ML17216A628: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/22/1986
| issue date = 07/22/1986
| title = Application for Amend to License NPF-16,changing Tech Spec 5.3.1, Reactor Core,Fuel Assemblies, to Delete Ref to Max Enrichment of 3.7 Weight Percent for Reload Fuel.Fee Paid
| title = Application for Amend to License NPF-16,changing Tech Spec 5.3.1, Reactor Core,Fuel Assemblies, to Delete Ref to Max Enrichment of 3.7 Weight Percent for Reload Fuel.Fee Paid
| author name = WOODY C O
| author name = Woody C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = THADANI A C
| addressee name = Thadani A
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000389
| docket = 05000389
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:ACCESSION NBR: FAC I L: 50-389 AUTH.NANE WOODYi C.O.REC IP.NANE THADANIa A.C.REQUL RY INFORMATION DISTRIBUTI
{{#Wiki_filter:''
'SYSTEN (RIDS')''8607280014 DOC.DATE: B6/07/22 NOTAR I ZED: YES St.Lucie Planti Unit 2i Florida Power h Light Co.AUTHOR AFFILIATION Florida Power 8c Light Co.RECIPIENT AFFILIATION PWR ProJect Directorate 8 DOCKET 05000389
REQUL     RY INFORMATION DISTRIBUTI     'SYSTEN (RIDS')
ACCESSION NBR: 8607280014           DOC. DATE: B6/07/22           I NOTAR ZED: YES         DOCKET FAC I L: 50-389    St. Lucie Planti Unit 2i Florida       Power h Light Co.       05000389 AUTH. NANE              AUTHOR   AFFILIATION WOODYi C. O.            Florida   Power 8c Light Co.
REC IP. NANE            RECIPIENT AFFILIATION THADANIa A. C.          PWR ProJect Directorate 8


==SUBJECT:==
==SUBJECT:==
Application for amend to License NPF-16'hanging Tech Spec 5.3.i."Reactor Core.Fuel Assembliesi" to delete ref to max enrichment of 3.7 weight/for reload fuel.Fee paid.DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE: TITLE: OR Submittal:
Application for amend to License NPF-16'hanging Tech Spec
General Distribution NOTES REC I P I ENT ID CODE/NAI'tE PWR-B EB PWR-B FOB PWR-B PD8 PD 01 PWR-B PEICSB COPIES LTTR ENCL 1 1 1 5 5 1 1 RECIPIENT ID CODE/NANE PWR-B PEICSB PWR-B PDS LA TOURIQNYi E PWR-B RSB COPIES LTTR ENCL 2 1 0 1 1 1 1 INTERNAL: ADN/LFNB NRR/ORAS RGN2 EXTERNAL: EQSQ BRUSKEp 8 NRC PDR 02 1 0 1 0 1 1 1 1 E S EG FIL LPDR NSIC 04 03 05 1 0 1 TOTAL NU<BER OF COPIES REQUIRED: LTTR 22 ENCL 18  
