ML14274A256: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/01/2014
| issue date = 08/01/2014
| title = 2014 DC Cook Initial License Examination Proposed Scenario D-1 Sheets
| title = 2014 DC Cook Initial License Examination Proposed Scenario D-1 Sheets
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Appendix D Required Operator Actions Form ES-D-2   Facility: __D C Cook______ Scenario No.: ____1____   Op-Test No.: 2014301 Examiners: ____________________________   Operators: _____________________________    ____________________________              _____________________________    ____________________________              _____________________________
{{#Wiki_filter:Appendix D                                 Required Operator Actions                     Form ES-D-2 Facility: __D C Cook______ Scenario No.: ____1____                             Op-Test No.: 2014301 Examiners: ____________________________ Operators:                   _____________________________
Initial Conditions: 100% power Turnover: A 200 MW power decrease has been requested by the System Dispatcher. Both units are at 100% power. Event No. Malf. No. Event Type* Event Description 1 U1_RCR16 C(ATC) TS Pressurizer Safety Valve Leak (SV45B 2gpm) 2 R Power Reduction 3 N Turbine Power Reduction 4 U1_ECP Stator Short C(ATC) TS East CCP fails on overcurrent 5 U1_RX33B I(BOP) Feedwater flow controller fails 6 U1_QTC302 175 over 5 Minutes I(ATC) Charging Letdown Header Temperature QTC-302 fails high 7 U1_RC01A 60% M(ALL) Large break LOCA 8 U1_ED05E (Trg 1) M(ALL) Vital bus T11A Fails (On RX Trip) 9 U1_RP10A U1_RP11A U1_RP11C C(ATC) Auto/Manual SI Train A does not occur                     * (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor Appendix D Scenario Outline Form ES-D-1 Page 1 of 1  Facility: __D C Cook______ Scenario No.: ____3____   Op-Test No.: 2014301 Examiners: ____________________________   Operators: _____________________________     ____________________________              _____________________________    ____________________________              _____________________________    Initial Conditions: ___ EDG CD has been run following mechanical maintenance. The run is complete and the EDG is ready to be shutdown and placed in standby. Turnover: 1-OHP-4021-032-001CD Attachment 2 is complete to step 4.4.2 and the diesel generator is ready to be shut down. Perform Step 4.4.3 through preparation for Restoring for OPERABILITY. U1 is at 92% power following turbine valve testing. Event No. Malf. No. Event Type* Event Description 1 N Secure the CD D/G 2 U1_NI10B 200 over 1 min I(ATC) TS Power range detector (NI-42) fails high 3 R Power increase to restore power 4 U1_FW40A 100 C(BOP) Condenser Level Control failure (100%) 5 U1_BLP131 0 over 30sec I(ATC) TS Steam generator #3 BLP131 controlling level channel fails low 6 U1_MS02C 50% Major Steam line #3 break inside containment 7 U1_RP01A U1_RP01B C(ATC) Reactor trip failure (ATWS), Rods Drop when MG sets de-energized 8 U1_RP09A U1_RP09B C(BOP) Feedwater isolation does not occur in automatic 9 U1_FW48C C(BOP) TDAFW pump does not start in auto                         * (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor Appendix D Scenario Outline Form ES-D-1 Page 1 of 1  Facility: __D C Cook______ Scenario No.: ___4_____ Op-Test No.: 2014301 Examiners: ____________________________   Operators: _____________________________    ____________________________               _____________________________     ____________________________              _____________________________  Initial Conditions: 12% power, main generator has just been paralleled. Turnover:   The unit is at 12% power with the generator has just been paralleled to the grid. The unit was down powered to fix leak on the weld for FTR-258, FW Disch Header Temperature tap.. The work is complete and the plant is returning to 100% power. Procedure 1-OHP-4021-001-006, Power Escalation is complete up to step 4.28. Raise Power at 10%/hour to ~29%. Event No. Malf. No. Event Type* Event Description 1 N Control Feed Flow In Manual 2 R Raise Power 3 U1_MPC253 to 740 I(ATC) Turbine impulse pressure instrument (MPC-253) fails HIGH 4 U1_MPP222 1500 C(BOP) MPP 222 SG #2 PORV Pressure Channel 5 U1_FPC_250A to 1 over 2 min I(BOP) Main Feedwater discharge pressure (FPC-250A) fails Low 6 U1_RC10D 10% over 5 Min Major Small break LOCA in containment (150 gpm with a 5 min ramp) 7 U1_RP10A U1_RP10B I(ATC) Auto SI fails 8 U1_TC02 U1_TC03 C(BOP) Main turbine fails to trip 9 U1_RD0435 U1_RD0441 C(ATC) Two rods fail to Drop (H4 & H6) 10 U1_ECP Stator Short C(ATC) East CCP trips on overcurrent 3 minutes after the RXtrip  * (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor Appendix D Scenario Outline Form ES-D-1   Page 1 of 1  Facility: __D C Cook______ Scenario No.: ___5_____   Op-Test No.: 2014301 Examiners: ____________________________   Operators: _____________________________     ____________________________              _____________________________    ____________________________              _____________________________  Initial Conditions: 79% power, Power reduction in progress. Turnover: Unit is stable at 79% power and continuing a power reduction to take the unit off line. Currently performing Step 4.11.1 of 02-OHP 4021.001.003, Power Reduction. Remove the North Condensate Booster pump from service - was run for engineering data collection. Event No. Malf. No. Event Type* Event Description 1 N Remove North Condensate Booster from service 2 U1_QLC451 To 0% I(ATC) TS VCT level instrument (QLC-451) fails low 3 R Power reduction 4 U1_MFC140 to 0 I(BOP) TS Steam flow channel (MFC-140) fails low (Controlling) 5 U1_RCR20 to 5 C(ATC) Pressurizer PORV (NRC-153) leaking (requires isolation) - 5% open NOTE: Time compression may be used as the procedure requires a 15 minute wait time after unisolating each PORV. 6 U1_RC23D to 30 over 10 min Major Reactor Trip with S/G #4 tube rupture (600 gpm (60%) ramp to 30% over 10 minutes - raise to 60% on trip) 7 U1_MS06D to 80% C(BOP) Steam generator safety valve (SV3-4) opens - 80%             * (N)ormal,    (R)eactivity,   (I)nstrument,   (C)omponent,    (M)ajor}}
Initial Conditions: 100% power Turnover: A 200 MW power decrease has been requested by the System Dispatcher. Both units are at 100% power.
Even        Malf. No.     Event                                      Event t No.                      Type*                                   Description C(ATC) 1        U1_RCR16                        Pressurizer Safety Valve Leak (SV45B 2gpm)
TS 2                             R         Power Reduction 3                             N         Turbine Power Reduction U1_ECP         C(ATC) 4                                        East CCP fails on overcurrent Stator Short          TS 5       U1_RX33B         I(BOP)       Feedwater flow controller fails U1_QTC302 6         175 over 5       I(ATC)       Charging Letdown Header Temperature QTC-302 fails high Minutes U1_RC01A 7                         M(ALL)       Large break LOCA 60%
U1_ED05E 8                         M(ALL)       Vital bus T11A Fails (On RX Trip)
(Trg 1)
U1_RP10A 9       U1_RP11A         C(ATC)       Auto/Manual SI Train A does not occur U1_RP11C
*         (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
 
