Line 21: |
Line 21: |
| : 1. General information concerning the design of your replacement SGs was provided in the submittal. In order for the staff to better understand the design of your replacement SGs, please provide the following information: | | : 1. General information concerning the design of your replacement SGs was provided in the submittal. In order for the staff to better understand the design of your replacement SGs, please provide the following information: |
| : a. A tubesheet map depicting the row and column numbers, | | : a. A tubesheet map depicting the row and column numbers, |
| : b. Tube material and manufacturer, c. Outside diameter and wall thickness of the tubes, d. Number of tubes in each SG, | | : b. Tube material and manufacturer, |
| : e. Tube pitch (e.g., triangular, 1.00-inch center-to-center), f. Expansion method and extent (e.g., hydraulic expansion for the full length of the tubesheet), g. Tube support plate material and design, h. Flow distribution baffle design, if applicable, i. Whether tubes were stress relieved after bending, and if so, the rows that were stress relieved, j. The smallest U-bend radius, and | | : c. Outside diameter and wall thickness of the tubes, |
| | : d. Number of tubes in each SG, |
| | : e. Tube pitch (e.g., triangular, 1.00-inch center-to-center), |
| | : f. Expansion method and extent (e.g., hydraulic expansion for the full length of the tubesheet), |
| | : g. Tube support plate material and design, |
| | : h. Flow distribution baffle design, if applicable, |
| | : i. Whether tubes were stress relieved after bending, and if so, the rows that were stress relieved, |
| | : j. The smallest U-bend radius, and |
| : k. Heat transfer surface area. | | : k. Heat transfer surface area. |
| : 2. One tube was inspected with a rotating probe due to a tubesheet drill hole anomaly and another tube was inspected for a "tube shaving signal." Please briefly discuss the nature of the anomaly and the "shaving signal." | | : 2. One tube was inspected with a rotating probe due to a tubesheet drill hole anomaly and another tube was inspected for a tube shaving signal. Please briefly discuss the nature of the anomaly and the shaving signal. |
| : 3. Please confirm that no tubes were plugged prior to placing the steam generators in service (i.e., pre-operational plugging at the factory and/or on site). | | : 3. Please confirm that no tubes were plugged prior to placing the steam generators in service (i.e., pre-operational plugging at the factory and/or on site). |
| : 4. It appears that not all wear scars were inspected with a rotating probe. Given that the nature of wear indications may differ from support to support (single sided versus double sided; tapered versus uniform), how was it ensured that an appropriate sizing technique was used? In addition, please discuss how it was confirmed that the indications were associated with the support (i.e., facing the support and not the result of some other degradation mechanisms such as wear from a loose part). For tubes sized with a rotating probe and a bobbin coil probe, what is the official size estimate (e.g., the most conservative)? | | : 4. It appears that not all wear scars were inspected with a rotating probe. Given that the nature of wear indications may differ from support to support (single sided versus double sided; tapered versus uniform), how was it ensured that an appropriate sizing technique was used? In addition, please discuss how it was confirmed that the indications were associated with the support (i.e., facing the support and not the result of some other degradation mechanisms such as wear from a loose part). For tubes sized with a rotating probe and a bobbin coil probe, what is the official size estimate (e.g., the most conservative)? |
| | | It appears that approximately 2000 tubes have wear indications at the anti-vibration bars. |
