ML091680661: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML091680661
| number = ML091680661
| issue date = 06/17/2009
| issue date = 06/17/2009
| title = 07/15/2009 Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss NRC End-of-Cycle Assessment of Davis-Besse Performance for the 2008 Calendar Year
| title = Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss NRC End-of-Cycle Assessment of Davis-Besse Performance for the 2008 Calendar Year
| author name = Cameron J L
| author name = Cameron J
| author affiliation = NRC/RGN-III/DRP/B6
| author affiliation = NRC/RGN-III/DRP/B6
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 17, 2009 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 17, 2009 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:                    FirstEnergy Nuclear Operating Company Name of Facility:                    Davis-Besse Nuclear Power Station Docket No:                          50-346 Date and Time of Meeting:            July 15, 2009, - 7:00 p.m. (EDT)
Location of Meeting:                Davis-Besse Site Energy Education Center 5501 North State Route 2 Oak Harbor, OH Purpose of Meeting:                  Discuss NRC End-of-Cycle assessment of Davis-Besse performance for the 2008 calendar year.
Category 1:                          This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
NRC Attendees J. Cameron, Chief, DRP Branch 6 A. Wilson, Resident Inspector Others as assigned Licensee Attendees J. Lash, Vice President Operation, FENOC D. Pace, Vice President Engineering, FENOC B. Allen, Site Vice President Others as assigned


Name of Licensee:   FirstEnergy Nuclear Operating Company
Notice of Significant                              Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jamnes Cameron at (630) 829-9833 by Friday July 10, 2009. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC=s meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference. For details, please call the NRC meeting contact.
Meeting


Name of Facility:   Davis-Besse Nuclear Power Station
==Contact:==
 
Jamnes L. Cameron, Chief Branch 6 (630) 829-9833 Jamnes.Cameron@nrc.gov Approved By:             /RA/
Docket No:    50-346
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Distribution:
 
Susan Bagley, Region III Coordinator, OEDO Robert Nelson, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource Cynthia Pederson, Director, Division of Reactor Projects, RIII Gary Shear, Deputy Director, Division of Reactor Projects, RIII Steven West, Director, Division of Reactor Safety, RIII Anne Boland, Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Davis Besse DRS Branch Chiefs:
Date and Time of Meeting:  July 15, 2009, - 7:00 p.m. (EDT)
Robert Daley David Hills Eric Duncan AnnMarie Stone Steven Orth Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Margaret Bucholz, DRP}}
 
Location of Meeting:  Davis-Besse Site Energy Education Center 5501 North State Route 2 Oak Harbor, OH
 
Purpose of Meeting:  Discuss NRC End-of-Cycle assessment of Davis-Besse performance for the 2008 calendar year.
 
Category 1:    This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
 
NRC Attendees J. Cameron, Chief, DRP Branch 6 A. Wilson, Resident Inspector Others as assigned
 
Licensee Attendees J. Lash, Vice President Operation, FENOC D. Pace, Vice President Engineering, FENOC B. Allen, Site Vice President Others as assigned
 
Notice of Significant  Licensee Meeting
 
Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jamnes Cameron at (630) 829-9833 by Friday July 10, 2009. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., Br aille, large print), please notify the NRC
=s meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference. For details, please call the NRC meeting contact.
 
Meeting Contact: Jamnes L. Cameron, Chief Branch 6 (630) 829-9833 Jamnes.Cameron@nrc.gov  
 
Approved By:   /RA/   Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Distribution
: Susan Bagley, Region III Coordinator, OEDO Robert Nelson, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource Cynthia Pederson, Director, Division of Reactor Proj ects, RIII Gary Shear, Deputy Director, Division of R eactor Proj ects, RIII Steven West, Director, Division of Reactor Safety, RIII Anne Boland, Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Davis Besse DRS Branch Chiefs:
Robert Daley David Hills Eric Duncan AnnMarie Stone Steven Orth Hironori Peterson  
 
Allan Barker, Regi onal State Liaison Officer, RIII PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Margaret Bucholz, DRP}}

Latest revision as of 00:32, 7 December 2019

Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss NRC End-of-Cycle Assessment of Davis-Besse Performance for the 2008 Calendar Year
ML091680661
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/17/2009
From: Jamnes Cameron
NRC/RGN-III/DRP/B6
To:
References
Download: ML091680661 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 17, 2009 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Davis-Besse Nuclear Power Station Docket No: 50-346 Date and Time of Meeting: July 15, 2009, - 7:00 p.m. (EDT)

Location of Meeting: Davis-Besse Site Energy Education Center 5501 North State Route 2 Oak Harbor, OH Purpose of Meeting: Discuss NRC End-of-Cycle assessment of Davis-Besse performance for the 2008 calendar year.

Category 1: This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees J. Cameron, Chief, DRP Branch 6 A. Wilson, Resident Inspector Others as assigned Licensee Attendees J. Lash, Vice President Operation, FENOC D. Pace, Vice President Engineering, FENOC B. Allen, Site Vice President Others as assigned

Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jamnes Cameron at (630) 829-9833 by Friday July 10, 2009. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC=s meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference. For details, please call the NRC meeting contact.

Meeting

Contact:

Jamnes L. Cameron, Chief Branch 6 (630) 829-9833 Jamnes.Cameron@nrc.gov Approved By: /RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Distribution:

Susan Bagley, Region III Coordinator, OEDO Robert Nelson, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource Cynthia Pederson, Director, Division of Reactor Projects, RIII Gary Shear, Deputy Director, Division of Reactor Projects, RIII Steven West, Director, Division of Reactor Safety, RIII Anne Boland, Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Davis Besse DRS Branch Chiefs:

Robert Daley David Hills Eric Duncan AnnMarie Stone Steven Orth Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Margaret Bucholz, DRP