Line 2: |
Line 2: |
| | number = ML12061A156 | | | number = ML12061A156 |
| | issue date = 03/01/2012 | | | issue date = 03/01/2012 |
| | title = 2012/03/01 Seabrook Lr - Draft Meeting Summary | | | title = Lr - Draft Meeting Summary |
| | author name = | | | author name = |
| | author affiliation = NRC/NRR | | | author affiliation = NRC/NRR |
|
---|
Category:E-Mail
MONTHYEARML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24115A2362024-03-28028 March 2024 Acceptance Review: Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23156A3042023-05-31031 May 2023 Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from Pressure Temperature Limits and Low Temperature Over Pressure Protection Curves ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23066A1892023-03-0303 March 2023 OEDO-22-00419: Email Dated 3-3-2023 to Petitioner on Seabrook ASR Petition ML23066A0892023-02-24024 February 2023 OEDO-22-00419 - Email Dated 02/24/2023 to Petitioner on Seabrook Unit 1 ASR Petition ML23020A9392023-01-19019 January 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements (EPID L-2022-LLA-0183) (Email) ML23011A3082023-01-11011 January 2023 Request for Additional Information Regarding Relief Request 4RA-22-001 (L-2022-LLR-0074) ML22341A0012022-12-0606 December 2022 Acceptance of Requested Licensing Action Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML22333A7452022-11-22022 November 2022 OEDO-22-00419 - Email: C-10 Response on PRB Initial Assessment - C-10 Petition on Seabrook ASR Concrete Degradation ML22287A1472022-10-13013 October 2022 2.026 Petition Screen-in Email ML22228A0552022-08-15015 August 2022 Request for Additional Information Steam Generator Tube Inspection Report Review ML22200A1082022-07-19019 July 2022 Acceptance Review for TSTF-577 Amendment ML22153A4152022-05-31031 May 2022 Request for Additional Information Re 120V Inverter LAR from TS Branch - Final ML22116A2442022-04-26026 April 2022 Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage ML22048B5522022-02-17017 February 2022 LTR-22-0010 Reply to Geoff Gilbert Email Concern About Seabrook Station Concrete Degradation ML22062B6642022-02-0707 February 2022 Request for Additional Information 120V Inverter LAR from the Electrical Branch ML22063A0002022-01-25025 January 2022 Requests for Additional Information from Risk Branch Regarding 120V Inverter LAR ML22020A2542022-01-20020 January 2022 LTR-22-0010 Geoff Gilbert, E-mail Concern About Seabrook Station Concrete Degradation ML21097A2512021-04-0707 April 2021 Request for Additional Information Regarding Steam Generator Tube Inspection Report Review for RFO 20 (EPID L-2020-LRO-0066) (Email) ML21054A0482021-02-23023 February 2021 Request for Additional Information Regarding Heat Flux Hot Channel Requirement Amendment Request ML20343A0942020-12-0303 December 2020 Request for Additional Information Regarding Seabrook (COVID-19) Part 73 Force-on-Force Exemption Request (L-2020-LLE-0219) ML20273A2812020-09-22022 September 2020 Acceptance of Requested Licensing Action License Amendment Request to Resolve Non-Conservative Heat Flux Hot Channel Factor Requiments ML20258A1502020-09-14014 September 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding One-Time Change to the AC Sources Operating TS ML20260H4932020-09-11011 September 2020 NRR E-mail Capture - Comanche Peak - Acceptance of Requested Licensing Action - Request to Use Later Code Edition of ASME OM Code ML20230A2962020-08-14014 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Allow a One-Time Change to the AC Sources Operating TS ML20167A1842020-06-11011 June 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding TSTF-411 and TSTF-418 (L-2019-LLA-0237) ML20124A0012020-05-0101 May 2020 Cancellation of Call with Seabrook on Steam Generator Tube Inspections ML20114E1592020-04-23023 April 2020 Email and Request for Additional Information Related to Seabrook License Amendment Request to Degraded Voltage Time Delay Setpoint (L-2020-LLA-0012) ML20101N0932020-04-10010 April 2020 Acceptance of Requested Licensing Action Re Relief Request to Defer ASME Inspections Due COVID-19 (EPIDs L-2020-LLR-0055, -56, and -57) ML20101L0402020-04-10010 April 2020 Acceptance of Requested Licensing Action Relief Request to Use Code Case OMN-13 with 2012 Edition of the OM Code ML20101H3912020-04-0808 April 2020 Verbal Authorization for Seabrook Relief Request 3IIR-7 ML20087K8262020-03-27027 March 2020 Upcoming Steam Generator Tube Inservice Inspection ML20063J9792020-02-28028 February 2020 Acceptance of Requested Licensing Action Amendment Request to Revise Degraded Voltage Time Delay Setpoint ML19347C6732019-12-13013 December 2019 Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-418 ML19296D9122019-10-23023 October 2019 NRR E-mail Capture - Request for Additional Information Related to Seabrook Inverter Amendment (L-2019-LLA-0216) ML19295F5422019-10-15015 October 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise Onsite Power Distribution Requirements ML19275G7832019-10-0101 October 2019 Limited Appearance Statement from New Hampshire State Representative, Robert Harb Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6512019-09-27027 September 2019 Limited Appearance Statement from Joanna Hammond Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6542019-09-26026 September 2019 Limited Appearance Statement from Brian Campbell Regarding the Seabrook Station Unit 1 License Amendment Application ML19196A3592019-07-15015 July 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise the Emergency Core Cooling System Accumulator Technical Specifications ML19169A2412019-06-13013 June 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Relief Requests for the Containment Building Spray Pump Flow and Vibration Testing (Epids L-2019-LLR-00 and L-2019-LLR-00) ML19162A0662019-06-0404 June 2019 Reply to Mr. Rick Jakious'S E-mail of 5-29-2019 to Stephen B. Comley Sr., We the People with Attachments ML19112A1782019-04-22022 April 2019 NRR E-mail Capture - Point Beach; Seabrook; Turkey Point - Acceptance of Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-563 ML19101A4042019-04-11011 April 2019 NRR E-mail Capture - Point Beach; Seabrook; St. Lucie; Turkey Point - Acceptance of Licensing Action Relief Request to Use Encoded Phased Array Ultrasonic Examination Techniques for Ferritic and Austenitic Welds ML19070A2382019-03-10010 March 2019 LTR-19-0088 Maura Healey, Attorney General, the Commonwealth of Massachusetts, Ltr NextEras Requests for a License Amendment and Twenty-year Extension Prior to Issuance of a Final Decision in Adjudicatory Hearing on Concrete Degradation at ML19056A4602019-02-25025 February 2019 Comment from Lisa Conti Regarding the Emergency Petition Filed by C-10 on February 13, 2019 ML19056A4582019-02-25025 February 2019 Comment from Deborah A. Jones Regarding the Emergency Petition Filed by C-10 on February 13, 2019 2024-05-24
[Table view] |
Text
SeabrookNPEm Resource From: Wentzel, Michael Sent: Thursday, March 01, 2012 11:21 AM To: Cliche, Richard
Subject:
Draft Meeting Summary Attachments: Summary of March 1, 2012 Telephone Conference.docx
- Rick, Can you take a look at the attached draft meeting summary for our earlier phone call and provide any feedback, if necessary?
