| {{#Wiki_filter:-4-(1) Maximum Power Level Carolina Power & Light Company is authorized to operate the facility at reactor core power levels not in excess of 2900 megawatts thermal (100 percent rated core power) in accordance with the conditions specified herein.(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 125 , are hereby incorporated into this license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.(3) Antitrust Conditions Carolina Power & Light Company shall comply with the antitrust conditions delineated in Appendix C to this license.(4) Initial Startup Test Program (Section 14)1 Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b)within one month of such change.(5) Steam Generator Tube Rupture (Section 15.6.3)Prior to startup following the first refueling outage, Carolina Power & Light Company shall submit for NRC review and receive approval of a steam generator tube rupture analysis, including the assumed operator actions, which demonstrates that the consequences if the design basis steam generator tube rupture event for the Shearon Harris Nuclear Power Plant are less than the acceptance criteria specified in the Standard Review Plan, NUREG-0800, at §15.6.3 Subparts 11(1) and (2) for calculated doses from radiological releases. | | {{#Wiki_filter: (1) Maximum Power Level Carolina Power & Light Company is authorized to operate the facility at reactor core power levels not in excess of 2900 megawatts thermal (100 percent rated core power) in accordance with the conditions specified herein. |
| In preparing their analysis Carolina Power & Light Company will not assume that operators will complete corrective actions within the first thirty minutes after a steam generator tube rupture.Amendment No. 125 1 The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed. | | (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 125 , are hereby incorporated into this license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. |
| ADMINISTRATIVE CONTROLS 6.11 RADIATION PROTECTION PROGRAM 6.11.1 Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained, and adhered to for all operations involving personnel radiation exposure.6.12 HIGH RADIATION'AREA As provided in paragraph 20.1601(c) of 10 CFR Part 20, the following controls shall be applied to high radiation areas in place of the controls required by paragraph 20.1601(a) and (b) of 10 CFR Part 20: 6.12.1 High Radiation Areas with Dose Rates Not Exceeding 1.0 rem/hour at 30 Centimeters from the Radiation Sources or from any Surface Penetrated by the Radiation a. Each accessible entryway to such an area shall be barricaded and conspicuously posted as a high radiation area. Such barricades may be opened as necessary to permit entry or exit of personnel or eqiupment. | | (3) Antitrust Conditions Carolina Power & Light Company shall comply with the antitrust conditions delineated in Appendix C to this license. |
| : b. Access to, and activities in, each such area shall be controlled by*means of a Radiation Work Permit (RWP) or equivalent that includes.specification of radiation dose rates in the immediate work area(s)and other appropriate radiation protection equipment and measures.c. Individuals qualified in radiation protection procedures and personnel continuously escorted by such individuals may be exempted from the requirement for an RWP or equivalent while performing their assigned duties provided that they are otherwise following plant radiation' protection procedures for entry to, exit from, and work in such areas.d. Each individual or group entering such an area shall: 1. Possess a radiation monitoring device that continuously displays radiation dose rates in the area ("radiation monitoring and indicating device"); | | (4) Initial Startup Test Program (Section 14)1 Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change. |
| or 2. Possess a radiation monitoring device that continuously integrates the radiation dose rates in the area and alarms when the device's dose alarm setpoint is reached ("alarming dosimeter"), with an appropriate alarm setpoint; or 3. Possess a radiation monitoring device .that continuously transmits dose rate and cumulative dose information to a remote receiver monitored by radiation protection personnel responsible for controlling personnel radiation exposure within the area; or 4. Possess a self-reading dosimeter and be under the surveillance, as specified in the RWP or equivalent, while in the area, by means of closed circuit television, of personnel qualified in radiation protection procedures, responsible for controlling personnel radiation exposure in the area, and with the means to communicate with individuals in the area who are covered by such surveillance; or SHEARON HARRIS -UNIT 1 6-26 Amendment No. 125 ADMINISTRATIVE CONTROLS HIGH RADIATION AREA (Continued)
| | (5) Steam Generator Tube Rupture (Section 15.6.3) |
| : 5. Be under the surveillance, as specified in the RWP or equivalent, while in the area, of an individual qualified in radiation protection procedures, equipped with a radiation monitoring and indicating device; who is responsible for.controlling personnel radiation exposure within the area.e. Except for individuals qualified in radiation protection procedures, or personnel continuously escorted by such individuals, entry into such areas shall be made only after dose rates in the area have been determined and entry personnel are knowledgeable of them. These continuously escorted personnel will receive a pre-job briefing prior to entry into such areas. This dose rate determination, knowledge, and pre-job briefing does not require documentation prior to entry.6.12.2 High Radiation Areas with Dose Rates Greater than 1.0 rem/hour at 30 Centimeters from the Radiation Source or from any Surface Penetrated by the Radiation, but less than 500 rads/hour at 1 Meter from the Radiation Source or from any Surface Penetrated by the Radiation a. Each accessible entryway to suchan area shall be conspicuously osted as a locked high radiation area and shall be provided with a ocked or continuously guarded door or gate that prevents unauthorized entry, and in addition: 1. All such door and gate keys shall be maintained under the administrative control of the Superintendent | | Prior to startup following the first refueling outage, Carolina Power & Light Company shall submit for NRC review and receive approval of a steam generator tube rupture analysis, including the assumed operator actions, which demonstrates that the consequences if the design basis steam generator tube rupture event for the Shearon Harris Nuclear Power Plant are less than the acceptance criteria specified in the Standard Review Plan, NUREG-0800, at §15.6.3 Subparts 11(1) and (2) for calculated doses from radiological releases. In preparing their analysis Carolina Power & Light Company will not assume that operators will complete corrective actions within the first thirty minutes after a steam generator tube rupture. |
| -Shift Operations or the Radiation Control Supervisor or designated representative; and 2. Doors and gates shall remain locked or guarded except during periods of personnel or eqiupment entry or exit.b. Access to. and activities in., each such area shall be controlled by means of an RWP or equivalent that includes specification of radiation dose rates in the immediate work area(s) and other appropriate radiation protection equipment and measures.c. Individuals qualified in radiation protection procedures may be exempted from the requirement for an RWP or equivalent while performing radiation surveys in such areas provided that they are otherwise following plant radiation protection procedures for entry to, exit from, and work in such areas.d. Each individual or group entering such an area shall: 1. Possess an alarming dosimeter with an appropriate alarm setpoint; or 2. Possess a radiation monitoring device that continuously transmits dose rate and cumulative dose information to a remote receiver monitored by radiation protection personnel responsible for controlling personnel radiation exposure within the area with the means to communicate with and control every individual in the area; or SHEARON HARRIS -UNIT 1 6-26a Amendment No.125 ADMINISTRATIVE CONTROLS HIGH RADIATION AREA (Continued) | | Amendment No. 125 1The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed. |
| : 3. Possess a direct-reading dosimeter and be under the surveillance as specified in the RWP or equivalent, while in the area, by means of closed circuit television, of personnel qualified in radiation protection procedures, responsible for controlling personnel radiation exposure in the area, and with the means to communicate with and control every individual in the area; or 4. Be under the surveillance, as specified in the RWP or equivalent, while in the area, of an individual qualified in radiation protection procedures, equipped with a radiation monitoring and indicating device; who is responsible for controlling personnel exposure within the area; or 5. In those cases where the options of Specifications 6.12.2.d.2, 6.12.2.d.3, and 6.12.2.d.4 above, are impractical or determined to be inconsistent with the "As Low As Reasonably Achievable" principle, possess a radiation monitoring and indicating device.e. Except for individuals qualified in radiation protection procedures, or personnel continuously escorted by such individuals, entry into such areas shall be.made only after doserates in the area have been determined and entry personnel are knowledgeable of them. These continuously escorted personnel will receive a pre-job briefing prior to entry into such areas. This dose rate determination, knowledge, and pre-job briefing does not require documentation prior to initial entry.f. Such individual areas that. are within a larger area where no enclosure exists for purpose of locking and where no enclosure can reasonably be constructed, around the individual area need not be controlled by a locked door or gate, nor continuously guarded, but shall be barricaded and conspicuously posted as a high radiation area, and a conspicuous, clearly visible flashing light shall be activated at the area as a warning device.SHEARON HARRIS -UNIT 1 6-26b Amendment No.125 ADMINISTRATIVE CONTROLS HIGH RADIATION AREA (Continued) 6.13 PROCESS CONTROL PROGRAM (PCP)Changes to the PCP: a. Shall be documented and records of reviews retained as required by FSAR Section 17.3.contain: performed shall be This documentation shall 1) Sufficient information to support the change together with the appropriate analyses or evaluations justifying the change(s) and 2) A determination that the change will maintain the overall conformance of the solidified waste product to existing requirements of Federal, State, or other applicable regulations. | | |
| : b. Shall become effective after review and acceptance by the PNSC and the approval of the Plant General Manager.6.14 OFFSITE DOSE CALCULATION MANUAL (ODCM)Changes to the ODCM: a. Shall be documented and records of reviews performed shall be retained as required by FSAR Section 17.3. This documentation shall contain: 1) Sufficient information to support the change together with the appropriate analyses or evaluations justifying the change(s) and SHEARON HARRIS -UNIT 1 6-27 Amendment No.125}} | | ADMINISTRATIVE CONTROLS 6.11 RADIATION PROTECTION PROGRAM 6.11.1 Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained, and adhered to for all operations involving personnel radiation exposure. |
| | 6.12 HIGH RADIATION'AREA As provided in paragraph 20.1601(c) of 10 CFR Part 20, the following controls shall be applied to high radiation areas in place of the controls required by paragraph 20.1601(a) and (b) of 10 CFR Part 20: |
| | 6.12.1 High Radiation Areas with Dose Rates Not Exceeding 1.0 rem/hour at 30 Centimeters from the Radiation Sources or from any Surface Penetrated by the Radiation |
| | : a. Each accessible entryway to such an area shall be barricaded and conspicuously posted as a high radiation area. Such barricades may be opened as necessary to permit entry or exit of personnel or eqiupment. |
| | : b. Access to, and activities in, each such area shall be controlled by |
| | *means of a Radiation Work Permit (RWP) or equivalent that includes |
| | .specification of radiation dose rates in the immediate work area(s) and other appropriate radiation protection equipment and measures. |
| | : c. Individuals qualified in radiation protection procedures and personnel continuously escorted by such individuals may be exempted from the requirement for an RWP or equivalent while performing their assigned duties provided that they are otherwise following plant radiation' protection procedures for entry to, exit from, and work in such areas. |
| | : d. Each individual or group entering such an area shall: |
| | : 1. Possess a radiation monitoring device that continuously displays radiation dose rates in the area ("radiation monitoring and indicating device"); or |
| | : 2. Possess a radiation monitoring device that continuously integrates the radiation dose rates in the area and alarms when the device's dose alarm setpoint is reached ("alarming dosimeter"), with an appropriate alarm setpoint; or |
| | : 3. Possess a radiation monitoring device .that continuously transmits dose rate and cumulative dose information to a remote receiver monitored by radiation protection personnel responsible for controlling personnel radiation exposure within the area; or |
| | : 4. Possess a self-reading dosimeter and be under the surveillance, as specified in the RWP or equivalent, while in the area, by means of closed circuit television, of personnel qualified in radiation protection procedures, responsible for controlling personnel radiation exposure in the area, and with the means to communicate with individuals in the area who are covered by such surveillance; or SHEARON HARRIS - UNIT 1 6-26 Amendment No. 125 |
| | |
| | ADMINISTRATIVE CONTROLS HIGH RADIATION AREA (Continued) |
| | : 5. Be under the surveillance, as specified in the RWP or equivalent, while in the area, of an individual qualified in radiation protection procedures, equipped with a radiation monitoring and indicating device; who is responsible for. |
| | controlling personnel radiation exposure within the area. |
| | : e. Except for individuals qualified in radiation protection procedures, or suchpersonnel continuously areas shall after bydose escorted be made only suchrates individuals, entry in the area haveinto been determined and entry personnel are knowledgeable of them. These continuously escorted personnel will receive a pre-job briefing prior to entry into such areas. This dose rate determination, knowledge, and pre-job briefing does not require documentation prior to entry. |
| | 6.12.2 High Radiation Areas with Dose Rates Greater than 1.0 rem/hour at 30 Centimeters from the Radiation Source or from any Surface Penetrated by the Radiation, but less than 500 rads/hour at 1 Meter from the Radiation Source or from any Surface Penetrated by the Radiation |
| | : a. Each accessible entryway to suchan area shall be conspicuously osted as a locked high radiation area and shall be provided with a ocked or continuously guarded door or gate that prevents unauthorized entry, and in addition: |
| | : 1. All such door and gate keys shall be maintained under the administrative control of the Superintendent - Shift Operations or the Radiation Control Supervisor or designated representative; and |
| | : 2. Doors and gates shall remain locked or guarded except during periods of personnel or eqiupment entry or exit. |
| | : b. Access to. and activities in., each such area shall be controlled by means of andose radiation or equivalent RWP rates that includes in the immediate specification work area(s) of and other appropriate radiation protection equipment and measures. |
| | : c. Individuals qualified in radiation protection procedures may be exempted from the requirement for an RWP or equivalent while performing radiation surveys in such areas provided that they are otherwise following plant radiation protection procedures for entry to, exit from, and work in such areas. |
| | : d. Each individual or group entering such an area shall: |
| | : 1. Possess an alarming dosimeter with an appropriate alarm setpoint; or |
| | : 2. Possess a radiation monitoring device that continuously transmits dose rate and cumulative dose information to a remote receiver monitored by radiation protection personnel responsible for controlling personnel radiation exposure within the area with the means to communicate with and control every individual in the area; or SHEARON HARRIS - UNIT 1 6-26a Amendment No.125 |
| | |
| | ADMINISTRATIVE CONTROLS HIGH RADIATION AREA (Continued) |
| | : 3. Possess a direct-reading dosimeter and be under the surveillance as specified in the RWP or equivalent, while in the area, by means of closed circuit television, of personnel qualified in radiation protection procedures, responsible for controlling personnel radiation exposure in the area, and with the means to communicate with and control every individual in the area; or |
| | : 4. Be under the surveillance, as specified in the RWP or equivalent, while in the area, of an individual qualified in radiation protection procedures, equipped with a radiation monitoring and indicating device; who is responsible for controlling personnel exposure within the area; or |
| | : 5. In those cases where the options of Specifications 6.12.2.d.2, 6.12.2.d.3, and 6.12.2.d.4 above, are impractical or determined to be inconsistent with the "As Low As Reasonably Achievable" principle, possess a radiation monitoring and indicating device. |
| | : e. Except for individuals qualified in radiation protection procedures, or personnel continuously escorted by such individuals, entry into such areas shall be.made only after doserates in the area have been determined and entry personnel are knowledgeable of them. These continuously escorted personnel will receive a pre-job briefing prior to entry into such areas. This dose rate determination, knowledge, and pre-job briefing does not require documentation prior to initial entry. |
| | : f. Such individual areas that. are within a larger area where no enclosure exists for purpose of locking and where no enclosure can reasonably be constructed, around the individual area need not be controlled by a locked door or gate, nor continuously guarded, but shall be barricaded and conspicuously posted as a high radiation area, and a conspicuous, clearly visible flashing light shall be activated at the area as a warning device. |
| | SHEARON HARRIS - UNIT 1 6-26b Amendment No.125 |
| | |
| | ADMINISTRATIVE CONTROLS HIGH RADIATION AREA (Continued) 6.13 PROCESS CONTROL PROGRAM (PCP) |
| | Changes to the PCP: |
| | : a. Shall be documented and records of reviews performed shall be retained as required by FSAR Section 17.3. This documentation shall contain: |
| | : 1) Sufficient information to support the change together with the appropriate analyses or evaluations justifying the change(s) and |
| | : 2) A determination that the change will maintain the overall conformance of the solidified waste product to existing requirements of Federal, State, or other applicable regulations. |
| | : b. Shall become effective after review and acceptance by the PNSC and the approval of the Plant General Manager. |
| | 6.14 OFFSITE DOSE CALCULATION MANUAL (ODCM) |
| | Changes to the ODCM: |
| | : a. Shall be documented and records of reviews performed shall be retained as required by FSAR Section 17.3. This documentation shall contain: |
| | : 1) Sufficient information to support the change together with the appropriate analyses or evaluations justifying the change(s) and SHEARON HARRIS - UNIT 1 6-27 Amendment No.125}} |
|
---|
Category:Technical Specification
MONTHYEARRA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-23-0244, Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2024-03-20020 March 2024 Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications2023-02-0707 February 2023 License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2021-11-15015 November 2021 Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes RA-21-0213, License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown2021-09-23023 September 2021 License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-16016 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21116A2072021-05-0404 May 2021 Correction to Amendment No. 184 Regarding TSTF Traveler TSTF-505, Rev. 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B RA-20-0252, License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications2021-02-24024 February 2021 License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation2020-12-0303 December 2020 Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML20237F4352020-09-0404 September 2020 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2020-07-27027 July 2020 Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-20-0148, Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications2020-05-27027 May 2020 Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications ML20147A0402020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Administrative Procedure Non-Safety Related PLP-106 Technical Specification Equipment List Program, Revision 073 (Redacted) ML20147A0332020-05-15015 May 2020 Amendment 63 to Update Final Safety Analysis Report, Chapter 16, Preliminary Technical Specification RA-19-0359, License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System2020-05-12012 May 2020 License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System RA-20-0105, Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies2020-04-16016 April 2020 Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2020-02-0606 February 2020 Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process RA-19-0440, Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications2019-11-21021 November 2019 Supplement to License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications RA-19-0067, License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies2019-11-0808 November 2019 License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies RA-19-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-10-0707 October 2019 License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-19-0123, License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications2019-07-25025 July 2019 License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-19-0017, License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type2019-04-10010 April 2019 License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type RA-18-0204, Transmittal of Technical Specification Bases2018-11-12012 November 2018 Transmittal of Technical Specification Bases HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme2018-08-13013 August 2018 License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2018-04-13013 April 2018 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2017-10-19019 October 2017 Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses HNP-17-041, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete2017-05-22022 May 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Du ML17066A2992017-03-28028 March 2017 2nd Correction to License Amendment No. 154 Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program HNP-16-066, License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report2016-12-0202 December 2016 License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process HNP-16-068, Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement2016-08-26026 August 2016 Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement HNP-16-064, Transmittal of Technical Specification Bases2016-08-10010 August 2016 Transmittal of Technical Specification Bases RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 52016-02-0101 February 2016 Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 HNP-15-038, License Amendment Request for Main Steam Safety Valve Lift Setting Tolerance Change2015-12-17017 December 2015 License Amendment Request for Main Steam Safety Valve Lift Setting Tolerance Change HNP-15-086, License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement2015-10-29029 October 2015 License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement HNP-15-040, Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2015-08-18018 August 2015 Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 2024-05-23
[Table view] Category:Amendment
MONTHYEARRA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-23-0244, Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2024-03-20020 March 2024 Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications2023-02-0707 February 2023 License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-21-0213, License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown2021-09-23023 September 2021 License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-16016 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21116A2072021-05-0404 May 2021 Correction to Amendment No. 184 Regarding TSTF Traveler TSTF-505, Rev. 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation2020-12-0303 December 2020 Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML20237F4352020-09-0404 September 2020 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2020-07-27027 July 2020 Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-20-0148, Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications2020-05-27027 May 2020 Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications RA-20-0105, Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies2020-04-16016 April 2020 Supplement to License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2020-02-0606 February 2020 Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process RA-19-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-10-0707 October 2019 License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-19-0123, License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications2019-07-25025 July 2019 License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2018-04-13013 April 2018 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2017-10-19019 October 2017 Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses HNP-17-041, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete2017-05-22022 May 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Du ML17066A2992017-03-28028 March 2017 2nd Correction to License Amendment No. 154 Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program HNP-14-119, Response to Request for Additional Information 2 Regarding License Amendment Request to Revise Technical Specification Table 3.3-4 Loss of Offsite Power 6.9 Kv Emergency Undervoltage Primary Setpoints2014-11-13013 November 2014 Response to Request for Additional Information #2 Regarding License Amendment Request to Revise Technical Specification Table 3.3-4 Loss of Offsite Power 6.9 Kv Emergency Undervoltage Primary Setpoints HNP-11-038, License Amendment Request for Extension of Refueling Water Storage Tank Allowed Outage Time2011-09-0202 September 2011 License Amendment Request for Extension of Refueling Water Storage Tank Allowed Outage Time HNP-09-016, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors2009-02-26026 February 2009 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 HNP-08-019, Supplement to Request for License Amendment to Relocate and Revise Technical Specifications Surveillance Requirement 4.0.52008-03-0606 March 2008 Supplement to Request for License Amendment to Relocate and Revise Technical Specifications Surveillance Requirement 4.0.5 HNP-07-094, Request for License Amendment to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process2008-01-0404 January 2008 Request for License Amendment to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process ML0720705472007-07-23023 July 2007 Technical Specification 6.12, High Radiation Area (TAC MD38895) HNP-07-040, Request for License Amendment to Use Other Containment Sump Water Level Instruments2007-04-30030 April 2007 Request for License Amendment to Use Other Containment Sump Water Level Instruments ML0429506192004-10-15015 October 2004 Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process HNP-04-071, Request for License Amendment Technical Specification Surveillance Requirements (SR) 4.0.5.A and Associated Bases2004-05-0505 May 2004 Request for License Amendment Technical Specification Surveillance Requirements (SR) 4.0.5.A and Associated Bases HNP-04-008, License Amendment Request: Steam Generator Water Level Instrumentation Usage, Technical Specifications 4.4.1.3.2 and 3.4.1.4.1.b, and Administrative Update to the Index2004-02-0404 February 2004 License Amendment Request: Steam Generator Water Level Instrumentation Usage, Technical Specifications 4.4.1.3.2 and 3.4.1.4.1.b, and Administrative Update to the Index HNP-03-116, Request for License Amendment Regarding Technical Specification 4.4.5.3a2003-12-0808 December 2003 Request for License Amendment Regarding Technical Specification 4.4.5.3a HNP-02-113, Request for License Amendment, Response Time Testing Elimination2002-08-30030 August 2002 Request for License Amendment, Response Time Testing Elimination HNP-02-088, Request for License Amendment, Technical Specifications 3/4.8.1.1 and 3/4.8.1.22002-07-0808 July 2002 Request for License Amendment, Technical Specifications 3/4.8.1.1 and 3/4.8.1.2 2024-05-23
[Table view] |
Text
(1) Maximum Power Level Carolina Power & Light Company is authorized to operate the facility at reactor core power levels not in excess of 2900 megawatts thermal (100 percent rated core power) in accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 125 , are hereby incorporated into this license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Antitrust Conditions Carolina Power & Light Company shall comply with the antitrust conditions delineated in Appendix C to this license.
(4) Initial Startup Test Program (Section 14)1 Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.
(5) Steam Generator Tube Rupture (Section 15.6.3)
Prior to startup following the first refueling outage, Carolina Power & Light Company shall submit for NRC review and receive approval of a steam generator tube rupture analysis, including the assumed operator actions, which demonstrates that the consequences if the design basis steam generator tube rupture event for the Shearon Harris Nuclear Power Plant are less than the acceptance criteria specified in the Standard Review Plan, NUREG-0800, at §15.6.3 Subparts 11(1) and (2) for calculated doses from radiological releases. In preparing their analysis Carolina Power & Light Company will not assume that operators will complete corrective actions within the first thirty minutes after a steam generator tube rupture.
Amendment No. 125 1The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
ADMINISTRATIVE CONTROLS 6.11 RADIATION PROTECTION PROGRAM 6.11.1 Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained, and adhered to for all operations involving personnel radiation exposure.
6.12 HIGH RADIATION'AREA As provided in paragraph 20.1601(c) of 10 CFR Part 20, the following controls shall be applied to high radiation areas in place of the controls required by paragraph 20.1601(a) and (b) of 10 CFR Part 20:
6.12.1 High Radiation Areas with Dose Rates Not Exceeding 1.0 rem/hour at 30 Centimeters from the Radiation Sources or from any Surface Penetrated by the Radiation
- a. Each accessible entryway to such an area shall be barricaded and conspicuously posted as a high radiation area. Such barricades may be opened as necessary to permit entry or exit of personnel or eqiupment.
- b. Access to, and activities in, each such area shall be controlled by
- means of a Radiation Work Permit (RWP) or equivalent that includes
.specification of radiation dose rates in the immediate work area(s) and other appropriate radiation protection equipment and measures.
- c. Individuals qualified in radiation protection procedures and personnel continuously escorted by such individuals may be exempted from the requirement for an RWP or equivalent while performing their assigned duties provided that they are otherwise following plant radiation' protection procedures for entry to, exit from, and work in such areas.
- d. Each individual or group entering such an area shall:
- 1. Possess a radiation monitoring device that continuously displays radiation dose rates in the area ("radiation monitoring and indicating device"); or
- 2. Possess a radiation monitoring device that continuously integrates the radiation dose rates in the area and alarms when the device's dose alarm setpoint is reached ("alarming dosimeter"), with an appropriate alarm setpoint; or
- 3. Possess a radiation monitoring device .that continuously transmits dose rate and cumulative dose information to a remote receiver monitored by radiation protection personnel responsible for controlling personnel radiation exposure within the area; or
- 4. Possess a self-reading dosimeter and be under the surveillance, as specified in the RWP or equivalent, while in the area, by means of closed circuit television, of personnel qualified in radiation protection procedures, responsible for controlling personnel radiation exposure in the area, and with the means to communicate with individuals in the area who are covered by such surveillance; or SHEARON HARRIS - UNIT 1 6-26 Amendment No. 125
ADMINISTRATIVE CONTROLS HIGH RADIATION AREA (Continued)
- 5. Be under the surveillance, as specified in the RWP or equivalent, while in the area, of an individual qualified in radiation protection procedures, equipped with a radiation monitoring and indicating device; who is responsible for.
controlling personnel radiation exposure within the area.
- e. Except for individuals qualified in radiation protection procedures, or suchpersonnel continuously areas shall after bydose escorted be made only suchrates individuals, entry in the area haveinto been determined and entry personnel are knowledgeable of them. These continuously escorted personnel will receive a pre-job briefing prior to entry into such areas. This dose rate determination, knowledge, and pre-job briefing does not require documentation prior to entry.
6.12.2 High Radiation Areas with Dose Rates Greater than 1.0 rem/hour at 30 Centimeters from the Radiation Source or from any Surface Penetrated by the Radiation, but less than 500 rads/hour at 1 Meter from the Radiation Source or from any Surface Penetrated by the Radiation
- a. Each accessible entryway to suchan area shall be conspicuously osted as a locked high radiation area and shall be provided with a ocked or continuously guarded door or gate that prevents unauthorized entry, and in addition:
- 1. All such door and gate keys shall be maintained under the administrative control of the Superintendent - Shift Operations or the Radiation Control Supervisor or designated representative; and
- 2. Doors and gates shall remain locked or guarded except during periods of personnel or eqiupment entry or exit.
- b. Access to. and activities in., each such area shall be controlled by means of andose radiation or equivalent RWP rates that includes in the immediate specification work area(s) of and other appropriate radiation protection equipment and measures.
- c. Individuals qualified in radiation protection procedures may be exempted from the requirement for an RWP or equivalent while performing radiation surveys in such areas provided that they are otherwise following plant radiation protection procedures for entry to, exit from, and work in such areas.
- d. Each individual or group entering such an area shall:
- 1. Possess an alarming dosimeter with an appropriate alarm setpoint; or
- 2. Possess a radiation monitoring device that continuously transmits dose rate and cumulative dose information to a remote receiver monitored by radiation protection personnel responsible for controlling personnel radiation exposure within the area with the means to communicate with and control every individual in the area; or SHEARON HARRIS - UNIT 1 6-26a Amendment No.125
ADMINISTRATIVE CONTROLS HIGH RADIATION AREA (Continued)
- 3. Possess a direct-reading dosimeter and be under the surveillance as specified in the RWP or equivalent, while in the area, by means of closed circuit television, of personnel qualified in radiation protection procedures, responsible for controlling personnel radiation exposure in the area, and with the means to communicate with and control every individual in the area; or
- 4. Be under the surveillance, as specified in the RWP or equivalent, while in the area, of an individual qualified in radiation protection procedures, equipped with a radiation monitoring and indicating device; who is responsible for controlling personnel exposure within the area; or
- 5. In those cases where the options of Specifications 6.12.2.d.2, 6.12.2.d.3, and 6.12.2.d.4 above, are impractical or determined to be inconsistent with the "As Low As Reasonably Achievable" principle, possess a radiation monitoring and indicating device.
- e. Except for individuals qualified in radiation protection procedures, or personnel continuously escorted by such individuals, entry into such areas shall be.made only after doserates in the area have been determined and entry personnel are knowledgeable of them. These continuously escorted personnel will receive a pre-job briefing prior to entry into such areas. This dose rate determination, knowledge, and pre-job briefing does not require documentation prior to initial entry.
- f. Such individual areas that. are within a larger area where no enclosure exists for purpose of locking and where no enclosure can reasonably be constructed, around the individual area need not be controlled by a locked door or gate, nor continuously guarded, but shall be barricaded and conspicuously posted as a high radiation area, and a conspicuous, clearly visible flashing light shall be activated at the area as a warning device.
SHEARON HARRIS - UNIT 1 6-26b Amendment No.125
ADMINISTRATIVE CONTROLS HIGH RADIATION AREA (Continued) 6.13 PROCESS CONTROL PROGRAM (PCP)
Changes to the PCP:
- a. Shall be documented and records of reviews performed shall be retained as required by FSAR Section 17.3. This documentation shall contain:
- 1) Sufficient information to support the change together with the appropriate analyses or evaluations justifying the change(s) and
- 2) A determination that the change will maintain the overall conformance of the solidified waste product to existing requirements of Federal, State, or other applicable regulations.
- b. Shall become effective after review and acceptance by the PNSC and the approval of the Plant General Manager.
6.14 OFFSITE DOSE CALCULATION MANUAL (ODCM)
Changes to the ODCM:
- a. Shall be documented and records of reviews performed shall be retained as required by FSAR Section 17.3. This documentation shall contain:
- 1) Sufficient information to support the change together with the appropriate analyses or evaluations justifying the change(s) and SHEARON HARRIS - UNIT 1 6-27 Amendment No.125