ML11314A138: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11314A138
| number = ML11314A138
| issue date = 09/01/2011
| issue date = 09/01/2011
| title = Crystal River, Unit 3, Drawing No. 522-041-019, Rev. 0, EC70139, Rev. 0, Attachment Z95R0, Column Connections to Concrete Floor
| title = Drawing No. 522-041-019, Rev. 0, EC70139, Rev. 0, Attachment Z95R0, Column Connections to Concrete Floor
| author name =  
| author name =  
| author affiliation = Progress Energy Florida, Inc
| author affiliation = Progress Energy Florida, Inc
Line 14: Line 14:
| document type = Drawing
| document type = Drawing
| page count = 1
| page count = 1
| project = TAC:ME5208
| stage = Other
}}
}}
=Text=
{{#Wiki_filter:PCHG-DESG Engineering Change          0000070139R0 Progress Energy Z95R0                                    Page 1 of 1}}

Latest revision as of 13:01, 12 November 2019

Drawing No. 522-041-019, Rev. 0, EC70139, Rev. 0, Attachment Z95R0, Column Connections to Concrete Floor
ML11314A138
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/01/2011
From:
Progress Energy Florida
To:
Office of Nuclear Reactor Regulation
References
3F0911-01, TAC ME5208 522-041-019
Download: ML11314A138 (1)


Text

PCHG-DESG Engineering Change 0000070139R0 Progress Energy Z95R0 Page 1 of 1