ML16111B131: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/20/2016
| issue date = 04/20/2016
| title = Closure of Investigation (OI 4-2015-010)
| title = Closure of Investigation (OI 4-2015-010)
| author name = Kramer J G
| author name = Kramer J
| author affiliation = NRC/RGN-IV
| author affiliation = NRC/RGN-IV
| addressee name = Edington R K
| addressee name = Edington R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED ST ATES NUCLEAR REGULATORY COMMISSION REGIO N IV 1 600 E LA M AR B L VD. ARLIN GTO N. TX 7 6 0 1 1-45 11 Mr. Randall K. Edington Exec utiv e Vice President Nuclear/CNO Arizona Public Service Company P.O. Box 52034 , MS 7602 Phoenix, AZ 85072-2034 April 20 , 2016
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD.
ARLIN GTON. TX 76011-4511 April 20, 2016 Mr. Randall K. Edington Executive Vice President Nuclear/CNO Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034


==SUBJECT:==
==SUBJECT:==
CLOSURE OF INVESTIGATION (0 14-2015-010)  
CLOSURE OF INVESTIGATION (014-2015-010)


==Dear Mr. Edington:==
==Dear Mr. Edington:==
This refers to an investigation conducted by the U.S. Nuclear Regulatory Commission
 
's (NRC's) Office of Investigations regarding acti vities at the Palo Verde Nuclear Generating Station. The Office of Investigations initiated the investigation to determine whether security personnel at Arizona Public Service Company's Palo Verde Nuclear Generating Station , Wintersburg , Arizona , were willfully inattentive while on duty by sleeping at their post. Based on the evidence developed during the investigation, the concern that security personnel at Palo Verde Nuclear Generating Station were willfully in attentive while on duty by sleeping at their post was not substantiated.
This refers to an investigation conducted by the U.S. Nuclear Regulatory Commission's (NRC's)
The NRC plans no further action related to this matter and considers this investigation closed. You should note that final NRC documents may be made ava il able to the public under the Freedom of Information Act subject to redaction of information pursuant to the Freedom of Information Act. Requests under the Freedom of Information Act should be made in accordance with 1 O CFR 9.23, Requests for Records. Information is accessible from the NRC's website at http://www.n r c.gov/r e ad ing-rm/foia/foia
Office of Investigations regarding activities at the Palo Verde Nuclear Generating Station. The Office of Investigations initiated the investigation to determine whether security personnel at Arizona Public Service Company's Palo Verde Nuclear Generating Station, Wintersburg ,
-request.html#how. In accordance with 10 CFR 2.390 of the NRC's " Agency Rules of Practice and Procedure ," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/read i ng-rm/adams.htm l. Dockets: 50-528; 50-529; 50-530 Licenses:
Arizona, were willfully inattentive while on duty by sleeping at their post.
NPF-41; NPF-51; NPF-74 S i ncerely ,
Based on the evidence developed during the investigation, the concern that security personnel at Palo Verde Nuclear Generating Station were willfully inattentive while on duty by sleeping at their post was not substantiated. The NRC plans no further action related to this matter and considers this investigation closed.
Allegations Coordination and Enforcement Staff UNITED ST ATES NUCLEAR REGULATORY COMMISSION REGIO N IV 1 600 E LA M AR B L VD. ARLIN GTO N. TX 7 6 0 1 1-45 11 Mr. Randall K. Edington Exec utiv e Vice President Nuclear/CNO Arizona Public Service Company P.O. Box 52034 , MS 7602 Phoenix, AZ 85072-2034 April 20 , 2016
You should note that final NRC documents may be made available to the public under the Freedom of Information Act subject to redaction of information pursuant to the Freedom of Information Act. Requests under the Freedom of Information Act should be made in accordance with 10 CFR 9.23, Requests for Records . Information is accessible from the NRC's website at http://www.nrc.gov/reading-rm/foia/foia-request.html#how.
In accordance with 10 CFR 2 .390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS) , accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
                                                ~~~Leader Allegations Coordination and Enforcement Staff Dockets: 50-528; 50-529; 50-530 Licenses: NPF-41 ; NPF-51 ; NPF-74
 
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD.
ARLIN GTON. TX 76011-4511 April 20, 2016 Mr. Randall K. Edington Executive Vice President Nuclear/CNO Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034


==SUBJECT:==
==SUBJECT:==
CLOSURE OF INVESTIGATION (0 14-2015-010)  
CLOSURE OF INVESTIGATION (014-2015-010)


==Dear Mr. Edington:==
==Dear Mr. Edington:==
This refers to an investigation conducted by the U.S. Nuclear Regulatory Commission
 
