ML060240491: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML060240491
| number = ML060240491
| issue date = 01/18/2006
| issue date = 01/18/2006
| title = 03/14/2006 - Perry Meeting Notice to Discuss the Nrc'S Annual Assessment of Perry and the Results of Confirmatory Action Letter to Followup Inspections in the Inspection Procedure (IP) 95002 Action Item Review and Corrective Action Program
| title = Perry Meeting Notice to Discuss the Nrc'S Annual Assessment of Perry and the Results of Confirmatory Action Letter to Followup Inspections in the Inspection Procedure (IP) 95002 Action Item Review and Corrective Action Program Action...
| author name = Duncan E
| author name = Duncan E
| author affiliation = NRC/RGN-III/DRP/RPB6
| author affiliation = NRC/RGN-III/DRP/RPB6

Latest revision as of 22:12, 7 December 2019

Perry Meeting Notice to Discuss the Nrc'S Annual Assessment of Perry and the Results of Confirmatory Action Letter to Followup Inspections in the Inspection Procedure (IP) 95002 Action Item Review and Corrective Action Program Action...
ML060240491
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/18/2006
From: Eric Duncan
NRC/RGN-III/DRP/RPB6
To:
References
Download: ML060240491 (4)


Text

January 18, 2006 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Perry Nuclear Power Plant, Unit 1 Docket No: 50-440 Date and Time of Meeting: Tuesday, March 14, 2006, at 3:00 p.m. (EST)

Location of Meeting: Renaissance Quail Hollow Resort Barberry Room 11080 Concord-Hambden Road Painesville, Ohio 44077 Purpose of Meeting: Public Meeting to Discuss the NRCs Annual Assessment of Perry and to Discuss the Results of Confirmatory Action Letter (CAL)

Followup Inspections in the Inspection Procedure (IP) 95002 Action Item Review and Corrective Action Program Action Item Review Areas.

Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees:

J. Caldwell, Region III Administrator E. Duncan, Chief, Branch 6, Division of Reactor Projects S. Campbell, Project Manager, Office of Nuclear Reactor Regulation G. Wright, Team Leader, Corrective Action Program Review Team J. Ellegood, Team Leader, IP 95002 Review Team R. Powell, Senior Resident Inspector, Perry M. Franke, Resident Inspector, Perry Others as Designated Licensee Attendees:

W. Pearce, Acting Vice President, Perry F. von Ahn, Director, Site Operations, Perry A. Cayia, Director, Performance Improvement, Perry J. Shaw, Director, Engineering, Perry T. Lentz, Director, Performance Improvement Initiative, Perry Others as Designated

Notice of Significant Licensee Meeting Notes:

(1) Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Eric Duncan at (630) 829-9628 by March 10, 2006.

(2) The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Approved by: /RA/

Eric R. Duncan, Chief Reactor Projects Branch 6

Notice of Significant Licensee Meeting Distribution:

B. Sheron (BWS), Associate Director for Projects Licensing and Technical Review, NRR B. Boger (BAB2), Associate Director for Operating Reactor Oversight and Licensing, NRR P. Habighorst (PJH2), Region III Coordinator, OEDO H. Nieh (HKN), Project Directorate, Division of Licensing and Project Management, NRR Project Manager, Project Directorate, Division of Licensing, Project Management, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, R. Powell DRS Branch Chiefs (JFL, DEH, RDL, KXR, AMS1, SKO, HXP1)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA