| | number = ML071430251 | | | number = ML071430251 |
| | issue date = 06/13/2007 | | | issue date = 06/13/2007 |
| | title = South Texas Project, Units 1 and 2 - Tech Spec Pages for Amendment Nos. 177 and 164 Regarding TS 3.3.3.6, Accident Monitoring Instrumentation, | | | title = Tech Spec Pages for Amendment Nos. 177 and 164 Regarding TS 3.3.3.6, Accident Monitoring Instrumentation, |
| | author name = | | | author name = |
| | author affiliation = NRC/NRR/ADRO/DORL/LPLIV | | | author affiliation = NRC/NRR/ADRO/DORL/LPLIV |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:V/)0-1 C:-3.Cr.a-:'3 3 CD CD 03 3 CD. CD AC INSTRUMENT | | {{#Wiki_filter:TABLE 3.3-10 V/) |
| : 1. Containment Pressure 2. Reactor. Coolant Outlet Temperature-T HOT (Wide Range)3. Reactor Coolant Inlet Temperature-T COLD (Wide Range)4. Reactor Coolant Pressure -Wide Range and Extended Range 5. Pressurizer Water Level 6. Steam Line Pressure 7. Steam Generator Water Level -Narrow Range 8. Steam Generator Water Level -Wide Range 9. Refueling Water Storage Tank Water Level 10. Auxiliary Feedwater Storage Tank Water Level 11. Auxiliary Feedwater Flow 12. Reactor Coolant System Subcooling Margin Monitoring TABLE 3.3-10 CIDENT MONITORING INSTRUMENTATION TOTAL MINIMUM NO. OF CHANNELS CHANNELS OPERABLE ACTION 43 4.1 4 (1/loop)4 (1/loop)4 4 3 4 1 4/steam generator 4/steam generator 4 (1/steam generator) 1/steam generator 1/steam generator 4 35 35 37 43 43 43 35 37 37 35 36 I 3 3 1 1 4 (1/steam generator) 2 4 1 TABLE 3.3-10 (Continued) | | 0 AC CIDENT MONITORING INSTRUMENTATION |
| ACTION 35- a.ACTION STATEMENTS With the number of OPERABLE channels one less than the Minimum Channels Operable requirement, restore the inoperable channel to OPERABLE status within 30 days or submit a Special Report within the next 14 days describing the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.b. With the number of OPERABLE channels two or more less than the Minimum Channels Operable requirement, restore one or more of the inoperable channels such that at least three channels are in OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within the next 12 hours.ACTION 36 -a. With the number of OPERABLE channels one less than the Total Number of Channels requirements, restore one inoperable channel to OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within the next 12 hours.b. With the number of OPERABLE channels less than the Minimum Channels Operable requirements, restore at least one inoperable channel to OPERABLE status within 48 hours, or be in at least HOT SHUTDOWN within the next 12 hours.ACTION 37 -a. With the number of OPERABLE channels one less than the Total Number of Channels requirements, restore the inoperable channel to OPERABLE status within 31 days, or be in at least HOT SHUTDOWN within the next 12 hours.b. With the number of OPERABLE channels two less than the Total Number of Channels requirement, restore at least one inoperable channel to OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within the next 12 hours.c. With the number of OPERABLE channels less than the Minimum Channels Operable requirement, restore at least one inoperable channel to OPERABLE status within 48 hours or be in at least HOT SHUTDOWN within the next 12 hours.SOUTH TEXAS -UNITS 1 & 2 3/4 ý-70 Unmit 1 Amendment No. 177.1}} | | -1 TOTAL MINIMUM NO. OF CHANNELS INSTRUMENT CHANNELS OPERABLE ACTION C: 1. Containment Pressure 4 .1 43 |
| | -3. |
| | : 2. Reactor. Coolant Outlet Temperature-T HOT (Wide Range) 4 (1/loop) 4 35 I |
| | : 3. Reactor Coolant Inlet Temperature- 4 (1/loop) 4 35 T COLD (Wide Range) |
| | Cr. 4. Reactor Coolant Pressure - Wide Range 3 37 and Extended Range 1 a-:' 5. Pressurizer Water Level 4 43 |
| | : 6. Steam Line Pressure 4/steam generator 1/steam generator 43 |
| | : 7. Steam Generator Water Level - 4/steam generator 1/steam generator 43 Narrow Range |
| | : 8. Steam Generator Water Level - 4 (1/steam generator) 4 35 Wide Range |
| | : 9. Refueling Water Storage Tank Water Level 3 1 37 3 3 |
| | : 10. Auxiliary Feedwater Storage Tank Water Level 3 1 37 CD CD |
| | : 11. Auxiliary Feedwater Flow 4 (1/steam generator) 4 35 03 3 |
| | : 12. Reactor Coolant System Subcooling 2 1 36 CD. CD Margin Monitoring |
| | |
| | TABLE 3.3-10 (Continued) |
| | ACTION STATEMENTS ACTION 35- a. With the number of OPERABLE channels one less than the Minimum Channels Operable requirement, restore the inoperable channel to OPERABLE status within 30 days or submit a Special Report within the next 14 days describing the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status. |
| | : b. With the number of OPERABLE channels two or more less than the Minimum Channels Operable requirement, restore one or more of the inoperable channels such that at least three channels are in OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within the next 12 hours. |
