{{#Wiki_filter:CRO-115 fnl - a   Page 1 of 10       REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
{{#Wiki_filter:CRO-115 fnl - a Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-115 Withdraw Control Rod Group One to 50%
CANDIDATE EXAMINER


CRO-115 Withdraw Control Rod Group One to 50%        CANDIDATE    EXAMINER CRO-115 fnl - a   Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Latch Group 7 Control rods and withdraw Safety Rod Group 1 to 50% Alternate Path:
CRO-115 fnl - a Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
No         Facility JPM #:
Latch Group 7 Control rods and withdraw Safety Rod Group 1 to 50%
CRO-111 K/A Rating(s):
Alternate Path:
System:    001 K/A:     A4.06 Rating:     2.9/3.2 Task Standard:
No Facility JPM #:
Latch Group 7 Control Rod and withdraw Safety Rod Group 1 To 50%
CRO-111 K/A Rating(s):
in accordance with OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%
System:    001 K/A:       A4.06 Rating:   2.9/3.2 Task Standard:
Preferred Evaluation Location:
Latch Group 7 Control Rod and withdraw Safety Rod Group 1 To 50% in accordance with OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)
Preferred Evaluation Method:
Preferred Evaluation Location:                                       Preferred Evaluation Method:
Simulator
Simulator __X ___ In-Plant ___ ___                                   Perform __X___ Simulate __ __
__X ___ In-Plant ___ ___     Perform __X___ Simulate __ __


==References:==
==References:==


OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%
OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)
) OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1)   Validation Time:
OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1)
20 min.       Time Critical: No ====================================================================================
Validation Time: 20 min.                                                     Time Critical: No
Candidate:
====================================================================================
_______________________________________
Candidate:       _______________________________________                     Time Start: _______________
Time Start: ____
NAME                                           Time Finish: ______________
___________    NAME     Time Finish: ______________ Performance Rating:   SAT ______ UNSAT ______
Performance Rating: SAT ______ UNSAT ______                                   Performance Time: _________
Performance Time
Examiner: ______________________________             ___________________________________/_________
: _________
NAME                                         SIGNATURE                   DATE
Examiner: ______________________________         ___________________________________/____
====================================================================================
_____    NAME     SIGNATURE                           DATE
Comments
====================================================================================
 
Comments CRO-115 fnl - a   Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS
CRO-115 fnl - a Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS
: 1. RECALL Snap 213 2. Go To RUN CRO-115 fnl - a   Page 4 of 10 Tools/Equipment/Procedures Needed OP/1/A./1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)
: 1. RECALL Snap 213
READ TO OPERATOR DIRECTIONS TO STUDENT
: 2. Go To RUN
 
CRO-115 fnl - a Page 4 of 10 Tools/Equipment/Procedures Needed OP/1/A./1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS Unit 1 startup in progress following a 28 day refueling outage Tc = 536ºF RCS pressure = 2155 psig OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1) is in progress at step 2.6.5 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) is in progress and has been completed through step 4.8 (Groups 1 through 6 have been manually latched).
INITIATING CUE The Control Room SRO directs you to continue with OP1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) beginning at Step 4.9.
Latch of groups 1 - 6 is complete. Manual Latch of Group 7 is required.


I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
CRO-115 fnl - a Page 5 of 10 START TIME: _______
INITIAL CONDITIONS Unit 1 startup in progress following a 28 day refueling outage Tc = 53 6ºF  RCS pressure =
STEP 1:     Step 4.9 Perform latch and PI alignment of Group 7, as follows:         CRITICAL STEP 4.9.1 Ensure GROUP SELECT SWITCH to 7.
2155 psig  OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.
___ SAT STANDARD:   Ensures Group Select Switch selected to Group 7 COMMENTS:
7 (Unit Startup From 532°F/2155 psig to MODE 1) is in progress at step 2.6.5 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) is in progress and has been completed through step 4.8 (Groups 1 through 6 have been manually latched).
___ UNSAT STEP 2:     Step 4.9.2 Verify only Group 7 CONTROL ON lights are ON. (PI panel)
INITIATING CUE The Control Room SRO directs you to continue with OP1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) beginning at Step 4.9. Latch of groups 1
___ SAT STANDARD:   Verifies only Group 7 lights are ON COMMENTS:                                                                               ___ UNSAT STEP 3:     Step 4.9.3                                                             *CRITICAL STEP IF Manual Latch and PI Alignment desired, perform the following: (R.M.)
- 6 is complete. Manual Latch of Group 7 is required.
CRO-115 fnl - a   Page 5 of 10 START TIME: _______
STEP 1: Step 4.9 Perform latch and PI alignment of Group 7, as follows:
4.9.1 Ensure GROUP SELECT SWITCH to 7.
STANDARD: Ensures Group Select Switch selected to Group 7 COMMENTS:     CRITICAL STEP
___ SAT    ___ UNSAT STEP 2: Step 4.9.2 Verify only Group 7 CONTROL ON lights are ON. (PI panel)
STANDARD: Verifies only Group 7 lights are ON COMMENTS:       ___ SAT    ___ UNSAT STEP 3: Step 4.9.3 IF Manual Latch and PI Alignment desired, perform the following: (R.M.)
A. *Ensure LATCH MANUAL is ON.
A. *Ensure LATCH MANUAL is ON.
B. *Ensure IN LIMIT BYPASS is ON.
B. *Ensure IN LIMIT BYPASS is ON.
C.
C. *Insert Group 7 for  5 seconds.
* D. Verify all 0% lights ON for Group 7. (PI Panel)
D. Verify all 0% lights ON for Group 7. (PI Panel)
E. *Ensure LATCH MANUAL is OFF.
E. *Ensure LATCH MANUAL is OFF.
F. *Ensure IN LIMIT BYPASS is OFF.
F. *Ensure IN LIMIT BYPASS is OFF.                                 ___ SAT G. Select RPI RESET.
G. Select RPI RESET. H. Verify Group 7 API/RPI indications agree. (PI Panel)
H. Verify Group 7 API/RPI indications agree. (PI Panel)
STANDARD: Candidate performs A  
STANDARD:   Candidate performs A - H above to manually latch the Group 7 rods
- H above to manually latch the Group 7 rods COMMENTS:     *CRITICAL STEP
___ UNSAT COMMENTS:
___ SAT 


___ UNSAT CRO-115 fnl - a   Page 6 of 10 STEP 4: Step 4.9.4 IF Auto Latch and PI Alignment desiredSTANDARD: Determine that Auto latch is NOT desired and continue to Step 4.10.
CRO-115 fnl - a Page 6 of 10 STEP 4:   Step 4.9.4 IF Auto Latch and PI Alignment desired STANDARD: Determine that Auto latch is NOT desired and continue to Step 4.10.
COMMENTS:             ___ SAT     ___ UNSAT STEP 5: Step 4.10 Reset Group 8 RPI, as follows:
COMMENTS:
___ SAT
___ UNSAT STEP 5:   Step 4.10 Reset Group 8 RPI, as follows:
4.10.1 Ensure GROUP SELECT SWITCH to 8.
4.10.1 Ensure GROUP SELECT SWITCH to 8.
STANDARD: Candidate places the Group Select Switch to Group 8 COMMENTS:           ___ SAT    ___ UNSAT STEP 6: Step 4.10.2 Verify Group 8 CONTROL ON lights are ON. (PI panel)
___ SAT STANDARD: Candidate places the Group Select Switch to Group 8 COMMENTS:
STANDARD: Candidate verifies that only the Group 8 lights are ON COMMENTS:         ___ SAT
___ UNSAT STEP 6:   Step 4.10.2 Verify Group 8 CONTROL ON lights are ON. (PI panel)
___ UNSAT STEP 7: Step 4.10.3 Select RPI RESET STANDARD: Candidate depresses the RPI reset selector COMMENTS:
___ SAT STANDARD: Candidate verifies that only the Group 8 lights are ON COMMENTS:                                                                     ___ UNSAT STEP 7:   Step 4.10.3 Select RPI RESET
___ SAT    ___ UNSAT CRO-115 fnl - a   Page 7 of 10 STEP 8: Step 4.10.4 Verify Group 8 API/RPI indications agree. (PI Panel)
___ SAT STANDARD: Candidate depresses the RPI reset selector
STANDARD: Candidate uses toggle switch to confirm that API/RPI indications agree.
___ UNSAT COMMENTS:
COMMENTS:           ___ SAT    ___ UNSAT  STEP 9: Step 4.11 Select FAULT RESET.
 
STANDARD: Candidate depresses the FAULT RESET selector.
CRO-115 fnl - a Page 7 of 10 STEP 8:         Step 4.10.4 Verify Group 8 API/RPI indications agree. (PI Panel)
___ SAT STANDARD:       Candidate uses toggle switch to confirm that API/RPI indications agree.
___ UNSAT COMMENTS:
STEP 9:         Step 4.11 Select FAULT RESET.
STANDARD:       Candidate depresses the FAULT RESET selector.                            ___ SAT COMMENTS:
___ UNSAT NOTE:
For the purpose of this procedure, an extended forced outage is an outage greater than 92 days where the Reactor Vessel Head is NOT removed. SR 3.1.4.2 requires the Control Rods to be tested for movement prior to entry into MODE 2.
STEP 10:        Step 4.12
___ SAT IF OWPG requires the Control Rods to be withdrawn due to an extended forced outage, perform PT/1/A/0600/015 (Control Rod Movement) for testing CRD Groups 1 thru 7 during unit startup.
___ UNSAT STANDARD:      Candidate determines from initiating cue that this startup is not from a forced outage of greater than 92 days and therefore this step is N/A.
EXAMINER CUE: If asked, this startup is a return to power following a 28 day refueling outage.
COMMENTS:
COMMENTS:
___ SAT    ___ UNSAT  NOTE: For the purpose of this procedure, an extended forced outage is an outage greater than 92 days where the Reactor Vessel Head is NOT removed. SR 3.1.4.2 requires the Control Rods to be tested for movement prior to entry into MODE 2.
 
STEP 10: Step 4.12 IF OWPG requires the Control Rods to be withdrawn due to an extended forced outage, perform PT/1/A/0600/015 (Control Rod Movement) for testing CRD Groups 1 thru 7 during unit startup.
CRO-115 fnl - a Page 8 of 10 STEP 11:     Step 4.13 Select Group 1, as follows:                     CRITICAL STEP 4.13.1 Ensure GROUP SELECT SWITCH to 1.
STANDARD: Candidate determines from initiating cue that this startup is not from a forced outage of greater than 92 days and therefore this step is N/A
STANDARD:     Candidate selects Group 1 on GROUP SELECT SWITCH.
. EXAMINER CUE:  If asked, this startup is a return to power following a 28 day refueling outage.
___ SAT COMMENTS:
COMMENTS:              ___ SAT    ___ UNSAT CRO-115 fnl - a   Page 8 of 10 STEP 11: Step 4.13 Select Group 1, as follows:
___ UNSAT STEP 12:     Step 4.13.2:
4.13.1 Ensure GROUP SELECT SWITCH to 1.
Verify only Group 1 CONTROL ON lights are ON. (PI panel)
STANDARD: Candidate selects Group 1 on GROUP SELECT SWITCH.
STANDARD:     Candidate verifies only the Group 1 lights are ON.            ___ SAT COMMENTS:
COMMENTS:       CRITICAL STEP
___ UNSAT STEP 13:     Step 4.13.3:                                               CRITICAL STEP Ensure Group 1 at 50%.
___ SAT    ___ UNSAT STEP 12: Step 4.13.2: Verify only Group 1 CONTROL ON lights are ON. (PI panel)
___ SAT STANDARD:     Candidate withdraws the Group 1 rods to 50%.
STANDARD: Candidate verifies only the Group 1 lights are ON.
COMMENTS:             ___ SAT
___ UNSAT STEP 13: Step 4.13.3
: Ensure Group 1 at 50%.
STANDARD: Candidate withdraws the Group 1 rods to 50%.
Examiner note: The candidate should update the SRO/crew when starting to withdraw Group 1 control rods. (not critical)
Examiner note: The candidate should update the SRO/crew when starting to withdraw Group 1 control rods. (not critical)
COMMENTS:       CRITICAL STEP
___ UNSAT COMMENTS:
___ SAT
STEP 14:     Step 4.13.4:
___ UNSAT  STEP 14: Step 4.13.4
Place GROUP SELECT SWITCH to OFF.
: Place GROUP SELECT SWITCH to OFF.
STANDARD:     Candidate places the GROUP SELECT SWITCH to OFF.               ___ SAT COMMENTS:
STANDARD: Candidate places the GROUP SE LECT SWITCH to OFF.
___ UNSAT END TASK TIME STOP: ________
COMMENTS:     END TASK      ___ SAT
___ UNSAT TIME STOP: ________


CRO-115 fnl - a   Page 9 of 10   CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to latch Group 7 of rods.
CRO-115 fnl - a Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP #                                         Explanation 1   This step is required to latch Group 7 of rods. If performed incorrectly the results would be the inability to withdraw Group 7 during the startup.
If performed incorrectly the results would be the inability to withdraw Group 7 during the startup.
3   This step is required to latch Group 7 of rods. If performed incorrectly the results would be the inability to withdraw Group 7 during the startup.
3 This step is required to latch Group 7 of rods. If performed incorrectly the results would be the inability to withdraw Group 7 during the startup.
11  This step is required to select the correct group of rods for withdrawal.
1 1 This step is required to select the correct group of rods for withdrawal
13  This step is required withdraw the Group 1 rods to 50% as directed..
. 1 3 This step is required withdraw the Group 1 rods to 50% as directed.
.
a    CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Unit 1 startup in progress following a 28 day refueling outage Tc = 53 6ºF  RCS pressure =
2155 psig  OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.
7 (Unit Startup From 532°F/2155 psig to MODE 1) is in progress at step 2.6.5 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Grou p 1 To 50%) is in progress and has been completed through step 4.8 (Groups 1 through 6 have been manually latched).
INITIATING CUE The Control Room SRO directs you to continue with OP1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1 To 50
%) beginning at Step 4.9.
Latch of groups 1
- 6 is complete. Manual Latch of Group 7 is required.


