{{#Wiki_filter:NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 1 OF 23 Underground Piping and Tanks Inspection and Monitoring ProgramProcedure Contains NMM eB REFLIB Forms:
{{#Wiki_filter:United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.
YESNO Effective DateProcedure Owner:Title:
In the Matter of:
Site:Steven Woods Manager - EP&C
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: ENT000599-00-BD01                  Identified: 12/10/2012 Admitted: 1/15/2013                          Withdrawn:                                              ENT000599 Rejected:                                      Stricken:                                            Submitted: December 6, 2012 Other:
NUCLEAR                       QUALITY RELATED        EN-DC-343            REV. 6 MANAGEMENT MANUAL                        INFORMATIONAL USE              PAGE 1 OF 23 Underground Piping and Tanks Inspection and Monitoring Program Procedure Contains NMM eB REFLIB Forms: YES                          NO Effective         Procedure Owner:             Steven Woods            Governance Owner:      Oscar Limpias Date          Title:                       Manager - EP&C          Title:                VP Engineering 11/30/2012        Site:                        PNPS                    Site:                 HQN Exception Site              Site Procedure Champion                          Title Date*
ANO              William Greeson                Manager, Programs & Components N/A                  BRP N/A                  CNS              Troy Barker                    Manager, Programs & Components GGNS              Linda Patterson                Manager, Programs & Components IPEC              Michael Tesoriero              Manager, Programs & Components JAF              Kevin Irving                    Manager, Programs & Components PLP              James Miksa                    Manager, Programs & Components PNPS              Steven Woods                   Manager, Programs & Components RBS              Charles Coleman                Manager, Programs & Components VY              George Wierzbowski              Manager, Programs & Components W3              Ran Gilmore                    Manager, Programs & Components N/A                    NP HQN              Joe Abisamra                    Chief Engineer Site and NMM Procedures Canceled or Superseded By This Revision Process Applicability Exclusion: All Sites:
Specific Sites: ANO            BRP        GGNS          IPEC  JAF    PLP      PNPS    RBS    VY    W3 Change Statement Revision 6 is a revision to assure consistency with CEP-UPT-0100 and NEI 09-14.
Added/updated few references in section 2 Added/updated definitions in section 3 to match those included in NEI 09-14 Rev 1 Added responsibility in section 4 for System Engineering to report in the INPO Consolidated Entry System (ICES - formerly EPIX) ALL identified underground pipe/tank leakages Relaxed requirement for applying API 570 when inspecting Piping/Tanks used to convey petroleum products in section 5.1 Added/updated few interfaces in section 6.0 Updated section 8.0 Revised Attachment 9.1 to include the option of using industry software.
Updated Attachment 9.2 Made some editorial changes
                        *Requires justification for the exception:


PNPSGovernance Owner: Title:
NUCLEAR                             QUALITY RELATED                      EN-DC-343                  REV. 6 MANAGEMENT MANUAL                            INFORMATIONAL USE                                PAGE 2 OF 23 Underground Piping and Tanks Inspection and Monitoring Program
Site:Oscar Limpias VP Engineering HQN 11/30/2012 Exception Date*SiteSite Procedure Champion Title ANO William Greeson Manager, Programs & Components N/A BRPN/A CNS Troy Barker Manager, Programs & Components GGNS Linda Patterson Manager, Programs & Components IPECMichael Tesoriero Manager, Programs & Components JAFKevin Irving Manager, Programs & Components PLPJames Miksa Manager, Programs & Components  PNPSSteven Woods Manager, Programs & Components RBSCharles Coleman Manager, Programs & Components VYGeorge Wierzbowski Manager, Programs & Components W3 Ran Gilmore Manager, Programs & Components N/A NPHQN Joe Abisamra Chief Engineer Site and NMM Procedures Canceled or Superseded By This RevisionProcess A pplicability Exclusion:
_____________________________________________________________________
All Sites:  Specific Sites: ANO BRP  GGNS  IPEC  JAF  PLP  PNPS  RBS  VY  W3 Change StatementRevision 6 is a revision to assure consistency with CEP-UPT-0100 and NEI 09-14. Added/updated few references in section 2 Added/updated definitions in section 3 to match those included in NEI 09-14 Rev 1 Added responsibility in section 4 for System Engineering to report in the INPO Consolidated Entry System (ICES - formerly EPIX) ALL identified underground pipe/tank leakages  Relaxed requirement for applying API 570 when inspecting Piping/Tanks used to convey petroleum products in section 5.1 Added/updated few interfaces in section 6.0 Updated section 8.0 Revised Attachment 9.1 to include the option of using industry software. Updated Attachment 9.2 Made some editorial changes *Requires justification for the exception:
TABLE OF CONTENTS Section        Title                                                                                   Page 1.0  PURPOSE        .................................................................................... 3
ENT000599 Submitted: December 6 , 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of
: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3)
ASLBP #:07-858-03-LR-BD01 Docket #:05000247 l 05000286 Exhibit #:
Identified:
Admitted: Withdrawn:
Rejected: Stricken: Other: ENT000599-00-BD0112/10/2012 1/15/2013 NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 2 OF 23 Underground Piping and Tanks Inspection and Monitoring Program_____________________________________________________________________TABLE OF CONTENTSSection  Title Page1.0PURPOSE  ....................................................................................  


==32.0REFERENCES==
==2.0  REFERENCES==
  .................................................................................. 33.0DEFINITIONS.................................................................................... 54.0RESPONSIBILITIES ......................................................................... 85.0DETAILS  .................................................................................. 116.0INTERFACES ................................................................................. 187.0RECORDS  .................................................................................. 198.0SITESPECIFICCOMMITMENTS .................................................... 199.0ATTACHMENTS ............................................................................. 20 ATTACHMENT 9.1ROADMAP FOR UNDERGROUND PIPING AND TANKS INSPECTION AND MONITORING PROGRAM ............................................ 21 ATTACHMENT 9.2LIST OF AFFECTED UNDERGROUND PIPING SYSTEMS AS PER LICENSE RENEWAL APPLICATION (LRA) ............................................. 22_____________________________________________________________________
  .................................................................................. 3 3.0  DEFINITIONS.................................................................................... 5 4.0  RESPONSIBILITIES ......................................................................... 8 5.0  DETAILS        .................................................................................. 11 6.0  INTERFACES ................................................................................. 18 7.0  RECORDS        .................................................................................. 19 8.0  SITE SPECIFIC COMMITMENTS .................................................... 19 9.0  ATTACHMENTS ............................................................................. 20 ATTACHMENT 9.1      ROADMAP FOR UNDERGROUND PIPING AND T ANKS INSPECTION AND MONITORING PROGRAM ............................................ 21 ATTACHMENT 9.2      LIST OF AFFECTED UNDERGROUND PIPING SYSTEMS AS PER LICENSE RENEWAL APPLICATION (LRA) ............................................. 22
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 3 OF 23 Underground Piping and Tanks Inspection and Monitoring Program1.0 PURPOSE [1] This procedure provides the requirements for each site to develop its own site specific Underground Piping and Tanks (UPT) Inspection and Monitoring Program (hereafter referred to as the Program).   [2] This procedure provides a set of recommendations for Entergy nuclear power plants to use in implementing an effective program to detect and mitigate life-limiting degradation that may occur in underground piping systems and tanks. For plants that have received a renewed operating license, this procedure incorporates commitments for the Underground Piping and Tanks program. [LO-LAR-2008-0048 CA-0002, CA-0046] [RLC LO-LAR-2009-00244 CA-15] [RC07.2029.01] [NL-09-111] [P-16911] [A-17827] [A-17910]. [3] This procedure is intended to supplement programs currently established for monitoring internal Microbiologically Influenced Corrosion (MIC) or Flow Accelerated Corrosion (FAC) in systems as described in EN-DC-340 and EN-DC-315. [4] The Program consists of inspection and monitoring of selected operational underground piping and tanks for external corrosion, including crevice, general corrosion, microbiologically influenced corrosion (MIC), pitting corrosion, and other age-related degradation. However, coordination with the MIC and FAC Program owners must continuously be achieved to assure the overall health (internal and external) of the underground piping and tanks. [5] The details of the risk ranking criteria, reasonable assurance guidance, recommendations for inspection, monitoring, and mitigation portion of this Program are contained in Program Section CEP-UPT-0100. This procedure and CEP-UPT-0100 contain the required elements to provide guidance and recommendations for a programmatic approach to help Program Owners prioritize inspections of underground segments, evaluate the inspection results, make fitness for service decisions, select a repair technique where required, and take preventive measures to reduce the likelihood and consequence of failures.  
_____________________________________________________________________
 
NUCLEAR                 QUALITY RELATED    EN-DC-343            REV. 6 MANAGEMENT MANUAL                  INFORMATIONAL USE          PAGE 3 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 1.0 PURPOSE
[1] This procedure provides the requirements for each site to develop its own site specific Underground Piping and Tanks (UPT) Inspection and Monitoring Program (hereafter referred to as the Program).
[2] This procedure provides a set of recommendations for Entergy nuclear power plants to use in implementing an effective program to detect and mitigate life-limiting degradation that may occur in underground piping systems and tanks. For plants that have received a renewed operating license, this procedure incorporates commitments for the Underground Piping and Tanks program. [LO-LAR-2008-0048 CA-0002, CA-0046]
[RLC LO-LAR-2009-00244 CA-15] [RC07.2029.01] [NL-09-111] [P-16911] [A-17827] [A-17910].
[3] This procedure is intended to supplement programs currently established for monitoring internal Microbiologically Influenced Corrosion (MIC) or Flow Accelerated Corrosion (FAC) in systems as described in EN-DC-340 and EN-DC-315.
[4] The Program consists of inspection and monitoring of selected operational underground piping and tanks for external corrosion, including crevice, general corrosion, microbiologically influenced corrosion (MIC), pitting corrosion, and other age-related degradation. However, coordination with the MIC and FAC Program owners must continuously be achieved to assure the overall health (internal and external) of the underground piping and tanks.
[5] The details of the risk ranking criteria, reasonable assurance guidance, recommendations for inspection, monitoring, and mitigation portion of this Program are contained in Program Section CEP-UPT-0100. This procedure and CEP-UPT-0100 contain the required elements to provide guidance and recommendations for a programmatic approach to help Program Owners prioritize inspections of underground segments, evaluate the inspection results, make fitness for service decisions, select a repair technique where required, and take preventive measures to reduce the likelihood and consequence of failures.


