ML13003A107: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/22/2012
| issue date = 10/22/2012
| title = 2012 LaSalle County Station Initial License Examination Proposed Exam Facility Transmission Letter, Forms ES-301-3, ES-301-4, and ES-401-6
| title = 2012 LaSalle County Station Initial License Examination Proposed Exam Facility Transmission Letter, Forms ES-301-3, ES-301-4, and ES-401-6
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
=Text=
{{#Wiki_filter:2012 LASALLE COUNTY STATION INITIAL LICENSE EXAMINATION PROPOSED EXAM FILES
1
~~;~J?;Y    Exelon Generation 10 CFR 55.40 RA12-042 September 4,2012 United States Nuclear Regulatory Commission Attention: NRC Region III Administrator 2443 Warrenville Rd.
Suite 210 Lisle, IL 60532-4352 laSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373/50-374
==Subject:==
Submittal of Integrated Initial Operator Licensing Examination Materials Enclosed are the examination materials that LaSalle County Station is submitting in support of the Initial License Examination scheduled for October 22 through November 2, 2012 at LaSalle County Station.
This submittal includes the Senior Reactor Operator (SRO) and Reactor Operator (RO) Job Performance Measures and Integrated Plant Operation Scenario Guides.
Submittal of the SRO and RO Written Examinations will follow per the agreement made with the NRC Chief Examiner.
These examination materials have been developed in accordance with NUREG 1021 "Operator Licensing Examination Standards," Revision 9. Please note that reference materials are attached to each individual examination question or item.
Some minor modifications have been made to the Integrated Examination Outline with regards to the operational scenarios in order to improve balance and content These changes improve examination quality and are in compliance with NUREG 1021, Revision 9, "Operator Licensing Examination Standards."
Some modifications or adjustments to the examination material may be required due to procedural changes.
In accordance with NUREG -1021, Revision 9, Section ES-201, please ensure that these materials are withheld from public disclosure until after the examinations are complete.
SEP  4 201Z
Should you have any questions concerning this letter, please contact Mr. Stephen Shields, Acting Regulatory Assurance Manager, at (815) 415-2811. For questions concerning examination outlines, please contact Mr. Douglas Wright at (815) 415 4025.
Respectfully, David P. Rhoades Site Vice President LaSalle County Station
==Enclosures:==
(Hand delivered to Dell McNeil, Chief Examiner, NRC Region III)
RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached Integrated Plant Operation Scenario Guides Completed Checklists:
Operating Test Quality Checklist (Form ES-301-3)
Simulator Scenario Quality Checklist (Form ES-301-4)
Transient and Event Checklist (Form ES-301-5)
Competencies Checklist (Form ES-301-6)
Written Exam Quality Checklist (Form ES-401-6)
Examination Security Agreements (Form ES-201-3)
Record of Rejected KlAs (Form ES-401-4)
BWR Examination Outline (Forms ES-401-1 and ES-401-3) cc:    Chief, NRC Operator Licensing Branch (w/o enclosures)
Senior Resident Inspector - LaSalle County Station (w/o enclosures) bcc:    (without enclosures)
LaSalle County Station Project Manager, NRR Site Vice President - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Director, Licensing and Regulatory Services Manager, Licensing - LaSalle County Station Nuclear Licensing Administrator - LaSalle County Station Exelon Document Control Desk Licensing (Hard Copy)
Exelon Document Control Desk Licensing (Electronic Copy)
Human Resources - LaSalle County Station Training Manager - LaSalle County Station
ES-301                                            Operating Test Quality Checklist                                  Form ES-301-3 Date of Examination: 10/2212012  Operating Test Number: 2012301 Initials
: 1. GENERAL CRITERIA a      bO    c#
: a.        The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
: b.          There is no day-to-day repetition between this and other operating tests to be administered during this examination.
: c.        The operating test shall not duplicate items from the applicants' audit test(s)(see Section D.1.a).
: d.          Overlap with the written examination and between different parts of the operating test is within acceptable limits.
: e.          It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
: 2. WALK-THROUGH CRITERIA
: a.          Each JPM includes the following, as applicable:
* initial conditions
* initiating cues
* references and tools, including associated procedures
* reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee
* operationally important speCific performance criteria that include:
detailed expected actions with exact criteria and nomenclature
                      -      system response and other examiner cues
                      -      statements describing important observations to be made by the applicant
                      -      criteria for successful completion of the task
                      -      identification of critical steps and their associated performance standards
                      -      restrictions on the sequence of steps, if applicable
: b.          Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES*201-2.
: 3. SIMULATOR CRITERIA The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.
Date
: a. Author                                                                                                            8/31 112
: b. Facility Reviewer (0)                                                                                            8'/J./II~
rI/IS/zOIZ, 1t?/t4to/ L NOTE:      ° The facility signature is not applicable for~_Rc.developed tests
              # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence is required.
ES-301, Page 24 of 27
* ES-301                                Simulator Scenario Quality Checklist                                  Form ES-301-4 aSalie              Date of Exam: 10/2212012              Scenario Numbers: 01/02/03 Operating Test Number:      20~1 Initials QUALITATIVE ATTRIBUTES a      b*        c#
: 1. The initial conditions are realistic, in that some equipment and/or instrumentation may be out of service, but it does not cue the operators into expected events.                                      OW      lit      .)4....
: 2. The scenarios consist mostly of related events.                                                      (JvJ    ~e.        ~
: 3. Each event description consists of
* the point in the scenario when it is to be initiated
* the malfunction(s) that are entered to initiate the event