CRO-22 3 fnl - b Page 1 of 10      REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE
a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Unit 1 startup in progress following a 28 day refueling outage Tc = 536ºF RCS pressure = 2155 psig OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1) is in progress at step 2.6.5 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) is in progress and has been completed through step 4.8 (Groups 1 through 6 have been manually latched).
INITIATING CUE The Control Room SRO directs you to continue with OP1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) beginning at Step 4.9.
Latch of groups 1 - 6 is complete. Manual Latch of Group 7 is required.


CRO-22 3  BYPASS ES SUBSYSTEM 2
CRO-223 fnl - b Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-223 BYPASS ES SUBSYSTEM 2 CANDIDATE EXAMINER


CANDIDATE    EXAMINER CRO-22 3 fnl - b Page 2 of 10   REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Remove ES Subsystem 2 from service.
CRO-223 fnl - b Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Remove ES Subsystem 2 from service.
Alternate Path:
Alternate Path:
No         Facility JPM #:
No Facility JPM #:
CRO-223 K/A Rating(s):
CRO-223 K/A Rating(s):
System:   013 K/A:     A4.02 Rating:     4.3/4.4 Task Standard:
System: 013 K/A:       A4.02 Rating: 4.3/4.4 Task Standard:
The candidate will remove the ES Subsystem 2 from service in accordance with OP/1/A/1105/014 Enclosure 4.9 (Removal and restoration of ES channels
The candidate will remove the ES Subsystem 2 from service in accordance with OP/1/A/1105/014 Enclosure 4.9 (Removal and restoration of ES channels) beginning with step 3.3.
) beginning with step 3.3
Preferred Evaluation Location:                                       Preferred Evaluation Method:
. Preferred Evaluation Location:
Simulator __X___ In-Plant ______                                     Perform __X___ Simulate __ __
Preferred Evaluation Method:
Simulator
__X___ In-Plant ______     Perform __X___ Simulate __ __


==References:==
==References:==


OP/1/A/1105/014 Enclosure 4.
OP/1/A/1105/014 Enclosure 4.9 (Removal and restoration of ES channels)
9 (Removal and restoration of ES channels
Validation Time: 15 min.                                                     Time Critical: No
Validation Time:
====================================================================================
15 min.       Time Critical: No ====================================================================================
Candidate:     _______________________________________                       Time Start: _______________
Candidate:
NAME                                           Time Finish: ______________
_______________________________________
Performance Rating: SAT ______ UNSAT ______                                   Performance Time: _________
Time Start: _______________     NAME     Time Finish: ______________
Examiner: ______________________________             ___________________________________/_________
Performance Rating:   SAT ______ UNSAT ______
NAME                                           SIGNATURE                   DATE
Performance Time
====================================================================================
: _________   Examiner: ______________________________         ___________________________________/____
Comments
_____    NAME     SIGNATURE                           DATE ====================================================================================
 
Comments CRO-22 3 fnl - b Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS:
CRO-223 fnl - b Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. Recall IC-41 2. Verify the Examiner has the ES cabinet key (#317) and both ES bypass keys (#316).
: 1. Recall IC-41
: 2. Verify the Examiner has the ES cabinet key (#317) and both ES bypass keys (#316).
: 3. Ensure all breaker flags are in the current plant condition.
: 3. Ensure all breaker flags are in the current plant condition.
: 4. Go to RUN.
: 4. Go to RUN.
CRO-22 3 fnl - b Page 4 of 10  Tools/Equipment/Procedures Needed:
OP/1/A/1105/014 Enclosure 4.9 Removal and restoration of ES channels READ TO OPERATOR DIRECTIONS TO STUDENT:


CRO-223 fnl - b Page 4 of 10 Tools/Equipment/Procedures Needed:
OP/1/A/1105/014 Enclosure 4.9 Removal and restoration of ES channels READ TO OPERATOR DIRECTIONS TO STUDENT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:  
INITIAL CONDITIONS:
 
The Unit 1 Reactor is at 100% power.
The Unit 1 Reactor is at 100% power.
A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service.
A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service.
The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power.
The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power.
The CRS has determined that Unit 1 ES Subsystem 2 is NOT required per Tech Specs
The CRS has determined that Unit 1 ES Subsystem 2 is NOT required per Tech Specs INITIATING CUE:
The CRS directs you to remove ES Subsystem 2 from service using OP/1/A/1105/014 .9.


INITIATING CUE:
CRO-223 fnl - b Page 5 of 10 START TIME: _______
The CR S directs you to remove ES Subsystem 2 from service using OP/1/A/1105/014 Enclosure 4.9.
STEP 1:            Step 2.1 NOTE: Equipment failure can be indicated by deviation alarm, fault alarm, hardware fail, etc... or notification by Maintenance.                                                      ___ SAT Verify one of the following:
* A procedure requires bypassing Voter(s), tripping of ES                ___ UNSAT channels, bypassing DHPIAS, or bypassing DLPIAS.
* Equipment failure requires bypassing Voter(s), tripping of ES channels, bypassing DHPIAS, or bypassing DLPIAS.
STANDARD:          Determine that the second bullet is satisfied and sign it off.
COMMENTS:
STEP 2:            Step 3.1 IF removal of both ES subsystems from service is required during outages, perform Section 4 "Removal Of Both ES Subsystems"              ___ SAT STANDARD:          Determine step does not apply and N/As step.
___ UNSAT COMMENTS:
STEP 3:            Step 3.2 NOTE: ES Subsystem 1 includes ES Input channels A1, B1, and C1 along with ES Voter Odd 1 and ES Voter Even 1.                                                                  ___ SAT IF removal of any or all of only ES Subsystem 1 channels from service is required, perform Section 5 "Removal Of Only ES Subsystem 1"
___ UNSAT STANDARD:          Determine step does not apply and N/As step.
COMMENTS:
STEP 4:            Step 3.3 If removal of any or all of Only ES subsystem 2 channels from service is required, perform Section 6 Removal of Only ES Subsystem 2            ___ SAT STANDARD:          Candidate proceeds to Section 6
___ UNSAT COMMENTS:


CRO-22 3 fnl - b Page 5 of 10 START TIME: _______
CRO-223 fnl - b Page 6 of 10 STEP 5:      Step 6.1:
STEP 1: Step 2.1 NOTE: Equipment failure can be indicated by deviation alarm, fault alarm, hardware fail, etc... or notification by Maintenance.
IF Unit 1 ES Subsystem 2 is NOT required per TS 3.3.5 and 3.3.7,          ___ SAT perform the following to remove from service any or all of only Unit 1 ES Subsystem 2 channels.
Verify one of the following:
STANDARD:     Candidate determines that ES Subsystem 2 is not required by TS 3.3.5      ___ UNSAT and 3.3.7 COMMENTS:
A procedure requires bypassing Voter(s), tripping of ES channels, bypassing DHPIAS, or bypassing DLPIAS.
STEP 6:      Step 6.1.1 IF Unit 1 ES Subsystem 1 is required per TS 3.3.5 and 3.3.7, verify the following:                                                               ___ SAT
Equipment failure requires bypassing Voter(s), tripping of ES channels, bypassing DHPIAS, or bypassing DLPIAS.
* Voter Odd 1 NOT bypassed (1SA-7)
STANDARD: Determine that the second bullet is satisfied and sign it off.
* Voter Even 1 NOT bypassed (1SA-7)
COMMENTS:           ___ SAT
* ES channel A1 operable or tripped (1SA-7)                        ___ UNSAT
* ES channel B1 operable or tripped (1SA-7)
* ES channel C1 operable or tripped (1SA-7)
STANDARD:     The candidate determines that the Unit 1 ES Subsystem is required per TS 3.3.5 and 3.3.7 and verifies there are no alarms present on ISA-7.
* Voter Odd 1 NOT bypassed (1SA-7/D1)
* Voter Even 1 NOT bypassed (1SA-7/E1)
* ES channel A1 operable or tripped (1SA-7/A1)
* ES channel B1 operable or tripped (1SA-7/B1)
* ES channel C1 operable or tripped (1SA-7/C1)
Examiner cue: Candidate may elect to perform a STAT alarm test to help ensure no alarms are present on 1SA-7. If asked, give him permission (as CR SRO) to perform alarm test. (The other RO will be required to help perform the test).
COMMENTS:
STEP 7:      Step 6.1.2.A Declare Unit 1 ES Subsystem 2 channels inoperable
___ SAT STANDARD:    Candidate reports that procedure requires declaration of ES Subsystem 2 channels inoperable Cue: Acknowledge Unit 1 ES Subsystem 2 channel inoperable.
___ UNSAT COMMENTS:


___ UNSAT  STEP 2: Step 3.1  IF removal of both ES subsystems from service is required during outages, perform Section 4 "Removal Of Both ES Subsystems"  STANDARD: Determine step does not apply and N/As step.
CRO-223 fnl - b Page 7 of 10 STEP 8:         Step 6.1.2.B Obtain MAN BYPASS 2 Key #316 (2 keys are required to bypass both         ___ SAT voters).
COMMENTS:            ___ SAT
STANDARD:       Candidate obtains correct keys (examiner provides)
___ UNSAT  STEP 3: Step 3.2  NOTE: ES Subsystem 1 includes ES Input channels A1, B1, and C1 along with ES Voter Odd 1 and ES Voter Even 1. IF removal of any or all of only ES Subsystem 1 channels from service is required, perform Section 5 "Removal Of Only ES Subsystem 1"  STANDARD: Determine step does not apply and N/As step.
___ UNSAT Cue: Provide the candidate with the correct keys. Keys are normally kept in the key locker in the WCC.
COMMENTS:            ___ SAT
COMMENTS:
___ UNSAT  STEP 4: Step 3.3  If removal of any or all of Only ES subsystem 2 channels from service is required, perform Section 6 "Removal of Only ES Subsystem 2" STANDARD: Candidate proceeds to Section 6 COMMENTS:            ___ SAT
STEP 9:        Step 6.1.2.C                                                            CRITICAL STEP IF bypassing Odd Voter 2, place MAN BYPASS 2 keyswitch in "BYP".
___ UNSAT CRO-22 3 fnl - b Page 6 of 10  STEP 5: Step 6.1:
(Cabinet 12)                                                            ___ SAT STANDARD:      Candidate places the MAN BYPASS 2 keyswitch in Cabinet 12 in the BYP position
IF Unit 1 ES Subsystem 2 is NOT required per TS 3.3.5 and 3.3.7, perform the following to remove from service any or all of only Unit 1 ES Subsystem 2 channels.
___ UNSAT COMMENTS:
STANDARD: Candidate determines that ES Subsystem 2 is not required by TS 3.3.5 and 3.3.7  COMMENTS:          ___ SAT        ___ UNSAT  STEP 6: Step 6.1.1
STEP 10:       Step 6.1.2.D                                                            CRITICAL STEP IF bypassing Even Voter 2, place MAN BYPASS 2 keyswitch in "BYP".
 