==2.0 REFERENCES==
==2.0 REFERENCES==
[1] NUREG-1801, Generic Aging Lessons Learned (GALL) Report, Rev. 2, December 2010[2] Entergy Quality Assurance Program Manual (QAPM) [3] NUREG-6876, Risk-Informed Assessment of Degraded Buried Piping Systems in Nuclear Power Plants, June 2005 NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 4 OF 23 Underground Piping and Tanks Inspection and Monitoring Program2.0 Cont.[4] 10 CFR 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants[5] 10 CFR 50, Appendix B Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants [6] ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants [7] NUMARC 93-01 (NEI 93-01), Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants,April 2011 [8] NEI 95-10, Industry Guideline for Implementing the Requirements of 10 CFR Part 54 -The License Renewal Rule,June 2005 [9] NEI 07-07 Final, Industry Ground Water Protection Initiative, Final Guidance  Document, August 2007  [10] EPRI 1021175, Recommendations for an Effective Program to Control the Degradation of Buried and Underground Piping and Tanks (1016456 Rev 1), December 2010  [11] EPRI Report 1011829, Condition Assessment of Large-Diameter Buried Piping, Phase 2: Vehicle Design and Construction, December 2005  [12] INPO Operating Experience Digest OED 2007-09, External Degradation of Buried Piping, April 2007 [13] EPRI 1011905, Cathodic Protection System Application and Maintenance Guide, December 2005 [14] EPRI Report 1021470, Balance of Plant Corrosion - The Buried Pipe Reference Guide, December 2010 [15] NUREG-1801, Generic Aging Lessons Learned (GALL) Report, Rev 0 April 2001, Rev1 September 2005, and Rev 2 December 2010. [16] API Standard 570, In-Service Inspection, Rating, Repair, and Alteration of Piping Systems, Third Edition, November 2009 [17] NACE Standard Recommended Practice RP-0502-2002, Pipeline External Corrosion Direct Assessment Methodology NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 5 OF 23 Underground Piping and Tanks Inspection and Monitoring Program2.0 Cont.  [18] NACE Standard Practice RP0169-2007, Control of External Corrosion on Underground or Submerged Metallic Piping Systems [19] NACE Standard Test Method TM0497-2002, Measurement Techniques Related to Criteria for Cathodic Protection on Underground or Submerged Metallic Piping Systems [20] NEI-09-14 Rev 1 - Nuclear Energy Institute, Guideline for the Management of Underground Piping and Tank Integrity, December 2010  [21] Engineering Report ECH-EP-10-00001, Radiological SSC Groundwater Initiative Risk Evaluation Criteria, June 2010  [22] EPRI 1021561, Inspection Methodologies for Buried Piping and Tanks, August 2010 [23] Standard EN-EP-S-002-MULTI, Underground Piping and Tanks General Visual Inspection [24] EPRI 1016276, An Assessment of Industry Needs for Control of Degradation in Buried Pipe, March 2008 [25] EPRI 1000115, Evaluation of Torsional Guided Waves for Inspection of Service Water Piping, December 2000 [26] EPRI 1019115, Buried Pipe Guided Wave Examination Reference Document, October 2009 [27] EPRI 1019157, Plant Support Engineering: Guideline on Nuclear Safety-Related Coatings, Revision 2 (Formerly TR-109937 and 1003102), December 2009 [28] CEP-NDE-0100, Administration and Control of NDE [29] INPO 12-009, ICES Reporting Requirements and Standards, August 2012 3.0 DEFINITIONS  [1] Baseline Inspection - The inspection of a new or replaced pipe or component that has not previously been involved in plant operations. [2] Buried Piping and Tanks - Piping and tanks that are below grade and in direct contact with the soil or concrete (e.g. a wall penetration or embedded in concrete).
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 6 OF 23 Underground Piping and Tanks Inspection and Monitoring Program3.0 Cont.  [3] Cathodic Protection (CP) - The application of a current to the outside surface of the pipe with the purpose of reducing the susceptibility of exposed segments of buried pipe (exposure caused by coating deterioration, damage or voids) to corrosion. The application of a low voltage residual current causes a shift (with respect to the anode) of the electrolytic potential at pipe exposed sites and thereby places the pipe in a more protected, less corrosive environment. [4] Component - A portion of an underground piping or tank system with defined boundaries. [5] Concrete Piping - Piping that is manufactured from concrete or cementitious material with or without metallic reinforcement. Concrete piping is generally used for large diameter lines such as the water intake piping from sources of cooling water (e.g., lakes, rivers, and reservoirs).  [6] Corrosion - The chemical or electrochemical reaction between a material, usually a metal, and its environment that produces a deterioration of the material and its properties. A common example is the oxidation of an iron-based alloy exposed to water (rusting). [7] Crevice Corrosion - Localized corrosion that may occur in areas of stagnant solutions existing in crevices, joints, and contacts between metals or between metals and non-metals. [8] Direct Examination - A Nondestructive Evaluation (NDE) examination where the NDE sensor(s) is in immediate contact with or in close proximity to the section of the component being examined. Results provide some degree of quantitative measurement of wall thickness or discontinuity size. Direct examinations can be performed from the interior or exterior surface. Detection and characterization capabilities vary by NDE method as well as by specific NDE technique. Examples of NDE methods include ultrasonics, eddy current, radiography, visual and various electromagnetic techniques. Visual examinations [das1]should be supplemented with NDE or engineering judgment that addresses the condition of the pipe wall. [9] Erosion - Deterioration of materials by the abrasive action of moving fluids or gases, usually accelerated by the presence of solid particles or gases in suspension. When corrosion occurs simultaneously, the term Erosion/Corrosion is often used. [10] General Corrosion - This type of corrosion attacks the entire un-protected surface in a uniform manner. Of all types of corrosion, this is the least damaging and easiest to determine or quantify the corrosion rate.  (Also referred to as uniform corrosion).
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 7 OF 23 Underground Piping and Tanks Inspection and Monitoring Program3.0 Cont.[11] Holidays - Discontinuities in coatings, (e.g., pinholes, voids) [12] Indirect Inspection - Survey techniques used to assess the likelihood of degradation without having direct access to the section of the component being examined. These inspections typically measure surrounding conditions that may be indicative of corrosion or damage. Results are typically qualitative and less accurate than direct examinations. Examples of indirect inspection methods include over-the-line surveys and for the purpose of this document, long range guided wave. [13] Initial Inspection - The inspection of a pipe or component that has been in-service but has not been previously inspected.. [14] Inspection Program - A systematic evaluation of in-scope underground components using various techniques [e.g., ultrasonic testing (UT), radiographic testing (RT), visual testing (VT), leak testing (LT), eddy current testing (ET)].  [15] Licensed Material - Licensed material (from 10 CFR 20.1003) (or licensed radioactive material) means source material, special nuclear material, or byproduct material received, possessed, used, transferred or disposed of under a general or specific license issued by the Commission and/or by the state [e.g. State Pollution Discharge Elimination System (SPDES)]. Components containing radioactive licensed material covered under NEI 09-14 should be consistent with those identified in NEI 07-07. [16] Microbiologically Influenced Corrosion (MIC) - Corrosion caused by the presence and/or activities of microorganisms in biofilms on the surface of the material. Microorganisms have been observed in a variety of environments that include seawater, natural freshwater (lakes, rivers and wells), soils and sediment. Microbiological organisms include bacteria, fungi and algae. [17] Opportunistic Inspection - An inspection performed when underground components are exposed or excavated due to another activity providing an opportunity to inspect and document the results for a program component. [18] Pitting - A form of localized corrosion that results in the formation of small, sharp edged cavities in a metal. [19] Quality Assurance Classification - For the purposes of this procedure, Safety Class or QA Category is used to designate safety classification. Refer to EN-DC-167 for a summary of the corresponding legacy classifications formerly used at each plant and how they are classified as safety related, augmented, and non-safety related.
[20] Redox - Of or relating to oxidation-reduction.
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 8 OF 23 Underground Piping and Tanks Inspection and Monitoring Program3.0 Cont.[21] Resistivity - The longitudinal electrical resistance of a uniform rod of unit length and unit cross-sectional area. The reciprocal of conductivity. [22] Soil Resistivity Measurement - A method of subsurface detection which measures changes in conductivity by passing electrical current through ground soils. This is generally a consequence of moisture content, and in this way, buried features can be detected by differential retention of groundwater. [23] Subsequent Re-inspection - The inspection of a component that has been previously subjected to a Baseline Inspection and/or an Initial Inspection. [24] Tunnel - A structure that is outside of a building, below grade, designed to accommodate personnel, and not routinely accessible. [25] Underground Piping - All piping that is below grade, not accessible, and outside of buildings. Underground piping may or may not be in direct contact with soil or concrete. This includes piping that is directly buried and those that are embedded in concrete or located in underground concrete vaults, tunnels, or guard pipes. Buried piping is considered to be a subset of underground piping [26] Underground Tank - All tanks that are outside of buildings and sufficiently below grade such that there is a reasonable possibility that leakage from inaccessible portions of the tank may not be detected. These tanks are below grade and may or may not be in direct contact with soil or concrete. This includes tanks that are directly buried and those that are embedded in concrete or located in underground concrete vaults or tunnels. [27] Uniform Corrosion - See General Corrosion.
[28] Vault - A structure that is outside of a building, below grade, not designed to accommodate personnel and not routinely accessible. [29] Visual Inspection - involve direct observation by inspectors or by the use of remote visual inspection devices. Visual inspections may include the use of pit gauges to assess the extent of any degradation noted. 4.0 RESPONSIBILITIES 


[1] The Director, Engineering (Headquarters), is responsible for: a) Providing corporate management, governance, and oversight of UPT Program activities from a fleet perspective.
[1] NUREG-1801, Generic Aging Lessons Learned (GALL) Report, Rev. 2, December 2010
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 9 OF 23 Underground Piping and Tanks Inspection and Monitoring Program4.0 [1] Cont. b) Ensuring fleet focus and alignment of the UPT Program implementation. c) Monitoring UPT Program health, assessment results, and ensuring fleet coordination of UPT Program activities.
[2] Entergy Quality Assurance Program Manual (QAPM)
[2] The Director, Engineering (Site), is responsible for: a) Overall development, maintenance, administration, and control of the UPT Program. b) Ensuring coordination of the UPT Program activities among the various departments involved at the applicable site.
[3] NUREG-6876, Risk-Informed Assessment of Degraded Buried Piping Systems in Nuclear Power Plants, June 2005
[3] The Manager, Programs & Components (Headquarters), is responsible for: a) Providing governance for the UPT Program across the fleet. b) Standardizing the UPT Program from site-to-site. c) Resolving conflicts that may arise in the interpretation of this procedure.
 
[4] The Manager, Programs & Components(Site), is responsible for: a) Implementing all aspects of this Program at the station.
NUCLEAR              QUALITY RELATED    EN-DC-343          REV. 6 MANAGEMENT MANUAL              INFORMATIONAL USE          PAGE 4 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 2.0 Cont.
b) Ensuring that all activities associated with this Program are performed in a timely and cost efficient manner commensurate with the risk and safety significance of the issue. c) Allocating adequate resources as necessary to implement this Program. d) Ensuring adequate training of UPT Program owners, site implementers, and backup personnel.
[4]    10 CFR 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants
[5] The Supervisor, Programs & Components (Headquarters), is responsible for: a) Providing management oversight of the UPT Program across the fleet.
[5]    10 CFR 50, Appendix B Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants
[6]    ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants
[7]    NUMARC 93-01 (NEI 93-01), Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, April 2011
[8]    NEI 95-10, Industry Guideline for Implementing the Requirements of 10 CFR Part 54
      -The License Renewal Rule, June 2005
[9]    NEI 07-07 Final, Industry Ground Water Protection Initiative, Final Guidance Document, August 2007
[10]  EPRI 1021175, Recommendations for an Effective Program to Control the Degradation of Buried and Underground Piping and Tanks (1016456 Rev 1),
December 2010
[11]  EPRI Report 1011829, Condition Assessment of Large-Diameter Buried Piping, Phase 2: Vehicle Design and Construction, December 2005
[12]  INPO Operating Experience Digest OED 2007-09, External Degradation of Buried Piping, April 2007
[13]  EPRI 1011905, Cathodic Protection System Application and Maintenance Guide, December 2005
[14]  EPRI Report 1021470, Balance of Plant Corrosion - The Buried Pipe Reference Guide, December 2010
[15]  NUREG-1801, Generic Aging Lessons Learned (GALL) Report, Rev 0 April 2001, Rev1 September 2005, and Rev 2 December 2010.
[16]  API Standard 570, In-Service Inspection, Rating, Repair, and Alteration of Piping Systems, Third Edition, November 2009
[17]  NACE Standard Recommended Practice RP-0502-2002, Pipeline External Corrosion Direct Assessment Methodology
 
NUCLEAR                QUALITY RELATED  EN-DC-343          REV. 6 MANAGEMENT MANUAL                INFORMATIONAL USE        PAGE 5 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 2.0 Cont.
[18]  NACE Standard Practice RP0169-2007, Control of External Corrosion on Underground or Submerged Metallic Piping Systems
[19]  NACE Standard Test Method TM0497-2002, Measurement Techniques Related to Criteria for Cathodic Protection on Underground or Submerged Metallic Piping Systems
[20]  NEI-09-14 Rev 1 - Nuclear Energy Institute, Guideline for the Management of Underground Piping and Tank Integrity, December 2010
[21]  Engineering Report ECH-EP-10-00001, Radiological SSC Groundwater Initiative Risk Evaluation Criteria, June 2010
[22]  EPRI 1021561, Inspection Methodologies for Buried Piping and Tanks, August 2010
[23]  Standard EN-EP-S-002-MULTI, Underground Piping and Tanks General Visual Inspection
[24]  EPRI 1016276, An Assessment of Industry Needs for Control of Degradation in Buried Pipe, March 2008
[25]  EPRI 1000115, Evaluation of Torsional Guided Waves for Inspection of Service Water Piping, December 2000
[26]  EPRI 1019115, Buried Pipe Guided Wave Examination Reference Document, October 2009
[27]  EPRI 1019157, Plant Support Engineering: Guideline on Nuclear Safety-Related Coatings, Revision 2 (Formerly TR-109937 and 1003102), December 2009
[28]  CEP-NDE-0100, Administration and Control of NDE
[29]  INPO 12-009, ICES Reporting Requirements and Standards, August 2012 3.0    DEFINITIONS
[1]    Baseline Inspection - The inspection of a new or replaced pipe or component that has not previously been involved in plant operations.
[2]    Buried Piping and Tanks - Piping and tanks that are below grade and in direct contact with the soil or concrete (e.g. a wall penetration or embedded in concrete).
 
NUCLEAR                  QUALITY RELATED    EN-DC-343          REV. 6 MANAGEMENT MANUAL                  INFORMATIONAL USE        PAGE 6 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 3.0 Cont.
[3]    Cathodic Protection (CP) - The application of a current to the outside surface of the pipe with the purpose of reducing the susceptibility of exposed segments of buried pipe (exposure caused by coating deterioration, damage or voids) to corrosion. The application of a low voltage residual current causes a shift (with respect to the anode) of the electrolytic potential at pipe exposed sites and thereby places the pipe in a more protected, less corrosive environment.
[4]    Component - A portion of an underground piping or tank system with defined boundaries.
[5]    Concrete Piping - Piping that is manufactured from concrete or cementitious material with or without metallic reinforcement. Concrete piping is generally used for large diameter lines such as the water intake piping from sources of cooling water (e.g.,
lakes, rivers, and reservoirs).
[6]    Corrosion - The chemical or electrochemical reaction between a material, usually a metal, and its environment that produces a deterioration of the material and its properties. A common example is the oxidation of an iron-based alloy exposed to water (rusting).
[7]    Crevice Corrosion - Localized corrosion that may occur in areas of stagnant solutions existing in crevices, joints, and contacts between metals or between metals and non-metals.
[8]    Direct Examination - A Nondestructive Evaluation (NDE) examination where the NDE sensor(s) is in immediate contact with or in close proximity to the section of the component being examined. Results provide some degree of quantitative measurement of wall thickness or discontinuity size. Direct examinations can be performed from the interior or exterior surface. Detection and characterization capabilities vary by NDE method as well as by specific NDE technique. Examples of NDE methods include ultrasonics, eddy current, radiography, visual and various electromagnetic techniques. Visual examinations [das1]should be supplemented with NDE or engineering judgment that addresses the condition of the pipe wall.
[9]    Erosion - Deterioration of materials by the abrasive action of moving fluids or gases, usually accelerated by the presence of solid particles or gases in suspension. When corrosion occurs simultaneously, the term Erosion/Corrosion is often used.
[10]  General Corrosion - This type of corrosion attacks the entire un-protected surface in a uniform manner. Of all types of corrosion, this is the least damaging and easiest to determine or quantify the corrosion rate. (Also referred to as uniform corrosion).
 