* the symptoms/cues that will be visible to the crew                                            PW      lit      ~
* the expected operator actions (by shift position)
* the event termination point (if applicable)
: 4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without a credible preceding inCident such as a seismic event.                                        Ovi :?/r          ~
: 5. The events are valid with regard to physics and thermodynamics.                                        f)w    2ft      ~
: 6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives.
p......, 7ft      )f"..
: 7.      If time compression techniques are used, the scenario summary clearly so indicates.
Operators have sufficient time to carry out expected activities without undue time constraints.
Cues are given.
Cw      1k      .)tv.
: 8. The simulator modeling is not altered.                                                                fic.v ,lit        ~
: 9. The scenarios have been validated. Pursuant to 10CFR55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated                  Ow RJ.o(.
to ensure that functional fidelity is maintained while running the planned scenarios.
: 10. Every operator will be evaluated using at least one new or significantly modified scenario.
All other scenarios have been altered in accordance with Section 0.5 of ES-301.                      \).oJ $.          ~
: 11. All individual operator competencies can be evaluated, as verified USing Form ES-301-6 (submit the form along with the simulator scenarios).                                                  PW JIlt.        ......
: 12. Each applicant will be significantly involved in the minimum number of transients and events specified on Form ES-301-5 (submit the form with the simulator scenarios).                            Ow J;It
: 13. The level of difficulty is appropriate to support licensing decisions for each crew position.          Ow ~-t          ~
__    II Target Quantitative Attributes (Per Scenario; See Section D.5.d)                    Actual Attributes    -      -
: 1. Total malfunctions (5-8)                                                              7 / 6 / 7      GYl..I    ~{      1M 2.
3.
4.
Malfunctions after EOP entry (1-2)
Abnormal events (2-4)
Majortransients (1-2) 2/1/1 3/ 2 / 2 1 / 1 I 1 6h.~
()v.;
                                                                                                                        /7).t p,,-, ;t(.
ht      ~
                                                                                                                                    ~
: 5. EOPs entered/requiring substantive actions (1-2)                                      1/2/3          f)t...;  ~t        l*
H      EOP contingencies requiring substantive actions (0-2)
Critical tasks (2-3) 1 / 0 / 1 2 I 3 I 2 (JIN Ok! Jjt
                                                                                                                        ?ft B
ES-301, Page 25 of 27
ES-401                                Written Examination Quality Checklist                                    Form ES-401-6
* Facility: LaSalle                                    Date of Exam: 10/22/2012 Item Description Exam Level: RO a
121 SRO 121 Initial Ow ;i?JL.
b*        c'
: 1.      Questions and answers are technically accurate and applicable to the facility.                                        ~
: 2.      a. NRC KlAs are referenced for all questions.
: b. Facility leaming objectives are referenced as available.                                        ~v    /Jie.      ~
: 3.      SRO questions are appropriate in accordance with Section D.2.d of ES-401                          Pw      ;i'i.l      ~
4.
5.
The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensing exam, consult the NRR OL program office).
Question duplication from the license screening/audit exam was controlled
                                                                                                              ~ )Mo-as indicated below (check the item that applies) and appears appropriate:
PW fJt 2L the audit exam was systematically and randomly developed; or
_ the audit exam was completed before the license exam was started; or                                                )..-
_ the examinations were developed independently; or
_ the licensee certifies that there is no duplication; or
_ other(explain)
: 6.      Bank use meets limits (no more than 75 percent                      Bank    Modified      New PW lie, from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO I SRO-only                    30/9        314        42112                    ~
question distribution(s) at right.
: 7.      Between 50 and 60 percent of the questions on the RO                  Memory            CIA exam are written at the comprehension lanalysis level; the SRO exam may exceed 60 percent if the randomly 35/6            45/19      ~vJ    lP          ~
selected KAs support the higher cognitive levels; enter the actual RO I SRO question distribution(s) at right.
: s.      References/handouts provided do not give away answers PL.J    JH, or aid in the elimination 01 distractors.                                                                            ~
: 9.      Question content conforms with specific KIA statements in the previously approved examination outline and is appropriate for the Tier to which they are assigned; deviations are justified IJw ~              ~
: 10.      Question psychometric quality and format meet the guidelines in ES Appendix B.                    '0,""  1#          ~
: 11.      The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with value on cover sheet 00 7!f.t          ~
Printed Name I Signature                              Date
: a. Author                                  Doualas Wriaht    ~W~
                                                                ~!x./~
9/06/2012
: b. Facility Reviewer (*)                  Richard Calvin          'I"  '~LJ..                                      §!lQl'l/2Q12
                                            ~\( Mc:..1e; / /~j~ A.L t? tJ1e./L' P
                                                                                                                          ~
: c. NRC Chief Examiner (#)                                                                      /'
: d. NRC Regional Supervisor      ~j6r'(frfO(. '~p~~~ .L ~ __                                                        II).      EqL Note:
* The facility reviewer's initials/signature are not applicable for NRC-developed examinations.
              # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
* ES-401, Page 29 of 33}}

Latest revision as of 08:23, 6 February 2020

2012 LaSalle County Station Initial License Examination Proposed Exam Facility Transmission Letter, Forms ES-301-3, ES-301-4, and ES-401-6
ML13003A107
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/22/2012
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML11354A206 List:
References
Download: ML13003A107 (7)


Text

2012 LASALLE COUNTY STATION INITIAL LICENSE EXAMINATION PROPOSED EXAM FILES

1

~~;~J?;Y Exelon Generation 10 CFR 55.40 RA12-042 September 4,2012 United States Nuclear Regulatory Commission Attention: NRC Region III Administrator 2443 Warrenville Rd.

Suite 210 Lisle, IL 60532-4352 laSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373/50-374

Subject:

Submittal of Integrated Initial Operator Licensing Examination Materials Enclosed are the examination materials that LaSalle County Station is submitting in support of the Initial License Examination scheduled for October 22 through November 2, 2012 at LaSalle County Station.

This submittal includes the Senior Reactor Operator (SRO) and Reactor Operator (RO) Job Performance Measures and Integrated Plant Operation Scenario Guides.

Submittal of the SRO and RO Written Examinations will follow per the agreement made with the NRC Chief Examiner.

These examination materials have been developed in accordance with NUREG 1021 "Operator Licensing Examination Standards," Revision 9. Please note that reference materials are attached to each individual examination question or item.

Some minor modifications have been made to the Integrated Examination Outline with regards to the operational scenarios in order to improve balance and content These changes improve examination quality and are in compliance with NUREG 1021, Revision 9, "Operator Licensing Examination Standards."

