{{#Wiki_filter:3/s jus CR just entered states:
{{#Wiki_filter:3/s j u s CR just entered states:
An issue was raised during the Region I NRC Inspection for license renewal regarding the operability of FS-4803, Refuel Bellows Seal Rupture Drain leakage alarm switch. FS-4803 did not actuate when functionally checked on 12/28/05.
An issue was raised during the Region I NRC Inspection for license renewal regarding the operability of FS-4803, Refuel Bellows Seal Rupture Drain leakage alarm switch. FS-4803 did not actuate when functionally checked on 12/28/05. Procedure 8.E.19, Attachment 1 was signed off on 2/3/06, as allowed in Section 9.0 Acceptance Criteria step [2],by initiating a Maintenance Request to repair or replace the defective component (ref. MR 06100047). A CR was written, as required by 8.E.19 Section 10.0 Corrective Action, to document the discrepant condition (ref. CR-PNP-2005-05471). The License Renewal team identified a commitment made by BECO in 1987 regarding Refuel Bellows Seal leakage. Procedure 8.E.19 did not identify this NRC commitment in the references or in the acceptance verification and signoff.}}
Procedure 8.E.19, Attachment 1 was signed off on 2/3/06, as allowed in Section 9.0 Acceptance Criteria step [2], by initiating a Maintenance Request to repair or replace the defective component (ref. MR 06100047).
A CR was written, as required by 8.E.19 Section 10.0 Corrective Action, to document the discrepant condition (ref.
CR- PNP-2005-05471). The License Renewal team identified a commitment made by BECO in 1987 regarding Refuel Bellows Seal leakage. Procedure 8.E.19 did not identify this NRC commitment in the references or in the acceptance verification and signoff.}}

Latest revision as of 09:19, 23 November 2019

CR-PNP-----------, CR Just Entered, Operability of Refuel Bellows Seal Rupture Drain Leakage Alarm Switch
ML070780197
Person / Time
Site: Pilgrim
Issue date: 03/08/2006
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
Download: ML070780197 (1)


Text

3/s j u s CR just entered states:

An issue was raised during the Region I NRC Inspection for license renewal regarding the operability of FS-4803, Refuel Bellows Seal Rupture Drain leakage alarm switch. FS-4803 did not actuate when functionally checked on 12/28/05. Procedure 8.E.19, Attachment 1 was signed off on 2/3/06, as allowed in Section 9.0 Acceptance Criteria step [2],by initiating a Maintenance Request to repair or replace the defective component (ref. MR 06100047). A CR was written, as required by 8.E.19 Section 10.0 Corrective Action, to document the discrepant condition (ref. CR-PNP-2005-05471). The License Renewal team identified a commitment made by BECO in 1987 regarding Refuel Bellows Seal leakage. Procedure 8.E.19 did not identify this NRC commitment in the references or in the acceptance verification and signoff.