ML12275A434: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML12275A434 | | number = ML12275A434 | ||
| issue date = 09/18/2012 | | issue date = 09/18/2012 | ||
| title = | | title = Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Chapter 10, Operating Controls and Limits | ||
| author name = | | author name = | ||
| author affiliation = Calvert Cliffs Nuclear Power Plant, LLC, Constellation Energy Nuclear Group, LLC, EDF Group | | author affiliation = Calvert Cliffs Nuclear Power Plant, LLC, Constellation Energy Nuclear Group, LLC, EDF Group | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CHAPTER 10 OPERATING CONTROLS AND LIMITS LIST OF EFFECTIVE PAGES PAGE REVISION PAGE REVISION | {{#Wiki_filter:CHAPTER 10 OPERATING CONTROLS AND LIMITS LIST OF EFFECTIVE PAGES PAGE REVISION PAGE REVISION LEP 10-1 15 10-i 8 10.0-1 15 CALVERT CLIFFS ISFSI USAR LEP 10-1 Rev. 15 | ||
Table 10.3-2, referenced in the Nuclear Regulatory Commission Safety Evaluation Report dated November 25, 1992, is now Table 9.4-2.}} | |||
CHAPTER 10 OPERATING CONTROLS AND LIMITS TABLE OF CONTENTS PAGE 10.0 OPERATING CONTROLS AND LIMITS 10.0-1 CALVERT CLIFFS ISFSI USAR 10-i Rev. 8 | |||
10.0 OPERATING CONTROLS AND LIMITS Some of the information formerly contained in this chapter has been moved to other, more appropriate parts of the Updated Safety Analysis Report. Other information was duplicated in the Independent Spent Fuel Storage Installation Technical Specifications and so was deleted from this chapter. Still other information in the chapter was submitted to the Nuclear Regulatory Commission as part of the proposed Technical Specifications, but was not approved. This last information was historical in nature and was also deleted from this chapter. | |||
Table 10.3-2, referenced in the Nuclear Regulatory Commission Safety Evaluation Report dated November 25, 1992, is now Table 9.4-2. | |||
CALVERT CLIFFS ISFSI USAR 10.0-1 Rev. 15}} |
Latest revision as of 22:53, 11 November 2019
ML12275A434 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 09/18/2012 |
From: | Calvert Cliffs, Constellation Energy Nuclear Group, EDF Group |
To: | Office of Nuclear Material Safety and Safeguards |
References | |
Download: ML12275A434 (3) | |
Text
CHAPTER 10 OPERATING CONTROLS AND LIMITS LIST OF EFFECTIVE PAGES PAGE REVISION PAGE REVISION LEP 10-1 15 10-i 8 10.0-1 15 CALVERT CLIFFS ISFSI USAR LEP 10-1 Rev. 15
CHAPTER 10 OPERATING CONTROLS AND LIMITS TABLE OF CONTENTS PAGE 10.0 OPERATING CONTROLS AND LIMITS 10.0-1 CALVERT CLIFFS ISFSI USAR 10-i Rev. 8
10.0 OPERATING CONTROLS AND LIMITS Some of the information formerly contained in this chapter has been moved to other, more appropriate parts of the Updated Safety Analysis Report. Other information was duplicated in the Independent Spent Fuel Storage Installation Technical Specifications and so was deleted from this chapter. Still other information in the chapter was submitted to the Nuclear Regulatory Commission as part of the proposed Technical Specifications, but was not approved. This last information was historical in nature and was also deleted from this chapter.
Table 10.3-2, referenced in the Nuclear Regulatory Commission Safety Evaluation Report dated November 25, 1992, is now Table 9.4-2.