ML18275A177: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name = Muniz A
| author name = Muniz A
| author affiliation = NRC/NRO/DLSE
| author affiliation = NRC/NRO/DLSE
| addressee name = Catts M P
| addressee name = Catts M
| addressee affiliation = GE Hitachi Nuclear Energy
| addressee affiliation = GE Hitachi Nuclear Energy
| docket = 05200045
| docket = 05200045
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Code of Federal Regulations}}
{{#Wiki_filter:OFFICIAL USE ONLY - PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 15, 2018 Ms. Michelle P. Catts Senior Vice President, Regulatory Affairs GE Hitachi Nuclear Energy 3901 Castle Hayne Road MC A-18 Wilmington, NC 28401
 
==SUBJECT:==
ADVANCED BOILING-WATER REACTOR DESIGN CERTIFICATION RENEWAL APPLICATION  SAFETY EVALUATION WITH NO OPEN ITEMS FOR SECTION 19.5, AIRCRAFT IMPACT ASSESSMENT
 
==Dear Ms. Catts:==
 
The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items to supplement the final safety evaluation report associated with the staffs review of the advanced boiling-water reactor (ABWR) design that was documented in NUREG-1503, Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design, and NUREG-1503, Supplement 1. This SE will document the staffs review of your application dated December 7, 2010, to renew the ABWR design certification.
The staffs SE for Section 19.5, Aircraft Impact Assessment, is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support a future meeting of the ACRS Subcommittee.
The enclosed SE is being provided only to GE-Hitachi Nuclear Energy for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public Inspections, Exemptions, Requests for Withholding. The staff concludes that the enclosed SE does not contain any information for which exemption from public disclosure has been sought or approved or any factual errors. However, the NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains no such exempt information or any factual errors. If within that ten day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public inspection through the NRC Public Document Room and the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public web page for this application.
Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
 
OFFICIAL USE ONLY - PROPRIETARY INFORMATION M. Catts                                  If you have any questions or comments concerning this matter, I can be reached at 301-415-4093 or via e-mail address at Adrian.Muniz@nrc.gov.
Sincerely,
                                          /RA/
Adrian Muniz, Lead Project Manager Licensing Branch 3 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Docket No. 52-045
 
==Enclosure:==
 
As stated cc: w/o encl. See next page OFFICIAL USE ONLY - PROPRIETARY INFORMATION
 
ML18275A167 - Package ML18275A177 - Letter  *via e-mail  NRO-002 OFFICE    PM:NRO/DLSE          LA:NRO/DLSE            LPM:NRO/DLSE NAME      JShea*              SGreen*                AMuniz (JShea for)
DATE      10/02/2018          10/02/2018            11/15/2018 DC GEH - ABWR Mailing List                      (Revised 08/16/2018)
Email APH@NEI.org (Adrian Heymer) awc@nei.org (Anne W. Cottingham) brianr.johnson@ge.com (R. R. Johnson)
Christopher.Powell@ge.com (Christopher Powell) cschlaseman@mpr.com (Caroline Schlaseman)
CumminWE@Westinghouse.com (Edward W. Cummins) cwaltman@roe.com (C. Waltman) david.lewis@pillsburylaw.com (David Lewis)
F.Shahrokhi@areva.com (Farshid Shahrokhi)
George_Stramback@Charter.net (George Stramback) jerald.head@ge.com (Jerald G. Head)
Joseph.Ondish@ge.com (Joseph Ondish)
Joseph_Hegner@dom.com (Joseph Hegner)
Kenichi.Sato.sz@hitachi.com (Kenichi Sato)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh)
Linda.Dolan@ge.com (Linda Dolan) lon.burnam@house.state.tx.us (Lon Burnam)
Maryann.Herzog@ge.com (Maryann Herzog) media@nei.org (Scott Peterson)
MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette)
RJB@NEI.org (Russell Bell) rtrench@mpr.com (Randy Trench)
Ryan.hough@ge.com (Ryan Hough) sabinski@suddenlink.net (Steve A. Bennett) tom.miller@hq.doe.gov (Tom Miller) trsmith@winston.com (Tyson Smith)
Vanessa.quinn@dhs.gov (Vanessa Quinn) wayne.marquino@gmail.com (Wayne Marquino)
Page1 of 1}}

