ML17048A118: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML17048A118 | | number = ML17048A118 | ||
| issue date = 02/17/2017 | | issue date = 02/17/2017 | ||
| title = | | title = Supplement to License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling | ||
| author name = Carr E | | author name = Carr E | ||
| author affiliation = PSEG Nuclear, LLC | | author affiliation = PSEG Nuclear, LLC | ||
Line 13: | Line 13: | ||
| document type = Letter | | document type = Letter | ||
| page count = 4 | | page count = 4 | ||
| project = | |||
| stage = Supplement | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 PSE:<i Nuclem*LLC 10 CFR 50.90 LR-N 17-0052 LAR H16-02 FEB 17' 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 HOPE CREEK GENERATING STATION RENEWED FACILITY OPERATING LICENSE NO. NPF-57 NRC DOCKET NO. 50-354 | ||
}} | ==Subject:== | ||
Supplement to License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling | |||
==Reference:== | |||
LR-N16-0066, "License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling," dated June 17, 2016 On June 17, 2016, PSEG Nuclear LLC (PSEG) submitted a license amendment request (LAR) to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station to permit operability of low pressure coolant injection while aligned to shutdown cooling. Subsequent to this submittal, PSEG determined that the Technical Specification (TS) markup page in of the LAR was missing the word "manually" in the added note. A corrected TS markup page is included as Attachment 1 to this letter. | |||
The corrected TS mark-up does not affect the Technical Analysis or No Significant Hazards Consideration conclusions contained in the LAR. In addition, the information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment. | |||
There are no regulatory commitments contained in this letter. i | |||
. i If you have any questions or require additional information, please contact Mr. Lee Marabella at (856) 339-1208. | |||
m 117 tm'i?l 10 CFR 50.90 Page 2 LR-N17-0052 I declare under penalty of perjury that the foregoing is true and correct. | |||
Executed on __________ | |||
(Date) | |||
R Eric Carr Site Vice President Hope Creek Generating Station Attachments: | |||
: 1. Technical Specification LCO 3.5. 2 (marked-up page) cc: Administrator, Region I, NRC Project Manager, NRC NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Chief, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. T. MacEwen, Hope Creek Commitment Tracking Coordinator | |||
LR-N17-0052 Attachment 1 Technical Specification LCO 3.5.2 (marked-up page) | |||
J/4 5.2 ECCS | |||
* SHUTDOWN ... ... | |||
IM!TING CONO[T!ON FOR PERAT[QN | |||
.,...._,...,.,.. r;l<;o,it!;Q>J.,1'1---""""'-"I ......._. | |||
3,5,2 At lest wa of thQ following sna11 b OPERABLE: | |||
: 2. An OPERABLE flow catn capable of taking suction from It east one of the followiflg watr sourcGs and trln$ferrfng ta ater thtogh thQ spray sorGr to th rQactor vsl: | |||
a) From tM swpprJssion <::hll.mbflr, or D) lthn the suport:ssion cniHMbtr waur 1vt\ is \ass tMn t1e limit or is drainid, from the condnsat storaga tanK containfng at ',east l3S,OOO avt.i1hc1 gallons of wat.ar. | |||
tl. Lo<R prssure coolant injecti01'1. (LPCI) syshm HIO$y:Hems uch with a subsystm eornprisQd of; L OrHt OP EAA8lE LPC! \jump , £\\d | |||
: 2. An OPERABLE flaw pth capab1t of taking swction from tht supprls 'oM chambir and transfirr1ng th* w1tar to thl reacor V{l5\ili1,** | |||
APPLICABtLlTY: OPERAiiOHAL CONDITION 4 and 5:11, ACTION: | |||
a, WHh oM of tl'le il00¥'11 rqr.drtd &ubsy3tlliM inoperaol:, rutora .at | |||
* 1 ust two S\JDSyHI'rl to OPERABLE tati,JS \Iii t.FI\n 4 ours or SWSPM all operations with pottntlal for draining thQ reactor v1sse1. | |||
: b. With ootl'1 o1 thlll :bov11 rnquird s.ubsyst&Hni inoplllNb1e, su:pend CORE ALTERATtONS urd 11 operlioni with a pountial for dratn1ng tM rt&ctor vass01. Rastor at 1t$t onm subsysttru to OPERABLE status rt1thin d. r.ors or uutlliei''l SECONDARY CONTAIHMIH INTEGRITY within th@ nxt e hours. | |||
Th1 ECCS s not rtQu1rd to b GPERABLE provitd that th rl&ctor vessel head is rmOvQd, thQ cvity Is floodtd, tno spnt fut1 pol gats &rt removed, nd lo'H<<r 14!ve1 is m<intalned within UH limit$ of SptC1fictioil 3.9.B and 3.9.9. | |||
<*<one LPCI subsystem may be considered OPERABLE during alignment and operation for decay heal removal if capable of being manually realigned and not otherwise inoperable. | |||
HOPE CREEK}} |
Latest revision as of 19:23, 4 February 2020
ML17048A118 | |
Person / Time | |
---|---|
Site: | Hope Creek |
Issue date: | 02/17/2017 |
From: | Carr E Public Service Enterprise Group |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
LAR H16-02, LR-N 17-0052 | |
Download: ML17048A118 (4) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 PSE:<i Nuclem*LLC 10 CFR 50.90 LR-N 17-0052 LAR H16-02 FEB 17' 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 HOPE CREEK GENERATING STATION RENEWED FACILITY OPERATING LICENSE NO. NPF-57 NRC DOCKET NO. 50-354
Subject:
Supplement to License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling
Reference:
LR-N16-0066, "License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling," dated June 17, 2016 On June 17, 2016, PSEG Nuclear LLC (PSEG) submitted a license amendment request (LAR) to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station to permit operability of low pressure coolant injection while aligned to shutdown cooling. Subsequent to this submittal, PSEG determined that the Technical Specification (TS) markup page in of the LAR was missing the word "manually" in the added note. A corrected TS markup page is included as Attachment 1 to this letter.
The corrected TS mark-up does not affect the Technical Analysis or No Significant Hazards Consideration conclusions contained in the LAR. In addition, the information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
There are no regulatory commitments contained in this letter. i
. i If you have any questions or require additional information, please contact Mr. Lee Marabella at (856) 339-1208.
m 117 tm'i?l 10 CFR 50.90 Page 2 LR-N17-0052 I declare under penalty of perjury that the foregoing is true and correct.
Executed on __________
(Date)
R Eric Carr Site Vice President Hope Creek Generating Station Attachments:
- 1. Technical Specification LCO 3.5. 2 (marked-up page) cc: Administrator, Region I, NRC Project Manager, NRC NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Chief, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. T. MacEwen, Hope Creek Commitment Tracking Coordinator
LR-N17-0052 Attachment 1 Technical Specification LCO 3.5.2 (marked-up page)
J/4 5.2 ECCS
- SHUTDOWN ... ...
IM!TING CONO[T!ON FOR PERAT[QN
.,...._,...,.,.. r;l<;o,it!;Q>J.,1'1---""""'-"I ......._.
3,5,2 At lest wa of thQ following sna11 b OPERABLE:
- 2. An OPERABLE flow catn capable of taking suction from It east one of the followiflg watr sourcGs and trln$ferrfng ta ater thtogh thQ spray sorGr to th rQactor vsl:
a) From tM swpprJssion <::hll.mbflr, or D) lthn the suport:ssion cniHMbtr waur 1vt\ is \ass tMn t1e limit or is drainid, from the condnsat storaga tanK containfng at ',east l3S,OOO avt.i1hc1 gallons of wat.ar.
tl. Lo<R prssure coolant injecti01'1. (LPCI) syshm HIO$y:Hems uch with a subsystm eornprisQd of; L OrHt OP EAA8lE LPC! \jump , £\\d
- 2. An OPERABLE flaw pth capab1t of taking swction from tht supprls 'oM chambir and transfirr1ng th* w1tar to thl reacor V{l5\ili1,**
APPLICABtLlTY: OPERAiiOHAL CONDITION 4 and 5:11, ACTION:
a, WHh oM of tl'le il00¥'11 rqr.drtd &ubsy3tlliM inoperaol:, rutora .at
- 1 ust two S\JDSyHI'rl to OPERABLE tati,JS \Iii t.FI\n 4 ours or SWSPM all operations with pottntlal for draining thQ reactor v1sse1.
- b. With ootl'1 o1 thlll :bov11 rnquird s.ubsyst&Hni inoplllNb1e, su:pend CORE ALTERATtONS urd 11 operlioni with a pountial for dratn1ng tM rt&ctor vass01. Rastor at 1t$t onm subsysttru to OPERABLE status rt1thin d. r.ors or uutllieil SECONDARY CONTAIHMIH INTEGRITY within th@ nxt e hours.
Th1 ECCS s not rtQu1rd to b GPERABLE provitd that th rl&ctor vessel head is rmOvQd, thQ cvity Is floodtd, tno spnt fut1 pol gats &rt removed, nd lo'H<<r 14!ve1 is m<intalned within UH limit$ of SptC1fictioil 3.9.B and 3.9.9.
<*<one LPCI subsystem may be considered OPERABLE during alignment and operation for decay heal removal if capable of being manually realigned and not otherwise inoperable.
HOPE CREEK