IR 05000297/2012202: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 25: | Line 25: | ||
==Dear Dr. Hawari:== | ==Dear Dr. Hawari:== | ||
The U.S. Nuclear Regulatory Commission (NRC) conducted a security inspection on February 13 to16, 2012, at your PULSTAR Nuclear Reactor Facility. The inspection included a review of activities authorized for your facility. The enclosed | The U.S. Nuclear Regulatory Commission (NRC) conducted a security inspection on February 13 to16, 2012, at your PULSTAR Nuclear Reactor Facility. The inspection included a review of activities authorized for your facility. The enclosed report presents the results of that inspection. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with NRC rules and regulations, and compliance with the conditions of your license. | The inspection examined activities conducted under your license as they relate to security and compliance with NRC rules and regulations, and compliance with the conditions of your license. | ||
Line 31: | Line 31: | ||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no safety concerns or non-compliances with NRC requirements were identified. No response to this letter is required. | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no safety concerns or non-compliances with NRC requirements were identified. No response to this letter is required. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390, | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390, Public Inspections, exemptions, request for withholding,a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related items contained in the enclosure, and in accordance with 10 CFR 2.390(d), a copy of this letter=s enclosure will not be available for public inspection. | ||
=s enclosure will not be available for public inspection. | |||
Should you have any questions concerning this inspection, please contact Jack Donohue at 301-452-1950 or electronic mail at Jack.donohue@nrc.gov. | Should you have any questions concerning this inspection, please contact Jack Donohue at 301-452-1950 or electronic mail at Jack.donohue@nrc.gov. | ||
Sincerely, | Sincerely, | ||
/RA/ Johnny H. Eads, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No.: 50-297 License No.: R-120 | /RA/ | ||
Johnny H. Eads, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No.: 50-297 License No.: R-120 NOTE: Document transmitted herewith contains security-related information. When separated from Nonpublic Enclosure: As stated the enclosure, this document is decontrolled cc w/o encl: See next page North Carolina State University Docket No.: 50-297 cc: | |||
Office of Intergovernmental Relations 116 West Jones Street Raleigh, NC 27603 Dr. Yousry Azmy, Head Nuclear Engineering Department North Carolina State University P.O. Box 7909 Raleigh, NC 27695-7909 Beverly Hall, Section Chief Department of Environment and Natural Resources Division of Environmental Health Radiation Protection Section 3825 Barrett Drive Raleigh, NC 27609-7221 Dr. Louis Martin-Vega Dean of Engineering North Carolina State University 113 Page Hall Box 7901 - NCSU Raleigh, NC 27695-7901 Andrew Cook Manager, Engineering and Operations Department of Nuclear Engineering North Carolina State University P. O. Box 7909 Raleigh, NC 27695-7909 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611 February 28, 2012 Dr. Ayman | |||
cc: | |||
Office of Intergovernmental Relations 116 West Jones Street Raleigh, NC 27603 | |||
Dr. Yousry Azmy, Head Nuclear Engineering Department North Carolina State University P.O. Box 7909 Raleigh, NC 27695-7909 | |||
Beverly Hall, Section Chief Department of Environment and Natural Resources Division of Environmental Health Radiation Protection Section 3825 Barrett Drive Raleigh, NC 27609-7221 | |||
Dr. Louis Martin-Vega Dean of Engineering North Carolina State University 113 Page Hall Box 7901 - NCSU Raleigh, NC 27695-7901 | |||
Andrew Cook Manager, Engineering and Operations Department of Nuclear Engineering North Carolina State University P. O. Box 7909 Raleigh, NC 27695-7909 | |||
Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611 February 28, 2012 Dr. Ayman | |||
}} | }} |
Latest revision as of 07:40, 12 November 2019
ML120590015 | |
Person / Time | |
---|---|
Site: | North Carolina State University |
Issue date: | 02/28/2012 |
From: | Johnny Eads Research and Test Reactors Licensing Branch |
To: | Hawari A North Carolina State University |
Donohue, J N, NRR/DPR, 4153163 | |
Shared Package | |
ML120590014 | List: |
References | |
IR-12-202 | |
Download: ML120590015 (3) | |
Text
ary 28, 2012
SUBJECT:
NORTH CAROLINA STATE UNIVERSITY - NRC ROUTINE INSPECTION REPORT NO. 50-297/2012-202
Dear Dr. Hawari:
The U.S. Nuclear Regulatory Commission (NRC) conducted a security inspection on February 13 to16, 2012, at your PULSTAR Nuclear Reactor Facility. The inspection included a review of activities authorized for your facility. The enclosed report presents the results of that inspection.
The inspection examined activities conducted under your license as they relate to security and compliance with NRC rules and regulations, and compliance with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no safety concerns or non-compliances with NRC requirements were identified. No response to this letter is required.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390, Public Inspections, exemptions, request for withholding,a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related items contained in the enclosure, and in accordance with 10 CFR 2.390(d), a copy of this letter=s enclosure will not be available for public inspection.
Should you have any questions concerning this inspection, please contact Jack Donohue at 301-452-1950 or electronic mail at Jack.donohue@nrc.gov.
Sincerely,
/RA/
Johnny H. Eads, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No.: 50-297 License No.: R-120 NOTE: Document transmitted herewith contains security-related information. When separated from Nonpublic Enclosure: As stated the enclosure, this document is decontrolled cc w/o encl: See next page North Carolina State University Docket No.: 50-297 cc:
Office of Intergovernmental Relations 116 West Jones Street Raleigh, NC 27603 Dr. Yousry Azmy, Head Nuclear Engineering Department North Carolina State University P.O. Box 7909 Raleigh, NC 27695-7909 Beverly Hall, Section Chief Department of Environment and Natural Resources Division of Environmental Health Radiation Protection Section 3825 Barrett Drive Raleigh, NC 27609-7221 Dr. Louis Martin-Vega Dean of Engineering North Carolina State University 113 Page Hall Box 7901 - NCSU Raleigh, NC 27695-7901 Andrew Cook Manager, Engineering and Operations Department of Nuclear Engineering North Carolina State University P. O. Box 7909 Raleigh, NC 27695-7909 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611 February 28, 2012 Dr. Ayman