ML19213A069: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer ' Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 WASHINGTON, D.C. 20555-0001 August 14, 2019
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 14, 2019 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer
' Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
THREE MILE ISLAND NUCLEAR STATION, UNIT 1 -WITHDRAWAL OF AN AMENDMENT REQUEST (EPID L-2018-LLA-0571)  
THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - WITHDRAWAL OF AN AMENDMENT REQUEST (EPID L-2018-LLA-0571)


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
By letter dated December 14, 2018, you applied for an amendment to the Three Mile Island Nuclear Station, Unit 1, Renewed Facility Operating License No. DPR-50. The proposed change would have revised Technical Specification 6.8.5 "Reactor Building Leakage Rate Testing Program," to allow for a one-cycle extension to the 10-year frequency of the containment leakage rate test (i.e., Integrated Leakage Rate Test or Type A test). Subsequently, by letter dated June 17, 2019, you withdrew the amendment request. The U.S. Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Renewed Facility Operating License with the Office of the Federal Register for publication.
 
Docket No. 50-289  
By letter dated December 14, 2018, you applied for an amendment to the Three Mile Island Nuclear Station, Unit 1, Renewed Facility Operating License No. DPR-50. The proposed change would have revised Technical Specification 6.8.5 "Reactor Building Leakage Rate Testing Program," to allow for a one-cycle extension to the 10-year frequency of the containment leakage rate test (i.e., Integrated Leakage Rate Test or Type A test).
Subsequently, by letter dated June 17, 2019, you withdrew the amendment request.
The U.S. Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Renewed Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
                                                                  .---/~---7
                                            /.,;.*:;....... ------ ~---
                                                        ***-~~--~~-~
                                        . c---** Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289


==Enclosure:==
==Enclosure:==


Notice of Withdrawal cc: Listserv Sincerely, .---/~---7
Notice of Withdrawal cc: Listserv
; .... ***-~~--~~-~
 
/.,;.*:; ....... ------~---. . c---** Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ENCLOSURE FEDERAL REGISTER NOTICE NUCLEAR REGULATORY COMMISSION
ENCLOSURE FEDERAL REGISTER NOTICE
 
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-289; NRC-2019-0079]
[Docket No. 50-289; NRC-2019-0079]
Exelon Generation Company LLC Three Mile Island Nuclear Station Unit 1 AGENCY: Nuclear Regulatory Commission.
Exelon Generation Company LLC Three Mile Island Nuclear Station Unit 1 AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; withdrawal by applicant.
ACTION: License amendment application; withdrawal by applicant.
[7590-01-P]


==SUMMARY==
==SUMMARY==
: The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Exelon Generation Company, LLC to withdraw its application dated December 14, 2018, for a proposed amendment to Renewed Facility Operating License No. DPR-50 for the Three Mile Island Nuclear Station, Unit 1. The proposed amendment would have revised Technical Specification 6.8.5 "Reactor Building Leakage Rate Testing Program," to allow for a one-cycle extension to the 10-year frequency of the containment leakage rate test (i.e., Integrated Leakage Rate Test (ILRT) or Type A test). DATES: The withdrawal of the proposed amendment takes effect on [INSERT DATE OF PUBLICATION IN THE FEDERAL REGISTER].
: The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Exelon Generation Company, LLC to withdraw its application dated December 14, 2018, for a proposed amendment to Renewed Facility Operating License No. DPR-50 for the Three Mile Island Nuclear Station, Unit 1. The proposed amendment would have revised Technical Specification 6.8.5 "Reactor Building Leakage Rate Testing Program," to allow for a one-cycle extension to the 10-year frequency of the containment leakage rate test (i.e., Integrated Leakage Rate Test (ILRT) or Type A test).
ADDRESSES:
DATES: The withdrawal of the proposed amendment takes effect on [INSERT DATE OF PUBLICATION IN THE FEDERAL REGISTER].
Please refer to Docket ID NRC-2019-0079 when contacting the NRC about the availability of information regarding this document.
ADDRESSES: Please refer to Docket ID NRC-2019-0079 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:
You may obtain available information related to this document using any of the following methods:
* Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for Docket ID NRC-2019-0079. Address questions about NRC docket IDs in Regulations.gov to Jennifer Borges; telephone: 301-287-9127; e-mail:
* Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for Docket ID NRC-2019-0079.
 
