ML12275A309: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12275A309
| number = ML12275A309
| issue date = 09/18/2012
| issue date = 09/18/2012
| title = Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Figure 7.4-1, Rev. 20, Dose Rates Vs E-W Distance from Hsm (Hsm Ends).
| title = Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Figure 7.4-1, Rev. 20, Dose Rates Vs E-W Distance from Hsm (Hsm Ends).
| author name =  
| author name =  
| author affiliation = Constellation Energy Nuclear Group, LLC, EDF Group, Calvert Cliffs Nuclear Power Plant, LLC
| author affiliation = Constellation Energy Nuclear Group, LLC, EDF Group, Calvert Cliffs Nuclear Power Plant, LLC
Line 13: Line 13:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:Calvert Cliffs Nuclear                                        USAR DOSE RATES VS E-W DISTANCE FROM HSM Power Plant, Independent                                    Figure 7.4-1 Spent Fuel Storage (HSM ENDS)
Installation                [REFERENCE 7.23]          Revision 20}}

Latest revision as of 22:54, 11 November 2019

Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Figure 7.4-1, Rev. 20, Dose Rates Vs E-W Distance from Hsm (Hsm Ends).
ML12275A309
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/18/2012
From:
Constellation Energy Nuclear Group, EDF Group, Calvert Cliffs
To:
Office of Nuclear Material Safety and Safeguards
References
Download: ML12275A309 (1)


Text

Calvert Cliffs Nuclear USAR DOSE RATES VS E-W DISTANCE FROM HSM Power Plant, Independent Figure 7.4-1 Spent Fuel Storage (HSM ENDS)

Installation [REFERENCE 7.23] Revision 20