ML15309A221: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
{{#Wiki_filter:Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                       NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                           Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by   Exhibit Name                                        Proffered Exhibit                                                                        Date             Admitted NRCR10001 ALL                        NRC Staff Pre-filed Hearing Exhibit List (REVISED)     11/05/2015 NRCR20101 NYS-26B/ RK-TC1B          NRC Staffs Revised Statement of Position Regarding     08/10/2015 NYS 26B/RK-TC-1B NRC000102 NYS-26B/ RK-TC1B          NRC Staffs Testimony of Allen Hiser, On Yee and       03/31/2012 Yes.
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRCR10001ALLNRC Staff Pre-filed Hearing Exhibit List (REVISED)11/05/2015NRCR20101NYS-26B/ RK-TC1BNRC Staff's Revised Statement of Position Regarding NYS 26B/RK-TC-1B 08/10/2015NRC000102NYS-26B/ RK-TC1BNRC Staff's Testimony of Allen Hiser, On Yee and Ching Ng Regarding NYS 26B/RK-TC-1B03/31/2012Yes.
Ching Ng Regarding NYS 26B/RK-TC-1B                                Superseded by NRC000168 NRC000103 NYS-26B/ RK-TC1B          Allen Hiser Statement of Professional Qualifications    03/30/2012 Yes NRCR00104 NYS-26 NYS-38              On Yee Statement of Professional Qualifications        08/10/2015 (REVISED)
Superseded by
NRCR00105 NYS-26 NYS-38              Ching Ng Statement of Professional Qualifications      08/10/2015 (REVISED)
NRC000106 NYS-26B/ RK-TC1B          NRC Inspection Manual, Inspection Procedure 71002,      03/30/2012 Yes License Renewal Inspection NRC000107 NYS-26B/ RK-TC1B          NRC Inspection Report 05000247/2008006 and              03/30/2012 Yes 05000286/2008006 NRC000108 NYS-26B/ RK-TC1B          Audit Report for Plant Aging Management Programs        03/31/2012 Yes and Reviews, Indian Point Nuclear Generating Unit Nos. 2 and 3 NRC000109 NYS-26B/ RK-TC1B          Letter NL-08-057, Letter from Entergy Nuclear          03/31/2012 Yes Operations, Inc., to NRC, Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Amendment 3 NRC000110 NYS-26B/ RK-TC1B          Letter NL-11-032, Letter from Entergy Nuclear          03/31/2012 Yes Operations, Inc. to NRC, Indian Point, Units 2 & 3, Response to Request for Additional Information on Aging Management Programs Page 1 of 14


NRC000168NRC000103NYS-26B/ RK-TC1BAllen Hiser Statement of Professional Qualifications03/30/2012Yes NRCR00104NYS-26 NYS-38On Yee Statement of Professional Qualifications (REVISED)08/10/2015NRCR00105NYS-26 NYS-38Ching Ng Statement of Professional Qualifications (REVISED)08/10/2015NRC000106NYS-26B/ RK-TC1BNRC Inspection Manual, Inspection Procedure 71002, License Renewal Inspection03/30/2012YesNRC000107NYS-26B/ RK-TC1BNRC Inspection Report 05000247/2008006 and 05000286/200800603/30/2012YesNRC000108NYS-26B/ RK-TC1BAudit Report for Plant Aging Management Programs and Reviews, Indian Point Nuclear Generating Unit
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                      NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit #    Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRC000111    NYS-26B/ RK-TC1B          Letter NL-07-153, Letter from Entergy Nuclear          03/31/2012 Yes Operations, Inc., to NRC, Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Amendment 1 NRC000112    NYS-26B/ RK-TC1B          NRC Regulatory Issue Summary -2011-14, Metal            03/31/2012 Yes Fatigue Analysis Performed By Computer Software NRC000113    NYS-26B/ RK-TC1B          ASME Code Section XI, Appendix L, Operating Plant      03/31/2012 Yes Fatigue Assessment NRC000114A-F NYS-26B/ RK-TC1B          MRP-227-A, Materials Reliability Program:              04/02/2012 Yes Pressurized Water Reactor Internals Inspection and Evaluation Guidelines NRC000115    NYS-26B/ RK-TC1B          EPRI, TR-105714, Rev. 5, Pressurized Water Reactor      03/31/2012 Yes Primary Water Chemistry Guidelines NRC000116    NYS-26B/ RK-TC1B          Requests for Additional Information in NRC Letter,      03/31/2012 Yes Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application Time-Limited Aging Analyses, Bolted Connections, and Boraflex, (April 18, 2008) (ADAMS Accession No. ML080870374)
NRC000117    NYS-26B/ RK-TC1B          Statement Of Consideration for 1995 License            03/31/2012 Yes Renewal Rule NRCR00118    NYS-26 NYS-38              Indian Point Unit 3 Technical Specifications            08/10/2015 (EXCERPT) (REVISED)
NRC000119    NYS-26B/ RK-TC1B          Salem Nuclear Generating Stations use of              03/31/2012 Yes WESTEMSTM fatigue software Page 2 of 14


Nos. 2 and 303/31/2012YesNRC000109NYS-26B/ RK-TC1BLetter NL-08-057, Letter from Entergy Nuclear Operations, Inc., to NRC, Indian Point Nuclear  
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                        NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                          Proffered Exhibit                                                                          Date            Admitted NRC000123 NYS-26B/ RK-TC-1B, RK-TC- Audit and Review Plan for Plant Aging Management          03/31/2012 Yes 2                          Reviews and Programs - Indian Point Generating Units Nos. 2 and 3)
NRC000124 NYS-26B/ RK-TC-1B, RK-TC- Scoping and Screening Methodology Audit Trip              03/31/2012 Yes 2                          Report For Indian Point, Units 2 and 3 NRCR00147 NYS-26 NYS-38              NRC Staffs Revised Statement of Position on State of    08/10/2015 New York and Riverkeepers Joint Contention NYS-38/RK-TC5 (REVISED)
NRC000148 NYS-38/ RK-TC5            NRC Staffs Testimony of Allen L. Hiser, On Yee, and    08/20/2012 Yes.
Ching Ng Concerning Portions of Contention NYS-38                  Superseded by NRC000168 NRC000149 NYS-38/ RK-TC5            ASME Section XI, Appendix A (Excerpt)                    08/20/2012 Yes NRC000150 NYS-38/ RK-TC5            ASME Section XI, Appendix C (Excerpt)                    08/20/2012 Yes NRC000151 NYS-38/ RK-TC5            Temporary Instruction 2516/001, dated March 30,         08/20/2012 Yes 2011 NRC000152 NYS-38/ RK-TC5            Indian Point Nuclear Generating Unit 2 - NRC            08/20/2012 Yes Inspection Report 05000247/2012008, dated April 19, 2012 NRC000153 NYS-38/ RK-TC5            NL-12-089, Entergy Letter Replying to Request for        08/20/2012 Yes Additional Information Regarding the License Renewal Application (dated June 14, 2012)
NRC000154 NYS-38/ RK-TC5            April 11, 2011 Summary of the March 11, 2011            08/20/2012 Yes Meeting between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute to Discuss Current License Renewal Topics Page 3 of 14


Generating Units 2 and 3, License Renewal App lication Amendment 303/31/2012YesNRC000110NYS-26B/ RK-TC1BLetter NL-11-032, Letter from Entergy Nuclear Operations, Inc. to NRC, Indian Point, Units 2 & 3, Response to Request for Additional Information on Ag in g Mana g ement Pro g rams03/31/2012Yes Page 1 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                       NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                             Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by   Exhibit Name                                          Proffered Exhibit                                                                          Date             Admitted NRC000155 NYS-38/ RK-TC5            March 30, 2011 Audit Report on the Use of                08/20/2012 Yes WESTEMS Software in the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application NRC000156 NYS-38/ RK-TC5            NL-11-101, Entergy Letter Regarding Clarification for    08/20/2012 Yes Request for Additional Information - Aging Management Programs (dated August 22, 2011)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000111NYS-26B/ RK-TC1BLetter NL-07-153, Letter from Entergy Nuclear Operations, Inc., to NRC, Indian Point Nuclear
NRC000157 NYS-38/ RK-TC5            Kenneth J. Karwoski - Statement of Professional          08/20/2012 Yes Qualifications NRC000158 NYS-38/ RK-TC5            August 12, 2010 NEI Steam Generator Task Force          08/20/2012 Yes NRC/ Industry Update (CONTAINS COPYRIGHTED MATERIAL)
NRC000159 NYS-38/ RK-TC5            Electric Power Research Institute - Implementation      08/20/2012 Yes Status of Industry Change Management Plan for Materials Related R & D Committees under NEI 03-08 (CONTAINS COPYRIGHTED MATERIAL)
NRC000160 NYS-38/ RK-TC5            August 4, 2011 NEI Steam Generator Task Force            08/20/2012 Yes NRC/ Industry Update (CONTAINS COPYRIGHTED MATERIAL)
NRCR00161 NYS-38/ RK-TC5            NRC Staff Testimony of Dr. Allen L. Hiser and Mr.        08/10/2015 Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (REVISED)
NRC000168 NYS-26 NYS-38              NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng,    08/10/2015 Mr. Gary Stevens, P.E., and Mr. On Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS- 38/RK-TC-5 Page 4 of 14


Generating Units 2 and 3, License Renewal App lication Amendment 103/31/2012YesNRC000112NYS-26B/ RK-TC1BNRC Regulatory Issue Summary -2011-14, Metal Fatigue Analysis Performed By Computer Software03/31/2012YesNRC000113NYS-26B/ RK-TC1BASME Code Section XI, Appendix L, Operating Plant Fatigue Assessment03/31/2012YesNRC000114A-FNYS-26B/ RK-TC1BMRP-227-A, Materials Reliability Program:
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                        NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                              Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                          Proffered Exhibit                                                                          Date            Admitted NRC000169 NYS-26 NYS-38              Indian Point Unit 2 Technical Specifications              08/10/2015 (EXCERPT)
Pressurized Water Reactor Internals Inspection and
NRC000170 NYS-26 NYS-38              EPRI 1008224, Final Report, Rev. 6, Pressurized          08/10/2015 Water Reactor Secondary Water Chemistry Guidelines (Dec. 2004) (PROPRIETARY)
NRC000171 NYS-26 NYS-38              EPRI 1015014, Materials Reliability Program:              08/10/2015 Evaluation of Controlling Transient Ramp Times Using Piping Methodologies When Considering Environmental Fatigue (Fen) Effects (MRP-218) (Sept.
2007) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)
NRC000172 NYS-26 NYS-38              EPRI 1003536, Materials Reliability Program: Second      08/10/2015 International Conference on Fatigue of Reactor Components (MRP-84) (Feb. 2003) (EXCERPT)
(CONTAINS COPYRIGHTED MATERIAL)
NRC000173 NYS-26 NYS-38              Excerpt from Transcript of Advisory Committee on          08/10/2015 Reactor Safeguards Metallurgy and Reactor Fuels Subcommittee at 105-106 (Dec. 2, 2014)
NRC000174 NYS-26 NYS-38              Background of the Factors of Safety Used in Divisions    08/10/2015 I of Sections III and XI of the ASME Rules for Nuclear Vessels (Oct. 1984) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)
NRC000175 NYS-26 NYS-38              Implementation of Automated, On-line Fatigue              08/10/2015 Monitoring in a Boiling Water Reactor (1993)
(CONTAINS COPYRIGHTED MATERIAL)
Page 5 of 14


Evaluation Guidelines04/02/2012YesNRC000115NYS-26B/ RK-TC1BEPRI, TR-105714, Rev. 5, Pressurized Water Reactor Primary Water Chemistry Guidelines03/31/2012YesNRC000116NYS-26B/ RK-TC1BRequests for Additional Information in NRC Letter, Request for Additional Information for the Review of  
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                      NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRC000176 NYS-26 NYS-38              EPRI 1003069, Materials Reliability Program Hot Cell    08/10/2015 Testing of Baffle/Former Bolts Removed From Two Lead PWR Plants (MRP-51) (PROPRIETARY)
NRC000177 NYS-26 NYS-38              ICONE5-2372, Fatigue and Stress Corrosion              08/10/2015 Cracking Behaviors of Irradiated Stainless Steels in PWR Primary Water (Nov. 2001) (CONTAINS COPYRIGHTED MATERIAL)
NRC000178 NYS-26 NYS-38              ASME Code, Section III - Subsection NCA, General        08/10/2015 Requirements for Division 1 and Division 2 Rules for Construction of Nuclear Facility Components (Jul. 1, 2007) (CONTAINS COPYRIGHTED MATERIAL)
NRC000179 NYS-26 NYS-38              Regulatory Guide 1.207, Guidelines for Evaluating      08/10/2015 Fatigue Analyses Incorporating the Life Reduction of Metal Components Due to the Effects of the Light-Water Reactor Environment for New Reactors (Mar.
2007)
NRC000180 NYS-26 NYS-38              NRC Inspection Manual, Chapter 2516, Policy and        08/10/2015 Guidance for the License Renewal Inspection Program (Aug. 13, 2013)
NRC000181 NYS-26 NYS-38              Letter from James Trapp, NRC, to John Ventosa,          08/10/2015 Entergy, Indian Point Nuclear Generating Unit 2 -
NRC License Renewal Team Inspection Report 05000247/2013009 (July 5, 2013)
Page 6 of 14


the Indian Point Nuclear Generating Unit Numbers 2  
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                      NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRC000182 NYS-26 NYS-38              Letter from James Trapp, NRC, to John Ventosa,          08/10/2015 Entergy, Indian Point Nuclear Generating Unit 2 -
NRC License Renewal Team Inspection Report 05000247/2013010 (Sept. 19, 2013)
NRC000183 NYS-26 NYS-38              NRC Inspection Manual, Inspection Procedure 71013,      08/10/2015 Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013)
NRC000184 NYS-25 NYS-26 NYS-38      Letter NL-13-114, Letter from Fred Dacimo, Entergy,    08/10/2015 to NRC, Implementation of License Renewal Regulatory Commitments Indian Point Nuclear Generating Unit No. 2 Docket No. 50-257 License No.
DPR-26 (Aug. 28, 2013)
NRC000185 NYS-26 NYS-38              Letter from Arthur Burritt, NRC, to Larry Coyle,        08/10/2015 Entergy, Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)
NRC000186 NYS-26 NYS-38              Effect of LWR Coolant Environments on the Fatigue      08/10/2015 of Reactor Materials, 79 Fed. Reg. 21811 (Apr. 17, 2014)
NRC000187 NYS-26, 38                Letter from John Daily, NRC, to Entergy, Request for    08/10/2015 Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos.
MD5407 and MD5408) ( Feb. 6, 2013)
Page 7 of 14


and 3, License Renewal Application Time-Limited
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                      NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRCR00188 NYS-26 NYS-38              Letter NL-15-060, Letter from Fred Dacimo, Entergy,    08/19/2015 to NRC, Entergy Actions Required Prior to Entry into Period of Extended Operation Associated with License Renewal Application (LRA) for Indian Point Nuclear Generating Unit No. 3 Docket No. 50-286 License No. DPR-64 (May 12, 2015) (Revised)
NRC000189 NYS-38                    TSTF-510, Rev. 2, Revision to Steam Generator          08/10/2015 Program Inspection Frequencies and Tube Sample Selection (Mar. 1, 2011)
NRC000190 NYS-38                    NRC White Paper on Risk-Informed and Performance-      08/10/2015 Based Regulation NRC000191 NYS-38                    Biweekly Notice; Applications and Amendments to        08/10/2015 Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 79 Fed. Reg. 15144 (Mar. 18, 2014)
NRC000192 NYS-38                    Letter NL-15-001, Letter from Lawrence Coyle, to        08/10/2015 NRC, Response to Request for Additional Information (RAI) for the Steam Generator Examination Program Results 2014 Refueling Outage (2R21) Indian Point Unit No. 2 Docket No. 50- 247 License No. DPR-26 (Jan. 15, 2015)
Page 8 of 14


Aging Analyses, Bolted Connections, and Boraflex, (April 18, 2008) (ADAMS Accession No.  
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                        NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                          Proffered Exhibit                                                                          Date            Admitted NRC000193 NYS-38                    Letter NL-13-143, Letter from Robert Walpole, to        08/10/2015 NRC, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Performed During the Spring 2013 Refueling Outage Indian Point Unit No. 3 Docket No. 50-286 License No. DPR-64 (Oct. 29, 2013)
NRC000194 NYS-38                    S. Miloudi et al, Destructive Examinations on Divider    08/10/2015 Plates from Decommissioned Steam Generators Affected by Superficial Stress Corrosion Cracks, in 15th International Conference on Environmental Degradation of Materials in Nuclear Power Systems-Water Reactors (2012) (CONTAINS COPYRIGHTED MATERIAL)
NRC000195 NYS-26 NYS-38              ASME Code, Section XI, Rules for Inservice              08/10/2015 Inspection of Nuclear Power Plant Components, 2007 through 2008 Addenda, IWB-2500, Table IWB-2500-1, IWB,3700, IWC-2500, Table IWC-2500-1(Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL)
NRC000196 NYS-25 NYS-38              NRC Staffs Initial Statement of Position on            08/10/2015 Contention NYS-25 (Reactor Vessel Internals)
(PROPRIETARY)
NRC000197 NYS-25 NYS-38              NRC Staff Testimony of Dr. Allen Hiser, Jeffrey          08/10/2015 Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 (PROPRIETARY)
Page 9 of 14


ML080870374)03/31/2012YesNRC000117NYS-26B/ RK-TC1BStatement Of Consideration for 1995 License Renewal Rule03/31/2012YesNRCR00118NYS-26 NYS-38Indian Point Unit 3 Technical Specifications (EXCERPT) (REVISED) 08/10/2015NRC000119NYS-26B/ RK-TC1BSalem Nuclear Generating Station's use of WESTEMS TM fatigue software03/31/2012Yes Page 2 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                     NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                           Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by   Exhibit Name                                        Proffered Exhibit                                                                        Date             Admitted NRC000198 NYS-25 NYS-38              Enclosure to MRP Letter 2013-025, MRP-227-A            08/10/2015 Applicability Guidelines for Combustion Engineering and Westinghouse Pressurized Water Reactor Designs (Oct. 4, 2013)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000123NYS-26B/ RK-TC-1B, RK-TC-2 Audit and Review Plan for Plant Aging Management Reviews and Programs - Indian Point Generating
NRC000199 NYS-25 NYS-38              ASME Code, Section XI, 2007 through 2008              08/10/2015 Addenda, IWA-2213 (Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL)
NRC000200 NYS-25 NYS-38              WCAP-17096-NP, Rev. 2, Reactor Internals              08/10/2015 Acceptance Criteria Methodology and Data Requirements (Dec. 2009)
NRC000201 NYS-25 NYS-38              NRC Position on Aging Management of CASS              08/10/2015 Reactor Vessel Internal Components (June 11, 2014)
NRC000202 NYS-25 NYS-38              ASM Handbook, Vol. 19, Fatigue and Fracture, Figure    08/10/2015 14 at 595 (1996) (EXCERPT ) (CONTAINS COPYRIGHTED MATERIAL)
NRC000203 NYS-25 NYS-38              EPRI 1021001NP/BWRVIP-100NP, Final Report,            08/10/2015 Rev. 1, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Oct. 2010)
(CONTAINS COPYRIGHTED MATERIAL)
NRC000204 NYS-25 NYS-38              PWROG-14048-P, Rev. 0, Functionality Analysis:        08/10/2015 Lower Support Columns (Dec. 2014)
(PROPRIETARY)
NRC000205 NYS-25 NYS-38              Indian Point, Unit 2, Updated Final Safety Analysis    08/10/2015 Report (UFSAR), Rev. 25, Chapter 3 - Reactor (2014)
Page 10 of 14


Units Nos. 2 and 3
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                       NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit #    Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRC000206    NYS-25 NYS-38              Indian Point, Unit 2, Updated Final Safety Analysis    08/10/2015 Report (UFSAR), Rev. 25, Chapter 14 - Safety Analysis (2014)
)03/31/2012YesNRC000124NYS-26B/ RK-TC-1B, RK-TC-2 Scoping and Screening Methodology Audit Trip Re p ort For Indian Point, Units 2 and 303/31/2012YesNRCR00147NYS-26 NYS-38NRC Staff's Revised Statement of Position on State of New York and Riverkeeper's Joint Contention NYS-
NRC000207    NYS-25 NYS-38              Regulatory Information Conference Presentation          08/10/2015 Slides, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015)
NRC00208A - E NYS-25 NYS-38              MRP Letter 2014-09, Biennial Report of Recent MRP-      08/10/2015 227-A Reactor Internals Inspection Results (May 12, 2014)
NRC000209    NYS-25 NYS-38              EPRI 1013396/BWRVIP-100-A, Final Report, BWR            08/10/2015 Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Aug. 2006) (PROPRIETARY)
NRC000210    NYS-25 NYS-38              EPRI 1013396NP/ BWRVIP-100NP-A, Final Report,          08/10/2015 BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Aug. 2006)
(CONTAINS COPYRIGHTED MATERIAL)
NRC000211    NYS-25 NYS-38              MRP-227, Rev. 1 Presentation Slides, Westinghouse      08/10/2015 Figures Presented at Public Meeting on March 31, 2015 (Feb. 2015)
NRC000212    NYS-25 NYS-38              R. Reed-Hill and R. Abbaschian, Physical Metallurgy    08/10/2015 Principles , Third Edition (1992) (EXCERPT)
(CONTAINS COPYRIGHTED MATERIAL)
Page 11 of 14


38/RK-TC5 (REVISED) 08/10/2015NRC000148NYS-38/ RK-TC5NRC Staff's Testimony of Allen L. Hiser, On Yee, and Ching Ng Concerning Portions of Contention NYS-3808/20/2012Yes.
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                      NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRC000213 NYS-25 NYS-38             Letter from Christopher Grimes, Chief, NRC, to          08/10/2015 Douglas Walters, NEI, License Renewal Issue No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components (May 19, 2000)
Superseded by
NRC000214 NYS-25 NYS-38              Letter from John Lubinski, NRC, to Jean Smith, EPRI,    08/10/2015 License Renewal Interim Staff Guidance LR-ISG-2011-04: Updated Aging Management Criteria for Reactor Vessel Internal Components for Pressurized Water Reactors (May 28, 2013)
NRC000215 NYS-25 NYS-38             Evaluation of WCAP-17780-P, "Reactor Internals          08/10/2015 Aging Management MRP- 227-A Applicability for Combustion Engineering [(CE)] and Westinghouse
[Electric Company (Westinghouse)] Pressurized Water Reactor Designs," and MRP-227-A, Applicability Guidelines for CE and Westinghouse Pressurized Water Reactor Designs (Nov. 7, 2014)
(PROPRIETARY)
NRC000216 NYS-25 NYS-38              U.S. Nuclear Regulatory Commission Office of            08/10/2015 Nuclear Reactor Regulation Division of License Renewal Aging Management Audit Report (Oct. 6, 2014)
Page 12 of 14


NRC000168NRC000149NYS-38/ RK-TC5ASME Section XI, Appendix A (Excerpt)08/20/2012Yes NRC000150NYS-38/ RK-TC5ASME Section XI, Appendix C (Excerpt)08/20/2012Yes NRC000151NYS-38/ RK-TC5Temporary Instruction 2516/001, dated March 30, 201108/20/2012YesNRC000152NYS-38/ RK-TC5Indian Point Nuclear Generating Unit 2 - NRC Inspection Report 05000247/2012008, dated April 19, 201208/20/2012YesNRC000153NYS-38/ RK-TC5NL-12-089, Entergy Letter Replying to Request for Additional Information Regarding the License
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                      NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                          Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit #  Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRC000218  NYS-25 NYS-38             EPRI 1016106, Final Report, Materials Reliability      08/10/2015 Program: Fracture Toughness Evaluation of Highly Irradiated PWR Stainless Steel Internal Components (MRP-210) (Dec. 2007) (COPYRIGHT)
NRC000219  NYS-25 NYS-38              Westinghouse InfoGram IG-10-1, Reactor Internals      08/10/2015 Lower Radial Support Clevis Insert Cap Screw Degradation (Mar. 31, 2010)
NRC000220  NYS-25 NYS-38              Pressurized Water Reactor Owners Group (PWROG)         08/10/2015 Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange:
Clevis Insert Bolt Update, (June 2014)
NRC00221A-F NYS-25 NYS-38             Babcock & Wilcox Report, S-1473-002, Final Report,    08/10/2015 Rev. 0, Examination of Clevis Bolts Removed from D.
C. Cook Nuclear Plant (Dec. 2013)
NRC000222  NYS-25 NYS-38              IP3 FSAR Rev. 04 Chapter 3 (2011) (EXCERPT)            08/10/2015 NRC000223  NYS-25 NYS-38             IP3 FSAR Rev. 04 Chapter 14 (2011)                    08/10/2015 NRC000224  NYS-25 NYS-38              IP3 FSAR Rev. 04 Chapter 16                            08/10/2015 NRC00225A-B NYS-25 NYS-38              EPRI 1016593, Final Report, Materials Reliability      08/10/2015 Program: Aging Management Strategies for Westinghouse and Combustion Engineering PWR Internals (MRP-232) (Dec. 31, 2008)
(PROPRIETARY)
NRC000226  NYS-25 NYS-38              Jeffrey C. Poehler Statement of Professional          08/10/2015 NRC000227  NYS-25 NYS-26 NYS-38       Gary Stevens Statement of Professional                08/10/2015 NRC000228  NYS-25 NYS-38              Indian Point Unit 2 Technical Specifications 3.1.4    08/10/2015 NRC000229  NYS-25 NYS-38             Indian Point Unit 3 Technical Specifications 3.1.4    08/10/2015 Page 13 of 14


Renewal Application (dated June 14, 2012)08/20/2012YesNRC000154NYS-38/ RK-TC5April 11, 2011 Summary of the March 11, 2011 Meeting between the U.S. Nuclear Regulatory
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                    NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                          Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                      Proffered Exhibit                                                                        Date            Admitted NRC000230 NYS-25, NYS-26, NYS-38      Table of Corrections to Staff Testimony              11/03/2015 Page 14 of 14


Commission Staff and the Nuclear Energy Institute to  
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                      NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRCR10001 ALL                        NRC Staff Pre-filed Hearing Exhibit List (REVISED)      11/05/2015 NRCR20101 NYS-26B/ RK-TC1B          NRC Staffs Revised Statement of Position Regarding    08/10/2015 NYS 26B/RK-TC-1B NRC000102 NYS-26B/ RK-TC1B          NRC Staffs Testimony of Allen Hiser, On Yee and       03/31/2012 Yes.
Ching Ng Regarding NYS 26B/RK-TC-1B                                Superseded by NRC000168 NRC000103 NYS-26B/ RK-TC1B          Allen Hiser Statement of Professional Qualifications    03/30/2012 Yes NRCR00104 NYS-26 NYS-38              On Yee Statement of Professional Qualifications        08/10/2015 (REVISED)
NRCR00105 NYS-26 NYS-38              Ching Ng Statement of Professional Qualifications      08/10/2015 (REVISED)
NRC000106 NYS-26B/ RK-TC1B          NRC Inspection Manual, Inspection Procedure 71002,      03/30/2012 Yes License Renewal Inspection NRC000107 NYS-26B/ RK-TC1B          NRC Inspection Report 05000247/2008006 and              03/30/2012 Yes 05000286/2008006 NRC000108 NYS-26B/ RK-TC1B          Audit Report for Plant Aging Management Programs        03/31/2012 Yes and Reviews, Indian Point Nuclear Generating Unit Nos. 2 and 3 NRC000109 NYS-26B/ RK-TC1B          Letter NL-08-057, Letter from Entergy Nuclear          03/31/2012 Yes Operations, Inc., to NRC, Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Amendment 3 NRC000110 NYS-26B/ RK-TC1B          Letter NL-11-032, Letter from Entergy Nuclear          03/31/2012 Yes Operations, Inc. to NRC, Indian Point, Units 2 & 3, Response to Request for Additional Information on Aging Management Programs Page 1 of 14


Discuss Current License Renewal Topics08/20/2012Yes Page 3 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                       NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                           Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit #   Contention Addressed by   Exhibit Name                                        Proffered Exhibit                                                                        Date             Admitted NRC000111    NYS-26B/ RK-TC1B          Letter NL-07-153, Letter from Entergy Nuclear          03/31/2012 Yes Operations, Inc., to NRC, Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Amendment 1 NRC000112    NYS-26B/ RK-TC1B          NRC Regulatory Issue Summary -2011-14, Metal            03/31/2012 Yes Fatigue Analysis Performed By Computer Software NRC000113    NYS-26B/ RK-TC1B          ASME Code Section XI, Appendix L, Operating Plant      03/31/2012 Yes Fatigue Assessment NRC000114A-F NYS-26B/ RK-TC1B          MRP-227-A, Materials Reliability Program:              04/02/2012 Yes Pressurized Water Reactor Internals Inspection and Evaluation Guidelines NRC000115    NYS-26B/ RK-TC1B          EPRI, TR-105714, Rev. 5, Pressurized Water Reactor      03/31/2012 Yes Primary Water Chemistry Guidelines NRC000116    NYS-26B/ RK-TC1B          Requests for Additional Information in NRC Letter,      03/31/2012 Yes Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application Time-Limited Aging Analyses, Bolted Connections, and Boraflex, (April 18, 2008) (ADAMS Accession No. ML080870374)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000155NYS-38/ RK-TC5March 30, 2011 Audit Report on the Use of WESTEMS Software in the Salem Nuclear Generating  
NRC000117    NYS-26B/ RK-TC1B          Statement Of Consideration for 1995 License            03/31/2012 Yes Renewal Rule NRCR00118    NYS-26 NYS-38              Indian Point Unit 3 Technical Specifications            08/10/2015 (EXCERPT) (REVISED)
NRC000119    NYS-26B/ RK-TC1B          Salem Nuclear Generating Stations use of              03/31/2012 Yes WESTEMSTM fatigue software Page 2 of 14


Station, Units 1 and 2, License Renewal Application08/20/2012YesNRC000156NYS-38/ RK-TC5NL-11-101, Entergy Letter Regarding Clarification for Request for Additional Information - Aging
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                        NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                          Proffered Exhibit                                                                          Date            Admitted NRC000123 NYS-26B/ RK-TC-1B, RK-TC- Audit and Review Plan for Plant Aging Management          03/31/2012 Yes 2                          Reviews and Programs - Indian Point Generating Units Nos. 2 and 3)
NRC000124 NYS-26B/ RK-TC-1B, RK-TC- Scoping and Screening Methodology Audit Trip              03/31/2012 Yes 2                          Report For Indian Point, Units 2 and 3 NRCR00147 NYS-26 NYS-38              NRC Staffs Revised Statement of Position on State of    08/10/2015 New York and Riverkeepers Joint Contention NYS-38/RK-TC5 (REVISED)
NRC000148 NYS-38/ RK-TC5            NRC Staffs Testimony of Allen L. Hiser, On Yee, and    08/20/2012 Yes.
Ching Ng Concerning Portions of Contention NYS-38                  Superseded by NRC000168 NRC000149 NYS-38/ RK-TC5            ASME Section XI, Appendix A (Excerpt)                    08/20/2012 Yes NRC000150 NYS-38/ RK-TC5            ASME Section XI, Appendix C (Excerpt)                    08/20/2012 Yes NRC000151 NYS-38/ RK-TC5            Temporary Instruction 2516/001, dated March 30,          08/20/2012 Yes 2011 NRC000152 NYS-38/ RK-TC5            Indian Point Nuclear Generating Unit 2 - NRC            08/20/2012 Yes Inspection Report 05000247/2012008, dated April 19, 2012 NRC000153 NYS-38/ RK-TC5            NL-12-089, Entergy Letter Replying to Request for       08/20/2012 Yes Additional Information Regarding the License Renewal Application (dated June 14, 2012)
NRC000154 NYS-38/ RK-TC5            April 11, 2011 Summary of the March 11, 2011            08/20/2012 Yes Meeting between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute to Discuss Current License Renewal Topics Page 3 of 14


Management Programs (dated August 22, 2011)08/20/2012YesNRC000157NYS-38/ RK-TC5Kenneth J. Karwoski - Statement of Professional Qualifications08/20/2012YesNRC000158NYS-38/ RK-TC5August 12, 2010 NEI Steam Generator Task Force NRC/ Industry Update (CONTAINS COPYRIGHTED  
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                        NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                          Proffered Exhibit                                                                          Date            Admitted NRC000155 NYS-38/ RK-TC5            March 30, 2011 Audit Report on the Use of                08/20/2012 Yes WESTEMS Software in the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application NRC000156 NYS-38/ RK-TC5            NL-11-101, Entergy Letter Regarding Clarification for    08/20/2012 Yes Request for Additional Information - Aging Management Programs (dated August 22, 2011)
NRC000157 NYS-38/ RK-TC5            Kenneth J. Karwoski - Statement of Professional         08/20/2012 Yes Qualifications NRC000158 NYS-38/ RK-TC5            August 12, 2010 NEI Steam Generator Task Force           08/20/2012 Yes NRC/ Industry Update (CONTAINS COPYRIGHTED MATERIAL)
NRC000159 NYS-38/ RK-TC5            Electric Power Research Institute - Implementation      08/20/2012 Yes Status of Industry Change Management Plan for Materials Related R & D Committees under NEI 03-08 (CONTAINS COPYRIGHTED MATERIAL)
NRC000160 NYS-38/ RK-TC5            August 4, 2011 NEI Steam Generator Task Force            08/20/2012 Yes NRC/ Industry Update (CONTAINS COPYRIGHTED MATERIAL)
NRCR00161 NYS-38/ RK-TC5            NRC Staff Testimony of Dr. Allen L. Hiser and Mr.        08/10/2015 Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (REVISED)
NRC000168 NYS-26 NYS-38              NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng,    08/10/2015 Mr. Gary Stevens, P.E., and Mr. On Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS- 38/RK-TC-5 Page 4 of 14


MATERIAL)08/20/2012YesNRC000159NYS-38/ RK-TC5Electric Power Research Institute - Implementation Status of Industry Change Management Plan for
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                        NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                              Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                          Proffered Exhibit                                                                          Date            Admitted NRC000169 NYS-26 NYS-38              Indian Point Unit 2 Technical Specifications              08/10/2015 (EXCERPT)
NRC000170 NYS-26 NYS-38              EPRI 1008224, Final Report, Rev. 6, Pressurized          08/10/2015 Water Reactor Secondary Water Chemistry Guidelines (Dec. 2004) (PROPRIETARY)
NRC000171 NYS-26 NYS-38              EPRI 1015014, Materials Reliability Program:              08/10/2015 Evaluation of Controlling Transient Ramp Times Using Piping Methodologies When Considering Environmental Fatigue (Fen) Effects (MRP-218) (Sept.
2007) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)
NRC000172 NYS-26 NYS-38              EPRI 1003536, Materials Reliability Program: Second      08/10/2015 International Conference on Fatigue of Reactor Components (MRP-84) (Feb. 2003) (EXCERPT)
(CONTAINS COPYRIGHTED MATERIAL)
NRC000173 NYS-26 NYS-38             Excerpt from Transcript of Advisory Committee on          08/10/2015 Reactor Safeguards Metallurgy and Reactor Fuels Subcommittee at 105-106 (Dec. 2, 2014)
NRC000174 NYS-26 NYS-38              Background of the Factors of Safety Used in Divisions    08/10/2015 I of Sections III and XI of the ASME Rules for Nuclear Vessels (Oct. 1984) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)
NRC000175 NYS-26 NYS-38              Implementation of Automated, On-line Fatigue              08/10/2015 Monitoring in a Boiling Water Reactor (1993)
(CONTAINS COPYRIGHTED MATERIAL)
Page 5 of 14


Materials Related R & D Committees under NEI 03-08 (CONTAINS COPYRIGHTED MATERIAL)08/20/2012YesNRC000160NYS-38/ RK-TC5August 4, 2011 NEI Steam Generator Task Force NRC/ Industry Update (CONTAINS COPYRIGHTED
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                      NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRC000176 NYS-26 NYS-38              EPRI 1003069, Materials Reliability Program Hot Cell    08/10/2015 Testing of Baffle/Former Bolts Removed From Two Lead PWR Plants (MRP-51) (PROPRIETARY)
NRC000177 NYS-26 NYS-38              ICONE5-2372, Fatigue and Stress Corrosion              08/10/2015 Cracking Behaviors of Irradiated Stainless Steels in PWR Primary Water (Nov. 2001) (CONTAINS COPYRIGHTED MATERIAL)
NRC000178 NYS-26 NYS-38              ASME Code, Section III - Subsection NCA, General        08/10/2015 Requirements for Division 1 and Division 2 Rules for Construction of Nuclear Facility Components (Jul. 1, 2007) (CONTAINS COPYRIGHTED MATERIAL)
NRC000179 NYS-26 NYS-38              Regulatory Guide 1.207, Guidelines for Evaluating      08/10/2015 Fatigue Analyses Incorporating the Life Reduction of Metal Components Due to the Effects of the Light-Water Reactor Environment for New Reactors (Mar.
2007)
NRC000180 NYS-26 NYS-38             NRC Inspection Manual, Chapter 2516, Policy and        08/10/2015 Guidance for the License Renewal Inspection Program (Aug. 13, 2013)
NRC000181 NYS-26 NYS-38              Letter from James Trapp, NRC, to John Ventosa,          08/10/2015 Entergy, Indian Point Nuclear Generating Unit 2 -
NRC License Renewal Team Inspection Report 05000247/2013009 (July 5, 2013)
Page 6 of 14


MATERIAL)08/20/2012YesNRCR00161NYS-38/ RK-TC5NRC Staff Testimony of Dr. Allen L. Hiser and Mr.
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                       NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRC000182 NYS-26 NYS-38              Letter from James Trapp, NRC, to John Ventosa,          08/10/2015 Entergy, Indian Point Nuclear Generating Unit 2 -
Kenneth J. Karwoski Concerning Portions of State of  
NRC License Renewal Team Inspection Report 05000247/2013010 (Sept. 19, 2013)
NRC000183 NYS-26 NYS-38             NRC Inspection Manual, Inspection Procedure 71013,      08/10/2015 Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013)
NRC000184 NYS-25 NYS-26 NYS-38      Letter NL-13-114, Letter from Fred Dacimo, Entergy,    08/10/2015 to NRC, Implementation of License Renewal Regulatory Commitments Indian Point Nuclear Generating Unit No. 2 Docket No. 50-257 License No.
DPR-26 (Aug. 28, 2013)
NRC000185 NYS-26 NYS-38              Letter from Arthur Burritt, NRC, to Larry Coyle,        08/10/2015 Entergy, Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)
NRC000186 NYS-26 NYS-38              Effect of LWR Coolant Environments on the Fatigue      08/10/2015 of Reactor Materials, 79 Fed. Reg. 21811 (Apr. 17, 2014)
NRC000187 NYS-26, 38                Letter from John Daily, NRC, to Entergy, Request for    08/10/2015 Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos.
MD5407 and MD5408) ( Feb. 6, 2013)
Page 7 of 14


New York and Riverkeeper, Inc. Joint Contention NYS
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                      NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRCR00188 NYS-26 NYS-38             Letter NL-15-060, Letter from Fred Dacimo, Entergy,    08/19/2015 to NRC, Entergy Actions Required Prior to Entry into Period of Extended Operation Associated with License Renewal Application (LRA) for Indian Point Nuclear Generating Unit No. 3 Docket No. 50-286 License No. DPR-64 (May 12, 2015) (Revised)
-38/RK-TC5 (REVISED) 08/10/2015NRC000168NYS-26 NYS-38NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. On Yee, Concerning
NRC000189 NYS-38                    TSTF-510, Rev. 2, Revision to Steam Generator          08/10/2015 Program Inspection Frequencies and Tube Sample Selection (Mar. 1, 2011)
NRC000190 NYS-38                    NRC White Paper on Risk-Informed and Performance-      08/10/2015 Based Regulation NRC000191 NYS-38                    Biweekly Notice; Applications and Amendments to        08/10/2015 Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 79 Fed. Reg. 15144 (Mar. 18, 2014)
NRC000192 NYS-38                    Letter NL-15-001, Letter from Lawrence Coyle, to        08/10/2015 NRC, Response to Request for Additional Information (RAI) for the Steam Generator Examination Program Results 2014 Refueling Outage (2R21) Indian Point Unit No. 2 Docket No. 50- 247 License No. DPR-26 (Jan. 15, 2015)
Page 8 of 14


Contentions NYS-26B/RK-TC-1B and NYS- 38/RK-TC
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                       NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                             Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by   Exhibit Name                                          Proffered Exhibit                                                                          Date             Admitted NRC000193 NYS-38                    Letter NL-13-143, Letter from Robert Walpole, to        08/10/2015 NRC, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Performed During the Spring 2013 Refueling Outage Indian Point Unit No. 3 Docket No. 50-286 License No. DPR-64 (Oct. 29, 2013)
-5 08/10/2015 Page 4 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
NRC000194 NYS-38                    S. Miloudi et al, Destructive Examinations on Divider    08/10/2015 Plates from Decommissioned Steam Generators Affected by Superficial Stress Corrosion Cracks, in 15th International Conference on Environmental Degradation of Materials in Nuclear Power Systems-Water Reactors (2012) (CONTAINS COPYRIGHTED MATERIAL)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000169NYS-26 NYS-38Indian Point Unit 2 Technical Specifications (EXCERPT)08/10/2015NRC000170NYS-26 NYS-38EPRI 1008224, Final Report, Rev. 6, Pressurized Water Reactor Secondary Water Chemistry
NRC000195 NYS-26 NYS-38              ASME Code, Section XI, Rules for Inservice              08/10/2015 Inspection of Nuclear Power Plant Components, 2007 through 2008 Addenda, IWB-2500, Table IWB-2500-1, IWB,3700, IWC-2500, Table IWC-2500-1(Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL)
NRC000196 NYS-25 NYS-38              NRC Staffs Initial Statement of Position on            08/10/2015 Contention NYS-25 (Reactor Vessel Internals)
(PROPRIETARY)
NRC000197 NYS-25 NYS-38              NRC Staff Testimony of Dr. Allen Hiser, Jeffrey          08/10/2015 Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 (PROPRIETARY)
Page 9 of 14


Guidelines (Dec. 2004) (PROPRIETARY) 08/10/2015NRC000171NYS-26 NYS-38EPRI 1015014, Materials Reliability Program:
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                      NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                          Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRC000198 NYS-25 NYS-38              Enclosure to MRP Letter 2013-025, MRP-227-A            08/10/2015 Applicability Guidelines for Combustion Engineering and Westinghouse Pressurized Water Reactor Designs (Oct. 4, 2013)
Evaluation of Controlling Transient Ramp Times
NRC000199 NYS-25 NYS-38              ASME Code, Section XI, 2007 through 2008              08/10/2015 Addenda, IWA-2213 (Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL)
NRC000200 NYS-25 NYS-38              WCAP-17096-NP, Rev. 2, Reactor Internals              08/10/2015 Acceptance Criteria Methodology and Data Requirements (Dec. 2009)
NRC000201 NYS-25 NYS-38              NRC Position on Aging Management of CASS              08/10/2015 Reactor Vessel Internal Components (June 11, 2014)
NRC000202 NYS-25 NYS-38              ASM Handbook, Vol. 19, Fatigue and Fracture, Figure    08/10/2015 14 at 595 (1996) (EXCERPT ) (CONTAINS COPYRIGHTED MATERIAL)
NRC000203 NYS-25 NYS-38              EPRI 1021001NP/BWRVIP-100NP, Final Report,            08/10/2015 Rev. 1, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Oct. 2010)
(CONTAINS COPYRIGHTED MATERIAL)
NRC000204 NYS-25 NYS-38              PWROG-14048-P, Rev. 0, Functionality Analysis:         08/10/2015 Lower Support Columns (Dec. 2014)
(PROPRIETARY)
NRC000205 NYS-25 NYS-38              Indian Point, Unit 2, Updated Final Safety Analysis    08/10/2015 Report (UFSAR), Rev. 25, Chapter 3 - Reactor (2014)
Page 10 of 14


Using Piping Methodologies When Considering
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                      NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit #    Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRC000206    NYS-25 NYS-38              Indian Point, Unit 2, Updated Final Safety Analysis    08/10/2015 Report (UFSAR), Rev. 25, Chapter 14 - Safety Analysis (2014)
NRC000207    NYS-25 NYS-38              Regulatory Information Conference Presentation          08/10/2015 Slides, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015)
NRC00208A - E NYS-25 NYS-38              MRP Letter 2014-09, Biennial Report of Recent MRP-      08/10/2015 227-A Reactor Internals Inspection Results (May 12, 2014)
NRC000209    NYS-25 NYS-38              EPRI 1013396/BWRVIP-100-A, Final Report, BWR            08/10/2015 Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Aug. 2006) (PROPRIETARY)
NRC000210    NYS-25 NYS-38              EPRI 1013396NP/ BWRVIP-100NP-A, Final Report,          08/10/2015 BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Aug. 2006)
(CONTAINS COPYRIGHTED MATERIAL)
NRC000211    NYS-25 NYS-38              MRP-227, Rev. 1 Presentation Slides, Westinghouse      08/10/2015 Figures Presented at Public Meeting on March 31, 2015 (Feb. 2015)
NRC000212    NYS-25 NYS-38              R. Reed-Hill and R. Abbaschian, Physical Metallurgy    08/10/2015 Principles , Third Edition (1992) (EXCERPT)
(CONTAINS COPYRIGHTED MATERIAL)
Page 11 of 14


Environmental Fatigue (F en) Effects (MRP-218) (Sept.
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                      NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                            Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRC000213 NYS-25 NYS-38              Letter from Christopher Grimes, Chief, NRC, to          08/10/2015 Douglas Walters, NEI, License Renewal Issue No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components (May 19, 2000)
2007) (EXCERPT) (CONTAINS COPYRIGHTED
NRC000214 NYS-25 NYS-38              Letter from John Lubinski, NRC, to Jean Smith, EPRI,    08/10/2015 License Renewal Interim Staff Guidance LR-ISG-2011-04: Updated Aging Management Criteria for Reactor Vessel Internal Components for Pressurized Water Reactors (May 28, 2013)
NRC000215 NYS-25 NYS-38              Evaluation of WCAP-17780-P, "Reactor Internals          08/10/2015 Aging Management MRP- 227-A Applicability for Combustion Engineering [(CE)] and Westinghouse
[Electric Company (Westinghouse)] Pressurized Water Reactor Designs," and MRP-227-A, Applicability Guidelines for CE and Westinghouse Pressurized Water Reactor Designs (Nov. 7, 2014)
(PROPRIETARY)
NRC000216 NYS-25 NYS-38              U.S. Nuclear Regulatory Commission Office of            08/10/2015 Nuclear Reactor Regulation Division of License Renewal Aging Management Audit Report (Oct. 6, 2014)
Page 12 of 14


