ML12095A386: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:FNR Characterization Package Workbook SP-017 Building Roof Master Copy Bartlett Services, Inc I I Package Log No: FNR-SP-017 I Survey Area: 7 I Survey Units: 7-1 Survey Unit/Area
{{#Wiki_filter:FNR Characterization Package Workbook SP-017 Building Roof Master Copy Bartlett Services, Inc


==
I I Package    Log No: FNR-SP-017 I              Survey Area: 7          I          Survey Units: 7-1 Survey Unit/Area
Description:==


== Description:==
FNR Roof and Vent Stack Exterior SURVEY PACKAGE COVER SHEET Survey Type: Characterization Survey Survey Objectives:
FNR Roof and Vent Stack Exterior SURVEY PACKAGE COVER SHEET Survey Type: Characterization Survey Survey Objectives:
: 1. Confirm that the FNR Roof is a non-impacted area.2. Alternately, if detectable licensed radioactive materials are measured, demonstrate that the FNR Roof and Vent Stack meet release criteria.3. Obtain measurements and supporting documentation of sufficient quality for the Final Status Survey Report.Package Contents: " Document Change Control Form" Survey Unit Walkdown Notes* Survey Design Worksheet" Survey & Sampling Instructions" Drawing and Document References Attachments
: 1. Confirm that the FNR Roof is a non-impacted area.
: 1. Photographs (Figures 1 through 9)5. Survey Maps with Field Annotation
: 2. Alternately, if detectable licensed radioactive materials are measured, demonstrate that the FNR Roof and Vent Stack meet release criteria.
: 6. Raw Data -Survey Forms & Field Notes 7. Survey Data Processing Forms 8. Sample Information Forms 9. Sample Chain of Custody Forms 10. Smear Counting Results 11. Vendor Laboratory Analysis Reports 12. UM Sample Analysis reports 13. Data Summary Report 14. JHA & Attendance Sheets 15. Reference Material 16. Correspondence
: 3. Obtain measurements and supporting documentation of sufficient quality for the Final Status Survey Report.
: 17. 6/11/07 Power Point Presentation, "Radiological Survey of FNR Roof'.18. Superseded Information 2.3.4.SP-0 17 Addendum Survey Maps & Forms Survey Timeline Survey Package Implementation:
Package Contents:                               5. Survey Maps with Field Annotation
_ __/____ ___Rock P. Neveau / /Radiological Engineer Ptinted Name Signature, Date Bruce J. Mann ,4 ( '2- _ _,- _ _ _Health Physics Supervisor Printed Signature Date Name Implementation Comments: Survey Package Closure: Radiological Engineer Printed Signature Date Name Health Physics Supervisor Printed Signature Date Name Package Closure Comments: SP-017 Pkg FormsRev03 Page I of 19 12/12/2007 Rev 03 Package Log No: FNR-SP-017 Survey Area: 7 Survey Units: 7-1 Survey Unit/Area
    "  Document Change Control Form                6. Raw Data - Survey Forms & Field Notes
    "  Survey Unit Walkdown Notes                  7. Survey Data Processing Forms
* Survey Design Worksheet                    8. Sample Information Forms
    "  Survey & Sampling Instructions              9. Sample Chain of Custody Forms
    "  Drawing and Document References            10. Smear Counting Results
: 11. Vendor Laboratory Analysis Reports Attachments                                    12. UM Sample Analysis reports
: 1. Photographs (Figures 1 through          13. Data Summary Report
: 9)                                      14. JHA & Attendance Sheets
: 2. SP-0 17 Addendum                        15. Reference Material
: 3. Survey Maps & Forms                    16. Correspondence
: 4. Survey Timeline                        17. 6/11/07 Power Point Presentation, "Radiological Survey of FNR Roof'.
: 18. Superseded Information Survey Package Implementation:                                       _   __/____                 ___
Rock P. Neveau                       /           /
Radiological Engineer Ptinted Name Signature,                         Date Bruce J. Mann                               ,4                           ( '2-     _   _  _,- _       _
Health Physics Supervisor Printed   Signature                         Date Name Implementation Comments:
Survey Package Closure:
Radiological Engineer Printed       Signature                         Date Name Health Physics Supervisor Printed   Signature                         Date Name Package Closure Comments:
SP-017 Pkg FormsRev03                     Page I of 19                           12/12/2007 Rev 03


==
Package Log No: FNR-SP-017                    Survey Area: 7              Survey Units: 7-1 Survey Unit/Area
Description:==


FNR Roof and Vent Stack Exterior Survey Package Document Control Change Form Change # Description Initiator/Date RE 01 Revised instructions to: B. Mann /20-1. Add collection of smears in PML reference Jun-07. per C.area at the 18 randomly selected locations.
== Description:==
Becker 2. Perform gamma scan survey of PML request.Reference Area. This requires that the reference area be gridded into two meter grids.3. Collect samples from the PML stacks.4. Modified List of attachments to add: B. Mann 25-5. Survey Timeline Jun-07 6. UM Tennelec S5 XLB smear count reports 7. Vendor laboratory sample analysis reports 8. Pre-Job hazard briefing attendance sheets.9. JHA for FNR Roof Characterization Survey Pkg SP-017 10. Survey maps with field annotation.
FNR Roof and Vent Stack Exterior Survey Package Document Control Change Form Change #                           Description                 Initiator/Date       RE 01                 Revised instructions to:                         B. Mann /20-
: 11. Raw measurement data sheets and field notes.12. 6/11/07 Power Point presentation,"Radiological Survey of FNR Roof'.13. Superseded Survey Package pages.02 Correction to Page 1 of Attachment 3, Survey B. Mann Forms, Instrument Information.
: 1. Add collection of smears in PML reference   Jun-07. per C.
Typos corrected 09-Jul 07.-detector serial Nos. HV and instrument efficiency.
area at the 18 randomly selected locations. Becker
03 Package revision 03. Incorporate Addendum B. Mann and Change cover sheet, list of attachments.
: 2. Perform gamma scan survey of PML             request.
12/11/07 This is to provide improved organization of supporting information.
Reference Area. This requires that the reference area be gridded into two meter grids.
SP-0 17 Pkg FormsRev03 Page 2 of 19 12/12/2007 Rev 03 I Package Log No: FNR-SP-0 17 1 Survey Area: 7 I Survey Units: 7-1 Survey Unit/Area
: 3. Collect samples from the PML stacks.
: 4. Modified List of attachments to add:         B. Mann 25-
: 5. Survey Timeline                         Jun-07
: 6. UM Tennelec S5 XLB smear count reports
: 7. Vendor laboratory sample analysis reports
: 8. Pre-Job hazard briefing attendance sheets.
: 9. JHA for FNR Roof Characterization Survey Pkg SP-017
: 10. Survey maps with field annotation.
: 11. Raw measurement data sheets and field notes.
: 12. 6/11/07 Power Point presentation, "Radiological Survey of FNR Roof'.
: 13. Superseded Survey Package pages.
02                 Correction to Page 1 of Attachment 3, Survey     B. Mann Forms, Instrument Information. Typos corrected   09-Jul 07.
                    - detector serial Nos. HV and instrument efficiency.
03                 Package revision 03. Incorporate Addendum       B. Mann and Change cover sheet, list of attachments. 12/11/07 This is to provide improved organization of supporting information.
SP-0 17 Pkg FormsRev03                   Page 2 of 19                   12/12/2007 Rev 03


==
I Package Log No:     FNR-SP-0 17 1              Survey Area: 7          I      Survey Units: 7-1 Survey Unit/Area
Description:==


== Description:==
FNR Roof and Vent Stack Exterior Survey Unit Walkdown Record Walkdown Checklist:
FNR Roof and Vent Stack Exterior Survey Unit Walkdown Record Walkdown Checklist:
: 1. Confirm dimensions of roof sections and confirm draft survey grid map.2. [M Measure vent stack height. Examine the vent stack -can access be gained from the roof for the survey of the interior surfaces (separate survey package)?3. F] Confirm locations and details of roof drain openings.
: 1.     Confirm dimensions of roof sections and confirm draft survey grid map.
Examine the roof drain openings -can the drains be accessed for sampling and survey?4. x Describe the materials; roof coverings, flashing, gutters, vent stack exterior.5. x Is roof surface dust or sediment present to provide material for samples of surface deposits?6. x Note the condition of the roof- is it amenable to scan survey with the floor monitor?7. x Identify any preparation work that must be accomplished prior to the actual survey.8. x Evaluate the safety issues -fall protection requirements and other advance preparation.
: 2. [M Measure vent stack height. Examine the vent stack - can access be gained from the roof for the survey of the interior surfaces (separate survey package)?
: 9. x Walkdown and examine the PML roof, particularly the south end. Is it suitable for use as a reference area?10. E] Take photographs of roof for planning aids.Walkdown Notes (from 5/10/07)1. Dimensions of roof confirmed.
: 3. F] Confirm locations and details of roof drain openings. Examine the roof drain openings - can the drains be accessed for sampling and survey?
The roof is in excellent condition  
: 4. x Describe the materials; roof coverings, flashing, gutters, vent stack exterior.
-precautions will be taken to avoid damage.2. The Vent Stack height measured (9 ft). It is not planned to access the vent stack interior from the FNR roof for surveys. It was determined that it would be safer to access to the stack interior from the vent pipe chase at the Cooling Tower elevation.
: 5. x Is roof surface dust or sediment present to provide material for samples of surface deposits?
: 3. Locations and details of roof drains confirmed.
: 6. x Note the condition of the roof- is it amenable to scan survey with the floor monitor?
The roof drains are readily accessible  
: 7. x Identify any preparation work that must be accomplished prior to the actual survey.
-the covers are not bolted.4. The roof consists of two inches of insulating material covered by a 60 mil thick EPD membrane (Ethylene Propylene with diene monomers).
: 8. x Evaluate the safety issues - fall protection requirements and other advance preparation.
It is bordered by metal flashing;the vent stack is painted steel.5. The roof is free from dust or sediment except at the roof drain openings and the Cooling'Tower exhaust vent frames.6. The roof is in good condition, with a smooth surface regular surface except in the vicinity of the roof drains and should readily accommodate a floor monitor for scan surveys. It is anticipated that we will scan up to 25% of the roof surface (roof surface area is -450 mnE).7. Light housekeeping cleanup support will be requested to remove rust & scale from the roof beneath cooling tower louvers and to remove leaves and twigs from the PML roof south section.8. For work on the portion of the roof that is at the PML elevation, the frames of cooling tower louvers can be used as anchor points for fall-arrest cables. There are several wasp nests in the cooling tower louvers in the FNR walls at the PML roof elevation (sprayed with pesticide 5/14/07).9. The PML roof is of the same vintage as the FNR -It is planned to use the S. end of the PML roof as a "reference area" for the FNR roof survey.10. The Reactor Laboratory Manager recommended that a few measurements be taken on the outside of the cooling tower louvers -mineral deposits from secondary cooling water are present on a few of the louvers.11. Samples of the roof material itself are not planned, but candidate material sampling locations are: the cooling tower exhaust vent frame and roof drains.12. Scale maps will be required for FNR roof and the reference area on the south end of the PML.End of Notes SP-017 Pkg FormsRev01 Page 3 of 19 6/25/2007 Rev 0 1 Package Log No: FNR-SP-017 I Survey Area: 7 ] Survey Units: 7-1 Survey Unit/Area
: 9. x Walkdown and examine the PML roof, particularly the south end. Is it suitable for use as a reference area?
: 10. E] Take photographs of roof for planning aids.
Walkdown Notes (from 5/10/07)
: 1. Dimensions of roof confirmed. The roof is in excellent condition - precautions will be taken to avoid damage.
: 2. The Vent Stack height measured (9 ft). It is not planned to access the vent stack interior from the FNR roof for surveys. It was determined that it would be safer to access to the stack interior from the vent pipe chase at the Cooling Tower elevation.
: 3. Locations and details of roof drains confirmed. The roof drains are readily accessible - the covers are not bolted.
: 4. The roof consists of two inches of insulating material covered by a 60 mil thick EPD membrane (Ethylene Propylene with diene monomers). It is bordered by metal flashing; the vent stack is painted steel.
: 5. The roof is free from dust or sediment except at the roof drain openings and the Cooling' Tower exhaust vent frames.
: 6. The roof is in good condition, with a smooth surface regular surface except in the vicinity of the roof drains and should readily accommodate a floor monitor for scan surveys. It is anticipated that we will scan up to 25% of the roof surface (roof surface area is - 450 mnE).
: 7. Light housekeeping cleanup support will be requested to remove rust & scale from the roof beneath cooling tower louvers and to remove leaves and twigs from the PML roof south section.
: 8. For work on the portion of the roof that is at the PML elevation, the frames of cooling tower louvers can be used as anchor points for fall-arrest cables. There are several wasp nests in the cooling tower louvers in the FNR walls at the PML roof elevation (sprayed with pesticide 5/14/07).
: 9. The PML roof is of the same vintage as the FNR - It is planned to use the S. end of the PML roof as a "reference area" for the FNR roof survey.
: 10. The Reactor Laboratory Manager recommended that a few measurements be taken on the outside of the cooling tower louvers - mineral deposits from secondary cooling water are present on a few of the louvers.
: 11. Samples of the roof material itself are not planned, but candidate material sampling locations are:
the cooling tower exhaust vent frame and roof drains.
: 12. Scale maps will be required for FNR roof and the reference area on the south end of the PML.
End of Notes SP-017 Pkg FormsRev01                       Page 3 of 19                         6/25/2007 Rev 0 1


==
Package Log No: FNR-SP-017            I      Survey Area: 7        ]      Survey Units: 7-1 Survey Unit/Area
Description:==


== Description:==
FNR Roof and Vent Stack Exterior Survey Design Worksheet
FNR Roof and Vent Stack Exterior Survey Design Worksheet
== Description:==
The FNR main roof is at elevation 894 ft. and of dimensions 54 ft. (N-S) by 60 ft. 8 in.(E-W) .This survey unit also includes the FNR 3 rd floor roof surfaces at the PML roof elevation bordering the FNR 4 th floor on the east and north. The roof is of "built-up" construction overlying a poured low-density concrete roof slab. It consists of two inches of insulating material covered by a 60 mil thick EPD membrane (Ethylene Propylene with diene monomers).
It is bordered by metal flashing.
The main roof is sloped to drain into two sumps located near the center of the roof area.These sumps drain into piping that connects to the storm sewer in the southwest comer of the FNR Beam Port floor. The FNR building vent stack is located near the northwest comer of the roof and extends 9 ft. above the roof line. The Cooling Tower exhaust fans vent through a large opening (8.5 x 24.5 ft.) located in the north-central part of the main roof.The sections of the roof on the north and east sides of the FNR building at elevation 875 ft., 19 ft.below the FNR Roof, are of similar construction to the main roof. This portion of the roof drains to two roof drains located near the north and east walls of the FNR which connect to the storm sewer piping in the east side of the Beam Port Floor.Survey Unit History: The FNR roof was replaced in 2001. There is no history of significant release of radioactive particulates from the FNR stack. [Historical Site Assessment, CH2MHill 2003]. It is noted that the FNR Roof is also downwind from the PML stacks.Design Assumptions:
The FNR Historical Site Assessment (HSA) report identified the FNR Roof as un-impacted, i. e., having low likelihood of contamination from licensed radioactive materials.
However, there are three potential pathways for contamination of the roof by licensed radioactive materials.
These are:* FNR stack which exhausted nine feet above the roof* PML stacks which are located just south of the FNR roof (FNR Pool trunks and fume hood exhausted from PML Stack 2).* The Cooling Tower exhaust vents are at the FNR roof level.There is no record of recent radiological surveys of the roof, so a conservative survey design will be applied. The FNR exhaust stack (interior) is identified as impacted in the HSA (it will be covered under a separate survey package).
The exterior of the FNR exhaust stack will be included with the survey of the roof.Theroof survey design assumptions follow MARSSIM survey guidance for a Class 2 structural survey unit. A single survey unit is established for the roof including the surfaces at both elevations.
The survey design for total surface activity measurements is based on the Wilcoxon Rank Sum (WRS)test with a survey reference area. However, the planning assumption is that ere are no actual residual contamination deposits on the roof, so the "sigma" value is small and )very large, hence the 4-calculated number of measurements will be small, (less than 10) for both the roof survey unit and reference area. For survey planning purposes, the default assumption is that at least 18 locations will be selected on triangular grids with random start location on the FNR Roof and on the reference area.This will assure sufficient statistical power of the WRS test at the decision error probabilities:
a = 0.05 and B = 0.05 regardless of the A/s value.The performance criteria for instrument selection are based on default surface activity DCGLs for Co-SP-017 Pkg FormsRev01 Page 4 of 19 6/25/2007 Rev 01 Package Log No: FNR-SP-017 j Survey Area: 7 1 Survey Units: 7-1 Survey Unit/Area


==
==
Description:==
Description:==
The FNR main roof is at elevation 894 ft. and of dimensions 54 ft. (N-S) by 60 ft. 8 in.
(E-W) .This survey unit also includes the FNR 3 rd floor roof surfaces at the PML roof elevation bordering the FNR 4 th floor on the east and north. The roof is of "built-up" construction overlying a poured low-density concrete roof slab. It consists of two inches of insulating material covered by a 60 mil thick EPD membrane (Ethylene Propylene with diene monomers). It is bordered by metal flashing. The main roof is sloped to drain into two sumps located near the center of the roof area.
These sumps drain into piping that connects to the storm sewer in the southwest comer of the FNR Beam Port floor. The FNR building vent stack is located near the northwest comer of the roof and extends 9 ft. above the roof line. The Cooling Tower exhaust fans vent through a large opening (8.5 x 24.5 ft.) located in the north-central part of the main roof.
The sections of the roof on the north and east sides of the FNR building at elevation 875 ft., 19 ft.
below the FNR Roof, are of similar construction to the main roof. This portion of the roof drains to two roof drains located near the north and east walls of the FNR which connect to the storm sewer piping in the east side of the Beam Port Floor.
Survey Unit History: The FNR roof was replaced in 2001. There is no history of significant release of radioactive particulates from the FNR stack. [Historical Site Assessment, CH2MHill 2003]. It is noted that the FNR Roof is also downwind from the PML stacks.
Design Assumptions:
The FNR Historical Site Assessment (HSA) report identified the FNR Roof as un-impacted, i. e.,
having low likelihood of contamination from licensed radioactive materials. However, there are three potential pathways for contamination of the roof by licensed radioactive materials. These are:
* FNR stack which exhausted nine feet above the roof
* PML stacks which are located just south of the FNR roof (FNR Pool trunks and fume hood exhausted from PML Stack 2).
* The Cooling Tower exhaust vents are at the FNR roof level.
There is no record of recent radiological surveys of the roof, so a conservative survey design will be applied. The FNR exhaust stack (interior) is identified as impacted in the HSA (it will be covered under a separate survey package). The exterior of the FNR exhaust stack will be included with the survey of the roof.
Theroof survey design assumptions follow MARSSIM survey guidance for a Class 2 structural survey unit. A single survey unit is established for the roof including the surfaces at both elevations.
The survey design for total surface activity measurements is based on the Wilcoxon Rank Sum (WRS) test with a survey reference area. However, the planning assumption is that ere are no actual residual contamination deposits on the roof, so the "sigma" value is small and      )very large, hence the      4-calculated number of measurements will be small, (less than 10) for both the roof survey unit and reference area. For survey planning purposes, the default assumption is that at least 18 locations will be selected on triangular grids with random start location on the FNR Roof and on the reference area.
This will assure sufficient statistical power of the WRS test at the decision error probabilities: a = 0.05 and B = 0.05 regardless of the A/s value.
The performance criteria for instrument selection are based on default surface activity DCGLs for Co-SP-017 Pkg FormsRev01                    Page 4 of 19                      6/25/2007 Rev 01
Package Log No: FNR-SP-017 j                Survey Area: 7        1      Survey Units: 7-1 Survey Unit/Area


FNR Roof and Vent Stack Exterior 60 (beta) and U-235 (alpha). These are 7100 dpm/100-cm 2 and 100 dpm/100-cm 2 , respectively.
== Description:==
The selection criteria are as follows:* Surface Gamma Scan: no numerical criterion (the 44-10 is not calibrated for measurements of gamma activity from surface, or near-surface, contamination.
FNR Roof and Vent Stack Exterior 60 (beta) and U-235 (alpha). These are 7100 dpm/100-cm 2 and 100 dpm/100-cm 2 , respectively. The selection criteria are as follows:
* Surface Beta Scan: 3500 dpm/100-cm 2 (50% of DCGL)" Total Surface Beta Measurements:
* Surface Gamma Scan: no numerical criterion (the 44-10 is not calibrated for measurements of gamma activity from surface, or near-surface, contamination.
1750 dpm/100-cm 2 (25% of DCGL)* Total Surface Alpha Measurements:
* Surface Beta Scan: 3500 dpm/100-cm 2 (50% of DCGL)
25 dpm/100-cm 2 (25% of Screening level DCGL for U-235)SRemovable Surface Beta Measurements:
        " Total Surface Beta Measurements: 1750 dpm/100-cm 2 (25% of DCGL)
70 dpm/1 00-cm 2 (1% of DCGL)* Removable Surface Alpha Measurements:
* Total Surface Alpha Measurements: 25 dpm/100-cm 2 (25% of Screening level DCGL for U-235)
25 dpm/100-cm 2 (25% of default DCGL for U-235)Action -investigation levels are also established as fractions of the applicable DCGLs:* Surface Gamma Scan: detectable sustained increase above background (audible response)* Surface Beta Scan: detectable sustained increase above background (audible response)* Total Surface Beta: 3500 dpm/100-cm 2 (50% of DCGL)* Total Surface Alpha: 50 dpm/100-cm 2 (50% of Screening level DCGL for U-235)* Removable Surface Beta: 700 dpm/100-cm 2 (10% of DCGL)* Removable Surface Alpha: 25 dpm/100-cm 2 (25% of Screening Level DCGL for U-235)Survey and Sampling Instruction Form General Instructions:
SRemovable Surface Beta Measurements: 70 dpm/1 00-cm 2 (1%of DCGL)
: 1. The roof areas on elevations 894 ft. and 875 ft. and the reference area are to be marked off in two meter grids. The grids are to be marked on the roof with, chalk line, paint markers, or other durable markers. The grids are marked to be consistent with the survey map grid layout.2. The grid numbers as shown on the survey maps will be used to identify survey locations; for scans, total surface activity measurements, sample locations and any special measurements.
* Removable Surface Alpha Measurements: 25 dpm/100-cm 2 (25% of default DCGL for U-235)
See Survey Map SP-01 7-01 for the grid layout of the roof.3. The survey will consist of: a. Gamma-scan survey of the entire roof area and the reference area (excluding Cooling Tower exhaust).b. Surface beta scan survey of a minimum of 20% of the roof surface area. (20% of the accessible area of the roof is equivalent to 22 grids) This includes 20-two-meter grids selected at random plus additional grids selected by the technician to include locations of possible deposition, e.g., down-wind of the vent stacks around roof drains, etc.c. Total surface beta activity measurements (one-minute count) are to be taken at locations in the 20 grids selected at random as shown on survey map SP-017-01.
Action - investigation levels are also established as fractions of the applicable DCGLs:
: d. Total surface alpha activity measurements (one-minute count) are to be taken at locations in the 20 grids selected at random as shown on survey map SP-0 17-01.e. Smears (100-cm 2) collected at each of the 20 grids selected at random and at the 18 selected locations in the reference area.f. Samples of loose scale and debris from roof drain openings, the Cooling Tower fan exhaust vent frame and the PML stacks..g. Smear or material samples from the four PML vent stack interiors.
* Surface Gamma Scan: detectable sustained increase above background (audible response)
SP-017 Pkg FormsRev0l PageS of 19 6/25/2007 Rev 01 SP-017 Pkg FormsRevO I Page 5 of 19 6/25/2007 Rev 01 Package Log No: FNR-SP-017 I Survey Area: 7 1 Survey Units: 7-1 Survey Unit/Area
* Surface Beta Scan: detectable sustained increase above background (audible response)
* Total Surface Beta: 3500 dpm/100-cm 2 (50% of DCGL)
* Total Surface Alpha: 50 dpm/100-cm 2 (50% of Screening level DCGL for U-235)
* Removable Surface Beta: 700 dpm/100-cm 2 (10% of DCGL)
* Removable Surface Alpha: 25 dpm/100-cm 2 (25% of Screening Level DCGL for U-235)
Survey and Sampling Instruction Form General Instructions:
: 1. The roof areas on elevations 894 ft. and 875 ft. and the reference area are to be marked off in two meter grids. The grids are to be marked on the roof with, chalk line, paint markers, or other durable markers. The grids are marked to be consistent with the survey map grid layout.
: 2. The grid numbers as shown on the survey maps will be used to identify survey locations; for scans, total surface activity measurements, sample locations and any special measurements. See Survey Map SP-01 7-01 for the grid layout of the roof.
: 3. The survey will consist of:
: a. Gamma-scan survey of the entire roof area and the reference area (excluding Cooling Tower exhaust).
: b. Surface beta scan survey of a minimum of 20% of the roof surface area. (20% of the accessible area of the roof is equivalent to 22 grids) This includes 20-two-meter grids selected at random plus additional grids selected by the technician to include locations of possible deposition, e.g., down-wind of the vent stacks around roof drains, etc.
: c. Total surface beta activity measurements (one-minute count) are to be taken at locations in the 20 grids selected at random as shown on survey map SP-017-01.
: d. Total surface alpha activity measurements (one-minute count) are to be taken at locations in the 20 grids selected at random as shown on survey map SP-0 17-01.
: e. Smears (100-cm 2) collected at each of the 20 grids selected at random and at the 18 selected locations in the reference area.
: f. Samples of loose scale and debris from roof drain openings, the Cooling Tower fan exhaust vent frame and the PML stacks..
: g. Smear or material samples from the four PML vent stack interiors.
of 19                       6/25/2007 Rev 01 PageS Pkg FormsRev0l SP-017 Pkg SP-017      FormsRevO I                 Page 5 of 19                       6/25/2007 Rev 01


==
Package Log No: FNR-SP-017 I                Survey Area: 7          1      Survey Units: 7-1 Survey Unit/Area
Description:==


FNR Roof and Vent Stack Exterior 4. Additional one-minute total surface beta measurements are to be taken to ensure that areas of the roof downwind of the FNR stack and the PML stacks are surveyed (north and east of the stacks). The prevailing wind direction is from the southwest.
== Description:==
: 5. Additional measurements may be selected by the Survey Technician on a judgment basis, considering locations where deposition could occur or where scan surveys show indications above background.
FNR Roof and Vent Stack Exterior
Additional measurements may also be directed by the Reactor Laboratory Manager, Assistant Laboratory Manager or by Project Radiation Protection management and supervisory personnel.
: 4. Additional one-minute total surface beta measurements are to be taken to ensure that areas of the roof downwind of the FNR stack and the PML stacks are surveyed (north and east of the stacks). The prevailing wind direction is from the southwest.
Such directions are to be documented on the comment section of the Survey Forms..6. The south end of the PML roof has been established as a reference area for the survey. Eighteen total surface activity measurements are to be collected at designated locations chosen at random (on a triangular grid).Specific Instructions:
: 5. Additional measurements may be selected by the Survey Technician on a judgment basis, considering locations where deposition could occur or where scan surveys show indications above background. Additional measurements may also be directed by the Reactor Laboratory Manager, Assistant Laboratory Manager or by Project Radiation Protection management and supervisory personnel. Such directions are to be documented on the comment section of the Survey Forms.
: 1. Background Survey a. Perform a minimum of five background measurements with each detector (one-minute scaler counts) on the FNR Roof and the Reference Area unless directed otherwise.
  .6. The south end of the PML roof has been established as a reference area for the survey. Eighteen total surface activity measurements are to be collected at designated locations chosen at random (on a triangular grid).
: b. The detectors include those used for gamma scans (LMI 44-10 Nal), surface beta scans (LMI 44-142 and LMI 239-1F Floor Monitor) and total surface activity measurements (LMI-44-142, beta &LIM 43-92, alpha). Record the data on Part II of the Survey Form. Record the location of each background measurement on the appropriate survey map.c. Take several background measurements with the LMI 44-142 on the accessible portions of the PML stacks (south side) for use as backgrounds for the survey of the FNR Stack.2.. Gamma Scan Survey a. Using the 44-10, 2x2 in. Sodium Iodide detector coupled to an LMI 2221 scaler-ratemeter, perform a walkover gamma scan survey of the entire FNR roof and PML reference area.b. Set the instrument to "fast" response and use the earphones to listen for an increase in the audible response.c. Maintain the detector within one to two inches from the roof surface moving the detector from side-to-side while slowly walking forward on a straight path (serpentine pattern).d. Cover the entire accessible roof surface -walk the roof in straight paths about one meter apart using the two-meter grid marks as guides.e. The detector speed is to be maintained between 0.5 and one meter per second.f. Note that the gamma scan sensitivity of the LMI 44-10 is not quantified for surfaces such as the FNR roof. The objective is to identify areas that exhibit direct gamma radiation counts that are distinguishable above the LMI 44-10 background count rate.g. Listen for any increases in the count rate as indicated by the audible response.
Specific Instructions:
Compare the count rates to the background count rate as determined in Part I of these instructions.
: 1. Background Survey
: h. Pause and investigate any areas where the detector response exceeds the background count rate.Mark areas that exhibit a sustained increase above background, > 1.5 times the average background count rate.i. Mark areas determined to be above the LMI 44-10 background.
: a. Perform a minimum of five background measurements with each detector (one-minute scaler counts) on the FNR Roof and the Reference Area unless directed otherwise.
Mark on the roof surface and on a survey map that shows the roof marked with two-meter grids.j. It is not required to record gamma scan observed gcpm in each grid on a survey data form. Record the range of observed gcpm for each traverse in the comments section.SP-017 Pkg FormsRev01 Page 6 of 19 6/25/2007 Rev 01 Package Log No: FNR-SP-017 1 Survey Area: 7 Survey Units: 7-1 Survey Unit/Area
: b. The detectors include those used for gamma scans (LMI 44-10 Nal), surface beta scans (LMI 44-142 and LMI 239-1F Floor Monitor) and total surface activity measurements (LMI-44-142, beta &
LIM 43-92, alpha). Record the data on Part II of the Survey Form. Record the location of each background measurement on the appropriate survey map.
: c. Take several background measurements with the LMI 44-142 on the accessible portions of the PML stacks (south side) for use as backgrounds for the survey of the FNR Stack.
2.. Gamma Scan Survey
: a. Using the 44-10, 2x2 in. Sodium Iodide detector coupled to an LMI 2221 scaler-ratemeter, perform a walkover gamma scan survey of the entire FNR roof and PML reference area.
: b. Set the instrument to "fast" response and use the earphones to listen for an increase in the audible response.
: c. Maintain the detector within one to two inches from the roof surface moving the detector from side-to-side while slowly walking forward on a straight path (serpentine pattern).
: d. Cover the entire accessible roof surface - walk the roof in straight paths about one meter apart using the two-meter grid marks as guides.
: e. The detector speed is to be maintained between 0.5 and one meter per second.
: f. Note that the gamma scan sensitivity of the LMI 44-10 is not quantified for surfaces such as the FNR roof. The objective is to identify areas that exhibit direct gamma radiation counts that are distinguishable above the LMI 44-10 background count rate.
: g. Listen for any increases in the count rate as indicated by the audible response. Compare the count rates to the background count rate as determined in Part I of these instructions.
: h. Pause and investigate any areas where the detector response exceeds the background count rate.
Mark areas that exhibit a sustained increase above background, > 1.5 times the average background count rate.
: i. Mark areas determined to be above the LMI 44-10 background. Mark on the roof surface and on a survey map that shows the roof marked with two-meter grids.
: j. It is not required to record gamma scan observed gcpm in each grid on a survey data form. Record the range of observed gcpm for each traverse in the comments section.
SP-017 Pkg FormsRev01                   Page 6 of 19                       6/25/2007 Rev 01


==
Package Log No: FNR-SP-017 1                  Survey Area: 7              Survey Units: 7-1 Survey Unit/Area
Description:==


FNR Roof and Vent.Stack Exterior Surface Beta Scan Surveys a. Perform surface beta scans of the 20 designated two-meter grids identified on the survey map.b. Maintain the detector at 1/4 inch from the surface and move the detector across the surface at a speed no greater than one detector width per second.c. In addition to the designated grids, scan selected grids downwind of the FNR Stack and downwind of PML Stack 2 (north and east of the stacks).d. The Ludlum Floor Monitor or the LMI 44-142 detector may be used for surface scan surveys. The LMI 44-142 detector is to be used in areas where the floor monitor cannot fit, or maintain the prescribed distance from the surface.e. Use the audio response (with head phones) to identify any areas where a count rate increase (above background) is noted.f. Delineate any locations where a sustained-increased count rate (audible increase or by meter/scaler response) is confirmed.
== Description:==
Mark the boundary on the roof and on a survey map. If an elevated area extends beyond grid boundaries, follow it to define the area as necessary.
FNR Roof and Vent.Stack Exterior Surface Beta Scan Surveys
: g. Record the highest count rate observed in each grid that is scanned (from the digital rate meter).This is to be done by mentally noting the highest digital count rate during the scan. Record the highest scan count rate whether or not "elevated" count rates were observed.
: a. Perform surface beta scans of the 20 designated two-meter grids identified on the survey map.
Record in units of gross counts per minute (g-cpm).h. Scan the exterior surface of the FNR Vent Stack using an LMI 44-142 detector.
: b. Maintain the detector at 1/4 inch from the surface and move the detector across the surface at a speed no greater than one detector width per second.
Cover at least 20% of the surface area of the stack.i. Using a LMI 44-142 detector, scan the Cooling Tower air intake Louvers (on the portion of the roof at the PML elevation) where mineral deposits (from cooling tower water) are visible. See Figure 8 photo. Mark any locations where the audible count rate is determined to be above background.
: c. In addition to the designated grids, scan selected grids downwind of the FNR Stack and downwind of PML Stack 2 (north and east of the stacks).
: d. The Ludlum Floor Monitor or the LMI 44-142 detector may be used for surface scan surveys. The LMI 44-142 detector is to be used in areas where the floor monitor cannot fit, or maintain the prescribed distance from the surface.
: e. Use the audio response (with head phones) to identify any areas where a count rate increase (above background) is noted.
: f. Delineate any locations where a sustained- increased count rate (audible increase or by meter/scaler response) is confirmed. Mark the boundary on the roof and on a survey map. If an elevated area extends beyond grid boundaries, follow it to define the area as necessary.
: g. Record the highest count rate observed in each grid that is scanned (from the digital rate meter).
This is to be done by mentally noting the highest digital count rate during the scan. Record the highest scan count rate whether or not "elevated" count rates were observed. Record in units of gross counts per minute (g-cpm).
: h. Scan the exterior surface of the FNR Vent Stack using an LMI 44-142 detector. Cover at least 20% of the surface area of the stack.
: i. Using a LMI 44-142 detector, scan the Cooling Tower air intake Louvers (on the portion of the roof at the PML elevation) where mineral deposits (from cooling tower water) are visible. See Figure 8 photo. Mark any locations where the audible count rate is determined to be above background.
: j. If needed to survey locations that are inaccessible to the floor monitor and the 44-142 detector, a pancake probe (LMI 44-9) is used to scan the locations.
: j. If needed to survey locations that are inaccessible to the floor monitor and the 44-142 detector, a pancake probe (LMI 44-9) is used to scan the locations.
NOTE: The beta scan survey is designed under the assumption that the scan sensitivity is < 3500 dpm/100-cm2, i. e., < 50% of the limiting surface DCGL (7100 dpmr/100-cm 2 for Co-60).4. Total Surface Activity Measurements
NOTE: The beta scan survey is designed under the assumption that the scan sensitivity is < 3500 dpm/100-cm2, i. e., < 50% of the limiting surface DCGL (7100 dpmr/100-cm 2 for Co-60).
: a. Perform total surface beta measurements (one-minute scaler counts) with an LMI 44-142 detector at each of the 20 locations identified on survey map SP-017-01 for the FNR.b. Perform total surface beta measurements (one-minute scaler counts) with an LMI 44-142 detector at each of the 18 locations on the PML roof identified on survey map SP-017-02.
: 4. Total Surface Activity Measurements
: a. Perform total surface beta measurements (one-minute scaler counts) with an LMI 44-142 detector at each of the 20 locations identified on survey map SP-017-01 for the FNR.
: b. Perform total surface beta measurements (one-minute scaler counts) with an LMI 44-142 detector at each of the 18 locations on the PML roof identified on survey map SP-017-02.
: c. Perform total surface alpha measurements (one-minute scaler counts) with an LMI 43-92 detector at each of the 20 locations identified on survey map SP-017-01.
: c. Perform total surface alpha measurements (one-minute scaler counts) with an LMI 43-92 detector at each of the 20 locations identified on survey map SP-017-01.
: d. Perform total surface alpha measurements (one-minute scaler counts) with an LMI 43-92 detector at each of the 18 locations on the PML roof identified on survey map SP-017-02.
: d. Perform total surface alpha measurements (one-minute scaler counts) with an LMI 43-92 detector at each of the 18 locations on the PML roof identified on survey map SP-017-02.
: e. Locate each total surface activity measurement by identifying the appropriate grid shown on the survey map. Select the measurement location within the grid using judgment -an accuracy of+one foot is sufficient.
: e. Locate each total surface activity measurement by identifying the appropriate grid shown on the survey map. Select the measurement location within the grid using judgment - an accuracy of+
It is not necessary to mark the measurement location on the roof.f. In addition to the 20 locations, take at least one total surface beta measurement on each area (if any) of the FNR where an increased count rate was observed during the scan survey including the FNR Vent Stack and the Cooling Tower Intake louvers.5. Smears and Material Samples a. Collect a 100 cm2 smear from each of the 20 selected grids on the FNR roof and the 18 designated SP-017 Pkg FormsRevO g Page 7 of 19 6/25/2007 Rev 01 Package Log No: FNR-SP-017 1 Survey Area: 7 I Survey Units: 7-1 Survey Unit/Area
one foot is sufficient. It is not necessary to mark the measurement location on the roof.
: f. In addition to the 20 locations, take at least one total surface beta measurement on each area (if any) of the FNR where an increased count rate was observed during the scan survey including the FNR Vent Stack and the Cooling Tower Intake louvers.
: 5. Smears and Material Samples
: a. Collect a 100 cm2 smear from each of the 20 selected grids on the FNR roof and the 18 designated SP-017 Pkg FormsRevO                         g 7 of 19 Page                              6/25/2007 Rev 01


==
Package Log No: FNR-SP-017 1                  Survey Area: 7        I      Survey Units: 7-1 Survey Unit/Area
Description:==
 
== Description:==
FNR Roof and Vent Stack Exterior locations on the PML reference area.. Use standard 49 mm smears. Count each for alpha and beta for a minimum of 1 minute.
: b. Collect samples of the loose material from the drain openings on the FNR main roof and from the roof of the 3 rd floor at the PML elevation. See Figure 7 photo for an example. Include material from the roof surface and the drain opening. Place the material from each drain opening in a separate 500 ml plastic bottle. Not all of the drains are good sampling candidates as they do not contain much material.
: c. Collect a 100 cm2 smear sample from inside each of the four PML stacks (or from the ventilation ducting in the PML downstream of the exhaust fans). Ensure that the smears are labeled to include the stack No. Count each smear for gross alpha and beta activity. %.,- d.-o-  C      V "r,,      (.10TY
: d. Collect a sample of the loose material from the Cooling Tower exhaust frame. Include rust, scale and lichen material. See Figure 9 photo. Place the material in a 500 ml plastic bottle. Mark the sample location on the survey map (SP-0 17-01)
: e. If detectable activity above background is observed during the scan or direct measurement surveys, collect a sample of the loose scale on the Cooling Tower intake louvers (PLM elevation, north side of FNR). See Figure 8. Place the material in a 500 ml plastic bottle. Mark the sample location on the survey map (SP-017-01).
: f. Label each sample container with the sample number using the following convention: SP-0 17-01, 02 etc, where the numbers 01, 02 are sequential numbers.
: 6. Survey of PML Roof Reference Area
: a. Mark the measurement locations on the PML reference area roof surface (# I through 18). Mark the reference area into 2 meter grids.. Coordinates of the reference area measurements are shown on Survey Design Map No. 2. The measurement locations may be established by measuring distances from the coordinate system origin at the NW comer of the reference area.
: b. These are to be one-minute scaler counts with an LMI 44-142 detector.
: c. Take a total surface beta measurement and a total surface alpha measurement at each of the locations identified on the survey map for the PML Roof reference area.
: 7. Survey Data Recording
: a. See the attached survey forms (Attachment 3).
: b. Complete the header information on each sheet of the survey form.
: c. Complete the instrument information table in Part I.
: d. Document background measurements in Part II.
: e. Record each total surface activity survey measurement and beta scan maximum cpm for each grid in Part III, survey measurement data form.
: f. Use a separate measurement data form for the Reference Area
: g. For each material sample record the following in Part IV.
          " Show the sample location on the survey map (Map No. SP-017-01) using the triangle icon with sequential sample No.
* Date sample collected
* Description of sample material
* Sample container (500 ml bottle, zip-lock bag, etc.)
          " Name of person who collected the sample.
Use the comment sections on the forms to document any discrepancies to conditions assumed in the instructions or any other explanatory information.
SP-017 Pkg FormsRev01                    Page 8 of 19                      6/25/2007 Rev 01
 
Package Log No: FNR-SP-017                  Survey Area: 7                Survey Units: 7-1 Survey Unit/Area
 
== Description:==
FNR Roof and Vent Stack Exterior Characterization Package References Package Log No: FNR-SP-017                  Survey Area: 7                Survey Units: 7-1 Survey Unit/Area
 
== Description:==
FNR Roof and Vent Stack Exterior
: 1. General
 
==References:==
 
A. FNR Decommissioning Plan, Rev 1, 2006. &sect; 1.2.3 provides a general description of the FNR Building.
B. The Historical Site Assessment [CH2MHill, January 2003], &sect; 5.2 identifies the FNR Roof as a non-impacted area.
C. The FNR Decommissioning Environmental Report [CH2MHill, June 2004] &sect; B.4.2.2, indicates that the prevailing wind direction in the Ann Arbor area is from the southwest.
: 2. Drawings:
Drawing No.                                        Description Dwg No. M-9, Smyth,                Reactor Building, Heating and Ventilating, 3 rd and 4th Floor Hinchman & Grylls, 1/24/55        Plans Dwg No. A-5, Smyth,                Reactor Building, Roof Plan and Details Hinchman & Grylls, 1/24/55 Dwg No. A-6, Smyth,                Reactor Building, Sections Hinchman & Grylls, 1/24/55 Sheet A2. 1, U of Michigan        Phoenix Laboratory and Ford reactor Roof Replacement, Roof Facilities Planning & Design,      Level Plan 5/15/2001 SP-0 17 Pkg Forms                        Page 9 of 19                        6/12/2007 Rev 0
 
SP-017 Survey Maps and Data Forms
 
I          I
                                                                                                                          - * .        ) Ford: Nuclle.r Reacior Surxey Map 17                              18                                  19 m.
0
                                                                                                                              .FNRKo,-Su-UiiiPY-7U1                                    -1.
2"0* \        Surface Area = 453.58 sq. mi 91                              99        10(
1--                V19                  104    10          lot I        Grid Spacing- 2 m FNRDP-DWG-74              'Date: 6/7/2007
                                                                                                                                                . .. *M-ap-No6. SP0-1-U7 1 8'
81                                        I                            I          I                  ,        ,
RQ        QA          01                                      Qe      9          76 9i R9  96          9)*
                                        /    *                                                                *
      '13"                                  /1'                                    15                              6 7_2                                          Li                                        75.        8 6'                                        70          71                            73
              -5 V
                        */ 9 5Q 50_          v 0t 8 /6
                                                                                    -617 61
                                                                                              '11, I;-        64      V*
12 j
v*  B Legend
                                                                                                                                                    - D~rain
                                                                                                                                                    - Survey Point A.              AQ
                                                " ,      50                                                          5.5        5          4    -Survey Point No.:
                                  !r I
4                    I            I 01 - Vent
                                            ./(                      42                  4^                                                  [K]      Scan Grid 5/        3" Cooling 4n                                      43          44 4&#xfd;          4*
6
                                                                                                                                            -xx---Grid-No.
Towler
                                                                                                                                                    - Material Sample Location Fans 2'              2                                    31                -3:                                      36      _      - Cooling Tower Vent
                                                                        /
                                                                    /
19        20                  1*          2]'
                                                                                                # 2          24          *~.
X                                                                                                -w Stac 3
0 09                                          1';      13          1_4-  is
                                  *                                                                                                                                    -f                  -
nA
(~1l      02                              U4      o4'                07          A3R
:1 _________      +/- _________      +/- ___________________________________________________________________________________
 
Ford Nuclear Reactor Survey Map Reference Area for FNR! Roof S-urve -Ufiiif-7-tr 16            17                    18        Suface Area = 133.87 sq. m Grid Spacing = 2 nm FNR P-DWG-7&#xfd;          Date': 6/4/2007 Map-No.- PO017-O2 14              15 11
* N 1-J 11            12                    13
                                        .19Legen                              d
__  _  _              9F__  __-          0-  ____-                    --------
                                                                          -Drain I
____I          __                                - Su~ey Point' 6              78
[4                5
                    *          *2  2 I
* _    _  _  _ _ _1              23
 
ILO -
FNR Survey Package SP-017 1:0ll                              Attachment 2 - Survey Design Map No. 1 R+
V+
North 0F LO+
Survey Design for 20 Direct Measurements Visual Sample Plan -Triangular Grid - Random Start 5/18/07 File: SP-017_OlAl 0-J2    -8        -6      -4      -2        02          4      6        8      10      12    14 16 I
 
FNR Survey Package SP-017
-&#xfd;T      Attachment 2 - Survey Design Map No.2                              ~7
                                                                                              &#xfd;Q
                                                                    ~4i        ~5l E-Fo                2.1                                                15.0. 13.
PML Roof 1A.i4=
02 North 0                                                          0
                                                                                  ~o.e.4 CD.
Survey Design for 18 Direct Measurements Visual Sample Plan - Triangular Grid - Random Start Reference Area for FNR Roof Survey 5/18/07 File: SP_017-02 C%1 U              U                  U
    -6I-    -5      -4      -3      -2  I    -1    0I        1I 2I  3 I  4 5I        6  7I


FNR Roof and Vent Stack Exterior locations on the PML reference area.. Use standard 49 mm smears. Count each for alpha and beta for a minimum of 1 minute.b. Collect samples of the loose material from the drain openings on the FNR main roof and from the roof of the 3 rd floor at the PML elevation.
FNR-SP-0 17, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107                  SHEET _    OF 7 I. Instrument Information Instrumentation Comments:
See Figure 7 photo for an example. Include material from the roof surface and the drain opening. Place the material from each drain opening in a separate 500 ml plastic bottle. Not all of the drains are good sampling candidates as they do not contain much material.c. Collect a 100 cm2 smear sample from inside each of the four PML stacks (or from the ventilation ducting in the PML downstream of the exhaust fans). Ensure that the smears are labeled to include the stack No. Count each smear for gross alpha and beta activity.  
: 1. Cable length is 6 ft on detectors in sets No. I through 4.
%.,- d.-o- C "r, V , (.10 TY d. Collect a sample of the loose material from the Cooling Tower exhaust frame. Include rust, scale and lichen material.
: 2. Instrument efficiency is determined with a Tc-99 calibration source.
See Figure 9 photo. Place the material in a 500 ml plastic bottle. Mark the sample location on the survey map (SP-0 17-01)e. If detectable activity above background is observed during the scan or direct measurement surveys, collect a sample of the loose scale on the Cooling Tower intake louvers (PLM elevation, north side of FNR). See Figure 8. Place the material in a 500 ml plastic bottle. Mark the sample location on the survey map (SP-017-01).
II. Background Measurements Location =>                    PML Roof                              FNR Roof Instrument      Isrmn        e Instrument Set    Instrument Set        set        Instrument Set No. 1          No. 2        No.     1        No. 2                  Notes Measurement No.No            Count    (cpm) Count      (cpm Count                Count (Cpm)(cpm)
: f. Label each sample container with the sample number using the following convention:
(cpm)    time              time              time            time (min)           (min)       _      (m in)          (min) 295        1      1.5      2    299        1      1.0      2    Alpha detector.
SP-0 17-01, 02 etc, where the numbers 01, 02 are sequential numbers.6. Survey of PML Roof Reference Area a. Mark the measurement locations on the PML reference area roof surface (# I through 18). Mark the reference area into 2 meter grids.. Coordinates of the reference area measurements are shown on Survey Design Map No. 2. The measurement locations may be established by measuring distances from the coordinate system origin at the NW comer of the reference area.b. These are to be one-minute scaler counts with an LMI 44-142 detector.c. Take a total surface beta measurement and a total surface alpha measurement at each of the locations identified on the survey map for the PML Roof reference area.7. Survey Data Recording a. See the attached survey forms (Attachment 3).b. Complete the header information on each sheet of the survey form.c. Complete the instrument information table in Part I.d. Document background measurements in Part II.e. Record each total surface activity survey measurement and beta scan maximum cpm for each grid in Part III, survey measurement data form.f. Use a separate measurement data form for the Reference Area g. For each material sample record the following in Part IV." Show the sample location on the survey map (Map No. SP-017-01) using the triangle icon with sequential sample No.* Date sample collected* Description of sample material* Sample container (500 ml bottle, zip-lock bag, etc.)" Name of person who collected the sample.Use the comment sections on the forms to document any discrepancies to conditions assumed in the instructions or any other explanatory information.
1                              2951.       2    2991.0_                            face up 2              282        1      0.5      2    284        1    2.0        2     Alpha detector.
SP-017 Pkg FormsRev01 Page 8 of 19 6/25/2007 Rev 01 Package Log No: FNR-SP-017 Survey Area: 7 Survey Units: 7-1 Survey Unit/Area
2 face up 276        1      2.0      2    270        1    0.5        2     Alpha detector.
3                                                                                    face up 4              272        1      0.5      2    260        1    0.5        2    Alpha detector.
face up 5              2Alpha                                                                      detector.
280        1      2.0      2    298        1    15.0      2    face down 235        1      NA      NA      278        1    3.5        2    Against FNR stack 6
7              NA      NA    &#xfd;NA        NA      NA        NA    0.0        2    Alpha detector.
face up Grid 105 NA      NA        NA      NA      NA        NA    4.5        2    Alpha detector.
8                                                                                    face up Grid 105 NA      NA        NA      NA      NA        NA      1.5      2    Alpha detector.
9              NAI      NA        NA      NAINANA                    1.5      2    face up Grid 105 Background Measurement Comments:
: 1. Background measurements taken on roof surfaces on 6/21/07 at locations throughout the FNR roof and PML reference area.
: 2. All beta measurements were taken with Instrument Set No. 1 and with detector sensitive face toward roof.
: 3. Alpha measurements taken with Instrument Set No. 2 and with detector in position as noted.
SP-0 17 Survey FormsRev02                  Sheet I of 7                        Rev02 7/11/2007