: 5. 3. i. "Reactor Core. Fuel Assembliesi" to delete ref to max enrichment of 3. 7 weight / for reload fuel. Fee paid.
~i', f!Yl''>~)'U<fk'4THIG NC>IT'iAf3'lYi>
DISTRIBUTION CODE: A001D           COPIES RECEIVED: LTR       ENCL     SIZE:
Yfl,"'0 3>j';);,il' lh I>l;TLi.'l'470~68.3'3'~4.;)flff P l OOG.." i(>~4f~)~"'">I/v~3'~"'ft i~8~<"%l c,~t:.'~'~I)l.t,l JI 3'()I ly 3-'Pi3H.oD 8'flpIJ 6''lg 3'<<eke"7)f MQITAI lk:l lh A t'~X''lI')'~>",~~P~~o+ssa'~(t 8>~3 i)v'i>JAN<'3 g lfii~f[,<372'3 l'"~+VCC;JI Oh" 3 yi hI i/A I),)cYOfM<<.,P)s.c, il7').3q ,'~.A.3.N.'~(l Al 3'I s aqua"<'>Pni t)~c.~i>i'~S'l~"'egs z g J o4'r<'>e 3 zo l<<aoi>,>i i qqA;l'>JVU(V Xf>fi o'>>'i)f 1 k')f'lb Qf"~~9 f I d$82PA I'9U-'~s)'f~)')fof.)R)'))"."'
TITLE:   OR Submittal: General Distribution NOTES I I REC P ENT           COPIES            RECIPIENT          COPIES ID CODE/NAI'tE       LTTR ENCL      ID CODE/NANE        LTTR ENCL PWR-B   EB               1    1    PWR-B PEICSB            2 PWR-B    FOB             1          PWR-B PDS LA            1      0 PWR-B    PD8 PD 01       5     5     TOURIQNYi E            1     1 PWR-B   PEICSB           1    1    PWR-B RSB               1     1 INTERNAL: ADN/LFNB                     1    0    E      S              1      0 NRR/ORAS                 1    0      EG  FIL        04            1 RGN2                     1 EXTERNAL: EQSQ BRUSKEp 8               1    1    LPDR            03 NRC PDR           02     1           NSIC             05 TOTAL NU<BER OF COPIES REQUIRED: LTTR             22   ENCL     18
t 4,<".h~,'q)>'4.i:it>t 4c (sv".o%F.h tips)~>>X."'g 8gso4 s'"'~>>'', ,-t~I<3,,lQ~il3
'<T l G3VI&0;-'i B:3K'K3D GL<>0'a.'3"&#xc3;~OUI>ljfIIR'3 VI<I noi+udiv3 aiG f~;z~naG.l.~l*xmdu'!~pl:3J l>l',f.;3 f F33/i t'lf'3)r'I l TNB I II338'8'~ANN...!Gf>3 0 I ff8dI J 3 6'>>3 3 8G~i G--R" 3 l-"~Ymir)IFUOT 885'"RH 3'lC<)l'NG 33 3.ll'>r"33R 3'Vi:]I 8 I 3:N 3Yif>NX..l(N')
G I 89 flf3" Q'P'chic)Q;ti 3 QQ'1 G.: Nil l>'l8')I3"'l fI HW'3 Gl"3'3 JXH<fA;,V'NH l i f~iI P,A~'f3%blR<l'DAO)a f;0 60 AG lJ'3 IBM FLORIDA POWER&LIGHT COMPANY JUL 2 2 1988 L-86-302 Office of Nuclear Reactor Regulation Attention:
Mr.Ashok C.Thadani, Director PWR Project Directorate II8 Division of PWR Licensing-B U.S.Nuclear Regulatory Commission Washington, D.C.20555