MATERIAL)08/10/2015NRC000172NYS-26 NYS-38EPRI 1003536, Materials Reliability Program: Second International Conference on Fatigue of Reactor Components (MRP-84) (Feb. 2003) (EXCERPT)  
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                     NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                          Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit #  Contention Addressed by    Exhibit Name                                        Proffered Exhibit                                                                        Date            Admitted NRC000218  NYS-25 NYS-38              EPRI 1016106, Final Report, Materials Reliability     08/10/2015 Program: Fracture Toughness Evaluation of Highly Irradiated PWR Stainless Steel Internal Components (MRP-210) (Dec. 2007) (COPYRIGHT)
(CONTAINS COPYRIGHTED MATERIAL) 08/10/2015NRC000173NYS-26 NYS-38Excerpt from Transcript of Advisory Committee on Reactor Safeguards Metallurgy and Reactor Fuels
NRC000219  NYS-25 NYS-38              Westinghouse InfoGram IG-10-1, Reactor Internals      08/10/2015 Lower Radial Support Clevis Insert Cap Screw Degradation (Mar. 31, 2010)
NRC000220  NYS-25 NYS-38              Pressurized Water Reactor Owners Group (PWROG)        08/10/2015 Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange:
Clevis Insert Bolt Update, (June 2014)
NRC00221A-F NYS-25 NYS-38              Babcock & Wilcox Report, S-1473-002, Final Report,    08/10/2015 Rev. 0, Examination of Clevis Bolts Removed from D.
C. Cook Nuclear Plant (Dec. 2013)
NRC000222  NYS-25 NYS-38              IP3 FSAR Rev. 04 Chapter 3 (2011) (EXCERPT)            08/10/2015 NRC000223  NYS-25 NYS-38              IP3 FSAR Rev. 04 Chapter 14 (2011)                    08/10/2015 NRC000224  NYS-25 NYS-38              IP3 FSAR Rev. 04 Chapter 16                            08/10/2015 NRC00225A-B NYS-25 NYS-38              EPRI 1016593, Final Report, Materials Reliability      08/10/2015 Program: Aging Management Strategies for Westinghouse and Combustion Engineering PWR Internals (MRP-232) (Dec. 31, 2008)
(PROPRIETARY)
NRC000226  NYS-25 NYS-38              Jeffrey C. Poehler Statement of Professional          08/10/2015 NRC000227  NYS-25 NYS-26 NYS-38      Gary Stevens Statement of Professional                08/10/2015 NRC000228  NYS-25 NYS-38              Indian Point Unit 2 Technical Specifications 3.1.4    08/10/2015 NRC000229  NYS-25 NYS-38              Indian Point Unit 3 Technical Specifications 3.1.4    08/10/2015 Page 13 of 14


Subcommittee at 105-106 (Dec. 2, 2014) 08/10/2015NRC000174NYS-26 NYS-38Background of the Factors of Safety Used in Divisions I of Sections III and XI of the ASME Rules for Nuclear
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)                     NRCR10001 Docket Nos. 50-247-LR and 50-286-LR                         Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by     Exhibit Name                                      Proffered Exhibit                                                                       Date             Admitted NRC000230 NYS-25, NYS-26, NYS-38      Table of Corrections to Staff Testimony               11/03/2015 Page 14 of 14}}
 
Vessels (Oct. 1984) (EXCERPT) (CONTAINS
 
COPYRIGHTED MATERIAL) 08/10/2015NRC000175NYS-26 NYS-38Implementation of Automated, On-line Fatigue Monitoring in a Boiling Water Reactor (1993)
(CONTAINS COPYRIGHTED MATERIAL) 08/10/2015 Page 5 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000176NYS-26 NYS-38EPRI 1003069, Materials Reliability Program Hot Cell Testing of Baffle/Former Bolts Removed From Two
 
Lead PWR Plants (MRP-51) (PROPRIETARY) 08/10/2015NRC000177NYS-26 NYS-38ICONE5-2372, Fatigue and Stress Corrosion Cracking Behaviors of Irradiated Stainless Steels in
 
PWR Primary Water (Nov. 2001) (CONTAINS
 
COPYRIGHTED MATERIAL) 08/10/2015NRC000178NYS-26 NYS-38ASME Code, Section III - Subsection NCA, General Requirements for Division 1 and Division 2 Rules for
 
Construction of Nuclear Facility Components (Jul. 1, 2007) (CONTAINS COPYRIGHTED MATERIAL) 08/10/2015NRC000179NYS-26 NYS-38Regulatory Guide 1.207, Guidelines for Evaluating Fatigue Analyses Incorporating the Life Reduction of
 
Metal Components Due to the Effects of the Light-
 
Water Reactor Environment for New Reactors (Mar.
 
2007)08/10/2015NRC000180NYS-26 NYS-38NRC Inspection Manual, Chapter 2516, Policy and Guidance for the License Renewal Inspection
 
Pro g ram (Au g. 13, 2013
)08/10/2015NRC000181NYS-26 NYS-38Letter from James Trapp, NRC, to John Ventosa, Entergy, Indian Point Nuclear Generating Unit 2 -
 
NRC License Renewal Team Inspection Report
 
05000247/2013009 (July 5, 2013) 08/10/2015 Page 6 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted: Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000182NYS-26 NYS-38Letter from James Trapp, NRC, to John Ventosa, Entergy, Indian Point Nuclear Generating Unit 2 -
 
NRC License Renewal Team Inspection Report
 
05000247/2013010 (Sept. 19, 2013) 08/10/2015NRC000183NYS-26 NYS-38NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal App lication (Se p t. 25, 2013
)08/10/2015NRC000184NYS-25 NYS-26 NYS-38Letter NL-13-114, Letter from Fred Dacimo, Entergy, to NRC, Implementation of License Renewal
 
Regulatory Commitments Indian Point Nuclear
 
Generating Unit No. 2 Docket No. 50-257 License No.
 
DPR-26 (Aug. 28, 2013) 08/10/2015NRC000185NYS-26 NYS-38Letter from Arthur Burritt, NRC, to Larry Coyle, Entergy, Annual Assessment Letter for Indian Point
 
Nuclear Generating Units 2 and 3 (Report
 
05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)08/10/2015NRC000186NYS-26 NYS-38Effect of LWR Coolant Environments on the Fatigue of Reactor Materials, 79 Fed. Reg. 21811 (Apr. 17, 2014)08/10/2015NRC000187NYS-26, 38Letter from John Daily, NRC, to Entergy, Request for Additional Information for the Review of the Indian
 
Point Nuclear Generating Unit Nos. 2 and 3, License
 
Renewal Application, Set 2013-01 (TAC Nos.
 
MD5407 and MD5408) ( Feb. 6, 2013) 08/10/2015 Page 7 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date Admitted NRCR00188NYS-26 NYS-38Letter NL-15-060, Letter from Fred Dacimo, Entergy, to NRC, Entergy Actions Required Prior to Entry into
 
Period of Extended Operation Associated with
 
License Renewal Application (LRA) for Indian Point
 
Nuclear Generating Unit No. 3 Docket No. 50-286 License No. DPR-64 (May 12, 2015) (Revised) 08/19/2015NRC000189NYS-38TSTF-510, Rev. 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample
 
Selection (Mar. 1, 2011
)08/10/2015NRC000190NYS-38NRC White Paper on Risk-Informed and Performance-Based Regulation 08/10/2015NRC000191NYS-38Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses
 
Involving No Significant Hazards Considerations, 79
 
Fed. Reg. 15144 (Mar. 18, 2014) 08/10/2015NRC000192NYS-38Letter NL-15-001, Letter from Lawrence Coyle, to NRC, Response to Request for Additional Information (RAI) for the Steam Generator Examination Program
 
Results 2014 Refueling Outage (2R21) Indian Point
 
Unit No. 2 Docket No. 50- 247 License No. DPR-26 (Jan. 15, 2015) 08/10/2015 Page 8 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000193NYS-38Letter NL-13-143, Letter from Robert Walpole, to NRC, Response to Request for Additional Information
 
Regarding Steam Generator Tube Inspection
 
Performed During the Spring 2013 Refueling Outage
 
Indian Point Unit No. 3 Docket No. 50-286 License
 
No. DPR-64 (Oct. 29, 2013) 08/10/2015NRC000194NYS-38S. Miloudi et al, Destructive Examinations on Divider Plates from Decommissioned Steam Generators
 
Affected by Superficial Stress Corrosion Cracks, in
 
15th International Conference on Environmental
 
Degradation of Materials in Nuclear Power Systems-
 
Water Reactors (2012) (CONTAINS COPYRIGHTED
 
MATERIAL)08/10/2015NRC000195NYS-26 NYS-38ASME Code, Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, 2007
 
through 2008 Addenda, IWB-2500, Table IWB-2500-
 
1, IWB,3700, IWC-2500, Table IWC-2500-1(Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL) 08/10/2015NRC000196NYS-25 NYS-38NRC Staff's Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals)
(PROPRIETARY) 08/10/2015NRC000197NYS-25 NYS-38NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-25 and NYS-
 
38/RK-TC-5 (PROPRIETARY) 08/10/2015 Page 9 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000198NYS-25 NYS-38Enclosure to MRP Letter 2013-025, MRP-227-A Applicability Guidelines for Combustion Engineering
 
and Westinghouse Pressurized Water Reactor
 
Desi g ns (Oct. 4, 2013
)08/10/2015NRC000199NYS-25 NYS-38ASME Code, Section XI, 2007 through 2008 Addenda, IWA-2213 (Jul. 1, 2008) (CONTAINS
 
COPYRIGHTED MATERIAL) 08/10/2015NRC000200NYS-25 NYS-38WCAP-17096-NP, Rev. 2, Reactor Internals Acceptance Criteria Methodology and Data
 
Re q uirements (Dec. 2009)08/10/2015NRC000201NYS-25 NYS-38"NRC Position on Aging Management of CASS Reactor Vessel Internal Components" (June 11, 2014) 08/10/2015NRC000202NYS-25 NYS-38 A SM Handbook, Vol. 19, Fatigue and Fracture, Figure 14 at 595 (1996) (EXCERPT ) (CONTAINS
 
COPYRIGHTED MATERIAL) 08/10/2015NRC000203NYS-25 NYS-38EPRI 1021001NP/BWRVIP-100NP, Final Report, Rev. 1, BWR Vessel and Internals Project, Updated
 
Assessment of the Fracture Toughness of Irradiated
 
Stainless Steel for BWR Core Shrouds (Oct. 2010)
(CONTAINS COPYRIGHTED MATERIAL) 08/10/2015NRC000204NYS-25 NYS-38PWROG-14048-P, Rev. 0, Functionality Analysis:
Lower Support Columns (Dec. 2014)
(PROPRIETARY) 08/10/2015NRC000205NYS-25 NYS-38Indian Point, Unit 2, Updated Final Safety Analysis Re p ort (UFSAR), Rev. 25, Cha p ter 3 - Reactor (2014)08/10/2015 Page 10 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000206NYS-25 NYS-38Indian Point, Unit 2, Updated Final Safety Analysis Report (UFSAR), Rev. 25, Chapter 14 - Safety A nal y sis (2014)08/10/2015NRC000207NYS-25 NYS-38Regulatory Information Conference Presentation Slides, "Recent Materials Inspections of PWR Reactor
 
Internals" (Mar. 2015)08/10/2015NRC00208A - ENYS-25 NYS-38MRP Letter 2014-09, Biennial Report of Recent MRP-227-A Reactor Internals Inspection Results (May 12, 2014)08/10/2015NRC000209NYS-25 NYS-38EPRI 1013396/BWRVIP-100-A, Final Report, BWR Vessel and Internals Project, Updated Assessment of
 
the Fracture Toughness of Irradiated Stainless Steel
 
for BWR Core Shrouds (Aug. 2006) (PROPRIETARY) 08/10/2015NRC000210NYS-25 NYS-38EPRI 1013396NP/ BWRVIP-100NP-A, Final Report, BWR Vessel and Internals Project, Updated
 
Assessment of the Fracture Toughness of Irradiated
 
Stainless Steel for BWR Core Shrouds (Aug. 2006)
(CONTAINS COPYRIGHTED MATERIAL) 08/10/2015NRC000211NYS-25 NYS-38MRP-227, Rev. 1 Presentation Slides, Westinghouse Figures Presented at Public Meeting on March 31, 2015 (Feb. 2015) 08/10/2015NRC000212NYS-25 NYS-38R. Reed-Hill and R. Abbaschian, Physical Metallurgy Principles , Third Edition (1992) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL) 08/10/2015 Page 11 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000213NYS-25 NYS-38Letter from Christopher Grimes, Chief, NRC, to Douglas Walters, NEI, License Renewal Issue No. 98-
 
0030, "Thermal Aging Embrittlement of Cast
 
Austenitic Stainless Steel Components" (May 19, 2000)08/10/2015NRC000214NYS-25 NYS-38Letter from John Lubinski, NRC, to Jean Smith, EPRI, License Renewal Interim Staff Guidance LR-ISG-2011
-04: Updated Aging Management Criteria for Reactor
 
Vessel Internal Components for Pressurized Water
 
Reactors (May 28, 2013) 08/10/2015NRC000215NYS-25 NYS-38Evaluation of WCAP-17780-P, "Reactor Internals Aging Management MRP- 227-A Applicability for
 
Combustion Engineering [(CE)] and Westinghouse
 
[Electric Company (Westinghouse)] Pressurized
 
Water Reactor Designs," and MRP-227-A, Applicability Guidelines for CE and Westinghouse
 
Pressurized Water Reactor Designs (Nov. 7, 2014)
(PROPRIETARY) 08/10/2015NRC000216NYS-25 NYS-38U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of License
 
Renewal Aging Management Audit Report (Oct. 6, 2014)08/10/2015 Page 12 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000218NYS-25 NYS-38EPRI 1016106, Final Report, Materials Reliability Program: Fracture Toughness Evaluation of Highly
 
Irradiated PWR Stainless Steel Internal Components (MRP-210) (Dec. 2007) (COPYRIGHT) 08/10/2015NRC000219NYS-25 NYS-38Westinghouse InfoGram IG-10-1, Reactor Internals Lower Radial Support Clevis Insert Cap Screw
 
De g radation (Mar. 31, 2010
)08/10/2015NRC000220NYS-25 NYS-38Pressurized Water Reactor Owners Group (PWROG)
Presentation Slides, "Industry and NRC Coordination
 
Meeting Materials Programs Technical Exchange:
 
Clevis Insert Bolt Update," (June 2014) 08/10/2015NRC00221A-FNYS-25 NYS-38Babcock & Wilcox Report, S-1473-002, Final Report, Rev. 0, Examination of Clevis Bolts Removed from D.
 
C. Cook Nuclear Plant (Dec. 2013)08/10/2015NRC000222NYS-25 NYS-38IP3 FSAR Rev. 04 Chapter 3 (2011) (EXCERPT)08/10/2015NRC000223NYS-25 NYS-38IP3 FSAR Rev. 04 Chapter 14 (2011)08/10/2015 NRC000224NYS-25 NYS-38IP3 FSAR Rev. 04 Chapter 1608/10/2015 NRC00225A-BNYS-25 NYS-38EPRI 1016593, Final Report, Materials Reliability Program: Aging Management Strategies for
 
Westinghouse and Combustion Engineering PWR
 
Internals (MRP-232) (Dec. 31, 2008)
(PROPRIETARY) 08/10/2015NRC000226NYS-25 NYS-38Jeffrey C. Poehler Statement of Professional 08/10/2015NRC000227NYS-25 NYS-26 NYS-38Gary Stevens Statement of Professional 08/10/2015 NRC000228NYS-25 NYS-38Indian Point Unit 2 Technical Specifications 3.1.408/10/2015 NRC000229NYS-25 NYS-38Indian Point Unit 3 Technical Specifications 3.1.408/10/2015 Page 13 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000230NYS-25, NYS-26, NYS-38Table of Corrections to Staff Testimony11/03/2015 Page 14 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRCR10001ALLNRC Staff Pre-filed Hearing Exhibit List (REVISED)11/05/2015NRCR20101NYS-26B/ RK-TC1BNRC Staff's Revised Statement of Position Regarding NYS 26B/RK-TC-1B 08/10/2015NRC000102NYS-26B/ RK-TC1BNRC Staff's Testimony of Allen Hiser, On Yee and Ching Ng Regarding NYS 26B/RK-TC-1B03/31/2012Yes.
Superseded by
 
NRC000168NRC000103NYS-26B/ RK-TC1BAllen Hiser Statement of Professional Qualifications03/30/2012Yes NRCR00104NYS-26 NYS-38On Yee Statement of Professional Qualifications (REVISED)08/10/2015NRCR00105NYS-26 NYS-38Ching Ng Statement of Professional Qualifications (REVISED)08/10/2015NRC000106NYS-26B/ RK-TC1BNRC Inspection Manual, Inspection Procedure 71002, License Renewal Inspection03/30/2012YesNRC000107NYS-26B/ RK-TC1BNRC Inspection Report 05000247/2008006 and 05000286/200800603/30/2012YesNRC000108NYS-26B/ RK-TC1BAudit Report for Plant Aging Management Programs and Reviews, Indian Point Nuclear Generating Unit
 
Nos. 2 and 303/31/2012YesNRC000109NYS-26B/ RK-TC1BLetter NL-08-057, Letter from Entergy Nuclear Operations, Inc., to NRC, Indian Point Nuclear
 
Generating Units 2 and 3, License Renewal App lication Amendment 303/31/2012YesNRC000110NYS-26B/ RK-TC1BLetter NL-11-032, Letter from Entergy Nuclear Operations, Inc. to NRC, Indian Point, Units 2 & 3, Response to Request for Additional Information on Ag in g Mana g ement Pro g rams03/31/2012Yes Page 1 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000111NYS-26B/ RK-TC1BLetter NL-07-153, Letter from Entergy Nuclear Operations, Inc., to NRC, Indian Point Nuclear
 
Generating Units 2 and 3, License Renewal App lication Amendment 103/31/2012YesNRC000112NYS-26B/ RK-TC1BNRC Regulatory Issue Summary -2011-14, Metal Fatigue Analysis Performed By Computer Software03/31/2012YesNRC000113NYS-26B/ RK-TC1BASME Code Section XI, Appendix L, Operating Plant Fatigue Assessment03/31/2012YesNRC000114A-FNYS-26B/ RK-TC1BMRP-227-A, Materials Reliability Program:
Pressurized Water Reactor Internals Inspection and
 
Evaluation Guidelines04/02/2012YesNRC000115NYS-26B/ RK-TC1BEPRI, TR-105714, Rev. 5, Pressurized Water Reactor Primary Water Chemistry Guidelines03/31/2012YesNRC000116NYS-26B/ RK-TC1BRequests for Additional Information in NRC Letter, Request for Additional Information for the Review of
 
the Indian Point Nuclear Generating Unit Numbers 2
 
and 3, License Renewal Application Time-Limited
 
Aging Analyses, Bolted Connections, and Boraflex, (April 18, 2008) (ADAMS Accession No.
 
ML080870374)03/31/2012YesNRC000117NYS-26B/ RK-TC1BStatement Of Consideration for 1995 License Renewal Rule03/31/2012YesNRCR00118NYS-26 NYS-38Indian Point Unit 3 Technical Specifications (EXCERPT) (REVISED) 08/10/2015NRC000119NYS-26B/ RK-TC1BSalem Nuclear Generating Station's use of WESTEMS TM fatigue software03/31/2012Yes Page 2 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000123NYS-26B/ RK-TC-1B, RK-TC-2 Audit and Review Plan for Plant Aging Management Reviews and Programs - Indian Point Generating
 
Units Nos. 2 and 3
)03/31/2012YesNRC000124NYS-26B/ RK-TC-1B, RK-TC-2 Scoping and Screening Methodology Audit Trip Re p ort For Indian Point, Units 2 and 303/31/2012YesNRCR00147NYS-26 NYS-38NRC Staff's Revised Statement of Position on State of New York and Riverkeeper's Joint Contention NYS-
 
38/RK-TC5 (REVISED) 08/10/2015NRC000148NYS-38/ RK-TC5NRC Staff's Testimony of Allen L. Hiser, On Yee, and Ching Ng Concerning Portions of Contention NYS-3808/20/2012Yes.
Superseded by
 
NRC000168NRC000149NYS-38/ RK-TC5ASME Section XI, Appendix A (Excerpt)08/20/2012Yes NRC000150NYS-38/ RK-TC5ASME Section XI, Appendix C (Excerpt)08/20/2012Yes NRC000151NYS-38/ RK-TC5Temporary Instruction 2516/001, dated March 30, 201108/20/2012YesNRC000152NYS-38/ RK-TC5Indian Point Nuclear Generating Unit 2 - NRC Inspection Report 05000247/2012008, dated April 19, 201208/20/2012YesNRC000153NYS-38/ RK-TC5NL-12-089, Entergy Letter Replying to Request for Additional Information Regarding the License
 
Renewal Application (dated June 14, 2012)08/20/2012YesNRC000154NYS-38/ RK-TC5April 11, 2011 Summary of the March 11, 2011 Meeting between the U.S. Nuclear Regulatory
 
Commission Staff and the Nuclear Energy Institute to
 
Discuss Current License Renewal Topics08/20/2012Yes Page 3 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000155NYS-38/ RK-TC5March 30, 2011 Audit Report on the Use of WESTEMS Software in the Salem Nuclear Generating
 
Station, Units 1 and 2, License Renewal Application08/20/2012YesNRC000156NYS-38/ RK-TC5NL-11-101, Entergy Letter Regarding Clarification for Request for Additional Information - Aging
 
Management Programs (dated August 22, 2011)08/20/2012YesNRC000157NYS-38/ RK-TC5Kenneth J. Karwoski - Statement of Professional Qualifications08/20/2012YesNRC000158NYS-38/ RK-TC5August 12, 2010 NEI Steam Generator Task Force NRC/ Industry Update (CONTAINS COPYRIGHTED
 
MATERIAL)08/20/2012YesNRC000159NYS-38/ RK-TC5Electric Power Research Institute - Implementation Status of Industry Change Management Plan for
 
Materials Related R & D Committees under NEI 03-08 (CONTAINS COPYRIGHTED MATERIAL)08/20/2012YesNRC000160NYS-38/ RK-TC5August 4, 2011 NEI Steam Generator Task Force NRC/ Industry Update (CONTAINS COPYRIGHTED
 
MATERIAL)08/20/2012YesNRCR00161NYS-38/ RK-TC5NRC Staff Testimony of Dr. Allen L. Hiser and Mr.
Kenneth J. Karwoski Concerning Portions of State of
 
New York and Riverkeeper, Inc. Joint Contention NYS
-38/RK-TC5 (REVISED) 08/10/2015NRC000168NYS-26 NYS-38NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. On Yee, Concerning
 
Contentions NYS-26B/RK-TC-1B and NYS- 38/RK-TC
-5 08/10/2015 Page 4 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000169NYS-26 NYS-38Indian Point Unit 2 Technical Specifications (EXCERPT)08/10/2015NRC000170NYS-26 NYS-38EPRI 1008224, Final Report, Rev. 6, Pressurized Water Reactor Secondary Water Chemistry
 
Guidelines (Dec. 2004) (PROPRIETARY) 08/10/2015NRC000171NYS-26 NYS-38EPRI 1015014, Materials Reliability Program:
Evaluation of Controlling Transient Ramp Times
 
Using Piping Methodologies When Considering
 
Environmental Fatigue (F en) Effects (MRP-218) (Sept.
2007) (EXCERPT) (CONTAINS COPYRIGHTED
 
MATERIAL)08/10/2015NRC000172NYS-26 NYS-38EPRI 1003536, Materials Reliability Program: Second International Conference on Fatigue of Reactor Components (MRP-84) (Feb. 2003) (EXCERPT)
(CONTAINS COPYRIGHTED MATERIAL) 08/10/2015NRC000173NYS-26 NYS-38Excerpt from Transcript of Advisory Committee on Reactor Safeguards Metallurgy and Reactor Fuels
 
Subcommittee at 105-106 (Dec. 2, 2014) 08/10/2015NRC000174NYS-26 NYS-38Background of the Factors of Safety Used in Divisions I of Sections III and XI of the ASME Rules for Nuclear
 
Vessels (Oct. 1984) (EXCERPT) (CONTAINS
 
COPYRIGHTED MATERIAL) 08/10/2015NRC000175NYS-26 NYS-38Implementation of Automated, On-line Fatigue Monitoring in a Boiling Water Reactor (1993)
(CONTAINS COPYRIGHTED MATERIAL) 08/10/2015 Page 5 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000176NYS-26 NYS-38EPRI 1003069, Materials Reliability Program Hot Cell Testing of Baffle/Former Bolts Removed From Two
 
Lead PWR Plants (MRP-51) (PROPRIETARY) 08/10/2015NRC000177NYS-26 NYS-38ICONE5-2372, Fatigue and Stress Corrosion Cracking Behaviors of Irradiated Stainless Steels in
 
PWR Primary Water (Nov. 2001) (CONTAINS
 
COPYRIGHTED MATERIAL) 08/10/2015NRC000178NYS-26 NYS-38ASME Code, Section III - Subsection NCA, General Requirements for Division 1 and Division 2 Rules for
 
Construction of Nuclear Facility Components (Jul. 1, 2007) (CONTAINS COPYRIGHTED MATERIAL) 08/10/2015NRC000179NYS-26 NYS-38Regulatory Guide 1.207, Guidelines for Evaluating Fatigue Analyses Incorporating the Life Reduction of
 
Metal Components Due to the Effects of the Light-
 
Water Reactor Environment for New Reactors (Mar.
 
2007)08/10/2015NRC000180NYS-26 NYS-38NRC Inspection Manual, Chapter 2516, Policy and Guidance for the License Renewal Inspection
 
Pro g ram (Au g. 13, 2013
)08/10/2015NRC000181NYS-26 NYS-38Letter from James Trapp, NRC, to John Ventosa, Entergy, Indian Point Nuclear Generating Unit 2 -
 
NRC License Renewal Team Inspection Report
 
05000247/2013009 (July 5, 2013) 08/10/2015 Page 6 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000182NYS-26 NYS-38Letter from James Trapp, NRC, to John Ventosa, Entergy, Indian Point Nuclear Generating Unit 2 -
 
NRC License Renewal Team Inspection Report
 
05000247/2013010 (Sept. 19, 2013) 08/10/2015NRC000183NYS-26 NYS-38NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal App lication (Se p t. 25, 2013
)08/10/2015NRC000184NYS-25 NYS-26 NYS-38Letter NL-13-114, Letter from Fred Dacimo, Entergy, to NRC, Implementation of License Renewal
 
Regulatory Commitments Indian Point Nuclear
 
Generating Unit No. 2 Docket No. 50-257 License No.
 
DPR-26 (Aug. 28, 2013) 08/10/2015NRC000185NYS-26 NYS-38Letter from Arthur Burritt, NRC, to Larry Coyle, Entergy, Annual Assessment Letter for Indian Point
 
Nuclear Generating Units 2 and 3 (Report
 
05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)08/10/2015NRC000186NYS-26 NYS-38Effect of LWR Coolant Environments on the Fatigue of Reactor Materials, 79 Fed. Reg. 21811 (Apr. 17, 2014)08/10/2015NRC000187NYS-26, 38Letter from John Daily, NRC, to Entergy, Request for Additional Information for the Review of the Indian
 
Point Nuclear Generating Unit Nos. 2 and 3, License
 
Renewal Application, Set 2013-01 (TAC Nos.
 
MD5407 and MD5408) ( Feb. 6, 2013) 08/10/2015 Page 7 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date Admitted NRCR00188NYS-26 NYS-38Letter NL-15-060, Letter from Fred Dacimo, Entergy, to NRC, Entergy Actions Required Prior to Entry into
 
Period of Extended Operation Associated with
 
License Renewal Application (LRA) for Indian Point
 
Nuclear Generating Unit No. 3 Docket No. 50-286 License No. DPR-64 (May 12, 2015) (Revised) 08/19/2015NRC000189NYS-38TSTF-510, Rev. 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample
 
Selection (Mar. 1, 2011
)08/10/2015NRC000190NYS-38NRC White Paper on Risk-Informed and Performance-Based Regulation 08/10/2015NRC000191NYS-38Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses
 
Involving No Significant Hazards Considerations, 79
 
Fed. Reg. 15144 (Mar. 18, 2014) 08/10/2015NRC000192NYS-38Letter NL-15-001, Letter from Lawrence Coyle, to NRC, Response to Request for Additional Information (RAI) for the Steam Generator Examination Program
 
Results 2014 Refueling Outage (2R21) Indian Point
 
Unit No. 2 Docket No. 50- 247 License No. DPR-26 (Jan. 15, 2015) 08/10/2015 Page 8 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000193NYS-38Letter NL-13-143, Letter from Robert Walpole, to NRC, Response to Request for Additional Information
 
Regarding Steam Generator Tube Inspection
 
Performed During the Spring 2013 Refueling Outage
 
Indian Point Unit No. 3 Docket No. 50-286 License
 
No. DPR-64 (Oct. 29, 2013) 08/10/2015NRC000194NYS-38S. Miloudi et al, Destructive Examinations on Divider Plates from Decommissioned Steam Generators
 
Affected by Superficial Stress Corrosion Cracks, in
 
15th International Conference on Environmental
 
Degradation of Materials in Nuclear Power Systems-
 
Water Reactors (2012) (CONTAINS COPYRIGHTED
 
MATERIAL)08/10/2015NRC000195NYS-26 NYS-38ASME Code, Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, 2007
 
through 2008 Addenda, IWB-2500, Table IWB-2500-
 
1, IWB,3700, IWC-2500, Table IWC-2500-1(Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL) 08/10/2015NRC000196NYS-25 NYS-38NRC Staff's Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals)
(PROPRIETARY) 08/10/2015NRC000197NYS-25 NYS-38NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-25 and NYS-
 
38/RK-TC-5 (PROPRIETARY) 08/10/2015 Page 9 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000198NYS-25 NYS-38Enclosure to MRP Letter 2013-025, MRP-227-A Applicability Guidelines for Combustion Engineering
 
and Westinghouse Pressurized Water Reactor
 
Desi g ns (Oct. 4, 2013
)08/10/2015NRC000199NYS-25 NYS-38ASME Code, Section XI, 2007 through 2008 Addenda, IWA-2213 (Jul. 1, 2008) (CONTAINS
 
COPYRIGHTED MATERIAL) 08/10/2015NRC000200NYS-25 NYS-38WCAP-17096-NP, Rev. 2, Reactor Internals Acceptance Criteria Methodology and Data
 
Re q uirements (Dec. 2009)08/10/2015NRC000201NYS-25 NYS-38"NRC Position on Aging Management of CASS Reactor Vessel Internal Components" (June 11, 2014) 08/10/2015NRC000202NYS-25 NYS-38 A SM Handbook, Vol. 19, Fatigue and Fracture, Figure 14 at 595 (1996) (EXCERPT ) (CONTAINS
 
