UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

April 3, 2013

Mr. Michael J. Annacone

Vice President

Brunswick Steam Electric Plant

P.O. Box 10429

Southport, NC 28461-0429

SUBJECT: NOTIFICATION OF BRUNSWICK STEAM ELECTRIC PLANT COMPONENT

DESIGN BASES INSPECTION - NRC INSPECTION REPORT

05000325/2013007, 0500324/2013007

Dear Mr. Annacone:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection (CDBI) at your Brunswick

Steam Electric Plant during the weeks of September 9 - 13, September 23 - 27, and October 7

- 11, 2013. Eric Stamm, a Senior Reactor Inspector from the NRCs Region II Office, will lead

the inspection team. This inspection will be conducted in accordance with the baseline

inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued

August 14, 2012.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

During a telephone conversation on April 1, 2013, Mr. Stamm confirmed with Mr. Bill Maury of

your staff, arrangements for an information-gathering site visit and the three-week onsite

inspection. The schedule is as follows:

  • Information-gathering visit: Week of August 19 - 23, 2013
  • Onsite weeks: September 9 - 13, September 23 - 27, and October 7 - 11, 2013

The purpose of the information-gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified. Mr. Rudy Bernhard, a Region II Senior Reactor

Analyst, will support Mr. Stamm during the information-gathering visit to review probabilistic risk

assessment data and identify risk significant components, which will be examined during the

inspection.

The Enclosure lists documents that will be needed prior to the information-gathering visit.

Please provide the referenced information to the Region II office by August 12, 2013. The

inspectors will try to minimize your administrative burden by specifically identifying only those

documents required for inspection preparation.

M. Annacone 2

Additional documents will be requested during the information-gathering visit. The additional

information will need to be available to the team in the Region II Office prior to the inspection

teams preparation week of September 2, 2013. Mr. Stamm, will also discuss the following

inspection support administrative details: (1) availability of knowledgeable plant engineering and

licensing personnel to serve as points of contact during the inspection, (2) method of tracking

inspector requests during the inspection, (3) licensee computer access, (4) working space, (5)

arrangements for site access, and (6) other applicable information.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

Enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Stamm at 404-997-4575 or contact

me at 404-997-4530.

Sincerely,

/RA/

Rebecca L. Nease, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-325 and 50-324

License Nos. DPR-71 and DPR-62

Enclosure:

Information Request for Brunswick Steam

Electric Plant - Component Design Bases

Inspection

cc: (See page 3)

_________________________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE RA RA

NAME STAMM NEASE

DATE 4/3/2013 4/3/2013 4/ /2013 4/ /2013 4/ /2013 4/ /2013 4/ /2013

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

M. Annacone 3

cc: Randy C. Ivey

Plant General Manager Manager, Nuclear Oversight

Brunswick Steam Electric Plant Brunswick Steam Electric Plant

Progress Energy Progress Energy Carolinas, Inc.

Electronic Mail Distribution Electronic Mail Distribution

Edward L. Wills, Jr. Paul E. Dubrouillet

Director Site Operations Manager, Training

Brunswick Steam Electric Plant Brunswick Steam Electric Plant

Electronic Mail Distribution Electronic Mail Distribution

J. W. (Bill) Pitesa Joseph W. Donahue

Senior Vice President Vice President

Nuclear Operations Nuclear Oversight

Duke Energy Corporation Progress Energy

Electronic Mail Distribution Electronic Mail Distribution

John A. Krakuszeski Senior Resident Inspector

Plant Manager U.S. Nuclear Regulatory Commission

Brunswick Steam Electric Plant Brunswick Steam Electric Plant

Electronic Mail Distribution U.S. NRC

8470 River Road, SE

Lara S. Nichols Southport, NC 28461

Deputy General Counsel

Duke Energy Corporation John H. O'Neill, Jr.

Electronic Mail Distribution Shaw, Pittman, Potts & Trowbridge

2300 N. Street, NW

M. Christopher Nolan Washington, DC 20037-1128

Director - Regulatory Affairs

General Office Peggy Force

Duke Energy Corporation Assistant Attorney General

Electronic Mail Distribution State of North Carolina

P.O. Box 629

Michael J. Annacone Raleigh, NC 27602

Vice President

Brunswick Steam Electric Plant Chairman

Electronic Mail Distribution North Carolina Utilities Commission

Electronic Mail Distribution

Annette H. Pope

Manager-Organizational Effectiveness Robert P. Gruber

Brunswick Steam Electric Plant Executive Director

Electronic Mail Distribution Public Staff - NCUC

4326 Mail Service Center

Lee Grzeck Raleigh, NC 27699-4326

Regulatory Affairs Manager

Brunswick Steam Electric Plant Anthony Marzano

Progress Energy Carolinas, Inc. Director

Electronic Mail Distribution Brunswick County Emergency Services

Electronic Mail Distribution

(cc contd - See page 4)

M. Annacone 4

(cc contd)

Public Service Commission

State of South Carolina

P.O. Box 11649

Columbia, SC 29211

W. Lee Cox, III

Section Chief

Radiation Protection Section

N.C. Department of Environmental

Commerce & Natural Resources

Electronic Mail Distribution

Warren Lee

Emergency Management Director

New Hanover County Department of

Emergency Management

230 Government Center Drive

Suite 115

Wilmington, NC 28403

Letter to Michael J. Annacone from Rebecca L. Nease dated April 3, 2013.

SUBJECT: NOTIFICATION OF BRUNSWICK STEAM ELECTRIC PLANT COMPONENT

DESIGN BASES INSPECTION - NRC INSPECTION REPORT

05000325/2013007, 0500324/2013007

Distribution

RIDSNRRDIRS

PUBLIC

RidsNrrPMBrunswick Resource

INFORMATION REQUEST FOR BRUNSWICK STEAM ELECTRIC PLANT

COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM (or FTP site, Sharepoint, etc.). The CDROM (or website) should be indexed and

hyperlinked to facilitate ease of use.

1. From your most-recent probabilistic safety analysis (PSA) excluding external events and

fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by Risk

Achievement Worth (RAW), and the other sorted by Birnbaum Importance

b. A list of the top 500 cutsets

2. From your most-recent PSA including external events and fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by RAW,

and the other sorted by Birnbaum Importance

b. A list of the top 500 cutsets

3. Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide

human reliability worksheets for these items.

4. List of time critical operator actions with a brief description of each action.

5. List of Emergency and Abnormal Operating Procedures revised (significant) since January

1, 2011, with a brief description of each revision.

6. List of components with low design margins (i.e., pumps closest to the design limit for flow

or pressure, diesel generator close to design-required output, heat exchangers close to

rated design heat removal, and motor-operated valve risk-margin rankings, etc.), and

associated evaluations or calculations.

7. List of station operating experience evaluations/reviews performed, and documented in the

stations corrective action program, for industry events and safety related equipment

failures/vulnerabilities [as communicated by NRC Generic Communications, Industry

Communications, 10 CFR Part 21 Notifications, etc.] since January 1, 2011.

8. List and brief description of safety-related structures, systems, or components (SSCs)

design modifications implemented since January 1, 2011.

9. List and brief description of common-cause component failures that have occurred since

January 1, 2011.

10. List and brief description of operability evaluations completed since January 1, 2011.

Enclosure

2

11. List of equipment on the sites Station Equipment Reliability Issues List, including a

description of the reason(s) why each component is on that list, and summaries (if

available) of your plans to address the issue(s).

12. List and brief description of equipment currently in degraded or nonconforming status as

described in Regulatory Issue Summary 05-020.

13. List and reason for equipment classified in maintenance rule (a)(1) status from

January 1, 2011, to present.

14. Copies of system descriptions (or the design basis documents) for safety-related systems.

15. Copy of Updated Final Safety Analysis Report.

16. Copy of Technical Specification(s).

17. Copy of Technical Specifications Bases.

18. Copy of Technical Requirements Manual(s).

19. List and brief description of Root Cause Evaluations performed since January 1, 2011.

20. In-service Testing Program Procedure(s).

21. Corrective Action Program Procedure(s).

22. One line diagram of electrical plant. (Electronic and full size - hard copy week of

August 19)

23. Index and legend for electrical plant one-line diagrams.

24. Primary AC calculation(s) for safety-related buses.

25. Primary DC calculation(s) for safety-related buses.

26. Piping and instrumentation diagrams (P&IDs) for safety-related systems. (Electronic and

1/2 size - hard copy week of August 19)

27. Index and Legend for P&IDs.

28. Copy of Operability Determination procedure(s).

30. Copies of condition reports associated with findings from previous CDBI. (If applicable)

31. Index (procedure number, title, and current revision) of station Emergency Operating

Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures.

32. Copy of any self-assessments performed in preparation for this inspection.

33. List of any condition reports generated in preparation for this inspection.

Enclosure

3

34. Copies of condition reports generated from previous CDBI (2010).

35. Contact information for a person to discuss PRA information prior to the information-

gathering trip. (Name, title, phone number, and e-mail address)

Enclosure