ML11314A147: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML11314A147
| number = ML11314A147
| issue date = 09/01/2011
| issue date = 09/01/2011
| title = Crystal River, Unit 3, Drawing No. 522-041 Sheet 001, EC 70139, Rev. 0, Attachment Z107R0, Vertical Bracing Member Replacement, Vertical Bracing Connections, N-S Member Connections at Roof El. 209'-1 (Between Column Line P1 & Q1), E-W Membe
| title = Drawing No. 522-041 Sheet 001, EC 70139, Rev. 0, Attachment Z107R0, Vertical Bracing Member Replacement, Vertical Bracing Connections, N-S Member Connections at Roof El. 209'-1 (Between Column Line P1 & Q1), E-W Member..
| author name =  
| author name =  
| author affiliation = Progress Energy Florida, Inc
| author affiliation = Progress Energy Florida, Inc
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:PCHG-DESG Engineering Change 0000070139R0 Z107R0                          Page 1 of 1}}

Latest revision as of 13:00, 12 November 2019

Drawing No. 522-041 Sheet 001, EC 70139, Rev. 0, Attachment Z107R0, Vertical Bracing Member Replacement, Vertical Bracing Connections, N-S Member Connections at Roof El. 209'-1 (Between Column Line P1 & Q1), E-W Member..
ML11314A147
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/01/2011
From:
Progress Energy Florida
To:
Office of Nuclear Reactor Regulation
References
3F0911-01, TAC ME5208 522-041-001
Download: ML11314A147 (1)


Text

PCHG-DESG Engineering Change 0000070139R0 Z107R0 Page 1 of 1