ML17255A277: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/01/1983
| issue date = 08/01/1983
| title = Application for Amend to License DPR-18,revising Tech Specs Re Overpressure Protection Sys Requirements,Regenerant Water Treatment Subsystem & Deleting process-to-actuator Response Time Testing Requirements
| title = Application for Amend to License DPR-18,revising Tech Specs Re Overpressure Protection Sys Requirements,Regenerant Water Treatment Subsystem & Deleting process-to-actuator Response Time Testing Requirements
| author name = MAIER J E
| author name = Maier J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 4
| page count = 4
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITEDSTATESOFAMERICANUCLEARREGULATORY COMMISSION IntheMatterofRochester GasandElectricCorporation (R.E.GinnaNuclearPowerPlant,UnitNo.1))))DocketNo.50-244))APPLICATION FORAMENDMENT TOOPERATING LICENSEPursuanttoSection50.90oftheregulations oftheU.S.NuclearRegulatory Commission (the"Commission"
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                              )
),Rochester GasandElectricCorporation
                                                    )
("RG&E"),
Rochester  Gas and Electric Corporation        )  Docket No. 50-244 (R. E. Ginna Nuclear Power Plant,             )
holderofProvisional Operating LicenseNo.DPR-18,herebyrequeststhattheTechnical Specifica-tionssetforthinAppendixAtothatlicensebeamendedtoin-corporate changesintheoverpressure protection systemopera-bilityrequirements, RWSTwatervolumerequirements, responsetimetestingrequirements, servicewaterpumppoweralignment, andbatterytesting.Theproposedtechnical specification changesaresetforthinAttachment AtothisApplication.
Unit No. 1)                                     )
Asafetyevaluations aresetforthinAttachment B.TheproposedchangesdonotinvolveaIlsignificant changeinthetypes,orasignificant increaseintheamounts,ofeffluents, oranychangeintheauthorized powerlevelofthefacility.
APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the U.S.
Asdemonstrated byAttachment C,theproposedchangedoesnotinvolveasignificant hazardsconsideration.
Nuclear Regulatory Commission (the "Commission" ), Rochester Gas and Electric Corporation ("RG&E"), holder of Provisional Operating License No. DPR-18, hereby requests    that the Technical Specifica-tions set forth in Appendix A to that license be amended to in-corporate changes in the overpressure protection system opera-bility requirements,   RWST water volume requirements, response time testing requirements, service water pump power alignment, and battery testing.
Nofeeisrequiredsincethesechangeshavepreviously beenreviewedbytheNRCStaffaspartoftheSystematic Evaluation Program.8308050485 8308olPDRADOCK05000244P,...,,.PDR PLtWrkJl WHEREFORE, Applicant respectfully requeststhatAppendixAtoProvisional Operating LicenseeNo.DPR-18beamendedintheformattachedheretoasAttachment A.Rochester~Gas andElectricCorporation ByJohnE.MaierVicePresident, ElectricandSteamProduction Subscribed andsworntobeforemeonthis~dayofAugust,1983.LYNNI.HAUCKNOTARYPUBLIC.StateofN.Y.,MonroeCguptyMyCommission ExpiresMarch30,19tYf.
The proposed technical specification changes are set forth in Attachment A to this Application. A safety evaluations are set forth in Attachment B. The proposed changes do not involve a Il significant change in the types, or a significant increase in the amounts, of effluents, or any change in the authorized power level of the facility. As demonstrated by Attachment C, the proposed change does not involve a significant hazards consideration. No fee is required since these changes have previously been reviewed by the NRC Staff as part of the Systematic Evaluation Program.
1("t1'vlh(ll}}
8308050485 8308ol P,...,,
PDR ADOCK 05000244
                .PDR
 
P Lt r
W    k J  l
 
WHEREFORE,             Applicant respectfully requests that Appendix          A to Provisional Operating                     Licensee  No. DPR-18 be amended  in the form attached hereto as Attachment A.
Rochester~Gas and Electric Corporation By John E. Maier Vice President, Electric and Steam  Production Subscribed and sworn to before                        me on  this      ~
day    of August, 1983.
LYNN I. HAUCK NOTARY PUBLIC. State of N.Y., Monroe Cgupty My Commission Expires March 30, 19tYf.
 
1( "t 1'
v lh
(
ll}}

Latest revision as of 08:37, 10 November 2019

Application for Amend to License DPR-18,revising Tech Specs Re Overpressure Protection Sys Requirements,Regenerant Water Treatment Subsystem & Deleting process-to-actuator Response Time Testing Requirements
ML17255A277
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/01/1983
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17255A274 List:
References
NUDOCS 8308050485
Download: ML17255A277 (4)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

Rochester Gas and Electric Corporation ) Docket No. 50-244 (R. E. Ginna Nuclear Power Plant, )

Unit No. 1) )

APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the regulations of the U.S.

Nuclear Regulatory Commission (the "Commission" ), Rochester Gas and Electric Corporation ("RG&E"), holder of Provisional Operating License No. DPR-18, hereby requests that the Technical Specifica-tions set forth in Appendix A to that license be amended to in-corporate changes in the overpressure protection system opera-bility requirements, RWST water volume requirements, response time testing requirements, service water pump power alignment, and battery testing.

The proposed technical specification changes are set forth in Attachment A to this Application. A safety evaluations are set forth in Attachment B. The proposed changes do not involve a Il significant change in the types, or a significant increase in the amounts, of effluents, or any change in the authorized power level of the facility. As demonstrated by Attachment C, the proposed change does not involve a significant hazards consideration. No fee is required since these changes have previously been reviewed by the NRC Staff as part of the Systematic Evaluation Program.

8308050485 8308ol P,...,,

PDR ADOCK 05000244

.PDR

P Lt r

W k J l

WHEREFORE, Applicant respectfully requests that Appendix A to Provisional Operating Licensee No. DPR-18 be amended in the form attached hereto as Attachment A.

Rochester~Gas and Electric Corporation By John E. Maier Vice President, Electric and Steam Production Subscribed and sworn to before me on this ~

day of August, 1983.

LYNN I. HAUCK NOTARY PUBLIC. State of N.Y., Monroe Cgupty My Commission Expires March 30, 19tYf.

1( "t 1'

v lh

(

ll