ML11269A192: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 20: | Line 20: | ||
INTHEDSC o | INTHEDSC o | ||
FILL DSC CAVITY PLACETOP WITH BORATED WATER | FILL DSC CAVITY PLACETOP WITH BORATED WATER | ||
--- SHIELD PLUG ONDSC DECONTAMINATE REMOVE THE OUTER SURFACE CASKIDSC OF CASK FROM FUEL POOL | --- SHIELD PLUG ONDSC DECONTAMINATE REMOVE THE OUTER SURFACE CASKIDSC OF CASK FROM FUEL POOL BGE-A92.01M Figure 5.1-1 ISFSI Loading Operations Flowchart Page 1 of 3 | ||
BGE-A92.01M Figure 5.1-1 ISFSI Loading Operations Flowchart Page 1 of 3 | |||
[See Reference 5.2] | [See Reference 5.2] | ||
Rev. 1 | Rev. 1 | ||
Line 29: | Line 27: | ||
LOWER WATER @ WELD PLUGS OVER 1 INSTALL LEVEL IN DSC _~~~ VENT AND TRUNNION CAVITY AND SIPHON PORTS RESTRAINTS ANNULUS AND PERFORM NDE | LOWER WATER @ WELD PLUGS OVER 1 INSTALL LEVEL IN DSC _~~~ VENT AND TRUNNION CAVITY AND SIPHON PORTS RESTRAINTS ANNULUS AND PERFORM NDE | ||
@ ,--._--1. t | @ ,--._--1. t | ||
, t SEAL WELD TOP INSTALL DSC REf'v1OVE SHIELD PLUG TOP COVER CASK BonOM TODse PLATE COVER II INSTALLCASK PE~FORM SEALWELD INNER &OUiER NDEON COVER PLATE PLUG SEAL WELD TO DSCSHELL ASSEMBLIES I, | |||
, t SEAL WELD TOP INSTALL DSC REf'v1OVE SHIELD PLUG TOP COVER CASK BonOM TODse PLATE COVER II | , I 8)-----'--DRAIN PERFORM NDE TOW LOADED REMAINING WATER TRAILER FROM DSCAND ON SEAL WELD TOHSM ANNULUS VACUUM INSTALL CASK DRYDSC TOP COVER PLATE II n BACKFILL esc MOVE CAVITY WITH C.A.3KTO HELIUM mAILER | ||
INSTALLCASK PE~FORM SEALWELD INNER &OUiER NDEON COVER PLATE PLUG SEAL WELD TO DSCSHELL ASSEMBLIES I, | |||
, I 8)-----'--DRAIN PERFORM NDE TOW LOADED REMAINING WATER TRAILER FROM DSCAND ON SEAL WELD TOHSM ANNULUS | |||
VACUUM INSTALL CASK DRYDSC TOP COVER PLATE II n BACKFILL esc MOVE CAVITY WITH C.A.3KTO HELIUM mAILER | |||
~_..Io-t __ | ~_..Io-t __ | ||
PERFORM LOWER CASK HELIUM L.EAK | PERFORM LOWER CASK HELIUM L.EAK | ||
Line 47: | Line 39: | ||
REMOVE RAM AND POSITION PULL CASK CASK WITH OUT OF HSMOPENING HSMOPENING REMOVE CASK INSTALLDSC TOP COVER PLATE SEISMIC | REMOVE RAM AND POSITION PULL CASK CASK WITH OUT OF HSMOPENING HSMOPENING REMOVE CASK INSTALLDSC TOP COVER PLATE SEISMIC | ||
& SKID TIE-DOWN RESTRAINT AND BRACKET HSMDOOR FASTENERS t | & SKID TIE-DOWN RESTRAINT AND BRACKET HSMDOOR FASTENERS t | ||
ALIGN AND TACK WELD DOCK CASK HSMCLOSED WITH HSM DOOR OPENING BGE-A92.01M | ALIGN AND TACK WELD DOCK CASK HSMCLOSED WITH HSM DOOR OPENING BGE-A92.01M SECURE SKID AND INSTALL CASK ~ | ||