COPYRIGHTED MATERIAL) 08/10/2015NRC000203NYS-25 NYS-38EPRI 1021001NP/BWRVIP-100NP, Final Report, Rev. 1, BWR Vessel and Internals Project, Updated
 
Assessment of the Fracture Toughness of Irradiated
 
Stainless Steel for BWR Core Shrouds (Oct. 2010)
(CONTAINS COPYRIGHTED MATERIAL) 08/10/2015NRC000204NYS-25 NYS-38PWROG-14048-P, Rev. 0, Functionality Analysis:
Lower Support Columns (Dec. 2014)
(PROPRIETARY) 08/10/2015NRC000205NYS-25 NYS-38Indian Point, Unit 2, Updated Final Safety Analysis Re p ort (UFSAR), Rev. 25, Cha p ter 3 - Reactor (2014)08/10/2015 Page 10 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000206NYS-25 NYS-38Indian Point, Unit 2, Updated Final Safety Analysis Report (UFSAR), Rev. 25, Chapter 14 - Safety A nal y sis (2014)08/10/2015NRC000207NYS-25 NYS-38Regulatory Information Conference Presentation Slides, "Recent Materials Inspections of PWR Reactor
 
Internals" (Mar. 2015)08/10/2015NRC00208A - ENYS-25 NYS-38MRP Letter 2014-09, Biennial Report of Recent MRP-227-A Reactor Internals Inspection Results (May 12, 2014)08/10/2015NRC000209NYS-25 NYS-38EPRI 1013396/BWRVIP-100-A, Final Report, BWR Vessel and Internals Project, Updated Assessment of
 
the Fracture Toughness of Irradiated Stainless Steel
 
for BWR Core Shrouds (Aug. 2006) (PROPRIETARY) 08/10/2015NRC000210NYS-25 NYS-38EPRI 1013396NP/ BWRVIP-100NP-A, Final Report, BWR Vessel and Internals Project, Updated
 
Assessment of the Fracture Toughness of Irradiated
 
Stainless Steel for BWR Core Shrouds (Aug. 2006)
(CONTAINS COPYRIGHTED MATERIAL) 08/10/2015NRC000211NYS-25 NYS-38MRP-227, Rev. 1 Presentation Slides, Westinghouse Figures Presented at Public Meeting on March 31, 2015 (Feb. 2015) 08/10/2015NRC000212NYS-25 NYS-38R. Reed-Hill and R. Abbaschian, Physical Metallurgy Principles , Third Edition (1992) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL) 08/10/2015 Page 11 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000213NYS-25 NYS-38Letter from Christopher Grimes, Chief, NRC, to Douglas Walters, NEI, License Renewal Issue No. 98-
 
0030, "Thermal Aging Embrittlement of Cast
 
Austenitic Stainless Steel Components" (May 19, 2000)08/10/2015NRC000214NYS-25 NYS-38Letter from John Lubinski, NRC, to Jean Smith, EPRI, License Renewal Interim Staff Guidance LR-ISG-2011
-04: Updated Aging Management Criteria for Reactor
 
Vessel Internal Components for Pressurized Water
 
Reactors (May 28, 2013) 08/10/2015NRC000215NYS-25 NYS-38Evaluation of WCAP-17780-P, "Reactor Internals Aging Management MRP- 227-A Applicability for
 
Combustion Engineering [(CE)] and Westinghouse
 
[Electric Company (Westinghouse)] Pressurized
 
Water Reactor Designs," and MRP-227-A, Applicability Guidelines for CE and Westinghouse
 
Pressurized Water Reactor Designs (Nov. 7, 2014)
(PROPRIETARY) 08/10/2015NRC000216NYS-25 NYS-38U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of License
 
Renewal Aging Management Audit Report (Oct. 6, 2014)08/10/2015 Page 12 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000218NYS-25 NYS-38EPRI 1016106, Final Report, Materials Reliability Program: Fracture Toughness Evaluation of Highly
 
Irradiated PWR Stainless Steel Internal Components (MRP-210) (Dec. 2007) (COPYRIGHT) 08/10/2015NRC000219NYS-25 NYS-38Westinghouse InfoGram IG-10-1, Reactor Internals Lower Radial Support Clevis Insert Cap Screw
 
De g radation (Mar. 31, 2010
)08/10/2015NRC000220NYS-25 NYS-38Pressurized Water Reactor Owners Group (PWROG)
Presentation Slides, "Industry and NRC Coordination
 
Meeting Materials Programs Technical Exchange:
 
Clevis Insert Bolt Update," (June 2014) 08/10/2015NRC00221A-FNYS-25 NYS-38Babcock & Wilcox Report, S-1473-002, Final Report, Rev. 0, Examination of Clevis Bolts Removed from D.
 
C. Cook Nuclear Plant (Dec. 2013)08/10/2015NRC000222NYS-25 NYS-38IP3 FSAR Rev. 04 Chapter 3 (2011) (EXCERPT)08/10/2015NRC000223NYS-25 NYS-38IP3 FSAR Rev. 04 Chapter 14 (2011)08/10/2015 NRC000224NYS-25 NYS-38IP3 FSAR Rev. 04 Chapter 1608/10/2015 NRC00225A-BNYS-25 NYS-38EPRI 1016593, Final Report, Materials Reliability Program: Aging Management Strategies for
 
Westinghouse and Combustion Engineering PWR
 
Internals (MRP-232) (Dec. 31, 2008)
(PROPRIETARY) 08/10/2015NRC000226NYS-25 NYS-38Jeffrey C. Poehler Statement of Professional 08/10/2015NRC000227NYS-25 NYS-26 NYS-38Gary Stevens Statement of Professional 08/10/2015 NRC000228NYS-25 NYS-38Indian Point Unit 2 Technical Specifications 3.1.408/10/2015 NRC000229NYS-25 NYS-38Indian Point Unit 3 Technical Specifications 3.1.408/10/2015 Page 13 of 14 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3)
Docket Nos. 50-247-LR and 50-286-LR ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List NRCR10001 Submitted:  Nov. 5, 2015Exhibit #Contention Addressed by ExhibitExhibit NameProffered Date AdmittedNRC000230NYS-25, NYS-26, NYS-38Table of Corrections to Staff Testimony11/03/2015 Page 14 of 14}}

Latest revision as of 07:54, 5 February 2020

NRCR10001 - NRC Staff Track 2 Exhibit List
ML15309A221
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/05/2015
From:
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 28475, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
Download: ML15309A221 (14)


Text

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRCR10001 ALL NRC Staff Pre-filed Hearing Exhibit List (REVISED) 11/05/2015 NRCR20101 NYS-26B/ RK-TC1B NRC Staffs Revised Statement of Position Regarding 08/10/2015 NYS 26B/RK-TC-1B NRC000102 NYS-26B/ RK-TC1B NRC Staffs Testimony of Allen Hiser, On Yee and 03/31/2012 Yes.

Ching Ng Regarding NYS 26B/RK-TC-1B Superseded by NRC000168 NRC000103 NYS-26B/ RK-TC1B Allen Hiser Statement of Professional Qualifications 03/30/2012 Yes NRCR00104 NYS-26 NYS-38 On Yee Statement of Professional Qualifications 08/10/2015 (REVISED)

NRCR00105 NYS-26 NYS-38 Ching Ng Statement of Professional Qualifications 08/10/2015 (REVISED)

NRC000106 NYS-26B/ RK-TC1B NRC Inspection Manual, Inspection Procedure 71002, 03/30/2012 Yes License Renewal Inspection NRC000107 NYS-26B/ RK-TC1B NRC Inspection Report 05000247/2008006 and 03/30/2012 Yes 05000286/2008006 NRC000108 NYS-26B/ RK-TC1B Audit Report for Plant Aging Management Programs 03/31/2012 Yes and Reviews, Indian Point Nuclear Generating Unit Nos. 2 and 3 NRC000109 NYS-26B/ RK-TC1B Letter NL-08-057, Letter from Entergy Nuclear 03/31/2012 Yes Operations, Inc., to NRC, Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Amendment 3 NRC000110 NYS-26B/ RK-TC1B Letter NL-11-032, Letter from Entergy Nuclear 03/31/2012 Yes Operations, Inc. to NRC, Indian Point, Units 2 & 3, Response to Request for Additional Information on Aging Management Programs Page 1 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000111 NYS-26B/ RK-TC1B Letter NL-07-153, Letter from Entergy Nuclear 03/31/2012 Yes Operations, Inc., to NRC, Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Amendment 1 NRC000112 NYS-26B/ RK-TC1B NRC Regulatory Issue Summary -2011-14, Metal 03/31/2012 Yes Fatigue Analysis Performed By Computer Software NRC000113 NYS-26B/ RK-TC1B ASME Code Section XI, Appendix L, Operating Plant 03/31/2012 Yes Fatigue Assessment NRC000114A-F NYS-26B/ RK-TC1B MRP-227-A, Materials Reliability Program: 04/02/2012 Yes Pressurized Water Reactor Internals Inspection and Evaluation Guidelines NRC000115 NYS-26B/ RK-TC1B EPRI, TR-105714, Rev. 5, Pressurized Water Reactor 03/31/2012 Yes Primary Water Chemistry Guidelines NRC000116 NYS-26B/ RK-TC1B Requests for Additional Information in NRC Letter, 03/31/2012 Yes Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application Time-Limited Aging Analyses, Bolted Connections, and Boraflex, (April 18, 2008) (ADAMS Accession No. ML080870374)

NRC000117 NYS-26B/ RK-TC1B Statement Of Consideration for 1995 License 03/31/2012 Yes Renewal Rule NRCR00118 NYS-26 NYS-38 Indian Point Unit 3 Technical Specifications 08/10/2015 (EXCERPT) (REVISED)

NRC000119 NYS-26B/ RK-TC1B Salem Nuclear Generating Stations use of 03/31/2012 Yes WESTEMSTM fatigue software Page 2 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000123 NYS-26B/ RK-TC-1B, RK-TC- Audit and Review Plan for Plant Aging Management 03/31/2012 Yes 2 Reviews and Programs - Indian Point Generating Units Nos. 2 and 3)

NRC000124 NYS-26B/ RK-TC-1B, RK-TC- Scoping and Screening Methodology Audit Trip 03/31/2012 Yes 2 Report For Indian Point, Units 2 and 3 NRCR00147 NYS-26 NYS-38 NRC Staffs Revised Statement of Position on State of 08/10/2015 New York and Riverkeepers Joint Contention NYS-38/RK-TC5 (REVISED)

NRC000148 NYS-38/ RK-TC5 NRC Staffs Testimony of Allen L. Hiser, On Yee, and 08/20/2012 Yes.

Ching Ng Concerning Portions of Contention NYS-38 Superseded by NRC000168 NRC000149 NYS-38/ RK-TC5 ASME Section XI, Appendix A (Excerpt) 08/20/2012 Yes NRC000150 NYS-38/ RK-TC5 ASME Section XI, Appendix C (Excerpt) 08/20/2012 Yes NRC000151 NYS-38/ RK-TC5 Temporary Instruction 2516/001, dated March 30, 08/20/2012 Yes 2011 NRC000152 NYS-38/ RK-TC5 Indian Point Nuclear Generating Unit 2 - NRC 08/20/2012 Yes Inspection Report 05000247/2012008, dated April 19, 2012 NRC000153 NYS-38/ RK-TC5 NL-12-089, Entergy Letter Replying to Request for 08/20/2012 Yes Additional Information Regarding the License Renewal Application (dated June 14, 2012)

NRC000154 NYS-38/ RK-TC5 April 11, 2011 Summary of the March 11, 2011 08/20/2012 Yes Meeting between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute to Discuss Current License Renewal Topics Page 3 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000155 NYS-38/ RK-TC5 March 30, 2011 Audit Report on the Use of 08/20/2012 Yes WESTEMS Software in the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application NRC000156 NYS-38/ RK-TC5 NL-11-101, Entergy Letter Regarding Clarification for 08/20/2012 Yes Request for Additional Information - Aging Management Programs (dated August 22, 2011)

NRC000157 NYS-38/ RK-TC5 Kenneth J. Karwoski - Statement of Professional 08/20/2012 Yes Qualifications NRC000158 NYS-38/ RK-TC5 August 12, 2010 NEI Steam Generator Task Force 08/20/2012 Yes NRC/ Industry Update (CONTAINS COPYRIGHTED MATERIAL)

NRC000159 NYS-38/ RK-TC5 Electric Power Research Institute - Implementation 08/20/2012 Yes Status of Industry Change Management Plan for Materials Related R & D Committees under NEI 03-08 (CONTAINS COPYRIGHTED MATERIAL)

NRC000160 NYS-38/ RK-TC5 August 4, 2011 NEI Steam Generator Task Force 08/20/2012 Yes NRC/ Industry Update (CONTAINS COPYRIGHTED MATERIAL)

NRCR00161 NYS-38/ RK-TC5 NRC Staff Testimony of Dr. Allen L. Hiser and Mr. 08/10/2015 Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (REVISED)

NRC000168 NYS-26 NYS-38 NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, 08/10/2015 Mr. Gary Stevens, P.E., and Mr. On Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS- 38/RK-TC-5 Page 4 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000169 NYS-26 NYS-38 Indian Point Unit 2 Technical Specifications 08/10/2015 (EXCERPT)

NRC000170 NYS-26 NYS-38 EPRI 1008224, Final Report, Rev. 6, Pressurized 08/10/2015 Water Reactor Secondary Water Chemistry Guidelines (Dec. 2004) (PROPRIETARY)

NRC000171 NYS-26 NYS-38 EPRI 1015014, Materials Reliability Program: 08/10/2015 Evaluation of Controlling Transient Ramp Times Using Piping Methodologies When Considering Environmental Fatigue (Fen) Effects (MRP-218) (Sept.

2007) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000172 NYS-26 NYS-38 EPRI 1003536, Materials Reliability Program: Second 08/10/2015 International Conference on Fatigue of Reactor Components (MRP-84) (Feb. 2003) (EXCERPT)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000173 NYS-26 NYS-38 Excerpt from Transcript of Advisory Committee on 08/10/2015 Reactor Safeguards Metallurgy and Reactor Fuels Subcommittee at 105-106 (Dec. 2, 2014)

NRC000174 NYS-26 NYS-38 Background of the Factors of Safety Used in Divisions 08/10/2015 I of Sections III and XI of the ASME Rules for Nuclear Vessels (Oct. 1984) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000175 NYS-26 NYS-38 Implementation of Automated, On-line Fatigue 08/10/2015 Monitoring in a Boiling Water Reactor (1993)

(CONTAINS COPYRIGHTED MATERIAL)

Page 5 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000176 NYS-26 NYS-38 EPRI 1003069, Materials Reliability Program Hot Cell 08/10/2015 Testing of Baffle/Former Bolts Removed From Two Lead PWR Plants (MRP-51) (PROPRIETARY)

NRC000177 NYS-26 NYS-38 ICONE5-2372, Fatigue and Stress Corrosion 08/10/2015 Cracking Behaviors of Irradiated Stainless Steels in PWR Primary Water (Nov. 2001) (CONTAINS COPYRIGHTED MATERIAL)

NRC000178 NYS-26 NYS-38 ASME Code,Section III - Subsection NCA, General 08/10/2015 Requirements for Division 1 and Division 2 Rules for Construction of Nuclear Facility Components (Jul. 1, 2007) (CONTAINS COPYRIGHTED MATERIAL)

NRC000179 NYS-26 NYS-38 Regulatory Guide 1.207, Guidelines for Evaluating 08/10/2015 Fatigue Analyses Incorporating the Life Reduction of Metal Components Due to the Effects of the Light-Water Reactor Environment for New Reactors (Mar.

