ML17261A823: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 4
| page count = 4
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:,-': ""AC CELE RATED DI BUTI ON DEMONSTRATION SYSTEM REGULATOR NFORMATION DISTRIBUTION TEM (RIDS)ACCESSION NBR:8901260321 DOC.DATE: 89/01/17 NOTARIZED:
{{#Wiki_filter:,-': ""AC CELE RATED         DI       BUTION        DEMONSTRATION             SYSTEM REGULATOR     NFORMATION DISTRIBUTION           TEM (RIDS)
NO DOCKET FACIL:50-f44 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTEf.NAME AUTHOR AFFILIATION SMITHiR.E.
ACCESSION NBR:8901260321         DOC.DATE: 89/01/17       NOTARIZED: NO             DOCKET FACIL:50-f44 Robert Emmet     Ginna   Nuclear Plant, Unit 1, Rochester       G 05000244 AUTEf.NAME         AUTHOR   AFFILIATION SMITHiR.E.         Rochester Gas & Electric Corp.
Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION STAHLEiC.Associate Director for Projects (Post 870411)
RECIP.NAME         RECIPIENT AFFILIATION STAHLEiC.           Associate Director for Projects (Post 870411)


==SUBJECT:==
==SUBJECT:==
Responds to Generic Ltr 85-09,submitting addition of item 37 on page 4.1-7&renumbering of subsequent items.DISTRIBUTION CODE: A055D COPIES.RECEIVED:LTR
Responds   to Generic Ltr 85-09,submitting addition of item             37 on page   4.1-7   & renumbering   of subsequent items.
/ENCL J SIZE: 3%TITLE: OR/Licensing Submittal:
DISTRIBUTION CODE: A055D       COPIES. RECEIVED:LTR     / ENCL   J   SIZE: 3%
Salem ATWS Events GL-83-28 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
TITLE: OR/Licensing Submittal: Salem       ATWS   Events GL-83-28 D
D 05000244 RECIPIENT ID CODE/NAME PDl-3 LA STAHLEiC INTERNAL: ARM/DAF/LFMB NRR/DEST/ESB 8D NRR/DEST/PSB 8D NRR/DOEA/GCB 11 OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 0 1 1 1 0 1 1 1 0.1 0 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD NRR LASHER,D NRR/DEST/ICSB 7 NRR/DLPQ/QAB 10 NUJ30CS-ABSTRACT EG F 01 NRC PDR COPIES LTTR ENCL 3 3 1 1 1 1 1 0 1 1 1 1 1 1 P~p f7$05 77gf f~Ri/h NVZE IO ALL''RIBS" RECIPIENTS:
NOTES:License Exp date in accordance       with 10CFR2,2.109(9/19/72).           05000244 RECIPIENT           COPIES            RECIPIENT          COPIES ID CODE/NAME          LTTR ENCL        ID CODE/NAME         LTTR ENCL PDl-3 LA                 1    0      PD1-3 PD                3    3 STAHLEiC                 1    1 INTERNAL: ARM/DAF/LFMB               1    0      NRR LASHER,D            1    1 NRR/DEST/ESB 8D         1    1      NRR/DEST/ICSB    7      1    1 NRR/DEST/PSB 8D          1     0. NRR/DLPQ/QAB 10          1    0 NRR/DOEA/GCB 11          1    0      NUJ30CS-ABSTRACT         1    1 OGC/HDS2                1    0      EG F           01       1     1 RES/DSIR/EIB            1     1 EXTERNAL: LPDR                      1     1     NRC PDR                  1     1 NSIC                    1     1 Ri P~ p f7$ 05   77gf f~
PIZASE HELP US I0 REHJCE HASTE!CXRGRCI'%HE DOCGMERZ CXÃZEKL DESK, RDCN Pl-37 (EXT.20079)TO EIaIMINATE YMR NAME PMK DIBTJGBVI!ION LXSTB FOR DOCUMENX8 KXJ DGNiT NEED!TOTAL NUMBER OF COPIES REQUIRED:.LTTR 19 ENCL 13 i IIIIIIIIIIII ZZZium Sir II IIIIIIIIII szu zirszttzz 0 ROCHESTER GAS AND ELECTRIC CORPORATION
                                                                                                /
~89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 ROBERT E.SMITH Vice President Producsion and Engineering January 17, 1989 TELEPHONE ANEA cOOET re 546-2700 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Mr.Carl Stahle PWR Project Directorate No.1 Washington, D.C.20555  
h NVZE IO ALL ''RIBS" RECIPIENTS:
PIZASE HELP US I0 REHJCE HASTE! CXRGRCI'%HE DOCGMERZ CXÃZEKL DESK, RDCN Pl-37 (EXT. 20079) TO EIaIMINATE YMR NAME PMK DIBTJGBVI!ION LXSTB FOR DOCUMENX8 KXJ DGNiT NEED!
TOTAL NUMBER OF COPIES REQUIRED:.LTTR           19   ENCL   13
 
0 i Sir IIIIIIIIIIII II ZZZium IIIIIIIIII szu           zirszttzz ROCHESTER GAS AND ELECTRIC CORPORATION                 ~ 89 EAST AVENUE, ROCHESTER, N. Y. 14649-0001 ROBERT       E. SMITH                                                               TELEPHONE Vice President Producsion and Engineering January 17, 1989                   ANEA cOOET re 546-2700 U.S. Nuclear Regulatory Commission Document                     Control Desk Attn: Mr. Carl Stahle PWR Project Directorate       No. 1 Washington, D.C.                         20555


==Subject:==
==Subject:==
Technical Specification for Reactor Trip Breakers Generic Letter 85-09 R.E.Ginna Nuclear Power Plant Docket No.50-244  
Technical Specification for Reactor Trip Breakers Generic Letter 85-09 R.E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear Mr. Stahle:==
 
Rochester          Gas    and  Electric originally submitted                    an Application for Amendment to the Ginna Operating License dated March 10, 1987 to reflect requirements for operation and testing of the reactor trip breakers. Resubmittals of this proposed Amendment were made on January 26, 1988 and August 26, 1988 to reflect changes requested by the NRC and by the fact that the format required changing following acceptance by the NRC        -of Amendment No. 24.
Subsequent          to the August 26, 1988 resubmittal, Amendment No. 30 was approved, by the NRC.                        The attachments to this letter reflect only the addition of item 37 on Page 4.1-7 and the renumbering of subsequent items.                            Other than these changes, this submittal remains as 1988            letter.
it was proposed in the August 26, As with the              original proposal, we request that the effective date of                      the approved Technical Specification be one month from the                          date of approval to allow surveillance procedures to be                        finalized  and    implemented    in  an      orderly manner.
Very  truly yours, O'TI0126032i 8901                    i7 PDR      ADDCN,              050002 P                                    PN                        obert E.      i JRJN015 Attachments
 
xc: Ms. Donna Ross New York State Energy Office U.S. Nuclear Regulatory Commission Region 1 475 Allendale  Road King of Prussia., PA 19406 Ginna Senior Resident Inspector


==Dear Mr.Stahle:==
ATTACH1IJD&T A Revise Appendix   A Technical Specifications by removing the pages identified below and inserting the enclosed pages.
Rochester Gas and Electric originally submitted an Application for Amendment to the Ginna Operating License dated March 10, 1987 to reflect requirements for operation and testing of the reactor trip breakers.Resubmittals of this proposed Amendment were made on January 26, 1988 and August 26, 1988 to reflect changes requested by the NRC and by the fact that the format required changing following acceptance by the NRC-of Amendment No.24.Subsequent to the August 26, 1988 resubmittal, Amendment No.30 was approved, by the NRC.The attachments to this letter reflect only the addition of item 37 on Page 4.1-7 and the renumbering of subsequent items.Other than these changes, this submittal remains as it was proposed in the August 26, 1988 letter.As with the original proposal, we request that the effective date of the approved Technical Specification be one month from the date of approval to allow surveillance procedures to be finalized and implemented in an orderly manner.Very truly yours, O'TI0126032i 8901 i7 PDR ADDCN, 050002 P PN obert E.i JRJN015 Attachments xc: Ms.Donna Ross New York State Energy Office U.S.Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia., PA 19406 Ginna Senior Resident Inspector ATTACH1IJD&T A Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages.Remove Insert.3.5-8 3.5-15 4.1-7 3.5-8 3.5-15 4.1-7 4.1-7a}}
Remove                       Insert.
3.5-8                       3.5-8 3.5-15                      3.5-15 4.1-7                        4.1-7 4.1-7a}}

