| Response to NRC Generic Letter 2016-01: Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools for the Missouri S&T Reactor Facility, R-79, Docket 50-123. | | Response to NRC Generic Letter 2016-01: Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools for the Missouri S&T Reactor Facility, R-79, Docket 50-123. |
| NRC: | | NRC: |
| The Missouri University of Science & Technology Research Reactor does not have neutron absorbing materials in the fuel storage pool (FSP). Fuel elements are positioned in two racks each made of 6061 T6 Aluminum. Each rack can hold one row of fifteen fuel elements with a distance ofr* five inches | | The Missouri University of Science & Technology Research Reactor does not have neutron absorbing materials in the fuel storage pool (FSP). Fuel elements are positioned in two racks each made of 6061 T6 Aluminum. Each rack can hold one row of fifteen fuel elements with a distance ofr* five inches between elements. The entire fuel inventory can be contained in the FSP. |
| .- ..
| |
| between elements. The entire fuel inventory can be contained in the FSP. | |
| ,*,,
| |
| The:reaCtor core has the control rods maintaining a subcritical reactor while the reactor is shutdown and not being used. During the annual control rod inspection 50% of the reactor core's critical mass is moved to the FSP. One control rod is removed from the core, inspected arid.~einstalled into the reactor core prior to the removal and inspection of the next control rod. | | The:reaCtor core has the control rods maintaining a subcritical reactor while the reactor is shutdown and not being used. During the annual control rod inspection 50% of the reactor core's critical mass is moved to the FSP. One control rod is removed from the core, inspected arid.~einstalled into the reactor core prior to the removal and inspection of the next control rod. |
| All fuel movements during this process are approved by the reactor manager and supervised by a Senior Reactor Operator. *- | | All fuel movements during this process are approved by the reactor manager and supervised by a Senior Reactor Operator. *- |
Latest revision as of 01:42, 5 February 2020
|
---|
Category:Letter
MONTHYEARML24281A0622024-10-0808 October 2024 Examination Confirmation Letter No. 50-123/Ol-25-01 Missouri University of Science and Technology ML24221A2882024-08-0808 August 2024 Follow-Up Report on EN-57239, Deviation from 10 CFR 50.54(k) and Missouri S&T Reactor (R-79) Technical Specification 6.1.3.1.a) IR 05000123/20242012024-07-0101 July 2024 Board of Curators of the University of Missouri – U.S. Nuclear Regulatory Commission Safety Inspection Report 05000123/2024201 ML24151A6642024-05-30030 May 2024 Submittal of 2023-2024 Annual Progress Report for Missouri University of Science and Technology Reactor ML24018A1112024-01-19019 January 2024 Board of the Curators of the University of Missouri – Change of Facility Backup Project Manager ML24017A1662024-01-18018 January 2024 Examination Confirmation Letter No. 50-123/Ol-24-02, Missouri University of Science and Technology (Must) ML23349A2062023-12-15015 December 2023 Missouri University of Science and Technology Reactor (Mstr), Follow-Up Report on EN-56878, Reportable Occurrence ML23311A0722023-12-12012 December 2023 Examination Report Letter No. 50-123/OL-24-01, Missouri University of Science and Technology ML23222A2202023-08-10010 August 2023 Examination Confirmation Letter No. 50-123/OL-24-01, Missouri University of Science and Technology IR 05000123/20232012023-08-0202 August 2023 Board of Curators of the University of Missouri - Us Nuclear Regulatory Commission Safety Inspection Report No. 05000123/2023201 ML23145A2542023-05-23023 May 2023 2022-2023 Annual Progress Report for Missouri University of Science and Technology Reactor ML23114A0772023-04-24024 April 2023 Examination Result Letter No. 50-123/OL-23-01, Missouri University of Science and Technology ML23114A0762023-04-24024 April 2023 Examination Report No. 50-123/OL-23-01, Missouri University of Science and Technology ML23040A3902023-03-13013 March 2023 Examination Confirmation Letter No. 50-123/OL-23-01, Missouri University of Science and Technology ML22280A1742022-10-31031 October 2022 Examination Confirmation Letter No. 50-123/OL-23-01, Missouri University of Science and Technology ML22298A3032022-10-17017 October 2022 Level 1 Personnel Change at the Missouri University of Science and Technology Reactor ML22235A7872022-08-23023 August 2022 Missouri & T Reactor, Response to Notification of Violation and Inspection Report 05000123/2022002 IR 05000123/20222022022-07-25025 July 2022 Board of Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000123/2022202 and Notice of Violation ML22150A0072022-05-30030 May 2022 Submittal of 2021-2022 Annual Progress Report for the Missouri University of Science and Technology Reactor ML22098A2232022-05-0505 May 2022 Board of Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Security Inspection Report (Cover Letter) ML22018A3062022-02-0101 February 2022 Examination Confirmation Letter No. 50-123/OL-22-02, Missouri University of Science and Technology ML21330A0462022-01-21021 January 2022 Board of Curators of the University of Missouri Issuance of Amendment No 23 to Renewed Facility Operating License No R-79 ML21292A3342021-10-18018 October 2021 Missouri & T Reactor, Follow-Up Report on and Retraction of EN-55509, Reported Violation of Technical Specification (Limiting Condition of Operation) 3.3.2 ML21257A1192021-09-23023 September 