ML062680353

From kanterella
Jump to navigation Jump to search
Condition Report List
ML062680353
Person / Time
Site: Pilgrim
Issue date: 07/28/2005
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2006-0159
Download: ML062680353 (2)


Text

Entqrgy Operations, Inc.

Condition Report List Page 1 of 2 July 28, 2005 8:34 AM CR-PNP-2005-03530 Significance:

Reportability:

Operability:

ADMIN - NA CR Status: Open Classification Code:

==

Description:==

There appears to be some confusion on the part of the Operations and EP staff regarding the assignment and response of the Security Shift Supervisor during an emergency. Some individuals are under the impression that the SSS reports immediately to the control room while others are under the impression that the SSS reports only to the control room after a certain delay time and only under certain conditions. The actions and availability of the SSS should be clarified for Operations, EP and Security so there is a clear expectation and understanding of when and where the SSS will be available during a security event.

Responsible Dept CA&A

Contact:

Originated: 07/27/2005 by Sowdon,Thomas L, Emerg Prep Mgmt Affected Systems:

Affected Equipment:

CR-PNP-2005-03529 Significance:

Reportability:

Operability:

CR Status: Open Classification Code:

==

Description:==

During the Force-on-Force drill on 7/27/05 it was noted that the public address announcements that are made by Security and Operations do not match exactly. The wording is different N and could contribute to some confusion during an emergency.

3 Responsible Dept:

CA&A

Contact:

Originated: 07/27/2005 by Sowdon,Thomas L, Emerg Prep Mgmt Affected Systems:

Affected Equipment:

CR-PNP-2005-03527 Significance:

Reportability:

Operability:

CR Status: Open Classification Code:

==

Description:==

During the FOF exercise it became apparent that several response locations lost attention to detail which allowed an drill advesary to pass through their area of responsibility without the N expected engagement.

Responsible Dept:

CA&A

Contact:

Originated: 07/27/2005 by Marcussen,Fred E, Security Plant Mgmt Affected Systems:

Affected Equipment:

Entergy Operations, Inc.

Condition Report List Page 2 of 2 July 28,2005 8:34 AM CR-PNP-2005-03526 Significance:

Reportablilty:

Operability:

CR Status: Open ClasslflcaUon Code:

==

Description:==

c During the FOF exercise the beginning event messages were not ckearly communicated to all controllers due to inadequate communication discipline between controllers and the lead controller.

Responsible Dept:

CA&A

Contact:

Originated: 07/27/2005 by Marcussen,Fred E, Security Plant Mgmt Affected Systems:

Affected Equipment:

Report Criteria:

FROM CRSDBA.V_CRCURRENT ((UPPER(PLANTCODE) = UPPER('PNP')) AND (ORIGINATEDYEAR = 2005) AND (CRNUMBER > 3489))