==
FNR-SP-017, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107    SHEET    2-    OF      7 Il. Survey Measurement Data Form        Location    PML Roof Reference Area Alpha          Gamma    Remov    Remov Beta Total        Total            Scan  a        03 Instr. Surface  Instr. Surface  Instr. Activity activity  activity          Notes Grid    Set    Activity  Set  Activity  Set    (gcpm  (dpm/10  (dpm/10 No. No.    (gcpm)    No.  (gcpm)    No.      NaI)  0-cm 2 )  0-cm 2) 01        1      311      2      16.5    4      6808      5.58    22.790 02        1      275      2      12.5    4      6961      3.72      15.19 03      NA        NA      NA      NA      4      6667      NA        NA 04        1      251      2      7.5      4      9396      1.86    72.17      y count effect of PML wall parapet 05      NA        NA      NA      NA      4      7322      NA        NA 06        1      278      2      8.5      4      6996      5.58    49.38 07        1      259      2      6.5      4      6780      5.58    53.18 08      NA        NA      NA      NA      4      9688      NA        NA        y count effect of PML wall parapet 09        1      287      2      14.0    4      7260      3.72    32.29 10        1      301      2      8.0      4      6782      11.16    43.68 11      NA        NA      NA      NA      4      6909      NA        NA 12        1      286      2      4.5      4      8449      3.72    20.89      y count effect of PML wall parapet 13      NA        NA      NA      NA      4      7184      NA        NA 14      NA        NA      NA      NA      4      6862      NA        NA 15      NA        NA      NA      NA      4      7545      NA        NA 16      NA        NA      NA      NA      4      7954      NA        NA 17      NA        NA      NA      NA      4      7476      NA        NA 18        1      292      2      12.0    4      6338      5.58    32.29 19        1      267      2      8.5      4      6690      5.58    20.89 20      NA        NA      NA      NA      4      10307      NA        NA        y count effect of PML wall parapet 21        1      283      2      13.5    4      6868      1.86    36.09 22        1      303      2      14.0    4      6904    14.88    32.29 23      NA        NA      NA      NA      4      6417      NA        NA 24        1      272      2      10.5    4      9763      3.72    32.29      y count effect of PML wall parapet 25      NA        NA      NA      NA      4      6535      NA        NA 26        1      265      2      9.5      4      6496      9.30    32.29 27        1      290      2      9.0      4      6760      7.44    39.88 28      NA        NA      NA      NA      4      10172      NA        NA        y count effect of PML wall parapet 29        1      279      2      14.5    4      6013      3.72      5.7 30        1      278      2      11.0    4      6482      9.30      3.80 31      NA        NA      NA      NA      4      7211      NA        NA
Description:==


FNR Roof and Vent Stack Exterior Characterization Package References Package Log No: FNR-SP-017 Survey Area: 7 Survey Units: 7-1 Survey Unit/Area
FNR-SP-0 17, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107                  SHEET    3    OF        7 32          1            273        2      4.5      4        10202        3.72      15.19    y count effect of PML wall parapet 33        NA            NA      NA      NA        4        5755          NA        NA 34        NA            NA      NA      NA        4        6139          NA        NA 35        NA            NA      NA      NA        4        6063          NA        NA 36        NA            NA      NA      NA        4        8026        NA        NA      y count effect of PML wall parapet Comments:
: 1. Beta TSA by JR Grey on 6/21/07 with instrument set No. 1 & 1 minute counts.
: 2. Alpha TSA by N Campbell on 6/21/07 using instrument set No. 2 & 2 minute counts.
: 3. Smears collected on 6/22/07 by JR Grey. Counted by UM Tennelec S5 XLB on 6/25/07.
: 4. Gamma scan survey of PML Roof on 6/25 & 6/26/07 by JR Grey using instrument set No. 4.
III. Survey Measurement Data Form                          Location          FNR Roof Max. P3                    Max.        Total Scan        Total        Gamma      Surface ot Survey                              Removable    Removabl    Count      Surface j3      Scan      Activity            Notes Point    Grid      Instrument      Activity    e Activity    Rate      Activity      Activity    (gcpm)
No.      No.        Set No.      (cL-dpm)    (836pm)    (gcpm)      (gcpm)      (gcpm NaI)
NA        1      4 for y scan        NA          NA          NA        NA            6780        NA                      V\
NA      2        4 for yscan          NA          NA          NA        NA            6458        NAVi NA      3        4for scan            NA          NA          NA        NA            6320        NA NA      45      4 for y scan        NA          NA          NA        NA            7680        NA                0,-1 NA                4forscan            NA          NA          NA        NA            6900        NA            -"
NA      6        4  foryyscan        NA          NA          NA        NA            5722        NA NA      7       4 for y scan        NA          NA          NA        NA            5905        NA NA        8      4 for y scan        NA          NA          NA          NA          6519        NA NA      9        4 for*y scan        NA          NA          NA        NA            6200        NA NA        10      4 foryyscan          NA          NA          NA          NA          5579        NA NA        11      4 for y scan        NA          NA          NA          NA          6128          NA NA        12      4 for -1scan        NA          NA          NA          NA          5694          NA NA        13      4 foryyscan          NA          NA          NA          NA          6011          NA NA        14      4 for y scan        NA          NA          NA          NA          6640          NA NA        15      4 for y scan        NA          NA          NA          NA          6210          NA NA        16      4 foryscan          NA          NA          NA          NA          5859          NA NA        17      4 for y  scan        NA          NA          NA          NA          8322          NA        y scan interf from Pool blocks below 1      18      1 for 3 TSA 2  7.44        17.09      346            290          9307          13.5      03scan on sed spot for ca TSA                                                                                    was 450 cpm, 9307 cpm y is from FNR wall NA        19            NA            NA          NA          NA          NA          5209          NA NA      20              NA            NA          NA          NA          NA          4663          NA 2      21        Tennelec for        1.86      32.29        332        264          4618          15.0 smears NA      22              NA            NA          NA          NA          NA          6028          NA


==
FNR-SP-0 17, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107      SHEET__    OF  7 3 23      Tennelec for  9.30      17.09      325        282      5281    17.0 smears NA 24          NA          NA        NA        NA        NA        6256    NA NA 25          NA          NA        NA        NA        NA        6217    NA 4 26      Tennelec for  3.72      22.79      356        216      6000    13.0 smears NA 27          NA          NA        NA        NA        NA        8512    NA NA 28          NA          NA        NA        NA        NA        7469    NA NA 29          NA          NA        NA        NA        NA        5200    NA NA 30          NA          NA        NA        NA        NA        4700    NA NA 31          NA          NA        NA        NA        NA        4703    NA NA 32          NA          NA        NA        NA        NA        5630    NA NA 33          NA          NA        NA        NA        NA        5782    NA NA 34          NA          NA        NA        NA        NA        5949    NA NA 35          NA          NA        NA        NA        NA        5912    NA NA 36          NA          NA        NA        NA        NA        6018    NA 5 37      Tennelec for  9.30      62.68      396        324      9933      9.5  y scan - effect of smears                                                                N wall of FNR NA 38          NA          NA        NA        NA        NA        6747    NA 6 39      Tennelec for  11.16    53.18      300        265      4770    14.0 smears NA  40          NA          NA        NA        NA        NA        4778    NA
Description:==
'A  41          NA          NA        NA        NA        NA        4971    NA 7 42      Tennelec for  3.72      7.60      303        300      5476    12.5 smears NA  43          NA          NA        NA        NA        NA        5853    NA 8 44      Tennelec for    1.86    18.99      356        312      6368    18.0 smears NA 45          NA          NA        NA        NA        NA        5920    NA NA  46          NA          NA        NA        NA        NA        5695    NA NA  47          NA          NA        NA        NA        NA        9145    NA    y scan - effect of N wall of FNR NA 48          NA          NA        NA        NA        NA        7240    NA NA  49          NA          NA        NA        NA        NA        5198    NA NA  50          NA          NA        NA        NA        NA        5084    NA NA 51          NA          NA        NA        NA        NA        5140    NA NA  52          NA          NA        NA        NA        NA        6730    NA NA  53          NA          NA        NA        NA        NA        6764    NA NA  54          NA          NA        NA        NA        NA        6924    NA NA  55          NA          NA        NA        NA        NA        6718    NA NA  56          NA          NA        NA        NA        NA        6692    NA NA 57          NA          NA        NA        NA        NA        8925    NA    y scan - effect of N wall of FNR 9 58      Tennelec for    0.0      5.70      442        343      8391    24.0  on sed. deposit smears NA 59          NA          NA        NA        NA        NA        5727    NA


FNR Roof and Vent Stack Exterior 1. General
FNR-SP-017, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107    SHEET___ OF  7 NA  60        NA        NA        NA        NA        NA        5346    NA 110  61    Tennelec for  3.72    41.78      329        260      5926    17.0 smears NA  62        NA        NA        NA        NA        NA        6305    NA 11 63      Tennelec for  1.86    15.19      333        280      6767    18.0  481 f3TSA on smears                                                                sed deposit NA  64        NA        NA        NA        NA        NA        6216    NA NA  65        NA        NA        NA        NA        NA        6335    NA 12 66      Tennelec for  1.86    32.29      338        335      6573    18.5 smears NA  67        NA        NA        NA        NA        NA        8380    NA  Yscan effect of roof parapet NA  68        NA        NA        NA        NA        NA        8419    NA  y scan - effect of FNR N wall NA  69        NA        NA        NA        NA        NA        6698    NA NA  70        NA        NA        NA        NA        NA        6052    NA NA  71        NA        NA        NA        NA        NA        6012    NA*
NA  72        NA        NA        NA        NA        NA        6553    NA NA  73        NA        NA        NA        NA        NA        5822    NA NA  74        NA        NA        NA        NA        NA        6077    NA NA  75        NA        NA        NA        NA        NA        6293    NA NA  76        NA        NA        NA        NA        NA        6740    NA
,13  77      Tennelec for  9.30    55.08      344        289      8715    25.5  389 3TSA on smears                                                                sed deposit NA  78        NA        NA        NA        NA        NA        8752    NA  y scan - effect of FNR N wall 14 79      Tennelec for  3.72    18.99      310        267      6480      9.5 smears NA  80        NA        NA        NA        NA        NA        6209    NA NA  81        NA        NA        NA        NA        NA        6048    NA 15 82      Tennelec for  3.72    20.89      376      264      6442    16.5 smears NA  83        NA        NA        NA        NA        NA        6172    NA 16 84      Tennelec for  7.44    20.89      356        277      5884    13.0 smears NA  85        NA          NA      NA        NA        NA      5924    NA NA  86        NA          NA      NA        NA        NA      6178    NA NA  87        NA          NA      NA        NA        NA      9064    NA  y scan effect of roof parapet NA  88        NA          NA      NA        NA        NA      8366    NA NA  89        NA          NA      NA        NA        NA      7301    NA NA  90        NA          NA      NA        NA        NA      8810    NA NA  91        NA          NA      NA        NA        NA      8169    NA NA  92        NA          NA      NA        NA        NA      7419    NA NA  93        NA          NA      NA        NA        NA      7120    NA
'NA  94        NA          NA      NA        NA        NA      7091      NA NA  95        NA          NA      NA        NA        NA      7641      NA


==References:==
FNR-SP-0 17, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107                  SHEET (0 OF          7 NA  96          NA            NA          NA          NA          NA          7061          NA INA  97          NA            NA          NA          NA          NA          9156          NA      y scan - effect of N wall of FNR 17  98      Tennelec for      1.86      17.09        324          318        6381          17.5 smears NA  99          NA            NA          NA          NA          NA          6841          NA NA  100          NA            NA          NA          NA          NA          7471          NA 18  101      Tennelec for      9.3      28.49        205          288        5770          14.0 smears NA  102          NA            NA          NA          NA          NA          6079          NA 19  103      Tennelec for    14.86      17.09.        279          263        6768          12.0 smears NA  104          NA            NA          NA          NA          NA          6386          NA NA  105          NA            NA          NA          NA          NA          6189          NA 20  106      Tennelec for      3.72      13.29        278          284        6773          12.0 smears 21  74*          NA            NA          NA          NA          252          NA          12.0 22  83*          NA            NA          NA          NA          314          NA          19.0 23  19*          NA            NA          NA          NA          295          NA          11.0 24  09*          NA            NA          NA          NA          290          NA          15.5 25  Stack        NA            NA          NA          293          297          NA          14.0 26  Stack        NA            NA          NA          NA          231          NA          NA 27  Stack        NA            NA          NA          NA          NA          NA          22.5 f28  58          NA            NA          NA          NA          402          NA          NA        3402 cpm on sediment I_        I                                                                                      deposit 29  98          NA            NA          NA          NA          335          NA          NA        3 33 5 cpm  on sediment deposit 30  21          NA            NA          NA          NA          439          NA          10.0      3439 cpm on Cooling Tower exhaust frame
: 31. 21          NA            NA          NA          NA          319          NA          89.0    a 89 cpm on cool twr exh frm 32  38          NA        NA              NA          NA          212          NA            NA      Cooling Tower intake frame 33  38          NA        NA              NA          NA          222          NA            NA      Cooling Tower intake frame Comments:
: 1. Total surface beta measurements by JR Grey on 6/21/07 using instrument set No. 1.
: 2. Total surface alpha measurements by N Campbell on 6/21/07 using instrument set No. 2
: 3. Smears collected on 6/20/07 by JR Grey. Smears were counted on the UM Tennelec S5 XLB 6/21/07. The alpha MDA was reported as 5.03 dpm and the beta MDA as 22.81 dpm
: 4. Gamma scan survey of FNR Roof on 6/22 and 6/25/07 by JR Grey using instrument set No. 4.
: 5. Scan survey of Cooling Tower exhaust frame just above the steel frame with LMI 44 count rate range of 2500 to 2900 cpm. This contrasts to count rate on the roof surface of- 5000 to 6000 cpm.
: 6. Grids marked with asterisk designate extra judgment TSA P3    measurements. downwind from PML and FNR Stacks.                                                        . k        &#xfd; -USA
                                                                                                        + 47st"1~