(Cabinet 14)                                                            ___ SAT STANDARD:      Candidate places the MAN BYPASS 2 keyswitch in Cabinet 14 in the BYP position and returns and signs step 3.3
IF Unit 1 ES Subsystem 1 is required per TS 3.3.5 and 3.3.7, verify the following:
___ UNSAT Examiner note: When this step is complete, candidate may indicate task is complete. If so, ask that they continue.
Voter Odd 1 NOT bypassed (1SA
COMMENTS:
-7)  Voter Even 1 NOT bypassed (1SA
STEP 11:        Step 3.4 If trip of ES input channels is required, perform one of the following:  ___ SAT STANDARD:      Candidate NAs this step COMMENTS:                                                                                ___ UNSAT
-7)  ES channel A1 operable or tripped (1SA-7)  ES channel B1 operable or tripped (1SA
-7)  ES channel C1 operable or tripped (1SA
-7)  STANDARD: The candidate determines that the Unit 1 ES Subsystem is required per TS 3.3.5 and 3.3.7 and verifies there are no alarms present on ISA
-7. Voter Odd 1 N OT bypassed (1SA
-7/D1)  Voter Even 1 NOT bypassed (1SA
-7/E1)  ES channel A1 operable or tripped (1SA
-7/A1)  ES channel B1 operable or tripped (1SA
-7/B1)  ES channel C1 operable or tripped (1SA
-7/C1)  Examiner cue:  Candidate may elect to perform a STAT alarm test to help ensure no alarms are present on 1SA
-7. If asked, give him permission (as CR SRO) to perform alarm test.
(The other RO will be required to help perform the test).
COMMENTS:            ___ SAT        ___ UNSAT  STEP 7: Step 6.1.2.A Declare Unit 1 ES Subsystem 2 channels inoperable STANDARD: Candidate reports that procedure requires declaration of ES Subsystem 2 channels inoperable Cue: Acknowledge Unit 1 ES Subsystem 2 channel inoperable.
COMMENTS:            ___ SAT
___ UNSAT CRO-22 3 fnl - b Page 7 of 10 STEP 8: Step 6.1.2.B Obtain MAN BYPASS 2 Key #316 (2 keys are required to bypass both voters). STANDARD: Candidate obtains correct keys (examiner provides)
Cue: Provide the candidate with the correct keys.
Keys are normally kept in the key locker in the WCC.
COMMENTS:        ___ SAT       ___ UNSAT STEP 9: Step 6.1.2.C


IF bypassing Odd Voter 2, place MAN BYPASS 2 keyswitch in "BYP". (Cabinet 12)
CRO-223 fnl - b Page 8 of 10 STEP 12:      Step 3.5 If bypassing DHPIAS is required, perform Section 10...                ___ SAT STANDARD:    Candidate NAs this step
STANDARD: Candidate places the MAN BYPASS 2 keyswitch in Cabinet 12 in the "BYP" position COMMENTS:    CRITICAL STEP
___ UNSAT COMMENTS:
STEP 13:      Step 3.6 If bypassing DLPIAS is required, perform Section 11...                ___ SAT STANDARD:    Candidate NAs this step
___ UNSAT COMMENTS:
STEP 14:      Step 3.7 If any ES channel was removed from service due to equipment failure,  ___ SAT perform Section 12.
STANDARD:     Candidate determines that no ES channel was removed and NAs this step                                                                  ___ UNSAT COMMENTS:
STEP 15:      Step 3.7 WHEN notified by I&E, restore ES channels by performing Section 13... ___ SAT STANDARD:    NO actions are required Cue: Another operator will continue with this procedure.                            ___ UNSAT COMMENTS:
TIME STOP: ________


___ SAT
CRO-223 fnl - b Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP #                                          Explanation 9  This step is critical because it is part 1 of removing all of ES Subsystem 2 from service 10   This step is critical because it is part 2 of removing all of ES Subsystem 2 from service
___ UNSAT  STEP 10: Step 6.1.2.D IF bypassing Even Voter 2, place MAN BYPASS 2 keyswitch in "BYP". (Cabinet 14)
STANDARD: Candidate places the MAN BYPASS 2 keyswitch in Cabinet 14 in the "BYP" position and returns and signs step 3.3  Examiner note:
When this step is complete, candidate may indicate task is complete. If so, ask that they continue.
COMMENTS:      CRITICAL STEP
___ SAT        ___ UNSAT  STEP 11: Step 3.4  If trip of ES input channels is required, perform one of the following:
STANDARD: Candidate NA's this step COMMENTS:            ___ SAT        ___ UNSAT CRO-22 3 fnl - b Page 8 of 10 STEP 12: Step 3.5  If bypassing DHPIAS is required, perform Section 10...
STANDARD: Candidate NA's this step COMMENTS:            ___ SAT        ___ UNSAT  STEP 13: Step 3.6  If bypassing DLPIAS is required, perform Section 11...
STANDARD: Candidate NA's this step COMMENTS:            ___ SAT
___ UNSAT  STEP 14: Step 3.7  If any ES channel was removed from service due to equipment failure, perform Section 12.
STANDARD: Candidate determines that no ES channel was removed and NA's this step COMMENTS:          ___ SAT
___ UNSAT  STEP 15: Step 3.7  WHEN notified by I&E, restore ES channels by performing Section 13...
STANDARD: NO actions are required Cue: Another operator will continue with this procedure.
COMMENTS:            ___ SAT        ___ UNSAT  TIME STOP: ________


CRO-22 3 fnl - b Page 9 of 10  CRITICAL STEP EXPLANATIONS STEP # Explanation 9 This step is critical because it is part 1 of removing all of ES Subsystem 2 from service 10 This step is critical because it is part 2 of removing all of ES Subsystem 2 from service
b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
 
b    CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Unit 1 Reactor is at 100% power.
The Unit 1 Reactor is at 100% power.
A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service.
A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service.
The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power.
The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power.
 
The CRS has determined that Unit 1 ES Subsystem 2 is NOT required per Tech Specs INITIATING CUE:
The CRS has determined that Unit 1 ES Subsystem 2 is NOT required per Tech Specs
The CRS directs you to remove ES Subsystem 2 from service using OP/1/A/1105/014 .9.
 
INITIATING CUE:
The CRS directs you to remove ES Subsystem 2 from service using OP/1/A/1105/014 Enclosure 4.9.


CRO-404 fnl - c Page 1 of 11   REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-40 4 Alignment of Condensate Recirc
CRO-404 fnl - c Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-404 Alignment of Condensate Recirc CANDIDATE EXAMINER


CANDIDATE      EXAMINER CRO-404 fnl - c Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:   Establish Alignment of Condensate Recirc and set flow.
CRO-404 fnl - c Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Establish Alignment of Condensate Recirc and set flow.
Alternate Path:
Alternate Path:
Yes Facility JPM #:
Yes Facility JPM #:
CRO-404 K/A Rating(s):
CRO-404 K/A Rating(s):
System: APE054 K/A: G2.1.20 Rating:
System: APE054 K/A:     G2.1.20 Rating: 4.6/4.6 Task Standard:
4.6/4.6 Task Standard:
Condensate recirculation flow of 2300-6000 gpm is established.
Condensate recirculation flow of 2300
Preferred Evaluation Location:                                     Preferred Evaluation Method:
-6000 gpm is established
Simulator __X__ In-Plant __ ___                                     Perform __X___ Simulate ____
. Preferred Evaluation Location:     Preferred Evaluation Method:
Simulator __X__ In-Plant __ ___     Perform __X___ Simulate ____


==References:==
==References:==


EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5.
EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5.23 (Alignment of Condensate Recirc).
23 (Alignment of Condensate Recirc).
Validation Time: 10 minutes                                         Time Critical: NO
Validation Time:
====================================================================================
1 0 minutes       Time Critical: NO ====================================================================================
Candidate:      _______________________________________                            Time Start: _________
NAME                                              Time Finish: ________
Performance Rating: SAT ______ UNSAT ______                                Performance Time: _________
Examiner: ______________________________              ____________________________________/________
NAME                                        SIGNATURE                    DATE
====================================================================================
COMMENTS
 
CRO-404 fnl - c Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. RECALL Snap 214
: 2. IMPORT files for CRO-404
: 3. Go to RUN


Candidate:
CRO-404 fnl - c Page 4 of 11 Tools/Equipment/Procedures Needed:
_______________________________________
EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5.23 (Alignment of Condensate Recirc)
Time Start: __
_______    NAME      Time Finish: ________
Performance Rating:  SAT ______ UNSAT ______
Performance Time
: _________  Examiner: ______________________________          ____________________________________/________
NAME      SIGNATURE                            DATE
====================================================================================
COMMENTS CRO-404 fnl - c Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. RECALL Snap 21 4  2. IMPORT files for CRO-40 4  3. Go to RUN CRO-404 fnl - c Page 4 of 11 Tools/Equipment/Procedures Needed:
EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5.
23 (Alignment of Condensate Recirc)
READ TO OPERATOR DIRECTION TO TRAINEE:
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator
Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator.
.
During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 RCPs.
During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 RCP's
The SGTR tab is in progress and is completed up to step 107.
.
The SGTR tab is in progress and is completed up to step 10
: 7.
INITIATING CUES:
INITIATING CUES:
The CRS directs you to perform Enclosure 5.
The CRS directs you to perform Enclosure 5.23 (Alignment of Condensate Recirc).
23 (Alignment of Condensate Recirc
).
CRO-404 fnl - c Page 5 of 11  START TIME: _______
STEP 1:  Step 1. Verify any HWP operating.
STANDARD: Determine the 1A HWP is operating (located on 1AB1) by observing the red run light illuminated and pump amps are on scale
. Continues to Step 2  COMMENTS:                ___ SAT
___ UNSAT  STEP 2:  Step 2 4 Verify any CBP operating. STANDARD: Determine that NO CBP is operating by observing the green off lights on 1AB1 are illuminated for each CBP and then perform the RNO.
Continues to Step 2 RNO  COMMENTS:                ___ SAT 


___ UNSAT  STEP 3:  Step 2 RNO  GO TO Step 7. STANDARD: Continues to Step 7  COMMENTS:                ___ SAT        ___ UNSAT CRO-404 fnl - c Page 6 of 11   STEP 4: Step 7 Ensure two HWPs operating STANDARD: Determines that only the 1A HWP is operating, per step 1.
CRO-404 fnl - c Page 5 of 11 START TIME: _______
Rotates the 1B HWP switch (located on 1AB1) to the START position, verifies the red ON light illuminates, and verifies pump amps increase and return to normal.
STEP 1:     Step 1.
OR Rotates the 1C HWP switch (located on 1AB1
Verify any HWP operating.
) to the START position, verifies the red ON light illuminates, and verifies pump amps increase and return to normal.
___ SAT STANDARD:   Determine the 1A HWP is operating (located on 1AB1) by observing the red run light illuminated and pump amps are on scale.
Continues to Step COMMENTS:               ___ SAT
Continues to Step 2
___ UNSAT COMMENTS:
STEP 2:      Step 24 Verify any CBP operating.
___ SAT STANDARD:    Determine that NO CBP is operating by observing the green off lights on 1AB1 are illuminated for each CBP and then perform the RNO.
Continues to Step 2 RNO                                                ___ UNSAT COMMENTS:
STEP 3:      Step 2 RNO
___ SAT GO TO Step 7.
STANDARD:    Continues to Step 7
___ UNSAT COMMENTS:


___ UNSAT   ALTERNATE PATH STEP 5: Step 8 Start the 1C COND BOOSTER PUMP.
CRO-404 fnl - c Page 6 of 11 STEP 4:      Step 7 Ensure two HWPs operating
STANDARD: Rotate the 1C COND BOOSTER PUMP switch (located on 1AB1
___ SAT STANDARD:    Determines that only the 1A HWP is operating, per step 1.
) to the START position. Observes that the pump does not start by noting the green stop light remains illuminated and the red start light remains OFF. Continues to RNO to Step 8 Note: The 1 C Cond Booster Pump will not start.
___ UNSAT Rotates the 1B HWP switch (located on 1AB1) to the START position, verifies the red ON light illuminates, and verifies pump amps increase and return to normal.
COMMENTS:               ___ SAT 
OR Rotates the 1C HWP switch (located on 1AB1) to the START position, verifies the red ON light illuminates, and verifies pump amps increase and return to normal.
Continues to Step 8 COMMENTS:
ALTERNATE PATH
___ SAT STEP 5:       Step 8 Start the 1C COND BOOSTER PUMP.
___ UNSAT STANDARD:     Rotate the 1C COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes that the pump does not start by noting the green stop light remains illuminated and the red start light remains OFF.
Continues to RNO to Step 8 Note: The 1C Cond Booster Pump will not start.
COMMENTS:


___ UNSAT CRO-404 fnl - c Page 7 of 11   STEP 6: RNO: Step 8 Start one available CBP
CRO-404 fnl - c Page 7 of 11 STEP 6:         RNO: Step 8                                                           CRITICAL STEP Start one available CBP.
. STANDARD: Rotates the 1 A COND BOOSTER PUMP switch (located on 1AB1
___ SAT STANDARD:       Rotates the 1A COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes the pump starts by observing the Red run light illuminated and pump amps increase and then return to normal. ___ UNSAT OR Rotates the 1B COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes the pump starts by observing the Red run light illuminated and pump amps increase and then return to normal.
) to the START position. Observes the pump starts by observing the Red run light illuminated and pump amps increase and then return to normal.
Continues to Step 9 COMMENTS:
OR Rotates the 1 B COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes the pump starts by observing the Red run light illuminated and pump amps increase and then return to normal.
STEP 7:        Step 9 Stop one operating HWP.
Continues to Step 9   COMMENTS:         CRITICAL STEP
___ SAT STANDARD:      Rotates the switch for a running HWP (Either 1A, 1B, or 1C) to the OFF position. Verifies the Red run light OFF, and the Green stop light illuminated.                                                            ___ UNSAT Examiner note: 1SA-8/C-2 (FDW PUMP SEAL DIFFERENCTIAL PRESSURE LOW) will actuate. This is an expected alarm.
Continues to Step 10 COMMENTS:
STEP 8:        Step 10                                                                ___ SAT Place the control switch for one secured HWP in AUTO STANDARD:      Places a non running HWP switch (1A or 1B) to AUTO.                    ___ UNSAT Continues to Step 11 COMMENTS:
 
CRO-404 fnl - c Page 8 of 11 STEP 9:      Step 11 Place the control switch for one secured CBP in AUTO.              ___ SAT STANDARD:    Places the non running CBP (1A or 1B) switch in AUTO.
Continues to Step 12                                                ___ UNSAT NOTE: 1C CBP switch should NOT be selected since the pump will not start.
COMMENTS:
STEP 10:      Step 12 Perform the following:
___ SAT
___ SAT
___ UNSAT  STEP 7:  Step 9 Stop one operating HWP.
* Position HWP LOAD SHED DEFEAT switch to a running HWP.
STANDARD: Rotates the switch for a running HWP (Either 1A, 1B, or 1C) to the OFF position. Verifies the Red run light OFF, and the Green stop light illuminated
* Position CBP LOAD SHED DEFEAT switch to a running CBP
. Examiner note: 1SA
___ UNSAT STANDARD:     Positions the HWP LOAD SHED DEFEAT switch to the running HWP, (1A, 1B, or 1C)
-8/C-2 (FDW PUMP SEAL DIFFERENCTIAL PRESSURE LOW) will actuate. This is an expected alarm.
Positions the CBP LOAD SHED DEFEAT switch to the running CBP, (1A or 1B )
Continues to Step 10  COMMENTS:
Continues to Step 13 COMMENTS:
STEP 11:      Step 13 Place the following in MANUAL:
___ SAT
___ SAT
___ UNSAT    STEP 8: Step 10 Place the control switch for one secured HWP in AUTO STANDARD: Places a non running HWP switch (1A or 1B) to AUTO. Continues to Step 11 COMMENTS:               ___ SAT 
* 1FDW-53
* 1FDW-65 STANDARD:     Locate the Moore controller on 1VB3 for each valve listed above and ___ UNSAT determine they are in MANUAL by the MANUAL light being Lit.
Continues to Step 14 COMMENTS:


___ UNSAT CRO-404 fnl - c Page 8 of 11   STEP 9:  Step 11 Place the control switch for one secured CBP in AUTO.
CRO-404 fnl - c Page 9 of 11 STEP 12:     Step 14                                                                 CRITICAL STEP Establish 2300-6000 gpm total recirc flow with one of the following:
STANDARD: Places the non running CBP (1 A or 1 B) switch in AUTO
. Continues to Step 12 NOTE: 1C CBP switch should NOT be selected since the pump will not start. COMMENTS:             ___ SAT        ___ UNSAT  STEP 10:  Step 12 Perform the following
:  Position HWP LOAD SHED DEFEAT switch to a running HWP.
Position CBP LOAD SHED DEFEAT switch to a running CBP STANDARD: Positions the HWP LOAD SHED DEFEAT switch to the running HWP, (1A, 1B, or 1C)
Positions the CBP LOAD SHED DEFEAT switch to the running CBP, (1A or 1B )  Continues to Step 13  COMMENTS:              ___ SAT
___ UNSAT  STEP 11:  Step 13 Place the following in MANUAL:
1FDW-53  1FDW-65  STANDARD: Locate the Moore controller on 1VB3 for each valve listed above and determine they are in MANUAL by the MANUAL light being Lit
. Continues to Step 14   COMMENTS:                ___ SAT        ___ UNSAT CRO-404 fnl - c Page 9 of 11  STEP 12:  Step 14 Establish 2300
-6000 gpm total recirc flow with one of the following
:  1FDW-53  1FDW-65  STANDARD: Candidate locates the Moore controller for 1FDW
-53 or 1FDW
-65 and using the manual loader adjusts one to a total recirc flow of 2300-6000 gpm. Note: Controller must be selected to the "P" position to observe flow.
Cue: Inform candidate that another RO will complete this enclosure and this JPM is finished . COMMENTS:          CRITICAL STEP
___ SAT
___ SAT
___ UNSAT   STOP TIME: ____________
* 1FDW-53
* 1FDW-65
___ UNSAT STANDARD:    Candidate locates the Moore controller for 1FDW-53 or 1FDW-65 and using the manual loader adjusts one to a total recirc flow of 2300-6000 gpm.
Note: Controller must be selected to the P position to observe flow.
Cue: Inform candidate that another RO will complete this enclosure and this JPM is finished
.
COMMENTS:
STOP TIME: ____________
 
CRO-404 fnl - c Page 10 of 11 CRITICAL STEP EXPLANATIONS:
STEP #                                      Explanation 6  Required to properly align Condensate recirc.
12  Required to establish proper flow for Condensate recirc.


CRO-404 fnl - c Page 10 of 11  CRITICAL STEP EXPLANATIONS:
c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
STEP # Explanation 6 Required to properly align Condensate recirc. 12 Required to establish proper flow for Condensate recirc
.
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator
Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator.
.
During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 RCPs.
During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 RCP's
The SGTR tab is in progress and is completed up to step 107.
.
The SGTR tab is in progress and is completed up to step 10
: 7.
INITIATING CUES:
INITIATING CUES:
The CRS directs you to perform Enclosure 5.23 (Alignment of Condensate Recirc).


The CRS directs you to perform Enclosure 5.
CRO-414 fnl - d Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-414 SWAPPING LPI MODES - HIGH PRESSURE MODE TO LPI NORMAL DECAY HEAT MODE CANDIDATE EXAMINER
23 (Alignment of Condensate Recirc).
 
CRO-414 fnl - d Page 1 of 11   REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-414 SWAPPING LPI MODES
- HIGH PRESSURE MODE TO LPI NORMAL DECAY HEAT MODE  
 
CANDIDATE     EXAMINER  


CRO-414 fnl - d Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:   Swapping LPI Modes
CRO-414 fnl - d Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
- LPI High Pressure Mode to LPI Normal Mode Alternate Path:
Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode Alternate Path:
No Facility JPM #:
No Facility JPM #:
CRO-092 K/A Rating(s):
CRO-092 K/A Rating(s):
System: 005 K/A: A4.01 Rating:   3.6*/3.4 Task Standard:
System: 005 K/A:     A4.01 Rating: 3.6*/3.4 Task Standard:
Swap LPI from High Pressure Mode to Normal Mode by procedure.
Swap LPI from High Pressure Mode to Normal Mode by procedure.
Preferred Evaluation Location:
Preferred Evaluation Location:                                       Preferred Evaluation Method:
Preferred Evaluation Method:
Simulator __X__ In-Plant ____                                         Perform __X___ Simulate __ __
Simulator
__X__ In-Plant ____       Perform __X___ Simulate __ __


==References:==
==References:==


OP/1/A/1104/004, Enclosure 4.
OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode)
15 (Swapping LPI Modes  
OP/1/A/1104/004, Enclosure 4.44 (Controlling LPI Cooler Outlet Temperature)
- LPI High Pressure Mode to LPI Normal Mode)
Validation Time: 40 minutes                                           Time Critical: NO
OP/1/A/1104/004, Enclosure 4.4 4 (Controlling LPI Cooler Outlet Temperature)
====================================================================================
Validation Time:
Candidate:     _______________________________________                             Time Start: _________
40 minutes       Time Critical: NO ====================================================================================
NAME                                                   Time Finish: ________
Candidate:
Performance Rating: SAT ______ UNSAT ______                                   Performance Time: _________
_______________________________________
Examiner: ______________________________             ____________________________________/________
Time Start: __
NAME                                           SIGNATURE                   DATE
_______    NAME       Time Finish: ________
====================================================================================
Performance Rating:   SAT ______ UNSAT ______
COMMENTS
Performance Time
 
: _________
CRO-414 fnl - d Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS:
Examiner: ______________________________         ____________________________________/________
: 1. RECALL SNAP 215
NAME     SIGNATURE                           DATE
: 2. Place simulator to RUN
====================================================================================
: 3. When asked manipulate the following LP vales using the valve program:
COMMENTS CRO-414 fnl - d Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS:
* OPEN 1LP-4
: 1. RECALL SNAP 215 2. Place simulator to RUN 3. When asked manipulate the following LP vales using the valve program:   OPEN 1LP-4   CLOSE 1LP-73, 1LP-74, and 1LP
* CLOSE 1LP-73, 1LP-74, and 1LP-75
-75  


CRO-414 fnl - d Page 4 of 11 Tools/Equipment/Procedures Needed: OP/1/A/1104/004, Enclosure 4.
CRO-414 fnl - d Page 4 of 11 Tools/Equipment/Procedures Needed:
15 (Swapping LPI Modes  
OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - High Pressure Mode to LPI Normal Mode)
- High Pressure Mode to LPI Normal Mode) OP/1/A/1104/004, Enclosure 4.4 4 (Controlling LPI Cooler Outlet Temperature)
OP/1/A/1104/004, Enclosure 4.44 (Controlling LPI Cooler Outlet Temperature)
READ TO OPERATOR DIRECTION TO TRAINEE:
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 shutdown in progress INITIATING CUES:
Unit 1 shutdown in progress INITIATING CUES:
The C RS directs you to perform OP/1/A/1104/004, Enclosure 4.
The CRS directs you to perform OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2.3.
15 (Swapping LPI Modes  
ALL associated White tags have been removed.
- LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2.
: 3.