NUCLEAR                QUALITY RELATED      EN-DC-343          REV. 6 MANAGEMENT MANUAL                INFORMATIONAL USE            PAGE 7 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 3.0 Cont.
[11]  Holidays - Discontinuities in coatings, (e.g., pinholes, voids)
[12]  Indirect Inspection - Survey techniques used to assess the likelihood of degradation without having direct access to the section of the component being examined. These inspections typically measure surrounding conditions that may be indicative of corrosion or damage. Results are typically qualitative and less accurate than direct examinations. Examples of indirect inspection methods include over-the-line surveys and for the purpose of this document, long range guided wave.
[13]  Initial Inspection - The inspection of a pipe or component that has been in-service but has not been previously inspected..
[14]  Inspection Program - A systematic evaluation of in-scope underground components using various techniques [e.g., ultrasonic testing (UT), radiographic testing (RT), visual testing (VT), leak testing (LT), eddy current testing (ET)].
[15]  Licensed Material - Licensed material (from 10 CFR 20.1003) (or licensed radioactive material) means source material, special nuclear material, or byproduct material received, possessed, used, transferred or disposed of under a general or specific license issued by the Commission and/or by the state [e.g. State Pollution Discharge Elimination System (SPDES)]. Components containing radioactive licensed material covered under NEI 09-14 should be consistent with those identified in NEI 07-07.
[16]  Microbiologically Influenced Corrosion (MIC) - Corrosion caused by the presence and/or activities of microorganisms in biofilms on the surface of the material.
Microorganisms have been observed in a variety of environments that include seawater, natural freshwater (lakes, rivers and wells), soils and sediment.
Microbiological organisms include bacteria, fungi and algae.
[17]  Opportunistic Inspection - An inspection performed when underground components are exposed or excavated due to another activity providing an opportunity to inspect and document the results for a program component.
[18]  Pitting - A form of localized corrosion that results in the formation of small, sharp edged cavities in a metal.
[19]  Quality Assurance Classification - For the purposes of this procedure, Safety Class or QA Category is used to designate safety classification. Refer to EN-DC-167 for a summary of the corresponding legacy classifications formerly used at each plant and how they are classified as safety related, augmented, and non-safety related.
[20]  Redox - Of or relating to oxidation-reduction.
 
NUCLEAR                QUALITY RELATED    EN-DC-343            REV. 6 MANAGEMENT MANUAL                INFORMATIONAL USE          PAGE 8 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 3.0 Cont.
[21]  Resistivity - The longitudinal electrical resistance of a uniform rod of unit length and unit cross-sectional area. The reciprocal of conductivity.
[22]  Soil Resistivity Measurement - A method of subsurface detection which measures changes in conductivity by passing electrical current through ground soils. This is generally a consequence of moisture content, and in this way, buried features can be detected by differential retention of groundwater.
[23]  Subsequent Re-inspection - The inspection of a component that has been previously subjected to a Baseline Inspection and/or an Initial Inspection.
[24]  Tunnel - A structure that is outside of a building, below grade, designed to accommodate personnel, and not routinely accessible.
[25]  Underground Piping - All piping that is below grade, not accessible, and outside of buildings. Underground piping may or may not be in direct contact with soil or concrete. This includes piping that is directly buried and those that are embedded in concrete or located in underground concrete vaults, tunnels, or guard pipes. Buried piping is considered to be a subset of underground piping
[26]  Underground Tank - All tanks that are outside of buildings and sufficiently below grade such that there is a reasonable possibility that leakage from inaccessible portions of the tank may not be detected. These tanks are below grade and may or may not be in direct contact with soil or concrete. This includes tanks that are directly buried and those that are embedded in concrete or located in underground concrete vaults or tunnels.
[27]  Uniform Corrosion - See General Corrosion.
[28]  Vault - A structure that is outside of a building, below grade, not designed to accommodate personnel and not routinely accessible.
[29]  Visual Inspection - involve direct observation by inspectors or by the use of remote visual inspection devices. Visual inspections may include the use of pit gauges to assess the extent of any degradation noted.
4.0    RESPONSIBILITIES
[1]    The Director, Engineering (Headquarters), is responsible for:
a) Providing corporate management, governance, and oversight of UPT Program activities from a fleet perspective.
 
NUCLEAR                 QUALITY RELATED    EN-DC-343          REV. 6 MANAGEMENT MANUAL                INFORMATIONAL USE          PAGE 9 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 4.0 [1] Cont.
b) Ensuring fleet focus and alignment of the UPT Program implementation.
c) Monitoring UPT Program health, assessment results, and ensuring fleet coordination of UPT Program activities.
[2]     The Director, Engineering (Site), is responsible for:
a) Overall development, maintenance, administration, and control of the UPT Program.
b) Ensuring coordination of the UPT Program activities among the various departments involved at the applicable site.
[3]     The Manager, Programs & Components (Headquarters), is responsible for:
a) Providing governance for the UPT Program across the fleet.
b) Standardizing the UPT Program from site-to-site.
c) Resolving conflicts that may arise in the interpretation of this procedure.
[4]     The Manager, Programs & Components (Site), is responsible for:
a) Implementing all aspects of this Program at the station.
b) Ensuring that all activities associated with this Program are performed in a timely and cost efficient manner commensurate with the risk and safety significance of the issue.
c) Allocating adequate resources as necessary to implement this Program.
d) Ensuring adequate training of UPT Program owners, site implementers, and backup personnel.
[5]     The Supervisor, Programs & Components (Headquarters), is responsible for:
a) Providing management oversight of the UPT Program across the fleet.
b) Coordinating fleet resources to participate in UPT Program assessments and benchmarks, as required.
b) Coordinating fleet resources to participate in UPT Program assessments and benchmarks, as required.
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 10 OF 23 Underground Piping and Tanks Inspection and Monitoring Program4.0[5] Cont
 
.c)Ensuring (i.e., in cooperation with UPT program owners from other sites) that industry activities specific to the UPT Program are adequately supported by the fleet. [6] The Supervisor, Programs & Components(Site), is responsible for: a) Assigning a Program Owner to develop, implement, and maintain the sites Program in accordance with this procedure. b) Ensuring the timely completion of inspections.
NUCLEAR                   QUALITY RELATED  EN-DC-343        REV. 6 MANAGEMENT MANUAL                  INFORMATIONAL USE      PAGE 10 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 4.0[5] Cont.
[7] The Program Owner(Headquarters), is responsible for: a) Maintaining cognizance of industry issues/events, operating experience, best practices, and NRC expectations. b) Coordinating with site implementation personnel and management, as necessary, to ensure effective implementation of the UPT Program. c) Coordinating and participating in periodic assessments of the UPT Program across the fleet using the guidance provided under EN-LI-104. d) Coordinating periodic meetings and teleconference calls with UPT Program owners. e) Providing clarification or interpretation of the UPT Program procedural, regulatory, and code requirements. f) Act as the point of contact for external organizations (e.g. NEI, INPO) g) Reviewing UPT Program performance indicators and health reports across the fleet. [8] The Program Owner(Si te), is responsible for: a) Developing, implementing, and maintaining a site specific Program in accordance with the requirements of this procedure and EN-DC-174. b) Developing Program and inspection documents. c) Reviewing site maintenance records for designated underground piping/tanks to determine if previous maintenance and inspections can be credited for extended period of operation inspection requirements.
c) Ensuring (i.e., in cooperation with UPT program owners from other sites) that industry activities specific to the UPT Program are adequately supported by the fleet.
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 11 OF 23 Underground Piping and Tanks Inspection and Monitoring Program4.0 [8] Cont
[6]     The Supervisor, Programs & Components (Site), is responsible for:
.d) Initiating Condition Reports (CRs) for inspected conditions that fail to meet the acceptance criteria. e) Creating and updating the program database. f) Interfacing with other discipline Engineers as required in order to implement this procedure.
a) Assigning a Program Owner to develop, implement, and maintain the sites Program in accordance with this procedure.
[9] The Design Engineering personnel (Site), is responsible for: a) Supporting Program Owner in developing and maintaining a site specific Program in accordance with this procedure. b) Developing Acceptance Criteria for underground piping and tanks. c) Supporting the review of inspection results and evaluations.
b) Ensuring the timely completion of inspections.
[10] The System Engineering personnel (Site), is responsible for: a) Ensuring that the site CP System is evaluated for proper operation and that routine maintenance and surveillance testing is being performed. b) Verifying that proper acceptance criteria have been established for evaluation of the CP test results. c) Confirming that the CP System is annually evaluated by a National Association of Corrosion Engineer certified specialist as recommended by EPRI 1021175. d) Reporting in the INPO Consolidated Entry System (ICES) ALL identified underground pipe/tank leakages (INPO 12-009). 5.0 DETAILS 5.1 PRECAUTIONS AND LIMITATIONS [1] The risk of a failure caused by corrosion, directly or indirectly represents the most common hazard associated with underground piping and tanks. The corrosion risk assessment, described in CEP-UPT-0100, is organized into categories reflecting four factors (soil resistivity, soil drainage, piping/tank material type, and CP/coating) that impact the degree of corrosion risk due to design and environmental conditions.
[7]     The Program Owner (Headquarters), is responsible for:
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 12 OF 23 Underground Piping and Tanks Inspection and Monitoring Program5.1 Cont.[2] Building the risk assessment tool requires the following four steps: a) Segmenting: dividing a system into smaller segments. The size of each segment shall reflect practical considerations of operation, maintenance, and cost of data gathering with respect to the benefit of increased accuracy.b) Customizing: deciding on a list of risk contributors and risk reducers and their relative importance. c) Data gathering: building a database by completing an evaluation for each segment of the system. d) Maintenance: identifying when and how risk factors can change and updating these factors accordingly. [3] Be aware that backfilling an excavated area could increase the corrosion susceptibility in that area of the buried piping or tank due to changing soil conditions. Consider re-using the same (or less corrosive) backfill in areas that are excavated. [4] When the inspection entails unearthing a segment, caution shall be used so as to not disturb the protective exterior coating or the CP system, as applicable. [5] Piping/Tanks used to convey petroleum products may be inspected by an authorized inspection agency in accordance with the provisions of API 570 or by a qualified inspector in accordance with CEP-NDE-0100 and EN-EP-S-002-MULTI.   [6] Work Orders involving excavation should consider including a task for the Site UPT, Site MIC, Site FAC, and Site Structures Monitoring Program Owners to be notified for possible opportunistic inspections. [LO-LAR-2008-0048 CA-2] [LO-LAR-2008-0048 CA-46] [RLC LO-LAR-2009-00244 CA-63] [RC07.2029.01] [RC07.2029. 50] .[A-17827] [A-17910] [P-16911] [NL-09-111] [7] New underground segments that are installed in the plant shall be inspected and documented by the Program Owner prior to burial. Coating condition, backfill/trench soil conditions, associated CP, baseline inspection data, etc. are items that should be documented.   [8] The use of new technologies to establish component condition should be an indicator to be reviewed on a continuous basis. Existing technologies are being enhanced and applied in innovative solutions. Like other fields, it is important that the Program Owner learns from plant experiences, strives to apply new technologies important in identifying component failures, and seeks to develop innovative means to apply existing technologies.
a) Maintaining cognizance of industry issues/events, operating experience, best practices, and NRC expectations.
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 13 OF 23 Underground Piping and Tanks Inspection and Monitoring Program5.2 PROCEDURES AND OVERSIGHT [1] Each Program Owner must take advantage of site excavating activities to perform opportunistic inspections. [LO-LAR-2008-0048 CA-0002] [RC07.2029.01] .[A-17827] [A-17910] [RLC LO-LAR-2009-00244 CA-63] [NL-09-111] [P-16911][2] CEP-UPT-0100 details the program requirements associated with scope, risk ranking, and examination techniques. [3] A long range plan for each plant should exist to ensure plant management is aware of funding requests and long term health of plant underground piping and tanks. [4] Program performance indicators and health reports in accordance with EN-DC-329 also ensure program health and communication with plant management. [5] Each Program Owner shall be qualified in accordance with the Entergy fleet qualification card. [6] Industry training should also be included in the training of the Underground Pipe and Tanks Program Owner. 5.3 RISK RANKING [1] Two options for performing risk ranking of a given location (segment) can be used. The first option utilizes risk analysis, where the risk is equal to a quantified likelihood of the failure times the quantified consequences of the failure. The second option, detailed in CEP-UPT-0100, places each location (segment) into a risk matrix based on a non-quantified likelihood of failure (i.e., low, medium, and high) versus the non-quantified consequences of failure (i.e., none, low, medium, and high). Both approaches require inspection of a prioritized sample of risk-ranked locations and should prevent most leaks and failures of Underground systems. [2] Computer software can be used to model underground segments to help determine the likelihood of failure and the consequence of failure. The computer modeling can substitute for the manual risk ranking as described in CEP-UPT-0100 and Engineering Report ECH-EP-10-00001. [3] A set of as-built drawings should be assembled showing the route of underground segments, including their location relative to other underground and above ground buildings, structures, and commodities. [4] An underground segment whose failure is inconsequential and would cause no direct or collateral damage to plant SSCs may be excluded from the scope of the program. A formal write-up for that exclusion should be considered.
b) Coordinating with site implementation personnel and management, as necessary, to ensure effective implementation of the UPT Program.
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 14 OF 23 Underground Piping and Tanks Inspection and Monitoring Program5.3 Cont.[5] Line specific data shall be collected and compiled for use in risk ranking, inspection, planning, and fitness for service assessment. The line may be subdivided into segments of similar characteristics. Lines that have similar design characteristics but have physical elevation differences should be segregated into upper and lower elevations in relationship to groundwater and drainage. The lower elevations of these lines (i.e., wetter ground) should be a higher inspection priority. [6] Soil samples should be collected for analysis to help assess the likelihood of outside diameter corrosion. [7] Where underground segments are protected by a CP system, the CP system should be annually inspected and tested to assess its continued adequacy. [8] An impact assessment (Safety Class, Public Risk, and Economics) shall be conducted to help rank components/segments (see CEP-UPT-0100). [9] The potential for corrosion of underground segments shall be evaluated to determine the likelihood of failure for each pipe segment (see CEP-UPT-0100). [10] Underground radiological piping and tanks are by definition considered High Risk in this Program due to industry operating experience and the resulting public concern. Consequently, all radiological underground piping/tanks are assigned a High inspection priority [11] The High Risk characterization of underground radiological piping and tanks will be further categorized into High-Low, High-Medium and High-High risk per Engineering Report ECH-EP-10-00001. This will allow for relative ranking of one High Risk radiological component versus another. 5.4 INSPECTIONS [1] In general, inspections should be performed at the segments that have the highest risk ranking as determined above. Other considerations such as access and cost may also be considered when the relative risk rankings are similar. [2] The applicable Code required minimum design thickness, t min , to be used in the fitness-for-service assessment should be determined before performing direct examinations, if possible. [3] Classic non-destructive examinations (surface and volumetric) are performed either by entering the segment (if sufficiently large) with the use of robots or pigs, by tools using electronic scanning techniques or by excavation to the segment surface, following plant procedures. Indirect inspection tools such as Direct Current Voltage Gradient (DCVG) and Guided Wave can assist the inspection process as a screening tool.
c) Coordinating and participating in periodic assessments of the UPT Program across the fleet using the guidance provided under EN-LI-104.
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 15 OF 23 Underground Piping and Tanks Inspection and Monitoring Program5.4 Cont.[4] When an underground segment is uncovered, the coating should be inspected by an experienced qualified person in accordance with Standard EN-EP-S-002-MULTI. The results should be documented and include relevant photographs or video. When an underground segment is uncovered (OD) or entered internally (ID) for any reason, as a minimum it should be visually inspected for evidence of corrosion or damage. Particular attention should be paid to the joints, especially welds, as they often are more susceptible to degradation than the base metal. [A-16753] [LO-LAR-2010-00232][5] The results of the inspection should be documented using Standard EN-EP-S-002-MULTI and any relevant photographs or videos should be included in the Program Notebook.[6] A volumetric examination technique should be used to determine wall loss, measure remaining thickness, or examine a weld. Results shall be evaluated for fitness-for-service. [7] There are several NDE methods that are applicable to underground piping inspections. See EPRI Report 1021175, EPRI IR-2010-409, and CEP-UPT-0100 for further discussion on NDE methods. [8] The following are general parameters to be inspected and documented for future reference [refer to CEP-UPT-100, section 5.2.24]:   a) External coating and wrapping condition. b) Pipe wall thickness degradation. c) Tank plate thickness degradation. d) CP System Performance (if applicable). [9] A CR shall be initiated if degradation is identified or the acceptance criteria are not met. 5.5 FITNESS FOR SERVICE (FFS) [LO-LAR-2008-0048-0002] [RC07.2029.01] [A-17827] [A-17910] [1] The integrity assessment shall be based on the design analysis of the underground system. [2] The inspection results shall be compiled and categorized. A projection of future damage shall be estimated based on current inspection results, planned repairs, and the time to the next planned inspection or repair.
d) Coordinating periodic meetings and teleconference calls with UPT Program owners.
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 16 OF 23 Underground Piping and Tanks Inspection and Monitoring Program5.5 Cont. [3] Methods and criteria should be in place prior to inspections to assess the significance of inspection results by applying the appropriate FFS assessment method, consistent with the damage mechanism and licensing commitments. [Refer to CEP-UPT-0100, section 5.5].[4] The knowledge gained through the FFS process should be used to review and adjust as necessary the risk ranking and the inspection plan. [5] A Condition Report (CR) shall be written if degradation is identified or acceptance criteria are not met [refer to CEP-UPT-0100, section 5.5]. The corrective actions may include engineering evaluations, scheduled inspections, and change of coating or replacement of corrosion susceptible components. Components that do not meet the acceptance criteria shall be dispositioned by engineering via the Engineering Change (EC) process (EN-DC-115). [6] Identified degraded conditions that are accepted as is should be included in the Margin Management Database as appropriate per EN-DC-195. 5.6 REPAIRS [1] Contingency planning should be in place for prompt implementation in case an underground segment fails to meet acceptance criteria. [2] The detailed design of the selected repair option should accommodate the specifics of the failed line. [3] Leak detection techniques and leak isolation options should be pre-selected for prompt implementation should a leak occur. 5.7 PREVENTION, MITIGATION AND LONG TERM STRATEGY [1] Where the risk of failure is unacceptable, preventive measures and options to mitigate the possible leakage should be implemented. [2] Newly installed underground piping and tanks should be coated as applicable during installation with a protective coating system in accordance with site specifications. These coatings include coal tar enamel with fiberglass wrap and a Kraft paper outer wrap, a polyolefin tape coating, or a fusion bonded epoxy coating. These coatings help protect the piping and tanks from contacting the aggressive soil environment. As part of preventive measures, the existing CP system may be updated or a new CP system may be installed. [P-16911][IP-RPT-11-LRD-07][3] Whenever components are excavated, then careful and stringent controls shall be in-place to assure proper or improved fill material is used to re-bury the component.
e) Providing clarification or interpretation of the UPT Program procedural, regulatory, and code requirements.
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 17 OF 23 Underground Piping and Tanks Inspection and Monitoring Program5.7 Cont.[4] Baseline inspections shall be performed prior to piping installation. Pipe coating, trenching condition, backfill/bedding materials, and any nearby CP are items that can be documented in the Program Notebook. [5] For plants with installed CP systems for underground piping and tanks, ensure Preventive Maintenance tasks exist to verify proper operation of these systems (recommended at least semi-annually). Verify corrective maintenance tasks for CP system identified deficiencies are corrected on a schedule commensurate with the safety significance of the system/component being protected. [6] Operating Experience (OE) reviews are to be included as part of the Underground Piping and Tanks Program Notebook.
f) Act as the point of contact for external organizations (e.g. NEI, INPO) g) Reviewing UPT Program performance indicators and health reports across the fleet.
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 18 OF 23 Underground Piping and Tanks Inspection and Monitoring Program6.0 INTERFACES [1] Engineering Standard EN-CS-S-008-MULTI, Pipe Wall Thinning Structural Evaluation [2] CEP-NDE-0112, Certification of Visual Examination Personnel [3] CEP-UPT-0100, Underground Piping and Tanks Inspection and Monitoring [4] EN-AD-103, Document Control and Records Management Programs
[8]     The Program Owner (Site), is responsible for:
[5] EN-DC-115, Engineering Change Process [6] EN-DC-134, Design Verification [7] EN-DC-141, Design Inputs [8] EN-DC-147, Engineering Reports [9] EN-DC-167, Classification of Structures, Systems, and Components [10] EN-DC-174, Engineering Program Sections
a) Developing, implementing, and maintaining a site specific Program in accordance with the requirements of this procedure and EN-DC-174.
[11] EN-DC-195, Margin Management [12] EN-DC-315, Flow Accelerated Corrosion Program [13] EN-DC-340, Microbiologically Influenced Corrosion (MIC) Monitoring Program [14] EN-IS-112, Trenching, Excavation, and Ground Penetrating Activities [15] EN-TQ-104, Engineering Support Personnel Training Program [16] EN-QV-111, Training and Certification of Inspection/Verification and Examination Personnel [17] EN-WM-100, Work Request (WR) Generation, Screening and Classification [18] EN-WM-101, On-Line Work Management Process
b) Developing Program and inspection documents.
[19] EN-DC-329, Engineering Programs Control and Oversight [20] EN-LI-102, Corrective Action Process [21] FTK-ESPP-G00121, Underground Piping/Tanks Program Owner NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 19 OF 23 Underground Piping and Tanks Inspection and Monitoring Program6.0 Cont. [22] EN-LI-104, Self-Assessment and Benchmark Process [23] EN-CY-111, Radiological Ground Water Monitoring Program 7.0 RECORDS [1] All data generated during the course of underground piping and tanks inspections should be referenced or retained by the Program Owner in the program notebooks. Follow applicable QA retention requirements and guidance contained in EN-DC-329. [2] Records, evaluations and reports generated as a result of the periodic inspections shall be retained and maintained in accordance with EN-AD-103 and as directed in the site Program, as applicable. [3] Changes to the Program based on the periodic review shall be performed in accordance with EN-DC-174, Engineering Program Sections. 8.0 SITE SPECIFIC COMMITMENTS StepSiteDocumentCommitment Number or Reference1.0[2], 5.1[6], 5.2[1], 5.5 ANO1License Renewal Commitment A-178271.0[2], 5.1[6], 5.2[1], 5.5 ANO2License Renewal Commitment A-179101.0[2], 5.1[6], 5.2[1]IPEC License Renewal Commitment NL-09-111 5.7 [2], Attachment 9.2 IPEC License Renewal Commitment IP-RPT-11-LRD07, Items 1b & 1a All, 1.0[2], 5.1[6], 5.2[1], 5.5 JAF License Renewal Commitment LO-LAR-2008-0048 CA-2 1.0[2], 5.1[6] JAF License Renewal Commitment LO-LAR-2008-0048 CA-46 (Underground fuel storage tanks) 1.0[2], Attachment 9.2 PLPLicense Renewal Commitment RLC LO-LAR-2009-00244 CA-15 (Implement buried services monitoring program) Attachment 9.2 PLPLicense Renewal Commitment RLC LO-LAR-2009-00244 CA-69 (Inspect below grade fire piping)
c) Reviewing site maintenance records for designated underground piping/tanks to determine if previous maintenance and inspections can be credited for extended period of operation inspection requirements.
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 20 OF 23 Underground Piping and Tanks Inspection and Monitoring Program8.0 Cont.
 
StepSiteDocumentCommitment Number or Reference5.1[6], 5.2[1], Attachment 9.2 PLPLicense Renewal Commitment RLC LO-LAR-2009-00244 CA-63 (Buried structures opportunistic inspection) 5.4 PLPLicense Renewal Commitment RLC LO-LAR-2009-00244 CA-38 (Perform inspection of a sample of buried piping? All, 1.0[2], 5.1[6], 5.2[1], 5.5 PNPSLicense Renewal Commitment RC07.2029.01 5.1[6]PNPSLicense Renewal Commitment RC07.2029.50 1.0[2], 5.1[6], 5.2[1], 5.7[2], Attachment 9.2 VTY License Renewal Commitment P-169115.4[4]VTY License Renewal Commitment A-16753 (LO-LAR-2010-00232) 9.0 ATTACHMENTS [1] Roadmap for Underground Piping and Tanks Inspection and Monitoring Program [2] List of Affected Underground Piping Systems as per Licensing Renewal Application (LRA)
NUCLEAR                   QUALITY RELATED    EN-DC-343          REV. 6 MANAGEMENT MANUAL                  INFORMATIONAL USE          PAGE 11 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 4.0 [8] Cont.
NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 21 OF 23 Underground Piping and Tanks Inspection and Monitoring Program ATTACHMENT 9.1ROADMAP FOR UNDERGROUND PIPING AND TANKS INSPECTION AND MONITORING PROGRAMSheet 1 of 1 NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 22 OF 23 Underground Piping and Tanks Inspection and Monitoring Program ATTACHMENT 9.2LIST OF AFFECTED UNDERGROUND PIPING SYSTEMS AS PER L ICENSE RENEWAL APPLICATION (LRA) Sheet 1 of 2StationSystemANOUnit 1 Service Water System Unit 2 Service Water System The plants Joint Fire Protection Loop Fuel Oil GGNS TBDIPEC City Water Containment Spray (IP3 only) Fire Protection - Water System Fuel Oil Plant Drains Safety Injection Security Propane Generator (IP3 only) Service Water Auxiliary Feedwater System River Water System (IP1 only) Circulating Water (IP2 only) Containment Isolation Support System JAF Condensate Storage Fire Protection - Water System Fuel Oil HPCI RCICRadwaste and Plant Drains Security Generator Standby Gas Treatment PNPSCondensate Storage Fire Protection - Water System EDG Fuel Oil Salt Service Water Standby Gas Treatment Station Blackout DG Fuel Oil & Cooling Water NUCLEAR MANAGEMENT MANUAL QUALITY RELATEDEN-DC-343REV. 6 INFORMATIONAL U SEPAGE 23 OF 23 Underground Piping and Tanks Inspection and Monitoring ProgramAttachment 9.2 List of Affected Underground Piping Systems as per License Renewal Application (LRA) Sheet 2 of 2 StationSystemPLPCondensate System [RLC LO-LAR-2009-00244 CA-69, Demineralized Water System CA-15, CA-38, CA-63]Diesel Fuel Oil System Feedwater System Fire Protection System Miscellaneous Gas System Radioactive Waste System Service Water System RBS TBDVYFire Protection - Water System [P-16911]Fuel Oil Service Water Standby Gas Treatment W3 TBD}}
d) Initiating Condition Reports (CRs) for inspected conditions that fail to meet the acceptance criteria.
e) Creating and updating the program database.
f) Interfacing with other discipline Engineers as required in order to implement this procedure.
[9]     The Design Engineering personnel (Site), is responsible for:
a) Supporting Program Owner in developing and maintaining a site specific Program in accordance with this procedure.
b) Developing Acceptance Criteria for underground piping and tanks.
c) Supporting the review of inspection results and evaluations.
[10]     The System Engineering personnel (Site), is responsible for:
a) Ensuring that the site CP System is evaluated for proper operation and that routine maintenance and surveillance testing is being performed.
b) Verifying that proper acceptance criteria have been established for evaluation of the CP test results.
c) Confirming that the CP System is annually evaluated by a National Association of Corrosion Engineer certified specialist as recommended by EPRI 1021175.
d) Reporting in the INPO Consolidated Entry System (ICES) ALL identified underground pipe/tank leakages (INPO 12-009).
5.0     DETAILS 5.1     PRECAUTIONS AND LIMITATIONS
[1]     The risk of a failure caused by corrosion, directly or indirectly represents the most common hazard associated with underground piping and tanks. The corrosion risk assessment, described in CEP-UPT-0100, is organized into categories reflecting four factors (soil resistivity, soil drainage, piping/tank material type, and CP/coating) that impact the degree of corrosion risk due to design and environmental conditions.
 
NUCLEAR                 QUALITY RELATED      EN-DC-343            REV. 6 MANAGEMENT MANUAL                INFORMATIONAL USE          PAGE 12 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 5.1 Cont.
[2]   Building the risk assessment tool requires the following four steps:
a) Segmenting: dividing a system into smaller segments. The size of each segment shall reflect practical considerations of operation, maintenance, and cost of data gathering with respect to the benefit of increased accuracy.
b) Customizing: deciding on a list of risk contributors and risk reducers and their relative importance.
c) Data gathering: building a database by completing an evaluation for each segment of the system.
d) Maintenance: identifying when and how risk factors can change and updating these factors accordingly.
[3]   Be aware that backfilling an excavated area could increase the corrosion susceptibility in that area of the buried piping or tank due to changing soil conditions. Consider re-using the same (or less corrosive) backfill in areas that are excavated.
[4]   When the inspection entails unearthing a segment, caution shall be used so as to not disturb the protective exterior coating or the CP system, as applicable.
[5]   Piping/Tanks used to convey petroleum products may be inspected by an authorized inspection agency in accordance with the provisions of API 570 or by a qualified inspector in accordance with CEP-NDE-0100 and EN-EP-S-002-MULTI.
[6]   Work Orders involving excavation should consider including a task for the Site UPT, Site MIC, Site FAC, and Site Structures Monitoring Program Owners to be notified for possible opportunistic inspections. [LO-LAR-2008-0048 CA-2] [LO-LAR-2008-0048 CA-46]
[RLC LO-LAR-2009-00244 CA-63] [RC07.2029.01] [RC07.2029. 50] .[A-17827] [A-17910] [P-16911]
[NL-09-111]
[7]   New underground segments that are installed in the plant shall be inspected and documented by the Program Owner prior to burial. Coating condition, backfill/trench soil conditions, associated CP, baseline inspection data, etc. are items that should be documented.
[8]   The use of new technologies to establish component condition should be an indicator to be reviewed on a continuous basis. Existing technologies are being enhanced and applied in innovative solutions. Like other fields, it is important that the Program Owner learns from plant experiences, strives to apply new technologies important in identifying component failures, and seeks to develop innovative means to apply existing technologies.
 
NUCLEAR                 QUALITY RELATED    EN-DC-343            REV. 6 MANAGEMENT MANUAL                  INFORMATIONAL USE          PAGE 13 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 5.2 PROCEDURES AND OVERSIGHT
[1] Each Program Owner must take advantage of site excavating activities to perform opportunistic inspections. [LO-LAR-2008-0048 CA-0002] [RC07.2029.01] .[A-17827] [A-17910]
[RLC LO-LAR-2009-00244 CA-63] [NL-09-111] [P-16911]
[2] CEP-UPT-0100 details the program requirements associated with scope, risk ranking, and examination techniques.
[3] A long range plan for each plant should exist to ensure plant management is aware of funding requests and long term health of plant underground piping and tanks.
[4] Program performance indicators and health reports in accordance with EN-DC-329 also ensure program health and communication with plant management.
[5] Each Program Owner shall be qualified in accordance with the Entergy fleet qualification card.
[6] Industry training should also be included in the training of the Underground Pipe and Tanks Program Owner.
5.3 RISK RANKING
[1] Two options for performing risk ranking of a given location (segment) can be used.
The first option utilizes risk analysis, where the risk is equal to a quantified likelihood of the failure times the quantified consequences of the failure. The second option, detailed in CEP-UPT-0100, places each location (segment) into a risk matrix based on a non-quantified likelihood of failure (i.e., low, medium, and high) versus the non-quantified consequences of failure (i.e., none, low, medium, and high). Both approaches require inspection of a prioritized sample of risk-ranked locations and should prevent most leaks and failures of Underground systems.
[2] Computer software can be used to model underground segments to help determine the likelihood of failure and the consequence of failure. The computer modeling can substitute for the manual risk ranking as described in CEP-UPT-0100 and Engineering Report ECH-EP-10-00001.
[3] A set of as-built drawings should be assembled showing the route of underground segments, including their location relative to other underground and above ground buildings, structures, and commodities.
[4] An underground segment whose failure is inconsequential and would cause no direct or collateral damage to plant SSCs may be excluded from the scope of the program.
A formal write-up for that exclusion should be considered.
 
NUCLEAR               QUALITY RELATED    EN-DC-343          REV. 6 MANAGEMENT MANUAL                INFORMATIONAL USE          PAGE 14 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 5.3 Cont.
[5]   Line specific data shall be collected and compiled for use in risk ranking, inspection, planning, and fitness for service assessment. The line may be subdivided into segments of similar characteristics. Lines that have similar design characteristics but have physical elevation differences should be segregated into upper and lower elevations in relationship to groundwater and drainage. The lower elevations of these lines (i.e., wetter ground) should be a higher inspection priority.
[6]   Soil samples should be collected for analysis to help assess the likelihood of outside diameter corrosion.
[7]   Where underground segments are protected by a CP system, the CP system should be annually inspected and tested to assess its continued adequacy.
[8]   An impact assessment (Safety Class, Public Risk, and Economics) shall be conducted to help rank components/segments (see CEP-UPT-0100).
[9]   The potential for corrosion of underground segments shall be evaluated to determine the likelihood of failure for each pipe segment (see CEP-UPT-0100).
[10]   Underground radiological piping and tanks are by definition considered High Risk in this Program due to industry operating experience and the resulting public concern.
Consequently, all radiological underground piping/tanks are assigned a High inspection priority
[11]   The High Risk characterization of underground radiological piping and tanks will be further categorized into High-Low, High-Medium and High-High risk per Engineering Report ECH-EP-10-00001. This will allow for relative ranking of one High Risk radiological component versus another.
5.4   INSPECTIONS
[1]   In general, inspections should be performed at the segments that have the highest risk ranking as determined above. Other considerations such as access and cost may also be considered when the relative risk rankings are similar.
[2]   The applicable Code required minimum design thickness, tmin, to be used in the fitness-for-service assessment should be determined before performing direct examinations, if possible.
[3]   Classic non-destructive examinations (surface and volumetric) are performed either by entering the segment (if sufficiently large) with the use of robots or pigs, by tools using electronic scanning techniques or by excavation to the segment surface, following plant procedures. Indirect inspection tools such as Direct Current Voltage Gradient (DCVG) and Guided Wave can assist the inspection process as a screening tool.
 
NUCLEAR                 QUALITY RELATED      EN-DC-343          REV. 6 MANAGEMENT MANUAL                INFORMATIONAL USE          PAGE 15 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 5.4 Cont.
[4]   When an underground segment is uncovered, the coating should be inspected by an experienced qualified person in accordance with Standard EN-EP-S-002-MULTI. The results should be documented and include relevant photographs or video. When an underground segment is uncovered (OD) or entered internally (ID) for any reason, as a minimum it should be visually inspected for evidence of corrosion or damage.
Particular attention should be paid to the joints, especially welds, as they often are more susceptible to degradation than the base metal. [A-16753] [LO-LAR-2010-00232]
[5]   The results of the inspection should be documented using Standard EN-EP-S-002-MULTI and any relevant photographs or videos should be included in the Program Notebook.
[6]   A volumetric examination technique should be used to determine wall loss, measure remaining thickness, or examine a weld. Results shall be evaluated for fitness-for-service.
[7]   There are several NDE methods that are applicable to underground piping inspections.
See EPRI Report 1021175, EPRI IR-2010-409, and CEP-UPT-0100 for further discussion on NDE methods.
[8]   The following are general parameters to be inspected and documented for future reference [refer to CEP-UPT-100, section 5.2.24]:
a) External coating and wrapping condition.
b) Pipe wall thickness degradation.
c) Tank plate thickness degradation.
d) CP System Performance (if applicable).
[9]   A CR shall be initiated if degradation is identified or the acceptance criteria are not met.
5.5   FITNESS FOR SERVICE (FFS) [LO-LAR-2008-0048-0002] [RC07.2029.01] [A-17827] [A-17910]
[1]   The integrity assessment shall be based on the design analysis of the underground system.
[2]   The inspection results shall be compiled and categorized. A projection of future damage shall be estimated based on current inspection results, planned repairs, and the time to the next planned inspection or repair.
 
NUCLEAR               QUALITY RELATED    EN-DC-343          REV. 6 MANAGEMENT MANUAL                INFORMATIONAL USE        PAGE 16 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 5.5 Cont.
[3]   Methods and criteria should be in place prior to inspections to assess the significance of inspection results by applying the appropriate FFS assessment method, consistent with the damage mechanism and licensing commitments. [Refer to CEP-UPT-0100, section 5.5].
[4]   The knowledge gained through the FFS process should be used to review and adjust as necessary the risk ranking and the inspection plan.
[5]   A Condition Report (CR) shall be written if degradation is identified or acceptance criteria are not met [refer to CEP-UPT-0100, section 5.5]. The corrective actions may include engineering evaluations, scheduled inspections, and change of coating or replacement of corrosion susceptible components. Components that do not meet the acceptance criteria shall be dispositioned by engineering via the Engineering Change (EC) process (EN-DC-115).
[6]   Identified degraded conditions that are accepted as is should be included in the Margin Management Database as appropriate per EN-DC-195.
5.6   REPAIRS
[1]   Contingency planning should be in place for prompt implementation in case an underground segment fails to meet acceptance criteria.
[2]   The detailed design of the selected repair option should accommodate the specifics of the failed line.
[3]   Leak detection techniques and leak isolation options should be pre-selected for prompt implementation should a leak occur.
5.7   PREVENTION, MITIGATION AND LONG TERM STRATEGY
[1]   Where the risk of failure is unacceptable, preventive measures and options to mitigate the possible leakage should be implemented.
[2]   Newly installed underground piping and tanks should be coated as applicable during installation with a protective coating system in accordance with site specifications.
These coatings include coal tar enamel with fiberglass wrap and a Kraft paper outer wrap, a polyolefin tape coating, or a fusion bonded epoxy coating. These coatings help protect the piping and tanks from contacting the aggressive soil environment. As part of preventive measures, the existing CP system may be updated or a new CP system may be installed. [P-16911] [IP-RPT-11-LRD-07]
[3]   Whenever components are excavated, then careful and stringent controls shall be in-place to assure proper or improved fill material is used to re-bury the component.
 
NUCLEAR               QUALITY RELATED    EN-DC-343          REV. 6 MANAGEMENT MANUAL                INFORMATIONAL USE          PAGE 17 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 5.7 Cont.
[4]   Baseline inspections shall be performed prior to piping installation. Pipe coating, trenching condition, backfill/bedding materials, and any nearby CP are items that can be documented in the Program Notebook.
[5]   For plants with installed CP systems for underground piping and tanks, ensure Preventive Maintenance tasks exist to verify proper operation of these systems (recommended at least semi-annually). Verify corrective maintenance tasks for CP system identified deficiencies are corrected on a schedule commensurate with the safety significance of the system/component being protected.
[6]   Operating Experience (OE) reviews are to be included as part of the Underground Piping and Tanks Program Notebook.
 
NUCLEAR                 QUALITY RELATED    EN-DC-343          REV. 6 MANAGEMENT MANUAL                INFORMATIONAL USE          PAGE 18 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 6.0 INTERFACES
[1] Engineering Standard EN-CS-S-008-MULTI, Pipe Wall Thinning Structural Evaluation
[2] CEP-NDE-0112, Certification of Visual Examination Personnel
[3] CEP-UPT-0100, Underground Piping and Tanks Inspection and Monitoring
[4] EN-AD-103, Document Control and Records Management Programs
[5] EN-DC-115, Engineering Change Process
[6] EN-DC-134, Design Verification
[7] EN-DC-141, Design Inputs
[8] EN-DC-147, Engineering Reports
[9] EN-DC-167, Classification of Structures, Systems, and Components
[10] EN-DC-174, Engineering Program Sections
[11] EN-DC-195, Margin Management
[12] EN-DC-315, Flow Accelerated Corrosion Program
[13] EN-DC-340, Microbiologically Influenced Corrosion (MIC) Monitoring Program
[14] EN-IS-112, Trenching, Excavation, and Ground Penetrating Activities
[15] EN-TQ-104, Engineering Support Personnel Training Program
[16] EN-QV-111, Training and Certification of Inspection/Verification and Examination Personnel
[17] EN-WM-100, Work Request (WR) Generation, Screening and Classification
[18] EN-WM-101, On-Line Work Management Process
[19] EN-DC-329, Engineering Programs Control and Oversight
[20] EN-LI-102, Corrective Action Process
[21] FTK-ESPP-G00121, Underground Piping/Tanks Program Owner
 
NUCLEAR               QUALITY RELATED        EN-DC-343          REV. 6 MANAGEMENT MANUAL              INFORMATIONAL USE            PAGE 19 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 6.0 Cont.
[22]   EN-LI-104, Self-Assessment and Benchmark Process
[23]   EN-CY-111, Radiological Ground Water Monitoring Program 7.0     RECORDS
[1]     All data generated during the course of underground piping and tanks inspections should be referenced or retained by the Program Owner in the program notebooks.
Follow applicable QA retention requirements and guidance contained in EN-DC-329.
[2]     Records, evaluations and reports generated as a result of the periodic inspections shall be retained and maintained in accordance with EN-AD-103 and as directed in the site Program, as applicable.
[3]     Changes to the Program based on the periodic review shall be performed in accordance with EN-DC-174, Engineering Program Sections.
8.0     SITE SPECIFIC COMMITMENTS Step            Site        Document              Commitment Number or Reference 1.0[2], 5.1[6],               License Renewal ANO1                                A-17827 5.2[1], 5.5                   Commitment 1.0[2], 5.1[6],               License Renewal ANO2                                A-17910 5.2[1], 5.5                   Commitment 1.0[2], 5.1[6],               License Renewal IPEC                              NL-09-111 5.2[1]                         Commitment 5.7 [2], Attachment           License Renewal IPEC                              IP-RPT-11-LRD07, Items 1b & 1a 9.2                            Commitment All, 1.0[2], 5.1[6],           License Renewal JAF                              LO-LAR-2008-0048 CA-2 5.2[1], 5.5                   Commitment License Renewal             LO-LAR-2008-0048 CA-46 1.0[2], 5.1[6]           JAF Commitment                  (Underground fuel storage tanks)
RLC LO-LAR-2009-00244 CA-15 1.0[2], Attachment             License Renewal PLP                              (Implement buried services 9.2                           Commitment monitoring program)
License Renewal             RLC LO-LAR-2009-00244 CA-69 Attachment 9.2          PLP Commitment                  (Inspect below grade fire piping)
 
NUCLEAR               QUALITY RELATED        EN-DC-343          REV. 6 MANAGEMENT MANUAL              INFORMATIONAL USE            PAGE 20 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 8.0 Cont.
Step            Site      Document                Commitment Number or Reference RLC LO-LAR-2009-00244 CA-63 5.1[6], 5.2[1],               License Renewal PLP                              (Buried structures opportunistic Attachment 9.2                 Commitment inspection)
RLC LO-LAR-2009-00244 CA-38 License Renewal 5.4                     PLP                              (Perform inspection of a sample of Commitment buried piping?
All, 1.0[2], 5.1[6],           License Renewal PNPS                              RC07.2029.01 5.2[1], 5.5                   Commitment License Renewal 5.1[6]                 PNPS                              RC07.2029.50 Commitment 1.0[2], 5.1[6],
License Renewal 5.2[1], 5.7[2],         VTY                               P-16911 Commitment Attachment 9.2 License Renewal 5.4[4]                   VTY                               A-16753 (LO-LAR-2010-00232)
Commitment 9.0     ATTACHMENTS
[1]     Roadmap for Underground Piping and Tanks Inspection and Monitoring Program
[2]     List of Affected Underground Piping Systems as per Licensing Renewal Application (LRA)
 
NUCLEAR               QUALITY RELATED        EN-DC-343          REV. 6 MANAGEMENT MANUAL              INFORMATIONAL USE              PAGE 21 OF 23 Underground Piping and Tanks Inspection and Monitoring Program ATTACHMENT 9.1      ROADMAP FOR UNDERGROUND PIPING AND T ANKS I NSPECTION AND MONITORING PROGRAM Sheet 1 of 1
 
NUCLEAR               QUALITY RELATED      EN-DC-343          REV. 6 MANAGEMENT MANUAL                INFORMATIONAL USE            PAGE 22 OF 23 Underground Piping and Tanks Inspection and Monitoring Program ATTACHMENT 9.2 LIST OF AFFECTED UNDERGROUND PIPING SYSTEMS AS PER LICENSE RENEWAL APPLICATION (LRA)
Sheet 1 of 2 Station                                          System ANO                        Unit 1 Service Water System Unit 2 Service Water System The plants Joint Fire Protection Loop Fuel Oil GGNS                         TBD IPEC                        City Water Containment Spray (IP3 only)
Fire Protection - Water System Fuel Oil Plant Drains Safety Injection Security Propane Generator (IP3 only)
Service Water Auxiliary Feedwater System River Water System (IP1 only)
Circulating Water (IP2 only)
Containment Isolation Support System JAF                         Condensate Storage Fire Protection - Water System Fuel Oil HPCI RCIC Radwaste and Plant Drains Security Generator Standby Gas Treatment PNPS                        Condensate Storage Fire Protection - Water System EDG Fuel Oil Salt Service Water Standby Gas Treatment Station Blackout DG Fuel Oil & Cooling Water
 
NUCLEAR                 QUALITY RELATED      EN-DC-343          REV. 6 MANAGEMENT MANUAL                INFORMATIONAL USE          PAGE 23 OF 23 Underground Piping and Tanks Inspection and Monitoring Program .2 List of Affected Underground Piping Systems as per License Renewal Application (LRA)
Sheet 2 of 2 Station                                          System PLP                          Condensate System
[RLC LO-LAR-2009-00244 CA-69,             Demineralized Water System CA-15, CA-38, CA-63]                 Diesel Fuel Oil System Feedwater System Fire Protection System Miscellaneous Gas System Radioactive Waste System Service Water System RBS                         TBD VY                          Fire Protection - Water System
[P-16911]                       Fuel Oil Service Water Standby Gas Treatment W3                           TBD}}

Revision as of 22:21, 4 November 2019

Official Exhibit - ENT000599-00-BD01 - EN-DC-343, Underground Piping and Tanks Inspection and Monitoring Program, Rev. 6 (Nov. 30, 2012)
ML13039A447
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/30/2012
From: Susanne Woods
Entergy Nuclear Operations
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 23852, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 EN-DC-343, Rev 6
Download: ML13039A447 (23)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.

In the Matter of:

(Indian Point Nuclear Generating Units 2 and 3)

ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: ENT000599-00-BD01 Identified: 12/10/2012 Admitted: 1/15/2013 Withdrawn: ENT000599 Rejected: Stricken: Submitted: December 6, 2012 Other:

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 1 OF 23 Underground Piping and Tanks Inspection and Monitoring Program Procedure Contains NMM eB REFLIB Forms: YES NO Effective Procedure Owner: Steven Woods Governance Owner: Oscar Limpias Date Title: Manager - EP&C Title: VP Engineering 11/30/2012 Site: PNPS Site: HQN Exception Site Site Procedure Champion Title Date*

ANO William Greeson Manager, Programs & Components N/A BRP N/A CNS Troy Barker Manager, Programs & Components GGNS Linda Patterson Manager, Programs & Components IPEC Michael Tesoriero Manager, Programs & Components JAF Kevin Irving Manager, Programs & Components PLP James Miksa Manager, Programs & Components PNPS Steven Woods Manager, Programs & Components RBS Charles Coleman Manager, Programs & Components VY George Wierzbowski Manager, Programs & Components W3 Ran Gilmore Manager, Programs & Components N/A NP HQN Joe Abisamra Chief Engineer Site and NMM Procedures Canceled or Superseded By This Revision Process Applicability Exclusion: All Sites:

Specific Sites: ANO BRP GGNS IPEC JAF PLP PNPS RBS VY W3 Change Statement Revision 6 is a revision to assure consistency with CEP-UPT-0100 and NEI 09-14.

Added/updated few references in section 2 Added/updated definitions in section 3 to match those included in NEI 09-14 Rev 1 Added responsibility in section 4 for System Engineering to report in the INPO Consolidated Entry System (ICES - formerly EPIX) ALL identified underground pipe/tank leakages Relaxed requirement for applying API 570 when inspecting Piping/Tanks used to convey petroleum products in section 5.1 Added/updated few interfaces in section 6.0 Updated section 8.0 Revised Attachment 9.1 to include the option of using industry software.

Updated Attachment 9.2 Made some editorial changes

  • Requires justification for the exception:

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 2 OF 23 Underground Piping and Tanks Inspection and Monitoring Program

_____________________________________________________________________

TABLE OF CONTENTS Section Title Page 1.0 PURPOSE .................................................................................... 3

2.0 REFERENCES

.................................................................................. 3 3.0 DEFINITIONS.................................................................................... 5 4.0 RESPONSIBILITIES ......................................................................... 8 5.0 DETAILS .................................................................................. 11 6.0 INTERFACES ................................................................................. 18 7.0 RECORDS .................................................................................. 19 8.0 SITE SPECIFIC COMMITMENTS .................................................... 19 9.0 ATTACHMENTS ............................................................................. 20 ATTACHMENT 9.1 ROADMAP FOR UNDERGROUND PIPING AND T ANKS INSPECTION AND MONITORING PROGRAM ............................................ 21 ATTACHMENT 9.2 LIST OF AFFECTED UNDERGROUND PIPING SYSTEMS AS PER LICENSE RENEWAL APPLICATION (LRA) ............................................. 22

_____________________________________________________________________

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 3 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 1.0 PURPOSE

[1] This procedure provides the requirements for each site to develop its own site specific Underground Piping and Tanks (UPT) Inspection and Monitoring Program (hereafter referred to as the Program).

[2] This procedure provides a set of recommendations for Entergy nuclear power plants to use in implementing an effective program to detect and mitigate life-limiting degradation that may occur in underground piping systems and tanks. For plants that have received a renewed operating license, this procedure incorporates commitments for the Underground Piping and Tanks program. [LO-LAR-2008-0048 CA-0002, CA-0046]

[RLC LO-LAR-2009-00244 CA-15] [RC07.2029.01] [NL-09-111] [P-16911] [A-17827] [A-17910].

[3] This procedure is intended to supplement programs currently established for monitoring internal Microbiologically Influenced Corrosion (MIC) or Flow Accelerated Corrosion (FAC) in systems as described in EN-DC-340 and EN-DC-315.

[4] The Program consists of inspection and monitoring of selected operational underground piping and tanks for external corrosion, including crevice, general corrosion, microbiologically influenced corrosion (MIC), pitting corrosion, and other age-related degradation. However, coordination with the MIC and FAC Program owners must continuously be achieved to assure the overall health (internal and external) of the underground piping and tanks.

[5] The details of the risk ranking criteria, reasonable assurance guidance, recommendations for inspection, monitoring, and mitigation portion of this Program are contained in Program Section CEP-UPT-0100. This procedure and CEP-UPT-0100 contain the required elements to provide guidance and recommendations for a programmatic approach to help Program Owners prioritize inspections of underground segments, evaluate the inspection results, make fitness for service decisions, select a repair technique where required, and take preventive measures to reduce the likelihood and consequence of failures.

2.0 REFERENCES

[1] NUREG-1801, Generic Aging Lessons Learned (GALL) Report, Rev. 2, December 2010

[2] Entergy Quality Assurance Program Manual (QAPM)

[3] NUREG-6876, Risk-Informed Assessment of Degraded Buried Piping Systems in Nuclear Power Plants, June 2005

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 4 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 2.0 Cont.

[4] 10 CFR 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants

[5] 10 CFR 50, Appendix B Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants

[6] ANSI N18.7-1976, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants

[7] NUMARC 93-01 (NEI 93-01), Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, April 2011

[8] NEI 95-10, Industry Guideline for Implementing the Requirements of 10 CFR Part 54

-The License Renewal Rule, June 2005

[9] NEI 07-07 Final, Industry Ground Water Protection Initiative, Final Guidance Document, August 2007

[10] EPRI 1021175, Recommendations for an Effective Program to Control the Degradation of Buried and Underground Piping and Tanks (1016456 Rev 1),

December 2010

[11] EPRI Report 1011829, Condition Assessment of Large-Diameter Buried Piping, Phase 2: Vehicle Design and Construction, December 2005

[12] INPO Operating Experience Digest OED 2007-09, External Degradation of Buried Piping, April 2007

[13] EPRI 1011905, Cathodic Protection System Application and Maintenance Guide, December 2005

[14] EPRI Report 1021470, Balance of Plant Corrosion - The Buried Pipe Reference Guide, December 2010

[15] NUREG-1801, Generic Aging Lessons Learned (GALL) Report, Rev 0 April 2001, Rev1 September 2005, and Rev 2 December 2010.

[16] API Standard 570, In-Service Inspection, Rating, Repair, and Alteration of Piping Systems, Third Edition, November 2009

[17] NACE Standard Recommended Practice RP-0502-2002, Pipeline External Corrosion Direct Assessment Methodology

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 5 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 2.0 Cont.

[18] NACE Standard Practice RP0169-2007, Control of External Corrosion on Underground or Submerged Metallic Piping Systems

[19] NACE Standard Test Method TM0497-2002, Measurement Techniques Related to Criteria for Cathodic Protection on Underground or Submerged Metallic Piping Systems

[20] NEI-09-14 Rev 1 - Nuclear Energy Institute, Guideline for the Management of Underground Piping and Tank Integrity, December 2010

[21] Engineering Report ECH-EP-10-00001, Radiological SSC Groundwater Initiative Risk Evaluation Criteria, June 2010

[22] EPRI 1021561, Inspection Methodologies for Buried Piping and Tanks, August 2010

[23] Standard EN-EP-S-002-MULTI, Underground Piping and Tanks General Visual Inspection

[24] EPRI 1016276, An Assessment of Industry Needs for Control of Degradation in Buried Pipe, March 2008

[25] EPRI 1000115, Evaluation of Torsional Guided Waves for Inspection of Service Water Piping, December 2000

[26] EPRI 1019115, Buried Pipe Guided Wave Examination Reference Document, October 2009

[27] EPRI 1019157, Plant Support Engineering: Guideline on Nuclear Safety-Related Coatings, Revision 2 (Formerly TR-109937 and 1003102), December 2009

[28] CEP-NDE-0100, Administration and Control of NDE

[29] INPO 12-009, ICES Reporting Requirements and Standards, August 2012 3.0 DEFINITIONS

[1] Baseline Inspection - The inspection of a new or replaced pipe or component that has not previously been involved in plant operations.

[2] Buried Piping and Tanks - Piping and tanks that are below grade and in direct contact with the soil or concrete (e.g. a wall penetration or embedded in concrete).

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 6 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 3.0 Cont.

[3] Cathodic Protection (CP) - The application of a current to the outside surface of the pipe with the purpose of reducing the susceptibility of exposed segments of buried pipe (exposure caused by coating deterioration, damage or voids) to corrosion. The application of a low voltage residual current causes a shift (with respect to the anode) of the electrolytic potential at pipe exposed sites and thereby places the pipe in a more protected, less corrosive environment.

[4] Component - A portion of an underground piping or tank system with defined boundaries.

[5] Concrete Piping - Piping that is manufactured from concrete or cementitious material with or without metallic reinforcement. Concrete piping is generally used for large diameter lines such as the water intake piping from sources of cooling water (e.g.,

lakes, rivers, and reservoirs).

[6] Corrosion - The chemical or electrochemical reaction between a material, usually a metal, and its environment that produces a deterioration of the material and its properties. A common example is the oxidation of an iron-based alloy exposed to water (rusting).

[7] Crevice Corrosion - Localized corrosion that may occur in areas of stagnant solutions existing in crevices, joints, and contacts between metals or between metals and non-metals.

[8] Direct Examination - A Nondestructive Evaluation (NDE) examination where the NDE sensor(s) is in immediate contact with or in close proximity to the section of the component being examined. Results provide some degree of quantitative measurement of wall thickness or discontinuity size. Direct examinations can be performed from the interior or exterior surface. Detection and characterization capabilities vary by NDE method as well as by specific NDE technique. Examples of NDE methods include ultrasonics, eddy current, radiography, visual and various electromagnetic techniques. Visual examinations [das1]should be supplemented with NDE or engineering judgment that addresses the condition of the pipe wall.

[9] Erosion - Deterioration of materials by the abrasive action of moving fluids or gases, usually accelerated by the presence of solid particles or gases in suspension. When corrosion occurs simultaneously, the term Erosion/Corrosion is often used.

[10] General Corrosion - This type of corrosion attacks the entire un-protected surface in a uniform manner. Of all types of corrosion, this is the least damaging and easiest to determine or quantify the corrosion rate. (Also referred to as uniform corrosion).

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 7 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 3.0 Cont.

[11] Holidays - Discontinuities in coatings, (e.g., pinholes, voids)

[12] Indirect Inspection - Survey techniques used to assess the likelihood of degradation without having direct access to the section of the component being examined. These inspections typically measure surrounding conditions that may be indicative of corrosion or damage. Results are typically qualitative and less accurate than direct examinations. Examples of indirect inspection methods include over-the-line surveys and for the purpose of this document, long range guided wave.

[13] Initial Inspection - The inspection of a pipe or component that has been in-service but has not been previously inspected..

[14] Inspection Program - A systematic evaluation of in-scope underground components using various techniques [e.g., ultrasonic testing (UT), radiographic testing (RT), visual testing (VT), leak testing (LT), eddy current testing (ET)].

[15] Licensed Material - Licensed material (from 10 CFR 20.1003) (or licensed radioactive material) means source material, special nuclear material, or byproduct material received, possessed, used, transferred or disposed of under a general or specific license issued by the Commission and/or by the state [e.g. State Pollution Discharge Elimination System (SPDES)]. Components containing radioactive licensed material covered under NEI 09-14 should be consistent with those identified in NEI 07-07.

[16] Microbiologically Influenced Corrosion (MIC) - Corrosion caused by the presence and/or activities of microorganisms in biofilms on the surface of the material.

Microorganisms have been observed in a variety of environments that include seawater, natural freshwater (lakes, rivers and wells), soils and sediment.

Microbiological organisms include bacteria, fungi and algae.

[17] Opportunistic Inspection - An inspection performed when underground components are exposed or excavated due to another activity providing an opportunity to inspect and document the results for a program component.

[18] Pitting - A form of localized corrosion that results in the formation of small, sharp edged cavities in a metal.

[19] Quality Assurance Classification - For the purposes of this procedure, Safety Class or QA Category is used to designate safety classification. Refer to EN-DC-167 for a summary of the corresponding legacy classifications formerly used at each plant and how they are classified as safety related, augmented, and non-safety related.

[20] Redox - Of or relating to oxidation-reduction.

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 8 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 3.0 Cont.

[21] Resistivity - The longitudinal electrical resistance of a uniform rod of unit length and unit cross-sectional area. The reciprocal of conductivity.

[22] Soil Resistivity Measurement - A method of subsurface detection which measures changes in conductivity by passing electrical current through ground soils. This is generally a consequence of moisture content, and in this way, buried features can be detected by differential retention of groundwater.

[23] Subsequent Re-inspection - The inspection of a component that has been previously subjected to a Baseline Inspection and/or an Initial Inspection.

[24] Tunnel - A structure that is outside of a building, below grade, designed to accommodate personnel, and not routinely accessible.

[25] Underground Piping - All piping that is below grade, not accessible, and outside of buildings. Underground piping may or may not be in direct contact with soil or concrete. This includes piping that is directly buried and those that are embedded in concrete or located in underground concrete vaults, tunnels, or guard pipes. Buried piping is considered to be a subset of underground piping

[26] Underground Tank - All tanks that are outside of buildings and sufficiently below grade such that there is a reasonable possibility that leakage from inaccessible portions of the tank may not be detected. These tanks are below grade and may or may not be in direct contact with soil or concrete. This includes tanks that are directly buried and those that are embedded in concrete or located in underground concrete vaults or tunnels.

[27] Uniform Corrosion - See General Corrosion.

[28] Vault - A structure that is outside of a building, below grade, not designed to accommodate personnel and not routinely accessible.

[29] Visual Inspection - involve direct observation by inspectors or by the use of remote visual inspection devices. Visual inspections may include the use of pit gauges to assess the extent of any degradation noted.

4.0 RESPONSIBILITIES

[1] The Director, Engineering (Headquarters), is responsible for:

a) Providing corporate management, governance, and oversight of UPT Program activities from a fleet perspective.

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 9 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 4.0 [1] Cont.

b) Ensuring fleet focus and alignment of the UPT Program implementation.

c) Monitoring UPT Program health, assessment results, and ensuring fleet coordination of UPT Program activities.

[2] The Director, Engineering (Site), is responsible for:

a) Overall development, maintenance, administration, and control of the UPT Program.

b) Ensuring coordination of the UPT Program activities among the various departments involved at the applicable site.

[3] The Manager, Programs & Components (Headquarters), is responsible for:

a) Providing governance for the UPT Program across the fleet.

b) Standardizing the UPT Program from site-to-site.

c) Resolving conflicts that may arise in the interpretation of this procedure.

[4] The Manager, Programs & Components (Site), is responsible for:

a) Implementing all aspects of this Program at the station.

b) Ensuring that all activities associated with this Program are performed in a timely and cost efficient manner commensurate with the risk and safety significance of the issue.

c) Allocating adequate resources as necessary to implement this Program.

d) Ensuring adequate training of UPT Program owners, site implementers, and backup personnel.

[5] The Supervisor, Programs & Components (Headquarters), is responsible for:

a) Providing management oversight of the UPT Program across the fleet.

b) Coordinating fleet resources to participate in UPT Program assessments and benchmarks, as required.

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 10 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 4.0[5] Cont.

c) Ensuring (i.e., in cooperation with UPT program owners from other sites) that industry activities specific to the UPT Program are adequately supported by the fleet.

[6] The Supervisor, Programs & Components (Site), is responsible for:

a) Assigning a Program Owner to develop, implement, and maintain the sites Program in accordance with this procedure.

b) Ensuring the timely completion of inspections.

[7] The Program Owner (Headquarters), is responsible for:

a) Maintaining cognizance of industry issues/events, operating experience, best practices, and NRC expectations.

b) Coordinating with site implementation personnel and management, as necessary, to ensure effective implementation of the UPT Program.

c) Coordinating and participating in periodic assessments of the UPT Program across the fleet using the guidance provided under EN-LI-104.

d) Coordinating periodic meetings and teleconference calls with UPT Program owners.

e) Providing clarification or interpretation of the UPT Program procedural, regulatory, and code requirements.

f) Act as the point of contact for external organizations (e.g. NEI, INPO) g) Reviewing UPT Program performance indicators and health reports across the fleet.

[8] The Program Owner (Site), is responsible for:

a) Developing, implementing, and maintaining a site specific Program in accordance with the requirements of this procedure and EN-DC-174.

b) Developing Program and inspection documents.

c) Reviewing site maintenance records for designated underground piping/tanks to determine if previous maintenance and inspections can be credited for extended period of operation inspection requirements.

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 11 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 4.0 [8] Cont.

d) Initiating Condition Reports (CRs) for inspected conditions that fail to meet the acceptance criteria.

e) Creating and updating the program database.

f) Interfacing with other discipline Engineers as required in order to implement this procedure.

[9] The Design Engineering personnel (Site), is responsible for:

a) Supporting Program Owner in developing and maintaining a site specific Program in accordance with this procedure.

b) Developing Acceptance Criteria for underground piping and tanks.

c) Supporting the review of inspection results and evaluations.

[10] The System Engineering personnel (Site), is responsible for:

a) Ensuring that the site CP System is evaluated for proper operation and that routine maintenance and surveillance testing is being performed.

b) Verifying that proper acceptance criteria have been established for evaluation of the CP test results.

c) Confirming that the CP System is annually evaluated by a National Association of Corrosion Engineer certified specialist as recommended by EPRI 1021175.

d) Reporting in the INPO Consolidated Entry System (ICES) ALL identified underground pipe/tank leakages (INPO 12-009).

5.0 DETAILS 5.1 PRECAUTIONS AND LIMITATIONS

[1] The risk of a failure caused by corrosion, directly or indirectly represents the most common hazard associated with underground piping and tanks. The corrosion risk assessment, described in CEP-UPT-0100, is organized into categories reflecting four factors (soil resistivity, soil drainage, piping/tank material type, and CP/coating) that impact the degree of corrosion risk due to design and environmental conditions.

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 12 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 5.1 Cont.

[2] Building the risk assessment tool requires the following four steps:

a) Segmenting: dividing a system into smaller segments. The size of each segment shall reflect practical considerations of operation, maintenance, and cost of data gathering with respect to the benefit of increased accuracy.

b) Customizing: deciding on a list of risk contributors and risk reducers and their relative importance.

c) Data gathering: building a database by completing an evaluation for each segment of the system.

d) Maintenance: identifying when and how risk factors can change and updating these factors accordingly.

[3] Be aware that backfilling an excavated area could increase the corrosion susceptibility in that area of the buried piping or tank due to changing soil conditions. Consider re-using the same (or less corrosive) backfill in areas that are excavated.

[4] When the inspection entails unearthing a segment, caution shall be used so as to not disturb the protective exterior coating or the CP system, as applicable.

[5] Piping/Tanks used to convey petroleum products may be inspected by an authorized inspection agency in accordance with the provisions of API 570 or by a qualified inspector in accordance with CEP-NDE-0100 and EN-EP-S-002-MULTI.

[6] Work Orders involving excavation should consider including a task for the Site UPT, Site MIC, Site FAC, and Site Structures Monitoring Program Owners to be notified for possible opportunistic inspections. [LO-LAR-2008-0048 CA-2] [LO-LAR-2008-0048 CA-46]

[RLC LO-LAR-2009-00244 CA-63] [RC07.2029.01] [RC07.2029. 50] .[A-17827] [A-17910] [P-16911]

[NL-09-111]

[7] New underground segments that are installed in the plant shall be inspected and documented by the Program Owner prior to burial. Coating condition, backfill/trench soil conditions, associated CP, baseline inspection data, etc. are items that should be documented.

[8] The use of new technologies to establish component condition should be an indicator to be reviewed on a continuous basis. Existing technologies are being enhanced and applied in innovative solutions. Like other fields, it is important that the Program Owner learns from plant experiences, strives to apply new technologies important in identifying component failures, and seeks to develop innovative means to apply existing technologies.

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 13 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 5.2 PROCEDURES AND OVERSIGHT

[1] Each Program Owner must take advantage of site excavating activities to perform opportunistic inspections. [LO-LAR-2008-0048 CA-0002] [RC07.2029.01] .[A-17827] [A-17910]

[RLC LO-LAR-2009-00244 CA-63] [NL-09-111] [P-16911]

[2] CEP-UPT-0100 details the program requirements associated with scope, risk ranking, and examination techniques.

[3] A long range plan for each plant should exist to ensure plant management is aware of funding requests and long term health of plant underground piping and tanks.

[4] Program performance indicators and health reports in accordance with EN-DC-329 also ensure program health and communication with plant management.

[5] Each Program Owner shall be qualified in accordance with the Entergy fleet qualification card.

[6] Industry training should also be included in the training of the Underground Pipe and Tanks Program Owner.

5.3 RISK RANKING

[1] Two options for performing risk ranking of a given location (segment) can be used.

The first option utilizes risk analysis, where the risk is equal to a quantified likelihood of the failure times the quantified consequences of the failure. The second option, detailed in CEP-UPT-0100, places each location (segment) into a risk matrix based on a non-quantified likelihood of failure (i.e., low, medium, and high) versus the non-quantified consequences of failure (i.e., none, low, medium, and high). Both approaches require inspection of a prioritized sample of risk-ranked locations and should prevent most leaks and failures of Underground systems.

[2] Computer software can be used to model underground segments to help determine the likelihood of failure and the consequence of failure. The computer modeling can substitute for the manual risk ranking as described in CEP-UPT-0100 and Engineering Report ECH-EP-10-00001.

[3] A set of as-built drawings should be assembled showing the route of underground segments, including their location relative to other underground and above ground buildings, structures, and commodities.

[4] An underground segment whose failure is inconsequential and would cause no direct or collateral damage to plant SSCs may be excluded from the scope of the program.

A formal write-up for that exclusion should be considered.

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 14 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 5.3 Cont.

[5] Line specific data shall be collected and compiled for use in risk ranking, inspection, planning, and fitness for service assessment. The line may be subdivided into segments of similar characteristics. Lines that have similar design characteristics but have physical elevation differences should be segregated into upper and lower elevations in relationship to groundwater and drainage. The lower elevations of these lines (i.e., wetter ground) should be a higher inspection priority.

[6] Soil samples should be collected for analysis to help assess the likelihood of outside diameter corrosion.

[7] Where underground segments are protected by a CP system, the CP system should be annually inspected and tested to assess its continued adequacy.

[8] An impact assessment (Safety Class, Public Risk, and Economics) shall be conducted to help rank components/segments (see CEP-UPT-0100).

[9] The potential for corrosion of underground segments shall be evaluated to determine the likelihood of failure for each pipe segment (see CEP-UPT-0100).

[10] Underground radiological piping and tanks are by definition considered High Risk in this Program due to industry operating experience and the resulting public concern.

Consequently, all radiological underground piping/tanks are assigned a High inspection priority

[11] The High Risk characterization of underground radiological piping and tanks will be further categorized into High-Low, High-Medium and High-High risk per Engineering Report ECH-EP-10-00001. This will allow for relative ranking of one High Risk radiological component versus another.

5.4 INSPECTIONS

[1] In general, inspections should be performed at the segments that have the highest risk ranking as determined above. Other considerations such as access and cost may also be considered when the relative risk rankings are similar.

[2] The applicable Code required minimum design thickness, tmin, to be used in the fitness-for-service assessment should be determined before performing direct examinations, if possible.

[3] Classic non-destructive examinations (surface and volumetric) are performed either by entering the segment (if sufficiently large) with the use of robots or pigs, by tools using electronic scanning techniques or by excavation to the segment surface, following plant procedures. Indirect inspection tools such as Direct Current Voltage Gradient (DCVG) and Guided Wave can assist the inspection process as a screening tool.

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 15 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 5.4 Cont.

[4] When an underground segment is uncovered, the coating should be inspected by an experienced qualified person in accordance with Standard EN-EP-S-002-MULTI. The results should be documented and include relevant photographs or video. When an underground segment is uncovered (OD) or entered internally (ID) for any reason, as a minimum it should be visually inspected for evidence of corrosion or damage.

Particular attention should be paid to the joints, especially welds, as they often are more susceptible to degradation than the base metal. [A-16753] [LO-LAR-2010-00232]

[5] The results of the inspection should be documented using Standard EN-EP-S-002-MULTI and any relevant photographs or videos should be included in the Program Notebook.

[6] A volumetric examination technique should be used to determine wall loss, measure remaining thickness, or examine a weld. Results shall be evaluated for fitness-for-service.

[7] There are several NDE methods that are applicable to underground piping inspections.

See EPRI Report 1021175, EPRI IR-2010-409, and CEP-UPT-0100 for further discussion on NDE methods.

[8] The following are general parameters to be inspected and documented for future reference [refer to CEP-UPT-100, section 5.2.24]:

a) External coating and wrapping condition.

b) Pipe wall thickness degradation.

c) Tank plate thickness degradation.

d) CP System Performance (if applicable).

[9] A CR shall be initiated if degradation is identified or the acceptance criteria are not met.

5.5 FITNESS FOR SERVICE (FFS) [LO-LAR-2008-0048-0002] [RC07.2029.01] [A-17827] [A-17910]

[1] The integrity assessment shall be based on the design analysis of the underground system.

[2] The inspection results shall be compiled and categorized. A projection of future damage shall be estimated based on current inspection results, planned repairs, and the time to the next planned inspection or repair.

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 16 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 5.5 Cont.

[3] Methods and criteria should be in place prior to inspections to assess the significance of inspection results by applying the appropriate FFS assessment method, consistent with the damage mechanism and licensing commitments. [Refer to CEP-UPT-0100, section 5.5].

[4] The knowledge gained through the FFS process should be used to review and adjust as necessary the risk ranking and the inspection plan.

[5] A Condition Report (CR) shall be written if degradation is identified or acceptance criteria are not met [refer to CEP-UPT-0100, section 5.5]. The corrective actions may include engineering evaluations, scheduled inspections, and change of coating or replacement of corrosion susceptible components. Components that do not meet the acceptance criteria shall be dispositioned by engineering via the Engineering Change (EC) process (EN-DC-115).

[6] Identified degraded conditions that are accepted as is should be included in the Margin Management Database as appropriate per EN-DC-195.

5.6 REPAIRS

[1] Contingency planning should be in place for prompt implementation in case an underground segment fails to meet acceptance criteria.

[2] The detailed design of the selected repair option should accommodate the specifics of the failed line.

[3] Leak detection techniques and leak isolation options should be pre-selected for prompt implementation should a leak occur.

5.7 PREVENTION, MITIGATION AND LONG TERM STRATEGY

[1] Where the risk of failure is unacceptable, preventive measures and options to mitigate the possible leakage should be implemented.

[2] Newly installed underground piping and tanks should be coated as applicable during installation with a protective coating system in accordance with site specifications.

These coatings include coal tar enamel with fiberglass wrap and a Kraft paper outer wrap, a polyolefin tape coating, or a fusion bonded epoxy coating. These coatings help protect the piping and tanks from contacting the aggressive soil environment. As part of preventive measures, the existing CP system may be updated or a new CP system may be installed. [P-16911] [IP-RPT-11-LRD-07]

[3] Whenever components are excavated, then careful and stringent controls shall be in-place to assure proper or improved fill material is used to re-bury the component.

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 17 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 5.7 Cont.

[4] Baseline inspections shall be performed prior to piping installation. Pipe coating, trenching condition, backfill/bedding materials, and any nearby CP are items that can be documented in the Program Notebook.

[5] For plants with installed CP systems for underground piping and tanks, ensure Preventive Maintenance tasks exist to verify proper operation of these systems (recommended at least semi-annually). Verify corrective maintenance tasks for CP system identified deficiencies are corrected on a schedule commensurate with the safety significance of the system/component being protected.

[6] Operating Experience (OE) reviews are to be included as part of the Underground Piping and Tanks Program Notebook.

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 18 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 6.0 INTERFACES

[1] Engineering Standard EN-CS-S-008-MULTI, Pipe Wall Thinning Structural Evaluation

[2] CEP-NDE-0112, Certification of Visual Examination Personnel

[3] CEP-UPT-0100, Underground Piping and Tanks Inspection and Monitoring

[4] EN-AD-103, Document Control and Records Management Programs

[5] EN-DC-115, Engineering Change Process

[6] EN-DC-134, Design Verification

[7] EN-DC-141, Design Inputs

[8] EN-DC-147, Engineering Reports

[9] EN-DC-167, Classification of Structures, Systems, and Components

[10] EN-DC-174, Engineering Program Sections

[11] EN-DC-195, Margin Management

[12] EN-DC-315, Flow Accelerated Corrosion Program

[13] EN-DC-340, Microbiologically Influenced Corrosion (MIC) Monitoring Program

[14] EN-IS-112, Trenching, Excavation, and Ground Penetrating Activities

[15] EN-TQ-104, Engineering Support Personnel Training Program

[16] EN-QV-111, Training and Certification of Inspection/Verification and Examination Personnel

[17] EN-WM-100, Work Request (WR) Generation, Screening and Classification

[18] EN-WM-101, On-Line Work Management Process

[19] EN-DC-329, Engineering Programs Control and Oversight

[20] EN-LI-102, Corrective Action Process

[21] FTK-ESPP-G00121, Underground Piping/Tanks Program Owner

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 19 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 6.0 Cont.

[22] EN-LI-104, Self-Assessment and Benchmark Process

[23] EN-CY-111, Radiological Ground Water Monitoring Program 7.0 RECORDS

[1] All data generated during the course of underground piping and tanks inspections should be referenced or retained by the Program Owner in the program notebooks.

Follow applicable QA retention requirements and guidance contained in EN-DC-329.

[2] Records, evaluations and reports generated as a result of the periodic inspections shall be retained and maintained in accordance with EN-AD-103 and as directed in the site Program, as applicable.

[3] Changes to the Program based on the periodic review shall be performed in accordance with EN-DC-174, Engineering Program Sections.

8.0 SITE SPECIFIC COMMITMENTS Step Site Document Commitment Number or Reference 1.0[2], 5.1[6], License Renewal ANO1 A-17827 5.2[1], 5.5 Commitment 1.0[2], 5.1[6], License Renewal ANO2 A-17910 5.2[1], 5.5 Commitment 1.0[2], 5.1[6], License Renewal IPEC NL-09-111 5.2[1] Commitment 5.7 [2], Attachment License Renewal IPEC IP-RPT-11-LRD07, Items 1b & 1a 9.2 Commitment All, 1.0[2], 5.1[6], License Renewal JAF LO-LAR-2008-0048 CA-2 5.2[1], 5.5 Commitment License Renewal LO-LAR-2008-0048 CA-46 1.0[2], 5.1[6] JAF Commitment (Underground fuel storage tanks)

RLC LO-LAR-2009-00244 CA-15 1.0[2], Attachment License Renewal PLP (Implement buried services 9.2 Commitment monitoring program)

License Renewal RLC LO-LAR-2009-00244 CA-69 Attachment 9.2 PLP Commitment (Inspect below grade fire piping)

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 20 OF 23 Underground Piping and Tanks Inspection and Monitoring Program 8.0 Cont.

Step Site Document Commitment Number or Reference RLC LO-LAR-2009-00244 CA-63 5.1[6], 5.2[1], License Renewal PLP (Buried structures opportunistic Attachment 9.2 Commitment inspection)

RLC LO-LAR-2009-00244 CA-38 License Renewal 5.4 PLP (Perform inspection of a sample of Commitment buried piping?

All, 1.0[2], 5.1[6], License Renewal PNPS RC07.2029.01 5.2[1], 5.5 Commitment License Renewal 5.1[6] PNPS RC07.2029.50 Commitment 1.0[2], 5.1[6],

License Renewal 5.2[1], 5.7[2], VTY P-16911 Commitment Attachment 9.2 License Renewal 5.4[4] VTY A-16753 (LO-LAR-2010-00232)

Commitment 9.0 ATTACHMENTS

[1] Roadmap for Underground Piping and Tanks Inspection and Monitoring Program

[2] List of Affected Underground Piping Systems as per Licensing Renewal Application (LRA)

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 21 OF 23 Underground Piping and Tanks Inspection and Monitoring Program ATTACHMENT 9.1 ROADMAP FOR UNDERGROUND PIPING AND T ANKS I NSPECTION AND MONITORING PROGRAM Sheet 1 of 1

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 22 OF 23 Underground Piping and Tanks Inspection and Monitoring Program ATTACHMENT 9.2 LIST OF AFFECTED UNDERGROUND PIPING SYSTEMS AS PER LICENSE RENEWAL APPLICATION (LRA)

Sheet 1 of 2 Station System ANO Unit 1 Service Water System Unit 2 Service Water System The plants Joint Fire Protection Loop Fuel Oil GGNS TBD IPEC City Water Containment Spray (IP3 only)

Fire Protection - Water System Fuel Oil Plant Drains Safety Injection Security Propane Generator (IP3 only)

Service Water Auxiliary Feedwater System River Water System (IP1 only)

Circulating Water (IP2 only)

Containment Isolation Support System JAF Condensate Storage Fire Protection - Water System Fuel Oil HPCI RCIC Radwaste and Plant Drains Security Generator Standby Gas Treatment PNPS Condensate Storage Fire Protection - Water System EDG Fuel Oil Salt Service Water Standby Gas Treatment Station Blackout DG Fuel Oil & Cooling Water

NUCLEAR QUALITY RELATED EN-DC-343 REV. 6 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 23 OF 23 Underground Piping and Tanks Inspection and Monitoring Program .2 List of Affected Underground Piping Systems as per License Renewal Application (LRA)

Sheet 2 of 2 Station System PLP Condensate System

[RLC LO-LAR-2009-00244 CA-69, Demineralized Water System CA-15, CA-38, CA-63] Diesel Fuel Oil System Feedwater System Fire Protection System Miscellaneous Gas System Radioactive Waste System Service Water System RBS TBD VY Fire Protection - Water System

[P-16911] Fuel Oil Service Water Standby Gas Treatment W3 TBD