==Dear Mr.Thadani:==
                        ~i ',  f!Yl''>~ )'U<fk'4THIG                    NC>IT 'iAf3'lYi>            Yfl,"'0 3>j';);,il' lh  I>l; TLi.'
Re: St.Lucie Unit 2 Docket No.50-389 Proposed License Amendment Reload Fuel Enrichment In accordance with IO CFR 50.90, Florida Power&Light Company (FPL)submits herewith three signed originals and forty copies of a request to amend Appendix A of Facility Operating License NPF-I6.This proposed amendment involves a change to Technical Specification 5.3.l,"Reactor Core, Fuel Assemblies".
                                  )~  "'">I/v~3      '~    "'ft i~JI l'470~68          .3'3 '~4 8 ~
The proposed change deletes the reference to a maximum enrichment of 3.7 w/o for reload fuel.A specification limiting the enrichment of reload fuel in the reactor core is unnecessary and superfluous in that there are other provisions in the Technical Specifications which determine safe operating and fuel storage limits related to fuel enrichment.
                                                                                      .;)flff
These other safe operating limits include dynamic parameters, rod worths and peaking factors.In other words, specification of reload fuel enrichment has no bearing on the safe operation of the reactor core provided that existing safety limits and limiting conditions for operation (LCOs)are satisfied.
                                                                                    <"%l  c, ~t:.
Attachment A to this letter provides the marked-up change to Technical Specification 5.3.I.Attachment B to this letter provides a"No Significant Hazards Considerations" evaluation in support of this proposed amendment.
3'()I ly 3-  '
In accordance with IO CFR 50.9I(a)(l), it has been determined that the proposed amendment does not involve any significant hazards considerations pursuant to IO CFR 50.92.In accordance with IO CFR 50.9I(b)(l), a copy of the proposed amendment is being forwarded to the State Designee for the State of Florida.I'607280014 860722 I PDR, ADOCK OS000389 PDR GR M3/0 I 6/I PEOPLE...SERVING PEOPLE 1'lt 1" AHV<<-V f r<<1<<II.ll>>vt tl II A III>>IH ill" 1>>1~7.It A.1 r I~.1~v~I~,/tI:v'l>>.1'<.I',;<<I I ti ,If I 1 rt<<'l AI f tl 1 A E,, All~f1 tl~'.',>>~" C'nfl ft-llf>>A 1 A" II I>>, ll<<I 1 ,1 A I Hv>>t I'I'IH I I~A r l(-Iv A tt II~,>>II I>>,C tr>>I A II~tl II~<<It I'I I I>>'<<I,>>Art~~11 H,t~4~A A It I I I H>>1 Qh I,~1 5 II I 1 1 It>>I 1~~1*JI 1 II<A, A..'I I.I'C.';I r"1 1-It~>>tl 1 h , II II II r ,.<vf<<I=~Il I~
                                                                                                        '~
Mr.Ashok C.Thadani, Director L-86-302 Page The proposed amendment has been reviewed by the St.Lucie Facility Review Group and the Florida Power&Light Company Nuclear Review Board.In accordance with IO CFR l70.I2(c), FPL Check No.2I05 for g l50 is attached as remittance for the license amendment application fee.Should you have any questions regarding this submittal, please feel free to contact us.Very truly yours, 0.Woo y roup Vice President Nuclear Energy COW/GRM/gp Attachments cc: Dr.J.Nelson Grace, USNRC, Region ll Harold F.Reis, Esquire, Newman&Holtzinger Mr.Alan Schubert, Florida Dept.of Health and Rehabilitative Services GR M3/0 I 6/2 II t\e 4 II I~Cl<<Ui t s'TATE OF FLORIDA~))ss.COUNTY OF DADE)J.W.Dickey, being first duly sworn, deposes and says: That he is Vice President Nuclear Operations of Florida Power R Light Company, the licensee herein;That he has executed the foregoing document;that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.3..Dick y Subscribed and sworn to before me this/ii'lie , 1986.Ew';,NOTARY'PUBLIC, in and for the County of;Dade, State of Florida.NOtARY PUSLIC StATE Or FLORIDA I.V CONNISSION EXP SEPT Ie,I989 OONOEO TllRU GENERAL I!IS~UNO g4 , l/k Y}}
P l OOG.." i(>~4f~ lfii~f [,<372'3 l'"~+
                                                                                                            '~ I )l.t,l g
VCC; JI Oh" hI i/A 3
                                                                .oD    8'flpIJ    6''lg          3 Pi3H
                                                                                                        '<<eke"7 )    f yi I), ) cYOfM<<
MQITAI lk:l lh A t'~X''lI')'~>",                                  .,P)s.c ,  il7').3q aqua"                                                          ~~P~~o+ssa'~(t          8  > ~3    i) v'i    >JAN<'3                ,'~ .A 3.N.'~(l Al 3'I s          <'        > Pni t)~c      .~i>  i  '~ S  'l 'egs
                                                          ~"            z g J o4'r<'>e 3 zo l <<aoi >,>i qqA; l '>JVU(V            i Xf>fi  o'>>'i ) f          k')  f'lb Qf "            ~9 f I d$ 82PA I'9U-'~ s )'f~)') fof.)R)'))"."' t 4,<"
1
                                                                                                      ."'g
                                                    ~
                  .h~,'q      )  >'4.i:it>t        4c (sv ".o% F. h tips )~>> X                                      8gso4 s'"'~>>'',
            -t~    I<3,,lQ~il3                        '<T l      G3VI&0;-'i        B:3K'K3D            GL<>0'a        .'3"&#xc3;~ OUI >ljfIIR'3 VI<I noi+udiv3 aiG            f ~;  z  ~naG        .l.~ l*xmdu'! ~pl:3J l >
f F33/i l',f.;3 t'lf'3    )                  TNB I      II338                                                          3'Vi:] I 8 I 3:N r'I l                '8'~ANN...!Gf>3            0I                                              3Yif>NX..l(N') G I ff8dIJ        3  6'>>3        3                                                      89 8G~i G--R" l        3                                                    flf3  "  Q 'P'chic)
                                                ~Ymir)IFUOT                                              Q; ti      3  QQ'1 G.:        Nil l 885'            "RH    3
                                                                                                                  >'l8') I3"'l fI HW'3
                                                'lC<)l'NG        33                                                      Gl"3'3 JXH<fA;,V'NH l i f~iI 3.ll    '>
r"33R                                                      P,A~'f3% blR< l
                                                                                                                                    'DAO)a f;0                          AG    lJ 60                          '3 IBM
 
FLORIDA POWER & LIGHT COMPANY JUL 2 2 1988 L-86-302 Office of Nuclear Reactor Regulation Attention:    Mr. Ashok C. Thadani, Director PWR Project Directorate II8 Division of PWR Licensing - B U. S. Nuclear Regulatory Commission Washington, D. C. 20555
 
==Dear Mr. Thadani:==
 
Re:   St. Lucie Unit 2 Docket No. 50-389 Proposed License Amendment Reload Fuel Enrichment In accordance with IO CFR 50.90, Florida Power & Light Company (FPL) submits herewith three signed originals and forty copies of a request to amend Appendix A of Facility Operating License NPF-I6.
This proposed amendment involves a change to Technical Specification 5.3.l, "Reactor Core, Fuel Assemblies". The proposed change deletes the reference to a maximum enrichment of 3.7 w/o for reload fuel.
A specification limiting the enrichment of reload fuel in the reactor core is unnecessary and superfluous in that there are other provisions in the Technical Specifications which determine safe operating and fuel storage limits related to fuel enrichment. These other safe operating limits include dynamic parameters, rod worths and peaking factors.       In other words, specification of reload fuel enrichment has no bearing on the safe operation of the reactor core provided that existing safety limits and limiting conditions for operation (LCOs) are satisfied.
Attachment A to this letter provides the marked-up change to Technical Specification 5.3.I. Attachment B to this letter provides a "No Significant Hazards Considerations" evaluation in support of this proposed amendment.
In accordance with IO CFR 50.9I(a)(l), it has been determined that the proposed amendment does not involve any significant hazards considerations pursuant to IO CFR 50.92.
In accordance   with IO CFR 50.9I(b)(l), a copy of the proposed amendment is being forwarded to the State Designee for the State of Florida.
I'607280014 860722 PDR, ADOCK       OS000389 I
PDR GR M3/0 I 6/ I                                                               PEOPLE... SERVING PEOPLE
 
1'lt                                                                                     1         "     AHV<<-     V f r<< 1       <<II.
tl ll     >>vt                                                   II A     III >>IH       ill" 1>>1
                                                                                                                                                                                            ~ 7.         It A.
r                                                         v
                                                                                                                ~
                                                                                                                  ,/                                        I                                                     ,If tI:v 'l>>
1                                                    1  ~                ~
ti I
I ~.                                                                                       .                                1
                                                                                                                                                '<.I ',;<<I                                     AI I 1
                                                                                                                                                                                                            'l rt<<
f E,,
tl                                                   1 A All~f1   tl       ~       '.',   >>
                                                                                                                        ~"           C'                     nfl         ft   llf>>       A 1                   ,1                                                                                                                                                        A I
A                                                                                                    '<<
I                                          I, A
It A"    II  I Hv>>       t I'       Ir
                                                ~
l(-Iv A
tr>>I                                          >>        Art  ~  I I                                            I  H I>>, ll                                                tt   II ~,   >>
A II                 II A
                                                                                                    ~      tl I>>,C                                   II                       ~     11                                                                      1  Qh I,
                                                                                  ~ <<
<<   I     1                      'IH                                                          It H,t ~                           >>
I'I             I I >>                           4  ~
1
* JI
      ~ 1                               I                                                                             It >>
I 5 II 1
1 ~   ~     II<A, 1
A..'I I.
1 I'C.                     I         r h
                          "1 1-   It ~ >>                                                         , II                                                             II II                                                                       r 1
tl                                                                                                                      ,.<vf<<
Il I     = ~                                                                                                                                                                         I ~
 
Mr. Ashok C. Thadani, Director L-86-302 Page The proposed amendment has been reviewed by the St. Lucie Facility Review Group and the Florida Power & Light Company Nuclear Review Board.
In accordance with IO CFR l70. I2(c), FPL Check No. 2I05 for g l50 is attached as remittance for the license amendment application fee. Should you have any questions regarding this submittal, please feel free to contact us.
Very truly yours,
: 0. Woo y roup Vice President Nuclear Energy COW/GRM/gp Attachments cc:   Dr. J. Nelson Grace, USNRC, Region ll Harold F. Reis, Esquire, Newman & Holtzinger Mr. Alan Schubert, Florida Dept. of Health and Rehabilitative Services GR M3/0 I 6/2
 