Some modifications or adjustments to the examination material may be required due to procedural changes.

In accordance with NUREG -1021, Revision 9, Section ES-201, please ensure that these materials are withheld from public disclosure until after the examinations are complete.

SEP 4 201Z

Should you have any questions concerning this letter, please contact Mr. Stephen Shields, Acting Regulatory Assurance Manager, at (815) 415-2811. For questions concerning examination outlines, please contact Mr. Douglas Wright at (815) 415 4025.

Respectfully, David P. Rhoades Site Vice President LaSalle County Station

Enclosures:

(Hand delivered to Dell McNeil, Chief Examiner, NRC Region III)

RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached Integrated Plant Operation Scenario Guides Completed Checklists:

Operating Test Quality Checklist (Form ES-301-3)

Simulator Scenario Quality Checklist (Form ES-301-4)

Transient and Event Checklist (Form ES-301-5)

Competencies Checklist (Form ES-301-6)

Written Exam Quality Checklist (Form ES-401-6)

Examination Security Agreements (Form ES-201-3)

Record of Rejected KlAs (Form ES-401-4)

BWR Examination Outline (Forms ES-401-1 and ES-401-3) cc: Chief, NRC Operator Licensing Branch (w/o enclosures)

Senior Resident Inspector - LaSalle County Station (w/o enclosures) bcc: (without enclosures)

LaSalle County Station Project Manager, NRR Site Vice President - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Director, Licensing and Regulatory Services Manager, Licensing - LaSalle County Station Nuclear Licensing Administrator - LaSalle County Station Exelon Document Control Desk Licensing (Hard Copy)

Exelon Document Control Desk Licensing (Electronic Copy)

Human Resources - LaSalle County Station Training Manager - LaSalle County Station

ES-301 Operating Test Quality Checklist Form ES-301-3 Date of Examination: 10/2212012 Operating Test Number: 2012301 Initials

1. GENERAL CRITERIA a bO c#
a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
b. There is no day-to-day repetition between this and other operating tests to be administered during this examination.
c. The operating test shall not duplicate items from the applicants' audit test(s)(see Section D.1.a).
d. Overlap with the written examination and between different parts of the operating test is within acceptable limits.
e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
2. WALK-THROUGH CRITERIA
a. Each JPM includes the following, as applicable:
  • initial conditions
  • initiating cues
  • references and tools, including associated procedures
  • reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee
  • operationally important speCific performance criteria that include:

detailed expected actions with exact criteria and nomenclature

- system response and other examiner cues

- statements describing important observations to be made by the applicant

- criteria for successful completion of the task

- identification of critical steps and their associated performance standards

- restrictions on the sequence of steps, if applicable

b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES*201-2.
3. SIMULATOR CRITERIA The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.

Date

a. Author 8/31 112
b. Facility Reviewer (0) 8'/J./II~

rI/IS/zOIZ, 1t?/t4to/ L NOTE: ° The facility signature is not applicable for~_Rc.developed tests

  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence is required.

ES-301, Page 24 of 27

  • ES-301 Simulator Scenario Quality Checklist Form ES-301-4 aSalie Date of Exam: 10/2212012 Scenario Numbers: 01/02/03 Operating Test Number: 20~1 Initials QUALITATIVE ATTRIBUTES a b* c#
1. The initial conditions are realistic, in that some equipment and/or instrumentation may be out of service, but it does not cue the operators into expected events. OW lit .)4....
2. The scenarios consist mostly of related events. (JvJ ~e. ~
3. Each event description consists of
  • the point in the scenario when it is to be initiated
  • the malfunction(s) that are entered to initiate the event
  • the symptoms/cues that will be visible to the crew PW lit ~
  • the expected operator actions (by shift position)
  • the event termination point (if applicable)
4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without a credible preceding inCident such as a seismic event. Ovi :?/r ~
5. The events are valid with regard to physics and thermodynamics. f)w 2ft ~
6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives.

p......, 7ft )f"..

