|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:vEntergy Entergy Nuclear Operations, Inc.Vermont Yankee 320 Governor Hunt Rd.Vernon, VT 802-257-7711 Michael J. Colomb Site Vice President This letter contains Security-Related Information Attachment 1 is withheld from public disclosure under 10CFR2.390 BVY 11-011 February 15, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 | | {{#Wiki_filter:Entergy Nuclear Operations, Inc. |
| | Vermont Yankee 320 Governor Hunt Rd. |
| | vEntergy Vernon, VT 802-257-7711 Michael J. Colomb Site Vice President This letter contains Security-Related Information Attachment 1 is withheld from public disclosure under 10CFR2.390 BVY 11-011 February 15, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| | Technical Specifications Proposed Change 292, Supplement 1 Response to Request for Additional Information on the VY Cyber Security Plan Docket No. 50-271 License No. DPR-28 |
|
| |
|
| ==REFERENCES:== | | ==REFERENCES:== |
| | : 1. Letter, Entergy to USNRC, "Revision of Commitment to Supplement the Vermont Yankee Cyber Security Plan Regarding Balance-of-Plant Systems," BVY 10-064, dated November 30, 2010 |
| | : 2. Letter, USNRC to Entergy, "Request for Additional Information to Support the Review of Vermont Yankee Nuclear Power Station Cyber Security Plan (ID: BVY 10-036)(TAC No. ME4296)," NVY 10-085, dated December 21, 2010 |
|
| |
|
| Technical Specifications Proposed Change 292, Supplement 1 Response to Request for Additional Information on the VY Cyber Security Plan Docket No. 50-271 License No. DPR-28 1. Letter, Entergy to USNRC, "Revision of Commitment to Supplement the Vermont Yankee Cyber Security Plan Regarding Balance-of-Plant Systems," BVY 10-064, dated November 30, 2010 2. Letter, USNRC to Entergy, "Request for Additional Information to Support the Review of Vermont Yankee Nuclear Power Station Cyber Security Plan (ID: BVY 10-036)(TAC No. ME4296)," NVY 10-085, dated December 21, 2010
| | ==Dear Sir or Madam:== |
| | |
| | In Reference 1, Entergy Nuclear Operations, Inc. (Entergy) deferred the supplement to the Vermont Yankee (VY) Cyber Security Plan until after the NRC staff has provided direction on further revision. In Reference 2, the NRC issued requests for additional information (RAIs) on the VY Cyber Security Plan with responses due by February 15, 2011. Entergy's responses to the RAIs are provided in Attachment 1. Changes to Section 4.3, "Defense-In-Depth Protective Strategies," of the VY Cyber Security Plan will be made in accordance with the RAI responses as described in Attachment 1. In addition to resolution of the issue identified in Reference 1, other common industry issues are being resolved (i.e., cyber security records retention and implementation schedules). Therefore, the VY Cyber Security Plan containing the changes due to the RAI responses will be submitted when the common industry issues are resolved. |
|
| |
|
| ==Dear Sir or Madam:==
| |
| In Reference 1, Entergy Nuclear Operations, Inc. (Entergy) deferred the supplement to the Vermont Yankee (VY) Cyber Security Plan until after the NRC staff has provided direction on further revision.
| |
| In Reference 2, the NRC issued requests for additional information (RAIs) on the VY Cyber Security Plan with responses due by February 15, 2011. Entergy's responses to the RAIs are provided in Attachment
| |
| : 1. Changes to Section 4.3, "Defense-In-Depth Protective Strategies," of the VY Cyber Security Plan will be made in accordance with the RAI responses as described in Attachment
| |
| : 1. In addition to resolution of the issue identified in Reference 1, other common industry issues are being resolved (i.e., cyber security records retention and implementation schedules).
| |
| Therefore, the VY Cyber Security Plan containing the changes due to the RAI responses will be submitted when the common industry issues are resolved.
| |
| BVY 11-011/page 2 of 5 Entergy requests that Attachment 1, which contains security-related information (S-RI), be withheld from public disclosure in accordance with 10CFR2.390. | | BVY 11-011/page 2 of 5 Entergy requests that Attachment 1, which contains security-related information (S-RI), be withheld from public disclosure in accordance with 10CFR2.390. |
| The new commitment contained in this submittal is provided in Attachment 2.Should you have any questions concerning this letter, or require additional information, please contact Mr. Robert Wanczyk at 802-451-3166. | | The new commitment contained in this submittal is provided in Attachment 2. |
| I declare under penalty of perjury that the foregoing is true and correct. Executed on February 15, 2011.Sincerely MJC/JMD Attachments: | | Should you have any questions concerning this letter, or require additional information, please contact Mr. Robert Wanczyk at 802-451-3166. |
| : 1. Response to Request for Additional Information (contains S-RI)2. List of Regulatory Commitments cc: William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. James S. Kim, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC 320 Governor Hunt Road Vernon, Vermont 05354 Ms. Elizabeth Miller Commissioner Vermont Department of Public Service 112 State Street -Drawer 20 Montpelier, Vermont 05620-2601 BVY 11-011 Docket 50-271 Attachment 2 Proposed Change 292, Supplement 1 List of Regulatory Commitments BVY 11-011 / Attachment 2 / page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. | | I declare under penalty of perjury that the foregoing is true and correct. Executed on February 15, 2011. |
| Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments. | | Sincerely MJC/JMD Attachments: 1. Response to Request for Additional Information (contains S-RI) |
| TYPE SCHEDULED (Check One) COMPLETION COMMITMENT ONE- DATE TIME CONTINUING (If Required)ACTION COMPLIANCE Changes to Section 4.3, X"Defense-I n-Depth Protective Strategies," of the Vermont Yankee Cyber Security Plan will be made in accordance with the RAI responses as described in Attachment 1 to BVY 11-011.}} | | : 2. List of Regulatory Commitments cc: William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. James S. Kim, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC 320 Governor Hunt Road Vernon, Vermont 05354 Ms. Elizabeth Miller Commissioner Vermont Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601 |
| | |
| | BVY 11-011 Docket 50-271 Attachment 2 Proposed Change 292, Supplement 1 List of Regulatory Commitments |
| | |
| | BVY 11-011 / Attachment 2 / page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments. |
| | TYPE SCHEDULED (Check One) COMPLETION COMMITMENT ONE- DATE TIME CONTINUING (If Required) |
| | ACTION COMPLIANCE Changes to Section 4.3, X "Defense-I n-Depth Protective Strategies," |
| | of the Vermont Yankee Cyber Security Plan will be made in accordance with the RAI responses as described in to BVY 11-011.}} |
Letter Sequence Supplement |
---|
|
|
MONTHYEARML1021100932010-07-30030 July 2010 Acceptance of LAR Application for Cyber Security Plan Project stage: Acceptance Review ML1021500452010-08-0505 August 2010 Cyber Security Amendment Withdrawal Letter Project stage: Other ML1035104752010-12-21021 December 2010 Request for Additional Information to Support the Review of Cyber Security Plan (Id: Bvy 10-036) Project stage: RAI BVY 11-011, Technical Specifications Proposed Change 292, Supplement 1 Response to Request for Additional Information on the Cyber Security Plan2011-02-15015 February 2011 Technical Specifications Proposed Change 292, Supplement 1 Response to Request for Additional Information on the Cyber Security Plan Project stage: Supplement ML1105507182011-03-0303 March 2011 Request for Additional Information to Support the Review of Vermont Yankee Nuclear Power Station Cyber Security Plan Project stage: RAI BVY 11-023, Technical Specifications Proposed Change 292, Supplement 2, Response to Request for Additional Information and Revision to Cyber Security Plan2011-04-0404 April 2011 Technical Specifications Proposed Change 292, Supplement 2, Response to Request for Additional Information and Revision to Cyber Security Plan Project stage: Supplement ML11152A0132011-07-20020 July 2011 License Amendment, Cyber Security Plan Project stage: Other ML1120700832011-07-28028 July 2011 ME4296, Correction Letter Replacement Page for Amendment No. 247 for Cyber Security Plan Project stage: Other BVY 12-046, Proposed Change No. 301 - Cyber Security Plan Implementation Schedule Milestones2012-07-0202 July 2012 Proposed Change No. 301 - Cyber Security Plan Implementation Schedule Milestones Project stage: Request ML1226803002012-09-27027 September 2012 Correction Letter to Letter Dated July 28, 2011, for Replacement Page Issued for Amendment No. 247 for Cyber Security Plan Project stage: Other ML12261A2922012-11-13013 November 2012 Issuance of Amendment to Renewed Facility Operating License Cyber Security Plan Implementation Schedule Milestone Project stage: Approval BVY 13-109, Cyber Security Plan Implementation Schedule, Proposed Change No. 3082013-12-19019 December 2013 Cyber Security Plan Implementation Schedule, Proposed Change No. 308 Project stage: Request 2011-04-04
[Table View] |
|
---|
Category:Letter type:BVY
MONTHYEARBVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 BVY 23-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-03-29029 March 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-005, Nuclear Onsite Property Damage Insurance2023-03-13013 March 2023 Nuclear Onsite Property Damage Insurance BVY 23-004, Pre-Notice of Disbursement from Decommissioning Trust2023-03-0202 March 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-003, Pre-Notice of Disbursement from Decommissioning Trust2023-01-31031 January 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-030, Documentary Evidence of Performance Bond2022-12-30030 December 2022 Documentary Evidence of Performance Bond BVY 22-028, Re Proof of Financial Protection2022-11-28028 November 2022 Re Proof of Financial Protection BVY 22-027, Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station2022-11-11011 November 2022 Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station BVY 22-026, Pre-Notice of Disbursement from Decommissioning Trust2022-10-31031 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-025, Pre-Notice of Disbursement from Decommissioning Trust2022-10-0404 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-023, Pre-Notice of Disbursement from Decommissioning Trust2022-09-0101 September 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-022, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-22022 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-16016 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-020, Pre-Notice of Disbursement from Decommissioning Trust2022-08-0101 August 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-019, Pre-Notice of Disbursement from Decommissioning Trust2022-07-0606 July 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-013, Notification of Revised Decommissioning Cost Estimate2022-06-17017 June 2022 Notification of Revised Decommissioning Cost Estimate BVY 22-018, Pre-Notice of Disbursement from Decommissioning Trust2022-06-0808 June 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-015, 2021 Radiological Environmental Operating Report2022-05-0505 May 2022 2021 Radiological Environmental Operating Report BVY 22-017, Pre-Notice of Disbursement from Decommissioning Trust2022-05-0505 May 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-014, 2021 Radiological Effluent Release Report2022-04-28028 April 2022 2021 Radiological Effluent Release Report BVY 22-012, Biennial Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d)2022-04-12012 April 2022 Biennial Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) BVY 22-011, Pre-Notice of Disbursement from Decommissioning Trust2022-04-0404 April 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-009, Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 20212022-03-23023 March 2022 Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 2021 BVY 22-008, Pre-Notice of Disbursement from Decommissioning Trust2022-02-24024 February 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-005, ISFSI Decommissioning Funding Plan2022-02-24024 February 2022 ISFSI Decommissioning Funding Plan 2024-01-04
[Table view] |
Text
Entergy Nuclear Operations, Inc.
Vermont Yankee 320 Governor Hunt Rd.
vEntergy Vernon, VT 802-257-7711 Michael J. Colomb Site Vice President This letter contains Security-Related Information Attachment 1 is withheld from public disclosure under 10CFR2.390 BVY 11-011 February 15, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Technical Specifications Proposed Change 292, Supplement 1 Response to Request for Additional Information on the VY Cyber Security Plan Docket No. 50-271 License No. DPR-28
REFERENCES:
- 1. Letter, Entergy to USNRC, "Revision of Commitment to Supplement the Vermont Yankee Cyber Security Plan Regarding Balance-of-Plant Systems," BVY 10-064, dated November 30, 2010
- 2. Letter, USNRC to Entergy, "Request for Additional Information to Support the Review of Vermont Yankee Nuclear Power Station Cyber Security Plan (ID: BVY 10-036)(TAC No. ME4296)," NVY 10-085, dated December 21, 2010
Dear Sir or Madam:
In Reference 1, Entergy Nuclear Operations, Inc. (Entergy) deferred the supplement to the Vermont Yankee (VY) Cyber Security Plan until after the NRC staff has provided direction on further revision. In Reference 2, the NRC issued requests for additional information (RAIs) on the VY Cyber Security Plan with responses due by February 15, 2011. Entergy's responses to the RAIs are provided in Attachment 1. Changes to Section 4.3, "Defense-In-Depth Protective Strategies," of the VY Cyber Security Plan will be made in accordance with the RAI responses as described in Attachment 1. In addition to resolution of the issue identified in Reference 1, other common industry issues are being resolved (i.e., cyber security records retention and implementation schedules). Therefore, the VY Cyber Security Plan containing the changes due to the RAI responses will be submitted when the common industry issues are resolved.
BVY 11-011/page 2 of 5 Entergy requests that Attachment 1, which contains security-related information (S-RI), be withheld from public disclosure in accordance with 10CFR2.390.
The new commitment contained in this submittal is provided in Attachment 2.
Should you have any questions concerning this letter, or require additional information, please contact Mr. Robert Wanczyk at 802-451-3166.
I declare under penalty of perjury that the foregoing is true and correct. Executed on February 15, 2011.
Sincerely MJC/JMD Attachments: 1. Response to Request for Additional Information (contains S-RI)
- 2. List of Regulatory Commitments cc: William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. James S. Kim, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC 320 Governor Hunt Road Vernon, Vermont 05354 Ms. Elizabeth Miller Commissioner Vermont Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601
BVY 11-011 Docket 50-271 Attachment 2 Proposed Change 292, Supplement 1 List of Regulatory Commitments
BVY 11-011 / Attachment 2 / page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE SCHEDULED (Check One) COMPLETION COMMITMENT ONE- DATE TIME CONTINUING (If Required)
ACTION COMPLIANCE Changes to Section 4.3, X "Defense-I n-Depth Protective Strategies,"
of the Vermont Yankee Cyber Security Plan will be made in accordance with the RAI responses as described in to BVY 11-011.