Appendix D                                     Scenario Outline                               Form ES-D-1 Facility: __D C Cook______ Scenario No.: ____3____                                   Op-Test No.: 2014301 Examiners: ____________________________ Operators:                       _____________________________
Initial Conditions: ___ EDG CD has been run following mechanical maintenance. The run is complete and the EDG is ready to be shutdown and placed in standby.
Turnover: 1-OHP-4021-032-001CD Attachment 2 is complete to step 4.4.2 and the diesel generator is ready to be shut down. Perform Step 4.4.3 through preparation for Restoring for OPERABILITY. U1 is at 92% power following turbine valve testing.
Event                           Event                                      Event Malf. No.
No.                           Type*                                   Description 1                               N         Secure the CD D/G U1_NI10B           I(ATC) 2        200 over 1                      Power range detector (NI-42) fails high min                TS 3                               R         Power increase to restore power U1_FW40A 4                         C(BOP)         Condenser Level Control failure (100%)
100 U1_BLP131           I(ATC) 5                                        Steam generator #3 BLP131 controlling level channel fails low 0 over 30sec            TS U1_MS02C 6                             Major       Steam line #3 break inside containment 50%
U1_RP01A                         Reactor trip failure (ATWS), Rods Drop when MG sets de-7                          C(ATC)
U1_RP01B                        energized U1_RP09A 8                         C(BOP)         Feedwater isolation does not occur in automatic U1_RP09B 9       U1_FW48C         C(BOP)         TDAFW pump does not start in auto
*         (N)ormal, (R)eactivity, (I)nstrument, (C)omponent,     (M)ajor Page 1 of 1
 