| | ACTION 36 - a. With the number of OPERABLE channels one less than the Total Number of Channels requirements, restore one inoperable channel to OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within the next 12 hours. |
| | : b. With the number of OPERABLE channels less than the Minimum Channels Operable requirements, restore at least one inoperable channel to OPERABLE status within 48 hours, or be in at least HOT SHUTDOWN within the next 12 hours. |
| | ACTION 37 - a. With the number of OPERABLE channels one less than the Total Number of Channels requirements, restore the inoperable channel to OPERABLE status within 31 days, or be in at least HOT SHUTDOWN within the next 12 hours. |
| | : b. With the number of OPERABLE channels two less than the Total Number of Channels requirement, restore at least one inoperable channel to OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within the next 12 hours. |
| | : c. With the number of OPERABLE channels less than the Minimum Channels Operable requirement, restore at least one inoperable channel to OPERABLE status within 48 hours or be in at least HOT SHUTDOWN within the next 12 hours. |
| | SOUTH TEXAS - UNITS 1 & 2 3/4 ý-70 Unmit 1 Amendment No. 177.1}} |
Letter Sequence Other |
---|
|
|
MONTHYEARNOC-AE-05001914, Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.2006-03-30030 March 2006 Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. Project stage: Request NOC-AE-06002060, Revision to Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.2006-10-0202 October 2006 Revision to Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. Project stage: Request ML0629800242006-10-23023 October 2006 10/23/06 E-mail and Attachment to A. Harrison and S. Head, STP, from M. Thadani, DORL/LPL4/PM - Request for Additional Information Project stage: RAI NOC-AE-07002104, Response to NRC Request for Additional Information on Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation2007-02-26026 February 2007 Response to NRC Request for Additional Information on Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation Project stage: Response to RAI ML0714302342007-06-13013 June 2007 Issuance of Amendment Nos. 177 and 164 Changes to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. Project stage: Approval ML0714302512007-06-13013 June 2007 Tech Spec Pages for Amendment Nos. 177 and 164 Regarding TS 3.3.3.6, Accident Monitoring Instrumentation, Project stage: Other 2006-03-30
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML21320A0022021-12-0808 December 2021 Issuance of Amendment Nos. 223 and 208 to Revise Technical Specification 3.6.3 and to Remove the Technical Specifications Index ML21106A2862021-05-0606 May 2021 Correction to Amendment Nos. 188 and 175 Regarding Relocation of Surveillance Test Intervals to Licensee-Controlled Program (Risk-Informed Initiative 5b) ML19067A2222019-06-0606 June 2019 Issuance of Amendment Nos. 215 and 201 Adoption of TSTF-522 Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18159A2122018-07-19019 July 2018 Issuance of Amendment Nos. 214 and 200 Emergency Response Organization Time Augmentation and Staffing Chances to the Emergency Plan (CAC Nos. MG0024 and MG0025; EPID L-2017-LLA-0265) ML17191B1372017-09-28028 September 2017 South Texas Project, Unit 1, Renewed Facility Operating License NPF-76 ML17192A0182017-09-28028 September 2017 South Texas Project, Unit 2, Renewed Facility Operating License and Appendices NPF-80 ML17038A2232017-07-11011 July 2017 Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 ML16116A0072016-04-29029 April 2016 Issuance of Amendment Nos. 210 and 197, Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years ML15342A0032015-12-28028 December 2015 Issuance of Amendment Nos. 209 and 196, Adopt Technical Specification Task Force (TSTF)-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (CAC MF6178-MF6179) ML15343A1282015-12-11011 December 2015 Issuance of Amendment No. 208, Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) NOC-AE-15003315, Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 202015-12-0303 December 2015 Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20 ML15209A6412015-09-22022 September 2015 Issuance of Amendment Nos. 207 and 195, Revise Updated Final Safety Analysis Report Table 15.6-17 to Correct Radiological Doses Resulting from Calculation Error Performed in Support of Amendments 182 and 169 ML15201A1952015-08-20020 August 2015 Issuance of Amendment Nos. 206 and 194, Revise the Emergency Action Level Scheme to the NRC-endorsed Scheme Contained in NEI-99, Revision 6 ML15075A1462015-04-29029 April 2015 Issuance of Amendment Nos. 205 and 193, Request to Revise Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers, for Required Actions and Allowed Outage Times ML15049A1292015-02-27027 February 2015 Issuance of Amendment Nos. 204 and 192, Revise