2007)

NRC000180 NYS-26 NYS-38 NRC Inspection Manual, Chapter 2516, Policy and 08/10/2015 Guidance for the License Renewal Inspection Program (Aug. 13, 2013)

NRC000181 NYS-26 NYS-38 Letter from James Trapp, NRC, to John Ventosa, 08/10/2015 Entergy, Indian Point Nuclear Generating Unit 2 -

NRC License Renewal Team Inspection Report 05000247/2013009 (July 5, 2013)

Page 6 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000182 NYS-26 NYS-38 Letter from James Trapp, NRC, to John Ventosa, 08/10/2015 Entergy, Indian Point Nuclear Generating Unit 2 -

NRC License Renewal Team Inspection Report 05000247/2013010 (Sept. 19, 2013)

NRC000183 NYS-26 NYS-38 NRC Inspection Manual, Inspection Procedure 71013, 08/10/2015 Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013)

NRC000184 NYS-25 NYS-26 NYS-38 Letter NL-13-114, Letter from Fred Dacimo, Entergy, 08/10/2015 to NRC, Implementation of License Renewal Regulatory Commitments Indian Point Nuclear Generating Unit No. 2 Docket No. 50-257 License No.

DPR-26 (Aug. 28, 2013)

NRC000185 NYS-26 NYS-38 Letter from Arthur Burritt, NRC, to Larry Coyle, 08/10/2015 Entergy, Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)

NRC000186 NYS-26 NYS-38 Effect of LWR Coolant Environments on the Fatigue 08/10/2015 of Reactor Materials, 79 Fed. Reg. 21811 (Apr. 17, 2014)

NRC000187 NYS-26, 38 Letter from John Daily, NRC, to Entergy, Request for 08/10/2015 Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos.

MD5407 and MD5408) ( Feb. 6, 2013)

Page 7 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRCR00188 NYS-26 NYS-38 Letter NL-15-060, Letter from Fred Dacimo, Entergy, 08/19/2015 to NRC, Entergy Actions Required Prior to Entry into Period of Extended Operation Associated with License Renewal Application (LRA) for Indian Point Nuclear Generating Unit No. 3 Docket No. 50-286 License No. DPR-64 (May 12, 2015) (Revised)

NRC000189 NYS-38 TSTF-510, Rev. 2, Revision to Steam Generator 08/10/2015 Program Inspection Frequencies and Tube Sample Selection (Mar. 1, 2011)

NRC000190 NYS-38 NRC White Paper on Risk-Informed and Performance- 08/10/2015 Based Regulation NRC000191 NYS-38 Biweekly Notice; Applications and Amendments to 08/10/2015 Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 79 Fed. Reg. 15144 (Mar. 18, 2014)

NRC000192 NYS-38 Letter NL-15-001, Letter from Lawrence Coyle, to 08/10/2015 NRC, Response to Request for Additional Information (RAI) for the Steam Generator Examination Program Results 2014 Refueling Outage (2R21) Indian Point Unit No. 2 Docket No. 50- 247 License No. DPR-26 (Jan. 15, 2015)

Page 8 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000193 NYS-38 Letter NL-13-143, Letter from Robert Walpole, to 08/10/2015 NRC, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Performed During the Spring 2013 Refueling Outage Indian Point Unit No. 3 Docket No. 50-286 License No. DPR-64 (Oct. 29, 2013)

NRC000194 NYS-38 S. Miloudi et al, Destructive Examinations on Divider 08/10/2015 Plates from Decommissioned Steam Generators Affected by Superficial Stress Corrosion Cracks, in 15th International Conference on Environmental Degradation of Materials in Nuclear Power Systems-Water Reactors (2012) (CONTAINS COPYRIGHTED MATERIAL)

NRC000195 NYS-26 NYS-38 ASME Code,Section XI, Rules for Inservice 08/10/2015 Inspection of Nuclear Power Plant Components, 2007 through 2008 Addenda, IWB-2500, Table IWB-2500-1, IWB,3700, IWC-2500, Table IWC-2500-1(Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL)

NRC000196 NYS-25 NYS-38 NRC Staffs Initial Statement of Position on 08/10/2015 Contention NYS-25 (Reactor Vessel Internals)

(PROPRIETARY)

NRC000197 NYS-25 NYS-38 NRC Staff Testimony of Dr. Allen Hiser, Jeffrey 08/10/2015 Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 (PROPRIETARY)

Page 9 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000198 NYS-25 NYS-38 Enclosure to MRP Letter 2013-025, MRP-227-A 08/10/2015 Applicability Guidelines for Combustion Engineering and Westinghouse Pressurized Water Reactor Designs (Oct. 4, 2013)

NRC000199 NYS-25 NYS-38 ASME Code,Section XI, 2007 through 2008 08/10/2015 Addenda, IWA-2213 (Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL)

NRC000200 NYS-25 NYS-38 WCAP-17096-NP, Rev. 2, Reactor Internals 08/10/2015 Acceptance Criteria Methodology and Data Requirements (Dec. 2009)

NRC000201 NYS-25 NYS-38 NRC Position on Aging Management of CASS 08/10/2015 Reactor Vessel Internal Components (June 11, 2014)

NRC000202 NYS-25 NYS-38 ASM Handbook, Vol. 19, Fatigue and Fracture, Figure 08/10/2015 14 at 595 (1996) (EXCERPT ) (CONTAINS COPYRIGHTED MATERIAL)

NRC000203 NYS-25 NYS-38 EPRI 1021001NP/BWRVIP-100NP, Final Report, 08/10/2015 Rev. 1, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Oct. 2010)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000204 NYS-25 NYS-38 PWROG-14048-P, Rev. 0, Functionality Analysis: 08/10/2015 Lower Support Columns (Dec. 2014)

(PROPRIETARY)

NRC000205 NYS-25 NYS-38 Indian Point, Unit 2, Updated Final Safety Analysis 08/10/2015 Report (UFSAR), Rev. 25, Chapter 3 - Reactor (2014)

Page 10 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000206 NYS-25 NYS-38 Indian Point, Unit 2, Updated Final Safety Analysis 08/10/2015 Report (UFSAR), Rev. 25, Chapter 14 - Safety Analysis (2014)

NRC000207 NYS-25 NYS-38 Regulatory Information Conference Presentation 08/10/2015 Slides, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015)

NRC00208A - E NYS-25 NYS-38 MRP Letter 2014-09, Biennial Report of Recent MRP- 08/10/2015 227-A Reactor Internals Inspection Results (May 12, 2014)

NRC000209 NYS-25 NYS-38 EPRI 1013396/BWRVIP-100-A, Final Report, BWR 08/10/2015 Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Aug. 2006) (PROPRIETARY)

NRC000210 NYS-25 NYS-38 EPRI 1013396NP/ BWRVIP-100NP-A, Final Report, 08/10/2015 BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Aug. 2006)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000211 NYS-25 NYS-38 MRP-227, Rev. 1 Presentation Slides, Westinghouse 08/10/2015 Figures Presented at Public Meeting on March 31, 2015 (Feb. 2015)

NRC000212 NYS-25 NYS-38 R. Reed-Hill and R. Abbaschian, Physical Metallurgy 08/10/2015 Principles , Third Edition (1992) (EXCERPT)

(CONTAINS COPYRIGHTED MATERIAL)

Page 11 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000213 NYS-25 NYS-38 Letter from Christopher Grimes, Chief, NRC, to 08/10/2015 Douglas Walters, NEI, License Renewal Issue No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components (May 19, 2000)

NRC000214 NYS-25 NYS-38 Letter from John Lubinski, NRC, to Jean Smith, EPRI, 08/10/2015 License Renewal Interim Staff Guidance LR-ISG-2011-04: Updated Aging Management Criteria for Reactor Vessel Internal Components for Pressurized Water Reactors (May 28, 2013)

NRC000215 NYS-25 NYS-38 Evaluation of WCAP-17780-P, "Reactor Internals 08/10/2015 Aging Management MRP- 227-A Applicability for Combustion Engineering [(CE)] and Westinghouse

[Electric Company (Westinghouse)] Pressurized Water Reactor Designs," and MRP-227-A, Applicability Guidelines for CE and Westinghouse Pressurized Water Reactor Designs (Nov. 7, 2014)

(PROPRIETARY)

NRC000216 NYS-25 NYS-38 U.S. Nuclear Regulatory Commission Office of 08/10/2015 Nuclear Reactor Regulation Division of License Renewal Aging Management Audit Report (Oct. 6, 2014)

Page 12 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000218 NYS-25 NYS-38 EPRI 1016106, Final Report, Materials Reliability 08/10/2015 Program: Fracture Toughness Evaluation of Highly Irradiated PWR Stainless Steel Internal Components (MRP-210) (Dec. 2007) (COPYRIGHT)

NRC000219 NYS-25 NYS-38 Westinghouse InfoGram IG-10-1, Reactor Internals 08/10/2015 Lower Radial Support Clevis Insert Cap Screw Degradation (Mar. 31, 2010)

NRC000220 NYS-25 NYS-38 Pressurized Water Reactor Owners Group (PWROG) 08/10/2015 Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange:

Clevis Insert Bolt Update, (June 2014)

NRC00221A-F NYS-25 NYS-38 Babcock & Wilcox Report, S-1473-002, Final Report, 08/10/2015 Rev. 0, Examination of Clevis Bolts Removed from D.

C. Cook Nuclear Plant (Dec. 2013)

NRC000222 NYS-25 NYS-38 IP3 FSAR Rev. 04 Chapter 3 (2011) (EXCERPT) 08/10/2015 NRC000223 NYS-25 NYS-38 IP3 FSAR Rev. 04 Chapter 14 (2011) 08/10/2015 NRC000224 NYS-25 NYS-38 IP3 FSAR Rev. 04 Chapter 16 08/10/2015 NRC00225A-B NYS-25 NYS-38 EPRI 1016593, Final Report, Materials Reliability 08/10/2015 Program: Aging Management Strategies for Westinghouse and Combustion Engineering PWR Internals (MRP-232) (Dec. 31, 2008)

(PROPRIETARY)

NRC000226 NYS-25 NYS-38 Jeffrey C. Poehler Statement of Professional 08/10/2015 NRC000227 NYS-25 NYS-26 NYS-38 Gary Stevens Statement of Professional 08/10/2015 NRC000228 NYS-25 NYS-38 Indian Point Unit 2 Technical Specifications 3.1.4 08/10/2015 NRC000229 NYS-25 NYS-38 Indian Point Unit 3 Technical Specifications 3.1.4 08/10/2015 Page 13 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000230 NYS-25, NYS-26, NYS-38 Table of Corrections to Staff Testimony 11/03/2015 Page 14 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRCR10001 ALL NRC Staff Pre-filed Hearing Exhibit List (REVISED) 11/05/2015 NRCR20101 NYS-26B/ RK-TC1B NRC Staffs Revised Statement of Position Regarding 08/10/2015 NYS 26B/RK-TC-1B NRC000102 NYS-26B/ RK-TC1B NRC Staffs Testimony of Allen Hiser, On Yee and 03/31/2012 Yes.

Ching Ng Regarding NYS 26B/RK-TC-1B Superseded by NRC000168 NRC000103 NYS-26B/ RK-TC1B Allen Hiser Statement of Professional Qualifications 03/30/2012 Yes NRCR00104 NYS-26 NYS-38 On Yee Statement of Professional Qualifications 08/10/2015 (REVISED)

NRCR00105 NYS-26 NYS-38 Ching Ng Statement of Professional Qualifications 08/10/2015 (REVISED)

NRC000106 NYS-26B/ RK-TC1B NRC Inspection Manual, Inspection Procedure 71002, 03/30/2012 Yes License Renewal Inspection NRC000107 NYS-26B/ RK-TC1B NRC Inspection Report 05000247/2008006 and 03/30/2012 Yes 05000286/2008006 NRC000108 NYS-26B/ RK-TC1B Audit Report for Plant Aging Management Programs 03/31/2012 Yes and Reviews, Indian Point Nuclear Generating Unit Nos. 2 and 3 NRC000109 NYS-26B/ RK-TC1B Letter NL-08-057, Letter from Entergy Nuclear 03/31/2012 Yes Operations, Inc., to NRC, Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Amendment 3 NRC000110 NYS-26B/ RK-TC1B Letter NL-11-032, Letter from Entergy Nuclear 03/31/2012 Yes Operations, Inc. to NRC, Indian Point, Units 2 & 3, Response to Request for Additional Information on Aging Management Programs Page 1 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000111 NYS-26B/ RK-TC1B Letter NL-07-153, Letter from Entergy Nuclear 03/31/2012 Yes Operations, Inc., to NRC, Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Amendment 1 NRC000112 NYS-26B/ RK-TC1B NRC Regulatory Issue Summary -2011-14, Metal 03/31/2012 Yes Fatigue Analysis Performed By Computer Software NRC000113 NYS-26B/ RK-TC1B ASME Code Section XI, Appendix L, Operating Plant 03/31/2012 Yes Fatigue Assessment NRC000114A-F NYS-26B/ RK-TC1B MRP-227-A, Materials Reliability Program: 04/02/2012 Yes Pressurized Water Reactor Internals Inspection and Evaluation Guidelines NRC000115 NYS-26B/ RK-TC1B EPRI, TR-105714, Rev. 5, Pressurized Water Reactor 03/31/2012 Yes Primary Water Chemistry Guidelines NRC000116 NYS-26B/ RK-TC1B Requests for Additional Information in NRC Letter, 03/31/2012 Yes Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application Time-Limited Aging Analyses, Bolted Connections, and Boraflex, (April 18, 2008) (ADAMS Accession No. ML080870374)

NRC000117 NYS-26B/ RK-TC1B Statement Of Consideration for 1995 License 03/31/2012 Yes Renewal Rule NRCR00118 NYS-26 NYS-38 Indian Point Unit 3 Technical Specifications 08/10/2015 (EXCERPT) (REVISED)

NRC000119 NYS-26B/ RK-TC1B Salem Nuclear Generating Stations use of 03/31/2012 Yes WESTEMSTM fatigue software Page 2 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000123 NYS-26B/ RK-TC-1B, RK-TC- Audit and Review Plan for Plant Aging Management 03/31/2012 Yes 2 Reviews and Programs - Indian Point Generating Units Nos. 2 and 3)

NRC000124 NYS-26B/ RK-TC-1B, RK-TC- Scoping and Screening Methodology Audit Trip 03/31/2012 Yes 2 Report For Indian Point, Units 2 and 3 NRCR00147 NYS-26 NYS-38 NRC Staffs Revised Statement of Position on State of 08/10/2015 New York and Riverkeepers Joint Contention NYS-38/RK-TC5 (REVISED)

NRC000148 NYS-38/ RK-TC5 NRC Staffs Testimony of Allen L. Hiser, On Yee, and 08/20/2012 Yes.

Ching Ng Concerning Portions of Contention NYS-38 Superseded by NRC000168 NRC000149 NYS-38/ RK-TC5 ASME Section XI, Appendix A (Excerpt) 08/20/2012 Yes NRC000150 NYS-38/ RK-TC5 ASME Section XI, Appendix C (Excerpt) 08/20/2012 Yes NRC000151 NYS-38/ RK-TC5 Temporary Instruction 2516/001, dated March 30, 08/20/2012 Yes 2011 NRC000152 NYS-38/ RK-TC5 Indian Point Nuclear Generating Unit 2 - NRC 08/20/2012 Yes Inspection Report 05000247/2012008, dated April 19, 2012 NRC000153 NYS-38/ RK-TC5 NL-12-089, Entergy Letter Replying to Request for 08/20/2012 Yes Additional Information Regarding the License Renewal Application (dated June 14, 2012)

NRC000154 NYS-38/ RK-TC5 April 11, 2011 Summary of the March 11, 2011 08/20/2012 Yes Meeting between the U.S. Nuclear Regulatory Commission Staff and the Nuclear Energy Institute to Discuss Current License Renewal Topics Page 3 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000155 NYS-38/ RK-TC5 March 30, 2011 Audit Report on the Use of 08/20/2012 Yes WESTEMS Software in the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application NRC000156 NYS-38/ RK-TC5 NL-11-101, Entergy Letter Regarding Clarification for 08/20/2012 Yes Request for Additional Information - Aging Management Programs (dated August 22, 2011)

NRC000157 NYS-38/ RK-TC5 Kenneth J. Karwoski - Statement of Professional 08/20/2012 Yes Qualifications NRC000158 NYS-38/ RK-TC5 August 12, 2010 NEI Steam Generator Task Force 08/20/2012 Yes NRC/ Industry Update (CONTAINS COPYRIGHTED MATERIAL)

NRC000159 NYS-38/ RK-TC5 Electric Power Research Institute - Implementation 08/20/2012 Yes Status of Industry Change Management Plan for Materials Related R & D Committees under NEI 03-08 (CONTAINS COPYRIGHTED MATERIAL)

NRC000160 NYS-38/ RK-TC5 August 4, 2011 NEI Steam Generator Task Force 08/20/2012 Yes NRC/ Industry Update (CONTAINS COPYRIGHTED MATERIAL)

NRCR00161 NYS-38/ RK-TC5 NRC Staff Testimony of Dr. Allen L. Hiser and Mr. 08/10/2015 Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (REVISED)

NRC000168 NYS-26 NYS-38 NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, 08/10/2015 Mr. Gary Stevens, P.E., and Mr. On Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS- 38/RK-TC-5 Page 4 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000169 NYS-26 NYS-38 Indian Point Unit 2 Technical Specifications 08/10/2015 (EXCERPT)

NRC000170 NYS-26 NYS-38 EPRI 1008224, Final Report, Rev. 6, Pressurized 08/10/2015 Water Reactor Secondary Water Chemistry Guidelines (Dec. 2004) (PROPRIETARY)

NRC000171 NYS-26 NYS-38 EPRI 1015014, Materials Reliability Program: 08/10/2015 Evaluation of Controlling Transient Ramp Times Using Piping Methodologies When Considering Environmental Fatigue (Fen) Effects (MRP-218) (Sept.

2007) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000172 NYS-26 NYS-38 EPRI 1003536, Materials Reliability Program: Second 08/10/2015 International Conference on Fatigue of Reactor Components (MRP-84) (Feb. 2003) (EXCERPT)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000173 NYS-26 NYS-38 Excerpt from Transcript of Advisory Committee on 08/10/2015 Reactor Safeguards Metallurgy and Reactor Fuels Subcommittee at 105-106 (Dec. 2, 2014)

NRC000174 NYS-26 NYS-38 Background of the Factors of Safety Used in Divisions 08/10/2015 I of Sections III and XI of the ASME Rules for Nuclear Vessels (Oct. 1984) (EXCERPT) (CONTAINS COPYRIGHTED MATERIAL)

NRC000175 NYS-26 NYS-38 Implementation of Automated, On-line Fatigue 08/10/2015 Monitoring in a Boiling Water Reactor (1993)

(CONTAINS COPYRIGHTED MATERIAL)

Page 5 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000176 NYS-26 NYS-38 EPRI 1003069, Materials Reliability Program Hot Cell 08/10/2015 Testing of Baffle/Former Bolts Removed From Two Lead PWR Plants (MRP-51) (PROPRIETARY)

NRC000177 NYS-26 NYS-38 ICONE5-2372, Fatigue and Stress Corrosion 08/10/2015 Cracking Behaviors of Irradiated Stainless Steels in PWR Primary Water (Nov. 2001) (CONTAINS COPYRIGHTED MATERIAL)

NRC000178 NYS-26 NYS-38 ASME Code,Section III - Subsection NCA, General 08/10/2015 Requirements for Division 1 and Division 2 Rules for Construction of Nuclear Facility Components (Jul. 1, 2007) (CONTAINS COPYRIGHTED MATERIAL)

NRC000179 NYS-26 NYS-38 Regulatory Guide 1.207, Guidelines for Evaluating 08/10/2015 Fatigue Analyses Incorporating the Life Reduction of Metal Components Due to the Effects of the Light-Water Reactor Environment for New Reactors (Mar.

2007)

NRC000180 NYS-26 NYS-38 NRC Inspection Manual, Chapter 2516, Policy and 08/10/2015 Guidance for the License Renewal Inspection Program (Aug. 13, 2013)

NRC000181 NYS-26 NYS-38 Letter from James Trapp, NRC, to John Ventosa, 08/10/2015 Entergy, Indian Point Nuclear Generating Unit 2 -

NRC License Renewal Team Inspection Report 05000247/2013009 (July 5, 2013)

Page 6 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000182 NYS-26 NYS-38 Letter from James Trapp, NRC, to John Ventosa, 08/10/2015 Entergy, Indian Point Nuclear Generating Unit 2 -

NRC License Renewal Team Inspection Report 05000247/2013010 (Sept. 19, 2013)

NRC000183 NYS-26 NYS-38 NRC Inspection Manual, Inspection Procedure 71013, 08/10/2015 Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013)

NRC000184 NYS-25 NYS-26 NYS-38 Letter NL-13-114, Letter from Fred Dacimo, Entergy, 08/10/2015 to NRC, Implementation of License Renewal Regulatory Commitments Indian Point Nuclear Generating Unit No. 2 Docket No. 50-257 License No.

DPR-26 (Aug. 28, 2013)

NRC000185 NYS-26 NYS-38 Letter from Arthur Burritt, NRC, to Larry Coyle, 08/10/2015 Entergy, Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001) (Mar. 4, 2015)

NRC000186 NYS-26 NYS-38 Effect of LWR Coolant Environments on the Fatigue 08/10/2015 of Reactor Materials, 79 Fed. Reg. 21811 (Apr. 17, 2014)

NRC000187 NYS-26, 38 Letter from John Daily, NRC, to Entergy, Request for 08/10/2015 Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos.

MD5407 and MD5408) ( Feb. 6, 2013)

Page 7 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRCR00188 NYS-26 NYS-38 Letter NL-15-060, Letter from Fred Dacimo, Entergy, 08/19/2015 to NRC, Entergy Actions Required Prior to Entry into Period of Extended Operation Associated with License Renewal Application (LRA) for Indian Point Nuclear Generating Unit No. 3 Docket No. 50-286 License No. DPR-64 (May 12, 2015) (Revised)

NRC000189 NYS-38 TSTF-510, Rev. 2, Revision to Steam Generator 08/10/2015 Program Inspection Frequencies and Tube Sample Selection (Mar. 1, 2011)

NRC000190 NYS-38 NRC White Paper on Risk-Informed and Performance- 08/10/2015 Based Regulation NRC000191 NYS-38 Biweekly Notice; Applications and Amendments to 08/10/2015 Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations, 79 Fed. Reg. 15144 (Mar. 18, 2014)

NRC000192 NYS-38 Letter NL-15-001, Letter from Lawrence Coyle, to 08/10/2015 NRC, Response to Request for Additional Information (RAI) for the Steam Generator Examination Program Results 2014 Refueling Outage (2R21) Indian Point Unit No. 2 Docket No. 50- 247 License No. DPR-26 (Jan. 15, 2015)

Page 8 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000193 NYS-38 Letter NL-13-143, Letter from Robert Walpole, to 08/10/2015 NRC, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Performed During the Spring 2013 Refueling Outage Indian Point Unit No. 3 Docket No. 50-286 License No. DPR-64 (Oct. 29, 2013)

NRC000194 NYS-38 S. Miloudi et al, Destructive Examinations on Divider 08/10/2015 Plates from Decommissioned Steam Generators Affected by Superficial Stress Corrosion Cracks, in 15th International Conference on Environmental Degradation of Materials in Nuclear Power Systems-Water Reactors (2012) (CONTAINS COPYRIGHTED MATERIAL)

NRC000195 NYS-26 NYS-38 ASME Code,Section XI, Rules for Inservice 08/10/2015 Inspection of Nuclear Power Plant Components, 2007 through 2008 Addenda, IWB-2500, Table IWB-2500-1, IWB,3700, IWC-2500, Table IWC-2500-1(Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL)

NRC000196 NYS-25 NYS-38 NRC Staffs Initial Statement of Position on 08/10/2015 Contention NYS-25 (Reactor Vessel Internals)

(PROPRIETARY)

NRC000197 NYS-25 NYS-38 NRC Staff Testimony of Dr. Allen Hiser, Jeffrey 08/10/2015 Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 (PROPRIETARY)

Page 9 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000198 NYS-25 NYS-38 Enclosure to MRP Letter 2013-025, MRP-227-A 08/10/2015 Applicability Guidelines for Combustion Engineering and Westinghouse Pressurized Water Reactor Designs (Oct. 4, 2013)

NRC000199 NYS-25 NYS-38 ASME Code,Section XI, 2007 through 2008 08/10/2015 Addenda, IWA-2213 (Jul. 1, 2008) (CONTAINS COPYRIGHTED MATERIAL)

NRC000200 NYS-25 NYS-38 WCAP-17096-NP, Rev. 2, Reactor Internals 08/10/2015 Acceptance Criteria Methodology and Data Requirements (Dec. 2009)

NRC000201 NYS-25 NYS-38 NRC Position on Aging Management of CASS 08/10/2015 Reactor Vessel Internal Components (June 11, 2014)

NRC000202 NYS-25 NYS-38 ASM Handbook, Vol. 19, Fatigue and Fracture, Figure 08/10/2015 14 at 595 (1996) (EXCERPT ) (CONTAINS COPYRIGHTED MATERIAL)

NRC000203 NYS-25 NYS-38 EPRI 1021001NP/BWRVIP-100NP, Final Report, 08/10/2015 Rev. 1, BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Oct. 2010)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000204 NYS-25 NYS-38 PWROG-14048-P, Rev. 0, Functionality Analysis: 08/10/2015 Lower Support Columns (Dec. 2014)

(PROPRIETARY)

NRC000205 NYS-25 NYS-38 Indian Point, Unit 2, Updated Final Safety Analysis 08/10/2015 Report (UFSAR), Rev. 25, Chapter 3 - Reactor (2014)

Page 10 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000206 NYS-25 NYS-38 Indian Point, Unit 2, Updated Final Safety Analysis 08/10/2015 Report (UFSAR), Rev. 25, Chapter 14 - Safety Analysis (2014)

NRC000207 NYS-25 NYS-38 Regulatory Information Conference Presentation 08/10/2015 Slides, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015)

NRC00208A - E NYS-25 NYS-38 MRP Letter 2014-09, Biennial Report of Recent MRP- 08/10/2015 227-A Reactor Internals Inspection Results (May 12, 2014)

NRC000209 NYS-25 NYS-38 EPRI 1013396/BWRVIP-100-A, Final Report, BWR 08/10/2015 Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Aug. 2006) (PROPRIETARY)

NRC000210 NYS-25 NYS-38 EPRI 1013396NP/ BWRVIP-100NP-A, Final Report, 08/10/2015 BWR Vessel and Internals Project, Updated Assessment of the Fracture Toughness of Irradiated Stainless Steel for BWR Core Shrouds (Aug. 2006)

(CONTAINS COPYRIGHTED MATERIAL)

NRC000211 NYS-25 NYS-38 MRP-227, Rev. 1 Presentation Slides, Westinghouse 08/10/2015 Figures Presented at Public Meeting on March 31, 2015 (Feb. 2015)

NRC000212 NYS-25 NYS-38 R. Reed-Hill and R. Abbaschian, Physical Metallurgy 08/10/2015 Principles , Third Edition (1992) (EXCERPT)

(CONTAINS COPYRIGHTED MATERIAL)

Page 11 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000213 NYS-25 NYS-38 Letter from Christopher Grimes, Chief, NRC, to 08/10/2015 Douglas Walters, NEI, License Renewal Issue No. 98-0030, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components (May 19, 2000)

NRC000214 NYS-25 NYS-38 Letter from John Lubinski, NRC, to Jean Smith, EPRI, 08/10/2015 License Renewal Interim Staff Guidance LR-ISG-2011-04: Updated Aging Management Criteria for Reactor Vessel Internal Components for Pressurized Water Reactors (May 28, 2013)

NRC000215 NYS-25 NYS-38 Evaluation of WCAP-17780-P, "Reactor Internals 08/10/2015 Aging Management MRP- 227-A Applicability for Combustion Engineering [(CE)] and Westinghouse

[Electric Company (Westinghouse)] Pressurized Water Reactor Designs," and MRP-227-A, Applicability Guidelines for CE and Westinghouse Pressurized Water Reactor Designs (Nov. 7, 2014)

(PROPRIETARY)

NRC000216 NYS-25 NYS-38 U.S. Nuclear Regulatory Commission Office of 08/10/2015 Nuclear Reactor Regulation Division of License Renewal Aging Management Audit Report (Oct. 6, 2014)

Page 12 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000218 NYS-25 NYS-38 EPRI 1016106, Final Report, Materials Reliability 08/10/2015 Program: Fracture Toughness Evaluation of Highly Irradiated PWR Stainless Steel Internal Components (MRP-210) (Dec. 2007) (COPYRIGHT)

NRC000219 NYS-25 NYS-38 Westinghouse InfoGram IG-10-1, Reactor Internals 08/10/2015 Lower Radial Support Clevis Insert Cap Screw Degradation (Mar. 31, 2010)

NRC000220 NYS-25 NYS-38 Pressurized Water Reactor Owners Group (PWROG) 08/10/2015 Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange:

Clevis Insert Bolt Update, (June 2014)

NRC00221A-F NYS-25 NYS-38 Babcock & Wilcox Report, S-1473-002, Final Report, 08/10/2015 Rev. 0, Examination of Clevis Bolts Removed from D.

C. Cook Nuclear Plant (Dec. 2013)

NRC000222 NYS-25 NYS-38 IP3 FSAR Rev. 04 Chapter 3 (2011) (EXCERPT) 08/10/2015 NRC000223 NYS-25 NYS-38 IP3 FSAR Rev. 04 Chapter 14 (2011) 08/10/2015 NRC000224 NYS-25 NYS-38 IP3 FSAR Rev. 04 Chapter 16 08/10/2015 NRC00225A-B NYS-25 NYS-38 EPRI 1016593, Final Report, Materials Reliability 08/10/2015 Program: Aging Management Strategies for Westinghouse and Combustion Engineering PWR Internals (MRP-232) (Dec. 31, 2008)

(PROPRIETARY)

NRC000226 NYS-25 NYS-38 Jeffrey C. Poehler Statement of Professional 08/10/2015 NRC000227 NYS-25 NYS-26 NYS-38 Gary Stevens Statement of Professional 08/10/2015 NRC000228 NYS-25 NYS-38 Indian Point Unit 2 Technical Specifications 3.1.4 08/10/2015 NRC000229 NYS-25 NYS-38 Indian Point Unit 3 Technical Specifications 3.1.4 08/10/2015 Page 13 of 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3) NRCR10001 Docket Nos. 50-247-LR and 50-286-LR Submitted: Nov. 5, 2015 ASLBP No. 07-858-03-LR-BD01 Evidentary Hearing NRC Staff TRACK 2 Exhibit List Exhibit # Contention Addressed by Exhibit Name Proffered Exhibit Date Admitted NRC000230 NYS-25, NYS-26, NYS-38 Table of Corrections to Staff Testimony 11/03/2015 Page 14 of 14