ML061000474: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML061000474 | | number = ML061000474 | ||
| issue date = 08/06/2004 | | issue date = 08/06/2004 | ||
| title = | | title = Determination of Settleable Solids in Sewage Procedure Number 32432-C, Rev 3 | ||
| author name = Sundaram S | | author name = Sundaram S | ||
| author affiliation = Southern Nuclear Operating Co, Inc | | author affiliation = Southern Nuclear Operating Co, Inc | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Approved By Procedure Number Rev Shan Sundnram Vogde Electric Generating Plant g 32432-C 3 Date Apprved DETERMINATION OF SETTLEABLE SOLIDS IN SEWVAGEPage Numter 08/06/2004 | {{#Wiki_filter:Approved By Procedure Number Rev Shan Sundnram Vogde Electric Generating Plant g 32432-C 3 Date Apprved DETERMINATION OF SETTLEABLE SOLIDS IN SEWVAGEPage Numter 08/06/2004 . 1 of 2 DETERMINATION OF SETTLEABLE SOLIDS IN SEWAGE PROCEDURE USAGE REQUIREMENTS- SECTIONS Continuous Use: Procedure must be open and readily available at the work location. Follow procedure step by step unless otherwise NONE !11 directed. i | ||
.1 of 2 DETERMINATION OF SETTLEABLE SOLIDS IN SEWAGE PROCEDURE USAGE REQUIREMENTS-SECTIONS Continuous Use: Procedure must be open and readily available at the work | .i Reference Use: Procedure or applicable section(s) available at the work ALL location for ready reference by person performing steps. | ||
Follow procedure step by step unless otherwise directed.Reference Use: Procedure or applicable section(s) available at the work ALL location for ready reference by person performing steps.Information Use: Available on plant site for reference as needed. NONE | II i, | ||
Information Use: Available on plant site for reference as needed. NONE | |||
:1 I | |||
Print1-I M.-I If, 7nlnr tf i0 O | |||
Approved By 4Procedure Number Rev SAnpSundarai i vogtle Electric Generating Plant is I32432-C 3 Date Approved 08/06/2004 DETERMINATION OF SETTLEABLE SOLIDS IN SEWVAGE I2 Page Number of 2 REFERENCE USE 1.0 PURPOSE This procedure provides instructions for the determination of settleable solids in sewage. | |||
3.1 Imhoff cone or equivalent 4.0 TEST STAND QUALITYCONTROL | 2.0 PRECAUTIONS 2.1 Mix the sample thoroughly prior to performing test. | ||
2.2 Keep in mind what your sample consists of and take all appropriate precautions to prevent personnel contamination. | |||
3.0 MATERIALS 3.1 Imhoff cone or equivalent 4.0 TEST STAND QUALITYCONTROL 4.1 Calibrations arc not applicable to this procedure. | |||
4.2 Calibration checks are not applicable to this procedure. | |||
5.0 INSTRUCTIONS 5.1 Pour 1000 ml of sample from the aeration chamber of the sewage treatment plant into an Imrhoff cone or equivalent. | |||
5.2 Allow to settle for approximately 1 hour. | |||
5.3 Observe the volume of sludge. Obtain the percentage of settleable solids by dividing the sludge volume by 10. | |||
5.4 Record results on the appropriate data sheet. | |||
== | ==6.0 REFERENCES== | ||
6.1 VEGP Procedure 35585-C "Operation Of The Sewage Treatment Plant" END OF PROCEDURE TEXT Pnntrwl M-rl nn.t In In. | |||
It, ')1{>}} | |||
6.1 VEGP Procedure 35585-C "Operation Of The Sewage Treatment Plant" END OF PROCEDURE TEXT Pnntrwl M-rl It, ')1{> |
Latest revision as of 21:06, 23 November 2019
ML061000474 | |
Person / Time | |
---|---|
Site: | Vogtle ![]() |
Issue date: | 08/06/2004 |
From: | Sundaram S Southern Nuclear Operating Co |
To: | Office of Nuclear Reactor Regulation |
References | |
32432-C, Rev 3 | |
Download: ML061000474 (2) | |
Text
Approved By Procedure Number Rev Shan Sundnram Vogde Electric Generating Plant g 32432-C 3 Date Apprved DETERMINATION OF SETTLEABLE SOLIDS IN SEWVAGEPage Numter 08/06/2004 . 1 of 2 DETERMINATION OF SETTLEABLE SOLIDS IN SEWAGE PROCEDURE USAGE REQUIREMENTS- SECTIONS Continuous Use: Procedure must be open and readily available at the work location. Follow procedure step by step unless otherwise NONE !11 directed. i
.i Reference Use: Procedure or applicable section(s) available at the work ALL location for ready reference by person performing steps.
II i,
Information Use: Available on plant site for reference as needed. NONE
- 1 I
Print1-I M.-I If, 7nlnr tf i0 O
Approved By 4Procedure Number Rev SAnpSundarai i vogtle Electric Generating Plant is I32432-C 3 Date Approved 08/06/2004 DETERMINATION OF SETTLEABLE SOLIDS IN SEWVAGE I2 Page Number of 2 REFERENCE USE 1.0 PURPOSE This procedure provides instructions for the determination of settleable solids in sewage.
2.0 PRECAUTIONS 2.1 Mix the sample thoroughly prior to performing test.
2.2 Keep in mind what your sample consists of and take all appropriate precautions to prevent personnel contamination.
3.0 MATERIALS 3.1 Imhoff cone or equivalent 4.0 TEST STAND QUALITYCONTROL 4.1 Calibrations arc not applicable to this procedure.
4.2 Calibration checks are not applicable to this procedure.
5.0 INSTRUCTIONS 5.1 Pour 1000 ml of sample from the aeration chamber of the sewage treatment plant into an Imrhoff cone or equivalent.
5.2 Allow to settle for approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
5.3 Observe the volume of sludge. Obtain the percentage of settleable solids by dividing the sludge volume by 10.
5.4 Record results on the appropriate data sheet.
6.0 REFERENCES
6.1 VEGP Procedure 35585-C "Operation Of The Sewage Treatment Plant" END OF PROCEDURE TEXT Pnntrwl M-rl nn.t In In.