|
---|
Category:Environmental Technical Specification
MONTHYEARML0610004802006-01-18018 January 2006 Procedure Number 35570-C, Rev 47, Operation of the Potable Water Systems. ML0610004512006-01-10010 January 2006 Groundwater Monitoring Program Procedure Number 30140-C Rev. 22 ML0610004792006-01-10010 January 2006 Operation of the Sewage Treatment Plant Procedure Number 35585-C Rev 13.1 ML0610005222005-12-0909 December 2005 Meteorological Tower Monitoring and Data Control Procedure Number 36030-C Rev. 17 ML0610004532005-12-0808 December 2005 Periodic Analysis Scheduling Program Procedure Number 30025-C, Rev. 53.1 ML0610005112005-11-0404 November 2005 Operation of Site Solid Waste Landfill (No. 3) and Special Requirements for the Asbestos Trench Procedure Number 36300-C, Rev 1 ML0610005522005-09-27027 September 2005 Meteorological Station 10M Ambient and 10-60M Delta Temperature Channel Calibration Procedure 24688-C, Rev 16 ML0610005082005-06-29029 June 2005 Control, Handling, and Disposal of Hazardous Waste Procedure Number 36221-C, Rev 13.1 ML0610005472005-05-13013 May 2005 Radioactive Liquid Effluent Release Permit Generation and Data Control Computer Method Procedure 36015-C Rev 23 ML0610005132005-02-0202 February 2005 Radioactive Gaseous Effluent Release Permit Generation and Data Control Computer Method Procedure Number 36020-C, Rev 28 ML0610005372004-12-0909 December 2004 NPDES Permit Implementation and Control Procedure Number 36001-C Rev 31 ML0610004742004-08-0606 August 2004 Determination of Settleable Solids in Sewage Procedure Number 32432-C, Rev 3 ML0610004562004-06-0202 June 2004 Chemistry Logkeeping, Filing, and Record Storage, Procedure Number 3104-C, Rev. 21 ML0610005002004-06-0101 June 2004 Rad Effluent Off Normal Conditions Procedure Number 36011-C, Rev 10 ML0610004762004-02-23023 February 2004 Monitoring of the Radioactive Gaseous Waste Management System Procedure Number 35430-C Rev 24 ML0610004772003-11-14014 November 2003 Operation of the Demineralized Water Makeup System Procedure 35510-C, Rev 57 ML0610004752003-11-14014 November 2003 Monitoring of the Radioactive Liquid Waste Management System Procedure Number 35420-C Rev 18 ML0610005502003-08-26026 August 2003 Operation of the Waste Water Retention Basins Automatic Sample Compositors Procedure Number 37015-C, Rev 8 ML0610005392003-08-19019 August 2003 Implementation of the Stormwater Pollution Prevention Plan (Swppp) Procedure 36002-E Rev 1.1 ML0610005442002-03-27027 March 2002 Offsite Dose Calculation Manual (ODCM) Implementation and Control Procedure Number 36010-C Rev 11.2 ML0610005182000-02-25025 February 2000 Radioactive Effluent Release Report Preparation Procedure Number 36025-C Rev 6.2 ML0610004721993-04-20020 April 1993 Determination of Zinc Procedure Number 32430-C, Rev 2 2006-01-18
[Table view] |
Text
Approved By Procedure Number Rev Shan Sundnram Vogde Electric Generating Plant g 32432-C 3 Date Apprved DETERMINATION OF SETTLEABLE SOLIDS IN SEWVAGEPage Numter 08/06/2004 . 1 of 2 DETERMINATION OF SETTLEABLE SOLIDS IN SEWAGE PROCEDURE USAGE REQUIREMENTS- SECTIONS Continuous Use: Procedure must be open and readily available at the work location. Follow procedure step by step unless otherwise NONE !11 directed. i
.i Reference Use: Procedure or applicable section(s) available at the work ALL location for ready reference by person performing steps.
II i,
Information Use: Available on plant site for reference as needed. NONE
- 1 I
Print1-I M.-I If, 7nlnr tf i0 O
Approved By 4Procedure Number Rev SAnpSundarai i vogtle Electric Generating Plant is I32432-C 3 Date Approved 08/06/2004 DETERMINATION OF SETTLEABLE SOLIDS IN SEWVAGE I2 Page Number of 2 REFERENCE USE 1.0 PURPOSE This procedure provides instructions for the determination of settleable solids in sewage.
2.0 PRECAUTIONS 2.1 Mix the sample thoroughly prior to performing test.
2.2 Keep in mind what your sample consists of and take all appropriate precautions to prevent personnel contamination.
3.0 MATERIALS 3.1 Imhoff cone or equivalent 4.0 TEST STAND QUALITYCONTROL 4.1 Calibrations arc not applicable to this procedure.
4.2 Calibration checks are not applicable to this procedure.
5.0 INSTRUCTIONS 5.1 Pour 1000 ml of sample from the aeration chamber of the sewage treatment plant into an Imrhoff cone or equivalent.
5.2 Allow to settle for approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
5.3 Observe the volume of sludge. Obtain the percentage of settleable solids by dividing the sludge volume by 10.
5.4 Record results on the appropriate data sheet.
6.0 REFERENCES
6.1 VEGP Procedure 35585-C "Operation Of The Sewage Treatment Plant" END OF PROCEDURE TEXT Pnntrwl M-rl nn.t In In.
It, ')1{>