Appendix D                                 Scenario Outline                         Form ES-D-1 Facility: __D C Cook______ Scenario No.: ___4_____                       Op-Test No.: 2014301 Examiners: ____________________________ Operators:              _____________________________
Initial Conditions: 12% power, main generator has just been paralleled.
Turnover: The unit is at 12% power with the generator has just been paralleled to the grid.
The unit was down powered to fix leak on the weld for FTR-258, FW Disch Header Temperature tap.. The work is complete and the plant is returning to 100% power.
Procedure 1-OHP-4021-001-006, Power Escalation is complete up to step 4.28. Raise Power at 10%/hour to ~29%.
Event                      Event                                 Event Malf. No.
No.                     Type*                               Description 1                         N     Control Feed Flow In Manual 2                         R     Raise Power U1_MPC253 3                       I(ATC)   Turbine impulse pressure instrument (MPC-253) fails HIGH to 740 U1_MPP222 4                     C(BOP)   MPP 222 SG #2 PORV Pressure Channel 1500 U1_FPC_250 5     A to 1 over 2   I(BOP)   Main Feedwater discharge pressure (FPC-250A) fails Low min U1_RC10D Small break LOCA in containment (150 gpm with a 5 min 6      10% over 5      Major Min                  ramp)
U1_RP10A 7                       I(ATC)   Auto SI fails U1_RP10B U1_TC02 8                     C(BOP)   Main turbine fails to trip U1_TC03 U1_RD0435 9                     C(ATC)   Two rods fail to Drop (H4 & H6)
U1_RD0441 U1_ECP 10       Stator Short C(ATC)   East CCP trips on overcurrent 3 minutes after the RXtrip
  *       (N)ormal,     (R)eactivity, (I)nstrument,   (C)omponent,     (M)ajor Page 1 of 1
 
Appendix D                               Scenario Outline                         Form ES-D-1 Facility: __D C Cook______ Scenario No.: ___5_____                   Op-Test No.: 2014301 Examiners: ____________________________ Operators:           _____________________________
Initial Conditions: 79% power, Power reduction in progress.
Turnover: Unit is stable at 79% power and continuing a power reduction to take the unit off line. Currently performing Step 4.11.1 of 02-OHP 4021.001.003, Power Reduction. Remove the North Condensate Booster pump from service - was run for engineering data collection.
Event                    Event                              Event Malf. No.
No.                     Type*                           Description 1                         N     Remove North Condensate Booster from service U1_QLC451       I(ATC) 2                                VCT level instrument (QLC-451) fails low To 0%        TS 3                         R     Power reduction U1_MFC140       I(BOP) 4                                Steam flow channel (MFC-140) fails low (Controlling) to 0        TS Pressurizer PORV (NRC-153) leaking (requires isolation) -
U1_RCR20                5% open NOTE: Time compression may be used as the 5                      C(ATC) to 5                procedure requires a 15 minute wait time after unisolating each PORV.
U1_RC23D Reactor Trip with S/G #4 tube rupture (600 gpm (60%)
6      to 30 over 10    Major ramp to 30% over 10 minutes - raise to 60% on trip) min U1_MS06D 7                     C(BOP)     Steam generator safety valve (SV3-4) opens - 80%
to 80%
*       (N)ormal,    (R)eactivity, (I)nstrument,   (C)omponent,    (M)ajor Page 1 of 1}}

Latest revision as of 17:17, 5 February 2020

2014 DC Cook Initial License Examination Proposed Scenario D-1 Sheets
ML14274A256
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/01/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Indiana Michigan Power Co
Shared Package
ML14218A305 List:
References
Download: ML14274A256 (4)


Text

Appendix D Required Operator Actions Form ES-D-2 Facility: __D C Cook______ Scenario No.: ____1____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________

Initial Conditions: 100% power Turnover: A 200 MW power decrease has been requested by the System Dispatcher. Both units are at 100% power.