| It appears that approximately 2000 tubes have wear indications at the anti-vibration bars. Discuss the extent to which this is consistent with the operating experience of similarly designed steam generators.}} | | Discuss the extent to which this is consistent with the operating experience of similarly designed steam generators.}} |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24192A2302024-07-10010 July 2024 003 Radiation Safety Baseline Inspection Information Request ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24177A2512024-02-12012 February 2024 Acceptance Review for RR 7-Proposed Alternative - Extension of Inspection Interval for St. Lucie Unit 1 Reactor Pressure Vessel Welds from 10 to 20 Years ML24177A2532024-02-12012 February 2024 Request for Additional Information Relief Request RR 7, Alternative Examination of Reactor Vessel Welds for Florida Power & Light Company, St. Lucie Nuclear Plant, Unit 1 ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22325A0692022-11-18018 November 2022 RAI Set 4 ML22270A1482022-09-26026 September 2022 SLRA Second Round RAI Letter 2 - Class 1 Fatigue (Final) ML22217A0032022-08-0404 August 2022 SLRA Second Round RAI Letter 1) ML22217A0022022-08-0404 August 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 1) ML22193A0872022-07-11011 July 2022 Letter RAI Set 3 (Final) ML22133A0032022-05-12012 May 2022 SLRA Rai'S Set 1 ML22101A2322022-05-0202 May 2022 Summary of the Environmental Remote Audit Related to the Review of the Subsequent License Renewal Application Enclosure RCIs and RAIs ML22094A1672022-04-0101 April 2022 2022 St. Lucie POV Inspection Information Request ML22075A1212022-03-16016 March 2022 Stl Problem Identification and Resolution (Pi&R) Information Request Final Report ML21350A4262021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Licensing Amendment Request Concerning Technical Specification Conversion to NUREG-1432, Revision 5 ML21119A3142021-04-28028 April 2021 Requests for Additional Information Regarding License Amendment Requests to Apply Risk Informed Completion Times (RICT) for the 120-Volt AC (EPID L-2020-LLA-0283) (Email) ML21063A3192021-03-0404 March 2021 Request for Additional Information Regarding Relief Request RR 15 - Extension of RPV Welds from 10 to 20 Years ML20092G3442020-04-0101 April 2020 RAIs for LAR to Revise Technical Specifications 6.8.4.o, Reactor Coolant Pump Flywheel Inspection Program ML20094G2022020-03-30030 March 2020 Request for Additional Information Regarding License Amendment Request to Adopt EAL Schemes Pursuant to NEI 99-01 (L-2019-LLA-0210) ML19225D3152019-08-13013 August 2019 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Bypass Devices (L-2019-LLA-0106) ML19218A2742019-08-0606 August 2019 Notification of Inspection and Request for Information ML19193A1982019-07-12012 July 2019 Emailed St. Lucie Heat Sink RFI ML19192A1372019-07-11011 July 2019 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Unit No. 2, Fall 2018 Refueling Outage Steam Generator Tube Inspection Report ML19192A1352019-06-25025 June 2019 NRR E-mail Capture - Draft Request for Additional Information - St. Lucie Plant, Unit No. 2, Fall 2018 Refueling Outage Steam Generator Tube Inspection Report ML19151A8312019-05-31031 May 2019 NRR E-mail Capture - St. Lucie Plant, Unit Nos. 1 and 2, Request for Additional Information Regarding Emergency Diesel Generator Surveillance Requirement Amendment Request ML19151A5092019-05-21021 May 2019 NRR E-mail Capture - Draft Request for Additional Information - St. Lucie Plant, Unit Nos. 1 and 2 Emergency Diesel Generator Surveillance Requirement Amendment Request ML19109A1392019-04-18018 April 2019 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding the License Amendment Request Pertaining to the Iodine Removal System ML19053A2242019-02-0101 February 2019 NRR E-mail Capture - St. Lucie Plant Unit No. 1 - Draft Request for Additional Information Related to Relief Request 6 Regarding the Refueling Water Tank Bottom Liner ML18296A2052018-10-22022 October 2018 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) L-2018-018, St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181)2018-10-22022 October 2018 St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) ML18197A4112018-08-0101 August 2018 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Reduce the Number of Control Element Assemblies ML18019A0712018-01-18018 January 2018 NRR E-mail Capture - Request for Additional Information - St. Lucie Inop AFW Steam Supply LAR (L-2017-LLA-0296) ML17331B1532017-11-27027 November 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie IST Relief Request #5 - PR-01 (L-2017-LLR-0113) ML17277A3692017-10-0404 October 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie Rict LAR - MF5372/MF5373 ML17152A1842017-06-0101 June 2017 Request for Additional Information - RPS Rate of Change and LCO Change LAR (CACs MF9119 9120) ML16356A1432016-12-20020 December 2016 Notification of Inspection and Request for Information ML16326A0092016-11-18018 November 2016 NRR E-mail Capture - Request for Additional Information Re. Nextera/Fpl LAR to Adopt TSTF-545 - CACs MF8203, MF8204, MF8208, and MF8209 ML16308A3232016-11-0303 November 2016 NRR E-mail Capture - Request for Additional Information - St. Lucie EDG Day Tank LAR - MF8006 ML16292A8212016-10-14014 October 2016 Emergency Preparedness Inspection and Request for Information ML17003A0452016-10-11011 October 2016 NRR E-mail Capture - (External_Sender) FW: St. Lucie Response to RAI on SL2-22 SG Tube Inspection Report (MF7604) ML16244A2602016-08-26026 August 2016 Notification of Inspection and Request for Information ML16155A3502016-06-0303 June 2016 Notification of Inspection and Request for Information ML16089A0052016-03-28028 March 2016 NRR E-mail Capture - Request for Additional Information - St. Lucie Srxb Mtc Surv - MF7269 & MF7270 ML16077A1062016-03-17017 March 2016 NRR E-mail Capture - Request for Additional Information - St Lucie Vacuum Gothic LAR - MF6980/MF6981 ML16068A2612016-03-0808 March 2016 NRR E-mail Capture - Request for Additional Information - St Lucie TSTF-422 - MF6683/MF6684 2024-07-12
[Table view] |
Text
REQUEST FOR ADDITIONAL INFORMATION 2009 STEAM GENERATOR TUBE INSPECTIONS ST. LUCIE UNIT 2 DOCKET NUMBER 50-389 By letter dated November 9, 2009 (Accession Number ML093230226) Florida Power & Light Company (the licensee) submitted information summarizing the results of the 2009 steam generator (SG) tube inspections at St. Lucie Unit 2. These inspections were performed during the eighteenth refueling outage (SL2-18).
In order for the NRC staff to complete its review of the document listed above, please provide the following additional information:
- 1. General information concerning the design of your replacement SGs was provided in the submittal. In order for the staff to better understand the design of your replacement SGs, please provide the following information:
- a. A tubesheet map depicting the row and column numbers,
- b. Tube material and manufacturer,
- c. Outside diameter and wall thickness of the tubes,
- d. Number of tubes in each SG,
- e. Tube pitch (e.g., triangular, 1.00-inch center-to-center),
- f. Expansion method and extent (e.g., hydraulic expansion for the full length of the tubesheet),
- g. Tube support plate material and design,
- h. Flow distribution baffle design, if applicable,
- i. Whether tubes were stress relieved after bending, and if so, the rows that were stress relieved,
- j. The smallest U-bend radius, and
- k. Heat transfer surface area.
- 2. One tube was inspected with a rotating probe due to a tubesheet drill hole anomaly and another tube was inspected for a tube shaving signal. Please briefly discuss the nature of the anomaly and the shaving signal.
- 3. Please confirm that no tubes were plugged prior to placing the steam generators in service (i.e., pre-operational plugging at the factory and/or on site).
- 4. It appears that not all wear scars were inspected with a rotating probe. Given that the nature of wear indications may differ from support to support (single sided versus double sided; tapered versus uniform), how was it ensured that an appropriate sizing technique was used? In addition, please discuss how it was confirmed that the indications were associated with the support (i.e., facing the support and not the result of some other degradation mechanisms such as wear from a loose part). For tubes sized with a rotating probe and a bobbin coil probe, what is the official size estimate (e.g., the most conservative)?
It appears that approximately 2000 tubes have wear indications at the anti-vibration bars.
Discuss the extent to which this is consistent with the operating experience of similarly designed steam generators.