ML17095A255: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/16/2016
| issue date = 11/16/2016
| title = 2016 LaSalle County Station Initial License Examination Proposed Exam Submittal Letter
| title = 2016 LaSalle County Station Initial License Examination Proposed Exam Submittal Letter
| author name = Zoia C D
| author name = Zoia C
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.-,--Exelon Generation.
{{#Wiki_filter:.-                                                                               LaSalle County Station Exelon Generation.                                                           2601 North   2ltrRoad Marseilles, lL 61341 81 5-41 5-2000 Telephone riwvw. exeloncorp.com RA16-060                                                               10 cFR 55.40 August 18, 2016 U.S. Nuclear Regulatory Commission Attention: NRC Region lll Administrator 2443Warrenville Road Suite 210 Lisle, lL 60532-4352 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Subject         Submittal of lntegrated lnitial Operator License Examination Materials Enclosed are the examination materials, which LaSalle County Station is submitting in support of the initial license examination, scheduled for October 17 through November 4,2016 at LaSalle County Station.
LaSalle County Station 2601 North 2ltrRoad Marseilles, lL 61341 81 5-41 5-2000 Telephone riwvw. exeloncorp.com RA16-060 10 cFR 55.40 August 18, 2016 U.S. Nuclear Regulatory Commission Attention:
This submittal includes the Job Performance Measures and lntegrated Plant Operation Scenario Guides. The Senior Reactor Operator and Reactor Operator written examinations will be submitted on Augusl22,2016.
NRC Region lll Administrator 2443Warrenville Road Suite 210 Lisle, lL 60532-4352 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Subject Submittal of lntegrated lnitial Operator License Examination Materials Enclosed are the examination materials, which LaSalle County Station is submitting in support of the initial license examination, scheduled for October 17 through November 4,2016 at LaSalle County Station.This submittal includes the Job Performance Measures and lntegrated Plant Operation Scenario Guides. The Senior Reactor Operator and Reactor Operator written examinations will be submitted on Augusl22,2016.
These examination materials have been developed in accordance with NUREG-1021, "Operator Licensing Examination Standards," Revision 10. Please note that reference materials are attached to each individual examination question or item.
These examination materials have been developed in accordance with NUREG-1021, "Operator Licensing Examination Standards," Revision 10. Please note that reference materials are attached to each individual examination question or item.Some minor modifications have been made to the lntegrated Examination Outline with regards to the operational scenarios in order to improve balance and content.These changes improve examination quality and are in compliance with NUREG-1 021, "Operator Licensing Examination Standards," Revision 1 0.Some modifications or adjustments to the examination material may be required due to procedural changes.ln accordance with NUREG -1021, Revision 10, Section ES-201, please ensure that these materials are withheld from public disclosure for 2 years from examination completion date.
Some minor modifications have been made to the lntegrated Examination Outline with regards to the operational scenarios in order to improve balance and content.
RA16-060 U.S. Nuclear Regulatory Commission August 18,2016 Page 2 of 2 Should you have any questions concerning this letter, please contact Mr. Guy V. Ford Jr., Regulatory Assurance Manager, at (815) 415-2800.
These changes improve examination quality and are in compliance with NUREG-1 021, "Operator Licensing Examination Standards," Revision 1 0.
For questions concerning examination materials, please contact Mr. Douglas Wright at (815) 415-4003.Respectfully, tl tt-,t-nt-l,^r,{William J Site Vice President LaSalle County Station  
Some modifications or adjustments to the examination material may be required due to procedural changes.
ln accordance with NUREG -1021, Revision 10, Section ES-201, please ensure that these materials are withheld from public disclosure for 2 years from examination completion date.
 
RA16-060 U.S. Nuclear Regulatory Commission August 18,2016 Page 2 of 2 Should you have any questions concerning this letter, please contact Mr. Guy V. Ford Jr., Regulatory Assurance Manager, at (815) 415-2800. For questions concerning examination materials, please contact Mr. Douglas Wright at (815) 415-4003.
Respectfully, tl tt- ,t-nt-William J  l,^r,{
Site Vice President LaSalle County Station


==Enclosures:==
==Enclosures:==
(Hand delivered to Chuck Zoia, Chief Examiner, NRC Region lll)RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached lntegrated Plant Operation Scenario Guides Completed Checklists:
(Hand delivered to Chuck Zoia, Chief Examiner, NRC Region lll)
Operating Test Quality Checklist (Form ES-301-3)Simulator Scenario Quality Checklist (Form ES-301-4)Transient and Event Checklist (Form ES-301-5)Competencies Checklist (Form ES-301-6)Written Exam Quality Checklist (Form ES-401-6)Examination Security Agreements (Form ES-201-3)Record of Rejected llAs (Form ES-401-4)cc Chief, NRC Operator Licensing Branch (w/o enclosures)
RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached lntegrated Plant Operation Scenario Guides Completed Checklists:
Operating Test Quality Checklist (Form ES-301-3)
Simulator Scenario Quality Checklist (Form ES-301-4)
Transient and Event Checklist (Form ES-301-5)
Competencies Checklist (Form ES-301-6)
Written Exam Quality Checklist (Form ES-401-6)
Examination Security Agreements (Form ES-201-3)
Record of Rejected llAs (Form ES-401-4) cc     Chief, NRC Operator Licensing Branch (w/o enclosures)
Senior Resident lnspector - LaSalle County Station (w/o enclosures)}}
Senior Resident lnspector - LaSalle County Station (w/o enclosures)}}

Latest revision as of 18:10, 4 February 2020

2016 LaSalle County Station Initial License Examination Proposed Exam Submittal Letter
ML17095A255
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/16/2016
From: Chuck Zoia
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML15274A403 List:
References
Download: ML17095A255 (2)


Text

.- LaSalle County Station Exelon Generation. 2601 North 2ltrRoad Marseilles, lL 61341 81 5-41 5-2000 Telephone riwvw. exeloncorp.com RA16-060 10 cFR 55.40 August 18, 2016 U.S. Nuclear Regulatory Commission Attention: NRC Region lll Administrator 2443Warrenville Road Suite 210 Lisle, lL 60532-4352 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Subject Submittal of lntegrated lnitial Operator License Examination Materials Enclosed are the examination materials, which LaSalle County Station is submitting in support of the initial license examination, scheduled for October 17 through November 4,2016 at LaSalle County Station.

This submittal includes the Job Performance Measures and lntegrated Plant Operation Scenario Guides. The Senior Reactor Operator and Reactor Operator written examinations will be submitted on Augusl22,2016.

These examination materials have been developed in accordance with NUREG-1021, "Operator Licensing Examination Standards," Revision 10. Please note that reference materials are attached to each individual examination question or item.

Some minor modifications have been made to the lntegrated Examination Outline with regards to the operational scenarios in order to improve balance and content.

These changes improve examination quality and are in compliance with NUREG-1 021, "Operator Licensing Examination Standards," Revision 1 0.

Some modifications or adjustments to the examination material may be required due to procedural changes.

ln accordance with NUREG -1021, Revision 10, Section ES-201, please ensure that these materials are withheld from public disclosure for 2 years from examination completion date.

RA16-060 U.S. Nuclear Regulatory Commission August 18,2016 Page 2 of 2 Should you have any questions concerning this letter, please contact Mr. Guy V. Ford Jr., Regulatory Assurance Manager, at (815) 415-2800. For questions concerning examination materials, please contact Mr. Douglas Wright at (815) 415-4003.

Respectfully, tl tt- ,t-nt-William J l,^r,{

Site Vice President LaSalle County Station

Enclosures:

(Hand delivered to Chuck Zoia, Chief Examiner, NRC Region lll)

RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached lntegrated Plant Operation Scenario Guides Completed Checklists:

Operating Test Quality Checklist (Form ES-301-3)

Simulator Scenario Quality Checklist (Form ES-301-4)

Transient and Event Checklist (Form ES-301-5)

Competencies Checklist (Form ES-301-6)

Written Exam Quality Checklist (Form ES-401-6)

Examination Security Agreements (Form ES-201-3)

Record of Rejected llAs (Form ES-401-4) cc Chief, NRC Operator Licensing Branch (w/o enclosures)

Senior Resident lnspector - LaSalle County Station (w/o enclosures)