactor trip. 4. When S/G NR levels <20%: Manually secure all three RCPs. FREEZE 5. When examinee is ready: RUN 7. When requested to bypass the FW isolation signals, enter the following:
: 4. When S/G
LOA-FWM040 SELECT = BYPASS LOA-FWM041 SELECT= BYPASS LOA-FWM042 SELECT = BYPASS COMMENTS:
: 4.        SIG NR NR levels <20%:
Tuesday, December 06, 2005 Page 11 of 11
Manually secure all three RCPs.
FREEZE
: 5. When examinee is ready:
RUN
: 7. When requested to bypass the FW isolation signals, enter the following:
LOA-FWMO4O LOA-FWM040               SELECT=
SELECT  = BYPASS LOA-FWMO41 LOA-FWM041               SELECT= BYPASS LOA-FWMO42 LOA-FWM042               SELECT=
SELECT= BYPASS COMMENT COMMENTS:    S:
Tuesday, Tuesday, December06 , 2005 December 06, 2005                                                                             Page ilof Page  11 ofii 11
 
V.C. SUMMER NUCLEAR STATION v.C.
JOB PERFORMANCE MEASURE
                                ]PM JPM        JPSF-062 RESPOND TO RHR PUMP VORTEXING APPROVAL:        APPROVAL DATE:
REV NO:
REVNO:  4 CANDIDATE EXAMINER:
THIS JPM IS NOT APPROVED Tuesday, December 06, 2005                                        of 9 Page 11 of9


v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPSF-062 RESPOND TO RHR PUMP VORTEXING APPROVAL:
TASK:
APPROVAL DATE: REV NO: 4 CANDIDATE EXAMINER:
TASK:
THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of9 TASK: 000-161-05-01 RESPOND TO RESIDUAL HEAT REMOVAL PUMP VORTEXING TASK STANDARD:  
000-161-05-01 000-161-05-01            RESPOND TO RESPOND    TO RESIDUAL RESIDUAL HEAT HEAT REMOVAL REMOVAL PUMP PUMP VORTEXING VORTEXING TASK STANDARD:
'B' RHR Pump is secured. Transition to AOP-115.5 is recommended.
TASK B RHR Pump
The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.
      'B'     Pump is secured.
PREFERRED EVALUATION LOCATION SIMULATOR  
AOP-1 15.5 is recommended.
Transition to AOP-115.5 The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.
PREFERRED EVALUATION LOCATION                                 PREFERRED EVALUATION METHOD SIMULATOR                                                       PERFORM


==REFERENCES:==
==REFERENCES:==


TOOLS: AOP-115.1 PREFERRED EVALUATION METHOD PERFORM EVALUATION TIME 15 TIME CRITICAL No lOCFR55: 41(b)10 CANDIDATE:
TOOLS:           AOP-115.1 EVALUATION TIME                     15       TIME CRITICAL           No     10CFR55:
TIME START: TIME FINISH: PERFORMANCE RATING: SAT: UN SAT: QUESTION GRADE: PERFORMANCE EXAMINER:
JOCFR55: 41(b)10 CANDIDATE:                                                                 TIME START:
SIGNATURE DATE COMMENTS:
TIME FINISH:
Tuesday, December 06, 2005 Page 2 of9 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
PERFORMANCE RATING:                 SAT:             UNSAT:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
UN SAT:
QUESTION GRADE:                     PERFORMANCE EXA  MINER:
EXAMINER:
SIGNATURE           DATE COMMENTS:
Tuesday, December 06, 2005 December 06, 2005                                                                    Page 22 of Page   of99
 
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN,  BEGIN, YOU ARE TO PERFORM PERFORM THE ACTIONS AS DIRECTED         IN THE INITIATING DIRECTED IN        INITIATING CUES. II WILL DESCRIBE THE GENERAL CONDITIONS UNDER          UNDER WHICH THIS TASK IS  IS TO BE PERFORMED PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
INITIAL CONDITION: The plant is in Mode 5 with the RCS at mid-loop conditions. The 'B'     B RHR loop is in service. The Mansell Level Monitoring system computer is set up In the simulator.
The plant is in Mode 5 with the RCS at mid-loop conditions.
INITIATiNG CUES: As the NROATC, respond to plant alarms.
The 'B' RHR loop is in service. The Mansell Level Monitoring system computer is set up In the simulator.
INITIATING HAND JPM                          OPERA TOR AT THIS TIME!
INITIATING CUES: As the NROATC, respond to plant alarms. HAND ]PM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06; 2005 Page 3 of9 
                            ]PM BRIEFING SHEET TO OPERATOR                     TiME!
]PM BRIEFING SHEET OPERATOR INSTRUCTIONS:
Tuesday, December 06, 06; 2005                                                                     Page 3 of of99
SAFETY CONSIDERATIONS:
 
INITIAL CONDITION:
JPM BRIEFING SHEET
The plant is in Mode 5 with the RCS at mid-loop conditions.
                                          ]PM OPERA TOR INSTRUCTIONS:
The 'B' RHR loop is in service. The Mansell Level Monitoring system computer is set up In the simulator.
OPERATOR SAFETY CONSIDERATIONS:
INITIATING CUES: As the NROATC, respond to plant alarms. HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 0/9 STEPS CR SEQ No No CUES: STEP: 1 Responds to the following annunciator:
INITIAL CONDITION: The plant is in Mode 5 with the RCS at mid-loop conditions. The 'B'     B RHR loop is in service. The Mansell Level Monitoring system computer is set up In the simulator.
XCP 6102-2, RHR LP B FLO LO COMMENTS:
INITIATING CUES: As the NROATC, respond to plant alarms.
CR SEQ STEP: 2 Ye Yes Close RHR outlet valve. CUES: COMMENTS:
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
CR SEQ STEP: 3 Ye Yes Throttle FCV-605B to stabilize RHR flow. CUES: STEP STANDARD:
Tuesday, December December 06, 06, 2005 2005                                                                   Page 44 of Page   0/99
Notes indications of B RHR pump cavitation/vortexing and Implements AOP-115.1. STEP STANDARD:
 
SAT UNSAT HCV-603B controller setpoint indicates O. STEP STANDARD:
STEPS CR SEQ         STEP:     1 1                                STEP STANDARD:
SAT UNSAT FCV-605B controller taken to manual and reduced until RHR pump amps and flow are stable. NOTE: The student should reduce RHR flow until vortexing indications stop. COMMENTS:
No No        Responds to the following annunciator:       Notes indications of B RHR pump 610 2-2, RHR LP B XCP 6102-2,           B FLO LO               cavitation/vortexing and Implements AOP AOP-115.1.
SAT UNSAT Tuesday, December 06, 2005 PageS 0/9 CR SEQ STEP: 4 No Yes Monitor the following; CUES: COMMENTS:
CUES:                                                                            SAT UNSAT UNSA T COMMENTS:
STEP: 5 STEP STANDARD:
CR SEQ         STEP:     2                                 STEP STANDARD:
Monitor flow on FI-6058, FLOW GPM; RHR PUMP '8' AMPS; RCS heatup*rate.
Ye Yes       Close RHR outlet valve.                       HCV-603B controller setpoint indicates O.
STEP STANDARD:
0.
SAT UNSAT CR SEQ No No Monitor RCS heatup on TR-413, HOT LEG OF no significantheatup on TR-413 WIDE RNG. CUES: Cue examinee that another operator will perform STP-103.001 COMMENTS:
CUES:                                                                             SAT UNSAT UNSA T COMMENTS:
STEP: 6 STEP STANDARD:
CR SEQ         STEP:       3                                 STEP STANDARD:
SAT UNSAT CR SEQ No No Verify RCS Hot Leg level elevation is Level verified approximately 430' 10" on GREATER THAN OR EQUAL TO' 430' 8 1/2" Mansell and Mid loop monitors CUES: COMMENTS:
Ye Yes       Throttle FCV-605B to stabilize RHR flow.     FCV-6058 controller taken to manual and FCV-605B reduced until RHR pump amps and flow are stable.
Tuesday, December 06, 2005 SAT UNSAT Page6oJ9 STEP: 7 STEP STANDARD:
CUES:                                                                            SAT NOTE: The student should reduce RHR flow until vortexing indications stop. UNSAT COMMENTS:
CR SEQ Ye No Control Charging and Letdown flow to restore Opens FCV-122 to increase charging flow RCS Hot Leg level elevation to GREATER until level starts to increase THAN 430' 10" (15.5 inches). CUES: COMMENTS:
O6 2005 Tuesday, December 06,                                                                     Page PageS5 0/9 of 9
CR SEQ STEP: 8 No Yes Responds to annunciators XCP-607 3-4 (LD AB SUMP/FD LEVEL HI) and XCP-61 02-2 (RHR LP B FLO LO) CUES: COMMENTS:
 
CR SEQ STEP: 9 Ye Yes Throttle flow as necessary to stabilize RHR Pump amps with flow GREATER THEN 500gpm. CUES: STEP STANDARD:
CR SEQ         STEP:       4                                 STEP STANDARD:
SAT UNSAT Notes indications of level decreasing and pump vortexing again STEP STANDARD:
No Yes No          Monitor the following; Monitor                                        Monitor flow on FI-6058, Fl-605B, FLOW GPM; GPM; RHR RHR PUMP '8' PUMP    B AMPS; RCSRCS heatup*rate.
SAT UNSAT Throttle RHR flow to attempt to stabilize RHR Pump amps. NOTE: RHR Pump amps are still unstable and flow is <500 gpm. COMMENTS:
heatup rate.
SAT UNSAT Tuesday, December 06, 2005 Page 70/9 CR SEQ STEP: 10 Ye Yes Stop the operating RHR Pump. CUES: COMMENTS:
CUES:                                                                               SAT UNSAT UNSA T COMMENTS:
CR SEQ STEP: 11 STEP STANDARD:
CR SEQ         STEP:        5                                  STEP STANDARD:
The operating RHR Pump is stopped. STEP STANDARD:
No No       Monitor RCS heatup on TR-413, HOT LEG OF   &deg;F  no significantheatup on TR-413 WIDE RNG.
SAT UNSAT No Yes Go to AOP-115.5, Loss Of RHR With The RCS Recommend transition to AOP-115.5.
CUES:                                                                               SAT STP-103.OO1 Cue examinee that another operator will perform STP-103.001                     UNSAT COMMENTS:
Not Intact (Mode 5). CUES: Cue: This completes this JPM. COMMENTS:
CR SEQ        STEP:       6                                 STEP STANDARD:
Examiner ends JPM at this point. Tuesday, December 06, 2005 SAT UNSAT Page 8 of9 
No No       Verify RCS Hot Leg level elevation is           Level verified approximately 430' 4301010" on GREATER THAN OR EQUAL TO'     TO 430      1/2 430' 8 1/2" Mansell and Mid loop monitors CUES:                                                                               SAT UNSAT UNSA T COMMENTS:
"-JPM SETUP SHEET JPM NO: JPSF-062 DESCRIPTION:
Tuesday, December 06 06, 2005                                                                   Page6oJ9 Page  6 of 9
RESPOND TO RHR PUMP VORTEXING IC SET: 20 INSTRUCTIONS:  
 
: 1. Place danger tags on the following components to simulate half-pipe lineup: RB Spray pumps Accumulator Isolation Valves Reactor Coolant Pumps Pressurizer Heaters Reactor Trip Breakers , 2. Set up the Mansell Level Monitoring computer in the simulator  
CR SEQ CR    SEQ      STEP:
: 3. If the Half-Pipe concern status board is used, the following information may be posted: Boration flow path: 'B' Charging pump, 115 B suction, 8801 A injection from RWST B/U 'A' Charging Pump, MVG-8104 suction, MVG-8884 injection from BAT Comments:
STEP:        77                                            STEP STEPSTANDARD:
Maintain 6"-10" above mid-loop Applicable procedures:
STANDARD:
AOP-115.1  
Ye No Ye    No      Control Charging Control     Charging and and Letdown Letdownflowflowtoto restore restore     Opens FCV-122 Opens      FCV-1 22 toto increase increasecharging charging flow flow RCS Hot RCS    Hot Leg Leg level level elevation elevation toto GREATER GREATER               until level until  level starts starts toto increase increase THAN 430' THAN      430 10"   (15.5 inches).
-RHR Pump Vortexing AOP-115.5  
10 (15.5    inches).
-Loss of RHR with RCS Not Intact 4. Activate OVR-AA028 SELECT=ON (Override Radiation Monitoring Panel Annunciators)  
CUES:
: 5. RUN 6. Insert MAL-RHR005B Severity = 1500 7. When RHR pump cavitation starts and RHR LOOP A FLO LO annunciator is in alarm, delete RHR005B 8. Run for 5 minutes to get good trend on mid loop monitors.
CUES:                                                                                                      SAT SAT UNSAT UNSA T COMMENTS:
FREEZE 9. Select RCS Trend from ZZMENU on MCB1 IPCS screen. 10. Energize the Audio Count Rate Circuit. 11. Do not take simulator to run until student says he/she is ready to begin JPM. 1 O. When student has begun to recover level, reinsert MAL-RHR005B SEVERITY = 1500 (RHR bypass line leak), SET = Trigger #1. Tuesday, December 06, 2005 Page 9 of 9 11. If necessary, Increase MAL-RHROOSB severity until flow is stabilized at <SOO gpm or cannot be stabilized to force them into AOP-11S.S.
COMMENTS:
COMMENTS:   
CR SEQ CR    SEQ      STEP:
STEP:        88                                            STEP STEP STANDARD:
STANDARD:
No Yes No   Yes     Responds to Responds     to annunciators annunciators XCP-607 XCP-607 3-4       (LD 3-4 (LD      Notes indications Notes    indications of  of level level decreasing decreasing and and AB SUMP/FD AB SUMP/FD LEVEL  LEVEL HI) HI) and and XCP-61 XCP-610      2-2 02-2         pump vortexing pump      vortexing again again (RHR LP (RHR    LP BB FLO FLO LO)
LO)
CUES:
CUES:                                                                                                     SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ CR    SEQ      STEP:
STEP:        9                                             STEP STANDARD:
STANDARD:
Ye  Yes Ye Yes       Throttle flow Throttle  flow as necessary to stabilize RHR               Throttle RHR flow to attempt to stabilize Pump amps with flow GREATER THEN Pump                                                        RHR Pump amps.
500gpm.
500gpm.
CUES:
CUES:                                                                                                     SAT NOTE:
NOTE: RHRRHR Pump Pump amps are   are still still unstable and flow is  is <500
                                                                        <500 gpm.
gpm.                          UNSAT COMMENT COMMENTS:    S:
: Tuesday, Tuesday, December December06, 06, 2005 2005                                                                                        Page 770/9 Page  of 9
 
CR SEQ CR            STEP:       10 10                              STEP STANDARD:
STA NDARD:
Ye Yes Ye          Stop the operating Stop      operating RHR RHR Pump.
Pump.              The operating The operating RHR RHR Pump Pump isis stopped.
stopped.
CUES:                                                                           SAT UNSAT UNSA T COMMENTS:
CR SEQ         STEP:       11                             STEP STANDARD:
No Yes     Go to AOP-115.5, AOP-1 15.5, Loss Of RHR With The RCS                         AOP-1 15.5.
Recommend transition to AOP-115.5.
Not Intact (Mode 5).
CUES:                                                                           SAT Cue: This completes this JPM.                                               UNSAT COMMENTS:
Examiner ends JPM at this point.
Tuesday, December 06, 2005 December 06, 2005                                                                Page 88 of Page   of99
 
JPM SETUP JPM      SETUP SHEET  SHEET JPM NO:
JPM        NO: JPSF-062 JPSF-062 DESCRIPTION:
DESCRIPTION:                  RESPOND TO RESPOND            TO RHR      PUMP VORTEXING RHR PUMP       VORTEXING IC SET:
IC    SET: 20    20 INSTRUCTIONS:
INSTRUCTIONS:
: 1. Place danger
: 1. Place      danger tags tags onon the the following foNowing components components to  to simulate simulate half-pipe half-pipe lineup:
lineup:
RB Spray RB     Spray pumps pumps Accumulator Accumulator IsolationIsolation Valves Valves Reactor      Coolant Reactor Coolant Pumps   Pumps Pressurizer Heaters Pressurizer         Heaters Reactor Trip Reactor      Trip Breakers Breakers
: 2. Set
: 2. Set up thethe Mansell Level Monitoring computer in the simulator
: 3. IfIf the the Half-Pipe Half-Pipe concern status board is used, the following information may be posted:
Boration flow Boration     flow path:
B Charging
    'B'   Charging pump, 115 B suction, 8801         8801A A injection from RWST B/U 'A' A Charging Pump, MVG- 8104 suction, MVG-8884 injection from BAT Comments: Maintain 6"-10" Comments:                      6-10 above mid-loop Applicable Applicable procedures:
AOP-115.1 AOP-115.1 - RHR Pump Vortexing AOP-1 AOP-115.5 15.5 - Loss of RHR with RCS Not Intact Intact 4.
: 4. Activate OVR-AA028 OVR-AA028                SELECT=ON SELECT=ON                  (Override Radiation Monitoring Panel Annunciators Annunciators))
: 5. RUN
: 5. RUN
: 6. Insert
: 6. Insert MAL-RHRO MAL-RHR005B   O5B Severity Severity == 1500 1500
: 7. When
: 7. When RHR RHR pump pump cavitation cavitation starts starts and and RHR RHR LOOPLOOP AA FLO FLO LO LO annunciator annunciator is is in in alarm, alarm, delete delete MAL MAL-RHROO5B RHR005B
: 8. Run
: 8. Run forfor 55 minutes minutes toto get  good trend get good             on mid trend on   mid loop loop monitors.
monitors.
FR    EEZE FREEZE
: 9. Select
: 9. Select RCS RCS Trend Trend from from ZZMENU ZZMENU on     on MCB1 MCB1 IPCSIPCS screen.
screen.
: 10. Energize
: 10. Energize the  the Audio Audio Count Count Rate Rate Circuit.
Circuit.
11.
: 11. Do      not take Do not   take simulator simulatorto  to run run until until student student says     he/she isis ready says he/she        ready to to begin begin JPM.
JPM.
10.
1O. When When student student has has begun begun to  to recover recover level, level, reinsert reinsert MAL-RHRO MAL-RHR005B         SEVERITY== 1500 O5B SEVERITY            1500 (RHR (RHR bypass bypass
 
line leak),
line            SET =
leak), SET      Trigger #1.
                    = Trigger  #1.                                                        Tuesday, December Tuesday, December 06,     Page 99 of 2005 Page 06, 2005        of99
: 11. IfIf necessary,
: 11.       necessary, Increase Increase MAL-RHROOSB MAL-RHROO5B severity severity until until flow flow is  stabilized at is stabilized at <SOO gpm or
                                                                                      <500 gpm  or cannot cannot be be stabilized to stabilized     to force force them them into into AOP-11S.S.
AOP-1 15.5.
COMMENTS:
 
V. C. SUMMER V.C. SUMMER NUCLEAR NUCLEAR STATION  S TA TION JOB      PERFORMANCE MEASURE JOB PERFORMANCE                      MEASURE JPM JPM          JPS-O72NRC JPS-072NRC RESPOND TO RESPOND  TO SOURCE SOURCE RANGE RANGE CHANNEL CHANNEL FAILURE FAILURE APPROVAL:
APPROVAL:          APPROVAL DATE:
APPROVAL  DATE:
REVN REV  NO:O: 11 CANDIDATE CANDIDATE EXAMINER:
EXAMINER:
IS NOT THIS JPM IS  NOT APPRO APPROVED VED
: Tuesday, Tuesday,December December06, 06,2005 2005                                                      of9 Page11of Page      9


V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM JPS-072NRC RESPOND TO SOURCE RANGE CHANNEL FAILURE APPROVAL:
TASK:
APPROVAL DATE: REV NO: 1 CANDIDATE EXAMINER:
TASK:
THIS JPM IS NOT APPRO VED Tuesday, December 06, 2005 Page 1 of9 TASK: 000-032-05-01 RESPOND TO SOURCE RANGE INSTRUMENTATION CHANNEL FAILURE TASK STANDARD:
000-032-05-01 000-032-05-01              RESPOND TO RESPOND   TO SOURCE SOURCE RANGE RANGE INSTRUMENTATION INSTRUMENTATION CHANNELCHANNEL FAILURE FAILURE TASK STANDARD:
N-32 (the failed channel) is in a BYPASS condition, fuel movement has been stopped, and all fuel is stored in a safe location.
N-32 (the failed channel) is in a BYPASS condition, fuel movement has been stopped, and all fuel is stored in a safe location.
PREFERRED EVALUATION LOCATION SIMULATOR  
PREFERRED EVALUATION LOCATION                               PREFERRED EVALUATION METHOD SIMULATOR                                                     PERFORM


==REFERENCES:==
==REFERENCES:==
AOP-401.9              SOURCE RANGE CHANNEL FAILURE TOOLS:                                    AOP-401 .9 and ARPs for 620 4-1 and 620 4-3 as Supply examinee with AOP-401.9 they are earned EVALUATION TIME                      10      TIME CRITICAL        No    10CFR55:
10CFR55: 45(A)4 CANDIDATE:                                                                TIME START:
TIME FINISH:
PERFORMANCE RATING:                  SAT:            UNSAT:
QUESTION GRADE:                  PERFORMANCE EXAMINER:
SIGNATURE            DATE COMMENTS:
December 06, Tuesday, December 06, 2005 2005                                                                  Page 22 of Page    0/99


AOP-401.9 PREFERRED EVALUATION METHOD PERFORM SOURCE RANGE CHANNEL FAILURE TOOLS: Supply examinee with AOP-401.9 and ARPs for 620 4-1 and 620 4-3 as they are earned EVALUATION TIME 10 TIME CRITICAL No lOCFR55: 45(A)4 CANDIDATE:
INSTRUCTIONS TO INSTRUCTIONS                TO OPERATOR OPERATOR READ TO READ    TO OPERATOR:
TIME START: TIME FINISH: PERFORMANCE RATING: SAT: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:
OPERATOR:
SIGNATURE DATE COMMENTS:
WHEN II TELL WHEN      TELL YOU YOU TO TO BEGIN, BEGIN, YOU YOU ARE ARE TO TO PERFORM PERFORM THE   THE ACTIONS ACTIONS ASAS DIRECTED DIRECTED IN IN THE THE INITIATING INITIATING CUES. II WILL CUES. WILL DESCRIBE DESCRIBE THE  THE GENERAL GENERAL CONDITIONS CONDITIONS UNDER  UNDER WHICH WHICH THIS  TASK IS THIS TASK   IS TO TO BEBE PERFORMED PERFORMED AND PROVIDE AND    PROVIDE THETHE NECESSARY NECESSARY TOOLS    TOOLS WITH WITH WHICH WHICH TO   TO PERFORM PERFORM THIS THIS TASK.
Tuesday, December 06, 2005 Page 2 0/9 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
TASK. BEFORE BEFORE STARTING, STARTING, II WILL  EXPLAIN    THE  INITIAL  CONDITIONS, WHICH WILL EXPLAIN THE INITIAL CONDITIONS,               WHICH STEPSSTEPS TO  TO SIMULATE SIMULATE OROR DISCUSS, DISCUSS, ANDAND PROVIDE PROVIDE INITIATING CUES.
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
INITIATING    CUES. WHEN WHEN YOUYOU COMPLETE COMPLETE THE   THE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE  THE OBJECTIVE OBJECTIVE FOR FOR THIS THIS JOB JOB PERFORMANCE MEASURE PERFORMANCE         MEASURE WILL WILL BE BE SATISFIED.
SATISFIED.
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
SAFETY    CONSIDERATIONS:
Plant is in mode 6 with refueling in progress and RCS temperature at 120&deg;F. Fuel movement is in progress with assembly J-9 being moved. This JPM will be simulated in the control room. INITIATING CUES: CRS directs operator to respond as expected to MCB Annunciators for the indicated plant conditions . HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 0/
INITIAL    CONDITION: Plant INITIAL CONDITION:           Plant is  in mode is in mode 66 with refueling refueling in in progress progress and and RCS RCS temperature at at 120&deg;F. Fuel 120&deg;F. Fuel movement movement is is in in progress progress with assembly J-9 being being moved.
]PM BRIEFING SHEET OPERATOR INSTRUCTIONS:
moved.
This JPM will be This JPM            simulated in be simulated   in the the control control room.
room.
INITIATING CUES: CRS directs operator to respond as expected to MCB Annunciators for the indicated plant conditions
                  . HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
Tuesday, December Tuesday,         06, 2005 December 06, 2005                                                                               Page Page 33 of 0/99
 
BRIEFING SHEET JPM BRIEFING
                                                ]PM                           SHEET OPERA TOR INSTRUCTIONS:
OPERATOR       INSTRUCTIONS:
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
SAFETY    CONSIDERATIONS:
INITIAL CONDITION:
INITIAL CONDITION:
Plant is in mode 6 with refueling in progress and RCS temperature at 120&deg;F. Fuel movement is in progress with assembly J-9 being moved. This JPM will be simulated in the control room. INITIATING CUES: CRS directs operator to respond as expected to MCB Annunciators for the indicated plant conditions HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 of9 STEPS CR SEQ STEP: Ye Yes Stop all core alterations.
INITIAL    CONDITION: Plant    Plant isis inin mode mode 66 with with refueling refueling inin progress progress and and RCS RCS temperature temperature at at 120&deg;F. Fuel 120&deg;F.       Fuel movement movement isis in in progress progress with with assembly assembly J-9 J-9 being being moved.
STEP STANDARD:
moved.
Stops fuel movement in progress.
This JPM This JPM will  will be simulated in be simulated        the control in the  control room.
Notify RE on headset and RB coordinator.
room.
CUES: SAT CUE: N 32 Meter to zero. Instrument Power N32 off. Non operate light, level trip UNSAT light, high flux shutdown light, bistable trip spare light. Annunciators 6204-1 and 620 4-3 are received COMMENTS:
INITIATING CUES:
CR SEQ STEP: 2 No Yes Stop all positive reactivity additions CUES: COMMENTS:
INITIATING     CUES: CRS    CRS directs directs operator operator toto respond respond as  as expected expected to to MCB MCB Annunciators Annunciators for for the indicated the  indicated plant plant conditions conditions HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU EVALUATOR HAVE SATISFACTORILY SATISFACTORILY COMPLETED                              COMPLETED THE ASSIGNED TASK.
CR SEQ STEP: 3 Ye Yes Check at least 1 Source Range channel operable CUES: STEP STANDARD:
Tuesday, December Tuesday, December O6 06, 2005 2005                                                                                    Page 44 of Page   of99
Any dilution or cooldown in progress stopped. STEP STANDARD:
 
SAT UNSAT Verifies normal/expected indication on N-31 at MCB or NIS panels. SAT CUE: Instrumental Power light on control powerlight on. N31 reads about 20 cps.UNSAT COMMENTS:
STEPS STEPS CR SEQ CR    SEQ          STEP:
Tuesday, December 06, 2005 PageS of9 CR SEQ STEP: 4 STEP STANDARD:
STEP:          1                                            STEP STEP STANDARD:
Ye Yes Check if RB evacuation alarm has actuated.
STANDARD:
SR HI FLUX AT SHUTDN annunciator is lit. CUES: CUE: RB coordinator reports that the RB evacuation alarm is sounding COMMENTS:
Ye Yes Ye   Yes       Stop all Stop  all core core alterations.
SAT UNSAT CR SEQ No No CUES: STEP: 5 Inform plant personnel that the Reactor Building evacuation alarm was spurious, and evacuation of the RB is NOT required.
alterations.                                Stops fuel Stops   fuel movement movement inin progress.
progress. Notify Notify RE on RE  on headset headset andand RBRB coordinator.
coordinator.
CUES:
CUES:                                                                                                          SAT SAT CUE:    N  32  Meter  to    zero. Instrument  Power    N32  off. Non CUE: N 32 Meter to zero. Instrument Power N32 off. Non operate light, level operate  light,        trip UNSAT level trip    UNSAT light, high light,  high flux flux shutdown shutdown light,  light, bistable bistable trip trip spare spare light.
light. Annunciators Annunciators 6204-1 620 4-1 andand 620 4-3 620        are received 4-3 are   received COMMENTS:
COMMENTS:
CR SEQ CR                STEP:         2                                             STEP STANDARD:
STANDARD:
No Yes No              Stop all Stop       positive reactivity all positive     reactivity additions additions                  Any dilution Any  dilution or or cooldown cooldown in  in progress progress stopped.
CUES:                                                                                                         SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ CR                STEP:         33                                              STEP STANDARD:
STANDARD:
Ye Yes         Check at least 1    1 Source Range channel                   Verities  normal/expected indication on N-Verifies normal/expected                        N operable                                                      31 at MCB or NIS panels.
CUES:                                                                                                          SAT CUE: Instrumental Power light on control power                  light on. N31 reads about 20 cps.UNSAT powerlight COMMENT COMMENTS:        S:
Tuesday, December Tuesday,  December 06, 06, 2005 2005                                                                                          PageS Page  of9 5 of 9
 
CR SEQ CR    SEQ      STEP:
STEP:         44                                              STEP STEPSTANDARD:
STANDARD:
Ye Yes Ye    Yes    CheckififRB Check       RBevacuation evacuationalarm  alarm has hasactuated.
actuated.     SRSR HIHI FLUX FLUXATATSHUTDN SHUTDN annunciator annunciatorisis lit.lit.
CUES:
CUES:                                                                                                     SAT SAT CUE: RB CUE:    RB coordinator coordinator reports reports thatthat the the RB RB evacuation evacuation alarm alarm isis sounding sounding             UNSAT UNSAT COMMENTS:
COMMENTS:
CR SEQ CR   SEQ       STEP:
STEP:         55                                              STEP STEP STANDARD:
STA NDARD:
No No No  No      Inform plant Inform   plant personnel personnel that  that the the Reactor Reactor             Personnel &
Personnel      & RB RB coordinator coordinator notified.
notified.
Building   evacuation       alarm   was Building evacuation alarm was spurious, and spurious, and     Announcement Announcement made  made that that the the alarm alarm isis evacuation of evacuation     of the the RB RB isis NOT NOT required.
required.            invalid..
invalid  ..
CUES:
CUES:                                                                                                    SAT SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ CR    SEQ      STEP:
STEP:        6                                              STEP STANDARD:
STANDARD:
Ye Yes Ye  Yes    Bypass level Bypass    level trip trip for N-32                                Set LEVEL TRIP switch for N-32 to BYPASS. Level trip bypass light lit.
CUES:
CUES:                                                                                                    SAT CUE:
CUE: Level Level trip trip bypass light light lit.
lit.                                                            UNSAT COMMENT COMMENTS:      S:
: Tuesday, Tuesday, December  06,2005 December06,  2005                                                                                        Page6of9 Page  6 of 9
 
CR SEQ CR    SEQ        STEP:
STEP:        77                                          STEP STEPSTANDARD:
STA NDARD:
No Yes No  Yes      VerifyN-32 Verify    N-32 isis bypassed.
bypassed.                              IRIR && SR SR TRIPTRIP BYP BYP annunciator annunciator (XCP-620 (XCP-620 4-5) isis inin alarm.
4-5)              alarm.
CUES:
CUES:                                                                                                      SAT SAT CUE:IR && SR CUE:IR            TRIP BYP SR TRIP      BYP annunciator annunciator (XCP-620 (XCP-620 4-5) 4-5) isis inin alarm.
alarm.                          UNSAT UNSAT COMMENT COMMENTS:      S:
CR SEQ CR    SEQ      STEP:
STEP:        88                                          STEP STEP STANDARD:
STANDARD:
No Yes No  Yes    Block the Block    the HIGH HIGH FLUX FLUX AT AT SHUTDOWN SHUTDOWN for  for N-N-          Verifies HIGH Verifies        HIGH FLUX FLUX AT AT SHUTDOWN SHUTDOWN 32.
: 32.                                                          switch for switch      for N-32 N-32 positioned positioned to to BLOCK.
BLOCK.
Verifies SR Verifies      SR HIGH HIGH FLUX FLUX ATAT SHUTDN SHUTDN Block  Block (XCP-620-4-4) annunciator (XCP-620-4-4)          annunciator is is lit.
lit.
CUES:
CUES:                                                                                                      SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ CR    SEQ      STEP:
STEP:        9                                            STEP STANDARD STANDARD::
No No No  No      Monitors an Monitors    an operable NI channel.                        Monitors N-31 and notes that it is reading as expected for current plant conditions.
CUES:
CUES:                                                                                                    SAT CUE:
CUE: N31 N31 reads reads about about 2020 CPS CPS                                                                  UNSAT COMMENT COMMENTS:    S:
: Tuesday, Tuesday, December  06, 2005 December06,    2005                                                                                            Page 770/9 Page    of 9
 
CR SEQ CR    SEQ      STEP:
STEP:        10 10                                    STEP STEP STANDARD:
STANDARD:
No Yes No  Yes      Ensure NR-45 Ensure    NR-45 isis selected selected to to operable operable channel channel  Verifies NR-45 Verifies  NR-45 selected selected to to N-31 N-31 channel.
channel.
CUES:
CUES:                                                                                    SAT SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ CR              STEP:
STEP:        11 11                                    STEP STANDARD:
STANDARD:
No No No  No      Dispatch I&C Dispatch        to determine l&C to  determine the the cause cause of of the the    l&C contacted I&C  contacted N32 N32  failure CUES:                                                                                    SAT UNSAT UNSA T COMMENTS:
COMMENTS:
Examiner ends JPM at this point.
: Tuesday, Tuesday, December December 06, 06, 2005 2005                                                                          Page8of9 Page 8 of 9
 
JPM    SETUP SHEET JPM SETUP        SHEET JPM NO:
jPM    NO: JPS-072NRC JPS-O72NRC DESCRIPTION:
DESCRIPTION:              RESPOND TO RESPOND        TO SOURCE SOURCE RANGE RANGE CHANNEL CHANNEL FAILURE FAILURE IC SET:
IC  SET:
INSTRUCTIONS:
INSTRUCTIONS:
: 1. RUN
: 1. RUN
: 2. Initial
: 2. Initial conditions conditions plant plant isis in in mode mode 66 and and moving moving fuel.
fuel.
FREEZE
: 5. FREEZE 5.
: 6. When student
: 6. When      student is  ready is ready
: 7. RUN
: 7. RUN Activate OVR-NI053
: 8. Activate      OVR-N1053 SELECT=OFF SELECT=OFF (Blown Instrument Power Fuse on N32.) (MAL???)
THESE SETUP INSTRUCTIONS THESE              INSTRUCTIONS ARE N/A FOR SIMULATING  SIMULATING IN THE MAIN CONTROL ROOM.
COMMENTS:
COMMENTS:
COMMENTS:
CR SEQ Ye Yes CUES: STEP: 6 Bypass level trip for N-32 CUE: Level trip bypass light lit. COMMENTS:
Tuesday, Tuesday, December December06,06, 2005 2005                                                              Page 990f9 Page   of 9
Tuesday, December 06, 2005 STEP STANDARD:
 
Personnel
V. C. SUMMER NUCLEAR STATION v.C.                                     S TA TION JOB PERFORMANCE MEASURE JPM
& RB coordinator notified.
                                ]PM         JPP-O55NRC JPP-055NRC LOCALLY START LOCALLY START THE THE TURBINE TURBINE DRIVEN DRIVEN EMERGENCY EMERGENCY FEEDWATER PUMP FEEDWATER  PUMP AND AND THROTTLE THROTTLE EMERGENCY EMERGENCY FEEDWATER FLOW FEEDWATER  FLOW AS AS DIRECTED DIRECTED APPROVAL:         APPROVAL DATE:
Announcement made that the alarm is invalid .. STEP STANDARD:
REVNO:
SAT UNSAT Set LEVEL TRIP switch for N-32 to BYPASS. Level trip bypass light lit. SAT UNSAT Page6of9 CR SEQ STEP: 7 No Yes Verify N-32 is bypassed.
REV NO: 0 CANDIDATE EXAMINER:
CUES: STEP STANDARD:
THIS JPM IS NOT APPROVED
IR & SR TRIP BYP annunciator (XCP-620 4-5) is in alarm. CUE:IR & SR TRIP BYP annunciator (XCP-620 4-5) is in alarm. COMMENTS:
: Tuesday, Tuesday, December December 06, 06, 2005 2005                                              Page 11 of Page    of11 11
SAT UNSAT CR SEQ STEP: 8 STEP STANDARD:
 
No Yes Block the HIGH FLUX AT SHUTDOWN for N-Verifies HIGH FLUX AT SHUTDOWN 32. switch for N-32 positioned to BLOCK. CUES: COMMENTS:
TASK:
CR SEQ No No CUES: STEP: 9 Monitors an operable NI channel. CUE: N31 reads about 20 CPS COMMENTS:
TASK:
Tuesday, December 06, 2005 Verifies SR HIGH FLUX AT SHUTDN Block (XCP-620-4-4) annunciator is lit. STEP STANDARD:
061-001-05-04 061-001-05-04                    LOCAL EMERGENCY LOCAL     EMERGENCY START    START OF OFTURBINE TURBINE DRIVEN DRIVEN EMERGENCY EMERGENCY FEEDWATER PUMP FEEDWATER        PUMP Turbine Driven Turbine    Driven Emergency Emergency Feedwater Feedwater PumpPump isis started started locally locally per per FEP-4.0, FEP-4.0, ENCLOSURE ENCLOSURE FF and    and speed speed increased to increased   to >> 4,000 4,000 rpm.
SAT UNSAT Monitors N-31 and notes that it is reading as expected for current plant conditions.
rpm. Flow Flow control control valves valves IFV-3536, IFV-3536, IFV-3546, IFV-3546, & & IFV-3556 IFV-3556 areare throttled throttled to to maintain SG maintain    SG WRWR levels levels between between 50%
SAT UNSAT Page 70/9 CR SEQ STEP: 10 STEP STANDARD:
50% and and 60%.
No Yes Ensure NR-45 is selected to operable channel Verifies NR-45 selected to N-31 channel. CUES: COMMENTS:
60%. Enclosure Enclosure FF steps steps 22 - 44 must
CR SEQ No No CUES: STEP: 11 Dispatch I&C to determine the cause of the N32 failure COMMENTS:
                                                                                            -   must bebe completed completed within within 30 30 minutes of minutes    of implementation.
Examiner ends JPM at this point. Tuesday, December 06, 2005 STEP STANDARD:
implementation. The  The use use of of applicable applicable Human Human Performance Performance ToolsTools (3-way (3-way communications, communications, self checking, self  checking, peerpeer checking, checking, phonetic phonetic alphabet, alphabet, etc) etc) and and industrial industrial safety safety practices practices meets meets expectations.
I&C contacted SAT UNSAT SAT UNSAT Page8of9 JPM SETUP SHEET jPM NO: JPS-072NRC DESCRIPTION:
expectations.
RESPOND TO SOURCE RANGE CHANNEL FAILURE IC SET: INSTRUCTIONS:
PREFERRED EVALUATION PREFERRED        EVALUATION LOCATION   LOCATION                        PREFERRED EVALUATION PREFERRED          EVALUATION METHOD    METHOD PLANT PLANT                                                                      SIMULATE SIMULATE
: 1. RUN 2. Initial conditions plant is in mode 6 and moving fuel. 5. FREEZE 6. When student is ready 7. RUN 8. Activate OVR-NI053 SELECT=OFF (Blown Instrument Power Fuse on N32.) (MAL???) THESE SETUP INSTRUCTIONS ARE N/A FOR SIMULATING IN THE MAIN CONTROL ROOM. COMMENTS:
 
Tuesday, December 06, 2005 Page 90f9 
==REFERENCES:==
-
v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPP-055NRC LOCALLY START THE TURBINE DRIVEN EMERGENCY FEEDWATER PUMP AND THROTTLE EMERGENCY FEEDWATER FLOW AS DIRECTED APPROVAL:
APPROVAL DATE: REV NO: 0 CANDIDATE EXAMINER:
THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of11 TASK: 061-001-05-04 LOCAL EMERGENCY START OF TURBINE DRIVEN EMERGENCY FEEDWATER PUMP Turbine Driven Emergency Feedwater Pump is started locally per FEP-4.0, ENCLOSURE F and speed increased to > 4,000 rpm. Flow control valves IFV-3536, IFV-3546, & IFV-3556 are throttled to maintain SG WR levels between 50% and 60%. Enclosure F steps 2 -4 must be completed within 30 minutes of implementation.
The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.
PREFERRED EVALUATION LOCATION PLANT  


==REFERENCES:==
==REFERENCES:==
AOP-600.1 AOP-600.1                  CONTROL ROOM CONTROL        ROOM EVACUATION EVACUATION FEP-4.0 FEP-4.0                    CONTROL ROOM CONTROL        ROOM EVACUATION EVACUATION DUE      DUE TO TO FIRE FIRE TOOLS:
TOOLS:              FEP-4.0, ENCLOSURE FEP-4.0,    ENCLOSURE FF EVALUATION TIME EVALUATION          TIME                25          TIME CRITICAL              NO      10CFR55:
10CFRS5: 45(a)7 CANDIDATE:
CANDIDATE:                                                                              TIME START:
TIME FINISH:
PERFORMA PERFORMANCE    NCE RATING:
RATING:          SAT:                UNSAT:
QUESTION QUESTION GRADE:                          PERFORMANCE PERFORMA    NCE EXAMINER EXAMINER::
SIGNATURE SIGNATUR    E                DATE DATE COMMENT COMMENTS:      S:
: Tuesday, Tuesday, December December06,06, 2005 2005                                                                                    Page22of Page    0/11 11


AOP-600.1 FEP-4.0 TOOLS: FEP-4.0, ENCLOSURE F EVALUATION TIME 25 CANDIDATE:
INSTRUCTIONS TO INSTRUCTIONS               TO OPERATOR OPERATOR READ TO READ     TO OPERATOR:
PERFORMANCE RATING: SAT: PREFERRED EVALUATION METHOD SIMULATE CONTROL ROOM EVACUATION CONTROL ROOM EVACUATION DUE TO FIRE TIME CRITICAL NO lOCFR55: 45(a)7 TIME START: TIME FINISH: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:
OPERATOR:
SIGNATURE DATE COMMENTS:
WHEN II TELL WHEN      TELL YOU YOU TO     BEGIN, YOU TO BEGIN,    YOU AREARE TOTO PERFORM PERFORM THETHE ACTIONS ACTIONS AS AS DIRECTED DIRECTED IN IN THE THE INITIATING INITIATING CUES. II WILL CUES. WILL DESCRIBE DESCRIBE THE THE GENERAL GENERAL CONDITIONS CONDITIONS UNDER UNDER WHICH WHICH THIS      TASK IS THIS TASK     IS TO TO BEBE PERFORMED PERFORMED AND PROVIDE AND    PROVIDE THETHE NECESSARY NECESSARY TOOLS TOOLS WITHWITH WHICH WHICH TO   PERFORM THIS TO PERFORM      THIS TASK.
Tuesday, December 06, 2005 Page 2 0/11 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
TASK. BEFORE BEFORE STARTING, STARTING, II WILL  EXPLAIN    THE  INITIAL  CONDITIONS, WHICH WILL EXPLAIN THE INITIAL CONDITIONS,               WHICH STEPS STEPS TOTO SIMULATE SIMULATE OR   OR DISCUSS, DISCUSS, AND AND PROVIDE PROVIDE INITIATING CUES.
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
INITIATING   CUES. WHEN WHEN YOUYOU COMPLETE COMPLETE THE   THE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE    THE OBJECTIVE OBJECTIVE FOR FOR THISTHIS JOB JOB PERFORMANCE MEASURE PERFORMANCE        MEASURE WILL WILL BE BE SATISFIED.
SATISFIED.
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
Burn Hazard INITIAL CONDITION:
SAFETY    CONSIDERATIONS:                Burn Hazard Burn   Hazard CONDITION: The Control INITIAL CONDITION:                 Control Room Room has has been evacuated due to aa fire. Control been evacuated                  Control of the plant plant has been has been established from thethe CREP panel.
The Control Room has been evacuated due to a fire. Control of the plant has been established from the CREP panel. The Shift Engineer is not available to start the TDEFP. INITIATING CUES: Control Room Supervisor directs the ABUL operator to locally start the TDEFP and to locally throttle EFW flow to maintain SG WR levels between 50% and 60% per FEP-4.0 ENCLOSURE F, Steps 2. thru 4 THIS IS A TIME CRITICAL JPM! AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!
panel. The Shift Engineer Engineer is not not available to available  to start start the TDEFP.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 of11 jPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
the TDEFP.
SAFETY CONSIDERATIONS:
INITIATING CUES: Control Room Supervisor directs the ABUL operator to locally start the TDEFP and to locally throttle EFW flow to maintain SG WR levels between 50% and 60% per FEP-4.0 ENCLOSURE F, Steps 2. thru 4 THIS IS A TIME CRITICAL JPM!
Burn Hazard INITIAL CONDITION:
A T NO TIME ARE AT                            A RE YOU TO OPERATE         OPERA TE ANY PLANT EQUIPMENT!          EQUIPMENT!
The Control Room has been evacuated due to a fire. Control of the plant has been established from the CREP panel. The Shift Engineer is not available to start the TDEFP. INITIATING CUES: Control Room Supervisor directs the ABUL operator to locally start the TDEFP and to locally throttle EFW flow to maintain SG WR levels between 50% and 60% per FEP-4.0 ENCLOSURE F, Steps 2. thru 4 A T NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!
HAND JPM BRiEFiNG BRIEFING SHEET TO OPERATOR AT THIS     THiS TIME!
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 0/11 STEPS CR SEQ STEP: Ye Yes Open XVG-2802B-MS HEADER C EF PUMP TURBINE SUPPLY VLV (IB-435 East Pen.). CUES: COMMENTS:
: Tuesday, Tuesday, December December 06, 06, 2005 2005                                                                            Page 33 of Page     of11 11
CR SEQ No No CUES: STEP: 2 Take the emergency stairs to the IB-412 Turbine Driven Emergency Feedwater Pump Room. STEP STANDARD:
 
Visually checks XVG-2802B-MS HEADER C EF PUMP TURBINE SUPPLY VLVopen, (IB-436 East Pen). STEP STANDARD:
jPM JPM BRIEFING SHEET OPERA TOR INSTRUCTIONS:
SAT UNSAT Identifies emergency stairs to the IB-412 Turbine Driven Emergency Feedwater Pump Room. SAT Cue operator to indicate where the emergency stairs to the IB-412 Turbine Driven UNSAT Emergency Feedwater Pump Room are located then proceed to the TDEPP room via the normal route through the RCA. COMMENTS:
OPERATOR       INSTRUCTIONS:
CR SEQ STEP: 3 Ye Yes If necessary, reset the throttle valve, XVT-02865-MS, EF PUMP TURB MAIN STEAM THROTILE VALVE. CUES: STEP STANDARD:
SAFETY CONSIDERATIONS:                   Burn Hazard Burn   Hazard INITIAL CONDITION:
Visually checks XVT02865-MS, EF PUMP TURB MAIN STEAM THROTTLE VALVE, reset by observing upper limit switch and trip hook engaged.(IB-412).
INITIAL    CONDITION: The    The Control Control Room Room has has been been evacuated evacuated due due to to aa fire.
SAT Cue operator that XVT02865-MS, EF PUMP TURB MAIN STEAM THROTTLE VALVE is reset. UNSAT " COMMENTS:
fire. Control Control of of the the plant plant has been established from the CREP panel.
Tuesday, December 06, 2005 PageS of11 CR SEQ STEP: 4 STEP STANDARD:
has                                    panel. The Shift Engineer Engineer is is not available to start the TDEFP.
No No Ensure XVT02813-MS, EF PUMP TURB STEAM Moves the declutch lever and engages the SUPPLY HDR DRAIN VLV, is open handwheel.
INITIATING CUES: Control Room      Room Supervisor directs the ABUL operator to locallylocally start the EFW flow to maintain TDEFP and to locally throttle EFW         maintain SG WR levels  levels between between 50% and 60% per FEP-4.0 ENCLOSURE F, Steps 2. thru 4 A T NO TIME ARE             A RE YOU TO OPERATE           OPERA TE ANY PLANT EQUIPMENT!  EQUIPMENT!
Turns valve handwheel in the close direction and verifies the valve starts to close then fully reopends valve CUES: SAT COMMENTS:
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU EVALUATOR SATISFACTORILY COMPLETED HAVE SATISFACTORILY                                     COMPLETED THE ASSIGNED TASK.
CR SEQ Ye Yes STEP: 5 Open IFV-2030-MS, EF PUMP TURB STEAM SUPPLY FLOW CONT VLV as follows: 1). Close IFV-2030-AV1-MS, IA ISOLATION VALVE FOR IFV-2030-MS.
Tuesday, December 06, Tuesday, December 06, 2005 2005                                                                                     0/11 Page 44 of Page      11
2). Vent IFV02030PR1-MS, IA SUPPLY PRESS REG FOR IFV-2030-MS.
 
UNSAT STEP STANDARD:
STEPS STEPS CR SEQ CR      SEQ       STEP:
1). Shuts IFV-2030-AV1-MS, IA ISOLATION VALVE FOR IFV-2030-MS by turning air isolation valve in the clockwise direction. (IB-412 above air tank). 2). Vents IFV-2030-PR1-MS, IA SUPPLY PRESS REG FOR IFV2030-MS by turning the valve T -Bar in the counterclockwise direction.
STEP:        1                                    STEP STEP STANDARD:
CUES: SAT Examiner cues operator that IFV-2030 remains closed after closing the IA valve but UNSAT opens when the regulator is vented off. COMMENTS:
STANDARD:
Tuesday, December 06, 2005 Page 6 of 11 CR SEQ STEP: 6 STEP STANDARD:
Ye Yes Ye     Yes     Open XVG-2802B-MS Open    XVG-2802B-MS HEADER HEADER CC EF EF PUMP PUMP       Visually checks Visually  checks XVG-2802B-MS XVG-2802B-MS HEADER HEADER TURBINE SUPPLY TURBINE      SUPPLY VLV VLV (IB-435 (IB-435 East East Pen.).
Ye Yes Verify Turbine speed increases to greater Visually verify Turbine Driven Emergency than 4000 RPM on ISI13505, EF PUMP TURBINE Feed Pump Speed by observing ISI13505, TACHOMETER.
Pen.).        EF PUMP CC EF   PUMP TURBINE TURBINE SUPPLY SUPPLY VLVopen, VLV open, (IB-436 (IB-436 East East Pen).
EF PUMP TURBINE TACHOMETER, local Tachometer indication (mounted on the Turbine).
Pen).
Turbine speed indicates  
CUES:
>4000 RPM. CUES: SAT Cue operator that turbine speed is 4200 rpm. COMMENTS:
CUES:                                                                                        SAT SAT UNSAT UNSA T COMMENTS:
CR SEQ STEP: 7 No Yes close the following drain valves MS, XVT-2804A-MS, and XVT-2804B-MS CUES: COMMENTS:
COMMENTS:
CR SEQ STEP: 8 No Yes Isolates Instrument Air to FCV-3536-EF. (IB-423) CUES: UNSAT STEP STANDARD:
CR SEQ CR                  STEP:      2                                    STEP STANDARD:
2803A, 2804A, & 2804B rotated in the clockwise direction until handwheel movement stops and valve will no longer rotate in the clockwise direction by hand STEP STANDARD:
STANDARD:
SAT UNSAT Checks FCV-3536 stem position(IB-423).
No No No    No      Take the Take  the emergency emergency stairs stairs to to the the IB-412 IB-412          Identifies emergency Identifies  emergency stairs stairs to to the the IB-412 IB-412 Turbine Driven Emergency Feedwater Feedwater Pump Pump     Turbine Driven Emergency Feedwater Feedwater Room.                                              Pump Room.
Student rotates IFV-3536-AV1-EF in the clockwise direction.
CUES:                                                                                        SAT Cue operator Cue    operator to indicate where the emergency stairs to the IB-412 IB-41 2 Turbine Driven UNSAT Emergency Feedwater Pump Room are located then proceed to the TDEPP room via Emergency the normal route through the RCA.
Cues the operator that IFV-3536 is full open. Then (while closing of AV1 valve) cues operator that the handle turns in the clockwise direction then stops. SAT UNSAT COMMENTS:
COMMENTS:
Tuesday, December 06, 2005 Page 70f11 CR SEQ STEP: 9 No Yes Vent air from the regulator for FCV-3536-EF, (IB-423).
COMMENTS:
CUES: Cue operator that he hears and feels air blowing. COMMENTS:
CR CR SEQSEQ          STEP:       33                                              STANDARD::
CR SEQ STEP: 10 Ye Yes Throttle FCV-3536-EF.
STEP STANDARD Ye Ye Yes         If necessary, reset the throttle valve, XVT-                           XVT02865-MS, Visually checks XVT02865-M      S, EF PUMP 02865-MS, EF EF PUMP PUMP TURB MAIN  MAIN STEAM STEAM                              THROTTLE VALVE, TURB MAIN STEAM THROTTLE THROTTLE THROTILE VALVE.VALVE.                              reset by observing upper limit limit switch and trip hook engaged.(IB-engaged.(IB-412).
CUES: STEP STANDARD:
412).
Operator opens the regulator vent. STEP STANDARD:
CUES:
SAT UNSAT Removes locking device. Rotates the handwheel for FCV-3536-EF in the clockwise direction to maintain 50% -60% WR level in A SG. Informs CRS at CREP he has throttled IFV-3536 and awaits further direction SAT NOTE TO EXAMINER:
CUES:                                                                                          SAT SAT Cue Cue operator operator that that XVT02865-M XVT02865-MS, S, EF EF PUMP PUMP TURB TURB MAIN MAIN STEAM STEAM THROTTLE THROTTLE VALVE VALVE         UNSAT UNSAT isis reset.
Ask operator how he/she would establish communcations UNSAT with the CRS at the CREP panel. Cue operator that he feels light resistance in the clockwise direction.
reset.
COMMENT  "
COMMENTS:        S:
: Tuesday, Tuesday, December December06, 06, 2005 2005                                                                          PageS of PageS  of11 11
 
CR SEQ CR    SEQ      STEP:
STEP:       44                                  STEP STANDARD:
STEP     STANDARD:
No No No  No      Ensure XVT02813-MS, Ensure   XVT02813-MS, EF EF PUMP PUMP TURB TURB STEAM STEAM Moves Moves the the declutch declutch lever lever and and engages engages the the SUPPLY HDR SUPPLY      HDR DRAIN DRAIN VLV, VLV, isis open open           handwheel. Turns handwheel.      Turns valve valve handwheel handwheel inin the close the   close direction direction and and verifies verifies the the valve valve starts to starts  to close close then then fully fully reopends reopends valve valve CUES:
CUES:                                                                                       SAT SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ         STEP:        5                                STEP STANDARD:
STANDARD:
Ye Yes Ye   Yes     Open IFV-2030-MS, Open    IFV-2030-MS, EF EF PUMP PUMP TURBTURB STEAM STEAM    1). Shuts 1). Shuts IFV-2030-AV1-MS, IFV-2030-AV1-MS, IA    IA SUPPLY FLOWFLOW CONT VLV as follows:            ISOLATION VALVE FOR IFV-2030-MS   IFV-2030-MS by 1). Close IFV-2030-AV1-MS, IA 1).                            IA ISOLATION     turning air isolation valve in the clockwise VALVE FOR IFV-2030-MS.                          direction. (IB-412 above air tank).
2). Vent IFV02030PR1-MS, IFVO2O3OPR1 -MS, IA SUPPLY PRESS                    IFV-2030-PR1-MS, IA SUPPLY 2). Vents IFV-2030-PR1-MS, REG FOR IFV-2030-MS.                            PRESS REG FOR IFV2030-MS by turning the valve T   T-Bar
                                                                              -Bar in the counterclockwise counterclockwise direction.
CUES:                                                                                       SAT Examiner cues operator that IFV-2030 remains closed after closing the IA valve but                 UNSAT UNSA T opens when the regulator is vented off.
COMMENT COMMENTS:    S:
: Tuesday, Tuesday, December December 06, 06, 2005 2005                                                                           Page 66 of Page    of11 11
 
CR SEQ CR     SEQ       STEP:
STEP:          66                                            STEP STEPSTANDARD:
STANDARD:
Ye Yes Ye    Yes      VerifyTurbine Verify   Turbinespeed speed increases increasesto      greater togreater            Visuallyverify Visually   verifyTurbine Turbine Driven Driven Emergency Emergency than 4000 than  4000 RPMRPM onon ISI13505, 1S113505, EF  EF PUMP PUMPTURBINE TURBINEFeed  Feed Pump Pump Speed Speed byby observing observing ISI13505, 1S113505, TACHOMETER.
TACHOMETER.                                                  EF PUMP EF  PUMP TURBINE TURBINE TACHOMETER, TACHOMETER, local      local Tachometer Tachometer indication     (mounted on indication (mounted    on the the Turbine).
Turbine). Turbine Turbine speed speed indicates indicates >4000
                                                                                                                        >4000 RPM.
RPM.
CUES:
CUES:                                                                                                   SAT SAT Cue operator Cue  operator that that turbine turbine speed speed isis 4200 4200 rpm.rpm.                                            UNSAT UNSAT COMMENT COMMENTS:      S:
CR SEQ CR    SEQ        STEP:
STEP:         77                                            STEP STEP STANDARD:
STANDARD:
No Yes No  Yes      close the close  the following drain drain valves XVT-2803A-XVT-2803A-         2803A, 2804A, &    & 2804B rotated rotated in in the MS, XVT-2804A-MS, MS,  XVT-2804A-MS, and      and XVT-2804B-MS XVT-2804B-MS                clockwise direction clockwise   direction until until handwheel handwheel movement stops and valve will no longer rotate in the clockwise direction by rotate                                by hand hand CUES:
CUES:                                                                                                  SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR CR SEQSEQ        STEP:
STEP:        88                                                    STANDARD::
STEP STANDARD No No Yes Yes      Isolates Isolates Instrument Air Air to to FCV-3536-E FCV-3536-EF. F. (IB-(IB-                FCV-3536 stem Checks FCV-3536      stem position(lB-4 position(IB-423).23).
423) 423)                                                                            IFV-3536-AV1-EF Student rotates IFV-3536-AV      1-EF in in the clockwise clockwise direction.
direction.
CUES:
CUES:                                                                                                  SAT SAT Cues Cues the the operator operator that that IFV-3536 IFV-3536 isis full full open.
open. Then Then (while (while closing  of AV1 closing of  AV1 valve) valve)      UNSAT UNSAT cues cues operator operator that that the the handle handle turns turns inin the the clockwise clockwise direction direction then then stops.
stops.
COMMENT COMMENTS:    S:
: Tuesday, Tuesday, December  06, 2005 December06,    2005                                                                                    Page 770f11 Page      of 11
 
CR SEQ CR    SEQ        STEP:
STEP:          99                                              STEP STEP STANDARD:
STANDARD:
No Yes No  Yes      Vent air Vent  air from from thethe regulator regulatorforfor FCV-3536-EF, FCV-3536-EF,        Operator Operator opens opens thethe regulator regulator vent.
vent.
(IB-423).
(IB-423).
CUES:
CUES:                                                                                                      SAT SAT Cue operator Cue  operator that that he      hears and he hears    and feels feels air    blowing.
air blowing.                                        UNSAT UNSAT COMMENTS:
COMMENTS:
CR SEQ CR    SEQ        STEP:
STEP:          10 10                                              STEP STEP STANDARD:
STANDARD:
Ye Yes Ye  Yes      Throttle FCV-3536-EF.
Throttle    FCV-3536-EF.                                        Removes locking Removes      locking device.
device. Rotates Rotates thethe handwheel for handwheel          FCV-3536-EF in for FCV-3536-EF      in the the clockwise direction clockwise    direction to to maintain maintain 50%
50% - 60%
                                                                                                                            - 60%
WR WR level level in in A A SG.
SG. Informs Informs CRS CRS at at CREP CREP he has throttled IFV-3536 and awaits direction further direction CUES:
CUES:                                                                                                      SAT NOTE TO EXAMINER:
EXAMINER: Ask operator how he/she would establish communcations      communcations UNSAT with the CRS at the CREP panel. Cue operator that he feels light resistance in the with clockwise direction.
clockwise COMMENTS:
COMMENTS:
CR SEQ          STEP:          11 11                                                      STANDARD::
STEP STANDARD No No Yes        Isolates Instrument Air to FCV-3546-E FCV-3546-EF. F. (IB-                                    position(IB-423).
Checks FCV-3546 stem position(IB-4            23).
423)                                                            Student rotates IFV-3546-AV Student            IFV-3546-AV1-EF1-EF in the clockwise direction.
clockwise    direction.
CUES:
CUES:                                                                                                      SAT SAT Cues Cues the the operator operator that that IFV-3546 IFV-3546 is is full full open.
open. Then Then (while (while closing closing of of AV1 AV1 valve) valve)    UNSAT UNSAT cues operator cues  operator that that the the handle handle turns turns inin the the clockwise clockwise direction direction then then stops.
stops.
COMMENT COMMENTS:    S:
: Tuesday, Tuesday, December  06, 2005 December06,  2005                                                                                          Page 88of Page    ofll 11
 
CR SEQ CR    SEQ        STEP:
STEP:          12 12                                          STEP STEP STANDARD:
STANDARD:
No Yes No  Yes      Vent air Vent  air from    the regulator from the    regulator for for FCV-3546-EF, FCV-3546-EF,          Operator opens Operator    opens the the regulator regulator vent.
vent.
(I B-423).
(IB-423).
CUES:
CUES:                                                                                                SAT SAT Cue  operator that Cue operator  that hehe hears hears and and feels feels air  blowing.
air blowing.                                      UNSAT UNSAT COMMENTS:
COMMENTS:
CR SEQ CR    SEQ        STEP:
STEP:          13 13                                          STEP STEP STANDARD:
STANDARD:
Ye Yes Ye  Yes    Throttle FCV-3546-EF.
Throttle    FCV-3546-EF.                                      Removes locking Removes    locking device.
device. Rotates Rotates thethe handwheel for FCV-3546-EF handwheel        FCV-3546-EF in  in the clockwise direction to maintain clockwise                maintain 50%
50% - 60%
                                                                                                                      - 60%
level in WR level    in B B SG. Informs Informs CRS at CREP has throttled IFV-3546 he has            IFV-3546 and and awaits awaits further instruction CUES:                                                                                                SAT Cue operator that he feels light resistance in the clockwise direction.                          UNSAT COMMENTS:
CR SEQ          STEP:          14                                          STEP STANDARD:
No Yes      Isolates Instrument Air to FCV-3556-EF. (IB-      (lB-      Checks FCV-3556 stem position(IB-423).
position(lB-423).
423)                                                        Student rotates IIFV-3556-AV1-EF FV -3556-A V1-EF in the clockwise direction.
CUES:                                                                                                SAT Cues the operator operator that IFV-3556 IFV-3556 is full open.
open. Then (while closing of  of AV1 valve)      UNSAT cues operator cues  operator that that the the handle handle turns turns in in the the clockwise clockwise direction direction then then stops.
stops.
COMMENTS:
Tuesday, Tuesday, December December 06, 06, 2005 2005                                                                                  Page    0/11 Page 99 of 11
 
CR SEQ CR  SEQ      STEP:
STEP:        15 15                                STEP STEP STANDARD:
STANDARD:
No Yes No  Yes    Vent air Vent    air from from the the regulator regulator for for FCV-3556-EF, FCV-3556-EF,  Operator opens Operator    opens the the regulator regulator vent.
vent.
(IB-423).
(IB-423).
CUES:
CUES:                                                                                    SAT SAT Cue  operator that Cue operator    that he  hears and he hears  and feels feels air air blowing.
blowing.                              UNSAT UNSAT COMMENTS:
COMMENTS:
COMMENTS:
CR SEQ STEP: 11 No Yes Isolates Instrument Air to FCV-3546-EF. (IB-423) STEP STANDARD:
CR SEQ CR            STEP:         16 16                                  STEP STANDARD:
Checks FCV-3546 stem position(IB-423).
STANDARD:
Student rotates IFV-3546-AV1-EF in the clockwise direction.
Ye Yes     Throttle FCV-3556-EF.
CUES: SAT Cues the operator that IFV-3546 is full open. Then (while closing of AV1 valve) UNSAT cues operator that the handle turns in the clockwise direction then stops. COMMENTS:
Throttle   FCV-3556-EF.                           Removes locking Removes     locking device. Rotates Rotates the handwheel for FCV-3556-EF FCV-3556-EF in the clockwise direction to maintain 50% - 60%-
Tuesday, December 06, 2005 Page 8 ofll CR SEQ STEP: 12 No Yes Vent air from the regulator for FCV-3546-EF, (IB-423).
WR level in C SG. Informs Informs CRS at CREP he has throttled IFV-3556 and awaits further instructions CUES:                                                                                    SAT Cue operator that he feels light resistance in the clockwise direction.               UNSAT COMMENTS:
CUES: Cue operator that he hears and feels air blowing. COMMENTS:
CR SEQ STEP: 13 Ye Yes Throttle FCV-3546-EF.
CUES: STEP STANDARD:
Operator opens the regulator vent. STEP STANDARD:
SAT UNSAT Removes locking device. Rotates the handwheel for FCV-3546-EF in the clockwise direction to maintain 50% -60% WR level in B SG. Informs CRS at CREP he has throttled IFV-3546 and awaits further instruction Cue operator that he feels light resistance in the clockwise direction.
COMMENTS:
COMMENTS:
SAT UNSAT CR SEQ STEP: 14 No Yes Isolates Instrument Air to FCV-3556-EF. (IB-423) STEP STANDARD:
Examiner ends JPM at this point.
Checks FCV-3556 stem position(IB-423).
Tuesday, December December 06, 06, 2005 2005                                                                      Page 10 Page    oj11 10 of 11
Student rotates I FV -3556-A V1-EF in the clockwise direction.
 
CUES: SAT Cues the operator that IFV-3556 is full open. Then (while closing of AV1 valve) UNSAT cues operator that the handle turns in the clockwise direction then stops. COMMENTS:
JPM SETUP JPM  SETUP SHEET SHEET JPMNO:
Tuesday, December 06, 2005 Page 9 0/11 CR SEQ STEP: 15 No Yes Vent air from the regulator for FCV-3556-EF, (IB-423).
jPM          JPP-O55NRC NO: JPP-055NRC DESCRIPTION:
CUES: Cue operator that he hears and feels air blowing. COMMENTS:
DESCRIPTION:           LOCALLY START LOCALLY START THE THE TURBINE TURBINE DRIVEN DRIVEN EMERGENCY EMERGENCY FEEDWATER FEEDWATER PUMP PUMP ANDAND THROTTLE EMERGENCY THROTTLE  EMERGENCY FEEDWATER FEEDWATER FLOW FLOW AS AS DIRECTED DIRECTED IC SET:
CR SEQ STEP: 16 Ye Yes Throttle FCV-3556-EF.
ICSET:
CUES: STEP STANDARD:
INSTRUCTIONS:
Operator opens the regulator vent. STEP STANDARD:
INSTRUCTIONS:
SAT UNSAT Removes locking device. Rotates the handwheel for FCV-3556-EF in the clockwise direction to maintain 50% -60% WR level in C SG. Informs CRS at CREP he has throttled IFV-3556 and awaits further instructions Cue operator that he feels light resistance in the clockwise direction.
COMMENTS:
COMMENTS:
SAT UNSAT Examiner ends JPM at this point. Tuesday, December 06, 2005 Page 10 oj 11 JPM SETUP SHEET jPM NO: JPP-055NRC DESCRIPTION:
LOCALLY START THE TURBINE DRIVEN EMERGENCY FEEDWATER PUMP AND THROTTLE EMERGENCY FEEDWATER FLOW AS DIRECTED ICSET: INSTRUCTIONS:
COMMENTS:
COMMENTS:
Tuesday, December 06, 2005 Page 11 of 11   
Tuesday, December istesday, December 06, 06, 2005 2005                                                  Page 11 Page   ofii 11 of 11
 
I a V.C. SUMMER v.C. SUMMER NUCLEAR  NUCLEAR STATION JOB      PERFORMANCE MEASURE JOB PERFORMANCE                    MEASURE JPM
                                  ]PM        JPPF JPPF-ESTABLISH CHILLED ESTABLISH  CHILLED WATER WATER ALTERNATE ALTERNATE COOLING COOLING TO TO CHARGING PUMPS CHARGING  PUMPS APPROVAL:
APPROVAL:            APPROVAL DATE:
APPROVAL  DATE:
REVNO:
REV NO: 66 CANDIDATE CANDIDATE EXAMINER:
EXAMINER:
THIS JPM IS NOT APPROVED
: Tuesday, Tuesday, December December 06, 06, 2005 2005                                                Page 11 of Page    of12 12
 
TASK:
TASK:
004-003-04-04 004-003-04-04                ESTABLISH CHILLED ESTABLISH      CHILLED WATER WATER ALTERNATE ALTERNATE COOLING COOLING TO  TO CHARGING CHARGING PUMPS    PUMPS TASK STANDARD:
TASK    STANDARD:
Chilled Water alternate Chilled Water    alternate cooling cooling isis provided provided toto the the "B" B Charging Charging Pump Pump perper AOP-118.1.
AOP-1 18.1. TheThe use use of of applicable Human applicable Human Performance Performance ToolsTools (3-way (3-way communications, communications, self self checking, checking, peerpeer checking, checking, phonetic*
phonetic alphabet, etc) alphabet, etc) and    industrial safety and industrial  safety practices practices meets meets expectations.
expectations. This This JPM JPM isis related related to to PRA PRA event event OACC "Operator OACC    Operator action action to to establish establish alternate alternate COOling cooling to to CS CS pumps".
pumps.
PREFERRED EVALUATION PREFERRED        EVALUATION LOCATION                                  PREFERRED EVALUATION PREFERRED        EVALUATION METHOD    METHOD PLANT PLANT                                                                      SIMULATE SIMULATE


v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPPF-ESTABLISH CHILLED WATER ALTERNATE COOLING TO CHARGING PUMPS APPROVAL:
==REFERENCES:==
APPROVAL DATE: REV NO: 6 CANDIDATE EXAMINER:
THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 of 12 TASK: 004-003-04-04 ESTABLISH CHILLED WATER ALTERNATE COOLING TO CHARGING PUMPS TASK STANDARD:
Chilled Water alternate cooling is provided to the "B" Charging Pump per AOP-118.1.
The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic*
alphabet, etc) and industrial safety practices meets expectations.
This JPM is related to PRA event OACC "Operator action to establish alternate COOling to CS pumps". PREFERRED EVALUATION LOCATION PLANT PREFERRED EVALUATION METHOD SIMULATE


==REFERENCES:==
==REFERENCES:==
AOP-1 18.1 AOP-118.1                    TOTAL LOSS LOSS OFOF COMPONENT COMPONENT COOLINGCOOLING WATER  WATER TOOLS:            AOP-118.1 Attachment AOP-118.1      Attachment 11 and and 1lBB FLASHLIGHT FLASHLIGHT EVALUATION TIME EVALUATION        T1ME                  20            TIME CRITICAL          NO        10CFR55:
JOCFR55: 45(a)6 CANDIDATE:
CANDIDATE:                                                                            TIME START:
TIME FINISH:
PERFORMANCE RATING:
PERFORMANCE                              SAT:                  UNSAT:
QUESTION GRADE:                        PERFORMANCE EXAMINER EXAMINER::
SIGNATURE                    DATE COMMENTS:
COMMENTS:
: Tuesday, Tuesday, December 06, 2005 December 06,  2005                                                                                    Page 22 of Page    of12 12
INSTRUCTIONS TO INSTRUCTIONS            TO OPERATOR OPERATOR READ TO READ    TO OPERATOR:
OPERATOR:
WHEN      TELL YOU WHEN II TELL    YOU TO      BEGIN, YOU TO BEGIN,    YOU ARE ARE TOTO PERFORM PERFORM THE  THE ACTIONS ACTIONS ASAS DIRECTED DIRECTED IN    IN THE THE INITIATING INITIATING CUES. WILL DESCRIBE CUES. II WILL  DESCRIBE THE    THE GENERAL GENERAL CONDITIONS CONDITIONS UNDERUNDER WHICH WHICH THIS    TASK IS THIS TASK    IS TO TO BE BE PERFORMED PERFORMED AND  PROVIDE THE AND PROVIDE      THE NECESSARY NECESSARY TOOLS        WITH WHICH TOOLS WITH    WHICH TO TO PERFORM PERFORM THISTHIS TASK.
TASK. BEFORE BEFORE STARTING, STARTING, II WILL  EXPLAIN THE WILL EXPLAIN            INITIAL CONDITIONS, THE INITIAL    CONDITIONS, WHICH WHICH STEPS STEPS TO TO SIMULATE SIMULATE OR      DISCUSS, AND OR DISCUSS,      AND PROVIDE PROVIDE INITIATING CUES.
INITIATING    CUES. WHEN WHEN YOU YOU COMPLETE COMPLETE THETHE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE  THE OBJECTIVE OBJECTIVE FOR  FOR THIS THIS JOB JOB PERFORMANCE MEASURE PERFORMANCE        MEASURE WILL  WILL BE BE SATISFIED.
SATISFIED.
CONSIDERATIONS:
SAFETY CONSIDERATIONS:                    Be sure Be      to read sure to read radiation  posting signs radiation posting signs prior prior to to entering entering charging charging rooms.
pump rooms.
pump INITIAL CONDITION: A total loss of Component Cooling Water has            has occurred. CRS has AOP-l 18.1.
implemented AOP-118.1.
INITIATING CUES: The CRS directs you, the ABLL, to extablish alternate cooling to the "B"            B Charging Pump from the Chilled Water System per AOP-118.1 Attachment 11 and 1lB.
B.
A T NO TIME ARE AT                            A RE YOU TO OPERATE            OPERA TE ANY PLANT EQUIPMENT!          EQUIPMENT!
HAND JPM}PM BRiEFING BRIEFING SHEET TO OPERATOR AT THIS TIME!
Tuesday, December Tuesday,          06, 2005 December 06, 2005                                                                            Page Page 33 of of12 12


AOP-118.1 TOTAL LOSS OF COMPONENT COOLING WATER TOOLS: AOP-118.1 Attachment 1 and 1 B FLASHLIGHT EVALUATION TIME 20 TIME CRITICAL NO lOCFR55: 45(a)6 CANDIDATE:
JPM BRIEFING SHEET
TIME START: TIME FINISH: PERFORMANCE RATING: SAT: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:
                                          ]PM OPERA TOR INSTRUCTIONS:
SIGNATURE DATE COMMENTS:
OPERATOR      INSTRUCTIONS:
Tuesday, December 06, 2005 Page 2 of12 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
Be sure to read radiation posting signs prior to entering charging pump rooms. INITIAL CONDITION: A total loss of Component Cooling Water has occurred.
CONSIDERATIONS:              Be sure Be sure to to read read radiation radiation posting posting signs signs prior prior to to entering entering charging charging pump pump rooms.
CRS has implemented AOP-118.1.
rooms.
INITIATING CUES: The CRS directs you, the ABLL, to extablish alternate cooling to the "B" Charging Pump from the Chilled Water System per AOP-118.1 Attachment 1 and 1 B. AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!
INITIAL CONDITION: A total loss of Component Cooling Water has          has occurred. CRS    has CRS has implemented AOP-118.1.
HAND }PM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 of12 
implemented AOP-l 18.1.
]PM BRIEFING SHEET OPERATOR INSTRUCTIONS:
INITIATING CUES: The CRS directs you, the ABLL, to extablish alternate cooling to the "B"       B Charging Pump from the Chilled Water System perper AOP-118.1 Attachment 11 and 1lB.
SAFETY CONSIDERATIONS:
B.
Be sure to read radiation posting signs prior to entering charging pump rooms. INITIAL CONDITION: A total loss of Component Cooling Water has occurred.
A T NO TIME ARE AT                            A RE YOU TO OPERATE         OPERA TE ANY PLANT EQUIPMENT!
CRS has implemented AOP-118.1.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.
INITIATING CUES: The CRS directs you, the ABLL, to extablish alternate cooling to the "B" Charging Pump from the Chilled Water System per AOP-118.1 Attachment 1 and 1 B. AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!
Tuesday, Tuesday, December 06, 2005 December 06, 2005                                                                        Page4of12 Page 4 of 12
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page4of12 STEPS CR SEQ STEP: 1 No Yes Obtain alternate cooling supply hoses and fittings.
 
CUES: STEP STANDARD:
STEPS CR SEQ         STEP:       1 1                            STEP STANDARD:
Hoses and fittings obtained from Dedicated Gang Box (AB-400).
No Yes       Obtain alternate cooling supply hoses and Hoses and fittings obtained from fittings.                                Dedicated Gang Box (AB-400).
SAT HAVE OPERATOR POINT OUT THE HOSES AND DISCUSS HOW THE LINES WOULD UNSAT BE CONNECTED, VERSUS REMOVING THE EQUIPMENT OUT OF THE GANG BOX. COMMENTS:
CUES:                                                                        SAT HAVE OPERATOR POINT OUT THE HOSES AND DISCUSS HOW THE LINES WOULD                   UNSAT BE CONNECTED, VERSUS REMOVING THE EQUIPMENT OUT OF THE GANG BOX.
CR SEQ STEP: 2 Ye Yes Connect the supply hose. CUES: COMMENTS:
COMMENTS:
CR SEQ STEP: 3 Ye Yes Connect the return hose. CUES: COMMENTS:
CR SEQ         STEP:       2                           STEP STANDARD:
Tuesday, December 06, 2005 STEP STANDARD:
Ye Yes       Connect the supply hose.                 Hose connected using Chicago fittings to IPXO9O62B-HR-VU, HIGH ROOT TO IPX09062B-HR-VU, IPX9O62B, AND XVT19647B-CC, CHG PP IPX9062B, B OIL CLR AL BOIL      ALT T CLG WTR SUPPLY VLV.
Hose connected using Chicago fittings to IPX09062B-HR-VU, HIGH ROOT TO IPX9062B, AND XVT19647B-CC, CHG PP BOIL CLR AL T CLG WTR SUPPLY VLV. STEP STANDARD:
CUES:                                                                         SAT UNSAT UNSA T COMMENTS:
SAT UNSAT Hose connected using Chicago fittings to IPX09098B-HR-VU, HIGH ROOT TO IPX9098B, AND XVT19648B-CC, CHG PP BOIL CLR AL T CLG WTR RETURN VLV. SAT UNSAT Page 5 0/12 CR SEQ STEP: 4 No Yes Check XVG09657B-CC (AB-400) valve position and record "AS FOUND" on attachment.
CR SEQ         STEP:       3                           STEP STANDARD:
STEP STANDARD:
STA NDARD:
Removes the locking device, attempts to turn XVG09657B-CC in the clockwise direction and records valve position on the attachment.
Ye Yes       Connect the return hose.                 Hose connected using Chicago fittings to IPXO9O98B-HR-VU, HIGH ROOT TO IPX09098B-HR-VU, IPX9O98B, AND XVT19648B-CC, CHG PP IPX9098B, B OIL CLR ALT BOIL      ALT CLG WTR RETURN VLV.
CUES: SAT Steps 4-21 involve valves that are standard Gate valves. Prompt examinee that UNSAT XVG09657B-CC turns freely in the clockwise direction.
CUES:                                                                         SAT UNSAT UNSA T COMMENTS:
Tuesday, December 06, 2005                                                             Page 5 0/12 of 12
 
CR SEQ CR    SEQ        STEP:
STEP:        44                                  STEP STEP STANDARD:
STANDARD:
No Yes No  Yes      Check XVG09657B-CC Check    XVG09657B-CC (AB-400)
(AB-400) valve valve        Removes the Removes    the locking locking device, device, attempts attempts toto position and position  and record record "AS AS FOUND" FOUND onon            turn XVG09657B-CC turn  XVG09657B-CC inin thethe clockwise clockwise attachment.
attachment.                                        direction and direction  and records records valve valve position position on on the the attachment.
attachment.
CUES:
CUES:                                                                                      SAT SAT Steps 4-21 involve Steps        involve valves that are standard Gate valves. Prompt examinee that UNSAT Prompt                    UNSAT XVG09657B-CC turns freely in the clockwise direction.
XVG09657B-CC COMMENTS:
COMMENTS:
CR SEQ          STEP:        5                                    STEP STANDARD:
Ye Yes      Close XVG09657B-CC.                                Closes XVG09657B-CC, CHG PP BOIL        B OIL CLR CCW INLET VLV, by rotating the valve handwheel fully in the clockwise direction.
CUES:                                                                                    SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:        6                                    STEP STANDARD:
No Yes      Check XVT1      9647B-CC (AB-400) valve XVT19647B-CC                            Attempts to turn XVT19647B-CC XVT1 9647B-CC in the position and record "AS AS FOUND" FOUND on            clockwise direction and records valve attachment.                                        position on the attachment.
CUES:                                                                                    SAT Prompt examinee that XVT19647B-CC does not move in the clockwise direction. UNSAT COMMENTS:
Tuesday, December Tuesday, December 06, 06, 2005 2005                                                                        Page6of12 Page 6 of 12
 
CR SEQ CR    SEQ      STEP:
STEP:      77                                  STEP STEP STANDARD:
STANDARD:
Ye Yes Ye  Yes    Open XVT19647B-CC.
Open    XVT19647B-CC.                            Opens XVT19647B-CC, Opens    XVT19647B-CC, CHG  CHG PP PP BOIL B OIL CLR CLR ALALTT CLG CLG WTR WTR SUPPLY SUPPLY VLV, VLV, by  by rotating the rotating  the valve valve handwheel handwheel fully fully in in the the counter-clockwise direction.
counter-clockwise    direction.
CUES:
CUES:                                                                                  SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:      8                                  STEP STANDARD:
No Yes      Check XVT09685B-CC (AB-400) valve                Removes the locking device and attempts position and record "AS  FOUND on AS FOUND"                  to turn XVT09685B-CC in the clockwise attachment.                                      direction.
CUES:                                                                                  SAT Prompt examinee that XVT09685B-CC turns freely in the clockwise direction.          UNSAT Student may choose to determine throttled position of the valve. 3.0 turns open.
COMMENTS:
CR SEQ        STEP:        9                                  STEP STANDARD:
Ye Yes      Close XVT09685B-CC.                              Closes XVT09685B-CC, CHG PP BOIL      B OIL CLR CCW OUTLET VALVE, by rotating the valve handwheel fully in the clockwise direction.
CUES:                                                                                  SAT UNSAT UNSA  T COMMENTS:
Tuesday,  December 06 Tuesday, December 06, 2005 2005                                                                      Page 770f12 Page    of 12
 
CR SEQ CR    SEQ        STEP:
STEP:        10 10                                      STEP STEP STANDARD:
STANDARD:
No Yes No  Yes      Check XVT19648B-CC Check    XVT1 9648B-CC (AB-400)
(AB-400) valve valve            Attempts Attempts toto turn turn XVT19648B-CC XVT1 9648B-CC in in the the position and position        record "AS and record      FOUND on AS FOUND"    on              clockwise direction.
clockwise  direction.
attachment.
attachment.
CUES:
CUES:                                                                                        SAT SAT Prompt examinee Prompt  examinee thatthat XVT19648B-CC XVT19648B-CC does does not not move move in in the the clockwise    direction. UNSAT clockwise direction. UNSAT COMMENTS:
CR SEQ          STEP:        11 11                                      STEP STANDARD:
Ye Yes      Open XVT19648B-CC.                                    Opens XVT19648B-CC, CHG PP BOIL     B OIL CLR ALALTT CLG WTR RETURN VLV, by rotating the valve handwheel in the fully counter-clockwise direction.
CUES:                                                                                        SAT UNSAT UNSA T COMMENTS:
CR SEQ          STEP:        12                                      STEP STANDARD:
No Yes                IPXO9O62B-HR-VU (AB-400) valve Check IPX09062B-HR-VU                                  Attempts to turn IPX09062B-HR-VU IPXO9O62B-HR-VU in the position and record "AS    FOUND on AS FOUND"                    clockwise direction.
attachment.
CUES:                                                                                        SAT Prompt examinee that 1PX09062B-HR-VU IPX09062B-HR-VU does not move in the clockwise direction.                UNSAT COMMENTS:
Tuesday, December Tuesday,          06, 2005 December 06,  2005                                                                          Page     of12 Page 88 of 12
 
CR SEQ CR    SEQ      STEP:
STEP:        13 13                                STEP STANDARD:
STEP    STANDARD:
Ye Yes Ye  Yes    Open    1PX09062B-HR-VU, (AB-400).
Open IPX09062B-HR-VU,      (AB-400).          Opens IPX09062B-HR-VU, Opens    1PX09062B-HR-VU, HIGH    HIGH ROOT ROOT TO  TO 1PX9062B, by IPX9062B,        rotating the by rotating    the valve valve handwheel inin the handwheel        the fully fully counter-clockwise counter-clockwise direction.
direction.
CUES:
CUES:                                                                                    SAT SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ CR              STEP:      14                              STEP STANDARD:
STA NDARD:
No Yes No          Check IPX09098B-HR-VU Check   1PX09098B-HR-VU (AB-400)
(AB-400) valve     Attempts to turn IPX09098B-HR-VU, 1PX09098B-HR-VU, HIGH    HIGH position and position and record record "AS AS FOUND" FOUND on on           ROOT TO ROOT    TO IPX9062B, IPX9O62B, in  in the the clockwise clockwise attachment.                                   direction.
CUES:                                                                                    SAT Prompt examinee that IPX09098B-HR-VU Prompt                  1PX09098B-HR-VU does not move in the clockwise direction.              UNSAT cOMMENTS:
COMMENTS:
CR SEQ        STEP:        15                                      STANDARD::
STEP STANDARD Ye Ye Yes      Open IPX09098B-HR-VU 1PX09098B-HR-VU (AB-400).                      IPXO9O98B-HR-VU, by rotating the Opens IPX09098B-HR-VU, valve handwheel in the fully counter-counter clockwise direction.
CUES:                                                                                    SAT UNSAT UNSA    T COMMENT COMMENTS:    S:
Tuesday,  December 06, Tuesday, December 06, 2005 2005                                                                        Page 99 of Page      12 of12
 
CR SEQ CR    SEQ        STEP:
STEP:          16 16                                            STEPSTANDARD:
STEP     STANDARD:
No Yes No  Yes      Check XVT09530B-CC Check    XVTO953OB-CC (AB-388)
(AB-388) valve valve                Removes Removes the the locking locking device device and and attempts attempts position and position        record "AS and record    AS FOUND" FOUND on  on                    to turn to  turn XVT09530B-CC XVTO953OB-CC inin thethe clockwise clockwise attachment.
attachment.                                                  direction.
direction.
CUES:
CUES:                                                                                                  SAT SAT Prompt examinee Prompt  examinee that that XVT09530B-CC XVTO953OB-CC turnsturns freely freely inin the the clockwise clockwise direction.
direction. UNSAT UNSAT COMMENTS:
COMMENTS:
CR SEQ CR    SEQ        STEP:
STEP:          17 17                                            STEP STEP STANDARD:
STANDARD:
Ye Yes Ye  Yes      Close XVT09530B-CC.
Close  XVTO953OB-CC.                                        Closes XVT09530B-CC, Closes    XVTO953OB-CC, CCW  CCW SPL SPLYY TO TO CHG PP CHG    PP BOIL B OIL CLR CLR BYP BYP VALVE, VALVE, by by rotating the rotating  the valve  handwheel in valve handwheel    in the the fully fully clockwise direction.
clockwise CUES:
CUES:                                                                                                  SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ CR              STEP:          18                                                    STANDARD::
STEP STANDARD No Yes No          Check XVT1      9654B-CC (AB-388) valve XVT19654B-CC                                        Removes the locking device and attempts position and record on attachment.                            to turn XVT1 XVT19654B-CC 9654B-CC in the clockwise direction.
CUES:
CUES:                                                                                                  SAT Prompt examinee examinee thatthat XVT19654B XVT19654B-CC-CC turns freely in in the clockwise clockwise direction.
direction.      UNSAT Student  may choose Student may    choose to  to determine determine throttled throttled position position of of thethe valve.
valve. 2.25 2.25 turns turns open.
open.
COMMENT COMMENTS:    S:
: Tuesday, Tuesday, December December O6 06, 2005 2005                                                                                    Page 10 Page  10of  12 of12
 
CR SEQ CR    SEQ        STEP:
STEP:          19 19                                        STEP STEP STANDARD:
STANDARD:
Ye Yes Ye  Yes      Open XVT19654B-CC.
Open    XVT19654B-CC.                                    Opens XVT19654B-CC, Opens    XVT19654B-CC, CHG/SICHG/Sl PUMPPUMP BB OIL CLR OIL  CLR CLG CLG WTR WTR INLET INLET VLV, VLV, by by rotating rotating valve handwheel the valve the        handwheel inin the the fully fully counter-counter clockwise direction.
clockwise   direction.
CUES:
CUES:                                                                                            SAT SAT UNSAT UNSA T COMMENTS:
COMMENTS:
COMMENTS:
CR SEQ Ye Yes CUES: STEP: 5 Close XVG09657B-CC.
CR SEQ CR    SEQ        STEP:
STEP:        20 20                                        STEP STEP STANDARD:
STANDARD:
No  Yes No Yes       Check XVT19655B-CC Check    XVT1 9655B-CC (AB-388)
(AB-388) valve valve            Removes the Removes    the locking locking device device and and attempts attempts position and record position          record "AS AS FOUND" FOUND on on              to turn XVT19655B-CC XVT19655B-CC in    in the clockwise clockwise attachment.
attachment.                                              direction.
direction.
CUES:
CUES:                                                                                             SAT Prompt Prompt  examinee    that  XVT19655B XVT19655B-CC -CC turns freely in the clockwise direction.        UNSAT Student may choose to determine "AS Student                                  AS FOUND" FOUND throttled position. 2.0 turns open.
COMMENTS:
COMMENTS:
CR SEQ STEP: 6 No Yes Check XVT19647B-CC (AB-400) valve position and record "AS FOUND" on attachment.
CUES: STEP STANDARD:
Closes XVG09657B-CC, CHG PP BOIL CLR CCW INLET VLV, by rotating the valve handwheel fully in the clockwise direction.
STEP STANDARD:
SAT UNSAT Attempts to turn XVT19647B-CC in the clockwise direction and records valve position on the attachment.
SAT Prompt examinee that XVT19647B-CC does not move in the clockwise direction.
UNSAT COMMENTS:
Tuesday, December 06, 2005 Page6of12 CR SEQ STEP: 7 Ye Yes Open XVT19647B-CC.
CUES: COMMENTS:
CR SEQ STEP: 8 No Yes Check XVT09685B-CC (AB-400) valve position and record "AS FOUND" on attachment.
STEP STANDARD:
Opens XVT19647B-CC, CHG PP BOIL CLR AL T CLG WTR SUPPLY VLV, by rotating the valve handwheel fully in the counter-clockwise direction.
STEP STANDARD:
SAT UNSAT Removes the locking device and attempts to turn XVT09685B-CC in the clockwise direction.
CUES: SAT Prompt examinee that XVT09685B-CC turns freely in the clockwise direction.
UNSAT Student may choose to determine throttled position of the valve. 3.0 turns open. COMMENTS:
CR SEQ STEP: 9 Ye Yes Close XVT09685B-CC.
CUES: COMMENTS:
Tuesday, December 06, 2005 STEP STANDARD:
Closes XVT09685B-CC, CHG PP BOIL CLR CCW OUTLET VALVE, by rotating the valve handwheel fully in the clockwise direction.
SAT UNSAT Page 70f12 CR SEQ STEP: 10 No Yes Check XVT19648B-CC (AB-400) valve position and record "AS FOUND" on attachment.
STEP STANDARD:
Attempts to turn XVT19648B-CC in the clockwise direction.
CUES: SAT Prompt examinee that XVT19648B-CC does not move in the clockwise direction.
UNSAT COMMENTS:
CR SEQ STEP: 11 Ye Yes Open XVT19648B-CC.
CUES: COMMENTS:
CR SEQ STEP: 12 No Yes Check IPX09062B-HR-VU (AB-400) valve position and record "AS FOUND" on attachment.
STEP STANDARD:
Opens XVT19648B-CC, CHG PP BOIL CLR AL T CLG WTR RETURN VLV, by rotating the valve handwheel in the fully counter-clockwise direction.
STEP STANDARD:
SAT UNSAT Attempts to turn IPX09062B-HR-VU in the clockwise direction.
CUES: SAT Prompt examinee that IPX09062B-HR-VU does not move in the clockwise direction.
UNSAT COMMENTS:
Tuesday, December 06, 2005 Page 8 of12 CR SEQ STEP: 13 Ye Yes Open IPX09062B-HR-VU, (AB-400).
CUES: COMMENTS:
CR SEQ STEP: 14 No Yes Check IPX09098B-HR-VU (AB-400) valve position and record "AS FOUND" on attachment.
STEP STANDARD:
Opens IPX09062B-HR-VU, HIGH ROOT TO IPX9062B, by rotating the valve handwheel in the fully counter-clockwise direction.
STEP STANDARD:
SAT UNSAT Attempts to turn IPX09098B-HR-VU, HIGH ROOT TO IPX9062B, in the clockwise direction.
CUES: SAT Prompt examinee that IPX09098B-HR-VU does not move in the clockwise direction.
UNSAT COMMENTS:
CR SEQ STEP: 15 Ye Yes Open IPX09098B-HR-VU (AB-400).
CUES: COMMENTS:
Tuesday, December 06, 2005 STEP STANDARD:
Opens IPX09098B-HR-VU, by rotating the valve handwheel in the fully clockwise direction.
SAT UNSAT Page 9 of 12 CR SEQ STEP: 16 No Yes Check XVT09530B-CC (AB-388) valve position and record "AS FOUND" on attachment.
CUES: STEP STANDARD:
Removes the locking device and attempts to turn XVT09530B-CC in the clockwise direction.
Prompt examinee that XVT09530B-CC turns freely in the clockwise direction.
COMMENTS:
COMMENTS:
SAT UNSAT CR SEQ STEP: 17 Ye Yes Close XVT09530B-CC.
CR CR SEQSEQ      STEP:         21 21                                                STANDARD::
CUES: COMMENTS:
STEP STANDARD Ye Ye Yes Yes    Open Open XVT19655B XVT19655B-CC. -CC.                             Opens XVT19655B XVT19655B-CC,       CHG/SI PUMP B
CR SEQ STEP: 18 No Yes Check XVT19654B-CC (AB-388) valve position and record on attachment.
                                                                                              -CC, CHG/Sl                B GB OIL CLR CLG WTR IN        IN VLV, by rotating the valve handwheel fully in the counter counter-clockwise direction.
CUES: STEP STANDARD:
Closes XVT09530B-CC, CCW SPL Y TO CHG PP BOIL CLR BYP VALVE, by rotating the valve handwheel in the fully clockwise direction.
STEP STANDARD:
SAT UNSAT Removes the locking device and attempts to turn XVT19654B-CC in the clockwise direction.
Prompt examinee that XVT19654B-CC turns freely in the clockwise direction.
Student may choose to determine throttled position of the valve. 2.25 turns open. SAT UNSAT COMMENTS:
Tuesday, December 06, 2005 Page 10 of 12 CR SEQ STEP: 19 Ye Yes Open XVT19654B-CC.
CUES: COMMENTS:
CR SEQ STEP: 20 No Yes Check XVT19655B-CC (AB-388) valve position and record "AS FOUND" on attachment.
STEP STANDARD:
Opens XVT19654B-CC, CHG/SI PUMP B OIL CLR CLG WTR INLET VLV, by rotating the valve handwheel in the fully clockwise direction.
STEP STANDARD:
SAT UNSAT Removes the locking device and attempts to turn XVT19655B-CC in the clockwise direction.
CUES: SAT Prompt examinee that XVT19655B-CC turns freely in the clockwise direction.
UNSAT Student may choose to determine "AS FOUND" throttled position.
2.0 turns open. COMMENTS:
CR SEQ STEP: 21 Ye Yes Open XVT19655B-CC.
CUES:
CUES:
CUES:                                                                                            SAT UNSAT UNSA    T COMMENT COMMENTS:    S:
Examiner Examiner ends ends JPM JPM at at this this point.
point.
Tuesday,  December 06, Tuesday, December  06, 2005 2005                                                                              Page 11 Page      of12 11 of 12
SETUP SHEET JPM SETUP JPM          SHEET JPM NO:
]PM    NO: JPPF-166BNRC JPPF-1 66BNRC DESCRIPTION:
DESCRIPTION:            ESTABLISH CHILLED ESTABLISH CHILLED WATER WATER ALTERNATE ALTERNATE COOLING COOLING TO TO CHARGING CHARGING PUMPS PUMPS IC SET:
ICSET:
INSTRUCTIONS:
INSTRUCTIONS:
COMMENTS:
COMMENTS:
Examiner ends JPM at this point. Tuesday, December 06, 2005 STEP STANDARD:
Opens XVT19655B-CC, CHG/SI PUMP B GB OIL CLR CLG WTR IN VLV, by rotating the valve handwheel fully in the clockwise direction.
SAT UNSAT Page 11 of 12 JPM SETUP SHEET ]PM NO: JPPF-166BNRC DESCRIPTION:
ESTABLISH CHILLED WATER ALTERNATE COOLING TO CHARGING PUMPS ICSET: INSTRUCTIONS:
COMMENTS:
COMMENTS:
Tllesday, December 06, 2005 Page 12 of 12   
Tuesday, Tllesday, December 06, 2005 December 06, 2005                                                  Page 12 Page     of12 12 of 12
 
V.C. SUMMER v.C. SUMMER NUCLEAR  NUCLEAR STATION  STATION JOB      PERFORMANCE MEASURE JOB PERFORMANCE                      MEASURE JPM
                                ]PM          JPP-052 JPP-052 STARTUP AA BATTERY STARTUP    BATTERY CHARGER CHARGER APPROVAL: DOW APPROVAL:  DOW      APPROVAL DATE:
APPROVAL  DATE: 7/12/2005 7/12/2005 REVNO:
REV  NO: 88 CANDiDATE CANDIDATE EXAMiNER:
EXAMINER:
THIS JPM IS APPROVED THIS
: Tuesday, Tuesday,December December06, 2005 06,2005                                              Page    of9 Page11of 9
 
TASK:
TASK:
063-007-01 063-007        -04 04              PLACE AA BATTERY PLACE        BATTERYCHARGER CHARGER IN    IN SERVICE SERVICE TASKSTANDARD:
TASK    STANDARD:
Bus 11HB Bus    HB isis supplied supplied from from the the swing swing charger charger XBC-1 XBC-1A/1AllB.
B. The The use use ofof applicable applicable Human Human Performance Performance Tools  (3-way    communicati Tools (3-way communications,    ons, self self checking, checking, peer peer checking, checking, phonetic phonetic alphabet, alphabet, etc) etc) and and industrial industrial safety practices safety  practices meets meets expectations.
expectations.
PREFERRED EVALUATION PREFERRED          EVALUATiONLOCATION LOCATION                        PREFERRED EVALUATION PREFERRED            EVALUATION METHOD  METHOD PLANT PLANT                                                                      SIMULATE SIMULATE


v.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE ]PM JPP-052 STARTUP A BATTERY CHARGER APPROVAL:
==REFERENCES:==
DOW APPROVAL DATE: 7/12/2005 REV NO: 8 CANDIDATE EXAMINER:
THIS JPM IS APPROVED Tuesday, December 06,2005 Page 1 of9 TASK: 063-007 04 PLACE A BATTERY CHARGER IN SERVICE TASK STANDARD:
Bus 1 HB is supplied from the swing charger XBC-1 A/1 B. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.
PREFERRED EVALUATION LOCATION PLANT PREFERRED EVALUATION METHOD SIMULATE


==REFERENCES:==
==REFERENCES:==
50P-311 SOP-311                      125 VDC 125  VDC SYSTEM SYSTEM TOOLS:
TOOLS:              SOP-31 1 SOP-311      SECTION SECTION      IV.D (PG.
IV.D  (PG. 6) 6)
SOP-31 SOP-3111    SECTION SECTION      IV.Q  (PGS 27 IV.Q (PGS    27 - 29)
                                                                - 29)
EVAL(JA TION TIME EVALUATION          TIME                  15 15          TIME      CRITICAL TIME CRITICAL            No No        10CFR55:
10CFR5S: 45(a)8 45(a)8 CANDIDATE:
CANDIDATE:                                                                              TIME TIME START:
START:
TIME TIME FINISH:
FiNISH:
PERFORMANCE RATING:
PERFORMANCE                              SAT:                UNSAT:
QUESTION GRADE:                        PERFORMANCE PERFORMANCE EXAMINER:
EXAMINER:
SIGNATURE SIGNATURE                      DATE COMMENTS:
COMMENTS:
: inesday, Tuesday, December December06, 06, 2005 2005                                                                                      Page22 of Page    0/99


SOP-311 125 VDC SYSTEM TOOLS: SOP-311 SECTION IV.D (PG. 6) SOP-311 SECTION IV.Q (PGS 27 -29) EVALUATION TIME 15 TIME CRITICAL No lOCFR55: 45(a)8 CANDIDATE:
INSTRUCTIONS TO INSTRUCTIONS                  TO OPERATOR OPERATOR READ TO READ        OPERATOR:
TIME START: TIME FINISH: PERFORMANCE RATING: SAT: UNSAT: QUESTION GRADE: PERFORMANCE EXAMINER:
TO OPERATOR:
SIGNATURE DATE COMMENTS:
WHEN II TELL WHEN       TELL YOU YOU TO      BEGIN, YOU TO BEGIN,     YOU ARE ARE TO TO PERFORM PERFORM THE  THE ACTIONS ACTIONS AS AS DIRECTED DIRECTED IN  IN THE THE INITIATING INITIATING CUES. II WILL CUES.     WILL DESCRIBE DESCRIBE THE    THE GENERAL GENERAL CONDITIONS CONDITIONS UNDER  UNDER WHICH WHICH THIS THIS TASK TASK ISIS TO TO BE BE PERFORMED PERFORMED AND PROVIDE AND    PROVIDE THETHE NECESSARY NECESSARY TOOLS TOOLS WITH WITH WHICH WHICH TO TO PERFORM PERFORM THISTHIS TASK.
Tuesday, December 06, 2005 Page 2 0/9 INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
TASK. BEFORE BEFORE STARTING, STARTING, II WILL  EXPLAIN  THE  INITIAL WILL EXPLAIN THE INITIAL CONDITIONS,CONDITIONS, WHICHWHICH STEPSSTEPS TO TO SIMULATE SIMULATE OR  OR DISCUSS, DISCUSS, AND  AND PROVIDE PROVIDE INITIATING CUES.
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.
INITIATING   CUES. WHEN WHEN YOU  YOU COMPLETE COMPLETE THE    THE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE  THE OBJECTIVE OBJECTIVE FOR   FOR THISTHIS JOB JOB PERFORMANCE MEASURE PERFORMANCE        MEASURE WILL          BE SATISFIED.
WILL BE SATISFIED.
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
PPE INITIAL CONDITION:
SAFETY      CONSIDERATiONS:                PPE PPE INITIAL CONDITION:
Battery charger 1 B is to be removed from service for scheduled maintenance.
INITIAL    CONDITION: Battery Battery charger charger 11 BB is is to be be removed removed from from service for scheduled scheduled maintenance. DPN-1 maintenance.     DPN-1 HB   HB must must be  transferred to be transferred to swing swing charger charger XBC-1 XBC-1 A- A-11 B.
DPN-1 HB must be transferred to swing charger XBC-1 A-1 B. DC OUTPUT and AC INPUT breakers on the swing charger are open. The swing battery charger "B" Train supply breaker from XMC-1 DB2Y is closed and all breakers on XET-4003-ED are open, with the keys in Train 'A' AC & DC. INITIATING CUES: Control room directs startup of the swing charger XBC-1A11 B, connection to bus 1 HB, and removal of 1 B charger from service in accordance with SOP-311. AT NO TIME ARE YOU TO OPERA TE ANY PLANT EQUIPMENT!
B. DC DC OUTPUT and   and AC AC INPUT INPUT breakers breakers on on the the swing swing charger charger are are open.
HAND ]PM BRIEFING SHEET TO OPERATOR AT THIS TIME! Tuesday, December 06, 2005 Page 3 0/9 JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
open.
The swing battery charger "B"     B Train supply breaker from XMC-1 DB2Y is closed and all breakers closed          breakers on XET-4003-ED XET-4003-ED are open, with the keyskeys inin Train A AC & DC.
                            'A' iNITIATING CUES: Control room directs startup of the swing charger XBC-1A11 INITIATING                                                                          XBC-1 All B, connection to bus 11 HB, and removal of 11 B charger from service in accordance with SOP-311.
A AT T NO TIME A                ARE RE YOU TO OPERA TE ANY PLANT EQUIPMEN            EQUIPMENT!                    T!
HAND JPM]PM BRIEFING BRIEFING SHEET TO OPERATOR AT THIS TIME!
: Tuesday, Tuesday, December 06, 2005 December 06  2005                                                                                  Page 33 of Page     0/99
 
JPM       BRIEFING SHEET JPM BRIEFING                      SHEET OPERA TOR INSTRUCTIONS:
OPERATOR       INSTRUCTIONS:
SAFETY CONSIDERATIONS:
SAFETY CONSIDERATIONS:
PPE INITIAL CONDITION:
SAFETY      CONSIDERATIONS:                  PPE PPE INITIAL CONDITION:
Battery charger 1 B is to be removed from service for scheduled maintenance.
INITIAL      CONDITION: Battery  Battery charger charger 11 BB isis to to be be removed removed from from service service for for scheduled scheduled maintenance. DPN-1 maintenance.      DPN-1HB        must be HB must       be transferred transferred to to swing swing charger charger XBC-1 XBC-1A- A-1lB. DC OUTPUT B. DC   OUTPUT and  and AC  AC INPUT IN PUT breakers breakers on  the swing on the   swing charger charger are are open.
DPN-1 HB must be transferred to swing charger XBC-1 A-1 B. DC OUTPUT and AC INPUT breakers on the swing charger are open. The swing battery charger "B" Train supply breaker from XMC-1 DB2Y is closed and all breakers on XET-4003-ED are open, with the keys in Train 'A' AC & DC. INITIATING CUES: Control room directs startup of the swing charger XBC-1A11 B, connection to bus 1 HB, and removal of 1 B charger from service in accordance with SOP-311. AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!
open.
HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK. Tuesday, December 06, 2005 Page 4 of9 STEPS CR SEQ STEP: 1 Ye Yes Align swing charger (IB-412-Swing Charger Room) to "B" Train. STEP STANDARD:
The swing The   swing battery battery charger charger "B"     B Train Train supply   breaker from supply breaker    from XMC-1 XMC-1 DB2Y DB2Y isis closed and closed   and all all breakers breakers on   on XET-4003-ED XET-4003-ED are are open, open, with with the the keys keys inin Train Train AAC&DC.
Closes TRAIN B-AC breaker and Train DC breaker for battery charger 1 A-1 B on XET -4003-ED using key interlocks.
                                'A' AC & DC.
CUES: SAT The keys swap in a criss-cross pattern (Train "A" AC to Train "B" DC and Train "A" UNSAT DC goes to Train "B" AC). If the operator tries to swap AC to AC or DC to DC inform him that the key will not turn. COMMENTS:
INITIATING CUES:
CR SEQ STEP: 2 Ye Yes Verifies charger set up for float voltage. . CUES: COMMENTS:
INITIATING      CUES: Control Control room room directs   startup of directs startup            the swing of the  swing charger charger XBC-1A11 XBC-1 All B, B, connection connection to bus to bus 11 HB, HB, and and removal removal of   of 11 BB charger charger from from service service in    accordance with in accordance   with SOP-311.
CR SEQ STEP: 3 No Yes Checks the feeder breaker from the swing charger to "B" Train open. CUES: COMMENTS:
SOP-311.
Tuesday, December 06, 2005 STEP STANDARD:
AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!  EQUIPMENT!
Places FLOAT/EQUALIZER Switch in the FLOAT position ON XBC1 A-1 B . STEP STANDARD:
HAND THIS PAPER BACK TO YOUR EVALUATO EVALUATOR                     R WHEN YOU FEEL THAT YOU HAVE SATISFACT  SATISFACTORILY                 ORILY COMPLETE        COMPLETED                     D THE ASSIGNED TASK.
SAT UNSAT Checks DPN-1HB-ED BKR 13, BATTERY CHARGER 1A-1B FEED TO DPN 1HB is in the OFF position.
Tuesday,  December06, Tuesday, December 06, 2005 2005                                                                                            Page 44 of Page    of99
SAT UNSAT Page 50f9 CR SEQ STEP: 4 Ye Yes Starts up the swing charger. CUES: COMMENTS:
 
CR SEQ STEP: 5 No Yes Checks output voltage. STEP STANDARD:
STEPS STEPS CR SEQ CR    SEQ        STEP:
Closes the DC OUTPUT (CB2) and AC INPUT (CB1) breakers on battery charger XBC1 A-1 B in the ON position.
STEP:          11                                              STEP STANDARD:
STEP STANDARD:
STEP    STANDARD:
SAT UNSAT Checks DC OUTPUT VOLTMETER stabilizes at 131-137 volts. CUES: SAT When operator points to DC OUTPUT VOLTMETER and indicates expected voltage, UNSAT inform the operator that voltage is 133 volts. COMMENTS:
Ye Yes Ye   Yes     Align  swing charger Align swing     charger (IB-412-Swing (IB-41 2-Swing Charger Charger         Closes TRAIN Closes    TRAIN B-AC B-AC breaker breaker and and Train Train B-B-Room) to Room)     to "B" B Train.
CR SEQ STEP: 6 No Yes Verifies capacitors charged. CUES: STEP STANDARD:
Train.                                      DC breaker DC   breaker for for battery battery charger charger 11 A-1 A-i BB on on XET-4003-E XET  -4003-ED D using using key key interlocks.
Waits approximately 5 (to 10) seconds, then checks red indicator lights on capacitor cabinet XPN5294-ED lit. When operator shows location of indicator lights, inform him that light are on. COMMENTS:
interlocks.
SAT UNSAT Tuesday, December 06, 2005 Page 60f9 CR SEQ STEP: 7 Ye Yes Puts swing charger on 1 HB. CUES: In 1 B Battery Charger Room. COMMENTS:
CUES:
CR SEQ STEP: 8 Ye Yes Removes XBC1 B from service. CUES: STEP STANDARD:
CUES:                                                                                                      SAT SAT The keys The  keys swap swap in in aa criss-cross criss-cross pattern pattern (Train (Train "A" A AC AC to to Train Train "B" B DC DC and and Train    A UNSAT Train "A"   UNSAT DC  goes  to  Train  B DC goes to Train "B" AC). AC). IfIf the the operator operator tries tries to to swap swap AC    to AC AC to AC or  DC to or DC to DC DC inform inform him that the key him that      key will  not turn.
Places DPN-1 HB-ED 13, BATTERY CHARG ER 1 A-1 B FEED to DPN-1 HB in the ON position.
will not   turn.
STEP STANDARD:
COMMENTS:
SAT UNSAT Places breaker DPN-1 HB-ED 11, BATTERY CHARGER 1 B FEED TO DPN1 HB in the OFF position.
COMMENTS:
When requested, inform examinee of the following initial conditions:
CR SEQ CR              STEP:         2                                               STEP STANDARD:
SAT UNSAT The FLOAT/EQUALIZER switch is in the FLOAT position.
STANDARD:
The battery charger timer for XBC-1 B is set at 0 hours and 0 minutes. (Section IV.D Step 2.2) COMMENTS:
Ye Yes       Verifies charger set up for float voltage.                     Places FLOAT/EQUALIZER FLOAT/EQUALIZER Switch in the FLOAT position ON XBC1 A-1     A-i B B..
CR SEQ STEP: 9 No Yes Opens XBC1 B DC OUTPUT and AC INPUT breakers.
    . CUES:                                                                                                      SAT UNSAT UNSA T COMMENTS:
STEP STANDARD:
COMMENTS:
Places DC OUTPUT and AC INPUT breakers on XBC1 B in the OFF position.
CR SEQ          STEP:          3                                              STEP STANDARD:
CUES: SAT When requested, inform examinee that the "BATT CHGR TRBL" alarm was received UNSAT on the main control board. COMMENTS:
STANDARD:
Tuesday, December 06, 2005 Page 70f9 CR SEQ STEP: 10 Ye Yes Verifies swing charger picks up load and establishes a float charge on the battery. CUES: STEP STANDARD:
No Yes        Checks the feeder breaker from the swing                                  DPN-1 HB-ED BKR 13, BATTERY Checks DPN-1HB-ED charger to "B" B Train open.                                  CHARGER 1A-1B lA-lB FEED TO DPN 1HB      1HB is in the OFF position.
Verifies Ammeter moves upscale and DC VOLTMETER indicates 133-135 volts on XBC1A-1B.
CUES:                                                                                                      SAT UNSAT UNSA    T COMMENT COMMENTS:      S:
Cue operator that Swing Charger ammeter indicates 35 amps and voltmeter indicates 134 VDC when requested.
Tuesday, December O6 Tuesday, December  06, 2005 2005                                                                                          Page 550f9 Page    of 9
SAT UNSAT COMMENTS:
 
Examiner ends JPM at this point. Tuesday, December 06, 2005 Page8of9 JPM SETUP SHEET ]PM NO: JPP-052 DESCRIPTION:
CR SEQ CR    SEQ        STEP:
STARTUP A BATTERY CHARGER ICSET: INSTRUCTIONS:
STEP:          44                                        STEP STANDARD:
STEP     STANDARD:
Ye Yes Ye   Yes     Starts up Starts  up the the swing swing charger.
charger.                                 the DC Closes the Closes        DC OUTPUT OUTPUT (CB2)
(CB2) and and AC AC IN PUT  (CB1) breakers INPUT (CB1)         breakers onon battery battery charger charger A-lB XBC1 A-1 XBC1        B inin the the ON ON position.
position.
CUES:
CUES:                                                                                                SAT SAT UNSAT UNSA T COMMENTS:
COMMENTS:
CR SEQ CR    SEQ        STEP:
STEP:          55                                        STEP STEP STANDARD:
STANDARD:
No Yes No            Checks output voltage.
Checks                                                    Checks DC Checks     DC OUTPUT OUTPUT VOLTMETER 131-137 volts.
stabilizes at 131-137 CUES:                                                                                               SAT When operator points to DC OUTPUT VOLTMETER and indicates expected voltage,                                 UNSAT inform the operator that voltage is 133 volts.
COMMENTS:
COMMENTS:
CR SEQ         STEP:         6                                         STEP STANDARD:
STANDARD:
No Yes No            Verifies capacitors charged.                             Waits approximatel approximately   y 5 (to 10) seconds, then checks red indicator lights on capacitor cabinet XPN5294-ED lit.
CUES:                                                                                                SAT When operator shows locationlocation of indicator lights, inform him that light are on.           UNSAT COMMENT COMMENTS:    S:
luesday, Tuesday, December 06, 2005 December 06,  2005                                                                                    Page 660f9 Page   of 9
 
CR SEQ CR    SEQ          STEP:
STEP:        77                                      STEP STEP STANDARD:
STANDARD:
Ye Yes Ye    Yes        Puts swing Puts   swing charger charger onon 11HB.
HB.                     Places DPN-1 Places  DPN-1HB-ED HB-ED 13, 13, BATTERY BATTERY CHARGER CHARG   ER 1lA-lB A-1 B FEED FEED toto DPN-1 DPN-1HBHB inin the the ON position.
ON  position.
CUES:
CUES:                                                                                            SAT SAT In 11 BB Battery In        Battery Charger Charger Room.
Room.                                                          UNSAT UNSAT COMMENTS:
COMMENTS:
CR SEQ CR    SEQ            STEP:
STEP:        88                                      STEP STEP STANDARD:
STANDARD:
Ye Yes Ye  Yes        Removes XBC1 Removes      XBC1 BB from from service.
service.                Places breaker Places breaker DPN-1 DPN-1 HB-ED H B-ED 11, 11, BATTERY BATTERY CHARGER 11 B CHARGER       B FEED FEED TOTO DPN1 DPN1 HBHB in in the the OFF position.
OFF  position.
CUES:
CUES:                                                                                            SAT When requested, When       requested, inform examinee of the following initial conditions:                   UNSAT The    FLOAT/EQU The FLOAT/EQUALIZER   ALIZER switch is in the FLOAT position.
The    battery The battery     charger   timer for XBC-1 B is set at 0 hours and 0 minutes.
(Section IV.D (Section          Step 2.2)
IV.D Step COMMENTS:
COMMENTS:
CR SEQ CR   SEQ         STEP:         9                                       STEP STANDARD:
No No Yes Yes        Opens XBC1 B DC OUTPUT and AC INPUT                   Places DC OUTPUT and AC INPUT breakers.                                            breakers on XBC1 B in the OFF position.
position.
CUES:
CUES:                                                                                           SAT When      requested,    inform  examinee    that When requested, inform examinee that the "BATT   the BATT CHGR CHGR TRBL TRBL" alarm alarm was was received received         UNSAT on the on  the main main control control board.
board.
COMMENT COMMENTS:        S:
Tuesday, December Tuesday,  December O6 06, 2005 2005                                                                            Page 770f9 Page   of 9
 
CR SEQ CR    SEQ        STEP:
STEP:         1010                                      STEPSTANDARD:
STEP     STANDARD:
Ye Yes Ye    Yes      Verifiesswing Verifies   swingcharger chargerpicks picksup upload loadand and         VerifiesAmmeter Verifies  Ammetermoves movesupscale upscaleand andDC DC establi shesaafloat establishes        floatcharge chargeon  thebattery.
onthe    battery.        VOLTMETERindicates VOLTMETER                 133-135 voltson indicates133-135 volts   on XBC1A-1 B.
XBC1A-1B.
CUES:
CUES:                                                                                          SAT SAT Cueoperator Cue   operatorthat thatSwing Swing Charger Chargerammeter ammeterindicates indicates35 35amps ampsandandvoltmeter voltmeter     UNSAT UNSAT indicat es  134 VDC    when  reques indicates 134 VDC when requested.       ted.
COMMENTS:
COMMENTS:
Exami Examinerner ends ends JPM JPM atat this this point.
point.
Tuesday, December 06, 2005                                                                               Page8of9 Tuesday, December 06, 2005                                                                            Page 8 of 9
 
JPM SETUP JPM  SETUPSHEET SHEET JPMNO:
]PM           JPR-052 NO: JPP-052 DESCRIPTION: STARTUP DESCRIPTION:          STARTUPAABATTERY BATTERY CHARGER CHARGER IC SET:
ICSET:
INSTRUCTIONS:
INSTRUCTIONS:
COMMENTS:
COMMENTS:
COMMENTS:
Tuesday, December 06, 2005 Page 9 of9}}
Tuesday, Tuesday,December December06, 06,2005 2005                              Page99of Page   of9 9}}

Latest revision as of 23:14, 11 March 2020

301 Draft Sim/In-Plant JPMs (Section 5)
ML101620416
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/28/2010
From:
NRC/RGN-II
To:
Pacific Gas & Electric Co
References
50-395/05-301, JPSF-025NRC 50-395/05-301
Download: ML101620416 (132)


Text

V.C. SUMMER NUCLEAR STATION v.C.

JOB PERFORMANCE MEASURE

]PM JPM JPSF-025NRC JPSF-O25NRC START AND LOAD START LOAD "A" A EMERGENCY EMERGENCY DIESEL DIESEL GENERATOR GENERATOR APPROVAL: APPROVAL DATE:

REVNO:

REV NO: 6 CANDIDATE EXAMiNER:

EXAMINER:

THIS JPM IS NOT APPROVED

Tuesday, Tuesday, December December 06, 06, 2005 2005 Page 11 f Page of12 12

TASK:

TASK:

064-003-01 -01 064-003-01-01 LOAD THE LOAD THE DIESEL DIESEL GENERATOR GENERATOR TASK STANDARD:

TASK STANDARD:

Examinee trips Examinee trips diesel diesel due due to overload. The to overload. The use of applicable use of applicable Human Human Performance Performance Tools Tools (3-way (3-way communications, self communications, self checking, checking, peer peer checking, checking, phonetic phonetic alphabet, alphabet, etc) etc) and and industrial industrial safety safety practices practices meets expectations.

meets expectations.

PREFERRED EVALUATION PREFERRED EVALUATION LOCATION LOCATION PREFERRED EVALUATION PREFERRED EVALUATION METHOD METHOD SIMULATOR SIMULATOR PERFORM PERFORM

REFERENCES:

REFERENCES:

SSCB-IV-7 SSCB-IV-7 DIESEL GENERATOR POWER DIESEL GENERATOR POWER FACTOR, FACTOR, CURRENT CURRENT VS. VS. LOAD LOAD SOP-306 SOP-306 EMERGENCY DIESEL EMERGENCY DIESEL GENERATOR GENERATOR TOOLS: Calculator Calculator SOP-306, EMERGENCY SOP-306, EMERGENCY DIESEL DIESEL GENERATOR GENERATOR EVALUATION TIME EVALUATION 25 TIME CRITICAL No 10CFR55:

10CFR55: 45(a)8 CANDIDATE:

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING:

PERFORMANCE SAT: UNSAT:

QUESTION GRADE: PERFORMANCE EXAMINER EXAMINER::

SIGNATURE DATE COMMENTS:

COMMENTS:

Tuesday, December Tuesday, December 06, 06, 2005 2005 Page 0/12 Page 22 of 12

INSTRUCTIONS TO INSTRUCTIONS TO OPERATOR OPERATOR READ TO READ TO OPERATOR:

OPERATOR:

WHEN II TELL WHEN TELL YOU YOU TO BEGIN, YOU TO BEGIN, YOU ARE ARE TO PERFORM THE TO PERFORM THE ACTIONS ACTIONS ASAS DIRECTED DIRECTED IN IN THE THE INITIATING INITIATING CUES. II WILL CUES. WILL DESCRIBE DESCRIBE THE THE GENERAL GENERAL CONDITIONS CONDITIONS UNDER UNDER WHICH WHICH THIS THIS TASK TASK IS IS TO TO BEBE PERFORMED PERFORMED AND PROVIDE THE AND PROVIDE THE NECESSARY NECESSARY TOOLS WITH WHICH TOOLS WITH WHICH TO TO PERFORM PERFORM THIS THIS TASK.

TASK. BEFORE BEFORE STARTING, STARTING, II WILL EXPLAIN THE WILL EXPLAIN INITIAL CONDITIONS, THE INITIAL CONDITIONS, WHICH WHICH STEPS STEPS TOTO SIMULATE SIMULATE OROR DISCUSS, DISCUSS, ANDAND PROVIDE PROVIDE INITIATING CUES.

INITIATING CUES. WHEN WHEN YOU YOU COMPLETE COMPLETE THE THE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE THE OBJECTIVE OBJECTIVE FOR FOR THIS THIS JOB JOB PERFORMANCE MEASURE PERFORMANCE MEASURE WILL WILL BE BE SATISFIED.

SATISFIED.

CONSIDERATIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION: The plant is operating at 100% power with normal AC power available to Maintenance Work Week. Relay testing is in progress all buses. It is A2 Maintenance on 11 DA which has necessitated the removal of 11 DA from NORMAL NORMAL and EMERGENCY feed. Station and Operations Management Management have given approval for this work due to recent OE concerning maintenance of these A DIG relays. "A" D/G is to be started and loaded onto bus 11 DA. Bus 11 DA will then be divorced from its NORMAL and EMERGENCY power sources until completion of testing. All pre-start check steps have been completed.

INITIATING CUES: CRS directs starting and loading of "A" A DIG D/G per SOP-306,Section IV.A, Steps 2.2.j thru 2.5.

HAND JPMjPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

Tuesday, December Tuesday, 06, 2005 December 06, 2005 Page 12 0/12 Page 33 of

]PM BRIEFING SHEET JPM OPERA TOR iNSTRUCTIONS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION: The plant is operating at 100% power with normal AC power available to all buses. It is A2 Maintenance Work Week. Relay testing is in progress on 11 DA which has necessitated the removal of 1 1 DA from NORMAL and EMERGENCY feed. Station and Operations Management have given approval for this work due to recent OE concerning maintenance of these A DIG is to be started and loaded onto bus 11 DA. Bus 11 DA will relays. "A" then be divorced from its NORMAL and EMERGENCY power sources until completion of testing. All pre-start check steps have been completed.

INITIATING CUES: A DIG CRS directs starting and loading of "A" D/G per SOP-306,Section IV.A, lV.A, Steps 2.2.j thru 2.5.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Tuesday, December 06, 2005 Page 4 oJ12 of 12

STEPS CR SEQ STEP: 11 STEP STANDARD:

No Yes No Yes Depress the GEN RELAYS Depress RELAYS RESET RESET Pushbutton Pushbutton DG DG A GEN GEN RELAYS RELAYS RESET RESET Pushbutton Pushbutton is is Depressed Depressed CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No Yes Momentarily place the EXCITER Switch to DG A EXCITER SWITCH taken to RESET RESET CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

No Yes Ensure DG A AUTOSTART NOT READY (XCP- DG A AUTO START NOT READY alarm is 636 1-2) Annunciator is clear clear CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 2005 PageS Page 5 of of12 12

CR SEQ CR STEP: 44 STEP STANDARD:

No No No No Verify AnQunciator Verify Annunciator XCP-636 1-2, 1-2, DG DG A Verifies Annunciator XCP-636 Verifies XCP-636 1-2, 1 -2, DG DG A A AUTOSTART NOT NOT READY, READY, is is clear.

clear. AUTOSTART NOT AUTOSTART NOT READY, READY, is is clear.

clear.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

No No The READY FOR AUTO START light is lB operator and verifies the Calls the IB illuminated at the DIG Local Control Panel READY FOR AUTO START" "READY START light is lit at A DIG the "A" D/G Local Control Panel.

CUES: SAT CUE: When requested, as the IB lB operator, inform the operator that the "READY READY FOR UNSAT START light is lit at the "A" AUTO START" A DIG D/G Local Control Panel.

COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

Ye Yes A Diesel Generator TEST switch to Place "A" A Diesel Generator Momentarily rotates "A" START. TEST switch to the START position.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 2005 December 06, 2005 Page 660f12 of 12

CR SEQ STEP: 7 STEP STANDARD:

No Yes Verify DIG starts and accelerates to 58.9 -

- DG A VOLTS indicates 6800-7600 volts volts, 61.1 Hertz and 6800-7600 volts. and FREQUENCY indicates 58.9 - 61.1-Hertz.

CUES: SAT CUE: For purposes of time compression, examiner should inform examinee that 10 UNSAT minutes has elapsed since the DIG was started. This in reference to Note 2.4 in the procedure..

procedure ..

COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

No No Ensure VOLT REG switch is in AUTO. VOLT REG switch for the 'A'A DIG indicates AUTO.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 9 STEP STANDARD:

Ye Yes Place the DG A SYNC SEL switch in DSL. DG A SYNC SEL switch indicates DSL.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 2005 Page 7 of 12

CR SEQ CR SEQ STEP:

STEP: 10 10 STEP STEP STANDARD:

STANDARD:

No No No No Monitor voltage Monitor voltage on DA SYNC on 11 DA SYNC VOLTS VOLTS and and Locates 11 DA Locates DA SYNC SYNC VOLTS VOLTS andand SYNC SYNC SYNC VOLTS.

SYNC VOLTS. VOLTS meters VOLTS meters and monitors voltage.

and monitors voltage.

CUES:

CUES: SAT SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ CR STEP: 11 11 STEP STANDARD:

Ye NoNo SYNC VOLTS Adjust SYNC VOLTS to to slightly slightly higher higher than VOLT REGREG RAISE LOWER switch RAISE LOWER switch used used to 11 DA SYNC VOLTS using VOLT REG RAISE adjust DG 'A'A SYNC VOLTS slightly higher LOWER. than 11 DA SYNC VOLTS. Only critical if adjustment is necessary.

CUES: SAT NOTE: Only critical if adjustment is necessary. UNSAT COMMENTS:

CR SEQ STEP: 12 STEP STANDARD:

Ye No Adjust Diesel Generator "A" A frequency to A SPEED switch used to adjust DIG DG 'A' synch roscope to rotate slowly in the cause synchroscope SYNCH ROSCOPE rotates speed so that SYNCHROSCOPE FAST direction using SPEED switch. slowly in the FAST direction.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December December 06, 06, 2005 2005 Page 88 of Page of12 12

CR SEQ CR SEQ STEP:

STEP: 13 13 STEP STEP STANDARD:

STANDARD:

Ye Yes Ye Yes When synchroscope When synchroscope isis in proper position, in proper position, When synchroscope When synchroscope isis between between 1111 close BUS close BUS 11 DA DA DG DG FEED FEED breaker.

breaker. oclock and o'clock and 12 12 o'clock, oclock, closes closes BUS BUS 11 DA DA DG DG FEED FEED breaker.

breaker.

CUES:

CUES: SAT SAT UNSAT 1JNSA T COMMENTS:

CR SEQ CR STEP: 14 14 STEP STANDARD:

No Yes Verify breaker 11 DA DG FEED breaker closed. Bus 11 DA DG FEED breaker breaker indicates red light ON, green light OFF.

light CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 15 STEP STANDARD:

No Yes Using the SPEED Switch, adjust load as DG A SPEED Switch is used to adjust necessary while monitoring KILOWATTS KILOWATTS Meter, AMPS Meter and Meter, AMPS Meter and KILOVARS Meter KILOVARS Meter as necessary. Should raise load to between 850 and 1000 1000 KW.

CUES: SAT CUE: For purposes of time compression, examiner should inform examexaminee 10 UNSAT inee that 10 minutes has elapsed after raising load to between 850 and 1000 1000 KW..

KW ..

COMMENTS:

Tuesday, December 06, 2005 December 06, 2005 Page 9 of Page of 12 12

CR SEQ CR SEQ STEP:

STEP: 16 16 STEP STEP STANDARD:

STANDARD:

No No No No Place DIG Place DIG 'A' SYNC SEL A SYNC SEL switch switch in in OFF.

OFF. DG A DG A SYNC SYNC SEL SEL switch switch indicates indicates OFF.

OFF.

CUES:

CUES: SAT SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ STEP: 17 STEP STANDARD:

No Yes No Using the Using the VOLT VOLT REG REG RAISE-LOWER RAISE-LOWER Switch, Switch, DG A VOLT REG DG REG RAISE-LOWER RAISE-LOWER Switch Switch is is adjust KILOVARS adjust KILOVARS used to adjust KILOVARS used KILO VARS CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 18 STEP STANDARD:

No Yes Utilizing Enclosure C, estimate the present load Uses Enclosure C to estimate current 11 DA on 1 1 DA. KW loading (approximately 2850 pluspIus or minus 50 KW).