Latest revision as of 17:05, 2 February 2020

Letter to Applicant - GEH ABWR DC Renewal SE for Section 19.5
ML18275A177
Person / Time
Site: 05200045
Issue date: 11/15/2018
From: Adrian Muniz
NRC/NRO/DLSE
To: Michelle Catts
GE Hitachi Nuclear Energy
Shea J
Shared Package
ML18275A167 List:
References
Download: ML18275A177 (4)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 15, 2018 Ms. Michelle P. Catts Senior Vice President, Regulatory Affairs GE Hitachi Nuclear Energy 3901 Castle Hayne Road MC A-18 Wilmington, NC 28401

SUBJECT:

ADVANCED BOILING-WATER REACTOR DESIGN CERTIFICATION RENEWAL APPLICATION SAFETY EVALUATION WITH NO OPEN ITEMS FOR SECTION 19.5, AIRCRAFT IMPACT ASSESSMENT

Dear Ms. Catts:

The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with no open items to supplement the final safety evaluation report associated with the staffs review of the advanced boiling-water reactor (ABWR) design that was documented in NUREG-1503, Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design, and NUREG-1503, Supplement 1. This SE will document the staffs review of your application dated December 7, 2010, to renew the ABWR design certification.

The staffs SE for Section 19.5, Aircraft Impact Assessment, is being provided to the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee to support a future meeting of the ACRS Subcommittee.

The enclosed SE is being provided only to GE-Hitachi Nuclear Energy for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public Inspections, Exemptions, Requests for Withholding. The staff concludes that the enclosed SE does not contain any information for which exemption from public disclosure has been sought or approved or any factual errors. However, the NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to verify the staffs conclusion that the SE contains no such exempt information or any factual errors. If within that ten day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public inspection through the NRC Public Document Room and the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public web page for this application.

Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION

OFFICIAL USE ONLY - PROPRIETARY INFORMATION M. Catts If you have any questions or comments concerning this matter, I can be reached at 301-415-4093 or via e-mail address at Adrian.Muniz@nrc.gov.

Sincerely,

/RA/

Adrian Muniz, Lead Project Manager Licensing Branch 3 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Docket No.52-045

Enclosure:

As stated cc: w/o encl. See next page OFFICIAL USE ONLY - PROPRIETARY INFORMATION

ML18275A167 - Package ML18275A177 - Letter *via e-mail NRO-002 OFFICE PM:NRO/DLSE LA:NRO/DLSE LPM:NRO/DLSE NAME JShea* SGreen* AMuniz (JShea for)

DATE 10/02/2018 10/02/2018 11/15/2018 DC GEH - ABWR Mailing List (Revised 08/16/2018)

Email APH@NEI.org (Adrian Heymer) awc@nei.org (Anne W. Cottingham) brianr.johnson@ge.com (R. R. Johnson)

Christopher.Powell@ge.com (Christopher Powell) cschlaseman@mpr.com (Caroline Schlaseman)

CumminWE@Westinghouse.com (Edward W. Cummins) cwaltman@roe.com (C. Waltman) david.lewis@pillsburylaw.com (David Lewis)

F.Shahrokhi@areva.com (Farshid Shahrokhi)

George_Stramback@Charter.net (George Stramback) jerald.head@ge.com (Jerald G. Head)

Joseph.Ondish@ge.com (Joseph Ondish)

Joseph_Hegner@dom.com (Joseph Hegner)

Kenichi.Sato.sz@hitachi.com (Kenichi Sato)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh)

Linda.Dolan@ge.com (Linda Dolan) lon.burnam@house.state.tx.us (Lon Burnam)

Maryann.Herzog@ge.com (Maryann Herzog) media@nei.org (Scott Peterson)

MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette)

RJB@NEI.org (Russell Bell) rtrench@mpr.com (Randy Trench)

Ryan.hough@ge.com (Ryan Hough) sabinski@suddenlink.net (Steve A. Bennett) tom.miller@hq.doe.gov (Tom Miller) trsmith@winston.com (Tyson Smith)

Vanessa.quinn@dhs.gov (Vanessa Quinn) wayne.marquino@gmail.com (Wayne Marquino)

Page1 of 1