|
|
(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 08/28/2009 | | | issue date = 08/28/2009 |
| | title = NRC Security Inspection Report 05000390/2009403 and 05000391/2009403 | | | title = NRC Security Inspection Report 05000390/2009403 and 05000391/2009403 |
| | author name = Ernstes M E | | | author name = Ernstes M |
| | author affiliation = NRC/RGN-II/DRS/PSB2 | | | author affiliation = NRC/RGN-II/DRS/PSB2 |
| | addressee name = Swafford P D | | | addressee name = Swafford P |
| | addressee affiliation = Tennessee Valley Authority | | | addressee affiliation = Tennessee Valley Authority |
| | docket = 05000390, 05000391 | | | docket = 05000390, 05000391 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:ust 28, 2009 |
| [[Issue date::August 28, 2009]]
| |
|
| |
|
| Mr. Preston Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
| | ==SUBJECT:== |
| | | WATTS BAR NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000390/2009403 AND 05000391/2009403 |
| SUBJECT: WATTS BAR NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000390/2009403 AND 05000391/2009403 | |
|
| |
|
| ==Dear Mr. Swafford:== | | ==Dear Mr. Swafford:== |
| On July 31, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Watts Bar Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on July 31, 2009 with Mr. M. Skaggs and other members of your staff. | | On July 31, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Watts Bar Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on July 31, 2009 with Mr. M. Skaggs and other members of your staff. |
|
| |
|
| The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. | | The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. |
|
| |
|
| Specifically, the focus of the inspection was Temporary Instruction 2201/002, Inspection of Transition of Contract Security to Proprietary Security Force. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | | Specifically, the focus of the inspection was Temporary Instruction 2201/002, Inspection of Transition of Contract Security to Proprietary Security Force. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. |
Line 34: |
Line 32: |
| Based on the results of this inspection, there were no findings of significance identified. | | Based on the results of this inspection, there were no findings of significance identified. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. | | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. |
| | |
| In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable TVA 2 response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information Withhold in accordance with 10 CFR 2.390", and follow the instructions for withholding in 10 CFR 2.390(b)(1).
| |
| | |
| Sincerely,/RA/
| |
| Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-390, 50-391 License No.: NPF-90, Construction Permit No. CPPR-92
| |
| | |
| ===Enclosure:===
| |
| Inspection Report 05000390/2009403 and 05000391/2009403
| |
| | |
| ===w/Attachment:===
| |
| Supplemental Information
| |
| | |
| cc w/encl.: (See page 3) TVA 3 cc w/Encl: Michael D. Skaggs Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Spring City, TN 37381
| |
| | |
| Gregory A. Boerschig Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381
| |
| | |
| Thomas Coutu Vice President Nuclear Support Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
| |
| | |
| Larry E. Nicholson General Manager Performance Improvement Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
| |
| | |
| Michael A. Purcell Senior Licensing Manager Nuclear Power Group Tennessee Valley Authority 4K Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
| |
| | |
| Michael K. Brandon Manager Licensing and Industry Affairs Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381
| |
| | |
| Patrick J. Asendorf General Manager Nuclear Emergency Services Tennessee Valley Authority 6B Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
| |
| | |
| Christopher E. Glover Manager Nuclear Security Operations Tennessee Valley Authority 6B Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
| |
| | |
| Kimberley D. Bayles (Acting) Site Security Manager Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381-2000
| |
| | |
| Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
| |
| | |
| Masoud Bajestani Vice President Watts Bar Unit 2 Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381
| |
|
| |
|
| Gordon P. Arent New Generation Licensing Manager Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381
| | In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable TVA 2 response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information Withhold in accordance with 10 CFR 2.390, and follow the instructions for withholding in 10 CFR 2.390(b)(1). |
|
| |
|
| _________________________ x SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRP RII:DRP RII:DRP SIGNATURE /RA/ /RA/ /RA/ NAME M. Ernstes J.Wallo E. Guthrie DATE 8/28/2009 8/28/2009 8/28/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO | | Sincerely, |