II t
    \     e 4 II I
                  ~ Cl
      <<Uit
 
s
  'TATE               OF FLORIDA ~
                                  )
                                  )     ss.
COUNTY OF DADE         )
J. W. Dickey, being first duly sworn, deposes and says:
That he is Vice President Nuclear Operations of Florida Power R Light Company, the licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.
3.. Dick y Subscribed and sworn to before me this
              /ii'lie
                                    , 1986.
Ew
      ';,NOTARY'PUBLIC, in and for the County of
        ; Dade, State of Florida.
NOtARY PUSLIC StATE Or FLORIDA I.V CONNISSION EXP SEPT Ie,I989 OONOEO TllRU GENERAL I!IS ~ UNO
 
g4 l
        /
    ,  k Y}}

Latest revision as of 09:53, 24 February 2020

Application for Amend to License NPF-16,changing Tech Spec 5.3.1, Reactor Core,Fuel Assemblies, to Delete Ref to Max Enrichment of 3.7 Weight Percent for Reload Fuel.Fee Paid
ML17216A628
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/22/1986
From: Woody C
FLORIDA POWER & LIGHT CO.
To: Thadani A
Office of Nuclear Reactor Regulation
Shared Package
ML17216A632 List:
References
L-86-302, NUDOCS 8607280014
Download: ML17216A628 (8)


Text

REQUL RY INFORMATION DISTRIBUTI 'SYSTEN (RIDS')

ACCESSION NBR: 8607280014 DOC. DATE: B6/07/22 I NOTAR ZED: YES DOCKET FAC I L: 50-389 St. Lucie Planti Unit 2i Florida Power h Light Co. 05000389 AUTH. NANE AUTHOR AFFILIATION WOODYi C. O. Florida Power 8c Light Co.

REC IP. NANE RECIPIENT AFFILIATION THADANIa A. C. PWR ProJect Directorate 8

SUBJECT:

Application for amend to License NPF-16'hanging Tech Spec

5. 3. i. "Reactor Core. Fuel Assembliesi" to delete ref to max enrichment of 3. 7 weight / for reload fuel. Fee paid.

DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES I I REC P ENT COPIES RECIPIENT COPIES ID CODE/NAI'tE LTTR ENCL ID CODE/NANE LTTR ENCL PWR-B EB 1 1 PWR-B PEICSB 2 PWR-B FOB 1 PWR-B PDS LA 1 0 PWR-B PD8 PD 01 5 5 TOURIQNYi E 1 1 PWR-B PEICSB 1 1 PWR-B RSB 1 1 INTERNAL: ADN/LFNB 1 0 E S 1 0 NRR/ORAS 1 0 EG FIL 04 1 RGN2 1 EXTERNAL: EQSQ BRUSKEp 8 1 1 LPDR 03 NRC PDR 02 1 NSIC 05 TOTAL NU<BER OF COPIES REQUIRED: LTTR 22 ENCL 18

~i ', f!Yl>~ )'U<fk'4THIG NC>IT 'iAf3'lYi> Yfl,"'0 3>j';);,il' lh I>l; TLi.'

)~ "'">I/v~3 '~ "'ft i~JI l'470~68 .3'3 '~4 8 ~

.;)flff

<"%l c, ~t:.

3'()I ly 3- '

'~

P l OOG.." i(>~4f~ lfii~f [,<372'3 l'"~+

'~ I )l.t,l g

VCC; JI Oh" hI i/A 3

.oD 8'flpIJ 6lg 3 Pi3H

'<<eke"7 ) f yi I), ) cYOfM<<

MQITAI lk:l lh A t'~XlI')'~>", .,P)s.c , il7').3q aqua" ~~P~~o+ssa'~(t 8 > ~3 i) v'i >JAN<'3 ,'~ .A 3.N.'~(l Al 3'I s <' > Pni t)~c .~i> i '~ S 'l 'egs

~" z g J o4'r<'>e 3 zo l <<aoi >,>i qqA; l '>JVU(V i Xf>fi o'>>'i ) f k') f'lb Qf " ~9 f I d$ 82PA I'9U-'~ s )'f~)') fof.)R)'))"."' t 4,<"

1

."'g

~

.h~,'q ) >'4.i:it>t 4c (sv ".o% F. h tips )~>> X 8gso4 s'"'~>>,

-t~ I<3,,lQ~il3 '<T l G3VI&0;-'i B:3K'K3D GL<>0'a .'3"Ã~ OUI >ljfIIR'3 VI

f F33/i l',f.;3 t'lf'3 ) TNB I II338 3'Vi:] I 8 I 3:N r'I l '8'~ANN...!Gf>3 0I 3Yif>NX..l(N') G I ff8dIJ 3 6'>>3 3 89 8G~i G--R" l 3 flf3 " Q 'P'chic)

