ML12157A084: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:EDO Principal Correspondence Control FROM: DUE: 06/20/12 Senator Debbie Stabenow EDO CONTROL: G20120377 DOC DT: 05/17/12 FINAL REPLY: TO: Commission FOR SIGNATURE OF : Chairman Jaczko** PRI **CRC NO: 12-0221 DESC: ROUTING: Safety Issues with Palisades Nuclear Power Plant (EDATS: SECY-2012-0279)
{{#Wiki_filter:EDO Principal Correspondence Control FROM:                   DUE: 06/20/12               EDO CONTROL: G20120377 DOC DT: 05/17/12 FINAL REPLY:
Borchardt Weber Johnson Ash Mamish OGC/GC Leeds, NRR Pederson, RIII Zobler, OGC Schmidt, OCA DATE: 06/04/12 ASSIGNED TO: EDO CONTACT: Rihm SPECIAL INSTRUCTIONS OR REMARKS: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179).
Senator Debbie Stabenow TO:
NRR and Region III to provide input to Roger Rihm, OEDO, if required.
Commission FOR SIGNATURE OF :                 ** PRI **             CRC NO: 12-0221 Chairman Jaczko DESC:                                                     ROUTING:
Roger Rihm will coordinate response with OGC and OCA.5~C~1-tDV1 L -~i&S'.
Safety Issues with Palisades Nuclear Power Plant         Borchardt (EDATS: SECY-2012-0279)                                 Weber Johnson Ash Mamish OGC/GC DATE:    06/04/12                                          Leeds, NRR Pederson, RIII ASSIGNED TO:              CONTACT:                          Zobler, OGC Schmidt, OCA EDO             Rihm SPECIAL INSTRUCTIONS OR REMARKS:
EDATS Number: SECY-2012-0279 Source: SECY Genera Inorato Assigned To: OEDO Other Assignees:
Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179).     NRR and Region III   to provide input to Roger Rihm, OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.
5~C~1-tDV1                                           L ~i&S'.
                                                                    -
 
EDATS Number: SECY-2012-0279                                                                   Source: SECY Genera Inorato Assigned To: OEDO                                                           OEDO Due Date: 6/20/2012 11:00 PM Other Assignees:                                                             SECY Due Date: 6/22/2012 11:00 PM


==Subject:==
==Subject:==
Safety Issues with Palisades Nuclear Power Plant
Safety Issues with Palisades Nuclear Power Plant


== Description:==
==
Description:==


CC Routing: NRR; RegionIII; OGC; OCA ADAMS Accession Numbers -Incoming:
CC Routing: NRR; RegionIII; OGC; OCA ADAMS Accession Numbers - Incoming: NONE                                               Response/Package: NONE Ote   nomto Cross Reference Number: G20120377, LTR- 12-0221                                                 Staff Initiated: NO Related Task:                                                                                Recurring Item: NO File Routing: EDATS                                                                  Agency Lesson Learned: NO OEDO Monthly Report Item: NO Proes     Infraio Action Type: Letter                                                                             Priority: Medium Sensitivity: None Signature Level: Chairman Jaczko                                                                     Urgency: NO Approval Level: No Approval Required OEDO Concurrence: YES OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR and Region II to provide input to Roger Rihm,,OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.
NONE OEDO Due Date: 6/20/2012 11:00 PM SECY Due Date: 6/22/2012 11:00 PM Response/Package:
Docmen Inoraio Originator Name: Senator Debbie Stabenow                                             Date of Incoming: 5/17/2012 Originating Organization: Congress                                    Document Received by SECY Date: 6/1/2012 Addressee: Commission                                              Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of l
NONE Ote nomto Cross Reference Number: G20120377, LTR- 12-0221 Related Task: File Routing: EDATS Staff Initiated:
 
NO Recurring Item: NO Agency Lesson Learned: NO OEDO Monthly Report Item: NO Proes Infraio Action Type: Letter Priority:
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Jun 01, 2012 11:23 PAPER NUMBER:     LTR- 12-0221                               LOGGING DATE: 05/18/2012 ACTION OFFICE:
Medium Sensitivity:
AUTHOR:           SEN Debbie Stabenow AFFILIATION:     CONG ADDRESSEE:       CHRM Gregory Jaczko
None Signature Level: Chairman Jaczko Urgency: NO Approval Level: No Approval Required OEDO Concurrence:
YES OCM Concurrence:
NO OCA Concurrence:
NO Special Instructions:
Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179).
NRR and Region II to provide input to Roger Rihm,,OEDO, if required.
Roger Rihm will coordinate response with OGC and OCA.Docmen Inoraio Originator Name: Senator Debbie Stabenow Originating Organization:
Congress Addressee:
Commission Incoming Task Received:
Letter Date of Incoming:
5/17/2012 Document Received by SECY Date: 6/1/2012 Date Response Requested by Originator:
NONE Page 1 of l OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Jun 01, 2012 11:23 PAPER NUMBER: ACTION OFFICE: LTR- 12-0221 LOGGING DATE: 05/18/2012 AUTHOR: AFFILIATION:
ADDRESSEE:


==SUBJECT:==
==SUBJECT:==
ACTION: DISTRIBUTION:
Concerns the Palisades nuclear power plant ACTION:          Signature of Chairman DISTRIBUTION:    RF, OCA to Ack LETTER DATE:      05/17/2012 ACKNOWLEDGED      No SPECIAL HANDLING: Commission Correspondence NOTES:
LETTER DATE: ACKNOWLEDGED SPECIAL HANDLING: SEN Debbie Stabenow CONG CHRM Gregory Jaczko Concerns the Palisades nuclear power plant Signature of Chairman RF, OCA to Ack 05/17/2012 No Commission Correspondence NOTES: FILE LOCATION: ADAMS 06/22/2012 DATE DUE: DATE SIGNED: EDO --G20120377 DEBBIE STABENOW COMMITTEES:
FILE LOCATION:   ADAMS DATE DUE:        06/22/2012                       DATE SIGNED:
MICHIGAN -AGRICULTURE, NUTRITION, AND FORESTRY BUDGET ENERGY AND NATURAL RESOURCES'Unied ýtatc 16cateFINANCE 133 HART SENATE OFFICE BUILDING WASHINGTON, DC 20510-2204 May 17, 2012 The Honorable Gregory Jaczko, Chairman The Honorable Kristine Svinicki, Commissioner The Honorable George Apostolakis, Commissioner The Honorable William Magwood, Commissioner The Honorable William Ostendorff, Commissioner United States Nuclear Regulatory Commission Mail Stop O- 16G4 Washington, DC 20555 Dear Chairman Jaczko and Honorable Commissioners, I am writing to express concerns regarding the Palisades nuclear power plant located in Covert, Michigan and related Nuclear Regulatory Commission actions.As you know, on September 25, 2011, the Palisades Nuclear Power Plant was shut down for a week due to electrical errors. There was also a component coupling failure at the plant in August 2011 and a water pump failure in May 2011. Due to continuing issues, the Nuclear Regulatory Commission has downgraded this plant to the "Regulatory Response Column" with the possibility of being downgraded further to the "Degraded Cornerstone Column." The safety of the Palisades plant is of the utmost importance to me and the residents of Michigan.
EDO -- G20120377
Palisades is an important job creator, providing more than 650 jobs in the area, and it must be capable of operating safely and effectively to continue powering Michigan businesses and homes. In the wake of multiple shutdowns and equipment issues, I am very concerned about the impact of these safety issues on the community and our state.Therefore, I respectfully request a detailed report of all the actions taken by the Nuclear Regulatory Commission to address the recent safety issues at the Palisades plant, as well as a detailed report of the history of incidents at Palisades that led to the downgrading of the plant's safety status.Sincerely, United States Senator PRINTED ON RECYCLED PAPER}}
 
DEBBIE STABENOW                                                                                           COMMITTEES:
MICHIGAN -                                                                               AGRICULTURE, NUTRITION, AND FORESTRY BUDGET ENERGY AND NATURAL RESOURCES
                                                            'Unied           16cateFINANCE
                                                                                ýtatc 133 HART SENATE OFFICE BUILDING WASHINGTON, DC 20510-2204 May 17, 2012 The Honorable Gregory Jaczko, Chairman The Honorable Kristine Svinicki, Commissioner The Honorable George Apostolakis, Commissioner The Honorable William Magwood, Commissioner The Honorable William Ostendorff, Commissioner United States Nuclear Regulatory Commission Mail Stop O- 16G4 Washington, DC 20555
 
==Dear Chairman Jaczko and Honorable Commissioners,==
 
I am writing to express concerns regarding the Palisades nuclear power plant located in Covert, Michigan and related Nuclear Regulatory Commission actions.
As you know, on September 25, 2011, the Palisades Nuclear Power Plant was shut down for a week due to electrical errors. There was also a component coupling failure at the plant in August 2011 and a water pump failure in May 2011. Due to continuing issues, the Nuclear Regulatory Commission has downgraded this plant to the "Regulatory Response Column" with the possibility of being downgraded further to the "Degraded Cornerstone Column."
The safety of the Palisades plant is of the utmost importance to me and the residents of Michigan. Palisades is an important job creator, providing more than 650 jobs in the area, and it must be capable of operating safely and effectively to continue powering Michigan businesses and homes. In the wake of multiple shutdowns and equipment issues, I am very concerned about the impact of these safety issues on the community and our state.
Therefore, I respectfully request a detailed report of all the actions taken by the Nuclear Regulatory Commission to address the recent safety issues at the Palisades plant, as well as a detailed report of the history of incidents at Palisades that led to the downgrading of the plant's safety status.
Sincerely, United States Senator PRINTED ON RECYCLED PAPER}}

Revision as of 03:56, 12 November 2019

G20120377/LTR-12-0221/EDATS: SECY-2012-0279 - Ltr. Senator Debbie Stabenow Safety Issues with Palisades Nuclear Power Plant
ML12157A084
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/17/2012
From: Stabenow D
US SEN (Senate), US Congress
To: Apostolakis G, Jaczko G, Magwood W, Ostendorff W, Kristine Svinicki
NRC/Chairman, NRC/OCM
Rihm R
Shared Package
ML12157A408 List:
References
G20120377, LTR-12-0221, SECY-2012-0279, CORR-12-0057
Download: ML12157A084 (4)


Text

EDO Principal Correspondence Control FROM: DUE: 06/20/12 EDO CONTROL: G20120377 DOC DT: 05/17/12 FINAL REPLY:

Senator Debbie Stabenow TO:

Commission FOR SIGNATURE OF : ** PRI ** CRC NO: 12-0221 Chairman Jaczko DESC: ROUTING:

Safety Issues with Palisades Nuclear Power Plant Borchardt (EDATS: SECY-2012-0279) Weber Johnson Ash Mamish OGC/GC DATE: 06/04/12 Leeds, NRR Pederson, RIII ASSIGNED TO: CONTACT: Zobler, OGC Schmidt, OCA EDO Rihm SPECIAL INSTRUCTIONS OR REMARKS:

Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR and Region III to provide input to Roger Rihm, OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.

5~C~1-tDV1 L ~i&S'.

-

EDATS Number: SECY-2012-0279 Source: SECY Genera Inorato Assigned To: OEDO OEDO Due Date: 6/20/2012 11:00 PM Other Assignees: SECY Due Date: 6/22/2012 11:00 PM

Subject:

Safety Issues with Palisades Nuclear Power Plant

==

Description:==

CC Routing: NRR; RegionIII; OGC; OCA ADAMS Accession Numbers - Incoming: NONE Response/Package: NONE Ote nomto Cross Reference Number: G20120377, LTR- 12-0221 Staff Initiated: NO Related Task: Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO OEDO Monthly Report Item: NO Proes Infraio Action Type: Letter Priority: Medium Sensitivity: None Signature Level: Chairman Jaczko Urgency: NO Approval Level: No Approval Required OEDO Concurrence: YES OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR and Region II to provide input to Roger Rihm,,OEDO, if required. Roger Rihm will coordinate response with OGC and OCA.

Docmen Inoraio Originator Name: Senator Debbie Stabenow Date of Incoming: 5/17/2012 Originating Organization: Congress Document Received by SECY Date: 6/1/2012 Addressee: Commission Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of l

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Jun 01, 2012 11:23 PAPER NUMBER: LTR- 12-0221 LOGGING DATE: 05/18/2012 ACTION OFFICE:

AUTHOR: SEN Debbie Stabenow AFFILIATION: CONG ADDRESSEE: CHRM Gregory Jaczko

SUBJECT:

Concerns the Palisades nuclear power plant ACTION: Signature of Chairman DISTRIBUTION: RF, OCA to Ack LETTER DATE: 05/17/2012 ACKNOWLEDGED No SPECIAL HANDLING: Commission Correspondence NOTES:

FILE LOCATION: ADAMS DATE DUE: 06/22/2012 DATE SIGNED:

EDO -- G20120377

DEBBIE STABENOW COMMITTEES:

MICHIGAN - AGRICULTURE, NUTRITION, AND FORESTRY BUDGET ENERGY AND NATURAL RESOURCES

'Unied 16cateFINANCE

ýtatc 133 HART SENATE OFFICE BUILDING WASHINGTON, DC 20510-2204 May 17, 2012 The Honorable Gregory Jaczko, Chairman The Honorable Kristine Svinicki, Commissioner The Honorable George Apostolakis, Commissioner The Honorable William Magwood, Commissioner The Honorable William Ostendorff, Commissioner United States Nuclear Regulatory Commission Mail Stop O- 16G4 Washington, DC 20555

Dear Chairman Jaczko and Honorable Commissioners,

I am writing to express concerns regarding the Palisades nuclear power plant located in Covert, Michigan and related Nuclear Regulatory Commission actions.

As you know, on September 25, 2011, the Palisades Nuclear Power Plant was shut down for a week due to electrical errors. There was also a component coupling failure at the plant in August 2011 and a water pump failure in May 2011. Due to continuing issues, the Nuclear Regulatory Commission has downgraded this plant to the "Regulatory Response Column" with the possibility of being downgraded further to the "Degraded Cornerstone Column."

The safety of the Palisades plant is of the utmost importance to me and the residents of Michigan. Palisades is an important job creator, providing more than 650 jobs in the area, and it must be capable of operating safely and effectively to continue powering Michigan businesses and homes. In the wake of multiple shutdowns and equipment issues, I am very concerned about the impact of these safety issues on the community and our state.

Therefore, I respectfully request a detailed report of all the actions taken by the Nuclear Regulatory Commission to address the recent safety issues at the Palisades plant, as well as a detailed report of the history of incidents at Palisades that led to the downgrading of the plant's safety status.

Sincerely, United States Senator PRINTED ON RECYCLED PAPER