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, Decein her 06, December 06, 2005 2005 Page 10 Page of 12 100/12

SOP-306 SO P-306 ENCLOSURE ENCLOSURE C C PAGE PAGE 11 OF OF 11 REVISION REVISION 16 16 EQUIPMENT KW TRAIN A EQUIPMENT KW RATINGS RATINGS KW KW EQUIPMENT EQUIPMENT RATING EQUIPMENT EQUIPMENT RATING Component Cooling Water Pump -- Slow (Y)

-- A= = 205 RBCUs -- Slow (N)

Fast(N)

Fast (N) Fast (Y = 1)

(Y=1) 187 Service Water Pump A= = 531 AB Charcoal Exhaust Fan (2) == 204 Service Water Booster Pump (No) FHB Exhaust Fan 46 Charging Pump A = 686 A=686 HVAC Chilled Water Pump AA=40

= 40 RHR Pump (No) HVAC Chiller 280 Emergency Feedwater Pump (No) XMC 1DA2X 180 RB Spray Pump (No) XMC1DA2Y 142 142 Spent Spent Fuel Cooling Cooling Pump 50 XMC1DA2Z 107 107 UPS UPS Inverter Inverter 106 106 XMC1EA1X 77 77 CHG CHG AA Pzr Pzr Backup Heaters Heaters (No)

(No) TOTAL  :::::2850 KW 2850 L _____________

Note Note 1: The actual 1: The KW Rating actual KW may be Rating may be varied by adjusting varied by adjusting the the number number of of heaters heaters in in service.

service.

CR SEQ CR SEQ STEP:

STEP: 19 19 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Using the Using SPEEDSwitch, the SPEED adjust DG Switch, adjust DG A A load load Operator attempts Operator attempts to to increase increase load load and and until the until the estimated estimated XSW1 XSW1 DADA load load isis being being will will be be unable unable toto control control KW KW since the DIG since the DIG carried by carried DG A.

by DG A. will malfunction. Indicated will malfunction. Indicated KW 1KW will will increase increase to approximately 5000 to approximately 5000 KWKW with with the operator the operator unable unable to control DIG to control D/G load.

load.

CUES: SAT CUE: For purposes of time compression, examiner should inform examinee that 10 10 UNSAT minutes has minutes has elapsed.

elapsed. The A DIG load will increase due D/G load due to the inserted inserted malfunction malfunction load increase once load increase is is started started...

COMMENTS:

CR SEQ STEP: 20 STEP STANDARD:

Ye Yes Operator trips the "A" A DG "A" A DG is tripped CUES: SAT CUE: Examiner ends the JPM at this point UNSAT COMMENTS:

Examiner ends JPM at this point.

Tuesday, December Tuesday, December 06, 06, 2005 2005 Page 11 Page of12 11 of 12

JPM SETUP SHEET JPM SETUP SHEET JPM NO:

]PM NO: JPSF-025NRC JPSF-O25NRC DESCRIPTION:

DESCRIPTION: START AND LOAD START AND LOAD "A" A EMERGENCY EMERGENCY DIESEL DIESEL GENERATOR GENERATOR ICSET:

IC SET: 10 10(100%

(100%

INSTRUCTIONS:

INSTRUCTIONS:

1. When student is
1. is ready; RUN RUN
2. Insert malfunction when examinee
2. Insert examinee raises from 950 KWKW to 2250 (514 RPM-518 2250 KW (514 RPM-518 RPMRPM over over 10 10 minutes.)

minutes.)

COMMENTS:

JPM Initial Condition of "Cylinder Monitoring was intentionally used Cylinder Monitoring" used to prevent requiring STP-125.002 attachments from having to be available. Also to prevent having to have a stopwatch available. This is too much effort to test the same skills as in SOP-306.

Tuesday, December Tuesday, December 06, 06, 2005 2005 Page 12 of Page 12 of12 12

V.C. SUMMER v.C. SUMMER NUCLEAR NUCLEAR STATION STATION JOB PERFORMANCE MEASURE JOB PERFORMANCE MEASURE JPM

]PM JPSF-059 JPSF-059 ALTERNATE ISOLATION ALTERNATE ISOLATION OF OF RUPTUREDS/G RUPTURED S/G ('e (C' MSIV)

MSIV)

APPROVAL:

APPROVAL: APPROVAL DATE:

APPROVAL DATE:

REVNO:

REV NO: 1111 CANDIDATE CANDIDATE EXAMINER:

EXAMJNER:

THIS JPM IS NOT APPROVED Tuesday, December06, Tuesday, December 06, 2005 2005 Page11 of Page of12 12

TASK:

TASK STANDARD:

The 'e' C S/G is completely isolated from the 'A' A and 'B' B S/G's S/Gs per EOP-4.0, steps 3.a - 3h, and step 3.i

- 3.1 alternate actions. The use of applicable Human Performance Tools (3-way communications, self-checking, peer checking, phonetic alphabet, etc.) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD SIMULATOR PERFORM

REFERENCES:

EOP-4.0 STEAM GENERATOR TUBE RUPTURE TOOLS: EOP-4.0 EVALUATION TIME 20 TIME CRITICAL NO JOCFR55: 45(A}6 10CFR55: 45(A)6 CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December O6 06, 2005 Page 22 of 0/12 12

INSTRUCTIONS TO INSTRUCTIONS TO OPERATOR OPERATOR READ TO READ TO OPERATOR:

OPERATOR:

WHEN II TELL WHEN TELL YOU YOU TO BEGIN, YOU TO BEGIN, YOU ARE ARE TOTO PERFORM PERFORM THE THE ACTIONS ACTIONS ASAS DIRECTED DIRECTED IN IN THE THE INITIATING INITIATING CUES. WILL DESCRIBE THE GENERAL CUES. I WILL DESCRIBE THE GENERAL CONDITIONS CONDITIONS UNDERUNDER WHICH WHICH THIS THIS TASK TASK ISIS TO TO BEBE PERFORMED PERFORMED AND PROVIDE AND PROVIDE THE NECESSARY TOOLS THE NECESSARY TOOLS WITH WITH WHICH WHICH TO TO PERFORM PERFORM THIS THIS TASK.

TASK. BEFORE BEFORE STARTING, STARTING, II WILL EXPLAIN WILL EXPLAIN THE INITIAL CONDITIONS, THE INITIAL CONDITIONS, WHICHWHICH STEPS STEPS TO TO SIMULATE SIMULATE OROR DISCUSS, DISCUSS, AND AND PROVIDE PROVIDE INITIATING CUES.

INITIATING WHEN YOU CUES. WHEN YOU COMPLETE COMPLETE THE THE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE THE OBJECTIVE OBJECTIVE FOR FOR THISTHIS JOB JOB PERFORMANCE MEASURE PERFORMANCE MEASURE WILL WILL BEBE SATISFIED.

SATISFIED.

SAFETY CONSIDERATIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

INITIAL CONDITION: The 'C' Steam Generator has experienced C Steam experienced aa tube rupture.

rupture. The crew crew has has taken actions taken actions through through step step 22 of of EOP-4.0.

EOP-4.O.

INITIATING CUES: The CRS has has directed the isolation of the RUPTURED S/G per EOP-4.0, EOP-4.O, step 3.

HAND JPM]PM BRIEFING SHEET TO OPERATOR AT THIS TIME!

Tuesday, Tuesday, December December 06, 06, 2005 2005 Page Page 33 of of12 12

]PM BRIEFING SHEET JPM BRIEFING OPERA TOR INSTRUCTIONS:

OPERATOR CONSIDERATIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

INITIAL CONDITION: The The 'G' C Steam Steam Generator Generator has has experienced experienced aa tube tube rupture.

rupture. The The crew crew has has EOP-4.O.

taken actions through step 2 of EOP-4.0.

INITIATING CUES: The GRS CRS has directed directed the isolation of of the RUPTURED S/G S/G per per EOP-4.0, EOP-4.O, step 3.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU EVALUATOR SATISFACTORILY COMPLETED HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Tuesday, 06, 2005 December 06, Tuesday, December 2005 Page 44 of Page 12 of12

STEPS STEPS CR SEQ CR SEQ STEP:

STEP: 1 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Place 'C' Place Steamline power C Steamline power relief relief in manual and in manual and 'C' Steamline C Steam line PWR PWR RELIEF RELIEF SETPT SETPT controller controller closed, closed. indicates manual indicates manual and and O.

0.

CUES:

CUES: SAT UNSAT COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No Yes Adjust 'C' Steamline C Steam line power relief setpoint 'C' C Steamline PWR RELIEF SETPT controller controller to 8.85. indicates 8.85 (1150 psig).

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

No Yes C Steam Align 'C' Steamline line power relief for power "C' Steamline C Steam line Power Relief mode switch relief operation. indicates PWR REL and the setpoint controller indicates AUTO.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December Tuesday, December 06, 06, 2005 2005 Page 5 of Page of12 12

CR SEQ CR STEP: 4 STEP STANDARD:

No No No No Place both Place both steam dump dump interlock interlock switches switches to Both STM DUMP Both DUMP INTERLOCK INTERLOCK switches bypass interlock.

bypass interlock, indicate BYP indicate BYP INTLK INTLK when RCS RCS Tavg

<552F.

<552"F.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

No Yes Verify the 'C' C steamline power relief indicates PCV-2020 indicates red light OFF, green closed, closed. light ON.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

Ye Yes Isolate the TDEFP steam supply from 'C' C S/G. PVG-2030 STM SPLY TO TD EFP TRN A (B) indicates closed. AO deenergizes XVG-2802B at XMC-1 DB2Y and closes XVG-2802B locally.

CUES: SAT NOTE: Operator may have already closed XVG-2802B from MCB lAW OAP-103.4.OAP-1 03.4. UNSAT Annunciators 622 2-3 and 623 2-3 are expected alarms for TFEFP Suto Start Defeated.

COMMENTS:

Tuesday, December 06, 2005 of 12 Page 660/12

CR SEQ STEP: 7 STEP STANDARD:

No Yes Isolate blowdown from the ruptured 8/G.

S/G. PVG-503C indicates red light OFF, green PVG-503e light ON.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

No Yes Isolates main steam drains from 'e' SIG.

C 8/G. PVT-2843C PVT PVT-28778

-2843e and PVT -2877B indicate red light OFF, green light ON.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 9 STEP STANDARD:

No Yes Attempts to close PVM-2801 PVM-2801C. e. MSIV 'e' Notes M81V C still indicates red light ON, green light OFF.

CUES: SAT Operator may send someone out to locally close "e" MSIV while proceeding.

C M81V UNSAT COMMENTS:

Tuesday, December 06, 2005 Page 770i12 of 12

CR SEQ CR STEP: 10 10 STEP STANDARD:

Ye Yes Close MSIVs MSIVs for 'A' A and 'B' SIGs.

B S/G's. PVM-2801A&B, MS PVM-2801A&B, ISOLATION VALVE, MS ISOLATION indicates red light OFF and green light ON.

indicates CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 11 STEP STANDARD:

Ye Yes Verify MS Isolation Bypass valves closed. Verifies PVM-2869A (B) (C) have closed indication (red light off and green light lit).

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 12 STEP STANDARD:

Ye Yes Isolate main steam to aux steam. Closes PCV-2058, MS TO AUX STM, indicates red light OFF and green light ON.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 2005 Page8of12 Page 8 of 12

CR SEQ STEP: 13 STEP STANDARD:

Ye Yes Isolate sealing steam.

Isolate Closes MVG-1701 MVG-1 701,, STEAM SEAL FEED FEED indicates red light OFF and green VLV, indicates light ON.

light CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 14 STEP STANDARD:

Ye Yes Close main turbine stop valve before seat Closes MVG-2896A-D, SV-1 (2,3,4) BSD, drains, drains. indicates red light OFF and green light ON.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 15 STEP STANDARD:

Ye Yes Isolate steam to deaerator. Places IPV-2231, MS/PEGGING STM TO DEAERATOR, controller in MAN and output of 0%.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 2005 Page 9 of 12 0/12

CR SEQ STEP: 16 STEP STANDARD:

No Yes Isolate steam to MSRs.

Isolate MSR DCS, As MSR DCS, MVG-2811 MVG-281 1 and XVG-2807 indicate closed.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 17 STEP STANDARD:

Ye Yes Ensure steam dumps closed. Places STM DUMP CNTRL controller in MAN and output of 0% and STM DUMP MODE SELECT switch to STM PRESS.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 18 STEP STANDARD:

Ye Yes Ensure main steam drains are closed. The following valve switches are in AUTO with red light OFF and green light ON:

PVT-2870, TO MSR A&B DRN, PVT- PVT 2851A-D, 2851 A-D, MS LINES TO TURB DRN, PVT- PVT 271 3A-D, STEAM DUMP DRN BYP, PVT-2713A-D, PVT 2838A,B, HDR DRNS. Notes PVT-2875, To MSR A&B DRN indicates mid-position.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 2005 Page lOofl2 100f 12

CR SEQ CR SEQ STEP:

STEP: 19 19 STEP STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Direct Turbine Direct Turbine Building Building operator operator toto complete complete Turbine Building Turbine Building operator operator acknowledges acknowledges ATT. 1, ATT. including alternate 1, including alternate isolation isolation for for PVT-PVT- and completes ATT.

and completes ATT. 1, 1, including including local local 2875.

2875. valve valve XVT -2872.

XVT-2872.

CUES:

CUES: SAT SAT Booth operator Booth operator acknowledges acknowledges as TB operator, as TB operator, to perform An.

to perform AU. 11 of of EOP-4.0 EOP-4.O UNSAT UNSAT isolation for PVT-2875 if directed.

including alternate isolation COMMENTS:

COMMENTS:

Examiner ends JPM at this point.

December 06, Tuesday, December Tuesday, 06, 2005 2005 Page 11 Page of12 11 of 12

JPM SETUP SHEET JPM NO: JPSF-059

]PM DESCRIPTION: ALTERNATE ISOLATION OF RUPTURED S/G ('C' (C MSIV)

ICSET:

IC SET: 10 10or328 or 328 INSTRUCTIONS:

1. Activate MAL-RCSOO2C MAL-RCS002C SEVERITY=450 RAMP=30 (SGTR ON 'C' C S/G)
2. RUN 180 seconds EOP-1 .0 & EOP-4.0 up through step 2.
3. Manual SI and perform actions of EOP-1.0 when > 30% level.

C S/G when>

4. Throttle EFW flow to 'C'
5. FREEZE
6. Activate MAL-MSSOO6C MAL-MSS006C SELECT=

SELECT = FAIL TO CLOSE (C MSIV FAIL TO CLOSE)

('C' OVR-MSO77B OVR-MS077B SELECT=ON (2875 INDICATION FAILS TO MIDPOSITION)

(2872 is not modeled but the booth operator can tell the control room it is closed because the drain is not open)

7. RUN 5 seconds and acknowledge annunciators
8. When student is ready:

RUN

9. Local Operator Actions when instructed:

Steam Drain Valves:

VLV-MSO42P VLV-MS042P SEVERITY=0 SEVERITY=O (2875(2872)

LOA-FWMO27 LOA-FWM027 SEVERITY=-15 (IPV-2232 - Sparging Steam to DA)

Trigger #2 LOA-MSSO33 LOA-MSS033 SELECT=RACK SELECT =RACK OUT (RACK OUT BKR FOR MVG-2802B (STM SUPPLY TO TDEFP))

COMMENTS:

Tuesday, December 06, 2005 Page 12 12 of 12

V.C. SUMMER NUCLEAR STATION v.C.

PERFORMANCE MEASURE JOB PERFORMANCE JPM

]PM JPSF-O12NRC JPSF-012NRC DROPPED ROD DROPPED ROD RECOVERY RECOVERY APPROVAL: APPROVAL DATE:

REV NO: 0 REVNO:

CANDIDATE EXAMINER EXAMINER:

THIS JPM IS NOT APPROVED Tuesday, December O6 Tuesday, December 06, 2005 2005 Page 11 of Page of10 10

TASK:

TASK:

000-003-05-01 000-003-05-01 RESPOND TO RESPOND TO DROPPED DROPPED CONTROL CONTROL ROD ROD TASK STANDARD:

TASK STANDARD:

Manual reactor Manual reactor trip trip inserted inserted after after second second control control rod rod drops. The use drops. The use of of applicable applicable Human Human Performance Tools Performance Tools (3-way (3-way communications, communications, self self checking, checking, peer peer checking, checking, phonetic phonetic alphabet, alphabet, etc) etc) and industrial and safety practices industrial safety practices meets meets expectations.

expectations.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD SIMULATOR PERFORM

REFERENCES:

AOP-403.6 DROPPED CONTROL DROPPED CONTROL ROD ROD TOOLS: AOP-403.6 (TO RECORD AFFECTED BANK HEIGHTS and to provide engineering numbers for limitations on rod withdrawal rates)

EVALUATION TIME 15 TIME CRITICAL No No IOCFR55: 45(A)5 CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 December 06, 2005 Page 22 of Page of 10 10

INSTRUCTIONS TO TO OPERATOR READ TO READ TO OPERATOR:

OPERATOR:

WHEN II TELL WHEN TELL YOU YOU TO TO BEGIN, BEGIN, YOU YOU ARE ARE TOTO PERFORM PERFORM THETHE ACTIONS ACTIONS AS AS DIRECTED DIRECTED IN IN THE THE INITIATING INITIATING CUES. II WILL CUES. WILL DESCRIBE DESCRIBE THE THE GENERAL GENERAL CONDITIONS CONDITIONS UNDER UNDER WHICH WHICH THIS TASK IS THIS TASK IS TO TO BEBE PERFORMED PERFORMED AND PROVIDE AND PROVIDE THE THE NECESSARY NECESSARY TOOLS TOOLS WITH WITH WHICH WHICH TOTO PERFORM PERFORM THIS THIS TASK.

TASK. BEFORE BEFORE STARTING, STARTING, II WILL EXPLAIN EXPLAIN THETHE INITIAL INITIAL CONDITIONS, CONDITIONS, WHICH STEPSSTEPS TOTO SIMULATE SIMULATE OR OR DISCUSS, DISCUSS, ANDAND PROVIDE PROVIDE INITIATING CUES.

INITIATING CUES. WHEN WHEN YOU YOU COMPLETE COMPLETE THE THE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE THE OBJECTIVE OBJECTIVE FOR FOR THISTHIS JOB JOB PERFORMANCE MEASURE PERFORMANCE MEASURE WILL BE BE SATISFIED.

SATISFIED.

SAFETY CONSIDERATIONS:

INITIAL CONDITION: Plant was operating at 75% power with all controls in automatic when F2 dropped due to a blown fuse. The blown fuse was control rod "F2" replaced in the 11AC AC power cabinet. Actions of AOP-403.6 have been completed through Step 10.

INITIATING CUES: CRS has directed NROATC to recover control rod "F-2" F-2 per AOP-403.6, starting with Step 11.

HAND JPM BRIEFING SHEET TO OPERATOR OPERA TOR AT THIS TIME!

Tuesday, Tuesday, December December 06, 06, 2005 2005 Page 33 of Page ofl0 10

jPM JPM BRIEFING SHEET OPERA TOR INSTRUCTIONS:

OPERATOR INSTRUCTiONS:

SAFETY CONSIDERATIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

INITIAL CONDITION: Plant Plant was was operating operating at at 75%

75% power power with with all all controls controls in in automatic automatic when when control rod control rod IF2" F2 dropped due to a blown blown fuse. The blown blown fuse was replaced in the 1lAG power cabinet. Actions of AOP-403.6 have AC power have been been completed through Step Step 10.

10.

INITIATING CUES: CRS INITIATING CUES: CRS hashas directed directed NROATC NROATC to to recover recover control control rod F-2 per rod IF-2" per AOP-403.6, starting with Step 11.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU EVALUATOR SATISFACTORILY COMPLETED HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Tuesday, Tuesday, December December 06, 06, 2005 2005 Page 44 of Page oflO 10

STEPS STEPS CR SEQ CR SEQ STEP:

STEP: 1 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Record Step Record Step Counter Counter readings readings for for both both groups groups Step counter Step counter reading reading for for both both groups groups inin of the of the affected affected bank.

bank. Control Bank Control Bank "A" A have have been been recorded recorded as as 230 steps.

230 steps.

CUES:

CUES: SAT SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No Yes Record PIA P/A Converter Reading. P/A converter reading has been recorded.

PIA CUES: SAT Booth operator gives examinee PIA P/A converter reading of 230 steps. UNSAT COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

Ye Yes Rotate ROD CNTRL BANK SEL switch ROD CNTRL BANK SEL Switch has been clockwise to the affected bank position. rotated clockwise to the CBA position.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, Tuesday, December December 06, 06, 2005 2005 Page 5 of PageS of1010

CR SEQ CR SEQ STEP:

STEP: 44 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Manually reset Manually reset Demand Step Counter Demand Step for the Counter for the The step counter The step counter forfor Bank Bank AA GROUP GROUP 11 affected group affected group toto zero.

zero. has has been been reset reset to to zero.

zero.

CUES:

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ CR STEP: 5 STEP STANDARD:

Ye Yes Place Lift Coil Place all Lift Disconnect Switches for the Coil Disconnect lift coil disconnect switches for Control All lift affected bank, except switches for the Bank "A" A rods, except Rod "F-2",

F-2, have dropped rod, to the ROD DISCONNECTED been placed in the ROD DISCONNECTED position. position.

CUES: SAT As the CRS, examiner should prompt the examinee exam inee to disconnect the affected bank. UNSAT Explain that the BOP operator will watch the MCB while he accomplishes this task.

COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

Ye Yes Withdraw the dropped rod: Drive the affected Rod F2 is moving in the outward direction.

bank out.

CUES: SAT If rod withdrawal rate is requested use "use not greater than 50 step increments not to UNSAT exceed 80% power.

power." Rod Control System Fail Urgent Alarm will alarm. If If examinee asks whether to depress depress the ROD CNTRL ALARM RESET switch, as the CRS, direct him to depress the switch after the rod has been realigned.

Fill Fill in in on on procedure procedure ahead ahead of of time.

COMMENTS:

Tuesday, December December 06, 06, 2005 2005 Page 66 of Page ofl0 10

CR SEQ CR SEQ STEP:

STEP: 77 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Verify dropped Verify dropped rodrod movement movement on on the the digital digital DRPI indicator DRPI indicator for for rod rod "F-2" F-2 in in Bank Bank "A" A isis rod position rod position indicator.

indicator, verified to verified to be be moving moving outout inin 66 step step increments.

increments.

CUES:

CUES: SAT UNSAT UNSAT COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

No Yes When dropped rod moves 6 steps, then verify ONE ROD ON BOTTOM annunciator is ONE ROD ON BOTTOM annunciator clears. clears, observed to be flashing (in the reset condition).

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 99 STEP STANDARD:

No Yes Adjust turbine load to maintain Tavg within +/- Tavg - Tref within +/-+/- 5°F.

5°FofTref.

5°F of Tref.

CUES: SAT No turbine manipulations are required since TAVG will remain within 5°F of Tref. UNSAT COMMENTS:

Tuesday, December Tuesday, December 06, 06, 2005 2005 Page 77 of Page of10 10

CR SEQ CR SEQ STEP:

STEP: 10 10 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Continue Rod Continue Rod withdrawl withdrawl to to the the demand demand Not more Not more than than 5050 step step increments increments or or 80%

80%

position position power as power as determined determined inin step step 66 CUES:

CUES: SAT SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ STEP: 11 11 STEP STANDARD:

STANDARD:

Ye Yes Observes that Observes that Rod Rod F-2 F-2 stops stops moving moving at at 30 30 notices that rod notices that F-2 is rod F-2 stuck is stuck steps and is apparently stuck CUES: SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ STEP: 12 STEP STANDARD:

STANDARD:

Ye Yes SelectorSwitch in Places Rod Control Bank SelectorSwitch Rod Control Bank Selector Switch.is Switch is in manual (lAW immediate operator action from manual AOP-403.5)

CUES: SAT UNSAT UNSA T COMMENT COMMENTS: S:

Tuesday, December 06, 2005 December 06, 2005 Page 88 of Page oj 10 10

CR SEQ CR SEQ STEP:

STEP: 1313 STEP STEPSTANDARD:

STANDARD:

Ye Yes Ye Yes Observesthat Observes thatRod RodP-6 P-6drops dropsinto intothe thecore core Evaluatesas Evaluates as22dropped droppedrods.

rods.

while rodF-2 while rod F-2remains remainsstuck stuckatat approximately3Osteps approximately30 steps CUES:

CUES: SAT SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ CR SEQ STEP:

STEP: 14 14 STEP STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Inserts aa manual Inserts manual reactor reactor trip.

trip. Places the Places the manual manual reactor reactor trip trip switch switch toto the TRIP the TRIP position.

position. Both Both Reactor Reactor Trip Trip breakers indicate breakers indicate green light ON, green light ON, redred light light OFF. All OFF. All rod rod bottom bottom lights are lit.

lights are lit.

CUES:

CUES: SAT The examin ee should insert The examinee should insert aa manualmanual reactor trip upon observing control rod P6 UNSAT observing control UNSAT drop. Continuing drop. Continuing to to withdraw withdraw original original dropped dropped rod more than 12 steps after the second rod second rod is is dropped dropped constitutes constitutes failure.

COMMENTS:

COMMENTS:

Exami ner ends Examiner ends JPM JPM atat this this point.

pOint.

Tuesday, December 06, 2005 Page99ofof1010 Tuesday, December 06, 2005 Page

JPM SETUP JPM SETUP SHEET SHEET JPM NO:

]PM NO: JPSF-012NRC JPSF-01 2NRC DESCRIPTION:

DESCRIPTION: DROPPED ROD DROPPED ROD RECOVERY RECOVERY ICSET:

IC SET: 11 11(75%

(75%

INSTRUCTIONS:

INSTRUCTIONS:

1. RUN
1. RUN
2. Activate:
2. Activate:

MAL-CRFOO4F2 MAL-CRF004F2 SELECT=ST SELECT =STATIONARY ATIONARY (Control rod (Control rod F2 F2 drops) drops)

3. Clear MAL-CRF004F2
3. MAL-CRFOO4F2 afterafter rod drops.
4. Control Tavg-Tref deviation within +/-1.5°F with rods in in AUTO
5. Place rod control in MANUAL FREEZE
6. FREEZE
7. When student is ready:

7.

RUN

8. When control rod F2 is withdrawn to approximately approximately 30 steps, insert: Trig #1 MAL-CRFOO7F2 MAL-CRF007F2 SELECT=UN TRIPPABLE SELECT =UNTRIPPABLE (Rod F2 sticks)

When Rod Control is placed in Manual - Trig #2.

MAL-CRFO MAL-CRF004P6 O4P6 SELECT=ST ATIONARY SELECT=STATIONARY (Control rod P6 drops)

COMMENT COMMENTS: S:

Report P/A PIA Converter reading isis 230 steps.

steps. IfIf aa rate of rod withdrawal is is requested from engineering, use not more than 50 step increments not to exceed 80% power.

"use power."

Tuesday, Tuesday, December December 06, 06, 2005 2005 Page 10 Page 10 of of10 10

AOP-403.6 AOP-403 .6 REVISION REVISION 22 DROPPED CONTROL DROPPED CONTROL ROD ROD ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE ALTERNATIVE ALTERNATIVE ACTION ACTION 7.

7. Provide Reactor Provide Engineering with[}

Reactor Engineering with information:

following information:

Time rod dropped: T-15 min mm Dropped rod Dropped rod location:

location: F-2 Initial Reactor power Initial level: 75%

Current Reactor power level: 75%

Current QPTR: 1.005

8. Determine and correct the cause 04J the failure NOTEStep NOTE - Step 9 This Step must be completed before continuing with Step 10
9. Obtain the following information fro frD Reactor Engineering:

Power level at which recovery is to be performed: <80%

< 80%

Rate of control rod movement during recovery:  :::; 50 steps 10.

10. If necessary, reduce Reactor powfl pown to the power level determined in S-te SreP
9. REFER TO GOP-4, POWER OPERATION (MODE 1). 1).

PAGE3OF7 PAGE 3 OF7

V.C. SUMMER NUCLEAR STATION v.C.

PERFORMANCE MEASURE JOB PERFORMANCE

]PM JPM JPS-O2ONRC JPS-020NRC SECURE NORMAL SECURE NORMAL LETDOWN LETDOWN AND PLACE PLACE EXCESS EXCESS LETDOWN IN LETDOWN IN SERVICE SERVICE APPROVAL: APPROVAL DATE:

REVNO:

REV NO: 11 CANDIDATE EXAMINER:

THIS JPM IS NOT APPROVED Tuesday, December Tuesday, December 06, 06, 2005 2005 Page 11 of Page of99

TASK:

TASK:

004-016-01 004-01 -01 6-01 -01 ESTABLISH EXCESS ESTABLISH EXCESS LETDOWN LETDOWN TO TO VOLUME VOLUME CONTROL CONTROL TANK(VCT)

TANK(VCT) OR OR REACTOR COOLANT REACTOR COOLANT DRAIN DRAIN TANK(RCDT)

TANK(RCDT)

TASK STANDARD:

TASK Excess letdown Excess letdown flow is established with final is established final excess letdown HX excess letdown HX outlet temperature << 165°F.

outlet temperature 165°F.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD SIMULATOR PERFORM PERFORM

REFERENCES:

SOP-i 02 SOP-102 CHEMICAL AND VOLUME CONTROL CONTROL SYSTEM TOOLS:

EVALUATION TIME 15 TIME CRITICAL No 10CFR55:

JOCFR55: 45(A)7 CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December Tuesday, 06, 2005 December 06, 2005 Page 22 of Page 0/99

INSTRUCTIONS TO INSTRUCTIONS TO OPERATOR OPERATOR READ TO READ TO OPERATOR:

OPERATOR:

WHEN I TELL WHEN TELL YOU YOU TO TO BEGIN, BEGIN, YOU ARE TO YOU ARE PERFORM THE TO PERFORM THE ACTIONS ACTIONS ASAS DIRECTED DIRECTED IN IN THE THE INITIATING INITIATING CUES. II WILL CUES. WILL DESCRIBE DESCRIBE THE THE GENERAL GENERAL CONDITIONS CONDITIONS UNDER UNDER WHICH WHICH THIS TASK IS THIS TASK IS TO TO BEBE PERFORMED PERFORMED AND PROVIDE AND PROVIDE THE THE NECESSARY NECESSARY TOOLS TOOLS WITH WITH WHICH WHICH TOTO PERFORM PERFORM THIS THIS TASK.

TASK. BEFORE BEFORE STARTING, STARTING, II WILL EXPLAIN WILL EXPLAIN THETHE INITIAL INITIAL CONDITIONS, CONDITIONS, WHICH STEPSSTEPS TOTO SIMULATE SIMULATE OR OR DISCUSS, DISCUSS, AND PROVIDE PROVIDE INITIATING CUES.

INITIATING CUES. WHEN YOU COMPLETECOMPLETE THE TASK SUCCESSFULLY, SUCCESSFULLY, THE THE OBJECTIVE OBJECTIVE FOR FOR THIS JOB PERFORMANCE MEASURE PERFORMANCE MEASURE WILL WILL BEBE SATISFIED.

SATISFIED.

SAFETY CONSIDERATIONS:

CONSIDERATIONS:

INITIAL CONDITION: Plant is at 75% power with all controls in AUTO. A letdown line leak has occurred.

INITIATING CUES: The Control Room Supervisor directs removing Normal letdown from SOP-i 02, IV.N and establishing excess letdown to the RCDT service per SOP-1 SOP-i02, IV.C.

per SOP-102, HAND JPM BRiEFING BRIEFING SHEET TO OPERATOR AT THIS THiS TiME!

TIME!

Tuesday, December Tuesday, 06, 2005 December 06, 2005 Page30f9 Page 3 of 9

JPM BRIEFING SHEET jPM SHEET OPERA TOR INSTRUCTIONS:

OPERATOR INSTRUCTIONS:

CONSIDERATIONS:

SAFETY CONSIDERATIONS:

INITiAL CONDITION:

INITIAL CONDITION: Plant Plant isis at at 75%

75% power power with with all all controls controls in in AUTO.

AUTO. A A letdown letdown line line leak leak has has occurred.

INITIATING CUES: The Control Room Supervisor Supervisor directs directs removing removing Normal letdown from service per service per SOP-102, SOP-i 02, IV.N IV.N and establishing establishing excess excess letdown letdown to the RCDT RCDT per SOP-102, IV.C.

per IV.C.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU EVALUATOR HAVE SATISFACT SATISFACTORILY ORILY COMPLETED COMPLETED THE ASSIGNED TASK.

Tuesday, December Tuesday, 06, 2005 December 06, 2005 Page 44 of Page of99

STEPS STEPS CR SEQ CR SEQ STEP:

STEP: 1 STEP STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Ensure the Ensure the following following Orifice Orifice Isolation Isolation Valves Valves 8149A, 8149A, 8149B, 8149B, && 8149C 8149C (green (green light light on on &&

are closed:

are closed: PVT-8149A, PVT-8149A, LTDNLTDN ORIFICE ORIFICE AA ISOL ISOL red red light light off) off) (6244-4 (624 4-4 alarms alarms for for RML-1 RML-1 (45 gpm),

(45 PVT-8149B, LTDN gpm), PVT-8149B, LTDN ORIFICE ORIFICE BB ISOL ISOL Trouble.

Trouble. This This isis expected expected alarm alarm for for (60 gpm).

(60 gpm). PVT PVT-8149C,

-8149C, LLTDN ORIFICE C TDN ORIFICE ISOL C ISOL letdown letdown isolation isolation (60 gpm).