7. If time compression techniques are used, the scenario summary clearly so indicates.

Operators have sufficient time to carry out expected activities without undue time constraints.

Cues are given.

Cw 1k .)tv.

8. The simulator modeling is not altered. fic.v ,lit ~
9. The scenarios have been validated. Pursuant to 10CFR55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated Ow RJ.o(.

to ensure that functional fidelity is maintained while running the planned scenarios.

10. Every operator will be evaluated using at least one new or significantly modified scenario.

All other scenarios have been altered in accordance with Section 0.5 of ES-301. \).oJ $. ~

11. All individual operator competencies can be evaluated, as verified USing Form ES-301-6 (submit the form along with the simulator scenarios). PW JIlt. ......
12. Each applicant will be significantly involved in the minimum number of transients and events specified on Form ES-301-5 (submit the form with the simulator scenarios). Ow J;It
13. The level of difficulty is appropriate to support licensing decisions for each crew position. Ow ~-t ~

__ II Target Quantitative Attributes (Per Scenario; See Section D.5.d) Actual Attributes - -

1. Total malfunctions (5-8) 7 / 6 / 7 GYl..I ~{ 1M 2.

3.

4.

Malfunctions after EOP entry (1-2)

Abnormal events (2-4)

Majortransients (1-2) 2/1/1 3/ 2 / 2 1 / 1 I 1 6h.~

()v.;

/7).t p,,-, ;t(.

ht ~

~

5. EOPs entered/requiring substantive actions (1-2) 1/2/3 f)t...; ~t l*

H EOP contingencies requiring substantive actions (0-2)

Critical tasks (2-3) 1 / 0 / 1 2 I 3 I 2 (JIN Ok! Jjt

?ft B

ES-301, Page 25 of 27

ES-401 Written Examination Quality Checklist Form ES-401-6

  • Facility: LaSalle Date of Exam: 10/22/2012 Item Description Exam Level: RO a

121 SRO 121 Initial Ow ;i?JL.

b* c'

1. Questions and answers are technically accurate and applicable to the facility. ~
2. a. NRC KlAs are referenced for all questions.
b. Facility leaming objectives are referenced as available. ~v /Jie. ~
3. SRO questions are appropriate in accordance with Section D.2.d of ES-401 Pw ;i'i.l ~

4.

5.

The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensing exam, consult the NRR OL program office).

Question duplication from the license screening/audit exam was controlled

~ )Mo-as indicated below (check the item that applies) and appears appropriate:

PW fJt 2L the audit exam was systematically and randomly developed; or

_ the audit exam was completed before the license exam was started; or )..-

_ the examinations were developed independently; or

_ the licensee certifies that there is no duplication; or

_ other(explain)

6. Bank use meets limits (no more than 75 percent Bank Modified New PW lie, from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO I SRO-only 30/9 314 42112 ~

question distribution(s) at right.

7. Between 50 and 60 percent of the questions on the RO Memory CIA exam are written at the comprehension lanalysis level; the SRO exam may exceed 60 percent if the randomly 35/6 45/19 ~vJ lP ~

selected KAs support the higher cognitive levels; enter the actual RO I SRO question distribution(s) at right.

s. References/handouts provided do not give away answers PL.J JH, or aid in the elimination 01 distractors. ~
9. Question content conforms with specific KIA statements in the previously approved examination outline and is appropriate for the Tier to which they are assigned; deviations are justified IJw ~ ~
10. Question psychometric quality and format meet the guidelines in ES Appendix B. '0,"" 1# ~
11. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with value on cover sheet 00 7!f.t ~

Printed Name I Signature Date

a. Author Doualas Wriaht ~W~

~!x./~

9/06/2012

b. Facility Reviewer (*) Richard Calvin 'I" '~LJ.. §!lQl'l/2Q12

~\( Mc:..1e; / /~j~ A.L t? tJ1e./L' P

~

c. NRC Chief Examiner (#) /'
d. NRC Regional Supervisor ~j6r'(frfO(. '~p~~~ .L ~ __ II). EqL Note:
  • The facility reviewer's initials/signature are not applicable for NRC-developed examinations.
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.