ML11269A104: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:, HORiZONTAL THERMAL EXPANSION.'GAP 1/4" X Z'SST VERTICAL.EGGCRA TE'GAP SQTUB1NG INSIDE 3/.'1'6" WALL 1f4'i TOTAL THICKNESS (ALUM/BORATED ALUM)NOTE:All other Dry Shielded Canister components are the sameasin Figure 1.3-1.CalvertCliffsNuclearPowerPlant,IndependentSpentFuelStorage Installation NUHOMS-32P DRY SHIELDED CANISTER BASKET ASSEMBLY COMPONENTS USARFigure1.3-7Revision15}}
{{#Wiki_filter:SQTUB1NG 8~50" INSIDE 3/.'1'6" WALL 1/4" X Z' SST
                                                                          , HORiZONTAL THERMAL VERTICAL.                                                         EXPANSION EGGCRATE ' GAP                                                   . 'GAP 1f4' i TOTAL THICKNESS (ALUM/BORATED ALUM)
NOTE: All other Dry Shielded Canister components are the same as in Figure 1.3-1.
Calvert Cliffs Nuclear                                                                USAR Power Plant, Independent        NUHOMS-32P DRY SHIELDED CANISTER BASKET           Figure 1.3-7 Spent Fuel Storage                        ASSEMBLY COMPONENTS Installation                                                                  Revision 15}}

Latest revision as of 15:11, 12 November 2019

Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 1, Figure 1.3.7, Rev 15, NUHOMS-32P Dry Shielded Canister Basket Assembly Components
ML11269A104
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/08/2011
From:
Calvert Cliffs
To:
Office of Nuclear Material Safety and Safeguards
References
Download: ML11269A104 (1)


Text

SQTUB1NG 8~50" INSIDE 3/.'1'6" WALL 1/4" X Z' SST

, HORiZONTAL THERMAL VERTICAL. EXPANSION EGGCRATE ' GAP . 'GAP 1f4' i TOTAL THICKNESS (ALUM/BORATED ALUM)

NOTE: All other Dry Shielded Canister components are the same as in Figure 1.3-1.

Calvert Cliffs Nuclear USAR Power Plant, Independent NUHOMS-32P DRY SHIELDED CANISTER BASKET Figure 1.3-7 Spent Fuel Storage ASSEMBLY COMPONENTS Installation Revision 15