ML072490008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:RPS Instrumentation 3.3.1.1GRAND GULF 3.3-4 Amendment No. 1 69 , SURVEILLANCE REQUIREMENTS  (continued) SURVEILLANCEFREQUENCYSR 3.3.1.1.5 Deleted SR  3.3.1.1.6 Deleted SR  3.3.1.1.7 Calibrate the local power range monitors.
{{#Wiki_filter:RPS Instrumentation 3.3.1.1 SURVEILLANCE REQUIREMENTS  (continued)
2000 MWD/T average core exposureSR 3.3.1.1.8 Perform CHANNEL FUNCTIONAL TEST. 92 days SR  3.3.1.1.9 Calibrate the trip units. 92 days (continued) 177}}
SURVEILLANCE                              FREQUENCY SR 3.3.1.1.5   Deleted SR  3.3.1.1.6   Deleted SR  3.3.1.1.7   Calibrate the local power range monitors. 2000 MWD/T average core exposure SR 3.3.1.1.8   Perform CHANNEL FUNCTIONAL TEST.             92 days SR  3.3.1.1.9   Calibrate the trip units.                   92 days (continued)
GRAND GULF                          3.3-4            Amendment No. 169, 177}}

Latest revision as of 02:55, 23 November 2019

Technical Specifications, Issuance of Amendment No. 177 Changes to Technical Specifications Surveillance Requirement 3.3.1.1.7, the Local Power Range Monitor Calibration Frequency
ML072490008
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/24/2007
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Vaidya B, NRR/DORL/LP4, 415-3308
Shared Package
ML072490005 List:
References
TAC MD3469
Download: ML072490008 (1)


Text

RPS Instrumentation 3.3.1.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.1.5 Deleted SR 3.3.1.1.6 Deleted SR 3.3.1.1.7 Calibrate the local power range monitors. 2000 MWD/T average core exposure SR 3.3.1.1.8 Perform CHANNEL FUNCTIONAL TEST. 92 days SR 3.3.1.1.9 Calibrate the trip units. 92 days (continued)

GRAND GULF 3.3-4 Amendment No. 169, 177