Technical Specification 6.9.1.6, Core Operating Limits Report, with Respect to Analytical Methods Used to Determine Core Operating Limits ML14339A1702015-02-13013 February 2015 Issuance of Amendment Nos. 203 and 191, Revise Fire Hazards Analysis Report and Fire Protection Program License Conditions Related to Alternate Shutdown Capability ML14281A0652015-01-29029 January 2015 Issuance of Amendment Nos. 202 and 190, Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML14260A4372014-08-14014 August 2014 Project Units 1 & 2, License Amendment Request - Proposed Administrative Controls Technical Specification 6.9.1.6, Core Operating Limits Report NOC-AE-14003143, Supplement to License Amendment Request Proposed Revision to Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers2014-06-0909 June 2014 Supplement to License Amendment Request Proposed Revision to Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers ML14106A3642014-04-22022 April 2014 Correction to Technical Specification Page 3/4 8-4, Amendment Nos. 188 and 175, Regarding Relocation of Surveillance Test Intervals to Licensee-Controlled Surveillance Frequency Control Program (TAC Nos. MF3732-33) NOC-AE-13003031, License Amendment Request, Proposed Revision to Technical Specification 3.3. 1, Functional Unit 20, Reactor Trip Breakers.2014-01-0606 January 2014 License Amendment Request, Proposed Revision to Technical Specification 3.3. 1, Functional Unit 20, Reactor Trip Breakers. ML13175A2112013-06-19019 June 2013 Project, Units 1 and 2, Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 NOC-AE-13002992, Supplement to License Amendment Request for Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.2013-04-15015 April 2013 Supplement to License Amendment Request for Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. ML12241A1932012-08-30030 August 2012 Correction Letter to Revised Technical Specification 3.7.7, Technical Specification Page 3/4 7-16 NOC-AE-12002877, Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.2012-08-0101 August 2012 Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. NOC-AE-11002677, Technical Specification Bases Control Program2011-06-16016 June 2011 Technical Specification Bases Control Program NOC-AE-10002605, License Amendment Request to Revise the Application of Risk-Managed Technical Specifications to Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration System.2010-11-22022 November 2010 License Amendment Request to Revise the Application of Risk-Managed Technical Specifications to Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration System. NOC-AE-10002541, Proposed Amendment to Technical Specification 6.8.3.I for Containment Post-Tensioning System Surveillance Program2010-05-18018 May 2010 Proposed Amendment to Technical Specification 6.8.3.I for Containment Post-Tensioning System Surveillance Program NOC-AE-09002389, License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26, Using the Consolidated Line Item Improvement Process2009-03-0303 March 2009 License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26, Using the Consolidated Line Item Improvement Process NOC-AE-09002390, Correction of Technical Specification Pages Previously Approved by Amendment2009-02-0404 February 2009 Correction of Technical Specification Pages Previously Approved by Amendment ML0822804722008-09-16016 September 2008 Technical Specifications, Issuance of Amendment Nos. 186 and 173, Deviation from Fire Protection Program Requirements ML0820504272008-07-29029 July 2008 License and Technical Specification Pages, Amendment Nos. 185 and 172, New License Condition/Revised TS Requirements Control Room Envelope Habitability in Accordance with TSTF-448, Rev. 3 ML0818902362008-07-0808 July 2008 Corrected Errata Sheet and TS Pages for Amendment No. 184 and 171 Issued June 30, 2008, Revise Technical Specification 3/4.8.2 to Modify Battery Surveillance Requirements ML0813303552008-06-30030 June 2008 License and Technical Specification Pages, Issuance of Amendment No. 184 and 171, Revise Technical Specification 3/4.8.2 to Modify Battery Surveillance Requirements NOC-AE-08002301, Withdrawal of Proposed Exception to Technical Specification 6.8.3.p.3, Control Room Envelope Habitability Program2008-05-27027 May 2008 Withdrawal of Proposed Exception to Technical Specification 6.8.3.p.3, Control Room Envelope Habitability Program ML0803603282008-03-25025 March 2008 Technical Specifications, Revise TS Surveillance Requirements for Emergency Core Cooling System Sumps ML0803604212008-03-0606 March 2008 Tech Spec Pages for Amendment Nos. 182 and 169, Adoption of Alternate Radiological Source Term in Assessment of Design-Basis Accident Dose Consequences ML0715901792007-07-20020 July 2007 Technical Specification Pages for Amendment Nos. 180 and 167 Technical Specification 3/4.8.2 for Batteries and DC Systems NOC-AE-07002183, Updated Pages to Incorporate Battery-Related Technical Specification Changes2007-07-17017 July 2007 Updated Pages to Incorporate Battery-Related Technical Specification Changes ML0720103122007-07-17017 July 2007 Project, Units 1 and 2 - Attachment to 7/18/07 E-Mail to M. Thadani, Nrr/Dorl/Lpliv, from P. Walker, STPNOC - Letter and Updated Technical Specification Pages - Battery Monitoring License Amendment Request (TAC MD0333, MD0334) ML0717801912007-07-13013 July 2007 Technical Specifications, Issuance of Amendment Nos. 179 and 166 Broad-Scope Risk-Informed Technical Specifications Amendments ML0714302512007-06-13013 June 2007 Tech Spec Pages for Amendment Nos. 177 and 164 Regarding TS 3.3.3.6, Accident Monitoring Instrumentation, NOC-AE-07002113, Proposed Change to Technical Specification 3.7.1.2, Auxiliary Feedwater System.2007-05-22022 May 2007 Proposed Change to Technical Specification 3.7.1.2, Auxiliary Feedwater System. NOC-AE-07002141, Resolution of Issues Regarding Proposed Amendment to Technical Specification 3/4.8.2 to Modify Requirements Related to Batteries and DC Systems2007-04-0606 April 2007 Resolution of Issues Regarding Proposed Amendment to Technical Specification 3/4.8.2 to Modify Requirements Related to Batteries and DC Systems NOC-AE-07002127, Request for License Amendment Related to Application of the Alternate Source Term2007-03-22022 March 2007 Request for License Amendment Related to Application of the Alternate Source Term ML0706503142007-02-28028 February 2007 South Texas Project, Units 1 and 2, Proposed Change to Technical Specification 3.7.1.2, Auxiliary Feedwater System. NOC-AE-06002036, Revised Broad Scope Risk-Informed Technical Specification Amendment Request2006-12-28028 December 2006 Revised Broad Scope Risk-Informed Technical Specification Amendment Request NOC-AE-06002095, Request for Enforcement Discretion for Technical Specifications 3.3.3.6 and 3.7.1.22006-12-18018 December 2006 Request for Enforcement Discretion for Technical Specifications 3.3.3.6 and 3.7.1.2 NOC-AE-06002060, Revision to Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.2006-10-0202 October 2006 Revision to Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. NOC-AE-06002040, Technical Specifications, Bases Control Program2006-07-20020 July 2006 Technical Specifications, Bases Control Program 2021-05-06
[Table view] |
Text
TABLE 3.3-10 V/)
0 AC CIDENT MONITORING INSTRUMENTATION
-1 TOTAL MINIMUM NO. OF CHANNELS INSTRUMENT CHANNELS OPERABLE ACTION C: 1. Containment Pressure 4 .1 43
-3.
- 2. Reactor. Coolant Outlet Temperature-T HOT (Wide Range) 4 (1/loop) 4 35 I
- 3. Reactor Coolant Inlet Temperature- 4 (1/loop) 4 35 T COLD (Wide Range)
Cr. 4. Reactor Coolant Pressure - Wide Range 3 37 and Extended Range 1 a-:' 5. Pressurizer Water Level 4 43
- 6. Steam Line Pressure 4/steam generator 1/steam generator 43
- 7. Steam Generator Water Level - 4/steam generator 1/steam generator 43 Narrow Range
- 8. Steam Generator Water Level - 4 (1/steam generator) 4 35 Wide Range
- 9. Refueling Water Storage Tank Water Level 3 1 37 3 3
- 10. Auxiliary Feedwater Storage Tank Water Level 3 1 37 CD CD
- 11. Auxiliary Feedwater Flow 4 (1/steam generator) 4 35 03 3
- 12. Reactor Coolant System Subcooling 2 1 36 CD. CD Margin Monitoring
TABLE 3.3-10 (Continued)
ACTION STATEMENTS ACTION 35- a. With the number of OPERABLE channels one less than the Minimum Channels Operable requirement, restore the inoperable channel to OPERABLE status within 30 days or submit a Special Report within the next 14 days describing the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.
- b. With the number of OPERABLE channels two or more less than the Minimum Channels Operable requirement, restore one or more of the inoperable channels such that at least three channels are in OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
ACTION 36 - a. With the number of OPERABLE channels one less than the Total Number of Channels requirements, restore one inoperable channel to OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b. With the number of OPERABLE channels less than the Minimum Channels Operable requirements, restore at least one inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
ACTION 37 - a. With the number of OPERABLE channels one less than the Total Number of Channels requirements, restore the inoperable channel to OPERABLE status within 31 days, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b. With the number of OPERABLE channels two less than the Total Number of Channels requirement, restore at least one inoperable channel to OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- c. With the number of OPERABLE channels less than the Minimum Channels Operable requirement, restore at least one inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SOUTH TEXAS - UNITS 1 & 2 3/4 ý-70 Unmit 1 Amendment No. 177.1