Address questions about NRC docket IDs in Regulations.gov to Jennifer Borges; telephone:
Jennifer.Borqes@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
301-287-9127; e-mail:
* NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document.
Jennifer.Borqes@nrc.gov.
* NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
FOR FURTHER INFORMATION CONTACT: Justin C. Poole, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-2048, e-mail: Justin.Poole@nrc.gov.
* NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html.
To begin the search, select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov.
The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document.
* NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Justin C. Poole, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone:
301-415-2048, e-mail: Justin.Poole@nrc.gov.
SUPPLEMENTARY INFORMATION:
SUPPLEMENTARY INFORMATION:
The NRC has granted the request, dated June 17, 2019 (ADAMS Accession No. ML19169A031), of Exelon Generation Company, LLC (the licensee) to withdraw its application, dated December 14, 2018 (ADAMS Accession No. ML18351A006), for proposed amendment to Renewed Facility Operating License No. DPR-50 for the Three Mile Island Nuclear Station, Unit 1, located in Dauphin County, Pennsylvania.
The NRC has granted the request, dated June 17, 2019 (ADAMS Accession No. ML19169A031), of Exelon Generation Company, LLC (the licensee) to withdraw its application, dated December 14, 2018 (ADAMS Accession No. ML18351A006), for proposed amendment to Renewed Facility Operating License No. DPR-50 for the Three Mile Island Nuclear Station, Unit 1, located in Dauphin County, Pennsylvania.
The amendment would have revised Technical Specification 6.8.5 "Reactor Building Leakage Rate Testing Program." The amendment would have allowed for a one-cycle extension to the 10-year frequency of the Three Mile Island Nuclear Station, 2 Unit 1, containment leakage rate test (i.e., ILRT or Type A test). The proposed change would have permitted the existing I LRT to be extended from 10 years to 11. 75 years. This extension would have moved the performance of the next ILRT from the scheduled fall 2019 refueling outage to the fall 2021 refueling outage. Exelon's December 14, 2018, request was noticed in the Federal Register on March 26, 2019 (84 FR 11338). Dated at Rockville, Maryland, this 14th day of August, 2019. For the Nuclear Regulatory Commission.
The amendment would have revised Technical Specification 6.8.5 "Reactor Building Leakage Rate Testing Program." The amendment would have allowed for a one-cycle extension to the 10-year frequency of the Three Mile Island Nuclear Station, 2
IRA/ James G. Danna, Chief, Plant Licensing Branch I, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.


==SUBJECT:==
Unit 1, containment leakage rate test (i.e., ILRT or Type A test). The proposed change would have permitted the existing ILRT to be extended from 10 years to 11. 75 years.
THREE MILE ISLAND NUCLEAR STATION, UNIT 1 -WITHDRAWAL OF AN AMENDMENT REQUEST (EPID L-2018-LLA-0571)
This extension would have moved the performance of the next ILRT from the scheduled fall 2019 refueling outage to the fall 2021 refueling outage.
DATED AUGUST 14, 2019 DISTRIBUTION:
Exelon's December 14, 2018, request was noticed in the Federal Register on March 26, 2019 (84 FR 11338).
PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1 Resource RidsNrrLACSmith Resource RidsNrrPMThreeMilelsland Resource RidsRgn1 MailCenter Resource ADAMS Accession Nos.: LTR: ML19213A069 FRN: ML19213A066 OFFICE NRR/DORL/LPL 1 :PM NRR/DORL/LPL 1 :LA NRR/DORL/LPL 1 :BC NAME JPoole CSmith JDanna DATE 08/07/2019 08/07/2019 08/08/2019 OFFICIAL RECORD COPY NRR/DORL/LPL 1 :PM JPoole 08/14/2019}}
Dated at Rockville, Maryland, this 14th day of August, 2019.
For the Nuclear Regulatory Commission.
IRA/
James G. Danna, Chief, Plant Licensing Branch I, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
3
 
LTR: ML19213A069       FRN: ML19213A066 OFFICE NRR/DORL/LPL 1:PM   NRR/DORL/LPL 1:LA NRR/DORL/LPL 1:BC NRR/DORL/LPL 1 :PM NAME   JPoole             CSmith             JDanna           JPoole DATE   08/07/2019         08/07/2019         08/08/2019       08/14/2019}}