(60 gpm).

CUES:

CUES: SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No Yes Close PVT-8152, LTDN LINE ISOL. 8152 (green light on & red light off CUES: SAT UNSAT UNSA T COMMENTS:

CR CR SEQ STEP: 3 STEP STANDARD:

No Yes Place FCV-122, CHG FLOW, in MAN and 122 indicates closed close.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, Tuesday, December December O6 06, 2005 2005 PageS Page of9 5 of 9

CR SEQ STEP~*

STEP 4 STEP STANDARD:

No Yes If necessary, close the following Charging not performed Line Isolation Valves:

a. MVG-8107, CHG LINE ISOL.
b. MVG-8108, CHG LINE ISOL.

CUES: SAT Cue operator that closing these valves is not necessary. Verifies CCW in service UNSAT per SOP-i 10.

perSOP-110.

COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

No No Checks Core Thermal power. Core power determined to be less than 2898 Mwt.

CUES: SAT cue the operator that the initial conditions for Establishing Excess Letdown have UNSAT been met COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

No Yes Ensure HCV-137 closed. HCV-137, XS LTDN HX, controller indicates 0% demand.

CUES: SAT UNSA T UNSAT COMMENTS:

Tuesday, December 06, 2005 Page 60/9 6 of 9

CR SEQ STEP: 7 STEP STANDARD:

Ye No Place excess letdown to RCDT. PVM-8143, XS LTDN TO VCT OR RCDT, indicates RCDT position.

CUES: SAT Examiners (as CRS) directs operator to send excess letdown to the RCDT. UNSAT COMMENTS:

CR SEQ STEP: 8 STEP STA NDARD:

STANDARD:

No No Ensure MVG-9583 is open. MVG-9583, FROM XS L LTDN TDN HX, indicates red light ON, green light OFF.

CUES: SAT NOTE: step 2.3 N/A because ther is no Phase A isolation signal and step 2.4 is N/A UNSAT because Excess letdown is being aligned to the RCDT.

COMMENTS:

CR SEQ STEP: 99 STEP STANDARD:

Ye Yes Opens PVT-8153 and PVT-8154, XS LTDN PVT-8153 and 8154, XS LTDN ISOL, ISOL. indicates red light ON, green light OFF.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 2005 Page 70f9 7of9

CR SEQ STEP: 10 STEP STANDARD:

No No Directs the building operator to locally monitor communicates direction to building operator RCDT level and pump operation at XPN0007 CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 11 STEP STANDARD:

Ye Yes Establishes excess letdown flow. Slowly increases demand on HCV-137 XS LTDN L TI-i 39, XS TDN HX CNTRL with final TI-139, LETDOWN HX OUT TEMP < < 165°F and XS LTDN LTDN TEMP HI annunciator not in alarm.

CUES: SAT NOTE: Receipt of the XS LLTDN/RCDT TDN/RCDT HX COW OUT TEMP HI CCW annunciator is not UNSAT grounds for failure of the JPM, but temperature must be reduced below 165°F before completing the JPM satisfactorilly.

COMMENTS:

CR SEQ STEP: 12 STEP STANDARD:

No Yes seal leakoff flow.

Checks proper RCP #1 sealleakoff FR-i 54A & B RCP SL LKOFF HI &

Checks FR-154A LO RANGE normal (0.2 - 5.0 gpm).

CUES: SAT UNSAT COMMENTS:

Examiner ends JPM at this point.

Tuesday, Decent her 06, 2005 December Page 8 of of99

JPM SETUP SHEET JPM NO: JPS-020NRC JPMNO: JPS-O2ONRC DESCRIPTION:

DESCRiPTION: SECURE NORMAL LETDOWN AND PLACE EXCESS LETDOWN IN SERVICE ICSET:

IC SET: 11(75%

11 (75%

INSTRUCTIONS:

1. RUN
2. Initialte lnitialte 5 GPM letdown line leak
3. FREEZE
4. When student is ready:

RUN COMMENTS:

Tuesday, December 06, 2005 Page90f9 Page 9 of 9

/

V.C. SUMMER NUCLEAR STATION v.C.

JOB PERFORMANCE MEASURE

]PM JPM JPS-068 SHIFT COMPONENT COOLING WATER TRAINS APPROVAL: APPROVAL DATE:

REVNO:

REV NO: 7 CANDIDATE EXAMINER:

THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 Page 1 1 of 16

TASK:

008-021-01-01 SWITCH COMPONENT COOLING WATER TRAINS TASK STANDARD:

B CCW pump is supplying non-essential loads in slow speed. CCW flow to non-essentials is not The 'B' C CCW is aligned to "B" interrupted. "C" B Train. 'B' B charging pump is running. 'A' A Train CCW is aligned to essential loads. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD SIMULATOR PERFORM

REFERENCES:

SOP-i 02 SOP-102 CHEMICAL AND VOLUME CONTROL SYSTEM SOP-118 COMPONENT COOLING SYSTEM TOOLS:

EVALUATION TIME 25 TIME CRITICAL No 10CFR55:

10CFR55: 45(a)8 CANDIDATE: TIME START:

TiME FINISH:

TIME PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 Page 2 of 16

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN II TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING CUES. II WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE BEFORE-STARTING,

'STARTING, II WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

INITIAL CONDITION: The plant is in Mode 1. "A" A CCW A Train CCW is the active loop with "N pump running in slow speed. "B" B Chilled Water Pump and Chiller have been started in preparation for starting "B" B Charging Pump.

INITIATING CUES: CRS directs NROATC to perform an active CCW loop switchover to "B" B SOP-i 18.

A Train maintenance per SOP-118.

Train for "A" HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

Tuesday, December 06, 2005 Page 3 of 16

jPM BRIEFING SHEET JPM OPERATOR OPERA TOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION: The plant is in Mode 1. "A" A Train CCW is the active loop ioop with "A" A CCW pump running in slow speed. "B"8 Chilled Water Pump and Chiller have B Charging Pump.

been started in preparation for starting "B" INITIATING CUES: CRS directs NROATC to perform an active CCW loop switchover to "B" 8 A Train maintenance per SOP-118.

Train for "A" SOP-i 18.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Tuesday, December 06, 2005 Page 4 of 16

STEPS CR SEQ STEP: 1 1 STEP STANDARD:

No No XPP-OO1 C, PUMP C, TRAIN A and Places XPP-001 Places 'c' C CCW pump Train A and Train B TRAIN B B ('C' (C CCW pump) in PULL-TO-LOCK. switch in PULL-TO-LOCK.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No No Align XPP-001 XPP-OO1 C, PUMP C, to Train B per Directs AO to align 'C' C CCW pump to the 'B' B Attachment VB with the exception of racking loop. AO completes Attachment VB of XSWIDB-ll, CC PUMP C in XSWIDB-II, C XPP0001 XPP0001C-CC.

C-CC. SOP-118.

CUES: SAT Booth operator initiates batch file CCCW2B. After amber "B B SELECTED" SELECTED light comes UNSAT on for the 'c' C CCW pump Transfer Switch on 'B'8 Train; as the Auxiliary Operator, booth operator reports Attachment VB is complete, except for racking in the 'C' C pump breaker on 'B' B Train.

COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

No No Ensure MVB-9503B, CC TO RHR HX B, (CCW Verifies MVB-9503B, CC TO RHR HX B to the 'B' B RHR heat exchanger) is open. open with indication of red light ON and green light OFF.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 06 2005 Page 50f16 5 of 16

CR SEQ STEP: 44 STEP STANDARD:

Ye Yes Start one of the following in slow speed: 'B' CCW Pump running in slow Starts B XPP-0001 B, PUMP B XPP-000i B speed with red indicating light ON and green light OFF. Notes that starting amps decay to normal running current.

CUES: SAT UNSA T UNSAT COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

Ye No Start MVB-9503B, CC TO RHR HX B, stroking Places control switch for MVB-9503B in in the closed direction. CLOSE. Observes valve in mid-position.

CUES: SAT IlI.B): Failure to complete Step 2.3.d in a UNSAT (SOP-i 18, III.B):

Per CAUTION 2.3.c and 2.3.d (SOP-118, timely manner after reducing RHR Heat Exchanger Flow will result in a loss of flow through the running CCW Pump or excessive flow perturbations in the CCW non- non essential loop.

NOTE TO EVALUATOR: Steps 5 - 8 of this JPM will be performed concurrently in rapid succession.

COMMENTS:

Tuesday, December 06, 2005 Page 6 of 16

CR SEQ STEP: 66 STEP STANDARD:

Ve Yes Ye Ves indicated on FI-7044, When flow, as indicated FI-7044, HX HX B B (Align non-essential loads loads to B

'B' train FLOW GPM, GPM, is between 5000 5000 gpm and 4000 CCW.) Places control for MVB COW.) MVB-in rapid gpm, perform the following in gpm, 9524B/9526B AND 9524B!9526B MVB-9687B/9525B, LP AND MVB-9687B/9525B, LP succession: B NON-ESSEN LOAD ISOL B ISOL to OPEN, with indication of red light ON and green light

1) Open MVB-9687B!9525B,
1) MVB-9687B/9525B, LP B B NON NON- OFF.

ESSEN LOAD ISOL.ISOL.

MVB-9524B/9526B, LP B

2) Open MVB-9524B/9526B, B NON NON-ESSEN LOAD ISOL.ISOL.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 7 STEP STANDARD:

Ve Yes Ye Ves When flow, as indicated on FI-7044, B Fl-7044, HX B (Isolate non-essential loads from A 'A' train FLOW GPM, is between 5000 gpm and 4000 CCW.) Places control switches for MVB- MVB gpm, perform the following in rapid 9524A19526A AND MVB-9687A19525A, MVB-9687N9525A, succession: LP AA NON-ESSEN LOAD JSOL ISOL to CLOSE, with indication of red light OFF and green MVB-9524A/9526A, LP A NON-

1) Close MVB-9524A19526A, NON light ON.

ESSEN LOAD ISOL.

2) Close MVB-9687 NON Al9525A, LP A NON-MVB-9687N9525A, ESSEN LOAD ISOL.

CUES: SAT UNSA T UNSAT COMMENTS:

Tuesday, December 06, O6 2005 Page 7 of 16

CR SEQ STEP: 8 STEP STANDARD:

Ye No Fl7044, HX B When flow, as indicated on FI-7044, (Align CCW TO 'A'A RHR heat exchanger.)

FLOW GPM, is between 5000 gpm and 4000 Places control switch for MVB-9503A, gpm, perform the following in rapid CC TO RHR HX A to OPEN with indication succession: of red light ON and green light OFF.

1) Open MVB-9503A, CC TO RHR HX A.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 99 STEP STANDARD:

No No Rack in XSW1 OB11, DB1 1, CC PUMP C XPP0001 C- Racked up in slow speed. Green light ON.

CC CCW PUMP C to complete Attachment VB

("C" (C CCW Pump breaker on 'B' B train).

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 10 STEP STANDARD:

No No XPP-0001C, Place XPP-0001 C, PUMP C, TRAIN B B in After- Places 'c' B switch in C CCW pump, Train "B" Stop. After-Stop.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 2005 Page 8 of 16

CR SEQ STEP: 11 ii STEP STANDARD:

No No 1 gpm sample flow Locally verify greater than 1 AO reports greater than 11 gpm flow on RML-2B, CCW Liquid Monitor. through RML-2B.

CUES: SAT Booth Operator reports that RML-2B flow is 5.0 gpm. UNSAT COMMENTS:

CR SEQ STEP: 12 STEP STASTANDARD:

NDARD:

No No Ensure the following valves have not The red light is ON and the green light is automatically closed due to high flow: off for all the following:

1) MVG-9625, CC TO RB MVG-9625, MVG-9626, MVG-9583, MVG- MVG
2) MVG-9626, CC TO RB 9593A,B,&C.
3) MVG-9583, FROM XS L LTDN TDN HX
4) MVT-9593A(B)(C), FROM RCP A(B)(C)THERM BARR CUES: SAT UNSA T UNSAT COMMENTS:

CR SEQ STEP: 13 STEP STANDARD:

Ye Yes Transfer the inservice Charging Pump to Train SOP-i 02,Section III.F, Initiates SOP-102, lII.F, Shifting SOP-102.

B per SOP-1'02.

B Operating Charging Pumps CUES: SAT Evaluator may need to cue operator that the Initial Conditions of SOP-102, Section UNSAT IIl.F may be considered complete. Cue operator that 10 days have elapsed since III.F previous Charging Pump run.

COMMENTS:

Tuesday, December 06, 2005 Page 9 of 16

CR SEQ STEP: 14 STEP STANDARD:

STA NDARD:

No Yes If XSW1 DB 15, CHARGING INJ PUMP No action required as this breaker is XPPOO43B-CS, XPP0043B-CS, is racked down, then initiate racked up. Operator notes green light on Attachment VD. B Charging Pump breaker.

'B' CUES: SAT SOP-i 02 is N/A because it has been out of service for 10 days.

Step 2.1 of SOP-102 UNSAT COMMENTS:

CR SEQ STEP: 15 STEP STANDARD:

No Yes Ensure XPP-43B-PP1, CHG PP B B AUX OIL PP, Observes that red light for XPP-43B-PP1 is is running. ON and green light is OFF.

CUES: SAT UNSA T UNSAT COMMENTS:

CR SEQ STEP: 16 STEP STANDARD:

No Yes Ensure Train B Component Cooling is Since this action was just previously SOP-i 18.

operating per SOP-118. accomplished, operator should simply check off this step.

CUES: SAT UNSAT COMMENTS:

Tuesday, December 06, 2005 Page 10 of 16

CR SEQ STEP: 17 STEP STANDARD:

No Yes Ensure Train B B Chill Water is operating per B chilled Operator should verify that 'B' SOP-501. water pump and chiller are operating.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 18 STEP STANDARD:

No Yes IPIOO152A, CHARGING PUMP B Verify IPI00152A, B Directs AB Lower Level to report suction SUCTION PRESS IND, indicates pump suction pressure on IPI00152A.

1P100152A.

pressure is greater than 15 psig (AB-388).

CUES: SAT When requested, Booth Operator reports that charging header suction pressure is UNSAT 55 psig.

COMMENTS:

CR SEQ STEP: 19 STEP STANDARD:

No Yes Start XPP-0043B, PUMP B. Places control switch for XPP-0043B in START and allows switch to spring-return to After-Start (mid-position). Notes breaker red light ON and green light OFF.

Also observes starting current decays to normal running current.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 2005 Page 11 of16 of 16

CR SEQ STEP: 20 STEP STANDARD:

No Yes Verify XPP-43B-PP1, CHG PP B B AUX OIL PP, Observes that red light goes OFF for XPP XPP-stops automatically when the Charging PUMP 43B-PP1 and that green light goes ON.

Comes up to full speed.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 21 STEP STANDARD:

No Yes Monitor the following to verify proper pump Notes that running current is around 42 operation: P1-121 is amps, discharge pressure on PI-121 around 2700 psig, and that status light for

1) Charging Pump B B running current is XVG-9684B-CC shows green light OFF between 30 amps and 50 amps. and red light ON.

P1-121, CHG PRESS PSIG, is between 2650

2) PI-121, psig and 2850 psig.
3) XVG-9684B-CC, CCW TO CHG PP B, is open.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 2005 Tllesday, Page 12 of 16

CR SEQ STEP: 22 STEP STANDARD:

Ye Yes Stop the Charging Pump being removed from Places the control switch for 'A' A Charging service. Pump breaker to STOP and allows it to spring-return to After-Stop (mid-position).

Notes that running current drops to ZERO.

CCW/CHG Pump warning tag" Places the "CCW/CHG tag on the control switch for 'A' A Charging Pump breaker.

CUES: SAT CCW/CHG Pump warning tag is NOT critical.

NOTE TO EVALUATOR: Transfer of "CCW/CHG UNSAT COMMENTS:

CR SEQ STEP: 23 STEP STANDARD:

No Yes Verify PI-121, P1-121, CHG PRESS PSIG, is between Observes that discharge pressure on PI- P1-2650 psig and 2850 psig. 121 is around 2700 psig.

CUES: SAT UNSA T UNSAT COMMENTS:

Tuesday, December 06, 2005 Page 13 of16 of 16

CR SEQ STEP: 24 STEP STANDARD:

No Yes Monitor the following for proper pump Observes Pressurizer Level is about 60%,

operation: 1) LR-459, PZR% LEVEL & LEVEL and all three seal injection flow rates are Fl-i 30A, RCP A INJ SP. 2) FI-130A, NJ FLO GPM.

GPM, 3) FI-Fl- approximately 8.2 gpm.

127A, RCP B B INJ NJ FLO GPM. 4) FI-124A, RCP C INJ FLO GPM.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 25 STEP STANDARD:

No Yes Align Component Cooling as required by SOP- SOP-i 18 to complete Operator returns to SOP-118 118. swapover of active loop.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 26 STEP STANDARD:

Ye No Secure the running Train A Component XPP-0001A, Places control switch for XPP-0001 A, in Cooling Water Pump in the off going active STOP and allows it to spring-return to loop: After-Stop (mid-position). Places CHARGING PUMP IN SERVICE" "CHARGING SERVICE tag on the

1) XPP-0001A, PUMP A B CCW Pump breaker.

control switch for 'B' CUES: SAT NOTE TO EVALUATOR: Transfer of "CHARGING CHARGING PUMP IN SERVICE" SERVICE tag is NOT UNSAT critical.

COMMENTS:

Tuesday, December 06, 2005 Page 14 of 16

CR SEQ CR STEP: 27 STANDARD:

STEP STANDARD:

No Yes No Yes Ensure XPP-58A(B)(C), CCBP Ensure CCBP A(B)(C) are are Checks status Checks status of of XPP-58A(B)(C)

XPP-58A(B)(C) Notes Notes aligned as aligned as follows:

follows: that CCBP that CCBP A A is is running running with with the the control control switch in switch in AUTO AUTO and and the the red red light light ON ON and and

1) One pump is in AUTO and operating.
1) green light OFF. Notes that the control
2) One pump is in AUTO and not operating. switch for CCBP B is in AUTO and the red
3) One pump is OFF. light is OFF and green light ON. Notes Notes that the control switch for CCBP C is in OFF and the red light is OFF and green light ON.

CUES: SAT UNSAT UNSA T COMMENTS:

Examiner ends JPM at this point.

Tuesday, December December 06, 06, 2005 2005 15 of Page 15 Page oj16 16

JPM SETUP SHEET JPM NO: JPS-068 DESCRIPTION: SHIFT COMPONENT COOLING WATER TRAINS ICSET:

IC SET: 10 or 324 10or324 INSTRUCTIONS:

1. RUN
2. Start 'B' B Chilled Water Pump and 'B' B HVAC Chiller
3. When student is ready: RUN
4. When AO requested by student to complete Attachment VIB of SOP-118, SOP-i 18, enter the following:

RUN BATCH FILE CCCW2B LOA-CCW045 LOA-CCWO45 SELECT =RACK IN SELECT=RACK (RACK UP 'C' C CCW PUMP BREAKER ON "B" B TRAIN)

COMMENTS:

Tuesday, December 06, O6 2005 Page 16 of 16 16of16

V. C. SUMMER NUCLEAR STATION v.C. STA TION PERFORMANCE MEASURE JOB PERFORMANCE

]PM JPM JPSF-083 JPSF-083 RESPOND TO RESPOND TO LOSS LOSS OF OF SECONDARY SECONDARY HEAT HEAT SINK SINK APPROVAL: APPROVAL DATE:

REV NO: 7 REVNO:

CANDIDATE EXAMINER:

THIS JPM IS NOT APPROVED Tuesday, December Tuesday, December 06, 06, 2005 2005 Page 11 of Page of11 11

TASK:

311-006-06-01 RESPONSE TO LOSS OF SECONDARY HEAT SINK TASK STANDARD:

Condensate flow has been established to at least one S/G via the FRV bypass valves by dumping steam via the condenser steam dumps (Power Reliefs if C-9 not available).

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD SIMULATOR PERFORM

REFERENCES:

EOP-15.0 RESPONSE TO LOSS OF SECONDARY HEAT SINK TOOLS: EOP-15.0 EVALUATION TIME 20 TIME CRITICAL CRITiCAL No 10CFR55:

JOCFR55: 45(A)7 CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 luesday, of11 Page 2 of 11

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN II TELL YOU TO BEGIN, BEGIN, YOU ARE TO PERFORM PERFORM THE ACTIONS AS DIRECTED DIRECTED IN IN THE INITIATING INITIATING CUES. II WILL DESCRIBE DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS IS TO BE BE PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, II WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

INITIAL CONDITION: Plant has experienced a trip from 100% due to a feedwater isolation with no EFW available. EOP-15.0 (Loss of Secondary Heat Sink) has been entered and steps 1-7 have been completed.

INITIATING CUES: The CRS directs operator to respond to loss of secondary heat sink per EOP-15.0, starting with Step 8.

HAND JPM jPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

Tuesday, December 06 06, 2005 Page 3 of 11 0/11

jPM BRIEFING SHEET JPM OPERA TOR INSTRUCTIONS:

OPERATOR SAFETY CONSIDERATIONS:

INITIAL CONDITION: Plant has experienced a trip from 100% due to a feedwater isolation with no EFW available. EOP-15.0 (Loss of Secondary Heat Sink) has been entered and steps 1-7 have been completed.

INITIATING CUES: The CRS directs operator to respond to loss of secondary heat sink per EOP-15.0, starting with Step 8.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Tuesday, December 06, 2005 Page 4 of 11

STEPS CR SEQ STEP: 11 STEP STANDARD:

No Yes Ensure one condensate pump is running A Condensate pump indicates red light

'A' B and 'C' ON, green light OFF. 'B' C Condensate pumps indicate red light OFF, green light ON.

CUES: SAT Cue operator to keep 'A' A Condensate pump running. UNSAT COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No Yes FWBPs are running Ensure two FWBP's A and 'B'

'A' B FWBPs indicate red light ON, green light OFF. 'e' D FWBP indicate C and 'D' red light OFF, green light ON.

CUES: SAT Cue operator to keep 'A'& B FWBPs running.

A& 'B' UNSAT COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

No Yes Ensure FW FCV'sFCVs are closed. FCV-478, 488, and 498 indicate red light OFF, green light ON.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 2005 Page 5 of 11

CR SEQ CR STEP: 4 STEP STANDARD:

STANDARD:

No Yes No Place FW Place FW bypass contollers in bypass contollers in manual manual and and FCV-3321 ,3331 FCV-3321 ,3331 ,3341

,3341 controller controller red red MAN MAN close, close. light is light is lit lit and and demand demand is is O.

0.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

Ye Yes Bypass FWIV signal. Directs CB Operator to perform step 8e of EOP-1 5.0.

EOP-15.0.

CUES: SAT NOTE: Booth Operator (as CB Operator) will bypass FWIVs and bypasses. UNSAT COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

No Yes Verify no steam line isolation signal. RB PRESS HI-2 Hl-2 STM LINE ISOL (XCP-612 2-1) is not lit.

CUES: SAT UNSAT UNSA T COMMENTS:

December 06, 2005 Tuesday, December 2005 Page 66 of Page of 11 11

CR SEQ STEP: 7 STEP STANDARD:

Ye Yes A and 'C' Close the 'A' MSIVs.

C MSIV's. PVM-2801A PVM-2801 A & C indicate red light OFF, green light ON.

CUES: SAT B S/G will be used to establish a heat sink. NOTE: A UNSAT Prompt the student that the 'B' Safety Injection signal may be generated during this step.

COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

Ye No Open the 'B' B MS Isolation Bypass Valve. Both MAIN STEAM ISOL VALVES RESET TRAIN A(B) momentarily depressed.

PVM-2869B indicates red light ON, green light OFF.

CUES: SAT B MSIV closes UNSAT NOTE: This step is only performed and therefore only critical if the 'B' on a Isolation signal during the previous step.

COMMENTS:

CR SEQ STEP: 9 STEP STANDARD:

No Yes Place FW switches in automatic. PVG-1 611 A(B)(C) and FCV-PVG-1611A(B)(C) FCV 3321 ,3331 ,3341 Train A and B switches 3321,3331,3341 indicate AUTO.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 06 2005 Page 7 of II

CR SEQ STEP: 10 STEP STANDARD:

Ye Yes Reset SI. Momentarily places both SI RESET TRAIN A(B) switches to the RESET position.

CUES: SAT NOTE: If SI signal has NOT been generated by this time, student must wait >60 UNSAT seconds to reset if the SI signal is generated later in procedure.

COMMENTS:

CR SEQ STEP: 11 STEP STANDARD:

No Yes Verify the condenser is available. C-9 status light is bright.

CUES: SAT UNSA T UNSAT COMMENTS:

CR SEQ STEP: 12 STEP STANDARD:

No Yes Open MFP turbine drain valves. MOV-1-5A MOV 5A indicates red light ON, green light OFF.

CUES: SAT A MFP will be used to establish a heat sink. NOTE: Student UNSAT Cue student that the 'A' A MFP.

only required to open drain valve for the 'A' COMMENTS:

Tuesday, December 06, 06 2005 PageS8 of11 Page of 11

CR SEQ STEP: 13 STEP STANDARD:

Yes No Ves A MFP.

Reset the 'A' FWP A TRIP/RESET switch momentarily A MFP will taken to reset. Student notes 'A' not reset.

CUES: SAT NOTE: MFP will not reset due to the 'B' B Train FW isolation signal. Attempting to start UNSAT another MFP would not constitute a failure.

COMMENTS:

CR SEQ STEP: 14 STEP STANDARD:

Ye No Ve Bypass the steam dump interlock when Tavg Both STM DUMP INTERLOCK Switches bright),

is <552°F (P12 interlock bright). BYP INTLK position.

taken to the BVP CUES: SAT NOTE: Only performed/critical if Tavg decreases below 552°F. UNSAT COMMENTS:

CR SEQ STEP: 15 STEP STANDARD:

Ye Ve Yes Ves B S/G (Opens FVC-Establish flowpath to the 'B' FCV-3331 controller indicates full open.

3331.

CUES: SAT UNSA T UNSAT COMMENTS:

Tuesday, December 06, 2005 Page 990/11 of 11

CR SEQ CR SEQ STEP:

STEP: 16 16 STEP STANDARD:

STEP STANDARD:

Ye Yes Ye Yes Depressurize the Depressurize the 'B' B S/G via the S/G via the steam steam dumps dumps STM DUMP STM DUMP MODE MODE SELECT SELECT Switch Switch and establish and FW flow establish FW flow to to the the 'B' B S/G.

S/G. indicates STM indicates STM PRESS.

PRESS. STM STM DUMP DUMP CNTRL CNTRL Controller adjusted Controller adjusted to to full full open open Bank Bank 11 steam dumps.

steam dumps. Flow Flow indicated indicated toto "B" B SG SG on FI-486/487.

on Fl-4861487.

CUES: SAT NOTE: IfIf C-9 is not available, the student may perform alternate steps NOTE: steps to dump UNSAT steam via the Power steam Power Reliefs.

COMMENTS:

COMMENTS:

Examiner ends JPM at this point.

Tuesday, Tuesday, December December 06, 06, 2005 2005 Page 10 Page 100/11 of 11

JPM SETUP JPM SETUP SHEET SHEET JPM NO:

jPM NO: JPSF-083 JPSF-083 DESCRIPTION:

DESCRIPTION: RESPOND TO RESPOND LOSS OF TO LOSS OF SECONDARY SECONDARY HEAT HEAT SINK SINK ICSET:

IC SET: 10 10or325 or 325 INSTRUCTIONS:

INSTRUCTIONS:

Activate

1. Activate 1.

MAL-FWMOO3A, 003B, MAL-FWM003A, 003B, 003C 003C (EFW Pump (EFW Pump Trip)

Trip)

MAL-PCSO13B MAL-PCS013B SELECT= INADVERTANT SELECT= INADVERTANT INIT INIT (Inadvertent FW (Inadvertent FW isolation isolation ('B' (B Train))

Train))

2. RUN
2. RUN
3. Perform Immediate
3. Perform Immediate Actions of EOP-1 .0 after of EOP-1.0 after reactor reactor trip.
4. When S/G
4. SIG NR NR levels <20%:

Manually secure all three RCPs.

FREEZE

5. When examinee is ready:

RUN

7. When requested to bypass the FW isolation signals, enter the following:

LOA-FWMO4O LOA-FWM040 SELECT=

SELECT = BYPASS LOA-FWMO41 LOA-FWM041 SELECT= BYPASS LOA-FWMO42 LOA-FWM042 SELECT=

SELECT= BYPASS COMMENT COMMENTS: S:

Tuesday, Tuesday, December06 , 2005 December 06, 2005 Page ilof Page 11 ofii 11

V.C. SUMMER NUCLEAR STATION v.C.

JOB PERFORMANCE MEASURE

]PM JPM JPSF-062 RESPOND TO RHR PUMP VORTEXING APPROVAL: APPROVAL DATE:

REV NO:

REVNO: 4 CANDIDATE EXAMINER:

THIS JPM IS NOT APPROVED Tuesday, December 06, 2005 of 9 Page 11 of9

TASK:

TASK:

000-161-05-01 000-161-05-01 RESPOND TO RESPOND TO RESIDUAL RESIDUAL HEAT HEAT REMOVAL REMOVAL PUMP PUMP VORTEXING VORTEXING TASK STANDARD:

TASK B RHR Pump

'B' Pump is secured.

AOP-1 15.5 is recommended.

Transition to AOP-115.5 The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD SIMULATOR PERFORM

REFERENCES:

TOOLS: AOP-115.1 EVALUATION TIME 15 TIME CRITICAL No 10CFR55:

JOCFR55: 41(b)10 CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

UN SAT:

QUESTION GRADE: PERFORMANCE EXA MINER:

EXAMINER:

SIGNATURE DATE COMMENTS:

Tuesday, December 06, 2005 December 06, 2005 Page 22 of Page of99

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, BEGIN, YOU ARE TO PERFORM PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING DIRECTED IN INITIATING CUES. II WILL DESCRIBE THE GENERAL CONDITIONS UNDER UNDER WHICH THIS TASK IS IS TO BE PERFORMED PERFORMED AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB PERFORMANCE MEASURE WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

INITIAL CONDITION: The plant is in Mode 5 with the RCS at mid-loop conditions. The 'B' B RHR loop is in service. The Mansell Level Monitoring system computer is set up In the simulator.

INITIATiNG CUES: As the NROATC, respond to plant alarms.

INITIATING HAND JPM OPERA TOR AT THIS TIME!

]PM BRIEFING SHEET TO OPERATOR TiME!

Tuesday, December 06, 06; 2005 Page 3 of of99

JPM BRIEFING SHEET

]PM OPERA TOR INSTRUCTIONS:

OPERATOR SAFETY CONSIDERATIONS:

INITIAL CONDITION: The plant is in Mode 5 with the RCS at mid-loop conditions. The 'B' B RHR loop is in service. The Mansell Level Monitoring system computer is set up In the simulator.

INITIATING CUES: As the NROATC, respond to plant alarms.

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Tuesday, December December 06, 06, 2005 2005 Page 44 of Page 0/99

STEPS CR SEQ STEP: 1 1 STEP STANDARD:

No No Responds to the following annunciator: Notes indications of B RHR pump 610 2-2, RHR LP B XCP 6102-2, B FLO LO cavitation/vortexing and Implements AOP AOP-115.1.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

Ye Yes Close RHR outlet valve. HCV-603B controller setpoint indicates O.

0.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

Ye Yes Throttle FCV-605B to stabilize RHR flow. FCV-6058 controller taken to manual and FCV-605B reduced until RHR pump amps and flow are stable.

CUES: SAT NOTE: The student should reduce RHR flow until vortexing indications stop. UNSAT COMMENTS:

O6 2005 Tuesday, December 06, Page PageS5 0/9 of 9

CR SEQ STEP: 4 STEP STANDARD:

No Yes No Monitor the following; Monitor Monitor flow on FI-6058, Fl-605B, FLOW GPM; GPM; RHR RHR PUMP '8' PUMP B AMPS; RCSRCS heatup*rate.

heatup rate.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

No No Monitor RCS heatup on TR-413, HOT LEG OF °F no significantheatup on TR-413 WIDE RNG.

CUES: SAT STP-103.OO1 Cue examinee that another operator will perform STP-103.001 UNSAT COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

No No Verify RCS Hot Leg level elevation is Level verified approximately 430' 4301010" on GREATER THAN OR EQUAL TO' TO 430 1/2 430' 8 1/2" Mansell and Mid loop monitors CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06 06, 2005 Page6oJ9 Page 6 of 9

CR SEQ CR SEQ STEP:

STEP: 77 STEP STEPSTANDARD:

STANDARD:

Ye No Ye No Control Charging Control Charging and and Letdown Letdownflowflowtoto restore restore Opens FCV-122 Opens FCV-1 22 toto increase increasecharging charging flow flow RCS Hot RCS Hot Leg Leg level level elevation elevation toto GREATER GREATER until level until level starts starts toto increase increase THAN 430' THAN 430 10" (15.5 inches).