2021 Board of the Curators of the University of Missouri - Change of Facility Project Manager ML21203A0762021-07-28028 July 2021 Examination Confirmation Letter No. 50-123/OL-22-01, Missouri University of Science and Technology IR 05000123/20210012021-06-28028 June 2021 Missouri University of Science and Technology (Ms&T) Routine Safety Inspection 50-123/2021-01 ML21153A4322021-06-0202 June 2021 Missouri & T Reactor - Follow-Up Report on Violation of Technical Specification (Surveillance Requirement) 4.6.2(1), EN-55266 ML21134A2452021-05-14014 May 2021 Missouri Univ. of Science & Technology, Self-Identified Violation of Operator Requalification Program 2.2 ML21039A3422021-02-0808 February 2021 Examination Confirmation Letter No.50-123/OL-21-01, Missouri University of Science and Technology ML21005A0272021-01-25025 January 2021 Must Amendment No 23 Acceptance Review - Application Accepted 12-28-2020 (6) ML20337A1622020-12-0202 December 2020 Proposed License Amendment Request for Missouri University of Science and Technology Reactor (License R-79, Docket 50-123) ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20314A3622020-11-12012 November 2020 Board of the Curators of the University of Missouri - Issuance of Amendment No. 22 to Renewed Facility Operating License No. R-79 to Extend the Period to Perform Visual Inspections of the Shim/Safety Rods ML20309A6762020-11-0404 November 2020 Missouri University of Science and Technology - Written Communication as Specified by 10 CFR 50.4 Requesting Approval of an Exigent Amendment to the Technical Specifications Appended to Facility Operating License R-79 IR 05000123/20202012020-09-28028 September 2020 Missouri University of Science and Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000123/2020201 ML20150A6062020-05-29029 May 2020 Missouri Univ. of Science & Technology - Submittal of 2019-2020 Annual Progress Report for Missouri University of Science and Technology Reactor ML20006C9282019-12-23023 December 2019 Examination Confirmation Letter No. 50-123/OL-20-02, Missouri University of Science and Technology ML19347B2142019-12-23023 December 2019 Examination Report No. 50-123/OL-20-01, Missouri University of Science and Technology ML19304B7332019-11-0505 November 2019 Examination Confirmation Letter No. 50-123/OL-20-01, Missouri University of Science and Technology ML19206A3642019-07-25025 July 2019 Examination Confirmation Letter No. 50-123/OL-19-02, Missouri University of Science and Technology IR 05000123/20192012019-07-0303 July 2019 Missouri University of Science and Technology - U.S. Nuclear Regulatory Commission Inspection Report No. 50 123/2019-201 ML19182A3592019-07-0101 July 2019 Level 1 Personnel Change at the Missouri University of Science and Technology Reactor ML19149A6242019-05-29029 May 2019 Missouri s & T Reactor - 2018-2019 Annual Progress Report for Missouri University of Science and Technology Reactor ML19010A0822019-01-17017 January 2019 Washington State University - Change of Facility Project Manager ML19028A2942019-01-17017 January 2019 Level III Personnel Change at the Missouri University of Science and Technology Reactor Facility, License R-79, Docket 50-123 ML18365A3532019-01-0808 January 2019 Missouri University of Science and Technology - Change of Facility Project Manager IR 05000123/20182022018-12-26026 December 2018 Missouri University of Science and Technology - U.S. Nuclear Regulatory Commission Security Inspection Report 05000123/2018202 (Cover Letter) ML18276A2842018-09-28028 September 2018 Missouri S&T Reactor - Submittal of Updated Operator Requalification Program ML18257A1372018-09-14014 September 2018 Missouri University of Science and Technology Reactor (S&T Reactor) - Reply to a Notice of Violation ML18233A4012018-07-0202 July 2018 Requesting Approval for Reviewing Official at Mstr 2024-08-08
[Table view] |
Text
MISSOURI UNIVERSITY OF SCIENCE AND TECHNOLOGY Formerly University of !Viissouri-Rol!a May 27, 2016 ATTN: Document Control Desk US Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Response to NRC Generic Letter 2016-01: Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools for the Missouri S&T Reactor Facility, R-79, Docket 50-123.
NRC:
The Missouri University of Science & Technology Research Reactor does not have neutron absorbing materials in the fuel storage pool (FSP). Fuel elements are positioned in two racks each made of 6061 T6 Aluminum. Each rack can hold one row of fifteen fuel elements with a distance ofr* five inches between elements. The entire fuel inventory can be contained in the FSP.
The:reaCtor core has the control rods maintaining a subcritical reactor while the reactor is shutdown and not being used. During the annual control rod inspection 50% of the reactor core's critical mass is moved to the FSP. One control rod is removed from the core, inspected arid.~einstalled into the reactor core prior to the removal and inspection of the next control rod.
All fuel movements during this process are approved by the reactor manager and supervised by a Senior Reactor Operator. *-
Please contact me at 573-341-4384 or webonzer@mst.edu if you have questions regarding this information.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on
.Sincerely, . : , ' ,; ,('
."w.
~,.
11* ~ ;_ ; .
~~-~~
,. o . *_ ~ *.: . . ,
., ;* *.,'.*.J****** . . ' ..
William Bonzer .! ' ..
1, .*
-*,, . .** -. .r . i.L - *., - ,._J . ,'"*:,_' T:
Missouri S&T Reactor Manager License R-79 * ,; 1 "' *' .. 1.; I! '!' ?" :..
Docket 50-123.. *: ' . *:* ...... .,
1