|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:.- LaSalle County Station | | {{#Wiki_filter:.- LaSalle County Station Exelon Generation. 2601 North 2ltrRoad Marseilles, lL 61341 81 5-41 5-2000 Telephone riwvw. exeloncorp.com RA16-060 10 cFR 55.40 August 18, 2016 U.S. Nuclear Regulatory Commission Attention: NRC Region lll Administrator 2443Warrenville Road Suite 210 Lisle, lL 60532-4352 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Subject Submittal of lntegrated lnitial Operator License Examination Materials Enclosed are the examination materials, which LaSalle County Station is submitting in support of the initial license examination, scheduled for October 17 through November 4,2016 at LaSalle County Station. |
| ,-
| |
| Exelon Generation. 2601 North 2ltrRoad Marseilles, lL 61341 81 5-41 5-2000 Telephone riwvw. exeloncorp.com | |
| -
| |
| RA16-060 10 cFR 55.40 August 18, 2016 U.S. Nuclear Regulatory Commission Attention: NRC Region lll Administrator 2443Warrenville Road Suite 210 Lisle, lL 60532-4352 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Subject Submittal of lntegrated lnitial Operator License Examination Materials Enclosed are the examination materials, which LaSalle County Station is submitting in support of the initial license examination, scheduled for October 17 through November 4,2016 at LaSalle County Station. | |
| This submittal includes the Job Performance Measures and lntegrated Plant Operation Scenario Guides. The Senior Reactor Operator and Reactor Operator written examinations will be submitted on Augusl22,2016. | | This submittal includes the Job Performance Measures and lntegrated Plant Operation Scenario Guides. The Senior Reactor Operator and Reactor Operator written examinations will be submitted on Augusl22,2016. |
| These examination materials have been developed in accordance with NUREG-1021, "Operator Licensing Examination Standards," Revision 10. Please note that reference materials are attached to each individual examination question or item. | | These examination materials have been developed in accordance with NUREG-1021, "Operator Licensing Examination Standards," Revision 10. Please note that reference materials are attached to each individual examination question or item. |
Latest revision as of 18:10, 4 February 2020
|
---|
Category:License-Operator
MONTHYEARIR 05000373/20243012024-10-31031 October 2024 Initial License Examination Report 05000373/2024301 05000374/2024301 ML24260A0492024-09-16016 September 2024 Operator Licensing Examination Approval - Lasalle County Station, Unit 1 and 2, September 2024 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21004A2302020-12-0101 December 2020 County, Written Exam ML21004A2322020-12-0101 December 2020 County, ES-301-4 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A1012020-12-0101 December 2020 in Plant JPM ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21005A0922020-12-0101 December 2020 Sim JPM ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A3692020-12-0101 December 2020 ES-401-4 ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A3652020-12-0101 December 2020 ES-301-7 ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21005A3802020-12-0101 December 2020 ES-201-1 ML21005A0222020-12-0101 December 2020 ES-301-1 SRO ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21005A0882020-12-0101 December 2020 Scenarios ML21005A3842020-12-0101 December 2020 ES-403-1 ML21005A3832020-12-0101 December 2020 ES-201-3 ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A0462020-12-0101 December 2020 ES-301-5 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs 2024-09-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000373/20243012024-10-31031 October 2024 Initial License Examination Report 05000373/2024301 05000374/2024301 ML24260A0492024-09-16016 September 2024 Operator Licensing Examination Approval - Lasalle County Station, Unit 1 and 2, September 2024 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21005A0262020-12-0101 December 2020 ES-301-2 SRO ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A3692020-12-0101 December 2020 ES-401-4 ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A1012020-12-0101 December 2020 in Plant JPM ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0882020-12-0101 December 2020 Scenarios ML21005A0922020-12-0101 December 2020 Sim JPM ML21005A3652020-12-0101 December 2020 ES-301-7 ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21004A2322020-12-0101 December 2020 County, ES-301-4 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21005A0462020-12-0101 December 2020 ES-301-5 ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21004A2302020-12-0101 December 2020 County, Written Exam ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21005A3802020-12-0101 December 2020 ES-201-1 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A3832020-12-0101 December 2020 ES-201-3 ML21005A3842020-12-0101 December 2020 ES-403-1 2024-09-16
[Table view] |
Text
.- LaSalle County Station Exelon Generation. 2601 North 2ltrRoad Marseilles, lL 61341 81 5-41 5-2000 Telephone riwvw. exeloncorp.com RA16-060 10 cFR 55.40 August 18, 2016 U.S. Nuclear Regulatory Commission Attention: NRC Region lll Administrator 2443Warrenville Road Suite 210 Lisle, lL 60532-4352 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Subject Submittal of lntegrated lnitial Operator License Examination Materials Enclosed are the examination materials, which LaSalle County Station is submitting in support of the initial license examination, scheduled for October 17 through November 4,2016 at LaSalle County Station.
This submittal includes the Job Performance Measures and lntegrated Plant Operation Scenario Guides. The Senior Reactor Operator and Reactor Operator written examinations will be submitted on Augusl22,2016.
These examination materials have been developed in accordance with NUREG-1021, "Operator Licensing Examination Standards," Revision 10. Please note that reference materials are attached to each individual examination question or item.
Some minor modifications have been made to the lntegrated Examination Outline with regards to the operational scenarios in order to improve balance and content.
These changes improve examination quality and are in compliance with NUREG-1 021, "Operator Licensing Examination Standards," Revision 1 0.
Some modifications or adjustments to the examination material may be required due to procedural changes.
ln accordance with NUREG -1021, Revision 10, Section ES-201, please ensure that these materials are withheld from public disclosure for 2 years from examination completion date.
RA16-060 U.S. Nuclear Regulatory Commission August 18,2016 Page 2 of 2 Should you have any questions concerning this letter, please contact Mr. Guy V. Ford Jr., Regulatory Assurance Manager, at (815) 415-2800. For questions concerning examination materials, please contact Mr. Douglas Wright at (815) 415-4003.
Respectfully, tl tt- ,t-nt-William J l,^r,{
Site Vice President LaSalle County Station
Enclosures:
(Hand delivered to Chuck Zoia, Chief Examiner, NRC Region lll)
RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached lntegrated Plant Operation Scenario Guides Completed Checklists:
Operating Test Quality Checklist (Form ES-301-3)
Simulator Scenario Quality Checklist (Form ES-301-4)
Transient and Event Checklist (Form ES-301-5)
Competencies Checklist (Form ES-301-6)
Written Exam Quality Checklist (Form ES-401-6)
Examination Security Agreements (Form ES-201-3)
Record of Rejected llAs (Form ES-401-4) cc Chief, NRC Operator Licensing Branch (w/o enclosures)
Senior Resident lnspector - LaSalle County Station (w/o enclosures)