SECURE SKID AND INSTALL CASK ~ | |||
RESTRAINT SYSTEM Figure 5.1-1 ISFSI Loading Operations Flowchart Page 3 of 3 | RESTRAINT SYSTEM Figure 5.1-1 ISFSI Loading Operations Flowchart Page 3 of 3 | ||
. f [See Reference 5.2] | . f [See Reference 5.2] | ||
Rev. 1}} | Rev. 1}} |
Latest revision as of 23:52, 6 February 2020
ML11269A192 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 09/08/2011 |
From: | Calvert Cliffs |
To: | Office of Nuclear Material Safety and Safeguards |
References | |
Download: ML11269A192 (3) | |
Text
CASK HANDLING PIT FUEL POOL AUX. BLDG. TRUCK BAY HSM SITE LOWERCASKI LOAD DSC INTO CASK -- DSCINTO FUEL POOL FILLANNULUS BETWEEN LOAD FUEL DSC AND CASK WITH ASSEMBLIES DEMINERALIZED INTODSC WATER
, o CHECK & RECORD INSTALLAND IDENTITY&
PRESSURIZE LOCATION OF ANNULUS SEAL EACH FUEL ASSY.
INTHEDSC o
FILL DSC CAVITY PLACETOP WITH BORATED WATER
--- SHIELD PLUG ONDSC DECONTAMINATE REMOVE THE OUTER SURFACE CASKIDSC OF CASK FROM FUEL POOL BGE-A92.01M Figure 5.1-1 ISFSI Loading Operations Flowchart Page 1 of 3
[See Reference 5.2]
Rev. 1
~ASK QECON AREA FUEL POQ1. AUX BLDG TRl.:CK BAY HSM SIT~
LOWER WATER @ WELD PLUGS OVER 1 INSTALL LEVEL IN DSC _~~~ VENT AND TRUNNION CAVITY AND SIPHON PORTS RESTRAINTS ANNULUS AND PERFORM NDE
@ ,--._--1. t
, t SEAL WELD TOP INSTALL DSC REf'v1OVE SHIELD PLUG TOP COVER CASK BonOM TODse PLATE COVER II INSTALLCASK PE~FORM SEALWELD INNER &OUiER NDEON COVER PLATE PLUG SEAL WELD TO DSCSHELL ASSEMBLIES I,
, I 8)-----'--DRAIN PERFORM NDE TOW LOADED REMAINING WATER TRAILER FROM DSCAND ON SEAL WELD TOHSM ANNULUS VACUUM INSTALL CASK DRYDSC TOP COVER PLATE II n BACKFILL esc MOVE CAVITY WITH C.A.3KTO HELIUM mAILER
~_..Io-t __
PERFORM LOWER CASK HELIUM L.EAK
-reST
-- ONTO SUPPORT SKID 1'1 Figure 5.1-1 ISFSI Loading Qgeratioos Flowchart Page 2 of 3
[See Reference 5.2J Rev. 2
AUX. BLDG CASK DECON PIT FUEL POOL TRUCK BAY HSM SITE INSPECTHSM ALIGN RAM AND INTERIOR FOR PUSH DSC DEBRIS INTOHSM
- ,~
REMOVE RAM AND POSITION PULL CASK CASK WITH OUT OF HSMOPENING HSMOPENING REMOVE CASK INSTALLDSC TOP COVER PLATE SEISMIC
& SKID TIE-DOWN RESTRAINT AND BRACKET HSMDOOR FASTENERS t
ALIGN AND TACK WELD DOCK CASK HSMCLOSED WITH HSM DOOR OPENING BGE-A92.01M SECURE SKID AND INSTALL CASK ~
RESTRAINT SYSTEM Figure 5.1-1 ISFSI Loading Operations Flowchart Page 3 of 3
. f [See Reference 5.2]
Rev. 1