A. FNR Decommissioning Plan, Rev 1, 2006. &sect; 1.2.3 provides a general description of the FNR Building.B. The Historical Site Assessment
FNR-SP-017, Attachment 3 -Survey Forms Survey No.:2007-1262 SurveyUnit No.7-1 Survey Pkg. SP-107                 SHEET       L OF         7 IV - Sample Information Sequential   Location     Date & Time         Material     Collected     Container     Comments No       (Grid No.)     Collected       Description       By FNR-RF-01   PML 14,18   6/22/07 0900         Dry deposits   R.Neveau     20 ml scint. Dry debris & sediment in vial     local low noint from water FNR-RF-02   PML 14,18   6/22/07 0915         Dry deposits   R.Neveau     20 ml scint. Replicate of FNR-RF-01 vial FNR-RF-03   FNR 63       6/22/07 0950         Dry deposits   R.Neveau     20 ml scint. Dry debris & sediment in vial     local low noint from water FNR-RF-04   FNR 40       6/22/07 1000         Rust & scale   R. Neveau     125 ml poly   Material from Cooling bottle     Tower Exhaust frame FNR-RF-05   FNR 31       6/22/07 1000       Moss & lichens R. Neveau     125 ml poly   Material from Cooling bottle     Tower Exhaust frame FNR-RF-06   FNR 88       6/22/07 1030         Dry deposits   R.Neveau     20 ml scint. Dry debris & sediment in vial     local low point from water FNR-RF-07   FNR 58       6/22/07 0950         Dry deposits   R.Neveau     20 ml scint. Dry debris & sediment in via       local low noint from water FNR-RF-08   FNR 62       6/25/07 0800       Drain catchment R. Neveau     20 ml scint   FNR roof drain debris FNR 22       6/25/07 0815       Drain catchment R. Neveau     20 ml scint   FNR roof drain FNR-RF-09                                         debris FNR-RF-10   FNR 92, 93   6/25/07 0830       Drain catchment R. Neveau     20 ml scint   FNR 3d floor roof drain FNR -_ F -10                                     d eb ris                 ___________                     ro ofd rain FNR-RF-11   FNR 67       6/25/07 0845       Drain catchment R. Neveau     20 ml scint   FNR 3 rd floor roof drain FNR-RF-11_                                       debris FNR-RF-12   FNR 58       6/26/07 0900         Dry deposits   R. Neveau     20 ml poly   Dry.debris & sediment in bottle     local low point from water FNR-RF-13   FNR 31       6/26/07 0830       Moss & lichens R. Neveau     125 ml poly   Material from Cooling bottle     Tower Exhaust frame FNR-RF-14   FNR 41       6/26/07 0845         Rust & scale   R. Neveau     125 ml poly   Material from Cooling bottle     Tower Exhaust frame FNR-RF-15           i-4                         ,-27-'
[CH2MHill, January 2003], &sect; 5.2 identifies the FNR Roof as a non-impacted area.C. The FNR Decommissioning Environmental Report [CH2MHill, June 2004] &sect; B.4.2.2, indicates that the prevailing wind direction in the Ann Arbor area is from the southwest.
AU55,                             pl                                     7,1_______
: 2. Drawings: Drawing No. Description Dwg No. M-9, Smyth, Reactor Building, Heating and Ventilating, 3 rd and 4th Floor Hinchman & Grylls, 1/24/55 Plans Dwg No. A-5, Smyth, Reactor Building, Roof Plan and Details Hinchman & Grylls, 1/24/55 Dwg No. A-6, Smyth, Reactor Building, Sections Hinchman & Grylls, 1/24/55 Sheet A2. 1, U of Michigan Phoenix Laboratory and Ford reactor Roof Replacement, Roof Facilities Planning & Design, Level Plan 5/15/2001 SP-0 17 Pkg Forms Page 9 of 19 6/12/2007 Rev 0 SP-017 Attachment 3 Survey Maps and Data Forms 91 8'17 81 18 19 1-- V19 I I 99 m.10(104 I I I-* .) Ford: Nuclle.r Reacior Surxey Map 0 .FNRKo,-Su-UiiiPY-7U1
FNR-RF-16   P* c'             X;o                                                           *- , 7         -
-1.2"0* \ Surface Area = 453.58 sq. mi I Grid Spacing- 2 m 10 lot FNRDP-DWG-74
ITA-C';_                                       7-o                                       07     7_A___
'Date: 6/7/2007... ap- No6. SP0-1-U7 1 , , 9 76 9i 75. 8 RQ QA 01 Qe R9 96 9)*'13" 6'7_2/ */1'70 15 Li*6 71 73 V9 0t 8 61'11, I;-12 j Legend*;" 5Q 64-5 50_v /6B-617 50-D~rain-Survey Point 4 -Survey Point No.: 01 -Vent I A.AQ 4 !r " , I I ....*5/./(Cooling 4n 42 4^5.5 5 4&#xfd; 6 44[K] -Scan Grid-xx---Grid-No.
FNR-RF-17   5     -         t                     "       RNee.                       Cii -oT-O7           ,7-o2-FNR-RF-18   fmn L       7i-t,*7 -c.-7                                       "           /-;,oo7 o77-0 Additional Comments (Insert Sample No prior to each comment):
3" 43 Towler Fans 2'2 31//-3: 2]'# 2 24 0 36-Material Sample Location_ -Cooling Tower Vent*~.19 20X Stac 09 1';3-w-f -13*1_4-nA is (~1l A3R 02 U4 o4'07:1 _________
N&i"AeI~4~b             ,,1                               "
+/- _________
                                                                    <3,5.l/,J~K                 J~~J-~~
+/- ___________________________________________________________________________________
RPT (PrintfSign):     o-       r c.     &Dat                                   e:
16 17 18 Ford Nuclear Reactor Survey Map Reference Area for FNR! Roof S-urve -Ufiiif-7-tr Suface Area = 133.87 sq. m Grid Spacing = 2 nm FNR P-DWG-7&#xfd; Date': 6/4/2007 Map-No.- PO017-O2**14 15 1-11 12 11*N J 13.19Legen d 9F__ __ _ _ 0- __- ____- ---------Drain____I I __ -Su~ey Point'6 78[4 5 2* *2 I *_ _ _ _ _ _1 23 ILO -1:0ll FNR Survey Package SP-017 Attachment 2 -Survey Design Map No. 1 R+V +North 0F LO+Survey Design for 20 Direct Measurements Visual Sample Plan -Triangular Grid -Random Start 5/18/07 File: SP-017_OlAl 0-J2-8 4 -2 02 4 6 8 10 12 14 16 I
te:
-&#xfd;T FNR Survey Package SP-017 Attachment 2 -Survey Design Map No.2 Fo -E 2.1~7&#xfd;Q~4i~5l 15.0. 13.PML Roof 1A.i4=02 0 North 0~o.e.4 CD.Survey Design for 18 Direct Measurements Visual Sample Plan -Triangular Grid -Random Start Reference Area for FNR Roof Survey 5/18/07 File: SP_017-02 C%1 U U U I- I I I I I I I-6 4 2 -1 0 1 2 3 4 5 6 7 FNR-SP-0 17, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107 SHEET _ OF 7 I. Instrument Information Instrumentation Comments: 1. Cable length is 6 ft on detectors in sets No. I through 4.2. Instrument efficiency is determined with a Tc-99 calibration source.II. Background Measurements Location => PML Roof FNR Roof Instrument Isrmn e Instrument Set Instrument Set set Instrument Set No. 1 No. 2 No. No. 2 Notes Measurement No.No 1 Count (cpm) Count (cpm Count Count (Cpm)(cpm)(cpm) time time time time (min) (min) _ (m in) (min)1 295 1 1.5 2 299 1 1.0 2 Alpha detector.2951. 2 2991.0_ face up 2 282 1 0.5 2 284 1 2.0 2 Alpha detector.2 face up 3 276 1 2.0 2 270 1 0.5 2 Alpha detector.face up 4 272 1 0.5 2 260 1 0.5 2 Alpha detector.face up 5 2Alpha detector.280 1 2.0 2 298 1 15.0 2 face down 6 235 1 NA NA 278 1 3.5 2 Against FNR stack 7 NA NA &#xfd;NA NA NA NA 0.0 2 Alpha detector.face up Grid 105 8 NA NA NA NA NA NA 4.5 2 Alpha detector.face up Grid 105 9 NA NA NA NA NA NA 1.5 2 Alpha detector.NAI NA NA NAINANA 1.5 2 face up Grid 105 Background Measurement Comments: 1. Background measurements taken on roof surfaces on 6/21/07 at locations throughout the FNR roof and PML reference area.2. All beta measurements were taken with Instrument Set No. 1 and with detector sensitive face toward roof.3. Alpha measurements taken with Instrument Set No. 2 and with detector in position as noted.SP-0 17 Survey FormsRev02 Sheet I of 7 Rev02 7/11/2007 FNR-SP-017, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107 SHEET 2- OF 7 Il. Survey Measurement Data Form Location PML Roof Reference Area Alpha Gamma Remov Remov Beta Total Total Scan a 03 Instr. Surface Instr. Surface Instr. Activity activity activity Notes Grid Set Activity Set Activity Set (gcpm (dpm/10 (dpm/10 No. No. (gcpm) No. (gcpm) No. NaI) 0-cm 2) 0-cm 2)01 1 311 2 16.5 4 6808 5.58 22.790 02 1 275 2 12.5 4 6961 3.72 15.19 03 NA NA NA NA 4 6667 NA NA 04 1 251 2 7.5 4 9396 1.86 72.17 y count effect of PML wall parapet 05 NA NA NA NA 4 7322 NA NA 06 1 278 2 8.5 4 6996 5.58 49.38 07 1 259 2 6.5 4 6780 5.58 53.18 08 NA NA NA NA 4 9688 NA NA y count effect of PML wall parapet 09 1 287 2 14.0 4 7260 3.72 32.29 10 1 301 2 8.0 4 6782 11.16 43.68 11 NA NA NA NA 4 6909 NA NA 12 1 286 2 4.5 4 8449 3.72 20.89 y count effect of PML wall parapet 13 NA NA NA NA 4 7184 NA NA 14 NA NA NA NA 4 6862 NA NA 15 NA NA NA NA 4 7545 NA NA 16 NA NA NA NA 4 7954 NA NA 17 NA NA NA NA 4 7476 NA NA 18 1 292 2 12.0 4 6338 5.58 32.29 19 1 267 2 8.5 4 6690 5.58 20.89 20 NA NA NA NA 4 10307 NA NA y count effect of PML wall parapet 21 1 283 2 13.5 4 6868 1.86 36.09 22 1 303 2 14.0 4 6904 14.88 32.29 23 NA NA NA NA 4 6417 NA NA 24 1 272 2 10.5 4 9763 3.72 32.29 y count effect of PML wall parapet 25 NA NA NA NA 4 6535 NA NA 26 1 265 2 9.5 4 6496 9.30 32.29 27 1 290 2 9.0 4 6760 7.44 39.88 28 NA NA NA NA 4 10172 NA NA y count effect of PML wall parapet 29 1 279 2 14.5 4 6013 3.72 5.7 30 1 278 2 11.0 4 6482 9.30 3.80 31 NA NA NA NA 4 7211 NA NA FNR-SP-0 17, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107 SHEET 3 OF 7 32 1 273 2 4.5 4 10202 3.72 15.19 y count effect of PML wall parapet 33 NA NA NA NA 4 5755 NA NA 34 NA NA NA NA 4 6139 NA NA 35 NA NA NA NA 4 6063 NA NA 36 NA NA NA NA 4 8026 NA NA y count effect of PML wall parapet Comments: 1. Beta TSA by JR Grey on 6/21/07 with instrument set No. 1 & 1 minute counts.2. Alpha TSA by N Campbell on 6/21/07 using instrument set No. 2 & 2 minute counts.3. Smears collected on 6/22/07 by JR Grey. Counted by UM Tennelec S5 XLB on 6/25/07.4. Gamma scan survey of PML Roof on 6/25 & 6/26/07 by JR Grey using instrument set No. 4.III. Survey Measurement Data Form Location FNR Roof Max. P3 Max. Total Scan Total Gamma Surface ot Survey Removable Removabl Count Surface j3 Scan Activity Notes Point Grid Instrument Activity e Activity Rate Activity Activity (gcpm)No. No. Set No. (cL-dpm) (83 6pm) (gcpm) (gcpm) (gcpm NaI)NA 1 4 for y scan NA NA NA NA 6780 NA V\NA 2 4 for yscan NA NA NA NA 6458 NAVi NA 3 4for scan NA NA NA NA 6320 NA NA 4 4 for y scan NA NA NA NA 7680 NA 0,-1 NA 5 4forscan NA NA NA NA 6900 NA -" NA 6 4 fory yscan NA NA NA NA 5722 NA NA 7 4 for y scan NA NA NA NA 5905 NA NA 8 4 for y scan NA NA NA NA 6519 NA NA 9 4 scan NA NA NA NA 6200 NA NA 10 4 fory yscan NA NA NA NA 5579 NA NA 11 4 for y scan NA NA NA NA 6128 NA NA 12 4 for -1scan NA NA NA NA 5694 NA NA 13 4 fory yscan NA NA NA NA 6011 NA NA 14 4 for y scan NA NA NA NA 6640 NA NA 15 4 for y scan NA NA NA NA 6210 NA NA 16 4 foryscan NA NA NA NA 5859 NA NA 17 4 for y scan NA NA NA NA 8322 NA y scan interf from Pool blocks below 1 18 1 for 3 TSA 2 7.44 17.09 346 290 9307 13.5 03 scan on sed spot for ca TSA was 450 cpm, 9307 cpm y is from FNR wall NA 19 NA NA NA NA NA 5209 NA NA 20 NA NA NA NA NA 4663 NA 2 21 Tennelec for 1.86 32.29 332 264 4618 15.0 smears NA 22 NA NA NA NA NA 6028 NA FNR-SP-0 17, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107 SHEET __ OF 7 3 23 Tennelec for 9.30 17.09 325 282 5281 17.0 smears NA 24 NA NA NA NA NA 6256 NA NA 25 NA NA NA NA NA 6217 NA 4 26 Tennelec for 3.72 22.79 356 216 6000 13.0 smears NA 27 NA NA NA NA NA 8512 NA NA 28 NA NA NA NA NA 7469 NA NA 29 NA NA NA NA NA 5200 NA NA 30 NA NA NA NA NA 4700 NA NA 31 NA NA NA NA NA 4703 NA NA 32 NA NA NA NA NA 5630 NA NA 33 NA NA NA NA NA 5782 NA NA 34 NA NA NA NA NA 5949 NA NA 35 NA NA NA NA NA 5912 NA NA 36 NA NA NA NA NA 6018 NA 5 37 Tennelec for 9.30 62.68 396 324 9933 9.5 y scan -effect of smears N wall of FNR NA 38 NA NA NA NA NA 6747 NA 6 39 Tennelec for 11.16 53.18 300 265 4770 14.0 smears NA 40 NA NA NA NA NA 4778 NA'A 41 NA NA NA NA NA 4971 NA 7 42 Tennelec for 3.72 7.60 303 300 5476 12.5 smears NA 43 NA NA NA NA NA 5853 NA 8 44 Tennelec for 1.86 18.99 356 312 6368 18.0 smears NA 45 NA NA NA NA NA 5920 NA NA 46 NA NA NA NA NA 5695 NA NA 47 NA NA NA NA NA 9145 NA y scan -effect of N wall of FNR NA 48 NA NA NA NA NA 7240 NA NA 49 NA NA NA NA NA 5198 NA NA 50 NA NA NA NA NA 5084 NA NA 51 NA NA NA NA NA 5140 NA NA 52 NA NA NA NA NA 6730 NA NA 53 NA NA NA NA NA 6764 NA NA 54 NA NA NA NA NA 6924 NA NA 55 NA NA NA NA NA 6718 NA NA 56 NA NA NA NA NA 6692 NA NA 57 NA NA NA NA NA 8925 NA y scan -effect of N wall of FNR 9 58 Tennelec for 0.0 5.70 442 343 8391 24.0 on sed. deposit smears NA 59 NA NA NA NA NA 5727 NA FNR-SP-017, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107 SHEET___ OF 7 NA 60 NA NA NA NA NA 5346 NA 110 61 Tennelec for 3.72 41.78 329 260 5926 17.0 smears NA 62 NA NA NA NA NA 6305 NA 11 63 Tennelec for 1.86 15.19 333 280 6767 18.0 481 f3TSA on smears sed deposit NA 64 NA NA NA NA NA 6216 NA NA 65 NA NA NA NA NA 6335 NA 12 66 Tennelec for 1.86 32.29 338 335 6573 18.5 smears NA 67 NA NA NA NA NA 8380 NA Y scan effect of roof parapet NA 68 NA NA NA NA NA 8419 NA y scan -effect of FNR N wall NA 69 NA NA NA NA NA 6698 NA NA 70 NA NA NA NA NA 6052 NA NA 71 NA NA NA NA NA 6012 NA*NA 72 NA NA NA NA NA 6553 NA NA 73 NA NA NA NA NA 5822 NA NA 74 NA NA NA NA NA 6077 NA NA 75 NA NA NA NA NA 6293 NA NA 76 NA NA NA NA NA 6740 NA ,13 77 Tennelec for 9.30 55.08 344 289 8715 25.5 389 3 TSA on smears sed deposit NA 78 NA NA NA NA NA 8752 NA y scan -effect of FNR N wall 14 79 Tennelec for 3.72 18.99 310 267 6480 9.5 smears NA 80 NA NA NA NA NA 6209 NA NA 81 NA NA NA NA NA 6048 NA 15 82 Tennelec for 3.72 20.89 376 264 6442 16.5 smears NA 83 NA NA NA NA NA 6172 NA 16 84 Tennelec for 7.44 20.89 356 277 5884 13.0 smears NA 85 NA NA NA NA NA 5924 NA NA 86 NA NA NA NA NA 6178 NA NA 87 NA NA NA NA NA 9064 NA y scan effect of roof parapet NA 88 NA NA NA NA NA 8366 NA NA 89 NA NA NA NA NA 7301 NA NA 90 NA NA NA NA NA 8810 NA NA 91 NA NA NA NA NA 8169 NA NA 92 NA NA NA NA NA 7419 NA NA 93 NA NA NA NA NA 7120 NA'NA 94 NA NA NA NA NA 7091 NA NA 95 NA NA NA NA NA 7641 NA FNR-SP-0 17, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107 SHEET (0 OF 7 NA 96 NA NA NA NA NA 7061 NA INA 97 NA NA NA NA NA 9156 NA y scan -effect of N wall of FNR 17 98 Tennelec for 1.86 17.09 324 318 6381 17.5 smears NA 99 NA NA NA NA NA 6841 NA NA 100 NA NA NA NA NA 7471 NA 18 101 Tennelec for 9.3 28.49 205 288 5770 14.0 smears NA 102 NA NA NA NA NA 6079 NA 19 103 Tennelec for 14.86 17.09. 279 263 6768 12.0 smears NA 104 NA NA NA NA NA 6386 NA NA 105 NA NA NA NA NA 6189 NA 20 106 Tennelec for 3.72 13.29 278 284 6773 12.0 smears 21 74* NA NA NA NA 252 NA 12.0 22 83* NA NA NA NA 314 NA 19.0 23 19* NA NA NA NA 295 NA 11.0 24 09* NA NA NA NA 290 NA 15.5 25 Stack NA NA NA 293 297 NA 14.0 26 Stack NA NA NA NA 231 NA NA 27 Stack NA NA NA NA NA NA 22.5 f28 58 NA NA NA NA 402 NA NA 3 402 cpm on sediment I_ I deposit 29 98 NA NA NA NA 335 NA NA 3 3 3 5 cpm on sediment deposit 30 21 NA NA NA NA 439 NA 10.0 3 439 cpm on Cooling Tower exhaust frame 31. 21 NA NA NA NA 319 NA 89.0 a 89 cpm on cool twr exh frm 32 38 NA NA NA NA 212 NA NA Cooling Tower intake frame 33 38 NA NA NA NA 222 NA NA Cooling Tower intake frame Comments: 1. Total surface beta measurements by JR Grey on 6/21/07 using instrument set No. 1.2. Total surface alpha measurements by N Campbell on 6/21/07 using instrument set No. 2 3. Smears collected on 6/20/07 by JR Grey. Smears were counted on the UM Tennelec S5 XLB 6/21/07. The alpha MDA was reported as 5.03 dpm and the beta MDA as 22.81 dpm 4. Gamma scan survey of FNR Roof on 6/22 and 6/25/07 by JR Grey using instrument set No. 4.5. Scan survey of Cooling Tower exhaust frame just above the steel frame with LMI 44-10 -count rate range of 2500 to 2900 cpm. This contrasts to count rate on the roof surface of- 5000 to 6000 cpm.6. Grids marked with asterisk designate extra judgment TSA P3 measurements.
62(0-01
downwind from PML and FNR Stacks. .k &#xfd; -USA+ 47st"1~
                                                                                            *      (>O RPT (Print/Sign):                                                           Dat
FNR-SP-017, Attachment 3 -Survey Forms Survey No.:2007-1262 SurveyUnit No.7-1 Survey Pkg. SP-107 SHEET L OF 7 IV -Sample Information Sequential Location Date & Time Material Collected Container Comments No (Grid No.) Collected Description By FNR-RF-01 PML 14,18 6/22/07 0900 Dry deposits R.Neveau 20 ml scint. Dry debris & sediment in vial local low noint from water FNR-RF-02 PML 14,18 6/22/07 0915 Dry deposits R.Neveau 20 ml scint. Replicate of FNR-RF-01 vial FNR-RF-03 FNR 63 6/22/07 0950 Dry deposits R.Neveau 20 ml scint. Dry debris & sediment in vial local low noint from water FNR-RF-04 FNR 40 6/22/07 1000 Rust & scale R. Neveau 125 ml poly Material from Cooling bottle Tower Exhaust frame FNR-RF-05 FNR 31 6/22/07 1000 Moss & lichens R. Neveau 125 ml poly Material from Cooling bottle Tower Exhaust frame FNR-RF-06 FNR 88 6/22/07 1030 Dry deposits R.Neveau 20 ml scint. Dry debris & sediment in vial local low point from water FNR-RF-07 FNR 58 6/22/07 0950 Dry deposits R.Neveau 20 ml scint. Dry debris & sediment in via local low noint from water FNR-RF-08 FNR 62 6/25/07 0800 Drain catchment R. Neveau 20 ml scint FNR roof drain debris FNR 22 6/25/07 0815 Drain catchment R. Neveau 20 ml scint FNR roof drain FNR-RF-09 debris FNR-RF-10 FNR 92, 93 6/25/07 0830 Drain catchment R. Neveau 20 ml scint FNR 3d floor roof drain F N R -_ F -10 d eb ris ___________
_______"_______,___!_____Dat RPT(Pint(Print/Sign):                                                          te:
ro ofd rain FNR-RF-11 FNR 67 6/25/07 0845 Drain catchment R. Neveau 20 ml scint FNR 3 rd floor roof drain FNR-RF-11_
Reviewed By (Print/sign): loc         1a Vexk/Date:}}
debris FNR-RF-12 FNR 58 6/26/07 0900 Dry deposits R. Neveau 20 ml poly Dry.debris  
& sediment in bottle local low point from water FNR-RF-13 FNR 31 6/26/07 0830 Moss & lichens R. Neveau 125 ml poly Material from Cooling bottle Tower Exhaust frame FNR-RF-14 FNR 41 6/26/07 0845 Rust & scale R. Neveau 125 ml poly Material from Cooling bottle Tower Exhaust frame FNR-RF-15 i-4 ,-27-' AU55, pl 7,1_______" FNR-RF-16 c' X;o , 7 -ITA- C';_ 7-o 07 7_A___FNR-RF-17 5 -t " RNee. Cii -oT-O7 ,7 -o2-FNR-RF-18 fmn L -c.-7 " /-;,oo7 o77-0 Additional Comments (Insert Sample No prior to each comment): N&i"AeI~4~b  
,,1 " <3,5.l/,J~K J~~J-~~RPT (PrintfSign):
o- r c. &Dat RPT (Print/Sign):
Dat RPT(Pint (Print/Sign):
_______"_______,___!_____Dat Reviewed By (Print/sign):
loc 1a Vexk/Date:
e: 62(0-01 te: (>O te:}}

Latest revision as of 10:21, 10 March 2020

Fnr Characterization Package Workbook SP-017 Building Roof
ML12095A386
Person / Time
Site: University of Michigan
Issue date: 02/14/2012
From:
Occupational Safety & Environmental Health University of Michigan
To:
NRC/FSME
Shared Package
ML120950629 List:
References
Download: ML12095A386 (22)


Text

FNR Characterization Package Workbook SP-017 Building Roof Master Copy Bartlett Services, Inc

I I Package Log No: FNR-SP-017 I Survey Area: 7 I Survey Units: 7-1 Survey Unit/Area

Description:

FNR Roof and Vent Stack Exterior SURVEY PACKAGE COVER SHEET Survey Type: Characterization Survey Survey Objectives:

1. Confirm that the FNR Roof is a non-impacted area.
2. Alternately, if detectable licensed radioactive materials are measured, demonstrate that the FNR Roof and Vent Stack meet release criteria.
3. Obtain measurements and supporting documentation of sufficient quality for the Final Status Survey Report.

Package Contents: 5. Survey Maps with Field Annotation

" Document Change Control Form 6. Raw Data - Survey Forms & Field Notes

" Survey Unit Walkdown Notes 7. Survey Data Processing Forms

  • Survey Design Worksheet 8. Sample Information Forms

" Survey & Sampling Instructions 9. Sample Chain of Custody Forms

" Drawing and Document References 10. Smear Counting Results

11. Vendor Laboratory Analysis Reports Attachments 12. UM Sample Analysis reports
1. Photographs (Figures 1 through 13. Data Summary Report
9) 14. JHA & Attendance Sheets
2. SP-0 17 Addendum 15. Reference Material
3. Survey Maps & Forms 16. Correspondence
4. Survey Timeline 17. 6/11/07 Power Point Presentation, "Radiological Survey of FNR Roof'.
18. Superseded Information Survey Package Implementation: _ __/____ ___

Rock P. Neveau / /

Radiological Engineer Ptinted Name Signature, Date Bruce J. Mann ,4 ( '2- _ _ _,- _ _

Health Physics Supervisor Printed Signature Date Name Implementation Comments:

Survey Package Closure:

Radiological Engineer Printed Signature Date Name Health Physics Supervisor Printed Signature Date Name Package Closure Comments:

SP-017 Pkg FormsRev03 Page I of 19 12/12/2007 Rev 03

Package Log No: FNR-SP-017 Survey Area: 7 Survey Units: 7-1 Survey Unit/Area

Description:

FNR Roof and Vent Stack Exterior Survey Package Document Control Change Form Change # Description Initiator/Date RE 01 Revised instructions to: B. Mann /20-

1. Add collection of smears in PML reference Jun-07. per C.

area at the 18 randomly selected locations. Becker

2. Perform gamma scan survey of PML request.

Reference Area. This requires that the reference area be gridded into two meter grids.

3. Collect samples from the PML stacks.
4. Modified List of attachments to add: B. Mann 25-
5. Survey Timeline Jun-07
6. UM Tennelec S5 XLB smear count reports
7. Vendor laboratory sample analysis reports
8. Pre-Job hazard briefing attendance sheets.
9. JHA for FNR Roof Characterization Survey Pkg SP-017
10. Survey maps with field annotation.
11. Raw measurement data sheets and field notes.
12. 6/11/07 Power Point presentation, "Radiological Survey of FNR Roof'.
13. Superseded Survey Package pages.

02 Correction to Page 1 of Attachment 3, Survey B. Mann Forms, Instrument Information. Typos corrected 09-Jul 07.

- detector serial Nos. HV and instrument efficiency.

03 Package revision 03. Incorporate Addendum B. Mann and Change cover sheet, list of attachments. 12/11/07 This is to provide improved organization of supporting information.

SP-0 17 Pkg FormsRev03 Page 2 of 19 12/12/2007 Rev 03

I Package Log No: FNR-SP-0 17 1 Survey Area: 7 I Survey Units: 7-1 Survey Unit/Area

Description:

FNR Roof and Vent Stack Exterior Survey Unit Walkdown Record Walkdown Checklist:

1. Confirm dimensions of roof sections and confirm draft survey grid map.
2. [M Measure vent stack height. Examine the vent stack - can access be gained from the roof for the survey of the interior surfaces (separate survey package)?
3. F] Confirm locations and details of roof drain openings. Examine the roof drain openings - can the drains be accessed for sampling and survey?
4. x Describe the materials; roof coverings, flashing, gutters, vent stack exterior.
5. x Is roof surface dust or sediment present to provide material for samples of surface deposits?
6. x Note the condition of the roof- is it amenable to scan survey with the floor monitor?
7. x Identify any preparation work that must be accomplished prior to the actual survey.
8. x Evaluate the safety issues - fall protection requirements and other advance preparation.
9. x Walkdown and examine the PML roof, particularly the south end. Is it suitable for use as a reference area?
10. E] Take photographs of roof for planning aids.

Walkdown Notes (from 5/10/07)

1. Dimensions of roof confirmed. The roof is in excellent condition - precautions will be taken to avoid damage.
2. The Vent Stack height measured (9 ft). It is not planned to access the vent stack interior from the FNR roof for surveys. It was determined that it would be safer to access to the stack interior from the vent pipe chase at the Cooling Tower elevation.
3. Locations and details of roof drains confirmed. The roof drains are readily accessible - the covers are not bolted.
4. The roof consists of two inches of insulating material covered by a 60 mil thick EPD membrane (Ethylene Propylene with diene monomers). It is bordered by metal flashing; the vent stack is painted steel.
5. The roof is free from dust or sediment except at the roof drain openings and the Cooling' Tower exhaust vent frames.
6. The roof is in good condition, with a smooth surface regular surface except in the vicinity of the roof drains and should readily accommodate a floor monitor for scan surveys. It is anticipated that we will scan up to 25% of the roof surface (roof surface area is - 450 mnE).
7. Light housekeeping cleanup support will be requested to remove rust & scale from the roof beneath cooling tower louvers and to remove leaves and twigs from the PML roof south section.
8. For work on the portion of the roof that is at the PML elevation, the frames of cooling tower louvers can be used as anchor points for fall-arrest cables. There are several wasp nests in the cooling tower louvers in the FNR walls at the PML roof elevation (sprayed with pesticide 5/14/07).
9. The PML roof is of the same vintage as the FNR - It is planned to use the S. end of the PML roof as a "reference area" for the FNR roof survey.
10. The Reactor Laboratory Manager recommended that a few measurements be taken on the outside of the cooling tower louvers - mineral deposits from secondary cooling water are present on a few of the louvers.
11. Samples of the roof material itself are not planned, but candidate material sampling locations are:

the cooling tower exhaust vent frame and roof drains.

12. Scale maps will be required for FNR roof and the reference area on the south end of the PML.

End of Notes SP-017 Pkg FormsRev01 Page 3 of 19 6/25/2007 Rev 0 1

Package Log No: FNR-SP-017 I Survey Area: 7 ] Survey Units: 7-1 Survey Unit/Area

Description:

FNR Roof and Vent Stack Exterior Survey Design Worksheet

==

Description:==

The FNR main roof is at elevation 894 ft. and of dimensions 54 ft. (N-S) by 60 ft. 8 in.

(E-W) .This survey unit also includes the FNR 3 rd floor roof surfaces at the PML roof elevation bordering the FNR 4 th floor on the east and north. The roof is of "built-up" construction overlying a poured low-density concrete roof slab. It consists of two inches of insulating material covered by a 60 mil thick EPD membrane (Ethylene Propylene with diene monomers). It is bordered by metal flashing. The main roof is sloped to drain into two sumps located near the center of the roof area.

These sumps drain into piping that connects to the storm sewer in the southwest comer of the FNR Beam Port floor. The FNR building vent stack is located near the northwest comer of the roof and extends 9 ft. above the roof line. The Cooling Tower exhaust fans vent through a large opening (8.5 x 24.5 ft.) located in the north-central part of the main roof.

The sections of the roof on the north and east sides of the FNR building at elevation 875 ft., 19 ft.

below the FNR Roof, are of similar construction to the main roof. This portion of the roof drains to two roof drains located near the north and east walls of the FNR which connect to the storm sewer piping in the east side of the Beam Port Floor.

Survey Unit History: The FNR roof was replaced in 2001. There is no history of significant release of radioactive particulates from the FNR stack. [Historical Site Assessment, CH2MHill 2003]. It is noted that the FNR Roof is also downwind from the PML stacks.

Design Assumptions:

The FNR Historical Site Assessment (HSA) report identified the FNR Roof as un-impacted, i. e.,

having low likelihood of contamination from licensed radioactive materials. However, there are three potential pathways for contamination of the roof by licensed radioactive materials. These are:

  • FNR stack which exhausted nine feet above the roof
  • PML stacks which are located just south of the FNR roof (FNR Pool trunks and fume hood exhausted from PML Stack 2).

There is no record of recent radiological surveys of the roof, so a conservative survey design will be applied. The FNR exhaust stack (interior) is identified as impacted in the HSA (it will be covered under a separate survey package). The exterior of the FNR exhaust stack will be included with the survey of the roof.

Theroof survey design assumptions follow MARSSIM survey guidance for a Class 2 structural survey unit. A single survey unit is established for the roof including the surfaces at both elevations.

The survey design for total surface activity measurements is based on the Wilcoxon Rank Sum (WRS) test with a survey reference area. However, the planning assumption is that ere are no actual residual contamination deposits on the roof, so the "sigma" value is small and )very large, hence the 4-calculated number of measurements will be small, (less than 10) for both the roof survey unit and reference area. For survey planning purposes, the default assumption is that at least 18 locations will be selected on triangular grids with random start location on the FNR Roof and on the reference area.

This will assure sufficient statistical power of the WRS test at the decision error probabilities: a = 0.05 and B = 0.05 regardless of the A/s value.

The performance criteria for instrument selection are based on default surface activity DCGLs for Co-SP-017 Pkg FormsRev01 Page 4 of 19 6/25/2007 Rev 01

Package Log No: FNR-SP-017 j Survey Area: 7 1 Survey Units: 7-1 Survey Unit/Area

Description:

FNR Roof and Vent Stack Exterior 60 (beta) and U-235 (alpha). These are 7100 dpm/100-cm 2 and 100 dpm/100-cm 2 , respectively. The selection criteria are as follows:

  • Surface Gamma Scan: no numerical criterion (the 44-10 is not calibrated for measurements of gamma activity from surface, or near-surface, contamination.
  • Surface Beta Scan: 3500 dpm/100-cm 2 (50% of DCGL)

" Total Surface Beta Measurements: 1750 dpm/100-cm 2 (25% of DCGL)

  • Total Surface Alpha Measurements: 25 dpm/100-cm 2 (25% of Screening level DCGL for U-235)

SRemovable Surface Beta Measurements: 70 dpm/1 00-cm 2 (1%of DCGL)

  • Removable Surface Alpha Measurements: 25 dpm/100-cm 2 (25% of default DCGL for U-235)

Action - investigation levels are also established as fractions of the applicable DCGLs:

  • Surface Gamma Scan: detectable sustained increase above background (audible response)
  • Surface Beta Scan: detectable sustained increase above background (audible response)
  • Total Surface Beta: 3500 dpm/100-cm 2 (50% of DCGL)
  • Total Surface Alpha: 50 dpm/100-cm 2 (50% of Screening level DCGL for U-235)
  • Removable Surface Beta: 700 dpm/100-cm 2 (10% of DCGL)
  • Removable Surface Alpha: 25 dpm/100-cm 2 (25% of Screening Level DCGL for U-235)

Survey and Sampling Instruction Form General Instructions:

1. The roof areas on elevations 894 ft. and 875 ft. and the reference area are to be marked off in two meter grids. The grids are to be marked on the roof with, chalk line, paint markers, or other durable markers. The grids are marked to be consistent with the survey map grid layout.
2. The grid numbers as shown on the survey maps will be used to identify survey locations; for scans, total surface activity measurements, sample locations and any special measurements. See Survey Map SP-01 7-01 for the grid layout of the roof.
3. The survey will consist of:
a. Gamma-scan survey of the entire roof area and the reference area (excluding Cooling Tower exhaust).
b. Surface beta scan survey of a minimum of 20% of the roof surface area. (20% of the accessible area of the roof is equivalent to 22 grids) This includes 20-two-meter grids selected at random plus additional grids selected by the technician to include locations of possible deposition, e.g., down-wind of the vent stacks around roof drains, etc.
c. Total surface beta activity measurements (one-minute count) are to be taken at locations in the 20 grids selected at random as shown on survey map SP-017-01.
d. Total surface alpha activity measurements (one-minute count) are to be taken at locations in the 20 grids selected at random as shown on survey map SP-0 17-01.
e. Smears (100-cm 2) collected at each of the 20 grids selected at random and at the 18 selected locations in the reference area.
f. Samples of loose scale and debris from roof drain openings, the Cooling Tower fan exhaust vent frame and the PML stacks..
g. Smear or material samples from the four PML vent stack interiors.

of 19 6/25/2007 Rev 01 PageS Pkg FormsRev0l SP-017 Pkg SP-017 FormsRevO I Page 5 of 19 6/25/2007 Rev 01

Package Log No: FNR-SP-017 I Survey Area: 7 1 Survey Units: 7-1 Survey Unit/Area

Description:

FNR Roof and Vent Stack Exterior

4. Additional one-minute total surface beta measurements are to be taken to ensure that areas of the roof downwind of the FNR stack and the PML stacks are surveyed (north and east of the stacks). The prevailing wind direction is from the southwest.
5. Additional measurements may be selected by the Survey Technician on a judgment basis, considering locations where deposition could occur or where scan surveys show indications above background. Additional measurements may also be directed by the Reactor Laboratory Manager, Assistant Laboratory Manager or by Project Radiation Protection management and supervisory personnel. Such directions are to be documented on the comment section of the Survey Forms.

.6. The south end of the PML roof has been established as a reference area for the survey. Eighteen total surface activity measurements are to be collected at designated locations chosen at random (on a triangular grid).

Specific Instructions:

1. Background Survey
a. Perform a minimum of five background measurements with each detector (one-minute scaler counts) on the FNR Roof and the Reference Area unless directed otherwise.
b. The detectors include those used for gamma scans (LMI 44-10 Nal), surface beta scans (LMI 44-142 and LMI 239-1F Floor Monitor) and total surface activity measurements (LMI-44-142, beta &

LIM 43-92, alpha). Record the data on Part II of the Survey Form. Record the location of each background measurement on the appropriate survey map.

c. Take several background measurements with the LMI 44-142 on the accessible portions of the PML stacks (south side) for use as backgrounds for the survey of the FNR Stack.

2.. Gamma Scan Survey

a. Using the 44-10, 2x2 in. Sodium Iodide detector coupled to an LMI 2221 scaler-ratemeter, perform a walkover gamma scan survey of the entire FNR roof and PML reference area.
b. Set the instrument to "fast" response and use the earphones to listen for an increase in the audible response.
c. Maintain the detector within one to two inches from the roof surface moving the detector from side-to-side while slowly walking forward on a straight path (serpentine pattern).
d. Cover the entire accessible roof surface - walk the roof in straight paths about one meter apart using the two-meter grid marks as guides.
e. The detector speed is to be maintained between 0.5 and one meter per second.
f. Note that the gamma scan sensitivity of the LMI 44-10 is not quantified for surfaces such as the FNR roof. The objective is to identify areas that exhibit direct gamma radiation counts that are distinguishable above the LMI 44-10 background count rate.
g. Listen for any increases in the count rate as indicated by the audible response. Compare the count rates to the background count rate as determined in Part I of these instructions.
h. Pause and investigate any areas where the detector response exceeds the background count rate.

Mark areas that exhibit a sustained increase above background, > 1.5 times the average background count rate.

i. Mark areas determined to be above the LMI 44-10 background. Mark on the roof surface and on a survey map that shows the roof marked with two-meter grids.
j. It is not required to record gamma scan observed gcpm in each grid on a survey data form. Record the range of observed gcpm for each traverse in the comments section.

SP-017 Pkg FormsRev01 Page 6 of 19 6/25/2007 Rev 01

Package Log No: FNR-SP-017 1 Survey Area: 7 Survey Units: 7-1 Survey Unit/Area

Description:

FNR Roof and Vent.Stack Exterior Surface Beta Scan Surveys

a. Perform surface beta scans of the 20 designated two-meter grids identified on the survey map.
b. Maintain the detector at 1/4 inch from the surface and move the detector across the surface at a speed no greater than one detector width per second.
c. In addition to the designated grids, scan selected grids downwind of the FNR Stack and downwind of PML Stack 2 (north and east of the stacks).
d. The Ludlum Floor Monitor or the LMI 44-142 detector may be used for surface scan surveys. The LMI 44-142 detector is to be used in areas where the floor monitor cannot fit, or maintain the prescribed distance from the surface.
e. Use the audio response (with head phones) to identify any areas where a count rate increase (above background) is noted.
f. Delineate any locations where a sustained- increased count rate (audible increase or by meter/scaler response) is confirmed. Mark the boundary on the roof and on a survey map. If an elevated area extends beyond grid boundaries, follow it to define the area as necessary.
g. Record the highest count rate observed in each grid that is scanned (from the digital rate meter).

This is to be done by mentally noting the highest digital count rate during the scan. Record the highest scan count rate whether or not "elevated" count rates were observed. Record in units of gross counts per minute (g-cpm).

h. Scan the exterior surface of the FNR Vent Stack using an LMI 44-142 detector. Cover at least 20% of the surface area of the stack.
i. Using a LMI 44-142 detector, scan the Cooling Tower air intake Louvers (on the portion of the roof at the PML elevation) where mineral deposits (from cooling tower water) are visible. See Figure 8 photo. Mark any locations where the audible count rate is determined to be above background.
j. If needed to survey locations that are inaccessible to the floor monitor and the 44-142 detector, a pancake probe (LMI 44-9) is used to scan the locations.

NOTE: The beta scan survey is designed under the assumption that the scan sensitivity is < 3500 dpm/100-cm2, i. e., < 50% of the limiting surface DCGL (7100 dpmr/100-cm 2 for Co-60).

4. Total Surface Activity Measurements
a. Perform total surface beta measurements (one-minute scaler counts) with an LMI 44-142 detector at each of the 20 locations identified on survey map SP-017-01 for the FNR.
b. Perform total surface beta measurements (one-minute scaler counts) with an LMI 44-142 detector at each of the 18 locations on the PML roof identified on survey map SP-017-02.
c. Perform total surface alpha measurements (one-minute scaler counts) with an LMI 43-92 detector at each of the 20 locations identified on survey map SP-017-01.
d. Perform total surface alpha measurements (one-minute scaler counts) with an LMI 43-92 detector at each of the 18 locations on the PML roof identified on survey map SP-017-02.
e. Locate each total surface activity measurement by identifying the appropriate grid shown on the survey map. Select the measurement location within the grid using judgment - an accuracy of+

one foot is sufficient. It is not necessary to mark the measurement location on the roof.

f. In addition to the 20 locations, take at least one total surface beta measurement on each area (if any) of the FNR where an increased count rate was observed during the scan survey including the FNR Vent Stack and the Cooling Tower Intake louvers.
5. Smears and Material Samples
a. Collect a 100 cm2 smear from each of the 20 selected grids on the FNR roof and the 18 designated SP-017 Pkg FormsRevO g 7 of 19 Page 6/25/2007 Rev 01

Package Log No: FNR-SP-017 1 Survey Area: 7 I Survey Units: 7-1 Survey Unit/Area

Description:

FNR Roof and Vent Stack Exterior locations on the PML reference area.. Use standard 49 mm smears. Count each for alpha and beta for a minimum of 1 minute.

b. Collect samples of the loose material from the drain openings on the FNR main roof and from the roof of the 3 rd floor at the PML elevation. See Figure 7 photo for an example. Include material from the roof surface and the drain opening. Place the material from each drain opening in a separate 500 ml plastic bottle. Not all of the drains are good sampling candidates as they do not contain much material.
c. Collect a 100 cm2 smear sample from inside each of the four PML stacks (or from the ventilation ducting in the PML downstream of the exhaust fans). Ensure that the smears are labeled to include the stack No. Count each smear for gross alpha and beta activity. %.,- d.-o- C V "r,, (.10TY
d. Collect a sample of the loose material from the Cooling Tower exhaust frame. Include rust, scale and lichen material. See Figure 9 photo. Place the material in a 500 ml plastic bottle. Mark the sample location on the survey map (SP-0 17-01)
e. If detectable activity above background is observed during the scan or direct measurement surveys, collect a sample of the loose scale on the Cooling Tower intake louvers (PLM elevation, north side of FNR). See Figure 8. Place the material in a 500 ml plastic bottle. Mark the sample location on the survey map (SP-017-01).
f. Label each sample container with the sample number using the following convention: SP-0 17-01, 02 etc, where the numbers 01, 02 are sequential numbers.
6. Survey of PML Roof Reference Area
a. Mark the measurement locations on the PML reference area roof surface (# I through 18). Mark the reference area into 2 meter grids.. Coordinates of the reference area measurements are shown on Survey Design Map No. 2. The measurement locations may be established by measuring distances from the coordinate system origin at the NW comer of the reference area.
b. These are to be one-minute scaler counts with an LMI 44-142 detector.
c. Take a total surface beta measurement and a total surface alpha measurement at each of the locations identified on the survey map for the PML Roof reference area.
7. Survey Data Recording
a. See the attached survey forms (Attachment 3).
b. Complete the header information on each sheet of the survey form.
c. Complete the instrument information table in Part I.
d. Document background measurements in Part II.
e. Record each total surface activity survey measurement and beta scan maximum cpm for each grid in Part III, survey measurement data form.
f. Use a separate measurement data form for the Reference Area
g. For each material sample record the following in Part IV.

" Show the sample location on the survey map (Map No. SP-017-01) using the triangle icon with sequential sample No.

  • Date sample collected
  • Description of sample material
  • Sample container (500 ml bottle, zip-lock bag, etc.)

" Name of person who collected the sample.

Use the comment sections on the forms to document any discrepancies to conditions assumed in the instructions or any other explanatory information.

SP-017 Pkg FormsRev01 Page 8 of 19 6/25/2007 Rev 01

Package Log No: FNR-SP-017 Survey Area: 7 Survey Units: 7-1 Survey Unit/Area

Description:

FNR Roof and Vent Stack Exterior Characterization Package References Package Log No: FNR-SP-017 Survey Area: 7 Survey Units: 7-1 Survey Unit/Area

Description:

FNR Roof and Vent Stack Exterior

1. General

References:

A. FNR Decommissioning Plan, Rev 1, 2006. § 1.2.3 provides a general description of the FNR Building.

B. The Historical Site Assessment [CH2MHill, January 2003], § 5.2 identifies the FNR Roof as a non-impacted area.

C. The FNR Decommissioning Environmental Report [CH2MHill, June 2004] § B.4.2.2, indicates that the prevailing wind direction in the Ann Arbor area is from the southwest.

2. Drawings:

Drawing No. Description Dwg No. M-9, Smyth, Reactor Building, Heating and Ventilating, 3 rd and 4th Floor Hinchman & Grylls, 1/24/55 Plans Dwg No. A-5, Smyth, Reactor Building, Roof Plan and Details Hinchman & Grylls, 1/24/55 Dwg No. A-6, Smyth, Reactor Building, Sections Hinchman & Grylls, 1/24/55 Sheet A2. 1, U of Michigan Phoenix Laboratory and Ford reactor Roof Replacement, Roof Facilities Planning & Design, Level Plan 5/15/2001 SP-0 17 Pkg Forms Page 9 of 19 6/12/2007 Rev 0

SP-017 Survey Maps and Data Forms

I I

- * . ) Ford: Nuclle.r Reacior Surxey Map 17 18 19 m.

0

.FNRKo,-Su-UiiiPY-7U1 -1.

2"0* \ Surface Area = 453.58 sq. mi 91 99 10(

1-- V19 104 10 lot I Grid Spacing- 2 m FNRDP-DWG-74 'Date: 6/7/2007

. .. *M-ap-No6. SP0-1-U7 1 8'

81 I I I , ,

RQ QA 01 Qe 9 76 9i R9 96 9)*

/ * *

'13" /1' 15 6 7_2 Li 75. 8 6' 70 71 73

-5 V

  • / 9 5Q 50_ v 0t 8 /6

-617 61

'11, I;- 64 V*

12 j

v* B Legend

- D~rain

- Survey Point A. AQ

" , 50 5.5 5 4 -Survey Point No.:

!r I

4 I I 01 - Vent

./( 42 4^ [K] Scan Grid 5/ 3" Cooling 4n 43 44 4ý 4*

6

-xx---Grid-No.

Towler

- Material Sample Location Fans 2' 2 31 -3: 36 _ - Cooling Tower Vent

/

/

19 20 1* 2]'

  1. 2 24 *~.

X -w Stac 3

0 09 1'; 13 1_4- is

  • -f -

nA

(~1l 02 U4 o4' 07 A3R

1 _________ +/- _________ +/- ___________________________________________________________________________________

Ford Nuclear Reactor Survey Map Reference Area for FNR! Roof S-urve -Ufiiif-7-tr 16 17 18 Suface Area = 133.87 sq. m Grid Spacing = 2 nm FNR P-DWG-7ý Date': 6/4/2007 Map-No.- PO017-O2 14 15 11

  • N 1-J 11 12 13

.19Legen d

__ _ _ 9F__ __- 0- ____- --------

-Drain I

____I __ - Su~ey Point' 6 78

[4 5

  • *2 2 I
  • _ _ _ _ _ _1 23

ILO -

FNR Survey Package SP-017 1:0ll Attachment 2 - Survey Design Map No. 1 R+

V+

North 0F LO+

Survey Design for 20 Direct Measurements Visual Sample Plan -Triangular Grid - Random Start 5/18/07 File: SP-017_OlAl 0-J2 -8 -6 -4 -2 02 4 6 8 10 12 14 16 I

FNR Survey Package SP-017

-ýT Attachment 2 - Survey Design Map No.2 ~7

ýQ

~4i ~5l E-Fo 2.1 15.0. 13.

PML Roof 1A.i4=

02 North 0 0

~o.e.4 CD.

Survey Design for 18 Direct Measurements Visual Sample Plan - Triangular Grid - Random Start Reference Area for FNR Roof Survey 5/18/07 File: SP_017-02 C%1 U U U

-6I- -5 -4 -3 -2 I -1 0I 1I 2I 3 I 4 5I 6 7I

FNR-SP-0 17, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107 SHEET _ OF 7 I. Instrument Information Instrumentation Comments:

1. Cable length is 6 ft on detectors in sets No. I through 4.
2. Instrument efficiency is determined with a Tc-99 calibration source.

II. Background Measurements Location => PML Roof FNR Roof Instrument Isrmn e Instrument Set Instrument Set set Instrument Set No. 1 No. 2 No. 1 No. 2 Notes Measurement No.No Count (cpm) Count (cpm Count Count (Cpm)(cpm)

(cpm) time time time time (min) (min) _ (m in) (min) 295 1 1.5 2 299 1 1.0 2 Alpha detector.