ALL associated White tags have been removed.
CRO-414 fnl - d Page 5 of 11 START TIME: _______
CRO-414 fnl - d Page 5 of 11   START TIME: _______
STEP 1:       Step 2.3                                                             CRITICAL STEP Position:
STEP 1: Step 2.3 Position: Open 1LP-5 (1A LPI PUMP SUCTION).
___ SAT
Open 1LP-6 (1C LPI PUMP SUCTION (A HDR).
* Open 1LP-5 (1A LPI PUMP SUCTION).
Open 1LP-7 (1C LPI PUMP SUCTION (B HDR).
* Open 1LP-6 (1C LPI PUMP SUCTION (A HDR).
Open 1LP-8 (1B LPI PUMP SUCTION).
* Open 1LP-7 (1C LPI PUMP SUCTION (B HDR).                         ___ UNSAT
STANDARD: Remove the cover from the switches for the following valves and OPEN them by placing their respective switches in the open position.
* Open 1LP-8 (1B LPI PUMP SUCTION).
1LP-5 (1A LPI PUMP SUCTION)
STANDARD:     Remove the cover from the switches for the following valves and OPEN them by placing their respective switches in the open position.
* 1LP-5 (1A LPI PUMP SUCTION)
Verify red light illuminates and green light goes off.
Verify red light illuminates and green light goes off.
1LP-6 (1C LPI PUMP SUCTION (A HDR)
* 1LP-6 (1C LPI PUMP SUCTION (A HDR)
Verify red light illuminates and green light goes off.
Verify red light illuminates and green light goes off.
1LP-7 (1C LPI PUMP SUCTION (B HDR)
* 1LP-7 (1C LPI PUMP SUCTION (B HDR)
Verify red light illuminates and green light goes off.
Verify red light illuminates and green light goes off.
1LP-8 (1B LPI PUMP SUCTION)
* 1LP-8 (1B LPI PUMP SUCTION)
Verify red light illuminates and green light goes off.
Verify red light illuminates and green light goes off.
COMMENTS:         CRITICAL STEP
COMMENTS:
STEP 2:        Step 2.4                                                            CRITICAL STEP Position:
___ SAT
___ SAT
___ UNSAT  STEP 2:  Step 2.4 Position:  Open 1LP-4 (Return Manual Block). (A
* Open 1LP-4 (Return Manual Block). (A-61)
-61) STANDARD: Dispatch an NEO to open 1LP-4. Booth Cue: Open 1LP-4 by using the Valve program and using time compression inform the candidate that 1LP-4 is open. COMMENTS:         CRITICAL STEP
STANDARD:     Dispatch an NEO to open 1LP-4.
___ SAT 
___ UNSAT Booth Cue: Open 1LP-4 by using the Valve program and using time compression inform the candidate that 1LP-4 is open.
COMMENTS:


___ UNSAT CRO-414 fnl - d Page 6 of 11   STEP 3: Step 2.5 Ensure: Close 1LP-73 (1B LPI Cooler Switchover Disch Block). (A 108) Close 1LP-74 (B Clr Disch Blk To A Pmp). (A
CRO-414 fnl - d Page 6 of 11 STEP 3:       Step 2.5                                                               CRITICAL STEP Ensure:
-61) Close 1LP-75 (1B LPI Cooler Disch Block To 1C LPI Pump). (A
___ SAT
-61)   STANDARD: Dispatch an NEO to CLOSE:
* Close 1LP-73 (1B LPI Cooler Switchover Disch Block). (A-1-108)
1LP-73 (1B LPI Cooler Switchover Disch Block). (A 108) 1LP-74 (B Clr Disch Blk To A Pmp). (A
* Close 1LP-74 (B Clr Disch Blk To A Pmp). (A-61)
-61) 1LP-75 (1B LPI Cooler Disch Block To 1C LPI Pump). (A
* Close 1LP-75 (1B LPI Cooler Disch Block To 1C LPI Pump). (A-61)     ___ UNSAT STANDARD:     Dispatch an NEO to CLOSE:
-61) Booth cue: CLOSE 1LP-73, 1LP-74, and 1LP-75 by using the Valve program and using time compression inform the candidate that the valves are CLOSED.
* 1LP-73 (1B LPI Cooler Switchover Disch Block). (A-1-108)
COMMENTS:          CRITICAL STEP
* 1LP-74 (B Clr Disch Blk To A Pmp). (A-61)
___ SAT        ___ UNSAT  STEP 4:  Step 2.6 Close 1LP-14 (1B LPI Cooler Outlet)
* 1LP-75 (1B LPI Cooler Disch Block To 1C LPI Pump). (A-61)
STANDARD: CLOSE 1LP-14 it by placing the switch in the close position and observe green closed light lit.
Booth cue: CLOSE 1LP-73, 1LP-74, and 1LP-75 by using the Valve program and using time compression inform the candidate that the valves are CLOSED.
Note: Valve has a long stroke time (1:50 sec)
COMMENTS:
COMMENTS:
CRITICAL STEP
STEP 4:        Step 2.6                                                                CRITICAL STEP Close 1LP-14 (1B LPI Cooler Outlet)
___ SAT
___ SAT STANDARD:      CLOSE 1LP-14 it by placing the switch in the close position and observe green closed light lit.
___ UNSAT   STEP 5: Step 2.7 Record 1A LPI cooler outlet temperature ________°F.
___ UNSAT Note: Valve has a long stroke time (1:50 sec)
COMMENTS:
STEP 5:       Step 2.7 Record 1A LPI cooler outlet temperature ________°F.
___ SAT STANDARD:      Locate the 1A LPI cooler outlet temperature indicator on 1UB2 and record 1A LPI cooler outlet temperature on the procedure.
___ UNSAT COMMENTS:


STANDARD: Locate the 1A LPI cooler outlet temperature indicator on 1UB2 and record 1A LPI cooler outlet temperature on the procedure.
CRO-414 fnl - d Page 7 of 11 STEP 6:       Step 2.8 Ensure open 1LP-9 (1C LPIP DISCH TO 1A LPI HDR).
COMMENTS:                ___ SAT
___ SAT STANDARD:     Determine 1LP-9 located on 1UB2 is OPEN by verifying the red OPEN light illuminated.
___ UNSAT CRO-414 fnl - d Page 7 of 11   STEP 6: Step 2.8 Ensure open 1LP-9 (1C LPIP DISCH TO 1A LPI HDR). STANDARD: Determine 1LP-9 located on 1UB2 is OPEN by verifying the red OPEN light illuminate
___ UNSAT COMMENTS:
: d. COMMENTS:               ___ SAT        ___ UNSAT  STEP 7: Step 2.9 Open 1LP-10 (1C LPIP DISCH TO 1B LPI HDR).
STEP 7:       Step 2.9                                                               CRITICAL STEP Open 1LP-10 (1C LPIP DISCH TO 1B LPI HDR).
STANDARD: Open 1LP-10 located on 1UB2 by taking the switch to the OPEN position and verifying the red OPEN light illuminates and the green CLOSE light goes out. COMMENTS:         CRITICAL STEP
___ SAT STANDARD:     Open 1LP-10 located on 1UB2 by taking the switch to the OPEN position and verifying the red OPEN light illuminates and the green CLOSE light goes out.                                                               ___ UNSAT COMMENTS:
___ SAT        ___ UNSAT  STEP 8: Step 2.10 Open 1LP-14 (1B LPI COOLER OUTLET).
STEP 8:       Step 2.10                                                             CRITICAL STEP Open 1LP-14 (1B LPI COOLER OUTLET).
___ SAT STANDARD:      Open 1LP-14 located on 1UB2 by taking the switch to the OPEN position and verifying the red OPEN light illuminates and the green CLOSE light goes out.                                                              ___ UNSAT Note: Valve has a long stroke time (1:50 sec)
COMMENTS:


STANDARD: Open 1LP-14 located on 1UB2 by taking the switch to the OPEN position and verifying the red OPEN light illuminates and the green CLOSE light goes out. Note: Valve has a long stroke time (1:50 sec)
CRO-414 fnl - d Page 8 of 11 NOTE: Do NOT exceed 6000 gpm LPSW flow per cooler.
___ SAT STEP 9:    Step 2.11 Adjust LPSW flow to 1B LPI Coolers per Enclosure 4.44 "Controlling LPI Cooler Outlet Temperature" to match 1B DH Cooler outlet temperature to 1A DH Cooler outlet temperature.                                      ___ UNSAT STANDARD:   Refer to Enclosure 4.44 "Controlling LPI Cooler Outlet Temperature".
COMMENTS:
COMMENTS:
CRITICAL STEP
STEP 10:   Enclosure 4.44 Step 1.1 IF RCS Cooldown in progress, review Section 3.
___ SAT
___ SAT STANDARD:   Candidate reviews section 3.
___ UNSAT CRO-414 fnl - d Page 8 of 11  NOTE: Do NOT exceed 6000 gpm LPSW flow per cooler.
COMMENTS:                                                                         ___ UNSAT STEP 11:   Enclosure 4.44 Step 1.2 IF RCS Heatup in progress, review Section 4.
STEP 9:  Step 2.11 Adjust LPSW flow to 1B LPI Coolers per Enclosure 4.4 4 "Controlling LPI Cooler Outlet Temperature" to match 1B DH Cooler outlet temperature to 1A DH Cooler outlet temperature
___ SAT STANDARD:   Determine step does not apply and N/A step.
. STANDARD: Refer to Enclosure 4.4 4 "Controlling LPI Cooler Outlet Temperature". COMMENTS:               ___ SAT        ___ UNSAT   STEP 10: Enclosure 4.44 Step 1.1 IF RCS Cooldown in progress, review Section 3.
COMMENTS:                                                                          ___ UNSAT
STANDARD: Candidate reviews section 3.


COMMENTS:
CRO-414 fnl - d Page 9 of 11 NOTE:
___ SAT
If in LPI is in SERIES MODE, LPSW flow should be established to both LPI coolers The following steps may be performed as many times as required.                         ___ SAT This enclosure can be performed in any sequence or any order.
___ UNSAT  STEP 11:  Enclosure 4.44 Step 1.2 IF RCS Heatup in progress, review Section
: 4. STANDARD: Determine step does not apply and N/A step.
COMMENTS:                ___ SAT        ___ UNSAT CRO-414 fnl - d Page 9 of 11   NOTE: If in LPI is in SERIES MODE, LPSW flow should be established to both LPI coolers The following steps may be performed as many times as required.
This enclosure can be performed in any sequence or any order.
The preference of use for LPSW is as follows:
The preference of use for LPSW is as follows:
   -1LPSW-251 and/or 1LPSW-252 in automatic (Step 2.1 and/or Step 2.5).
   -1LPSW-251 and/or 1LPSW-252 in automatic (Step 2.1 and/or Step 2.5).                   ___ UNSAT
   -1LPSW-251 and/or 1LPSW-252 in manual (Step 2.2 and/or Step 2.6).
   -1LPSW-251 and/or 1LPSW-252 in manual (Step 2.2 and/or Step 2.6).
   -1LPSW-4 and/or 1LPSW-5 (Step 2.3 and/or Step 2.7).
   -1LPSW-4 and/or 1LPSW-5 (Step 2.3 and/or Step 2.7).
LPSW Leakage Accumulator level is a function of LPSW System pressure. When LPSW flow to LPI Coolers is significantly changed, LPSW Leakage Accumulator level will increase and may exceed the limits of SR 3.7.7.1 until LPSW system pressure stabilizes. As a result, momentary entry into TS 3.7.7 may be necessary.
LPSW Leakage Accumulator level is a function of LPSW System pressure. When LPSW flow to LPI Coolers is significantly changed, LPSW Leakage Accumulator level will increase and may exceed the limits of SR 3.7.7.1 until LPSW system pressure stabilizes.
STEP 12: Enclosure 4.44 Steps 2.1 - 2.4 LPSW to 1A LPI Cooler STANDARD: Candidate should determine that these steps do NOT apply and continue to Step 2.5.
As a result, momentary entry into TS 3.7.7 may be necessary.
COMMENTS:               ___ SAT        ___ UNSAT  STEP 1 2: Enclosure 4.44 Step 2.5 IF 1LPSW-252 (1B LPI COOLER LPSW CONTROL) is in "AUTO", position 1LPSW
STEP 12:         Enclosure 4.44 Steps 2.1 - 2.4 LPSW to 1A LPI Cooler STANDARD:         Candidate should determine that these steps do NOT apply and continue to Step 2.5.
-252 Controller Setpoint as required.
COMMENTS:
STANDARD: Adjust LPSW flow to 1B LPI Coolers by positioning 1LPSW
STEP 12:         Enclosure 4.44 Step 2.5                                               CRITICAL STEP IF 1LPSW-252 (1B LPI COOLER LPSW CONTROL) is in "AUTO",
-252 Controller Setpoint so that 1B DH Cooler outlet temperature is approaching 1A DH Cooler outlet temperature (Temperature as noted at step 2.7). COMMENTS:       END TASK   CRITICAL STEP
position 1LPSW-252 Controller Setpoint as required.                   ___ SAT STANDARD:         Adjust LPSW flow to 1B LPI Coolers by positioning 1LPSW-252 Controller Setpoint so that 1B DH Cooler outlet temperature is approaching 1A DH Cooler outlet temperature (Temperature as noted at   ___ UNSAT step 2.7).
___ SAT        ___ UNSAT STOP TIME: ____________
COMMENTS:
END TASK STOP TIME: ____________


CRO-414 fnl - d Page 10 of 11 CRITICAL STEP EXPLANATIONS:
CRO-414 fnl - d Page 10 of 11 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 1 Step is required to provide the correct flow path.
STEP #                                         Explanation 1     Step is required to provide the correct flow path.
2 Step is required to provide the correct flow path.
2     Step is required to provide the correct flow path.
3 Step is required to provide the correct flow path.
3     Step is required to provide the correct flow path.
4 Step is required to provide the correct flow path.
4     Step is required to provide the correct flow path.
7 Step is required to provide the correct flow path.
7     Step is required to provide the correct flow path.
8 Step is required to provide the correct flow path.
8     Step is required to provide the correct flow path.
12 Step is required to ensure proper thermal transition to 1B LPI Cooler.
12     Step is required to ensure proper thermal transition to 1B LPI Cooler.
Note: All valves on the valve lineup may not be needed to successfully complete the task.
Note: All valves on the valve lineup may not be needed to successfully complete the task.


d   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 shutdown in progress  
Unit 1 shutdown in progress INITIATING CUES:
 
The CRS directs you to perform OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2.3.
INITIATING CUES:
The CRS directs you to perform OP/1/A/1104/004, Enclosure 4.
15 (Swapping LPI Modes  
- LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2.3.
 
ALL associated White tags have been removed.
ALL associated White tags have been removed.


CRO-508 fnl - e Page 1 of 9   REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-508 E S Channels 5 and 6 Recovery  
CRO-508 fnl - e Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-508 ES Channels 5 and 6 Recovery CANDIDATE EXAMINER
 
CANDIDATE     EXAMINER  


CRO-508 fnl - e Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:   ES Channels 5 and 6 Recovery Alternate Path:
CRO-508 fnl - e Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
No Facility JPM #:
ES Channels 5 and 6 Recovery Alternate Path:
New K/A Rating(s):
No Facility JPM #:
System: 103 K/A: A4.0 4 Rating:   3.5*/3.5* Task Standard:
New K/A Rating(s):
System: 103 K/A:     A4.04 Rating: 3.5*/3.5*
Task Standard:
ES Channels 5 and 6 are returned to normal using EOP Enclosure 5.41 (ES Recovery).
ES Channels 5 and 6 are returned to normal using EOP Enclosure 5.41 (ES Recovery).
Preferred Evaluation Location:     Preferred Evaluation Method:
Preferred Evaluation Location:                                       Preferred Evaluation Method:
Simulator __X__ In-Plant __ ___     Perform __X___ Simulate ____
Simulator __X__ In-Plant __ ___                                     Perform __X___ Simulate ____


==References:==
==References:==


EOP Encl. 5.41 (ES Recovery)
EOP Encl. 5.41 (ES Recovery)
Validation Time
Validation Time: 10 minutes                                         Time Critical: NO
: 10 minutes       Time Critical: NO ====================================================================================
====================================================================================
Candidate:      _______________________________________                            Time Start: _________
NAME                                                Time Finish: ________
Performance Rating: SAT ______ UNSAT ______                                  Performance Time: _________
Examiner: ______________________________            ____________________________________/________
NAME                                          SIGNATURE                    DATE
====================================================================================
COMMENTS


Candidate:
CRO-508 fnl - e Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:
_______________________________________
: 1. RECALL Snap 216
Time Start: __
: 2. IMPORT files for CRO-508
_______    NAME      Time Finish: ________
: 3. Go to RUN
Performance Rating:  SAT ______ UNSAT ______
 
Performance Time
CRO-508 fnl - e Page 4 of 9 Tools/Equipment/Procedures Needed:
: _________
Examiner: ______________________________          ____________________________________/________
NAME      SIGNATURE                            DATE
====================================================================================
COMMENTS CRO-508 fnl - e Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. RECALL Snap 216 2. IMPORT files for CRO
-508 3. Go to RUN CRO-508 fnl - e Page 4 of 9 Tools/Equipment/Procedures Needed:
EOP Encl. 5.41 (ES Recovery)
EOP Encl. 5.41 (ES Recovery)
READ TO OPERATOR DIRECTION TO TRAINEE:
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A MSLB has occurred.
ES Channels 1 - 6 have actuated on High RB pressure.
EOP Encl. 5.1 (ES Actuation) is complete ALL ES Channels are being reset EOP Encl. 5.41 (ES Recovery) is complete through step 40 INITIATING CUES:
The CRS directs you to continue in EOP Encl. 5.41 (ES Recovery) beginning at step 41.


A MSLB has occurred.
CRO-508 fnl - e Page 5 of 9 START TIME: _______
ES Channels 1
STEP 1:     Step 41 Verify reset of any of the following is desired:                       ___ SAT
- 6 have actuated on High RB pressure
* ES Channel 5
. EOP Encl. 5.1 (ES Actuation) is complete ALL ES Channels are being reset EOP Encl. 5.41 (ES Recovery) is complete through step 40 INITIATING CUES:
* ES Channel 6
The CRS directs you to continue in EOP Encl. 5.41 (ES Recovery) beginning at step 41
___ UNSAT STANDARD:   Determines, from Initiating Cue, that reset of ES Channels 5 and 6 is desired.
.
COMMENTS:
CRO-508 fnl - e Page 5 of 9   START TIME: _______
STEP 2:      Step 42 Verify Stat Alarms have cleared:
STEP 1: Step 41 Verify reset of any of the following is desired:
___ SAT
ES Channel 5 ES Channel 6 STANDARD: Determines, from Initiating Cue, that reset of ES Channels 5 and 6 is desired.
* 1SA-7/A-1 (1A1 ES TRIP)
* 1SA-7/B-1 (1B1 ES TRIP)
* 1SA-7/C-1 (1C1 ES TRIP)
* 1SA-7/A-2 (1A2 ES TRIP)                                        ___ UNSAT
* 1SA-7/B-2 (1B2 ES TRIP)
* 1SA-7/C-2 (1C2 ES TRIP)
STANDARD:    Determine that all of the above statalarms on 1SA-7 are clear by observing that their respective window lights are NOT illuminated.
COMMENTS:
COMMENTS:
STEP 3:      Step 43                                                              CRTICAL STEP Perform the following to reset ES (1UB1):
___ SAT
* Depress RESET for CH 5.
* Depress RESET for CH 6.
___ UNSAT STANDARD:    Candidate depresses the RESET pushbuttons for Channels 5 and 6 located on 1UB1 COMMENTS:
CRO-508 fnl - e Page 6 of 9 STEP 4:  Step 44 Verify:
___ SAT
___ SAT
___ UNSAT   STEP 2: Step 4 2 Verify Stat Alarms have cleared:
* CH 5 TRIPPED light off
1SA-7/A-1 (1A1 ES TRIP) 1SA-7/B-1 (1B1 ES TRIP) 1SA-7/C-1 (1C1 ES TRIP) 1SA-7/A-2 (1A2 ES TRIP) 1SA-7/B-2 (1B2 ES TRIP) 1SA-7/C-2 (1C2 ES TRIP)
* CH 6 TRIPPED light off
STANDARD: Determine that all of the above statalarms on 1SA
___ UNSAT STANDARD: Candidate locates ES Channels 5 and 6 and verifies that their respective lights are no longer lit/illuminated.
-7 are clear by observing that their respective window lights are NOT illuminated
COMMENTS:
. COMMENTS:               ___ SAT        ___ UNSAT  STEP 3: Step 4 3 Perform the following to reset ES (1UB1):
STEP 5:   Step 45 Open:
Depress RESET for CH 5.
Depress RESET for CH 6.
STANDARD: Candidate depresses the RESET pushbuttons for Channels 5 and 6 located on 1UB1 COMMENTS:
CRTICAL STEP
___ SAT
___ SAT
___ UNSAT CRO-508 fnl - e Page 6 of 9  STEP 4:  Step 4 4 Verify:  CH 5 TRIPPED light off CH 6 TRIPPED light off STANDARD: Candidate locates ES Channels 5 and 6 and verifies that their respective lights are no longer lit/illuminated.
* 1CC-7
* 1CC-8
___ UNSAT STANDARD: Candidate verifies 1CC-7 and 1CC-8 are OPEN by observing RED lights ON and GREEN lights OFF.
COMMENTS:
COMMENTS:
___ SAT        ___ UNSAT  STEP 5: Step 4 5 Open:  1CC-7  1CC-8  STANDARD: Candidate verifies 1CC-7 and 1CC-8 are OPEN by observing RED light s ON and GREEN light s OFF. COMMENTS:
STEP 6:   Step 46
___ SAT       ___ UNSAT  STEP 6:  Step 4 6 Ensure one CC pump is running in the ON position.
___ SAT Ensure one CC pump is running in the ON position.
STANDARD: Candidate verifies only one CC pump is running.
STANDARD: Candidate verifies only one CC pump is running.
___ UNSAT COMMENTS:
CRO-508 fnl - e Page 7 of 9 STEP 7:      Step 47 Ensure one CC pump off and in AUTO.
___ SAT STANDARD:    Candidate ensures the standby CC pump control switch is in the AUTO position.                                                              ___ UNSAT COMMENTS:
STEP 8:      Step 48                                                              CRTICAL STEP Position the following switches to LOW:
___ SAT
* 1A RBCU
* 1B RBCU
* 1C RBCU
___ UNSAT STANDARD:    Candidate places the speed control switches for RBCUs 1A, 1B, & 1C to the LOW position.
COMMENTS:
COMMENTS:
___ SAT
STEP 9:      Step 49                                                              CRTICAL STEP Depress the following PUSH TO RET TO NORMAL AFT ES RESET
___ UNSAT CRO-508 fnl - e Page 7 of 9  STEP 7:  Step 4 7 Ensure one CC pump off and in AUTO. STANDARD: Candidate ensures the standby CC pump control switch is in the AUTO position. COMMENTS:
___ SAT pushbuttons:
___ SAT 
* 1A RBCU ES RESET
* 1B RBCU ES RESET
* 1C RBCU ES RESET                                              ___ UNSAT STANDARD:   Candidate depresses the following PUSH TO RET TO NORMAL AFT ES RESET pushbuttons for RBCUs 1A, 1B, & 1C Examiners Cue: Another operator will continue with this procedure.
COMMENTS:
END TASK STOP TIME: ____________


___ UNSAT  STEP 8: Step 4 8 Position the following switches to LOW:
CRO-508 fnl - e Page 8 of 9 CRITICAL STEP EXPLANATIONS:
1A RBCU  1B RBCU  1C RBCU  STANDARD: Candidate places the speed control switches for RBCUs 1A, 1B, & 1C to the LOW position
STEP #                                      Explanation 3    This step is required to reset the ES channels 5 & 6 so the associated components can be re-aligned for normal operation.
. COMMENTS:        CRTICAL STEP
8   This step is required to return the RBCUs to a normal alignment.
___ SAT
9   This step is required to return the RBCUs to a normal alignment.
___ UNSAT  STEP 9:  Step 4 9 Depress the following PUSH TO RET TO NORMAL AFT ES RESET pushbuttons:
1A RBCU ES RESET 1B RBCU ES RESET 1C RBCU ES RESET STANDARD: Candidate depress es the following PUSH TO RET TO NORMAL AFT ES RESET pushbuttons for RBCUs 1A, 1B, & 1C Examiners Cue:  Another operator will continue with this procedure.
COMMENTS:      END TASK  CRTICAL STEP
___ SAT        ___ UNSAT STOP TIME: ____________


CRO-508 fnl - e Page 8 of 9  CRITICAL STEP EXPLANATIONS:
e CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
STEP # Explanation 3 This step is required to reset the ES channels 5 & 6 so the associated components can be re-aligned for normal operation
. 8 This step is required to return the RBCUs to a normal alignment
. 9 This step is required to return the RBCUs to a normal alignment
.
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A MSLB has occurred.
A MSLB has occurred.
ES Channels 1  
ES Channels 1 - 6 have actuated on High RB pressure.
- 6 have actuated on High RB pressure.
EOP Encl. 5.1 (ES Actuation) is complete ALL ES Channels are being reset EOP Encl. 5.41 (ES Recovery) is complete through step 40 INITIATING CUES:
EOP Encl. 5.1 (ES Actuation) is complete ALL ES Channels are being reset EOP Encl. 5.41 (ES Recovery) is complete through step 40
The CRS directs you to continue in EOP Encl. 5.41 (ES Recovery) beginning at step 41.