10 (15.5 inches).

CUES:

CUES: SAT SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ CR SEQ STEP:

STEP: 88 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Responds to Responds to annunciators annunciators XCP-607 XCP-607 3-4 (LD 3-4 (LD Notes indications Notes indications of of level level decreasing decreasing and and AB SUMP/FD AB SUMP/FD LEVEL LEVEL HI) HI) and and XCP-61 XCP-610 2-2 02-2 pump vortexing pump vortexing again again (RHR LP (RHR LP BB FLO FLO LO)

LO)

CUES:

CUES: SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ CR SEQ STEP:

STEP: 9 STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Throttle flow Throttle flow as necessary to stabilize RHR Throttle RHR flow to attempt to stabilize Pump amps with flow GREATER THEN Pump RHR Pump amps.

500gpm.

500gpm.

CUES:

CUES: SAT NOTE:

NOTE: RHRRHR Pump Pump amps are are still still unstable and flow is is <500

<500 gpm.

gpm. UNSAT COMMENT COMMENTS: S:

Tuesday, Tuesday, December December06, 06, 2005 2005 Page 770/9 Page of 9

CR SEQ CR STEP: 10 10 STEP STANDARD:

STA NDARD:

Ye Yes Ye Stop the operating Stop operating RHR RHR Pump.

Pump. The operating The operating RHR RHR Pump Pump isis stopped.

stopped.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 11 STEP STANDARD:

No Yes Go to AOP-115.5, AOP-1 15.5, Loss Of RHR With The RCS AOP-1 15.5.

Recommend transition to AOP-115.5.

Not Intact (Mode 5).

CUES: SAT Cue: This completes this JPM. UNSAT COMMENTS:

Examiner ends JPM at this point.

Tuesday, December 06, 2005 December 06, 2005 Page 88 of Page of99

JPM SETUP JPM SETUP SHEET SHEET JPM NO:

JPM NO: JPSF-062 JPSF-062 DESCRIPTION:

DESCRIPTION: RESPOND TO RESPOND TO RHR PUMP VORTEXING RHR PUMP VORTEXING IC SET:

IC SET: 20 20 INSTRUCTIONS:

INSTRUCTIONS:

1. Place danger
1. Place danger tags tags onon the the following foNowing components components to to simulate simulate half-pipe half-pipe lineup:

lineup:

RB Spray RB Spray pumps pumps Accumulator Accumulator IsolationIsolation Valves Valves Reactor Coolant Reactor Coolant Pumps Pumps Pressurizer Heaters Pressurizer Heaters Reactor Trip Reactor Trip Breakers Breakers

2. Set
2. Set up thethe Mansell Level Monitoring computer in the simulator
3. IfIf the the Half-Pipe Half-Pipe concern status board is used, the following information may be posted:

Boration flow Boration flow path:

B Charging

'B' Charging pump, 115 B suction, 8801 8801A A injection from RWST B/U 'A' A Charging Pump, MVG- 8104 suction, MVG-8884 injection from BAT Comments: Maintain 6"-10" Comments: 6-10 above mid-loop Applicable Applicable procedures:

AOP-115.1 AOP-115.1 - RHR Pump Vortexing AOP-1 AOP-115.5 15.5 - Loss of RHR with RCS Not Intact Intact 4.

4. Activate OVR-AA028 OVR-AA028 SELECT=ON SELECT=ON (Override Radiation Monitoring Panel Annunciators Annunciators))
5. RUN
5. RUN
6. Insert
6. Insert MAL-RHRO MAL-RHR005B O5B Severity Severity == 1500 1500
7. When
7. When RHR RHR pump pump cavitation cavitation starts starts and and RHR RHR LOOPLOOP AA FLO FLO LO LO annunciator annunciator is is in in alarm, alarm, delete delete MAL MAL-RHROO5B RHR005B
8. Run
8. Run forfor 55 minutes minutes toto get good trend get good on mid trend on mid loop loop monitors.

monitors.

FR EEZE FREEZE

9. Select
9. Select RCS RCS Trend Trend from from ZZMENU ZZMENU on on MCB1 MCB1 IPCSIPCS screen.

screen.

10. Energize
10. Energize the the Audio Audio Count Count Rate Rate Circuit.

Circuit.

11.

11. Do not take Do not take simulator simulatorto to run run until until student student says he/she isis ready says he/she ready to to begin begin JPM.

JPM.

10.

1O. When When student student has has begun begun to to recover recover level, level, reinsert reinsert MAL-RHRO MAL-RHR005B SEVERITY== 1500 O5B SEVERITY 1500 (RHR (RHR bypass bypass

line leak),

line SET =

leak), SET Trigger #1.

= Trigger #1. Tuesday, December Tuesday, December 06, Page 99 of 2005 Page 06, 2005 of99

11. IfIf necessary,
11. necessary, Increase Increase MAL-RHROOSB MAL-RHROO5B severity severity until until flow flow is stabilized at is stabilized at <SOO gpm or

<500 gpm or cannot cannot be be stabilized to stabilized to force force them them into into AOP-11S.S.

AOP-1 15.5.

COMMENTS:

V. C. SUMMER V.C. SUMMER NUCLEAR NUCLEAR STATION S TA TION JOB PERFORMANCE MEASURE JOB PERFORMANCE MEASURE JPM JPM JPS-O72NRC JPS-072NRC RESPOND TO RESPOND TO SOURCE SOURCE RANGE RANGE CHANNEL CHANNEL FAILURE FAILURE APPROVAL:

APPROVAL: APPROVAL DATE:

APPROVAL DATE:

REVN REV NO:O: 11 CANDIDATE CANDIDATE EXAMINER:

EXAMINER:

IS NOT THIS JPM IS NOT APPRO APPROVED VED

Tuesday, Tuesday,December December06, 06,2005 2005 of9 Page11of Page 9

TASK:

TASK:

000-032-05-01 000-032-05-01 RESPOND TO RESPOND TO SOURCE SOURCE RANGE RANGE INSTRUMENTATION INSTRUMENTATION CHANNELCHANNEL FAILURE FAILURE TASK STANDARD:

N-32 (the failed channel) is in a BYPASS condition, fuel movement has been stopped, and all fuel is stored in a safe location.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD SIMULATOR PERFORM

REFERENCES:

AOP-401.9 SOURCE RANGE CHANNEL FAILURE TOOLS: AOP-401 .9 and ARPs for 620 4-1 and 620 4-3 as Supply examinee with AOP-401.9 they are earned EVALUATION TIME 10 TIME CRITICAL No 10CFR55:

10CFR55: 45(A)4 CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE EXAMINER:

SIGNATURE DATE COMMENTS:

December 06, Tuesday, December 06, 2005 2005 Page 22 of Page 0/99

INSTRUCTIONS TO INSTRUCTIONS TO OPERATOR OPERATOR READ TO READ TO OPERATOR:

OPERATOR:

WHEN II TELL WHEN TELL YOU YOU TO TO BEGIN, BEGIN, YOU YOU ARE ARE TO TO PERFORM PERFORM THE THE ACTIONS ACTIONS ASAS DIRECTED DIRECTED IN IN THE THE INITIATING INITIATING CUES. II WILL CUES. WILL DESCRIBE DESCRIBE THE THE GENERAL GENERAL CONDITIONS CONDITIONS UNDER UNDER WHICH WHICH THIS TASK IS THIS TASK IS TO TO BEBE PERFORMED PERFORMED AND PROVIDE AND PROVIDE THETHE NECESSARY NECESSARY TOOLS TOOLS WITH WITH WHICH WHICH TO TO PERFORM PERFORM THIS THIS TASK.

TASK. BEFORE BEFORE STARTING, STARTING, II WILL EXPLAIN THE INITIAL CONDITIONS, WHICH WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPSSTEPS TO TO SIMULATE SIMULATE OROR DISCUSS, DISCUSS, ANDAND PROVIDE PROVIDE INITIATING CUES.

INITIATING CUES. WHEN WHEN YOUYOU COMPLETE COMPLETE THE THE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE THE OBJECTIVE OBJECTIVE FOR FOR THIS THIS JOB JOB PERFORMANCE MEASURE PERFORMANCE MEASURE WILL WILL BE BE SATISFIED.

SATISFIED.

SAFETY CONSIDERATIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION: Plant INITIAL CONDITION: Plant is in mode is in mode 66 with refueling refueling in in progress progress and and RCS RCS temperature at at 120°F. Fuel 120°F. Fuel movement movement is is in in progress progress with assembly J-9 being being moved.

moved.

This JPM will be This JPM simulated in be simulated in the the control control room.

room.

INITIATING CUES: CRS directs operator to respond as expected to MCB Annunciators for the indicated plant conditions

. HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

Tuesday, December Tuesday, 06, 2005 December 06, 2005 Page Page 33 of 0/99

BRIEFING SHEET JPM BRIEFING

]PM SHEET OPERA TOR INSTRUCTIONS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

INITIAL CONDITION: Plant Plant isis inin mode mode 66 with with refueling refueling inin progress progress and and RCS RCS temperature temperature at at 120°F. Fuel 120°F. Fuel movement movement isis in in progress progress with with assembly assembly J-9 J-9 being being moved.

moved.

This JPM This JPM will will be simulated in be simulated the control in the control room.

room.

INITIATING CUES:

INITIATING CUES: CRS CRS directs directs operator operator toto respond respond as as expected expected to to MCB MCB Annunciators Annunciators for for the indicated the indicated plant plant conditions conditions HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU EVALUATOR HAVE SATISFACTORILY SATISFACTORILY COMPLETED COMPLETED THE ASSIGNED TASK.

Tuesday, December Tuesday, December O6 06, 2005 2005 Page 44 of Page of99

STEPS STEPS CR SEQ CR SEQ STEP:

STEP: 1 STEP STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Stop all Stop all core core alterations.

alterations. Stops fuel Stops fuel movement movement inin progress.

progress. Notify Notify RE on RE on headset headset andand RBRB coordinator.

coordinator.

CUES:

CUES: SAT SAT CUE: N 32 Meter to zero. Instrument Power N32 off. Non CUE: N 32 Meter to zero. Instrument Power N32 off. Non operate light, level operate light, trip UNSAT level trip UNSAT light, high light, high flux flux shutdown shutdown light, light, bistable bistable trip trip spare spare light.

light. Annunciators Annunciators 6204-1 620 4-1 andand 620 4-3 620 are received 4-3 are received COMMENTS:

COMMENTS:

CR SEQ CR STEP: 2 STEP STANDARD:

STANDARD:

No Yes No Stop all Stop positive reactivity all positive reactivity additions additions Any dilution Any dilution or or cooldown cooldown in in progress progress stopped.

CUES: SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ CR STEP: 33 STEP STANDARD:

STANDARD:

Ye Yes Check at least 1 1 Source Range channel Verities normal/expected indication on N-Verifies normal/expected N operable 31 at MCB or NIS panels.

CUES: SAT CUE: Instrumental Power light on control power light on. N31 reads about 20 cps.UNSAT powerlight COMMENT COMMENTS: S:

Tuesday, December Tuesday, December 06, 06, 2005 2005 PageS Page of9 5 of 9

CR SEQ CR SEQ STEP:

STEP: 44 STEP STEPSTANDARD:

STANDARD:

Ye Yes Ye Yes CheckififRB Check RBevacuation evacuationalarm alarm has hasactuated.

actuated. SRSR HIHI FLUX FLUXATATSHUTDN SHUTDN annunciator annunciatorisis lit.lit.

CUES:

CUES: SAT SAT CUE: RB CUE: RB coordinator coordinator reports reports thatthat the the RB RB evacuation evacuation alarm alarm isis sounding sounding UNSAT UNSAT COMMENTS:

COMMENTS:

CR SEQ CR SEQ STEP:

STEP: 55 STEP STEP STANDARD:

STA NDARD:

No No No No Inform plant Inform plant personnel personnel that that the the Reactor Reactor Personnel &

Personnel & RB RB coordinator coordinator notified.

notified.

Building evacuation alarm was Building evacuation alarm was spurious, and spurious, and Announcement Announcement made made that that the the alarm alarm isis evacuation of evacuation of the the RB RB isis NOT NOT required.

required. invalid..

invalid ..

CUES:

CUES: SAT SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ CR SEQ STEP:

STEP: 6 STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Bypass level Bypass level trip trip for N-32 Set LEVEL TRIP switch for N-32 to BYPASS. Level trip bypass light lit.

CUES:

CUES: SAT CUE:

CUE: Level Level trip trip bypass light light lit.

lit. UNSAT COMMENT COMMENTS: S:

Tuesday, Tuesday, December 06,2005 December06, 2005 Page6of9 Page 6 of 9

CR SEQ CR SEQ STEP:

STEP: 77 STEP STEPSTANDARD:

STA NDARD:

No Yes No Yes VerifyN-32 Verify N-32 isis bypassed.

bypassed. IRIR && SR SR TRIPTRIP BYP BYP annunciator annunciator (XCP-620 (XCP-620 4-5) isis inin alarm.

4-5) alarm.

CUES:

CUES: SAT SAT CUE:IR && SR CUE:IR TRIP BYP SR TRIP BYP annunciator annunciator (XCP-620 (XCP-620 4-5) 4-5) isis inin alarm.

alarm. UNSAT UNSAT COMMENT COMMENTS: S:

CR SEQ CR SEQ STEP:

STEP: 88 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Block the Block the HIGH HIGH FLUX FLUX AT AT SHUTDOWN SHUTDOWN for for N-N- Verifies HIGH Verifies HIGH FLUX FLUX AT AT SHUTDOWN SHUTDOWN 32.

32. switch for switch for N-32 N-32 positioned positioned to to BLOCK.

BLOCK.

Verifies SR Verifies SR HIGH HIGH FLUX FLUX ATAT SHUTDN SHUTDN Block Block (XCP-620-4-4) annunciator (XCP-620-4-4) annunciator is is lit.

lit.

CUES:

CUES: SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ CR SEQ STEP:

STEP: 9 STEP STANDARD STANDARD::

No No No No Monitors an Monitors an operable NI channel. Monitors N-31 and notes that it is reading as expected for current plant conditions.

CUES:

CUES: SAT CUE:

CUE: N31 N31 reads reads about about 2020 CPS CPS UNSAT COMMENT COMMENTS: S:

Tuesday, Tuesday, December 06, 2005 December06, 2005 Page 770/9 Page of 9

CR SEQ CR SEQ STEP:

STEP: 10 10 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Ensure NR-45 Ensure NR-45 isis selected selected to to operable operable channel channel Verifies NR-45 Verifies NR-45 selected selected to to N-31 N-31 channel.

channel.

CUES:

CUES: SAT SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ CR STEP:

STEP: 11 11 STEP STANDARD:

STANDARD:

No No No No Dispatch I&C Dispatch to determine l&C to determine the the cause cause of of the the l&C contacted I&C contacted N32 N32 failure CUES: SAT UNSAT UNSA T COMMENTS:

COMMENTS:

Examiner ends JPM at this point.

Tuesday, Tuesday, December December 06, 06, 2005 2005 Page8of9 Page 8 of 9

JPM SETUP SHEET JPM SETUP SHEET JPM NO:

jPM NO: JPS-072NRC JPS-O72NRC DESCRIPTION:

DESCRIPTION: RESPOND TO RESPOND TO SOURCE SOURCE RANGE RANGE CHANNEL CHANNEL FAILURE FAILURE IC SET:

IC SET:

INSTRUCTIONS:

INSTRUCTIONS:

1. RUN
1. RUN
2. Initial
2. Initial conditions conditions plant plant isis in in mode mode 66 and and moving moving fuel.

fuel.

FREEZE

5. FREEZE 5.
6. When student
6. When student is ready is ready
7. RUN
7. RUN Activate OVR-NI053
8. Activate OVR-N1053 SELECT=OFF SELECT=OFF (Blown Instrument Power Fuse on N32.) (MAL???)

THESE SETUP INSTRUCTIONS THESE INSTRUCTIONS ARE N/A FOR SIMULATING SIMULATING IN THE MAIN CONTROL ROOM.

COMMENTS:

COMMENTS:

Tuesday, Tuesday, December December06,06, 2005 2005 Page 990f9 Page of 9

V. C. SUMMER NUCLEAR STATION v.C. S TA TION JOB PERFORMANCE MEASURE JPM

]PM JPP-O55NRC JPP-055NRC LOCALLY START LOCALLY START THE THE TURBINE TURBINE DRIVEN DRIVEN EMERGENCY EMERGENCY FEEDWATER PUMP FEEDWATER PUMP AND AND THROTTLE THROTTLE EMERGENCY EMERGENCY FEEDWATER FLOW FEEDWATER FLOW AS AS DIRECTED DIRECTED APPROVAL: APPROVAL DATE:

REVNO:

REV NO: 0 CANDIDATE EXAMINER:

THIS JPM IS NOT APPROVED

Tuesday, Tuesday, December December 06, 06, 2005 2005 Page 11 of Page of11 11

TASK:

TASK:

061-001-05-04 061-001-05-04 LOCAL EMERGENCY LOCAL EMERGENCY START START OF OFTURBINE TURBINE DRIVEN DRIVEN EMERGENCY EMERGENCY FEEDWATER PUMP FEEDWATER PUMP Turbine Driven Turbine Driven Emergency Emergency Feedwater Feedwater PumpPump isis started started locally locally per per FEP-4.0, FEP-4.0, ENCLOSURE ENCLOSURE FF and and speed speed increased to increased to >> 4,000 4,000 rpm.

rpm. Flow Flow control control valves valves IFV-3536, IFV-3536, IFV-3546, IFV-3546, & & IFV-3556 IFV-3556 areare throttled throttled to to maintain SG maintain SG WRWR levels levels between between 50%

50% and and 60%.

60%. Enclosure Enclosure FF steps steps 22 - 44 must

- must bebe completed completed within within 30 30 minutes of minutes of implementation.

implementation. The The use use of of applicable applicable Human Human Performance Performance ToolsTools (3-way (3-way communications, communications, self checking, self checking, peerpeer checking, checking, phonetic phonetic alphabet, alphabet, etc) etc) and and industrial industrial safety safety practices practices meets meets expectations.

expectations.

PREFERRED EVALUATION PREFERRED EVALUATION LOCATION LOCATION PREFERRED EVALUATION PREFERRED EVALUATION METHOD METHOD PLANT PLANT SIMULATE SIMULATE

REFERENCES:

REFERENCES:

AOP-600.1 AOP-600.1 CONTROL ROOM CONTROL ROOM EVACUATION EVACUATION FEP-4.0 FEP-4.0 CONTROL ROOM CONTROL ROOM EVACUATION EVACUATION DUE DUE TO TO FIRE FIRE TOOLS:

TOOLS: FEP-4.0, ENCLOSURE FEP-4.0, ENCLOSURE FF EVALUATION TIME EVALUATION TIME 25 TIME CRITICAL NO 10CFR55:

10CFRS5: 45(a)7 CANDIDATE:

CANDIDATE: TIME START:

TIME FINISH:

PERFORMA PERFORMANCE NCE RATING:

RATING: SAT: UNSAT:

QUESTION QUESTION GRADE: PERFORMANCE PERFORMA NCE EXAMINER EXAMINER::

SIGNATURE SIGNATUR E DATE DATE COMMENT COMMENTS: S:

Tuesday, Tuesday, December December06,06, 2005 2005 Page22of Page 0/11 11

INSTRUCTIONS TO INSTRUCTIONS TO OPERATOR OPERATOR READ TO READ TO OPERATOR:

OPERATOR:

WHEN II TELL WHEN TELL YOU YOU TO BEGIN, YOU TO BEGIN, YOU AREARE TOTO PERFORM PERFORM THETHE ACTIONS ACTIONS AS AS DIRECTED DIRECTED IN IN THE THE INITIATING INITIATING CUES. II WILL CUES. WILL DESCRIBE DESCRIBE THE THE GENERAL GENERAL CONDITIONS CONDITIONS UNDER UNDER WHICH WHICH THIS TASK IS THIS TASK IS TO TO BEBE PERFORMED PERFORMED AND PROVIDE AND PROVIDE THETHE NECESSARY NECESSARY TOOLS TOOLS WITHWITH WHICH WHICH TO PERFORM THIS TO PERFORM THIS TASK.

TASK. BEFORE BEFORE STARTING, STARTING, II WILL EXPLAIN THE INITIAL CONDITIONS, WHICH WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS STEPS TOTO SIMULATE SIMULATE OR OR DISCUSS, DISCUSS, AND AND PROVIDE PROVIDE INITIATING CUES.

INITIATING CUES. WHEN WHEN YOUYOU COMPLETE COMPLETE THE THE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE THE OBJECTIVE OBJECTIVE FOR FOR THISTHIS JOB JOB PERFORMANCE MEASURE PERFORMANCE MEASURE WILL WILL BE BE SATISFIED.

SATISFIED.

SAFETY CONSIDERATIONS:

SAFETY CONSIDERATIONS: Burn Hazard Burn Hazard CONDITION: The Control INITIAL CONDITION: Control Room Room has has been evacuated due to aa fire. Control been evacuated Control of the plant plant has been has been established from thethe CREP panel.

panel. The Shift Engineer Engineer is not not available to available to start start the TDEFP.

the TDEFP.

INITIATING CUES: Control Room Supervisor directs the ABUL operator to locally start the TDEFP and to locally throttle EFW flow to maintain SG WR levels between 50% and 60% per FEP-4.0 ENCLOSURE F, Steps 2. thru 4 THIS IS A TIME CRITICAL JPM!

A T NO TIME ARE AT A RE YOU TO OPERATE OPERA TE ANY PLANT EQUIPMENT! EQUIPMENT!

HAND JPM BRiEFiNG BRIEFING SHEET TO OPERATOR AT THIS THiS TIME!

Tuesday, Tuesday, December December 06, 06, 2005 2005 Page 33 of Page of11 11

jPM JPM BRIEFING SHEET OPERA TOR INSTRUCTIONS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: Burn Hazard Burn Hazard INITIAL CONDITION:

INITIAL CONDITION: The The Control Control Room Room has has been been evacuated evacuated due due to to aa fire.

fire. Control Control of of the the plant plant has been established from the CREP panel.

has panel. The Shift Engineer Engineer is is not available to start the TDEFP.

INITIATING CUES: Control Room Room Supervisor directs the ABUL operator to locallylocally start the EFW flow to maintain TDEFP and to locally throttle EFW maintain SG WR levels levels between between 50% and 60% per FEP-4.0 ENCLOSURE F, Steps 2. thru 4 A T NO TIME ARE A RE YOU TO OPERATE OPERA TE ANY PLANT EQUIPMENT! EQUIPMENT!

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU EVALUATOR SATISFACTORILY COMPLETED HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Tuesday, December 06, Tuesday, December 06, 2005 2005 0/11 Page 44 of Page 11

STEPS STEPS CR SEQ CR SEQ STEP:

STEP: 1 STEP STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Open XVG-2802B-MS Open XVG-2802B-MS HEADER HEADER CC EF EF PUMP PUMP Visually checks Visually checks XVG-2802B-MS XVG-2802B-MS HEADER HEADER TURBINE SUPPLY TURBINE SUPPLY VLV VLV (IB-435 (IB-435 East East Pen.).

Pen.). EF PUMP CC EF PUMP TURBINE TURBINE SUPPLY SUPPLY VLVopen, VLV open, (IB-436 (IB-436 East East Pen).

Pen).

CUES:

CUES: SAT SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ CR STEP: 2 STEP STANDARD:

STANDARD:

No No No No Take the Take the emergency emergency stairs stairs to to the the IB-412 IB-412 Identifies emergency Identifies emergency stairs stairs to to the the IB-412 IB-412 Turbine Driven Emergency Feedwater Feedwater Pump Pump Turbine Driven Emergency Feedwater Feedwater Room. Pump Room.

CUES: SAT Cue operator Cue operator to indicate where the emergency stairs to the IB-412 IB-41 2 Turbine Driven UNSAT Emergency Feedwater Pump Room are located then proceed to the TDEPP room via Emergency the normal route through the RCA.

COMMENTS:

COMMENTS:

CR CR SEQSEQ STEP: 33 STANDARD::

STEP STANDARD Ye Ye Yes If necessary, reset the throttle valve, XVT- XVT02865-MS, Visually checks XVT02865-M S, EF PUMP 02865-MS, EF EF PUMP PUMP TURB MAIN MAIN STEAM STEAM THROTTLE VALVE, TURB MAIN STEAM THROTTLE THROTTLE THROTILE VALVE.VALVE. reset by observing upper limit limit switch and trip hook engaged.(IB-engaged.(IB-412).

412).

CUES:

CUES: SAT SAT Cue Cue operator operator that that XVT02865-M XVT02865-MS, S, EF EF PUMP PUMP TURB TURB MAIN MAIN STEAM STEAM THROTTLE THROTTLE VALVE VALVE UNSAT UNSAT isis reset.

reset.

COMMENT "

COMMENTS: S:

Tuesday, Tuesday, December December06, 06, 2005 2005 PageS of PageS of11 11

CR SEQ CR SEQ STEP:

STEP: 44 STEP STANDARD:

STEP STANDARD:

No No No No Ensure XVT02813-MS, Ensure XVT02813-MS, EF EF PUMP PUMP TURB TURB STEAM STEAM Moves Moves the the declutch declutch lever lever and and engages engages the the SUPPLY HDR SUPPLY HDR DRAIN DRAIN VLV, VLV, isis open open handwheel. Turns handwheel. Turns valve valve handwheel handwheel inin the close the close direction direction and and verifies verifies the the valve valve starts to starts to close close then then fully fully reopends reopends valve valve CUES:

CUES: SAT SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Open IFV-2030-MS, Open IFV-2030-MS, EF EF PUMP PUMP TURBTURB STEAM STEAM 1). Shuts 1). Shuts IFV-2030-AV1-MS, IFV-2030-AV1-MS, IA IA SUPPLY FLOWFLOW CONT VLV as follows: ISOLATION VALVE FOR IFV-2030-MS IFV-2030-MS by 1). Close IFV-2030-AV1-MS, IA 1). IA ISOLATION turning air isolation valve in the clockwise VALVE FOR IFV-2030-MS. direction. (IB-412 above air tank).

2). Vent IFV02030PR1-MS, IFVO2O3OPR1 -MS, IA SUPPLY PRESS IFV-2030-PR1-MS, IA SUPPLY 2). Vents IFV-2030-PR1-MS, REG FOR IFV-2030-MS. PRESS REG FOR IFV2030-MS by turning the valve T T-Bar

-Bar in the counterclockwise counterclockwise direction.

CUES: SAT Examiner cues operator that IFV-2030 remains closed after closing the IA valve but UNSAT UNSA T opens when the regulator is vented off.

COMMENT COMMENTS: S:

Tuesday, Tuesday, December December 06, 06, 2005 2005 Page 66 of Page of11 11

CR SEQ CR SEQ STEP:

STEP: 66 STEP STEPSTANDARD:

STANDARD:

Ye Yes Ye Yes VerifyTurbine Verify Turbinespeed speed increases increasesto greater togreater Visuallyverify Visually verifyTurbine Turbine Driven Driven Emergency Emergency than 4000 than 4000 RPMRPM onon ISI13505, 1S113505, EF EF PUMP PUMPTURBINE TURBINEFeed Feed Pump Pump Speed Speed byby observing observing ISI13505, 1S113505, TACHOMETER.

TACHOMETER. EF PUMP EF PUMP TURBINE TURBINE TACHOMETER, TACHOMETER, local local Tachometer Tachometer indication (mounted on indication (mounted on the the Turbine).

Turbine). Turbine Turbine speed speed indicates indicates >4000

>4000 RPM.

RPM.

CUES:

CUES: SAT SAT Cue operator Cue operator that that turbine turbine speed speed isis 4200 4200 rpm.rpm. UNSAT UNSAT COMMENT COMMENTS: S:

CR SEQ CR SEQ STEP:

STEP: 77 STEP STEP STANDARD:

STANDARD:

No Yes No Yes close the close the following drain drain valves XVT-2803A-XVT-2803A- 2803A, 2804A, & & 2804B rotated rotated in in the MS, XVT-2804A-MS, MS, XVT-2804A-MS, and and XVT-2804B-MS XVT-2804B-MS clockwise direction clockwise direction until until handwheel handwheel movement stops and valve will no longer rotate in the clockwise direction by rotate by hand hand CUES:

CUES: SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR CR SEQSEQ STEP:

STEP: 88 STANDARD::

STEP STANDARD No No Yes Yes Isolates Isolates Instrument Air Air to to FCV-3536-E FCV-3536-EF. F. (IB-(IB- FCV-3536 stem Checks FCV-3536 stem position(lB-4 position(IB-423).23).

423) 423) IFV-3536-AV1-EF Student rotates IFV-3536-AV 1-EF in in the clockwise clockwise direction.

direction.

CUES:

CUES: SAT SAT Cues Cues the the operator operator that that IFV-3536 IFV-3536 isis full full open.

open. Then Then (while (while closing of AV1 closing of AV1 valve) valve) UNSAT UNSAT cues cues operator operator that that the the handle handle turns turns inin the the clockwise clockwise direction direction then then stops.

stops.

COMMENT COMMENTS: S:

Tuesday, Tuesday, December 06, 2005 December06, 2005 Page 770f11 Page of 11

CR SEQ CR SEQ STEP:

STEP: 99 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Vent air Vent air from from thethe regulator regulatorforfor FCV-3536-EF, FCV-3536-EF, Operator Operator opens opens thethe regulator regulator vent.

vent.

(IB-423).

(IB-423).

CUES:

CUES: SAT SAT Cue operator Cue operator that that he hears and he hears and feels feels air blowing.

air blowing. UNSAT UNSAT COMMENTS:

COMMENTS:

CR SEQ CR SEQ STEP:

STEP: 10 10 STEP STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Throttle FCV-3536-EF.

Throttle FCV-3536-EF. Removes locking Removes locking device.

device. Rotates Rotates thethe handwheel for handwheel FCV-3536-EF in for FCV-3536-EF in the the clockwise direction clockwise direction to to maintain maintain 50%

50% - 60%

- 60%

WR WR level level in in A A SG.

SG. Informs Informs CRS CRS at at CREP CREP he has throttled IFV-3536 and awaits direction further direction CUES:

CUES: SAT NOTE TO EXAMINER:

EXAMINER: Ask operator how he/she would establish communcations communcations UNSAT with the CRS at the CREP panel. Cue operator that he feels light resistance in the with clockwise direction.

clockwise COMMENTS:

COMMENTS:

CR SEQ STEP: 11 11 STANDARD::

STEP STANDARD No No Yes Isolates Instrument Air to FCV-3546-E FCV-3546-EF. F. (IB- position(IB-423).

Checks FCV-3546 stem position(IB-4 23).

423) Student rotates IFV-3546-AV Student IFV-3546-AV1-EF1-EF in the clockwise direction.

clockwise direction.

CUES:

CUES: SAT SAT Cues Cues the the operator operator that that IFV-3546 IFV-3546 is is full full open.

open. Then Then (while (while closing closing of of AV1 AV1 valve) valve) UNSAT UNSAT cues operator cues operator that that the the handle handle turns turns inin the the clockwise clockwise direction direction then then stops.

stops.

COMMENT COMMENTS: S:

Tuesday, Tuesday, December 06, 2005 December06, 2005 Page 88of Page ofll 11

CR SEQ CR SEQ STEP:

STEP: 12 12 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Vent air Vent air from the regulator from the regulator for for FCV-3546-EF, FCV-3546-EF, Operator opens Operator opens the the regulator regulator vent.

vent.

(I B-423).

(IB-423).

CUES:

CUES: SAT SAT Cue operator that Cue operator that hehe hears hears and and feels feels air blowing.

air blowing. UNSAT UNSAT COMMENTS:

COMMENTS:

CR SEQ CR SEQ STEP:

STEP: 13 13 STEP STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Throttle FCV-3546-EF.

Throttle FCV-3546-EF. Removes locking Removes locking device.

device. Rotates Rotates thethe handwheel for FCV-3546-EF handwheel FCV-3546-EF in in the clockwise direction to maintain clockwise maintain 50%

50% - 60%

- 60%

level in WR level in B B SG. Informs Informs CRS at CREP has throttled IFV-3546 he has IFV-3546 and and awaits awaits further instruction CUES: SAT Cue operator that he feels light resistance in the clockwise direction. UNSAT COMMENTS:

CR SEQ STEP: 14 STEP STANDARD:

No Yes Isolates Instrument Air to FCV-3556-EF. (IB- (lB- Checks FCV-3556 stem position(IB-423).

position(lB-423).

423) Student rotates IIFV-3556-AV1-EF FV -3556-A V1-EF in the clockwise direction.

CUES: SAT Cues the operator operator that IFV-3556 IFV-3556 is full open.

open. Then (while closing of of AV1 valve) UNSAT cues operator cues operator that that the the handle handle turns turns in in the the clockwise clockwise direction direction then then stops.

stops.

COMMENTS:

Tuesday, Tuesday, December December 06, 06, 2005 2005 Page 0/11 Page 99 of 11

CR SEQ CR SEQ STEP:

STEP: 15 15 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Vent air Vent air from from the the regulator regulator for for FCV-3556-EF, FCV-3556-EF, Operator opens Operator opens the the regulator regulator vent.

vent.

(IB-423).

(IB-423).

CUES:

CUES: SAT SAT Cue operator that Cue operator that he hears and he hears and feels feels air air blowing.

blowing. UNSAT UNSAT COMMENTS:

COMMENTS:

CR SEQ CR STEP: 16 16 STEP STANDARD:

STANDARD:

Ye Yes Throttle FCV-3556-EF.

Throttle FCV-3556-EF. Removes locking Removes locking device. Rotates Rotates the handwheel for FCV-3556-EF FCV-3556-EF in the clockwise direction to maintain 50% - 60%-

WR level in C SG. Informs Informs CRS at CREP he has throttled IFV-3556 and awaits further instructions CUES: SAT Cue operator that he feels light resistance in the clockwise direction. UNSAT COMMENTS:

COMMENTS:

Examiner ends JPM at this point.

Tuesday, December December 06, 06, 2005 2005 Page 10 Page oj11 10 of 11

JPM SETUP JPM SETUP SHEET SHEET JPMNO:

jPM JPP-O55NRC NO: JPP-055NRC DESCRIPTION:

DESCRIPTION: LOCALLY START LOCALLY START THE THE TURBINE TURBINE DRIVEN DRIVEN EMERGENCY EMERGENCY FEEDWATER FEEDWATER PUMP PUMP ANDAND THROTTLE EMERGENCY THROTTLE EMERGENCY FEEDWATER FEEDWATER FLOW FLOW AS AS DIRECTED DIRECTED IC SET:

ICSET:

INSTRUCTIONS:

INSTRUCTIONS:

COMMENTS:

COMMENTS:

Tuesday, December istesday, December 06, 06, 2005 2005 Page 11 Page ofii 11 of 11

I a V.C. SUMMER v.C. SUMMER NUCLEAR NUCLEAR STATION JOB PERFORMANCE MEASURE JOB PERFORMANCE MEASURE JPM

]PM JPPF JPPF-ESTABLISH CHILLED ESTABLISH CHILLED WATER WATER ALTERNATE ALTERNATE COOLING COOLING TO TO CHARGING PUMPS CHARGING PUMPS APPROVAL:

APPROVAL: APPROVAL DATE:

APPROVAL DATE:

REVNO:

REV NO: 66 CANDIDATE CANDIDATE EXAMINER:

EXAMINER:

THIS JPM IS NOT APPROVED

Tuesday, Tuesday, December December 06, 06, 2005 2005 Page 11 of Page of12 12

TASK:

TASK:

004-003-04-04 004-003-04-04 ESTABLISH CHILLED ESTABLISH CHILLED WATER WATER ALTERNATE ALTERNATE COOLING COOLING TO TO CHARGING CHARGING PUMPS PUMPS TASK STANDARD:

TASK STANDARD:

Chilled Water alternate Chilled Water alternate cooling cooling isis provided provided toto the the "B" B Charging Charging Pump Pump perper AOP-118.1.

AOP-1 18.1. TheThe use use of of applicable Human applicable Human Performance Performance ToolsTools (3-way (3-way communications, communications, self self checking, checking, peerpeer checking, checking, phonetic*

phonetic alphabet, etc) alphabet, etc) and industrial safety and industrial safety practices practices meets meets expectations.

expectations. This This JPM JPM isis related related to to PRA PRA event event OACC "Operator OACC Operator action action to to establish establish alternate alternate COOling cooling to to CS CS pumps".

pumps.

PREFERRED EVALUATION PREFERRED EVALUATION LOCATION PREFERRED EVALUATION PREFERRED EVALUATION METHOD METHOD PLANT PLANT SIMULATE SIMULATE

REFERENCES:

REFERENCES:

AOP-1 18.1 AOP-118.1 TOTAL LOSS LOSS OFOF COMPONENT COMPONENT COOLINGCOOLING WATER WATER TOOLS: AOP-118.1 Attachment AOP-118.1 Attachment 11 and and 1lBB FLASHLIGHT FLASHLIGHT EVALUATION TIME EVALUATION T1ME 20 TIME CRITICAL NO 10CFR55:

JOCFR55: 45(a)6 CANDIDATE:

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING:

PERFORMANCE SAT: UNSAT:

QUESTION GRADE: PERFORMANCE EXAMINER EXAMINER::

SIGNATURE DATE COMMENTS:

COMMENTS:

Tuesday, Tuesday, December 06, 2005 December 06, 2005 Page 22 of Page of12 12

INSTRUCTIONS TO INSTRUCTIONS TO OPERATOR OPERATOR READ TO READ TO OPERATOR:

OPERATOR:

WHEN TELL YOU WHEN II TELL YOU TO BEGIN, YOU TO BEGIN, YOU ARE ARE TOTO PERFORM PERFORM THE THE ACTIONS ACTIONS ASAS DIRECTED DIRECTED IN IN THE THE INITIATING INITIATING CUES. WILL DESCRIBE CUES. II WILL DESCRIBE THE THE GENERAL GENERAL CONDITIONS CONDITIONS UNDERUNDER WHICH WHICH THIS TASK IS THIS TASK IS TO TO BE BE PERFORMED PERFORMED AND PROVIDE THE AND PROVIDE THE NECESSARY NECESSARY TOOLS WITH WHICH TOOLS WITH WHICH TO TO PERFORM PERFORM THISTHIS TASK.

TASK. BEFORE BEFORE STARTING, STARTING, II WILL EXPLAIN THE WILL EXPLAIN INITIAL CONDITIONS, THE INITIAL CONDITIONS, WHICH WHICH STEPS STEPS TO TO SIMULATE SIMULATE OR DISCUSS, AND OR DISCUSS, AND PROVIDE PROVIDE INITIATING CUES.

INITIATING CUES. WHEN WHEN YOU YOU COMPLETE COMPLETE THETHE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE THE OBJECTIVE OBJECTIVE FOR FOR THIS THIS JOB JOB PERFORMANCE MEASURE PERFORMANCE MEASURE WILL WILL BE BE SATISFIED.

SATISFIED.

CONSIDERATIONS:

SAFETY CONSIDERATIONS: Be sure Be to read sure to read radiation posting signs radiation posting signs prior prior to to entering entering charging charging rooms.

pump rooms.

pump INITIAL CONDITION: A total loss of Component Cooling Water has has occurred. CRS has AOP-l 18.1.

implemented AOP-118.1.

INITIATING CUES: The CRS directs you, the ABLL, to extablish alternate cooling to the "B" B Charging Pump from the Chilled Water System per AOP-118.1 Attachment 11 and 1lB.

B.

A T NO TIME ARE AT A RE YOU TO OPERATE OPERA TE ANY PLANT EQUIPMENT! EQUIPMENT!

HAND JPM}PM BRiEFING BRIEFING SHEET TO OPERATOR AT THIS TIME!

Tuesday, December Tuesday, 06, 2005 December 06, 2005 Page Page 33 of of12 12

JPM BRIEFING SHEET

]PM OPERA TOR INSTRUCTIONS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

CONSIDERATIONS: Be sure Be sure to to read read radiation radiation posting posting signs signs prior prior to to entering entering charging charging pump pump rooms.

rooms.

INITIAL CONDITION: A total loss of Component Cooling Water has has occurred. CRS has CRS has implemented AOP-118.1.

implemented AOP-l 18.1.

INITIATING CUES: The CRS directs you, the ABLL, to extablish alternate cooling to the "B" B Charging Pump from the Chilled Water System perper AOP-118.1 Attachment 11 and 1lB.

B.

A T NO TIME ARE AT A RE YOU TO OPERATE OPERA TE ANY PLANT EQUIPMENT!

HAND THIS PAPER BACK TO YOUR EVALUATOR WHEN YOU FEEL THAT YOU HAVE SATISFACTORILY COMPLETED THE ASSIGNED TASK.

Tuesday, Tuesday, December 06, 2005 December 06, 2005 Page4of12 Page 4 of 12

STEPS CR SEQ STEP: 1 1 STEP STANDARD:

No Yes Obtain alternate cooling supply hoses and Hoses and fittings obtained from fittings. Dedicated Gang Box (AB-400).

CUES: SAT HAVE OPERATOR POINT OUT THE HOSES AND DISCUSS HOW THE LINES WOULD UNSAT BE CONNECTED, VERSUS REMOVING THE EQUIPMENT OUT OF THE GANG BOX.

COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

Ye Yes Connect the supply hose. Hose connected using Chicago fittings to IPXO9O62B-HR-VU, HIGH ROOT TO IPX09062B-HR-VU, IPX9O62B, AND XVT19647B-CC, CHG PP IPX9062B, B OIL CLR AL BOIL ALT T CLG WTR SUPPLY VLV.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

STA NDARD:

Ye Yes Connect the return hose. Hose connected using Chicago fittings to IPXO9O98B-HR-VU, HIGH ROOT TO IPX09098B-HR-VU, IPX9O98B, AND XVT19648B-CC, CHG PP IPX9098B, B OIL CLR ALT BOIL ALT CLG WTR RETURN VLV.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06, 2005 Page 5 0/12 of 12

CR SEQ CR SEQ STEP:

STEP: 44 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Check XVG09657B-CC Check XVG09657B-CC (AB-400)

(AB-400) valve valve Removes the Removes the locking locking device, device, attempts attempts toto position and position and record record "AS AS FOUND" FOUND onon turn XVG09657B-CC turn XVG09657B-CC inin thethe clockwise clockwise attachment.

attachment. direction and direction and records records valve valve position position on on the the attachment.

attachment.

CUES:

CUES: SAT SAT Steps 4-21 involve Steps involve valves that are standard Gate valves. Prompt examinee that UNSAT Prompt UNSAT XVG09657B-CC turns freely in the clockwise direction.

XVG09657B-CC COMMENTS:

COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

Ye Yes Close XVG09657B-CC. Closes XVG09657B-CC, CHG PP BOIL B OIL CLR CCW INLET VLV, by rotating the valve handwheel fully in the clockwise direction.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

No Yes Check XVT1 9647B-CC (AB-400) valve XVT19647B-CC Attempts to turn XVT19647B-CC XVT1 9647B-CC in the position and record "AS AS FOUND" FOUND on clockwise direction and records valve attachment. position on the attachment.

CUES: SAT Prompt examinee that XVT19647B-CC does not move in the clockwise direction. UNSAT COMMENTS:

Tuesday, December Tuesday, December 06, 06, 2005 2005 Page6of12 Page 6 of 12

CR SEQ CR SEQ STEP:

STEP: 77 STEP STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Open XVT19647B-CC.

Open XVT19647B-CC. Opens XVT19647B-CC, Opens XVT19647B-CC, CHG CHG PP PP BOIL B OIL CLR CLR ALALTT CLG CLG WTR WTR SUPPLY SUPPLY VLV, VLV, by by rotating the rotating the valve valve handwheel handwheel fully fully in in the the counter-clockwise direction.

counter-clockwise direction.

CUES:

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

No Yes Check XVT09685B-CC (AB-400) valve Removes the locking device and attempts position and record "AS FOUND on AS FOUND" to turn XVT09685B-CC in the clockwise attachment. direction.

CUES: SAT Prompt examinee that XVT09685B-CC turns freely in the clockwise direction. UNSAT Student may choose to determine throttled position of the valve. 3.0 turns open.

COMMENTS:

CR SEQ STEP: 9 STEP STANDARD:

Ye Yes Close XVT09685B-CC. Closes XVT09685B-CC, CHG PP BOIL B OIL CLR CCW OUTLET VALVE, by rotating the valve handwheel fully in the clockwise direction.

CUES: SAT UNSAT UNSA T COMMENTS:

Tuesday, December 06 Tuesday, December 06, 2005 2005 Page 770f12 Page of 12

CR SEQ CR SEQ STEP:

STEP: 10 10 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Check XVT19648B-CC Check XVT1 9648B-CC (AB-400)

(AB-400) valve valve Attempts Attempts toto turn turn XVT19648B-CC XVT1 9648B-CC in in the the position and position record "AS and record FOUND on AS FOUND" on clockwise direction.

clockwise direction.

attachment.

attachment.

CUES:

CUES: SAT SAT Prompt examinee Prompt examinee thatthat XVT19648B-CC XVT19648B-CC does does not not move move in in the the clockwise direction. UNSAT clockwise direction. UNSAT COMMENTS:

CR SEQ STEP: 11 11 STEP STANDARD:

Ye Yes Open XVT19648B-CC. Opens XVT19648B-CC, CHG PP BOIL B OIL CLR ALALTT CLG WTR RETURN VLV, by rotating the valve handwheel in the fully counter-clockwise direction.

CUES: SAT UNSAT UNSA T COMMENTS:

CR SEQ STEP: 12 STEP STANDARD:

No Yes IPXO9O62B-HR-VU (AB-400) valve Check IPX09062B-HR-VU Attempts to turn IPX09062B-HR-VU IPXO9O62B-HR-VU in the position and record "AS FOUND on AS FOUND" clockwise direction.

attachment.

CUES: SAT Prompt examinee that 1PX09062B-HR-VU IPX09062B-HR-VU does not move in the clockwise direction. UNSAT COMMENTS:

Tuesday, December Tuesday, 06, 2005 December 06, 2005 Page of12 Page 88 of 12

CR SEQ CR SEQ STEP:

STEP: 13 13 STEP STANDARD:

STEP STANDARD:

Ye Yes Ye Yes Open 1PX09062B-HR-VU, (AB-400).

Open IPX09062B-HR-VU, (AB-400). Opens IPX09062B-HR-VU, Opens 1PX09062B-HR-VU, HIGH HIGH ROOT ROOT TO TO 1PX9062B, by IPX9062B, rotating the by rotating the valve valve handwheel inin the handwheel the fully fully counter-clockwise counter-clockwise direction.

direction.

CUES:

CUES: SAT SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ CR STEP: 14 STEP STANDARD:

STA NDARD:

No Yes No Check IPX09098B-HR-VU Check 1PX09098B-HR-VU (AB-400)

(AB-400) valve Attempts to turn IPX09098B-HR-VU, 1PX09098B-HR-VU, HIGH HIGH position and position and record record "AS AS FOUND" FOUND on on ROOT TO ROOT TO IPX9062B, IPX9O62B, in in the the clockwise clockwise attachment. direction.

CUES: SAT Prompt examinee that IPX09098B-HR-VU Prompt 1PX09098B-HR-VU does not move in the clockwise direction. UNSAT cOMMENTS:

COMMENTS:

CR SEQ STEP: 15 STANDARD::

STEP STANDARD Ye Ye Yes Open IPX09098B-HR-VU 1PX09098B-HR-VU (AB-400). IPXO9O98B-HR-VU, by rotating the Opens IPX09098B-HR-VU, valve handwheel in the fully counter-counter clockwise direction.

CUES: SAT UNSAT UNSA T COMMENT COMMENTS: S:

Tuesday, December 06, Tuesday, December 06, 2005 2005 Page 99 of Page 12 of12

CR SEQ CR SEQ STEP:

STEP: 16 16 STEPSTANDARD:

STEP STANDARD:

No Yes No Yes Check XVT09530B-CC Check XVTO953OB-CC (AB-388)

(AB-388) valve valve Removes Removes the the locking locking device device and and attempts attempts position and position record "AS and record AS FOUND" FOUND on on to turn to turn XVT09530B-CC XVTO953OB-CC inin thethe clockwise clockwise attachment.

attachment. direction.

direction.

CUES:

CUES: SAT SAT Prompt examinee Prompt examinee that that XVT09530B-CC XVTO953OB-CC turnsturns freely freely inin the the clockwise clockwise direction.

direction. UNSAT UNSAT COMMENTS:

COMMENTS:

CR SEQ CR SEQ STEP:

STEP: 17 17 STEP STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Close XVT09530B-CC.

Close XVTO953OB-CC. Closes XVT09530B-CC, Closes XVTO953OB-CC, CCW CCW SPL SPLYY TO TO CHG PP CHG PP BOIL B OIL CLR CLR BYP BYP VALVE, VALVE, by by rotating the rotating the valve handwheel in valve handwheel in the the fully fully clockwise direction.

clockwise CUES:

CUES: SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ CR STEP: 18 STANDARD::

STEP STANDARD No Yes No Check XVT1 9654B-CC (AB-388) valve XVT19654B-CC Removes the locking device and attempts position and record on attachment. to turn XVT1 XVT19654B-CC 9654B-CC in the clockwise direction.

CUES:

CUES: SAT Prompt examinee examinee thatthat XVT19654B XVT19654B-CC-CC turns freely in in the clockwise clockwise direction.

direction. UNSAT Student may choose Student may choose to to determine determine throttled throttled position position of of thethe valve.

valve. 2.25 2.25 turns turns open.

open.

COMMENT COMMENTS: S:

Tuesday, Tuesday, December December O6 06, 2005 2005 Page 10 Page 10of 12 of12

CR SEQ CR SEQ STEP:

STEP: 19 19 STEP STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Open XVT19654B-CC.

Open XVT19654B-CC. Opens XVT19654B-CC, Opens XVT19654B-CC, CHG/SICHG/Sl PUMPPUMP BB OIL CLR OIL CLR CLG CLG WTR WTR INLET INLET VLV, VLV, by by rotating rotating valve handwheel the valve the handwheel inin the the fully fully counter-counter clockwise direction.

clockwise direction.

CUES:

CUES: SAT SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ CR SEQ STEP:

STEP: 20 20 STEP STEP STANDARD:

STANDARD:

No Yes No Yes Check XVT19655B-CC Check XVT1 9655B-CC (AB-388)

(AB-388) valve valve Removes the Removes the locking locking device device and and attempts attempts position and record position record "AS AS FOUND" FOUND on on to turn XVT19655B-CC XVT19655B-CC in in the clockwise clockwise attachment.

attachment. direction.

direction.

CUES:

CUES: SAT Prompt Prompt examinee that XVT19655B XVT19655B-CC -CC turns freely in the clockwise direction. UNSAT Student may choose to determine "AS Student AS FOUND" FOUND throttled position. 2.0 turns open.

COMMENTS:

COMMENTS:

CR CR SEQSEQ STEP: 21 21 STANDARD::

STEP STANDARD Ye Ye Yes Yes Open Open XVT19655B XVT19655B-CC. -CC. Opens XVT19655B XVT19655B-CC, CHG/SI PUMP B

-CC, CHG/Sl B GB OIL CLR CLG WTR IN IN VLV, by rotating the valve handwheel fully in the counter counter-clockwise direction.

CUES:

CUES: SAT UNSAT UNSA T COMMENT COMMENTS: S:

Examiner Examiner ends ends JPM JPM at at this this point.

point.

Tuesday, December 06, Tuesday, December 06, 2005 2005 Page 11 Page of12 11 of 12

SETUP SHEET JPM SETUP JPM SHEET JPM NO:

]PM NO: JPPF-166BNRC JPPF-1 66BNRC DESCRIPTION:

DESCRIPTION: ESTABLISH CHILLED ESTABLISH CHILLED WATER WATER ALTERNATE ALTERNATE COOLING COOLING TO TO CHARGING CHARGING PUMPS PUMPS IC SET:

ICSET:

INSTRUCTIONS:

INSTRUCTIONS:

COMMENTS:

COMMENTS:

Tuesday, Tllesday, December 06, 2005 December 06, 2005 Page 12 Page of12 12 of 12

V.C. SUMMER v.C. SUMMER NUCLEAR NUCLEAR STATION STATION JOB PERFORMANCE MEASURE JOB PERFORMANCE MEASURE JPM

]PM JPP-052 JPP-052 STARTUP AA BATTERY STARTUP BATTERY CHARGER CHARGER APPROVAL: DOW APPROVAL: DOW APPROVAL DATE:

APPROVAL DATE: 7/12/2005 7/12/2005 REVNO:

REV NO: 88 CANDiDATE CANDIDATE EXAMiNER:

EXAMINER:

THIS JPM IS APPROVED THIS

Tuesday, Tuesday,December December06, 2005 06,2005 Page of9 Page11of 9

TASK:

TASK:

063-007-01 063-007 -04 04 PLACE AA BATTERY PLACE BATTERYCHARGER CHARGER IN IN SERVICE SERVICE TASKSTANDARD:

TASK STANDARD:

Bus 11HB Bus HB isis supplied supplied from from the the swing swing charger charger XBC-1 XBC-1A/1AllB.

B. The The use use ofof applicable applicable Human Human Performance Performance Tools (3-way communicati Tools (3-way communications, ons, self self checking, checking, peer peer checking, checking, phonetic phonetic alphabet, alphabet, etc) etc) and and industrial industrial safety practices safety practices meets meets expectations.

expectations.

PREFERRED EVALUATION PREFERRED EVALUATiONLOCATION LOCATION PREFERRED EVALUATION PREFERRED EVALUATION METHOD METHOD PLANT PLANT SIMULATE SIMULATE

REFERENCES:

REFERENCES:

50P-311 SOP-311 125 VDC 125 VDC SYSTEM SYSTEM TOOLS:

TOOLS: SOP-31 1 SOP-311 SECTION SECTION IV.D (PG.

IV.D (PG. 6) 6)

SOP-31 SOP-3111 SECTION SECTION IV.Q (PGS 27 IV.Q (PGS 27 - 29)

- 29)

EVAL(JA TION TIME EVALUATION TIME 15 15 TIME CRITICAL TIME CRITICAL No No 10CFR55:

10CFR5S: 45(a)8 45(a)8 CANDIDATE:

CANDIDATE: TIME TIME START:

START:

TIME TIME FINISH:

FiNISH:

PERFORMANCE RATING:

PERFORMANCE SAT: UNSAT:

QUESTION GRADE: PERFORMANCE PERFORMANCE EXAMINER:

EXAMINER:

SIGNATURE SIGNATURE DATE COMMENTS:

COMMENTS:

inesday, Tuesday, December December06, 06, 2005 2005 Page22 of Page 0/99

INSTRUCTIONS TO INSTRUCTIONS TO OPERATOR OPERATOR READ TO READ OPERATOR:

TO OPERATOR:

WHEN II TELL WHEN TELL YOU YOU TO BEGIN, YOU TO BEGIN, YOU ARE ARE TO TO PERFORM PERFORM THE THE ACTIONS ACTIONS AS AS DIRECTED DIRECTED IN IN THE THE INITIATING INITIATING CUES. II WILL CUES. WILL DESCRIBE DESCRIBE THE THE GENERAL GENERAL CONDITIONS CONDITIONS UNDER UNDER WHICH WHICH THIS THIS TASK TASK ISIS TO TO BE BE PERFORMED PERFORMED AND PROVIDE AND PROVIDE THETHE NECESSARY NECESSARY TOOLS TOOLS WITH WITH WHICH WHICH TO TO PERFORM PERFORM THISTHIS TASK.

TASK. BEFORE BEFORE STARTING, STARTING, II WILL EXPLAIN THE INITIAL WILL EXPLAIN THE INITIAL CONDITIONS,CONDITIONS, WHICHWHICH STEPSSTEPS TO TO SIMULATE SIMULATE OR OR DISCUSS, DISCUSS, AND AND PROVIDE PROVIDE INITIATING CUES.

INITIATING CUES. WHEN WHEN YOU YOU COMPLETE COMPLETE THE THE TASK TASK SUCCESSFULLY, SUCCESSFULLY, THE THE OBJECTIVE OBJECTIVE FOR FOR THISTHIS JOB JOB PERFORMANCE MEASURE PERFORMANCE MEASURE WILL BE SATISFIED.

WILL BE SATISFIED.

SAFETY CONSIDERATIONS:

SAFETY CONSIDERATiONS: PPE PPE INITIAL CONDITION:

INITIAL CONDITION: Battery Battery charger charger 11 BB is is to be be removed removed from from service for scheduled scheduled maintenance. DPN-1 maintenance. DPN-1 HB HB must must be transferred to be transferred to swing swing charger charger XBC-1 XBC-1 A- A-11 B.

B. DC DC OUTPUT and and AC AC INPUT INPUT breakers breakers on on the the swing swing charger charger are are open.

open.

The swing battery charger "B" B Train supply breaker from XMC-1 DB2Y is closed and all breakers closed breakers on XET-4003-ED XET-4003-ED are open, with the keyskeys inin Train A AC & DC.

'A' iNITIATING CUES: Control room directs startup of the swing charger XBC-1A11 INITIATING XBC-1 All B, connection to bus 11 HB, and removal of 11 B charger from service in accordance with SOP-311.

A AT T NO TIME A ARE RE YOU TO OPERA TE ANY PLANT EQUIPMEN EQUIPMENT! T!

HAND JPM]PM BRIEFING BRIEFING SHEET TO OPERATOR AT THIS TIME!

Tuesday, Tuesday, December 06, 2005 December 06 2005 Page 33 of Page 0/99

JPM BRIEFING SHEET JPM BRIEFING SHEET OPERA TOR INSTRUCTIONS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

SAFETY CONSIDERATIONS: PPE PPE INITIAL CONDITION:

INITIAL CONDITION: Battery Battery charger charger 11 BB isis to to be be removed removed from from service service for for scheduled scheduled maintenance. DPN-1 maintenance. DPN-1HB must be HB must be transferred transferred to to swing swing charger charger XBC-1 XBC-1A- A-1lB. DC OUTPUT B. DC OUTPUT and and AC AC INPUT IN PUT breakers breakers on the swing on the swing charger charger are are open.

open.

The swing The swing battery battery charger charger "B" B Train Train supply breaker from supply breaker from XMC-1 XMC-1 DB2Y DB2Y isis closed and closed and all all breakers breakers on on XET-4003-ED XET-4003-ED are are open, open, with with the the keys keys inin Train Train AAC&DC.

'A' AC & DC.

INITIATING CUES:

INITIATING CUES: Control Control room room directs startup of directs startup the swing of the swing charger charger XBC-1A11 XBC-1 All B, B, connection connection to bus to bus 11 HB, HB, and and removal removal of of 11 BB charger charger from from service service in accordance with in accordance with SOP-311.

SOP-311.

AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT! EQUIPMENT!

HAND THIS PAPER BACK TO YOUR EVALUATO EVALUATOR R WHEN YOU FEEL THAT YOU HAVE SATISFACT SATISFACTORILY ORILY COMPLETE COMPLETED D THE ASSIGNED TASK.

Tuesday, December06, Tuesday, December 06, 2005 2005 Page 44 of Page of99

STEPS STEPS CR SEQ CR SEQ STEP:

STEP: 11 STEP STANDARD:

STEP STANDARD:

Ye Yes Ye Yes Align swing charger Align swing charger (IB-412-Swing (IB-41 2-Swing Charger Charger Closes TRAIN Closes TRAIN B-AC B-AC breaker breaker and and Train Train B-B-Room) to Room) to "B" B Train.

Train. DC breaker DC breaker for for battery battery charger charger 11 A-1 A-i BB on on XET-4003-E XET -4003-ED D using using key key interlocks.

interlocks.

CUES:

CUES: SAT SAT The keys The keys swap swap in in aa criss-cross criss-cross pattern pattern (Train (Train "A" A AC AC to to Train Train "B" B DC DC and and Train A UNSAT Train "A" UNSAT DC goes to Train B DC goes to Train "B" AC). AC). IfIf the the operator operator tries tries to to swap swap AC to AC AC to AC or DC to or DC to DC DC inform inform him that the key him that key will not turn.

will not turn.

COMMENTS:

COMMENTS:

CR SEQ CR STEP: 2 STEP STANDARD:

STANDARD:

Ye Yes Verifies charger set up for float voltage. Places FLOAT/EQUALIZER FLOAT/EQUALIZER Switch in the FLOAT position ON XBC1 A-1 A-i B B..

. CUES: SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

STANDARD:

No Yes Checks the feeder breaker from the swing DPN-1 HB-ED BKR 13, BATTERY Checks DPN-1HB-ED charger to "B" B Train open. CHARGER 1A-1B lA-lB FEED TO DPN 1HB 1HB is in the OFF position.

CUES: SAT UNSAT UNSA T COMMENT COMMENTS: S:

Tuesday, December O6 Tuesday, December 06, 2005 2005 Page 550f9 Page of 9

CR SEQ CR SEQ STEP:

STEP: 44 STEP STANDARD:

STEP STANDARD:

Ye Yes Ye Yes Starts up Starts up the the swing swing charger.

charger. the DC Closes the Closes DC OUTPUT OUTPUT (CB2)

(CB2) and and AC AC IN PUT (CB1) breakers INPUT (CB1) breakers onon battery battery charger charger A-lB XBC1 A-1 XBC1 B inin the the ON ON position.

position.

CUES:

CUES: SAT SAT UNSAT UNSA T COMMENTS:

COMMENTS:

CR SEQ CR SEQ STEP:

STEP: 55 STEP STEP STANDARD:

STANDARD:

No Yes No Checks output voltage.

Checks Checks DC Checks DC OUTPUT OUTPUT VOLTMETER 131-137 volts.

stabilizes at 131-137 CUES: SAT When operator points to DC OUTPUT VOLTMETER and indicates expected voltage, UNSAT inform the operator that voltage is 133 volts.

COMMENTS:

COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

STANDARD:

No Yes No Verifies capacitors charged. Waits approximatel approximately y 5 (to 10) seconds, then checks red indicator lights on capacitor cabinet XPN5294-ED lit.

CUES: SAT When operator shows locationlocation of indicator lights, inform him that light are on. UNSAT COMMENT COMMENTS: S:

luesday, Tuesday, December 06, 2005 December 06, 2005 Page 660f9 Page of 9

CR SEQ CR SEQ STEP:

STEP: 77 STEP STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Puts swing Puts swing charger charger onon 11HB.

HB. Places DPN-1 Places DPN-1HB-ED HB-ED 13, 13, BATTERY BATTERY CHARGER CHARG ER 1lA-lB A-1 B FEED FEED toto DPN-1 DPN-1HBHB inin the the ON position.

ON position.

CUES:

CUES: SAT SAT In 11 BB Battery In Battery Charger Charger Room.

Room. UNSAT UNSAT COMMENTS:

COMMENTS:

CR SEQ CR SEQ STEP:

STEP: 88 STEP STEP STANDARD:

STANDARD:

Ye Yes Ye Yes Removes XBC1 Removes XBC1 BB from from service.

service. Places breaker Places breaker DPN-1 DPN-1 HB-ED H B-ED 11, 11, BATTERY BATTERY CHARGER 11 B CHARGER B FEED FEED TOTO DPN1 DPN1 HBHB in in the the OFF position.

OFF position.

CUES:

CUES: SAT When requested, When requested, inform examinee of the following initial conditions: UNSAT The FLOAT/EQU The FLOAT/EQUALIZER ALIZER switch is in the FLOAT position.

The battery The battery charger timer for XBC-1 B is set at 0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> and 0 minutes.

(Section IV.D (Section Step 2.2)

IV.D Step COMMENTS:

COMMENTS:

CR SEQ CR SEQ STEP: 9 STEP STANDARD:

No No Yes Yes Opens XBC1 B DC OUTPUT and AC INPUT Places DC OUTPUT and AC INPUT breakers. breakers on XBC1 B B in the OFF position.

position.

CUES:

CUES: SAT When requested, inform examinee that When requested, inform examinee that the "BATT the BATT CHGR CHGR TRBL TRBL" alarm alarm was was received received UNSAT on the on the main main control control board.

board.

COMMENT COMMENTS: S:

Tuesday, December Tuesday, December O6 06, 2005 2005 Page 770f9 Page of 9

CR SEQ CR SEQ STEP:

STEP: 1010 STEPSTANDARD:

STEP STANDARD:

Ye Yes Ye Yes Verifiesswing Verifies swingcharger chargerpicks picksup upload loadand and VerifiesAmmeter Verifies Ammetermoves movesupscale upscaleand andDC DC establi shesaafloat establishes floatcharge chargeon thebattery.

onthe battery. VOLTMETERindicates VOLTMETER 133-135 voltson indicates133-135 volts on XBC1A-1 B.

XBC1A-1B.

CUES:

CUES: SAT SAT Cueoperator Cue operatorthat thatSwing Swing Charger Chargerammeter ammeterindicates indicates35 35amps ampsandandvoltmeter voltmeter UNSAT UNSAT indicat es 134 VDC when reques indicates 134 VDC when requested. ted.

COMMENTS:

COMMENTS:

Exami Examinerner ends ends JPM JPM atat this this point.

point.

Tuesday, December 06, 2005 Page8of9 Tuesday, December 06, 2005 Page 8 of 9

JPM SETUP JPM SETUPSHEET SHEET JPMNO:

]PM JPR-052 NO: JPP-052 DESCRIPTION: STARTUP DESCRIPTION: STARTUPAABATTERY BATTERY CHARGER CHARGER IC SET:

ICSET:

INSTRUCTIONS:

INSTRUCTIONS:

COMMENTS:

COMMENTS:

Tuesday, Tuesday,December December06, 06,2005 2005 Page99of Page of9 9