Latest revision as of 08:19, 10 November 2019

Application for Amend to License DPR-18,adding Item 37 on Page 4.1-7 & Renumbering Subsequent Items Re Reactor Trip Breakers
ML17261A823
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/17/1989
From: Rich Smith
ROCHESTER GAS & ELECTRIC CORP.
To: Stahle C
Office of Nuclear Reactor Regulation
Shared Package
ML17261A824 List:
References
GL-85-09, GL-85-9, NUDOCS 8901260321
Download: ML17261A823 (4)


Text

,-': ""AC CELE RATED DI BUTION DEMONSTRATION SYSTEM REGULATOR NFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR:8901260321 DOC.DATE: 89/01/17 NOTARIZED: NO DOCKET FACIL:50-f44 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTEf.NAME AUTHOR AFFILIATION SMITHiR.E. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION STAHLEiC. Associate Director for Projects (Post 870411)

SUBJECT:

Responds to Generic Ltr 85-09,submitting addition of item 37 on page 4.1-7 & renumbering of subsequent items.

DISTRIBUTION CODE: A055D COPIES. RECEIVED:LTR / ENCL J SIZE: 3%

TITLE: OR/Licensing Submittal: Salem ATWS Events GL-83-28 D

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDl-3 LA 1 0 PD1-3 PD 3 3 STAHLEiC 1 1 INTERNAL: ARM/DAF/LFMB 1 0 NRR LASHER,D 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 7 1 1 NRR/DEST/PSB 8D 1 0. NRR/DLPQ/QAB 10 1 0 NRR/DOEA/GCB 11 1 0 NUJ30CS-ABSTRACT 1 1 OGC/HDS2 1 0 EG F 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 Ri P~ p f7$ 05 77gf f~

/

h NVZE IO ALL RIBS" RECIPIENTS:

PIZASE HELP US I0 REHJCE HASTE! CXRGRCI'%HE DOCGMERZ CXÃZEKL DESK, RDCN Pl-37 (EXT. 20079) TO EIaIMINATE YMR NAME PMK DIBTJGBVI!ION LXSTB FOR DOCUMENX8 KXJ DGNiT NEED!

TOTAL NUMBER OF COPIES REQUIRED:.LTTR 19 ENCL 13

0 i Sir IIIIIIIIIIII II ZZZium IIIIIIIIII szu zirszttzz ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N. Y. 14649-0001 ROBERT E. SMITH TELEPHONE Vice President Producsion and Engineering January 17, 1989 ANEA cOOET re 546-2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Mr. Carl Stahle PWR Project Directorate No. 1 Washington, D.C. 20555

Subject:

Technical Specification for Reactor Trip Breakers Generic Letter 85-09 R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Stahle:

Rochester Gas and Electric originally submitted an Application for Amendment to the Ginna Operating License dated March 10, 1987 to reflect requirements for operation and testing of the reactor trip breakers. Resubmittals of this proposed Amendment were made on January 26, 1988 and August 26, 1988 to reflect changes requested by the NRC and by the fact that the format required changing following acceptance by the NRC -of Amendment No. 24.

Subsequent to the August 26, 1988 resubmittal, Amendment No. 30 was approved, by the NRC. The attachments to this letter reflect only the addition of item 37 on Page 4.1-7 and the renumbering of subsequent items. Other than these changes, this submittal remains as 1988 letter.

it was proposed in the August 26, As with the original proposal, we request that the effective date of the approved Technical Specification be one month from the date of approval to allow surveillance procedures to be finalized and implemented in an orderly manner.

Very truly yours, O'TI0126032i 8901 i7 PDR ADDCN, 050002 P PN obert E. i JRJN015 Attachments

xc: Ms. Donna Ross New York State Energy Office U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia., PA 19406 Ginna Senior Resident Inspector

ATTACH1IJD&T A Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages.

Remove Insert.

3.5-8 3.5-8 3.5-15 3.5-15 4.1-7 4.1-7 4.1-7a