ML071370655: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:r *OFFICE OF THE SECRETARY  
{{#Wiki_filter:r
*CORRESPONDENCE CONTROL TICKET Date Printed: Mlay 16, 2007 16:57 PAPER NUMBER: ACTION OFFICE: AUTHOR: AFFILIATION:
* OFFICE OF THE SECRETARY
ADDRESSEE:
* CORRESPONDENCE CONTROL TICKET Date Printed: Mlay 16, 2007 16:57 PAPER NUMBER:     LTR-07-0346                                LOGGING DATE: 05/14/2007 EDO ACTION OFFICE:                                                                         EDO DEDMRT" Nancy Oates B0015 DEDIA AUTHOR:                                                                             AO AFFILIATION:     MA ADDRESSEE:       Dale Klein


==SUBJECT:==
==SUBJECT:==
ACTION: DISTRIBUTION:
Annual town meeting, Article 38--Pilgrim Aging Management Plan ACTION:          Appropriate DISTRIBUTION:    RF LETTER DATE:      03/10/2007 ACKNOWLEDGED      No SPECIAL HANDLING: Made publicly available in ADAMS via EDO/DPC NOTES:
LETTER DATE: ACKNOWLEDGED SPECIAL HANDLING: LTR-07-0346 EDO Nancy Oates MA Dale Klein LOGGING DATE: 05/14/2007 EDO DEDMRT" B0015 DEDIA AO Annual town meeting, Article 38--Pilgrim Aging Management Plan Appropriate RF 03/10/2007 No Made publicly available in ADAMS via EDO/DPC NOTES: FILE LOCATION: ADAMS DATE DUE: DATE SIGNED:  
FILE LOCATION:   ADAMS DATE DUE:                                         DATE SIGNED:
..-.ANNUAL TOWN MEETING MARCH 10, 2007 DUXBURY PERFORMING ARTS CENTER 73 ALDEN STREET, DUXBURY, MA The meeting was called to order by the Moderator at 9:05am, recessed for lunch at 12:15pm, reconvened at 1:15pm, recessed at 5;05pm until Monday at 7:30pm and adjourned sine die at 10:20pm all at the Duxbury Performing Arts Center.Article 3 8-Pilgrim Aging.Management Plan-Moved and seconded that the town vote to approve the matter set forth in Article 38: "That the Town of Duxbury will advocate that the Pilgrim Nuclear Power Station's aging management plan, now and in the future shall consist of more effective methods to inspect and monitor for leaks of radioactive water from systems and components, including underground pipes and tanks, including the proper placement and regular inspection of monitoring wells between the reactor and Cape Cod Bay in order to better protect public health, safety and our marine aquaculture.
 
The Town Clerk of Duxbury shall forward the text of this Article to the Town of Duxbury's State and Federal delegations, to all Select Boards within the Emergency Planning Zone of Pilgrim NPS, the Nuclear Regulatory Commission and Entergy Corp., so that the intent of the Citizens of Duxbury is widely known. Motion carried A true copy, Attest: Nancy M. Oates Duxbury Town Clerk.1. (
. -. .
ANNUAL TOWN MEETING MARCH 10, 2007 DUXBURY PERFORMING ARTS CENTER 73 ALDEN STREET, DUXBURY, MA The meeting was called to order by the Moderator at 9:05am, recessed for lunch at 12:15pm, reconvened at 1:15pm, recessed at 5;05pm until Monday at 7:30pm and adjourned sine die at 10:20pm all at the Duxbury Performing Arts Center.Article 3 9-Pilgrim Plume Transport Model-Moved and seconded that Town of Duxbury will advocate that the Pilgrim Nuclear Power Station's plume transport model be changed from Straight-line Gaussian model (Class A models) to more complex models.(Class B) to more accurately reflect the variable and complex wind and weather conditions that are affected by sea breezes, terrain, buildings and variable precipitation.
ANNUAL TOWN MEETING MARCH 10, 2007 DUXBURY PERFORMING ARTS CENTER 73 ALDEN STREET, DUXBURY, MA The meeting was called to order by the Moderator at 9:05am, recessed for lunch at 12:15pm, reconvened at 1:15pm, recessed at 5;05pm until Monday at 7:30pm and adjourned sine die at 10:20pm all at the Duxbury Performing Arts Center.
Now Pilgrim is allowed to base inputs to their Class A models from the meteorological tower on site. The on-site tower only tells what wind direction is on site, but not what happens to the plume as it travels offsite. Computerized combination weather radiation monitors are readily available.
Article 3 8-Pilgrim Aging.Management Plan-Moved and seconded that the town vote to approve the matter set forth in Article 38:
They must be required to be placed in appropriate offsite locations, determined by a meteorological site-specific analysis, so that protective actions called for in an emergency are appropriate and accurate studies of potential health effects from exposure can be preformed.
        "That the Town of Duxbury will advocate that the Pilgrim Nuclear Power Station's aging management plan, now and in the future shall consist of more effective methods to inspect and monitor for leaks of radioactive water from systems and components, including underground pipes and tanks, including the proper placement and regular inspection of monitoring wells between the reactor and Cape Cod Bay in order to better protect public health, safety and our marine aquaculture. The Town Clerk of Duxbury shall forward the text of this Article to the Town of Duxbury's State and Federal delegations, to all Select Boards within the Emergency Planning Zone of Pilgrim NPS, the Nuclear Regulatory Commission and Entergy Corp., so that the intent of the Citizens of Duxbury is widely known. Motion carried A true copy, Attest:
The Clerk of Duxbury shall forward the text of this Article to the Town of Duxbury's State and Federal delegations, to all Select Boards within the Emergency Planning Zone of Pilgrim NPS, the Nuclear Regulatory Commission and Entergy Corp., so that the intent of the Citizens of Duxbury is widely known. Motion carried A,true copy, Attest:.---Nancy Duxbury Town Clerk}}
Nancy M. Oates Duxbury Town Clerk
                      .1. (
 
ANNUAL TOWN MEETING MARCH 10, 2007 DUXBURY PERFORMING ARTS CENTER 73 ALDEN STREET, DUXBURY, MA The meeting was called to order by the Moderator at 9:05am, recessed for lunch at 12:15pm, reconvened at 1:15pm, recessed at 5;05pm until Monday at 7:30pm and adjourned sine die at 10:20pm all at the Duxbury Performing Arts Center.
Article 3 9-Pilgrim Plume Transport Model-Moved and seconded that Town of Duxbury will advocate that the Pilgrim Nuclear Power Station's plume transport model be changed from Straight-line Gaussian model (Class A models) to more complex models
      . (Class B) to more accurately reflect the variable and complex wind and weather conditions that are affected by sea breezes, terrain, buildings and variable precipitation.
Now Pilgrim is allowed to base inputs to their Class A models from the meteorological tower on site. The on-site tower only tells what wind direction is on site, but not what happens to the plume as it travels offsite. Computerized combination weather radiation monitors are readily available. They must be required to be placed in appropriate offsite locations, determined by a meteorological site-specific analysis, so that protective actions called for in an emergency are appropriate and accurate studies of potential health effects from exposure can be preformed. The Clerk of Duxbury shall forward the text of this Article to the Town of Duxbury's State and Federal delegations, to all Select Boards within the Emergency Planning Zone of Pilgrim NPS, the Nuclear Regulatory Commission and Entergy Corp., so that the intent of the Citizens of Duxbury is widely known. Motion carried A,true copy, Attest:
. ---   Nancy X*-Oates Duxbury Town Clerk}}

Revision as of 07:05, 23 November 2019

LTR-07-0346 - Nancy M. Oates Re Annual Town Meeting on 03/10/2007on Articles 38 & 39, Pilgrim Aging Management Plan & Pilgrim Plume Transport Model
ML071370655
Person / Time
Site: Pilgrim
Issue date: 03/10/2007
From: Oates N
Town of Duxbury, MA
To: Kline D
NRC/Chairman
References
LTR-07-0346
Download: ML071370655 (3)


Text

r

  • OFFICE OF THE SECRETARY
  • CORRESPONDENCE CONTROL TICKET Date Printed: Mlay 16, 2007 16:57 PAPER NUMBER: LTR-07-0346 LOGGING DATE: 05/14/2007 EDO ACTION OFFICE: EDO DEDMRT" Nancy Oates B0015 DEDIA AUTHOR: AO AFFILIATION: MA ADDRESSEE: Dale Klein

SUBJECT:

Annual town meeting, Article 38--Pilgrim Aging Management Plan ACTION: Appropriate DISTRIBUTION: RF LETTER DATE: 03/10/2007 ACKNOWLEDGED No SPECIAL HANDLING: Made publicly available in ADAMS via EDO/DPC NOTES:

FILE LOCATION: ADAMS DATE DUE: DATE SIGNED:

. -. .

ANNUAL TOWN MEETING MARCH 10, 2007 DUXBURY PERFORMING ARTS CENTER 73 ALDEN STREET, DUXBURY, MA The meeting was called to order by the Moderator at 9:05am, recessed for lunch at 12:15pm, reconvened at 1:15pm, recessed at 5;05pm until Monday at 7:30pm and adjourned sine die at 10:20pm all at the Duxbury Performing Arts Center.

Article 3 8-Pilgrim Aging.Management Plan-Moved and seconded that the town vote to approve the matter set forth in Article 38:

"That the Town of Duxbury will advocate that the Pilgrim Nuclear Power Station's aging management plan, now and in the future shall consist of more effective methods to inspect and monitor for leaks of radioactive water from systems and components, including underground pipes and tanks, including the proper placement and regular inspection of monitoring wells between the reactor and Cape Cod Bay in order to better protect public health, safety and our marine aquaculture. The Town Clerk of Duxbury shall forward the text of this Article to the Town of Duxbury's State and Federal delegations, to all Select Boards within the Emergency Planning Zone of Pilgrim NPS, the Nuclear Regulatory Commission and Entergy Corp., so that the intent of the Citizens of Duxbury is widely known. Motion carried A true copy, Attest:

Nancy M. Oates Duxbury Town Clerk

.1. (

ANNUAL TOWN MEETING MARCH 10, 2007 DUXBURY PERFORMING ARTS CENTER 73 ALDEN STREET, DUXBURY, MA The meeting was called to order by the Moderator at 9:05am, recessed for lunch at 12:15pm, reconvened at 1:15pm, recessed at 5;05pm until Monday at 7:30pm and adjourned sine die at 10:20pm all at the Duxbury Performing Arts Center.

Article 3 9-Pilgrim Plume Transport Model-Moved and seconded that Town of Duxbury will advocate that the Pilgrim Nuclear Power Station's plume transport model be changed from Straight-line Gaussian model (Class A models) to more complex models

. (Class B) to more accurately reflect the variable and complex wind and weather conditions that are affected by sea breezes, terrain, buildings and variable precipitation.

Now Pilgrim is allowed to base inputs to their Class A models from the meteorological tower on site. The on-site tower only tells what wind direction is on site, but not what happens to the plume as it travels offsite. Computerized combination weather radiation monitors are readily available. They must be required to be placed in appropriate offsite locations, determined by a meteorological site-specific analysis, so that protective actions called for in an emergency are appropriate and accurate studies of potential health effects from exposure can be preformed. The Clerk of Duxbury shall forward the text of this Article to the Town of Duxbury's State and Federal delegations, to all Select Boards within the Emergency Planning Zone of Pilgrim NPS, the Nuclear Regulatory Commission and Entergy Corp., so that the intent of the Citizens of Duxbury is widely known. Motion carried A,true copy, Attest:

. --- Nancy X*-Oates Duxbury Town Clerk