| | /RA/ |
| | Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-390, 50-391 License No.: NPF-90, Construction Permit No. CPPR-92 Enclosure: Inspection Report 05000390/2009403 and 05000391/2009403 w/Attachment: Supplemental Information cc w/encl.: (See page 3) TVA 3 cc w/Encl: Patrick J. Asendorf Michael D. Skaggs General Manager Site Vice President Nuclear Emergency Services Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6B Lookout Place P. O. Box 2000 1101 Market Street Spring City, TN 37381 Chattanooga, TN 37402-2801 Gregory A. Boerschig Christopher E. Glover Plant Manager Manager Watts Bar Nuclear Plant Nuclear Security Operations Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 6B Lookout Place Spring City, TN 37381 1101 Market Street Chattanooga, TN 37402-2801 Thomas Coutu Vice President Kimberley D. Bayles Nuclear Support (Acting) Site Security Manager Tennessee Valley Authority Watts Bar Nuclear Plant 3R Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, TN 37381-2000 Larry E. Nicholson Ashok S. Bhatnagar General Manager Senior Vice President Performance Improvement Nuclear Generation Development and Tennessee Valley Authority Construction 3R Lookout Place Tennessee Valley Authority 1101 Market Street 6A Lookout Place Chattanooga, TN 37402-2801 1101 Market Street Chattanooga, TN 37402-2801 Michael A. Purcell Senior Licensing Manager Masoud Bajestani Nuclear Power Group Vice President Watts Bar Unit 2 Tennessee Valley Authority Watts Bar Nuclear Plant 4K Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, TN 37381 Michael K. Brandon Gordon P. Arent Manager New Generation Licensing Manager Licensing and Industry Affairs Watts Bar Nuclear Plant Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 P.O. Box 2000 Spring City, TN 37381 Spring City, TN 37381 _________________________ x SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRP RII:DRP RII:DRP SIGNATURE /RA/ /RA/ /RA/ |
| | NAME M. Ernstes J.Wallo E. Guthrie DATE 8/28/2009 8/28/2009 8/28/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05
[Table view] |
Text
ust 28, 2009
SUBJECT:
WATTS BAR NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000390/2009403 AND 05000391/2009403
Dear Mr. Swafford:
On July 31, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Watts Bar Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on July 31, 2009 with Mr. M. Skaggs and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
Specifically, the focus of the inspection was Temporary Instruction 2201/002, Inspection of Transition of Contract Security to Proprietary Security Force. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, there were no findings of significance identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable TVA 2 response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information Withhold in accordance with 10 CFR 2.390, and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-390, 50-391 License No.: NPF-90, Construction Permit No. CPPR-92 Enclosure: Inspection Report 05000390/2009403 and 05000391/2009403 w/Attachment: Supplemental Information cc w/encl.: (See page 3) TVA 3 cc w/Encl: Patrick J. Asendorf Michael D. Skaggs General Manager Site Vice President Nuclear Emergency Services Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6B Lookout Place P. O. Box 2000 1101 Market Street Spring City, TN 37381 Chattanooga, TN 37402-2801 Gregory A. Boerschig Christopher E. Glover Plant Manager Manager Watts Bar Nuclear Plant Nuclear Security Operations Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 6B Lookout Place Spring City, TN 37381 1101 Market Street Chattanooga, TN 37402-2801 Thomas Coutu Vice President Kimberley D. Bayles Nuclear Support (Acting) Site Security Manager Tennessee Valley Authority Watts Bar Nuclear Plant 3R Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, TN 37381-2000 Larry E. Nicholson Ashok S. Bhatnagar General Manager Senior Vice President Performance Improvement Nuclear Generation Development and Tennessee Valley Authority Construction 3R Lookout Place Tennessee Valley Authority 1101 Market Street 6A Lookout Place Chattanooga, TN 37402-2801 1101 Market Street Chattanooga, TN 37402-2801 Michael A. Purcell Senior Licensing Manager Masoud Bajestani Nuclear Power Group Vice President Watts Bar Unit 2 Tennessee Valley Authority Watts Bar Nuclear Plant 4K Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, TN 37381 Michael K. Brandon Gordon P. Arent Manager New Generation Licensing Manager Licensing and Industry Affairs Watts Bar Nuclear Plant Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 P.O. Box 2000 Spring City, TN 37381 Spring City, TN 37381 _________________________ x SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRP RII:DRP RII:DRP SIGNATURE /RA/ /RA/ /RA/
NAME M. Ernstes J.Wallo E. Guthrie DATE 8/28/2009 8/28/2009 8/28/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO