ML090150537: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML090150537 | | number = ML090150537 | ||
| issue date = 01/13/2009 | | issue date = 01/13/2009 | ||
| title = | | title = SIT Document Request (01-13-2009) | ||
| author name = | | author name = | ||
| author affiliation = NRC/RGN-II | | author affiliation = NRC/RGN-II | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Brunswick SIT Document Request (01-13-2009) | {{#Wiki_filter:Brunswick SIT Document Request (01-13-2009) | ||
All documents are requested in electronic form (MS Office or PDF files) unless specified hard copy. | |||
All documents are requested in electronic form (MS Office or PDF files) unless specified hard copy. Request all attached documents for any NCRs or WOs requested. | Request all attached documents for any NCRs or WOs requested. | ||
: 1. Latest copy of Diesel Timeline - December 28 through Present. | : 1. Latest copy of Diesel Timeline - December 28 through Present. | ||
: 2. Copies of the following WOs: a. 1471867 | : 2. Copies of the following WOs: | ||
: b. 1472140 c. 1472328 d. 1472329 e. 1472336 f. 1472343 g. 1472349 h. 1472345 | : a. 1471867 | ||
: i. 1472944 j. 1472346 k. 1472763 l. 1472947 m. 1472945 | : b. 1472140 | ||
: n. 1472966 o. 1472965 p. 1472963 q. 1472978 r. 1033642-01 | : c. 1472328 | ||
: s. 1472971 t. 1473214 | : d. 1472329 | ||
: 3. Copies of the following NCRs: a. 312500 | : e. 1472336 | ||
: b. 312819 c. 312969 d. 312916 e. 312868 f. 312876 | : f. 1472343 | ||
: g. 312500 h. 312854 i. 312971 j. 312973 | : g. 1472349 | ||
: 4. Last 5 years of NCRs on DG fuel rack limiters | : h. 1472345 | ||
: 5. Last 5 years of NCRs on DG starting air distributors | : i. 1472944 | ||
: 6. WOs, Modification Packages, Post-Maintenance Test results, NCRs, and 50.59 evaluation or screening related to installation of set screws on DG 3 right side air distributor plates. | : j. 1472346 | ||
: 7. Copy of DG quarterly and RFO surveillance test procedures | : k. 1472763 | ||
: 8. Copy of WOs and any post-maintenance testing documents related to replacement of fuel rack limiter components on DG 4 in June 2007 and DG 3 in October 2008. | : l. 1472947 | ||
: 9. Last 8 years of component replacement history and any related NCRs on the fuel rack limiters. | : m. 1472945 | ||
: 10. Copies of any root cause or apparent cause analyses performed in the last 4 years related to problems with the DGs. | : n. 1472966 | ||
: 11. Copies of any NCRs in the last 8 years related to air quality or contamination in the DG air start system. | : o. 1472965 | ||
: 12. Any vendor recommendations or guidance received concerning (a) air start distributor issues and (b) fuel rack limiters. | : p. 1472963 | ||
: 13. Copy of DG Vendor Manual | : q. 1472978 | ||
: 14. Hard copy of drawing of DG fuel rack limiter | : r. 1033642-01 | ||
: 15. Copy of DG Design Basis Documents (DBD) | : s. 1472971 | ||
: 16. Copy of last completed LOOP test on all four EDGs | : t. 1473214 | ||
: 17. Copies of all letters from EDG vendor and/or diesel manufacturer | : 3. Copies of the following NCRs: | ||
: 18. Reliability and availability data of each EDG trended over the last three years. | : a. 312500 | ||
: 19. Explanation of NSW pumps control circuit. This could be provided via phone conversation or interview. | : b. 312819 | ||
: 20. Copy of the EDG output circuit breaker control circuit drawings for EDG 3 and 4. | : c. 312969 | ||
: 21. Motor data sheet for the NSW pump. | : d. 312916 | ||
: 22. Copies of operating experience (OE) reviews on the fuel rack limit cylinder and the starting air distributor. | : e. 312868 | ||
: 23. Design basis documentation or vendor documentation that describes events during EDG starting at cranking. | : f. 312876 | ||
: g. 312500 | |||
: h. 312854 | |||
: i. 312971 | |||
: j. 312973 | |||
: 4. Last 5 years of NCRs on DG fuel rack limiters | |||
: 5. Last 5 years of NCRs on DG starting air distributors | |||
: 6. WOs, Modification Packages, Post-Maintenance Test results, NCRs, and 50.59 evaluation or screening related to installation of set screws on DG 3 right side air distributor plates. | |||
: 7. Copy of DG quarterly and RFO surveillance test procedures | |||
: 8. Copy of WOs and any post-maintenance testing documents related to replacement of fuel rack limiter components on DG 4 in June 2007 and DG 3 in October 2008. | |||
: 9. Last 8 years of component replacement history and any related NCRs on the fuel rack limiters. | |||
: 10. Copies of any root cause or apparent cause analyses performed in the last 4 years related to problems with the DGs. | |||
: 11. Copies of any NCRs in the last 8 years related to air quality or contamination in the DG air start system. | |||
: 12. Any vendor recommendations or guidance received concerning (a) air start distributor issues and (b) fuel rack limiters. | |||
: 13. Copy of DG Vendor Manual | |||
: 14. Hard copy of drawing of DG fuel rack limiter | |||
: 15. Copy of DG Design Basis Documents (DBD) | |||
: 16. Copy of last completed LOOP test on all four EDGs | |||
: 17. Copies of all letters from EDG vendor and/or diesel manufacturer | |||
: 18. Reliability and availability data of each EDG trended over the last three years. | |||
: 19. Explanation of NSW pumps control circuit. This could be provided via phone conversation or interview. | |||
: 20. Copy of the EDG output circuit breaker control circuit drawings for EDG 3 and 4. | |||
: 21. Motor data sheet for the NSW pump. | |||
: 22. Copies of operating experience (OE) reviews on the fuel rack limit cylinder and the starting air distributor. | |||
: 23. Design basis documentation or vendor documentation that describes events during EDG starting at cranking. | |||
: 24. Design basis documentation or vendor documentation that establishes basis for timing of the fuel rack limiter.}} | : 24. Design basis documentation or vendor documentation that establishes basis for timing of the fuel rack limiter.}} |
Latest revision as of 09:52, 14 November 2019
ML090150537 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 01/13/2009 |
From: | NRC/RGN-II |
To: | |
References | |
Download: ML090150537 (2) | |
Text
Brunswick SIT Document Request (01-13-2009)
All documents are requested in electronic form (MS Office or PDF files) unless specified hard copy.
Request all attached documents for any NCRs or WOs requested.
- 1. Latest copy of Diesel Timeline - December 28 through Present.
- 2. Copies of the following WOs:
- a. 1471867
- b. 1472140
- c. 1472328
- d. 1472329
- e. 1472336
- f. 1472343
- g. 1472349
- h. 1472345
- i. 1472944
- j. 1472346
- k. 1472763
- l. 1472947
- m. 1472945
- n. 1472966
- o. 1472965
- p. 1472963
- q. 1472978
- r. 1033642-01
- s. 1472971
- t. 1473214
- 3. Copies of the following NCRs:
- a. 312500
- b. 312819
- c. 312969
- d. 312916
- e. 312868
- f. 312876
- g. 312500
- h. 312854
- i. 312971
- j. 312973
- 6. WOs, Modification Packages, Post-Maintenance Test results, NCRs, and 50.59 evaluation or screening related to installation of set screws on DG 3 right side air distributor plates.
- 8. Copy of WOs and any post-maintenance testing documents related to replacement of fuel rack limiter components on DG 4 in June 2007 and DG 3 in October 2008.
- 9. Last 8 years of component replacement history and any related NCRs on the fuel rack limiters.
- 10. Copies of any root cause or apparent cause analyses performed in the last 4 years related to problems with the DGs.
- 11. Copies of any NCRs in the last 8 years related to air quality or contamination in the DG air start system.
- 12. Any vendor recommendations or guidance received concerning (a) air start distributor issues and (b) fuel rack limiters.
- 13. Copy of DG Vendor Manual
- 14. Hard copy of drawing of DG fuel rack limiter
- 17. Copies of all letters from EDG vendor and/or diesel manufacturer
- 18. Reliability and availability data of each EDG trended over the last three years.
- 19. Explanation of NSW pumps control circuit. This could be provided via phone conversation or interview.
- 21. Motor data sheet for the NSW pump.
- 22. Copies of operating experience (OE) reviews on the fuel rack limit cylinder and the starting air distributor.
- 23. Design basis documentation or vendor documentation that describes events during EDG starting at cranking.
- 24. Design basis documentation or vendor documentation that establishes basis for timing of the fuel rack limiter.