- Thanks, Mike Michael Wentzel Project Manager NRR/DLR/RPB2 (301) 415-6459 michael.wentzel@nrc.gov 1
Hearing Identifier: Seabrook_License_Renewal_NonPublic Email Number: 2686 Mail Envelope Properties (C0A338EE37A11447B136119705BF9A3F0111361C595F)
Subject:
Draft Meeting Summary Sent Date: 3/1/2012 11:20:33 AM Received Date: 3/1/2012 11:20:41 AM From: Wentzel, Michael Created By: Michael.Wentzel@nrc.gov Recipients:
"Cliche, Richard" <Richard.Cliche@fpl.com>
Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 315 3/1/2012 11:20:41 AM Summary of March 1, 2012 Telephone Conference.docx 25043 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
LICENSEE: NextEra Energy Seabrook, LLC FACILITY: Seabrook Station
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MARCH 1, 2012 BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK, LLC, CONCERNING THE DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE SEABROOK STATION, LICENSE RENEWAL APPLICATION ENVIRONMENTAL REVIEW (TAC. NO.
ME3959)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of NextEra Energy Seabrook, LLC held a telephone conference call on March 1, 2012, to discuss and clarify the staffs requests for additional information (RAIs) concerning the Seabrook Station, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs RAIs. provides a listing of the participants and Enclosure 2 contains a listing of the RAIs discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.
Michael Wentzel License Renewal Branch, RPB2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Number:50-443
Enclosures:
- 1. List of Participants
- 2. List of Requests for Additional Information
TELEPHONE CONFERENCE CALL SEABROOK STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS MARCH 1, 2012 PARTICIPANTS AFFILIATIONS Michael Wentzel Nuclear Regulatory Commission Richard Cliche NextEra Energy Seabrook, LLC.
Enclosure 1
REQUESTS FOR ADDITIONAL INFORMATION LICENSE RENEWAL APPLICATION MARCH 1, 2012 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of NextEra Energy Seabrook, LLC (NextEra) held a telephone conference call on March 1, 2012, to discuss and clarify the following request for additional information (RAI) concerning the license renewal application (LRA) environmental review (ER).
Seabrook RAI for Cooling System Alternatives In response to public comments received on the Seabrook Station (Seabrook) license renewal application draft supplemental environmental impact statement (SEIS), from both the Environmental Protection Agency (EPA), Region 1 (ML11304A059) and National Oceanic and Atmospheric Administrations (NOAA) National Marine Fisheries Service (NMFS)
(ML11304A057), the NRC will evaluate the environmental impacts of a range of alternatives for structural and operational modifications to the Seabrook cooling system that could reduce adverse impacts to aquatic resources. For example, EPA recommended that the each alternative characterize the number of organisms to be impinged and/or entrained by the intake structure under the different alternatives. This evaluation will be included in the final SEIS for the Seabrook license renewal application. The NRC does not have the regulatory authority to implement the requirements of the Clean Water Act or to require changes to Seabrooks cooling system. As stated in the EPAs letter to the NRC, the evaluation will not purport to provide or suggest the answers to the ultimate permitting questions that EPA must address under the Clean Water Act.
In order to assist the NRC in the preparation of the response to these comments, please provide copies of any assessment(s) of the environmental impacts associated with the construction and operation of closed-cycle cooling system alternatives, including alternatives for structural and operational modifications to the Seabrook cooling system. Of particular interest are any assessments evaluate the potential environmental impacts to land use, air quality, water resources, terrestrial and aquatic resources (including the estimated number of organisms to be impinged and/or entrained by the intake structure under the different alternatives), human health, socioeconomics, transportation, aesthetics, cultural resources, and waste management.
Discussion: Prior to the phone call, NextEra provided NRC a 2008 document entitled, Cooling Water Intake Structure Information Document for review. This document had previously been submitted by NextEra in response to the staffs October 29, 2010 RAIs. The ML numbers for the report are ML110100311 (Cover through Appendix A) and ML110100312 (Appendix B through Appendix E). Since this document has already been submitted on the Seabrook docket, and no further information is needed at this time, the NRC agreed on the conference call to withdraw the draft RAI on this matter.
Enclosure 2