Latest revision as of 11:42, 22 February 2020

Withdrawal of an Amendment Request
ML19213A069
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/14/2019
From: Justin Poole
Plant Licensing Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Poole J, NRR/DORL/LPLI, 301-415-2048
References
EPID L-2018-LLA-0571
Download: ML19213A069 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 14, 2019 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer

' Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1 - WITHDRAWAL OF AN AMENDMENT REQUEST (EPID L-2018-LLA-0571)

Dear Mr. Hanson:

By letter dated December 14, 2018, you applied for an amendment to the Three Mile Island Nuclear Station, Unit 1, Renewed Facility Operating License No. DPR-50. The proposed change would have revised Technical Specification 6.8.5 "Reactor Building Leakage Rate Testing Program," to allow for a one-cycle extension to the 10-year frequency of the containment leakage rate test (i.e., Integrated Leakage Rate Test or Type A test).

Subsequently, by letter dated June 17, 2019, you withdrew the amendment request.

The U.S. Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Renewed Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

.---/~---7

/.,;.*:;....... ------ ~---

      • -~~--~~-~

. c---** Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

Notice of Withdrawal cc: Listserv

ENCLOSURE FEDERAL REGISTER NOTICE

[7590-01-P]

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-289; NRC-2019-0079]

Exelon Generation Company LLC Three Mile Island Nuclear Station Unit 1 AGENCY: Nuclear Regulatory Commission.

ACTION: License amendment application; withdrawal by applicant.

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Exelon Generation Company, LLC to withdraw its application dated December 14, 2018, for a proposed amendment to Renewed Facility Operating License No. DPR-50 for the Three Mile Island Nuclear Station, Unit 1. The proposed amendment would have revised Technical Specification 6.8.5 "Reactor Building Leakage Rate Testing Program," to allow for a one-cycle extension to the 10-year frequency of the containment leakage rate test (i.e., Integrated Leakage Rate Test (ILRT) or Type A test).

DATES: The withdrawal of the proposed amendment takes effect on [INSERT DATE OF PUBLICATION IN THE FEDERAL REGISTER].

ADDRESSES: Please refer to Docket ID NRC-2019-0079 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:

  • Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for Docket ID NRC-2019-0079. Address questions about NRC docket IDs in Regulations.gov to Jennifer Borges; telephone: 301-287-9127; e-mail:

Jennifer.Borqes@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.

  • NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document.
  • NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Justin C. Poole, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-2048, e-mail: Justin.Poole@nrc.gov.

SUPPLEMENTARY INFORMATION:

The NRC has granted the request, dated June 17, 2019 (ADAMS Accession No. ML19169A031), of Exelon Generation Company, LLC (the licensee) to withdraw its application, dated December 14, 2018 (ADAMS Accession No. ML18351A006), for proposed amendment to Renewed Facility Operating License No. DPR-50 for the Three Mile Island Nuclear Station, Unit 1, located in Dauphin County, Pennsylvania.

The amendment would have revised Technical Specification 6.8.5 "Reactor Building Leakage Rate Testing Program." The amendment would have allowed for a one-cycle extension to the 10-year frequency of the Three Mile Island Nuclear Station, 2

Unit 1, containment leakage rate test (i.e., ILRT or Type A test). The proposed change would have permitted the existing ILRT to be extended from 10 years to 11. 75 years.

This extension would have moved the performance of the next ILRT from the scheduled fall 2019 refueling outage to the fall 2021 refueling outage.

Exelon's December 14, 2018, request was noticed in the Federal Register on March 26, 2019 (84 FR 11338).

Dated at Rockville, Maryland, this 14th day of August, 2019.

For the Nuclear Regulatory Commission.

IRA/

James G. Danna, Chief, Plant Licensing Branch I, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.

3

LTR: ML19213A069 FRN: ML19213A066 OFFICE NRR/DORL/LPL 1:PM NRR/DORL/LPL 1:LA NRR/DORL/LPL 1:BC NRR/DORL/LPL 1 :PM NAME JPoole CSmith JDanna JPoole DATE 08/07/2019 08/07/2019 08/08/2019 08/14/2019