Even Malf. No. Event Event t No. Type* Description C(ATC) 1 U1_RCR16 Pressurizer Safety Valve Leak (SV45B 2gpm)

TS 2 R Power Reduction 3 N Turbine Power Reduction U1_ECP C(ATC) 4 East CCP fails on overcurrent Stator Short TS 5 U1_RX33B I(BOP) Feedwater flow controller fails U1_QTC302 6 175 over 5 I(ATC) Charging Letdown Header Temperature QTC-302 fails high Minutes U1_RC01A 7 M(ALL) Large break LOCA 60%

U1_ED05E 8 M(ALL) Vital bus T11A Fails (On RX Trip)

(Trg 1)

U1_RP10A 9 U1_RP11A C(ATC) Auto/Manual SI Train A does not occur U1_RP11C

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ____3____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________

Initial Conditions: ___ EDG CD has been run following mechanical maintenance. The run is complete and the EDG is ready to be shutdown and placed in standby.

Turnover: 1-OHP-4021-032-001CD Attachment 2 is complete to step 4.4.2 and the diesel generator is ready to be shut down. Perform Step 4.4.3 through preparation for Restoring for OPERABILITY. U1 is at 92% power following turbine valve testing.

Event Event Event Malf. No.

No. Type* Description 1 N Secure the CD D/G U1_NI10B I(ATC) 2 200 over 1 Power range detector (NI-42) fails high min TS 3 R Power increase to restore power U1_FW40A 4 C(BOP) Condenser Level Control failure (100%)

100 U1_BLP131 I(ATC) 5 Steam generator #3 BLP131 controlling level channel fails low 0 over 30sec TS U1_MS02C 6 Major Steam line #3 break inside containment 50%

U1_RP01A Reactor trip failure (ATWS), Rods Drop when MG sets de-7 C(ATC)

U1_RP01B energized U1_RP09A 8 C(BOP) Feedwater isolation does not occur in automatic U1_RP09B 9 U1_FW48C C(BOP) TDAFW pump does not start in auto

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 1

Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ___4_____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________

Initial Conditions: 12% power, main generator has just been paralleled.

Turnover: The unit is at 12% power with the generator has just been paralleled to the grid.

The unit was down powered to fix leak on the weld for FTR-258, FW Disch Header Temperature tap.. The work is complete and the plant is returning to 100% power.

Procedure 1-OHP-4021-001-006, Power Escalation is complete up to step 4.28. Raise Power at 10%/hour to ~29%.

Event Event Event Malf. No.

No. Type* Description 1 N Control Feed Flow In Manual 2 R Raise Power U1_MPC253 3 I(ATC) Turbine impulse pressure instrument (MPC-253) fails HIGH to 740 U1_MPP222 4 C(BOP) MPP 222 SG #2 PORV Pressure Channel 1500 U1_FPC_250 5 A to 1 over 2 I(BOP) Main Feedwater discharge pressure (FPC-250A) fails Low min U1_RC10D Small break LOCA in containment (150 gpm with a 5 min 6 10% over 5 Major Min ramp)

U1_RP10A 7 I(ATC) Auto SI fails U1_RP10B U1_TC02 8 C(BOP) Main turbine fails to trip U1_TC03 U1_RD0435 9 C(ATC) Two rods fail to Drop (H4 & H6)

U1_RD0441 U1_ECP 10 Stator Short C(ATC) East CCP trips on overcurrent 3 minutes after the RXtrip

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 1

Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ___5_____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________

Initial Conditions: 79% power, Power reduction in progress.

Turnover: Unit is stable at 79% power and continuing a power reduction to take the unit off line. Currently performing Step 4.11.1 of 02-OHP 4021.001.003, Power Reduction. Remove the North Condensate Booster pump from service - was run for engineering data collection.

Event Event Event Malf. No.

No. Type* Description 1 N Remove North Condensate Booster from service U1_QLC451 I(ATC) 2 VCT level instrument (QLC-451) fails low To 0% TS 3 R Power reduction U1_MFC140 I(BOP) 4 Steam flow channel (MFC-140) fails low (Controlling) to 0 TS Pressurizer PORV (NRC-153) leaking (requires isolation) -

U1_RCR20 5% open NOTE: Time compression may be used as the 5 C(ATC) to 5 procedure requires a 15 minute wait time after unisolating each PORV.

U1_RC23D Reactor Trip with S/G #4 tube rupture (600 gpm (60%)

6 to 30 over 10 Major ramp to 30% over 10 minutes - raise to 60% on trip) min U1_MS06D 7 C(BOP) Steam generator safety valve (SV3-4) opens - 80%

to 80%

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 1