{{#Wiki_filter:PRELIMINARY NOTIFICATION - REGION III April 20, 2009 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-III-09-002  
{{#Wiki_filter:PRELIMINARY NOTIFICATION - REGION III April 20, 2009 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-III-09-002 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region III staff on this date.
 
Facility                                           Licensee Emergency Classification Kewaunee Power Station                                   Notification of Unusual Event Dominion Energy Kewaunee, Inc                           Alert Kewaunee, Wisconsin                                     Site Area Emergency Docket: 50-305                                           General Emergency License: DPR-43                                     _x Not Applicable
This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region III staff on this date.
Facility Kewaunee Power Station Dominion Energy Kewaunee, Inc Kewaunee, Wisconsin Docket: 50-305 License: DPR-43 Licensee Emergency Classification Notification of Unusual Event Alert      Site Area Emergency General Emergency  _x   Not Applicable


==SUBJECT:==
==SUBJECT:==
UNPLANNED SHUTDOWN DUE TO MAIN STEAM PRESSURE INSTRUMENTS NOT CALIBRATED AS REQUIRED  
UNPLANNED SHUTDOWN DUE TO MAIN STEAM PRESSURE INSTRUMENTS NOT CALIBRATED AS REQUIRED DESCRIPTION:
 
DESCRIPTION:  
 
On April 16, 2009, the licensee identified that it had not been properly performing several of the calibrations related to the main steam pressure instruments. The licensee subsequently revised its procedures and began the calibrations. However, because of the time needed to revise the procedures and complete the calibrations, the licensee was required by its Technical Specifications to shut down the reactor. The reactor was shut down at approximately 11:45 p.m.
On April 16, 2009, the licensee identified that it had not been properly performing several of the calibrations related to the main steam pressure instruments. The licensee subsequently revised its procedures and began the calibrations. However, because of the time needed to revise the procedures and complete the calibrations, the licensee was required by its Technical Specifications to shut down the reactor. The reactor was shut down at approximately 11:45 p.m.
on April 16, 2009.  
on April 16, 2009.
 
After the shutdown, the licensee also discovered that one of the reactor trip system instrumentation trip setpoints was improperly set. This setpoint was recalibrated to the appropriate value during the shutdown.
After the shutdown, the licensee also discovered that one of the reactor trip system instrumentation trip setpoints was improperly set. This setpoint was recalibrated to the appropriate value during the shutdown.  
 
On April 20, 2009, the licensee completed the calibrations and at approximately 5:15 a.m.
On April 20, 2009, the licensee completed the calibrations and at approximately 5:15 a.m.
restarted the reactor. The licensee plans to return the reactor to full power within the week. The NRC resident inspectors from Kewaunee and the nearby Point Beach plant observed shutdown and startup activities.
restarted the reactor. The licensee plans to return the reactor to full power within the week. The NRC resident inspectors from Kewaunee and the nearby Point Beach plant observed shutdown and startup activities.
 
The information in this preliminary notification has been reviewed with licensee management.
The information in this preliminary notification has been reviewed with licensee management.  
The State of Wisconsin has been notified.
 
This information is current as of 9:00 a.m. on April 20, 2009.
The State of Wisconsin has been notified.  
CONTACT:         Michael Kunowski                       Steve Burton 630-829-9618                           630-408-2617}}
 
This information is current as of 9:00 a.m. on April 20, 2009.  
 
CONTACT: Michael Kunowski   Steve Burton 630-829-9618   630-408-2617}}


{{PNO-Nav|region=III}}
{{PNO-Nav|region=III}}

Latest revision as of 08:01, 14 November 2019

PNO-III-09-002 - Kewaunee Unplanned Shutdown Due to Main Steam Pressure Instruments Not Calibrated as Required
ML091100266
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/20/2009
From: Stephen Burton, Michael Kunowski
NRC/RGN-III/DRP/B5
To:
References
PNO-III-09-002
Download: ML091100266 (1)


PRELIMINARY NOTIFICATION - REGION III April 20, 2009 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-III-09-002 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region III staff on this date.

Facility Licensee Emergency Classification Kewaunee Power Station Notification of Unusual Event Dominion Energy Kewaunee, Inc Alert Kewaunee, Wisconsin Site Area Emergency Docket: 50-305 General Emergency License: DPR-43 _x Not Applicable

SUBJECT:

UNPLANNED SHUTDOWN DUE TO MAIN STEAM PRESSURE INSTRUMENTS NOT CALIBRATED AS REQUIRED DESCRIPTION:

On April 16, 2009, the licensee identified that it had not been properly performing several of the calibrations related to the main steam pressure instruments. The licensee subsequently revised its procedures and began the calibrations. However, because of the time needed to revise the procedures and complete the calibrations, the licensee was required by its Technical Specifications to shut down the reactor. The reactor was shut down at approximately 11:45 p.m.

on April 16, 2009.

After the shutdown, the licensee also discovered that one of the reactor trip system instrumentation trip setpoints was improperly set. This setpoint was recalibrated to the appropriate value during the shutdown.

On April 20, 2009, the licensee completed the calibrations and at approximately 5:15 a.m.

restarted the reactor. The licensee plans to return the reactor to full power within the week. The NRC resident inspectors from Kewaunee and the nearby Point Beach plant observed shutdown and startup activities.

The information in this preliminary notification has been reviewed with licensee management.

The State of Wisconsin has been notified.

This information is current as of 9:00 a.m. on April 20, 2009.

CONTACT: Michael Kunowski Steve Burton 630-829-9618 630-408-2617