| issue date = 09/29/2011
| issue date = 09/29/2011
| title = Mip - University of Illinois Nuclear Reactor FY2012
| title = Mip - University of Illinois Nuclear Reactor FY2012
| author name = Lipa C A
| author name = Lipa C
| author affiliation = NRC/RGN-III/DNMS/MCID
| author affiliation = NRC/RGN-III/DNMS/MCID
| addressee name = Holm R L
| addressee name = Holm R
| addressee affiliation = Univ of Illinois - Urbana - Champaign
| addressee affiliation = Univ of Illinois - Urbana - Champaign
| docket = 05000151
| docket = 05000151
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:September 29, 2011  
{{#Wiki_filter:September 29, 2011 Dr. Richard L. Holm University of Illinois at Urbana-Champaign Department of Engineering Administration 303 Engineering Hall 1308 West Green Street Urbana, IL 61801
 
Dr. Richard L. Holm University of Illinois at Urbana-Champaign Department of Engineering Administration 303 Engineering Hall 1308 West Green Street Urbana, IL 61801  


==SUBJECT:==
==SUBJECT:==
UNIVERSITY OF ILLINOIS NUCLEAR REACTOR MASTER INSPECTION PLAN  FISCAL YEAR 2012  
UNIVERSITY OF ILLINOIS NUCLEAR REACTOR MASTER INSPECTION PLAN  FISCAL YEAR 2012


==Dear Dr. Holm:==
==Dear Dr. Holm:==


In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2545, "Research and Test Reactor Inspection Program," the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the University of Illinois Nuclear Reactor. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of October 2011 through December 2012. The plan outlines how we intend to focus our regional inspection resources to address significant ongoing decommissioning activities.
In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2545, Research and Test Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the University of Illinois Nuclear Reactor. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of October 2011 through December 2012. The plan outlines how we intend to focus our regional inspection resources to address significant ongoing decommissioning activities.
Because this MIP is based, in part, on your proposed schedule of decommissioning activities for fiscal year (FY) 2012; the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the University of Illinois Nuclear Reactor inspection schedule.
Because this MIP is based, in part, on your proposed schedule of decommissioning activities for fiscal year (FY) 2012; the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the University of Illinois Nuclear Reactor inspection schedule.
We currently project the region will conduct approximately five inspections at the reactor through December 2012, if work begins as planned. You have indicated that a decommissioning contractor has been selected and will begin work in the fall of 2011. One inspection will be conducted prior to the start of work to verify the proper organization, controls and support are in place. The subsequent inspections will be conducted once work commences to ensure decontamination and dismantlement activities are being adequately conducted. Additional inspections may be warranted, depending on specific decommissioning activities being conducted.  
We currently project the region will conduct approximately five inspections at the reactor through December 2012, if work begins as planned. You have indicated that a decommissioning contractor has been selected and will begin work in the fall of 2011. One inspection will be conducted prior to the start of work to verify the proper organization, controls and support are in place. The subsequent inspections will be conducted once work commences to ensure decontamination and dismantlement activities are being adequately conducted. Additional inspections may be warranted, depending on specific decommissioning activities being conducted.


R. Holm The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.  
R. Holm                                         The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.
 
Inspection Procedure             Title IP 69013                         Research and Test Reactor Decommissioning IP 83801                         Inspection of Final Surveys of Permanently Shutdown Reactors In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
Inspection Procedure Title IP 69013   Research and Test Reactor Decommissioning IP 83801   Inspection of Final Surveys of Permanently Shutdown       Reactors  
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.
Sincerely,
                                                  /RA/
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115 cc:      J. Klinger, Illinois Emergency Management Agency (IEMA)
C. Settles, IEMA L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois


In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
R. Holm                                                                    The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.
Inspection Procedure                            Title IP 69013                                        Research and Test Reactor Decommissioning IP 83801                                        Inspection of Final Surveys of Permanently Shutdown Reactors In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.
Sincerely,
Sincerely,
/RA/  Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115
                                                                            /RA/
 
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115 cc:         J. Klinger, Illinois Emergency Management Agency (IEMA)
cc: J. Klinger, Illinois Emergency Management    Agency (IEMA)  C. Settles, IEMA  L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois R. Holm The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.
C. Settles, IEMA L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois DISTRIBUTION:
 
Bruce Watson                                                 Allan Barker John Hickman                                                 Harral Logaras Dominick Orlando                                             Viktoria Mitlyng Cynthia Pederson                                             Prema Chandrathil Anne Boland                                                   MCID Patrick Louden
Inspection Procedure  Title  IP 69013  Research and Test Reactor Decommissioning  IP 83801  Inspection of Final Surveys of Permanently Shutdown        Reactors
*See previous concurrence DOCUMENT NAME: G:\DNMSIII\Work in progress\MIP - University of Illinois Nuclear Reactor FY2012.docx Publicly Available                           Non-Publicly Available                     Sensitive               Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy OFFICE           RIII DNMS                     E     RIII DNMS                 E     RIII                                 RIII NAME             JETapp:jm JET                       CALipa CAL DATE             09/29/11                             09/29/11 OFFICIAL RECORD COPY}}
 
In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.
Sincerely,  /RA/
Christine A. Lipa, Chief Materials Control, ISFSI, and   Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115  
 
cc: J. Klinger, Illinois Emergency Management Agency (IEMA)
C. Settles, IEMA L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois  
 
DISTRIBUTION
: Bruce Watson   Allan Barker John Hickman   Harral Logaras Dominick Orlando   Viktoria Mitlyng Cynthia Pederson   Prema Chandrathil Anne Boland   MCID Patrick Louden  
*See previous concurrence DOCUMENT NAME: G:\DNMSIII\Work in progress\MIP - University of Illinois Nuclear Reactor FY2012.docx   Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS E RIII DNMS E RIII RIII NAME JETapp:jm JET CALipa CAL   DATE 09/29/11 09/29/11   OFFICIAL RECORD COPY}}

Latest revision as of 13:54, 12 November 2019

Mip - University of Illinois Nuclear Reactor FY2012
ML11276A070
Person / Time
Site: University of Illinois
Issue date: 09/29/2011
From: Christine Lipa
NRC/RGN-III/DNMS/MCID
To: Holm R
University of Illinois
References
Download: ML11276A070 (3)


Text

September 29, 2011 Dr. Richard L. Holm University of Illinois at Urbana-Champaign Department of Engineering Administration 303 Engineering Hall 1308 West Green Street Urbana, IL 61801

SUBJECT:

UNIVERSITY OF ILLINOIS NUCLEAR REACTOR MASTER INSPECTION PLAN FISCAL YEAR 2012

Dear Dr. Holm:

In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual, Chapter 2545, Research and Test Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the University of Illinois Nuclear Reactor. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of October 2011 through December 2012. The plan outlines how we intend to focus our regional inspection resources to address significant ongoing decommissioning activities.

Because this MIP is based, in part, on your proposed schedule of decommissioning activities for fiscal year (FY) 2012; the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the University of Illinois Nuclear Reactor inspection schedule.

We currently project the region will conduct approximately five inspections at the reactor through December 2012, if work begins as planned. You have indicated that a decommissioning contractor has been selected and will begin work in the fall of 2011. One inspection will be conducted prior to the start of work to verify the proper organization, controls and support are in place. The subsequent inspections will be conducted once work commences to ensure decontamination and dismantlement activities are being adequately conducted. Additional inspections may be warranted, depending on specific decommissioning activities being conducted.

R. Holm The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.

Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115 cc: J. Klinger, Illinois Emergency Management Agency (IEMA)

C. Settles, IEMA L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois

R. Holm The following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted.

Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors In accordance with Title 10 Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00151 License No. R-115 cc: J. Klinger, Illinois Emergency Management Agency (IEMA)

C. Settles, IEMA L. Prussing, Mayor, City of Urbana J. Stubbins, University of Illinois DISTRIBUTION:

Bruce Watson Allan Barker John Hickman Harral Logaras Dominick Orlando Viktoria Mitlyng Cynthia Pederson Prema Chandrathil Anne Boland MCID Patrick Louden

  • See previous concurrence DOCUMENT NAME: G:\DNMSIII\Work in progress\MIP - University of Illinois Nuclear Reactor FY2012.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy OFFICE RIII DNMS E RIII DNMS E RIII RIII NAME JETapp:jm JET CALipa CAL DATE 09/29/11 09/29/11 OFFICIAL RECORD COPY