~Ymir)IFUOT Q; ti 3 QQ'1 G.: Nil l 885' "RH 3

>'l8') I3"'l fI HW'3

'lC<)l'NG 33 Gl"3'3 JXH<fA;,V'NH l i f~iI 3.ll '>

r"33R P,A~'f3% blR< l

'DAO)a f;0 AG lJ 60 '3 IBM

FLORIDA POWER & LIGHT COMPANY JUL 2 2 1988 L-86-302 Office of Nuclear Reactor Regulation Attention: Mr. Ashok C. Thadani, Director PWR Project Directorate II8 Division of PWR Licensing - B U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Thadani:

Re: St. Lucie Unit 2 Docket No. 50-389 Proposed License Amendment Reload Fuel Enrichment In accordance with IO CFR 50.90, Florida Power & Light Company (FPL) submits herewith three signed originals and forty copies of a request to amend Appendix A of Facility Operating License NPF-I6.

This proposed amendment involves a change to Technical Specification 5.3.l, "Reactor Core, Fuel Assemblies". The proposed change deletes the reference to a maximum enrichment of 3.7 w/o for reload fuel.

A specification limiting the enrichment of reload fuel in the reactor core is unnecessary and superfluous in that there are other provisions in the Technical Specifications which determine safe operating and fuel storage limits related to fuel enrichment. These other safe operating limits include dynamic parameters, rod worths and peaking factors. In other words, specification of reload fuel enrichment has no bearing on the safe operation of the reactor core provided that existing safety limits and limiting conditions for operation (LCOs) are satisfied.

Attachment A to this letter provides the marked-up change to Technical Specification 5.3.I. Attachment B to this letter provides a "No Significant Hazards Considerations" evaluation in support of this proposed amendment.

In accordance with IO CFR 50.9I(a)(l), it has been determined that the proposed amendment does not involve any significant hazards considerations pursuant to IO CFR 50.92.

In accordance with IO CFR 50.9I(b)(l), a copy of the proposed amendment is being forwarded to the State Designee for the State of Florida.

I'607280014 860722 PDR, ADOCK OS000389 I

PDR GR M3/0 I 6/ I PEOPLE... SERVING PEOPLE

1'lt 1 " AHV<<- V f r<< 1 <<II.

tl ll >>vt II A III >>IH ill" 1>>1

~ 7. It A.

r v

~

,/ I ,If tI:v 'l>>

1 1 ~ ~

ti I

I ~. . 1

'<.I ',;<<I AI I 1

'l rt<<

f E,,

tl 1 A All~f1 tl ~ '.', >>

~" C' nfl ft llf>> A 1 ,1 A I

A '<<

I I, A

It A" II I Hv>> t I' Ir

~

l(-Iv A

tr>>I >> Art ~ I I I H I>>, ll tt II ~, >>

A II II A

~ tl I>>,C II ~ 11 1 Qh I,

~ <<

<< I 1 'IH It H,t ~ >>

I'I I I >> 4 ~

1

  • JI

~ 1 I It >>

I 5 II 1

1 ~ ~ II<A, 1

A..'I I.

1 I'C. I r h

"1 1- It ~ >> , II II II r 1

tl ,.<vf<<

Il I = ~ I ~

Mr. Ashok C. Thadani, Director L-86-302 Page The proposed amendment has been reviewed by the St. Lucie Facility Review Group and the Florida Power & Light Company Nuclear Review Board.

In accordance with IO CFR l70. I2(c), FPL Check No. 2I05 for g l50 is attached as remittance for the license amendment application fee. Should you have any questions regarding this submittal, please feel free to contact us.

Very truly yours,

0. Woo y roup Vice President Nuclear Energy COW/GRM/gp Attachments cc: Dr. J. Nelson Grace, USNRC, Region ll Harold F. Reis, Esquire, Newman & Holtzinger Mr. Alan Schubert, Florida Dept. of Health and Rehabilitative Services GR M3/0 I 6/2

II t

\ e 4 II I

~ Cl

<<Uit

s

'TATE OF FLORIDA ~

)

) ss.

COUNTY OF DADE )

J. W. Dickey, being first duly sworn, deposes and says:

That he is Vice President Nuclear Operations of Florida Power R Light Company, the licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.

3.. Dick y Subscribed and sworn to before me this

/ii'lie

, 1986.

Ew

';,NOTARY'PUBLIC, in and for the County of

Dade, State of Florida.

NOtARY PUSLIC StATE Or FLORIDA I.V CONNISSION EXP SEPT Ie,I989 OONOEO TllRU GENERAL I!IS ~ UNO

g4 l

/

, k Y