's (NRC's) Office of Investigations regarding acti vities at the Palo Verde Nuclear Generating Station. The Office of Investigations initiated the investigation to determine whether security personnel at Arizona Public Service Company's Palo Verde Nuclear Generating Station , Wintersburg , Arizona , were willfully inattentive while on duty by sleeping at their post. Based on the evidence developed during the investigation, the concern that security personnel at Palo Verde Nuclear Generating Station were willfully in attentive while on duty by sleeping at their post was not substantiated.
This refers to an investigation conducted by the U.S. Nuclear Regulatory Commission's (NRC's)
The NRC plans no further action related to this matter and considers this investigation closed. You should note that final NRC documents may be made ava il able to the public under the Freedom of Information Act subject to redaction of information pursuant to the Freedom of Information Act. Requests under the Freedom of Information Act should be made in accordance with 1 O CFR 9.23, Requests for Records. Information is accessible from the NRC's website at http://www.n r c.gov/r e ad ing-rm/foia/foia
Office of Investigations regarding activities at the Palo Verde Nuclear Generating Station. The Office of Investigations initiated the investigation to determine whether security personnel at Arizona Public Service Company's Palo Verde Nuclear Generating Station, Wintersburg ,
-request.html#how. In accordance with 10 CFR 2.390 of the NRC's " Agency Rules of Practice and Procedure ," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/read i ng-rm/adams.htm l. Dockets: 50-528; 50-529; 50-530 Licenses:
Arizona, were willfully inattentive while on duty by sleeping at their post.
NPF-41; NPF-51; NPF-74 S i ncerely ,
Based on the evidence developed during the investigation, the concern that security personnel at Palo Verde Nuclear Generating Station were willfully inattentive while on duty by sleeping at their post was not substantiated. The NRC plans no further action related to this matter and considers this investigation closed.
Allegations Coordination and Enforcement Staff}}
You should note that final NRC documents may be made available to the public under the Freedom of Information Act subject to redaction of information pursuant to the Freedom of Information Act. Requests under the Freedom of Information Act should be made in accordance with 10 CFR 9.23, Requests for Records . Information is accessible from the NRC's website at http://www.nrc.gov/reading-rm/foia/foia-request.html#how.
In accordance with 10 CFR 2 .390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS) , accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
                                                ~~~Leader Allegations Coordination and Enforcement Staff Dockets: 50-528; 50-529; 50-530 Licenses: NPF-41 ; NPF-51 ; NPF-74}}

Latest revision as of 19:13, 10 November 2019

Closure of Investigation (OI 4-2015-010)
ML16111B131
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/20/2016
From: John Kramer
NRC Region 4
To: Edington R
Arizona Public Service Co
References
OI 4-2015-010
Download: ML16111B131 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD.

ARLIN GTON. TX 76011-4511 April 20, 2016 Mr. Randall K. Edington Executive Vice President Nuclear/CNO Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034

SUBJECT:

CLOSURE OF INVESTIGATION (014-2015-010)

Dear Mr. Edington:

This refers to an investigation conducted by the U.S. Nuclear Regulatory Commission's (NRC's)

Office of Investigations regarding activities at the Palo Verde Nuclear Generating Station. The Office of Investigations initiated the investigation to determine whether security personnel at Arizona Public Service Company's Palo Verde Nuclear Generating Station, Wintersburg ,

Arizona, were willfully inattentive while on duty by sleeping at their post.

Based on the evidence developed during the investigation, the concern that security personnel at Palo Verde Nuclear Generating Station were willfully inattentive while on duty by sleeping at their post was not substantiated. The NRC plans no further action related to this matter and considers this investigation closed.

You should note that final NRC documents may be made available to the public under the Freedom of Information Act subject to redaction of information pursuant to the Freedom of Information Act. Requests under the Freedom of Information Act should be made in accordance with 10 CFR 9.23, Requests for Records . Information is accessible from the NRC's website at http://www.nrc.gov/reading-rm/foia/foia-request.html#how.

In accordance with 10 CFR 2 .390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS) , accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

~~~Leader Allegations Coordination and Enforcement Staff Dockets: 50-528; 50-529; 50-530 Licenses: NPF-41 ; NPF-51 ; NPF-74

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD.

ARLIN GTON. TX 76011-4511 April 20, 2016 Mr. Randall K. Edington Executive Vice President Nuclear/CNO Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034

SUBJECT:

CLOSURE OF INVESTIGATION (014-2015-010)

Dear Mr. Edington:

This refers to an investigation conducted by the U.S. Nuclear Regulatory Commission's (NRC's)

Office of Investigations regarding activities at the Palo Verde Nuclear Generating Station. The Office of Investigations initiated the investigation to determine whether security personnel at Arizona Public Service Company's Palo Verde Nuclear Generating Station, Wintersburg ,

Arizona, were willfully inattentive while on duty by sleeping at their post.

Based on the evidence developed during the investigation, the concern that security personnel at Palo Verde Nuclear Generating Station were willfully inattentive while on duty by sleeping at their post was not substantiated. The NRC plans no further action related to this matter and considers this investigation closed.

You should note that final NRC documents may be made available to the public under the Freedom of Information Act subject to redaction of information pursuant to the Freedom of Information Act. Requests under the Freedom of Information Act should be made in accordance with 10 CFR 9.23, Requests for Records . Information is accessible from the NRC's website at http://www.nrc.gov/reading-rm/foia/foia-request.html#how.

In accordance with 10 CFR 2 .390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS) , accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

~~~Leader Allegations Coordination and Enforcement Staff Dockets: 50-528; 50-529; 50-530 Licenses: NPF-41 ; NPF-51 ; NPF-74