1 2951. 2 2991.0_ face up 2 282 1 0.5 2 284 1 2.0 2 Alpha detector.

2 face up 276 1 2.0 2 270 1 0.5 2 Alpha detector.

3 face up 4 272 1 0.5 2 260 1 0.5 2 Alpha detector.

face up 5 2Alpha detector.

280 1 2.0 2 298 1 15.0 2 face down 235 1 NA NA 278 1 3.5 2 Against FNR stack 6

7 NA NA ýNA NA NA NA 0.0 2 Alpha detector.

face up Grid 105 NA NA NA NA NA NA 4.5 2 Alpha detector.

8 face up Grid 105 NA NA NA NA NA NA 1.5 2 Alpha detector.

9 NAI NA NA NAINANA 1.5 2 face up Grid 105 Background Measurement Comments:

1. Background measurements taken on roof surfaces on 6/21/07 at locations throughout the FNR roof and PML reference area.
2. All beta measurements were taken with Instrument Set No. 1 and with detector sensitive face toward roof.
3. Alpha measurements taken with Instrument Set No. 2 and with detector in position as noted.

SP-0 17 Survey FormsRev02 Sheet I of 7 Rev02 7/11/2007

FNR-SP-017, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107 SHEET 2- OF 7 Il. Survey Measurement Data Form Location PML Roof Reference Area Alpha Gamma Remov Remov Beta Total Total Scan a 03 Instr. Surface Instr. Surface Instr. Activity activity activity Notes Grid Set Activity Set Activity Set (gcpm (dpm/10 (dpm/10 No. No. (gcpm) No. (gcpm) No. NaI) 0-cm 2 ) 0-cm 2) 01 1 311 2 16.5 4 6808 5.58 22.790 02 1 275 2 12.5 4 6961 3.72 15.19 03 NA NA NA NA 4 6667 NA NA 04 1 251 2 7.5 4 9396 1.86 72.17 y count effect of PML wall parapet 05 NA NA NA NA 4 7322 NA NA 06 1 278 2 8.5 4 6996 5.58 49.38 07 1 259 2 6.5 4 6780 5.58 53.18 08 NA NA NA NA 4 9688 NA NA y count effect of PML wall parapet 09 1 287 2 14.0 4 7260 3.72 32.29 10 1 301 2 8.0 4 6782 11.16 43.68 11 NA NA NA NA 4 6909 NA NA 12 1 286 2 4.5 4 8449 3.72 20.89 y count effect of PML wall parapet 13 NA NA NA NA 4 7184 NA NA 14 NA NA NA NA 4 6862 NA NA 15 NA NA NA NA 4 7545 NA NA 16 NA NA NA NA 4 7954 NA NA 17 NA NA NA NA 4 7476 NA NA 18 1 292 2 12.0 4 6338 5.58 32.29 19 1 267 2 8.5 4 6690 5.58 20.89 20 NA NA NA NA 4 10307 NA NA y count effect of PML wall parapet 21 1 283 2 13.5 4 6868 1.86 36.09 22 1 303 2 14.0 4 6904 14.88 32.29 23 NA NA NA NA 4 6417 NA NA 24 1 272 2 10.5 4 9763 3.72 32.29 y count effect of PML wall parapet 25 NA NA NA NA 4 6535 NA NA 26 1 265 2 9.5 4 6496 9.30 32.29 27 1 290 2 9.0 4 6760 7.44 39.88 28 NA NA NA NA 4 10172 NA NA y count effect of PML wall parapet 29 1 279 2 14.5 4 6013 3.72 5.7 30 1 278 2 11.0 4 6482 9.30 3.80 31 NA NA NA NA 4 7211 NA NA

FNR-SP-0 17, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107 SHEET 3 OF 7 32 1 273 2 4.5 4 10202 3.72 15.19 y count effect of PML wall parapet 33 NA NA NA NA 4 5755 NA NA 34 NA NA NA NA 4 6139 NA NA 35 NA NA NA NA 4 6063 NA NA 36 NA NA NA NA 4 8026 NA NA y count effect of PML wall parapet Comments:

1. Beta TSA by JR Grey on 6/21/07 with instrument set No. 1 & 1 minute counts.
2. Alpha TSA by N Campbell on 6/21/07 using instrument set No. 2 & 2 minute counts.
3. Smears collected on 6/22/07 by JR Grey. Counted by UM Tennelec S5 XLB on 6/25/07.
4. Gamma scan survey of PML Roof on 6/25 & 6/26/07 by JR Grey using instrument set No. 4.

III. Survey Measurement Data Form Location FNR Roof Max. P3 Max. Total Scan Total Gamma Surface ot Survey Removable Removabl Count Surface j3 Scan Activity Notes Point Grid Instrument Activity e Activity Rate Activity Activity (gcpm)

No. No. Set No. (cL-dpm) (836pm) (gcpm) (gcpm) (gcpm NaI)

NA 1 4 for y scan NA NA NA NA 6780 NA V\

NA 2 4 for yscan NA NA NA NA 6458 NAVi NA 3 4for scan NA NA NA NA 6320 NA NA 45 4 for y scan NA NA NA NA 7680 NA 0,-1 NA 4forscan NA NA NA NA 6900 NA -"

NA 6 4 foryyscan NA NA NA NA 5722 NA NA 7 4 for y scan NA NA NA NA 5905 NA NA 8 4 for y scan NA NA NA NA 6519 NA NA 9 4 for*y scan NA NA NA NA 6200 NA NA 10 4 foryyscan NA NA NA NA 5579 NA NA 11 4 for y scan NA NA NA NA 6128 NA NA 12 4 for -1scan NA NA NA NA 5694 NA NA 13 4 foryyscan NA NA NA NA 6011 NA NA 14 4 for y scan NA NA NA NA 6640 NA NA 15 4 for y scan NA NA NA NA 6210 NA NA 16 4 foryscan NA NA NA NA 5859 NA NA 17 4 for y scan NA NA NA NA 8322 NA y scan interf from Pool blocks below 1 18 1 for 3 TSA 2 7.44 17.09 346 290 9307 13.5 03scan on sed spot for ca TSA was 450 cpm, 9307 cpm y is from FNR wall NA 19 NA NA NA NA NA 5209 NA NA 20 NA NA NA NA NA 4663 NA 2 21 Tennelec for 1.86 32.29 332 264 4618 15.0 smears NA 22 NA NA NA NA NA 6028 NA

FNR-SP-0 17, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107 SHEET__ OF 7 3 23 Tennelec for 9.30 17.09 325 282 5281 17.0 smears NA 24 NA NA NA NA NA 6256 NA NA 25 NA NA NA NA NA 6217 NA 4 26 Tennelec for 3.72 22.79 356 216 6000 13.0 smears NA 27 NA NA NA NA NA 8512 NA NA 28 NA NA NA NA NA 7469 NA NA 29 NA NA NA NA NA 5200 NA NA 30 NA NA NA NA NA 4700 NA NA 31 NA NA NA NA NA 4703 NA NA 32 NA NA NA NA NA 5630 NA NA 33 NA NA NA NA NA 5782 NA NA 34 NA NA NA NA NA 5949 NA NA 35 NA NA NA NA NA 5912 NA NA 36 NA NA NA NA NA 6018 NA 5 37 Tennelec for 9.30 62.68 396 324 9933 9.5 y scan - effect of smears N wall of FNR NA 38 NA NA NA NA NA 6747 NA 6 39 Tennelec for 11.16 53.18 300 265 4770 14.0 smears NA 40 NA NA NA NA NA 4778 NA

'A 41 NA NA NA NA NA 4971 NA 7 42 Tennelec for 3.72 7.60 303 300 5476 12.5 smears NA 43 NA NA NA NA NA 5853 NA 8 44 Tennelec for 1.86 18.99 356 312 6368 18.0 smears NA 45 NA NA NA NA NA 5920 NA NA 46 NA NA NA NA NA 5695 NA NA 47 NA NA NA NA NA 9145 NA y scan - effect of N wall of FNR NA 48 NA NA NA NA NA 7240 NA NA 49 NA NA NA NA NA 5198 NA NA 50 NA NA NA NA NA 5084 NA NA 51 NA NA NA NA NA 5140 NA NA 52 NA NA NA NA NA 6730 NA NA 53 NA NA NA NA NA 6764 NA NA 54 NA NA NA NA NA 6924 NA NA 55 NA NA NA NA NA 6718 NA NA 56 NA NA NA NA NA 6692 NA NA 57 NA NA NA NA NA 8925 NA y scan - effect of N wall of FNR 9 58 Tennelec for 0.0 5.70 442 343 8391 24.0 on sed. deposit smears NA 59 NA NA NA NA NA 5727 NA

FNR-SP-017, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107 SHEET___ OF 7 NA 60 NA NA NA NA NA 5346 NA 110 61 Tennelec for 3.72 41.78 329 260 5926 17.0 smears NA 62 NA NA NA NA NA 6305 NA 11 63 Tennelec for 1.86 15.19 333 280 6767 18.0 481 f3TSA on smears sed deposit NA 64 NA NA NA NA NA 6216 NA NA 65 NA NA NA NA NA 6335 NA 12 66 Tennelec for 1.86 32.29 338 335 6573 18.5 smears NA 67 NA NA NA NA NA 8380 NA Yscan effect of roof parapet NA 68 NA NA NA NA NA 8419 NA y scan - effect of FNR N wall NA 69 NA NA NA NA NA 6698 NA NA 70 NA NA NA NA NA 6052 NA NA 71 NA NA NA NA NA 6012 NA*

NA 72 NA NA NA NA NA 6553 NA NA 73 NA NA NA NA NA 5822 NA NA 74 NA NA NA NA NA 6077 NA NA 75 NA NA NA NA NA 6293 NA NA 76 NA NA NA NA NA 6740 NA

,13 77 Tennelec for 9.30 55.08 344 289 8715 25.5 389 3TSA on smears sed deposit NA 78 NA NA NA NA NA 8752 NA y scan - effect of FNR N wall 14 79 Tennelec for 3.72 18.99 310 267 6480 9.5 smears NA 80 NA NA NA NA NA 6209 NA NA 81 NA NA NA NA NA 6048 NA 15 82 Tennelec for 3.72 20.89 376 264 6442 16.5 smears NA 83 NA NA NA NA NA 6172 NA 16 84 Tennelec for 7.44 20.89 356 277 5884 13.0 smears NA 85 NA NA NA NA NA 5924 NA NA 86 NA NA NA NA NA 6178 NA NA 87 NA NA NA NA NA 9064 NA y scan effect of roof parapet NA 88 NA NA NA NA NA 8366 NA NA 89 NA NA NA NA NA 7301 NA NA 90 NA NA NA NA NA 8810 NA NA 91 NA NA NA NA NA 8169 NA NA 92 NA NA NA NA NA 7419 NA NA 93 NA NA NA NA NA 7120 NA

'NA 94 NA NA NA NA NA 7091 NA NA 95 NA NA NA NA NA 7641 NA

FNR-SP-0 17, Attachment 3 -Survey Forms Survey No.:2007-1262 Survey Unit No.7-1 Survey Pkg. SP-107 SHEET (0 OF 7 NA 96 NA NA NA NA NA 7061 NA INA 97 NA NA NA NA NA 9156 NA y scan - effect of N wall of FNR 17 98 Tennelec for 1.86 17.09 324 318 6381 17.5 smears NA 99 NA NA NA NA NA 6841 NA NA 100 NA NA NA NA NA 7471 NA 18 101 Tennelec for 9.3 28.49 205 288 5770 14.0 smears NA 102 NA NA NA NA NA 6079 NA 19 103 Tennelec for 14.86 17.09. 279 263 6768 12.0 smears NA 104 NA NA NA NA NA 6386 NA NA 105 NA NA NA NA NA 6189 NA 20 106 Tennelec for 3.72 13.29 278 284 6773 12.0 smears 21 74* NA NA NA NA 252 NA 12.0 22 83* NA NA NA NA 314 NA 19.0 23 19* NA NA NA NA 295 NA 11.0 24 09* NA NA NA NA 290 NA 15.5 25 Stack NA NA NA 293 297 NA 14.0 26 Stack NA NA NA NA 231 NA NA 27 Stack NA NA NA NA NA NA 22.5 f28 58 NA NA NA NA 402 NA NA 3402 cpm on sediment I_ I deposit 29 98 NA NA NA NA 335 NA NA 3 33 5 cpm on sediment deposit 30 21 NA NA NA NA 439 NA 10.0 3439 cpm on Cooling Tower exhaust frame

31. 21 NA NA NA NA 319 NA 89.0 a 89 cpm on cool twr exh frm 32 38 NA NA NA NA 212 NA NA Cooling Tower intake frame 33 38 NA NA NA NA 222 NA NA Cooling Tower intake frame Comments:
1. Total surface beta measurements by JR Grey on 6/21/07 using instrument set No. 1.
2. Total surface alpha measurements by N Campbell on 6/21/07 using instrument set No. 2
3. Smears collected on 6/20/07 by JR Grey. Smears were counted on the UM Tennelec S5 XLB 6/21/07. The alpha MDA was reported as 5.03 dpm and the beta MDA as 22.81 dpm
4. Gamma scan survey of FNR Roof on 6/22 and 6/25/07 by JR Grey using instrument set No. 4.
5. Scan survey of Cooling Tower exhaust frame just above the steel frame with LMI 44 count rate range of 2500 to 2900 cpm. This contrasts to count rate on the roof surface of- 5000 to 6000 cpm.
6. Grids marked with asterisk designate extra judgment TSA P3 measurements. downwind from PML and FNR Stacks. . k ý -USA

+ 47st"1~

FNR-SP-017, Attachment 3 -Survey Forms Survey No.:2007-1262 SurveyUnit No.7-1 Survey Pkg. SP-107 SHEET L OF 7 IV - Sample Information Sequential Location Date & Time Material Collected Container Comments No (Grid No.) Collected Description By FNR-RF-01 PML 14,18 6/22/07 0900 Dry deposits R.Neveau 20 ml scint. Dry debris & sediment in vial local low noint from water FNR-RF-02 PML 14,18 6/22/07 0915 Dry deposits R.Neveau 20 ml scint. Replicate of FNR-RF-01 vial FNR-RF-03 FNR 63 6/22/07 0950 Dry deposits R.Neveau 20 ml scint. Dry debris & sediment in vial local low noint from water FNR-RF-04 FNR 40 6/22/07 1000 Rust & scale R. Neveau 125 ml poly Material from Cooling bottle Tower Exhaust frame FNR-RF-05 FNR 31 6/22/07 1000 Moss & lichens R. Neveau 125 ml poly Material from Cooling bottle Tower Exhaust frame FNR-RF-06 FNR 88 6/22/07 1030 Dry deposits R.Neveau 20 ml scint. Dry debris & sediment in vial local low point from water FNR-RF-07 FNR 58 6/22/07 0950 Dry deposits R.Neveau 20 ml scint. Dry debris & sediment in via local low noint from water FNR-RF-08 FNR 62 6/25/07 0800 Drain catchment R. Neveau 20 ml scint FNR roof drain debris FNR 22 6/25/07 0815 Drain catchment R. Neveau 20 ml scint FNR roof drain FNR-RF-09 debris FNR-RF-10 FNR 92, 93 6/25/07 0830 Drain catchment R. Neveau 20 ml scint FNR 3d floor roof drain FNR -_ F -10 d eb ris ___________ ro ofd rain FNR-RF-11 FNR 67 6/25/07 0845 Drain catchment R. Neveau 20 ml scint FNR 3 rd floor roof drain FNR-RF-11_ debris FNR-RF-12 FNR 58 6/26/07 0900 Dry deposits R. Neveau 20 ml poly Dry.debris & sediment in bottle local low point from water FNR-RF-13 FNR 31 6/26/07 0830 Moss & lichens R. Neveau 125 ml poly Material from Cooling bottle Tower Exhaust frame FNR-RF-14 FNR 41 6/26/07 0845 Rust & scale R. Neveau 125 ml poly Material from Cooling bottle Tower Exhaust frame FNR-RF-15 i-4 ,-27-'

AU55, pl 7,1_______

FNR-RF-16 P* c' X;o *- , 7 -

ITA-C';_ 7-o 07 7_A___

FNR-RF-17 5 - t " RNee. Cii -oT-O7 ,7-o2-FNR-RF-18 fmn L 7i-t,*7 -c.-7 " /-;,oo7 o77-0 Additional Comments (Insert Sample No prior to each comment):

N&i"AeI~4~b ,,1 "

<3,5.l/,J~K J~~J-~~

RPT (PrintfSign): o- r c. &Dat e:

te:

62(0-01

  • (>O RPT (Print/Sign): Dat

_______"_______,___!_____Dat RPT(Pint(Print/Sign): te:

Reviewed By (Print/sign): loc 1a Vexk/Date: