Correction to Amendment Package Issued with Amendment No. 125 on July 23, 2007
ML072620548
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/19/2007
From: Vaaler M
NRC/NRR/ADRO/DORL/LPLII-2
To: Duncan R
Carolina Power & Light Co
Vaaler, Marlayna, NRR/DORL 415-3178
References
TAC MD3895
Download: ML072620548 (4)


Text

September 19, 2007 Robert J. Duncan II, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - CORRECTION TO AMENDMENT PACKAGE ISSUED WITH AMENDMENT NO. 125 ON JULY 23, 2007 (TAC NO. MD3895)

Dear Mr. Duncan:

On July 23, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 125 to Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant (HNP),

Unit No. 1, in response to your request dated December 20, 2006.

This amendment revised the HNP Technical Specifications (TS) to change the administrative controls associated with worker access to high and very high radiation areas to be consistent with Section 20 of Title 10 to the Code of Federal Regulations and Regulatory Guide 8.38, Control of Access To High and Very High Radiation Areas in Nuclear Power Plants, Revision 1. The changes included differentiating dose rates associated with high and very high radiation areas, adding requirements for groups entering high radiation areas, and clarifying the communication requirements for workers in high radiation areas.

A typographical error was found on the page designated as the Attachment to License Amendment No. 125 in the initial amendment package. The error involved listing TS page 5-26 as needing to be removed, to be replaced with the revised pages, rather than TS page 6-26.

A corrected license amendment page is attached to replace the page initially issued. This change has also been reflected in the NRCs official record copy of this document. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-3178.

Sincerely,

/RA/

Marlayna Vaaler, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Attachment:

As stated cc: See next page

September 19, 2007 Robert J. Duncan II, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - CORRECTION TO AMENDMENT PACKAGE ISSUED WITH AMENDMENT NO. 125 ON JULY 23, 2007 (TAC NO. MD3895)

Dear Mr. Duncan:

On July 23, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 125 to Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant (HNP),

Unit No. 1, in response to your request dated December 20, 2006.

This amendment revised the HNP Technical Specifications (TS) to change the administrative controls associated with worker access to high and very high radiation areas to be consistent with Section 20 of Title 10 to the Code of Federal Regulations and Regulatory Guide 8.38, Control of Access To High and Very High Radiation Areas in Nuclear Power Plants, Revision 1. The changes included differentiating dose rates associated with high and very high radiation areas, adding requirements for groups entering high radiation areas, and clarifying the communication requirements for workers in high radiation areas.

A typographical error was found on the page designated as the Attachment to License Amendment No. 125 in the initial amendment package. The error involved listing TS page 5-26 as needing to be removed, to be replaced with the revised pages, rather than TS page 6-26.

A corrected license amendment page is attached to replace the page initially issued. This change has also been reflected in the NRCs official record copy of this document. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-3178.

Sincerely,

/RA/

Marlayna Vaaler, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Attachment:

As stated cc: See next page DISTRIBUTION:

PUBLIC LPL2-2 R/F RidsNrrPMMVaaler RidsNrrDorlLpl2-2 RidsOgcRp RidsAcrsAcnwMailCenter RidsRgn2MailCenter (RMusser) RidsNrrLACSola ADAMS Accession Number: ML072620548 NRR-106 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME MVaaler CSola TBoyce DATE 09/19/07 09/19/07 09/19/07 OFFICIAL RECORD COPY

Mr. Robert J. Duncan II Shearon Harris Nuclear Power Plant, Unit 1 Carolina Power & Light Company cc:

David T. Conley Mr. Robert P. Gruber Associate General Counsel II - Executive Director Legal Department Public Staff NCUC Progress Energy Service Company, LLC 4326 Mail Service Center Post Office Box 1551 Raleigh, North Carolina 27699-4326 Raleigh, North Carolina 27602-1551 Chairman of the North Carolina Resident Inspector / Harris NPS Utilities Commission c/o U. S. Nuclear Regulatory Commission Post Office Box 29510 5421 Shearon Harris Road Raleigh, North Carolina 27626-0510 New Hill, North Carolina 27562-9998 Mr. Tony Gurley, Chair Ms. Margaret A. Force Board of County Commissioners Assistant Attorney General of Wake County State of North Carolina P. O. Box 550 Post Office Box 629 Raleigh, North Carolina 27602 Raleigh, North Carolina 27602 Mr. Carl Thompson, Chair Public Service Commission Board of County Commissioners State of South Carolina of Chatham County Post Office Drawer 11649 P. O. Box 87 Columbia, South Carolina 29211 Pittsboro, North Carolina 27312 Ms. Beverly Hall, Section Chief Mr. Thomas J. Natale, Manager Division of Radiation Protection Support Services N.C. Department of Environment Shearon Harris Nuclear Power Plant and Natural Resources Carolina Power & Light Company 3825 Barrett Drive P. O. Box 165, Mail Zone 1 Raleigh, North Carolina 27609-7721 New Hill, North Carolina 27562-0165 Mr. J. Paul Fulford Mr. David H. Corlett, Supervisor Manager, Performance Evaluation and Licensing/Regulatory Programs Regulatory Affairs PEB 5 Shearon Harris Nuclear Power Plant Carolina Power & Light Company Carolina Power & Light Company Post Office Box 1551 P. O. Box 165, Mail Zone 1 Raleigh, North Carolina 27602-1551 New Hill, NC 27562-0165 Mr. Chris L. Burton Mr. John H. ONeill, Jr.

Director of Site Operations Pillsbury Winthrop Shaw Pittman, LLP and Acting Plant General Manager 2300 N Street NW.

Shearon Harris Nuclear Power Plant Washington, DC 20037-1128 Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165

ATTACHMENT TO LICENSE AMENDMENT NO. 125 FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace page 4 of Operating License No. NPF-63 with the attached page 4.

Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Pages Insert Pages 6-26 6-26 6-26a 6-26b 6-27 6-27