INITIATING CUES:
CRO-606 fnl - f Page 1 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-606 Energize Main Feeder Busses From CT-5 CANDIDATE EXAMINER


The CRS directs you to continue in EOP Encl. 5.41 (ES Recovery) beginning at step 41
CRO-606 fnl - f Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
.  
Energize Main Feeder Busses From CT-5 Alternate Path:
Yes Facility JPM #:
CRO-008 K/A Rating(s):
System: 055 K/A:      EA2.03 Rating: 3.9/4.7 Task Standard:
Energize Main Feeder Busses from CT-5.
Preferred Evaluation Location:                                    Preferred Evaluation Method:
Simulator __X___ In-Plant ______                                  Perform __X__ Simulate _____


CR O-606 fnl - f Page 1 of 15    REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-606  Energize Main Feeder Busses From CT
==References:==
-5     


CANDIDATE     EXAMINER 
EOP, Encl 5.38 (Restoration of Power)
Validation Time: 15 minutes                                      Time Critical: No
====================================================================================
Candidate:     _______________________________________                          Time Start: _________
NAME                                            Time Finish: ________
Performance Rating: SAT ______ UNSAT ______                              Performance Time: _________
Examiner: ______________________________            ____________________________________/________
NAME                                      SIGNATURE                    DATE
====================================================================================
COMMENTS


CR O-606 fnl - f Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:   Energize Main Feeder Busses From CT-5  Alternate Path:
CRO-606 fnl - f Page 3 of 15 SIMULATOR OPERATOR INSTRUCTIONS:
Yes  Facility JPM #:
: 1. RECALL Snap 218
CRO-008  K/A Rating(s):  
: 2. IMPORT Files for CRO-606
: 3. Place simulator in RUN


System: 0 55 K/A:  E A 2.0 3 Rating:    3.9/4.7  Task Standard:
CRO-606 fnl - f Page 4 of 15 Tools/Equipment/Procedures Needed:
 
Energize Main Feeder Busses from CT
-5. Preferred Evaluation Location:
Preferred Evaluation Method:
Simulator
__X___ In-Plant ______      Perform __X__ Simulate _____ 
 
==References:==
 
EOP, Encl 5.38 (Restoration of Power)
Validation Time
: 15 minutes      Time Critical
:  No ====================================================================================
Candidate:
_______________________________________
Time Start: ___
______    NAME      Time Finish: ________
Performance Rating:  SAT ______ UNSAT ______
Performance Time
: _________
Examiner: ______________________________          ____________________________________/________
NAME      SIGNATURE                            DATE
====================================================================================
COMMENTS CR O-606 fnl - f Page 3 of 15  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. RECALL Snap 218  2. IMPORT Files fo r CRO-606
: 3. Place simulator in RUN CR O-606 fnl - f Page 4 of 15 Tools/Equipment/Procedures Needed:
EOP, Encl 5.38 (Restoration of Power)
EOP, Encl 5.38 (Restoration of Power)
READ TO OPERATOR DIRECTION TO TRAINEE:
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 experienced a unit trip followed by a lockout on CT
Unit 1 experienced a unit trip followed by a lockout on CT-1.
-1.
Blackout tab of the EOP in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).
Blackout tab of the EOP in progress
INITIATING CUES:
The CRS directs you to initiate Encl. 5.38, Restoration of Power, to regain power to the Main Feeder Buses.
 
CRO-606 fnl - f Page 5 of 15 START TIME: _______
STEP 1:      Step 1 Verify power has been restored.
___ SAT STANDARD:    Determine power has NOT been restored by observing MFB voltage on 1AB1. Perform RNO step.
Continue to Step 2
___ UNSAT COMMENTS:
STEP 2:      Step 1 RNO GO TO Step 3.
___ SAT STANDARD:    GO TO Step 3.
COMMENTS:
___ UNSAT STEP 3:      Step 3                                                              CRITICAL STEP Place 1HP-31 in HAND and reduce demand to 0.
___ SAT STANDARD:    Place 1HP-31 in HAND and reduce demand to 0 using the toggle switch.
Located on 1UB1.
Continue to Step 4
___ UNSAT COMMENTS:
STEP 4:      Step 4 Close 1HP-21.
___ SAT STANDARD:    Close 1HP-21 by rotating the switch to the closed position on 1UB2.
Continue to Step 5 COMMENTS:                                                                          ___ UNSAT


The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power). INITIATING CUES:
CRO-606 fnl - f Page 6 of 15 STEP 5:    Step 5 Verify any of the following energized:
The CRS directs you to initiate Encl. 5.38, Restoration of Power, to regain power to the Main Feeder Buses.
* MFB1                                                                  ___ SAT
* MFB2 STANDARD: Observes that zero (0) volts are indicated on both MFBs meters located on 1AB1.                                                                 ___ UNSAT Continue to Step 5 RNO COMMENTS:
STEP 6:    Step 5 RNO GO TO Step 8.
___ SAT STANDARD:  GO TO Step 8.
COMMENTS:                                                                          ___ UNSAT STEP 7:    Step 8 Verify CT-1 indicates  4160 volts.
___ SAT STANDARD:  Observes that zero (0) volts is indicated on CT-1 on 1AB1.
Continue to Step 8 RNO COMMENTS:                                                                         ___ UNSAT STEP 8:    Step 8 RNO GO TO Step 18.
___ SAT STANDARD:  GO TO Step 18.
COMMENTS:                                                                          ___ UNSAT STEP 9:    Step 18 Verify both Standby Bus #1 and Standby Bus #2 are de-energized.
___ SAT STANDARD:  Observes that zero (0) volts is indicated both Standby Buses located on 2AB3.
Continue to Step 19
___ UNSAT COMMENTS:


CR O-606 fnl - f Page 5 of 15  START TIME: _______
CRO-606 fnl - f Page 7 of 15 STEP 10:  Step 19 Verify all Keowee units operating.
STEP 1:  Step 1 Verify power has been restored.
___ SAT STANDARD: Determine that Keowee Unit 2 is Emergency Lockout by observing the Statalarm 2SA-18/A1.
STANDARD: Determine power has NOT been restored by observing MFB voltage on 1AB1. Perform RNO step.
Continue to Step 19 RNO
Continue to Step 2  COMMENTS:              ___ SAT
___ UNSAT COMMENTS:
___ UNSAT  STEP 2:  Step 1 RNO GO TO Step 3. STANDARD: GO TO Step 3. COMMENTS:              ___ SAT        ___ UNSAT  STEP 3:  Step 3 Place 1HP-31 in HAND and reduce demand to 0.
STEP 11:  Step 19 RNO
STANDARD: Place 1HP-31 in HAND and reduce demand to 0 using the toggle switch. Located on 1UB1.
: 1. Emergency start Keowee units:
Continue to Step 4  COMMENTS:        CRITICAL STEP      ___ SAT
___ SAT
___ UNSAT  STEP 4:  Step 4 Close 1HP-21. STANDARD: Close 1HP-21 by rotating the switch to the closed position on 1 U B2. Continue to Step 5  COMMENTS:              ___ SAT        ___ UNSAT CR O-606 fnl - f Page 6 of 15  STEP 5:  Step 5 Verify any of the following energized:
* KEOWEE EMER START CHANNEL A
MFB1  MFB2  STANDARD: Observes that zero (0) volts are indicated on both MFBs meters located on 1AB1. Continue to Step 5 RNO  COMMENTS:              ___ SAT        ___ UNSAT  STEP 6:  Step 5 RNO GO TO Step 8. STANDARD: GO TO Step 8. COMMENTS:              ___ SAT
* KEOWEE EMER START CHANNEL B
___ UNSAT  STEP 7:  Step 8 Verify CT-  STANDARD: Observes that zero (0) volts is indicated on CT
: 2. IF NO Keowee units are operating,                               ___ UNSAT THEN GO TO Step 38.
-1 on 1AB1. Continue to Step 8 RNO  COMMENTS:              ___ SAT
STANDARD: Place the KEOWEE EMER START CHANNEL A and B switches to start located on 1UB1.
___ UNSAT  STEP 8:  Step 8 RNO GO TO Step 18. STANDARD: GO TO Step 18. COMMENTS:              ___ SAT        ___ UNSAT  STEP 9:  Step 1 8 Verify both Standby Bus #1 and Standby Bus #2 are de
COMMENTS:
-energized.
STEP 12:  Step 20 Verify both Keowee units in Oconee Control (statalarms on):
STANDARD: Observes that zero (0) volts is indicated both Standby Buses located on 2AB3. Continue to Step 19  COMMENTS:              ___ SAT        ___ UNSAT CR O-606 fnl - f Page 7 of 15   STEP 10:  Step 1 9 Verify all Keowee units operating.
___ SAT
STANDARD: Determine that Keowee Unit 2 is Emergency Lockout by observing the Statalarm 2SA-18/A1. Continue to Step 19 RNO COMMENTS:             ___ SAT        ___ UNSAT  STEP 11:  Step 19 RNO 1. Emergency start Keowee units:
* UNIT 1 OCONEE CONTROL (2SA-17/E-1)
KEOWEE EMER START CHANNEL A KEOWEE EMER START CHANNEL B
* UNIT 2 OCONEE CONTROL (2SA-18/E-1)
: 2. IF NO Keowee units are operating, THEN GO TO Step 3 8. STANDARD: Place the KEOWEE EMER START CHANNEL A and B switc h es to start located on 1UB1.
___ UNSAT STANDARD: Determine neither Statalarm above is actuated.
COMMENTS:             ___ SAT        ___ UNSAT  STEP 12:  Step 20 Verify both Keowee units in Oconee Control (statalarms on):
Continue to Step 20 RNO COMMENTS:
UNIT 1 OCONEE CONTROL (2SA
STEP 13:  Step 20 RNO Notify Keowee Operator to place both Keowee units Master Transfer
-17/E-1)   UNIT 2 OCONEE CONTROL (2SA
___ SAT switches to remote.
-18/E-1)     STANDARD: Determine neither Statalarm above is actuated.
Continue to Step 20 RNO COMMENTS:             ___ SAT
___ UNSAT  STEP 13:  Step 20 RNO Notify Keowee Operator to place both Keowee units Master Transfer switches to remote.
STANDARD: Call the Keowee Operator and ask that both Keowee units Master Transfer switches be place to remote.
STANDARD: Call the Keowee Operator and ask that both Keowee units Master Transfer switches be place to remote.
Continue to Step 21 COMMENTS:             ___ SAT        ___ UNSAT CR O-606 fnl - f Page 8 of 15   STEP 14: Step 21 Verify both Keowee units operating.
___ UNSAT Continue to Step 21 COMMENTS:
STANDARD: Determine that only KHU 1 is operating.
 
Continue to Step 21 RNO COMMENTS:             ___ SAT        ___ UNSAT  STEP 15: Step 21 RNO 1. IF UNIT 1 EMER FDR ACB 3 is closed, AND Unit 1 Keowee is NOT operating, THEN open UNIT 1 EMER FDR ACB 3.
CRO-606 fnl - f Page 8 of 15 STEP 14:   Step 21 Verify both Keowee units operating.
: 2. IF UNIT 2 EMER FDR ACB 4 is closed, AND Unit 2 Keowee is NOT operating, THEN open UNIT 2 EMER FDR ACB
___ SAT STANDARD: Determine that only KHU 1 is operating.
: 4. STANDARD: Determine that BOTH ACB
Continue to Step 21 RNO
-3 and ACB-4 are OPEN, Continue to Step 22 COMMENTS:             ___ SAT
___ UNSAT COMMENTS:
___ UNSAT  ALTERNATE PATH STEP 16: Step 2 2 Ensure one of the following is closed for an operating Keowee unit:
STEP 15:   Step 21 RNO
Unit 1 Unit 2 UNIT 1 EMER FDR ACB-3 UNIT 1 EMER FDR ACB-4   STANDARD: Attempt to close ACB
: 1. IF UNIT 1 EMER FDR ACB 3 is closed, AND Unit 1 Keowee is NOT
-3 and determine it did NOT close. Continue s to step 23 COMMENTS:             ___ SAT
___ SAT operating, THEN open UNIT 1 EMER FDR ACB 3.
___ UNSAT  STEP 17: Step 23 Verify 4160 volt power has been restored to the MFB.
: 2. IF UNIT 2 EMER FDR ACB 4 is closed, AND Unit 2 Keowee is NOT operating, THEN open UNIT 2 EMER FDR ACB 4.
STANDARD: Determine 4160 volt power has NOT been restored to the MFB by observing the U
___ UNSAT STANDARD: Determine that BOTH ACB-3 and ACB-4 are OPEN, Continue to Step 22 COMMENTS:
-1 FDR BUS VOLTS meters on 1AB1.
ALTERNATE PATH STEP 16:   Step 22                                                            ___ SAT Ensure one of the following is closed for an operating Keowee unit:
Continue to step 2 3 RNO COMMENTS:             ___ SAT
Unit 1             Unit 2                               ___ UNSAT UNIT 1              UNIT 1 EMER FDR            EMER FDR ACB-3               ACB-4 STANDARD: Attempt to close ACB-3 and determine it did NOT close.
___ UNSAT CR O-606 fnl - f Page 9 of 15   STEP 18:  Step 23 RNO GO TO Step 2 5  STANDARD: GO TO Step 2 5  COMMENTS:             ___ SAT        ___ UNSAT   STEP 19:  Step 25 Verify CT-4 indicates  4160 volts.
Continues to step 23 COMMENTS:
STANDARD: Determine CT
STEP 17:   Step 23 Verify 4160 volt power has been restored to the MFB.
-4 indicates zero volts on meter located on 1AB3.
___ SAT STANDARD: Determine 4160 volt power has NOT been restored to the MFB by observing the U-1 FDR BUS VOLTS meters on 1AB1.
Continue to Step 25 RNO COMMENTS:             ___ SAT       ___ UNSAT   STEP 20:  Step 2 5 RNO GO TO Step 38. STANDARD: GO TO Step 38. COMMENTS:
Continue to step 23 RNO
___ UNSAT COMMENTS:
 
CRO-606 fnl - f Page 9 of 15 STEP 18:  Step 23 RNO GO TO Step 25
___ SAT STANDARD: GO TO Step 25 COMMENTS:                                                                         ___ UNSAT STEP 19:  Step 25 Verify CT-4 indicates  4160 volts.
___ SAT STANDARD: Determine CT-4 indicates zero volts on meter located on 1AB3.
Continue to Step 25 RNO
___ UNSAT COMMENTS:
STEP 20:  Step 25 RNO GO TO Step 38.
___ SAT STANDARD: GO TO Step 38.
___ UNSAT COMMENTS:
STEP 21:  Step 38 IAAT CT-5 indicates  4160 volts,
___ SAT THEN GO TO Step 55.
STANDARD: Determine that approximately 4160 volts is indicated on the CT-5 voltage meter located on 1AB1 and then GO TO Step 55                            ___ UNSAT COMMENTS:
 
CRO-606 fnl - f Page 10 of 15 STEP 22:      Step 55                                                            CRITICAL STEP Place the following switches in MAN:
___ SAT
* MFB1 AUTO/MAN
* MFB2 AUTO/MAN
* STANDBY 1 AUTO/MAN                                                ___ UNSAT
* STANDBY 2 AUTO/MAN STANDARD:    Rotates the AUTO/MAN selector switch to the MANUAL position for each of the switches listed above.
Continue to Step 56 Examiner note: Various Statalarms will actuate as these switches are manipulated.
They are expected.
COMMENTS:
STEP 23:      Step 56 Open the following breakers:
___ SAT
* N11 MFB1 NORMAL FDR
* N21 MFB2 NORMAL FDR
* E11 MFB1 STARTUP FDR                                              ___ UNSAT
* E21 MFB2 STARTUP FDR STANDARD:    Verify each of the above breakers is OPEN by observing the white breaker open light is LIT on 1AB1.
Continue to Step 57 COMMENTS:
STEP 24:      Step 57                                                            *CRITICAL STEP Place the following switches in MAN:
___ SAT
              *  *CT4 BUS 1 AUTO/MAN
              *  *CT4 BUS 2 AUTO/MAN
* CT5 BUS 1 AUTO/MAN                                                ___ UNSAT
* CT5 BUS 2 AUTO/MAN STANDARD:    Rotates the AUTO/MAN selector switch to the MANUAL position for each of the switches listed above located on 2AB3.
Continue to Step 58 COMMENTS:
 
CRO-606 fnl - f Page 11 of 15 STEP 25:  Step 58 Open the following breakers:
___ SAT
* SK1 CT4 STBY BUS 1 FEEDER
* SK2 CT4 STDY BUS 2 FEEDER
___ UNSAT STANDARD: Verify each of the above breakers is OPEN by observing the white breaker open light is LIT on 2AB3.
Continue to Step 59 COMMENTS:
STEP 26:  Step 59                                                                CRITICAL STEP Close the following breakers:
___ SAT
* SL1 CT5 STBY BUS 1 FEEDER
* SL2 CT5 STBY BUS 2 FEEDER
___ UNSAT STANDARD: Go to the CLOSED position for each of the switches listed above located on 1AB3..
Continue to Step 60 COMMENTS:
STEP 27:  Step 60                                                                CRITICAL STEP Place the following switches in AUTO:
___ SAT
___ SAT
___ UNSAT  STEP 21:  Step 3 8 IAAT CT- THEN GO TO Step 5 5. STANDARD:  Determine that approximately 4160 volts is indicated on the CT-5 voltage  meter located on 1AB1 and then GO TO Step 55  COMMENTS:              ___ SAT        ___ UNSAT CR O-606 fnl - f Page 10 of 15  STEP 22:  Step 55 Place the following switches in MAN:
* CT5 BUS 1 AUTO/MAN
MFB 1 AUTO/MAN  MFB 2 AUTO/MAN  STANDBY 1 AUTO/MAN STANDBY 2 AUTO/MAN STANDARD: Rotates the AUTO/MAN selector switch to the MANUAL position for each of the switches listed above. Continue to Step 56  Examiner note: Various Statalarms will actuate as these switches are manipulated. They are expected.
* CT5 BUS 2 AUTO/MAN
COMMENTS:        CRITICAL STEP      ___ SAT        ___ UNSAT  STEP 23:  Step 56 Open the following breakers:
___ UNSAT STANDARD: Rotates the AUTO/MAN selector switch to the AUTO position for each of the switches listed above.
N1 1 MFB1 NORMAL FDR N2 1 MFB2 NORMAL FDR  E1 1 MFB1 STARTUP FDR E2 1 MFB2 STARTUP FDR STANDARD: Verify each of the above breakers is OPEN by observing the white breaker open light is LIT on 1AB1. Continue to Step 57  COMMENTS:              ___ SAT
Continue to Step 61 COMMENTS:
___ UNSAT  STEP 24:  Step 57 Place the following switches in MAN:
  *CT4 BUS 1 AUTO/MAN
  *CT4 BUS 2 AUTO/MAN CT5 BUS 1 AUTO/MAN CT5 BUS 2 AUTO/MAN STANDARD: Rotates the AUTO/MAN selector switch to the MANUAL position for each of the switches listed above located on 2AB3.
Continue to Step 58  COMMENTS:       *CRITICAL STEP      ___ SAT 


___ UNSAT CR O-606 fnl - f Page 11 of 15   STEP 25:  Step 58 Open the following breakers:
CRO-606 fnl - f Page 12 of 15 STEP 28:        Step 61 Verify Standby Bus #1 energized.
SK1 CT4 STBY BUS 1 FEEDER SK2 CT4 STDY BUS 2 FEEDER  STANDARD: Verify each of the above breakers is OPEN by observing the white breaker open light is LIT on 2AB3.
___ SAT STANDARD:       Observes that 4160 volts are indicated for Standby Bus #1 located on 2AB3.
Continue to Step 59  COMMENTS:    
Continue to Step 62                                                    ___ UNSAT COMMENTS:
STEP 29:        Step 62 Notify CR SRO in each unit where a blackout exists that Standby Bus #1 is energized.                                                          ___ SAT STANDARD:      Notifies CR SRO that Standby Bus #1 is energized located on 2AB3.
Continue to Step 63
___ UNSAT Cue: If asked, inform candidate that only Unit 1 is affected.
COMMENTS:
STEP 30:        Step 63                                                                CRITICAL STEP Close the following breakers:
___ SAT
* S11 STBY BUS 1 TO MFB1
* S21 STBY BUS 2 TO MFB2
___ UNSAT STANDARD:       Goes to the CLOSED position for each of the switches listed above.
Continue to Step 64 Note: Only 1 of the Stby Busses must be energized to restore power to MFBs.
COMMENTS:
STEP 31:        Step 64 Verify any of the following energized:
___ SAT
* 1TC
* 1TD
* 1TE                                                                ___ UNSAT STANDARD:      Observes that  4160 volts indicated on either MFB voltmeters or OAC.
Continue to Step 65 COMMENTS:


___ SAT        ___ UNSAT  STEP 26:  Step 59 Close the following breakers:
CRO-606 fnl - f Page 13 of 15 STEP 32:     Step 65 Notify Unit 1 CR SRO of status of 4160V SWGR.
SL1 CT5 STBY BUS 1 FEEDER SL2 CT5 STBY BUS 2 FEEDER STANDARD: Go to the CLOSED position for each of the switches listed above located on 1AB3.. Continue to Step 60  COMMENTS:        CRITICAL STEP      ___ SAT
___ SAT STANDARD:   Notifies CR SRO of status of 4160V SWGR
___ UNSAT  STEP 27:  Step 60 Place the following switches in AUTO:
___ UNSAT COMMENTS:
CT5 BUS 1 AUTO/MAN CT5 BUS 2 AUTO/MAN STANDARD: Rotates the AUTO/MAN selector switch to the AUTO position for each of the switches liste d above. Continue to Step 61  COMMENTS:        CRITICAL STEP      ___ SAT
END TASK STOP TIME: ____________
___ UNSAT CR O-606 fnl - f Page 12 of 15  STEP 28:  Step 61 Verify Standby Bus #1 energized.
STANDARD: Observes that  4160 volts are indicated for Standby Bus #1 located on 2AB3. Continue to Step 62  COMMENTS:              ___ SAT        ___ UNSAT  STEP 29:  Step 62 Notify CR SRO in each unit where a blackout exists that Standby Bus #1 is energized.
STANDARD: Notifies CR SRO that Standby Bus #1 is energized located on 2AB3.
Continue to Step 63 Cue: If asked, inform candidate that only Unit 1 is affected.
COMMENTS:              ___ SAT        ___ UNSAT  STEP 30:  Step 63 Close the following breakers:
S1 1 STBY BUS 1 TO MFB1 S2 1 STBY BUS 2 TO MFB2 STANDARD: Goes to the CLOSED position for each of the switches listed above. Continue to Step 64  Note: Only 1 of the Stby Busses must be energized to restore power to MFBs.
COMMENTS:        CRITICAL STEP      ___ SAT
___ UNSAT  STEP 31:  Step 64 Verify any of the following energized:
1TC  1TD  1TE  STANDARD: Observes that  4160 volts indicated on either MFB voltmeters or OAC
. Continue to Step 65  COMMENTS:              ___ SAT
___ UNSAT CR O-606 fnl - f Page 13 of 15   STEP 32: Step 65 Notify Unit 1 CR SRO of status of 4160V SWGR.
STANDARD: Notifies CR SRO of status of 4160V SWGR   COMMENTS:     END TASK         ___ SAT        ___ UNSAT  STOP TIME: ____________


CR O-606 fnl - f Page 14 of 15 CRITICAL STEP EXPLANATIONS:
CRO-606 fnl - f Page 14 of 15 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 3 Step is required to protect the RCP seals.
STEP #                                       Explanation 3   Step is required to protect the RCP seals.
22 Step is required to satisfy power switching logic.
22   Step is required to satisfy power switching logic.
24 Step is required to satisfy power switching logic.
24   Step is required to satisfy power switching logic.
26 Step is required to energize the Main Feeder Bus.
26   Step is required to energize the Main Feeder Bus.
27 Step is required to provide undervoltage protection
27   Step is required to provide undervoltage protection.
. 30 Step is required to energize the Main Feeder Bus.
30   Step is required to energize the Main Feeder Bus.


f   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
f CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 experienced a unit trip followed by a lockout on CT
Unit 1 experienced a unit trip followed by a lockout on CT-1.
-1.
Blackout tab of the EOP in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).
Blackout tab of the EOP in progress
 
The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).
INITIATING CUES:
INITIATING CUES:
The CRS directs you to initiate Encl. 5.38, Restoration of Power, to regain power to the Main Feeder Buses.
The CRS directs you to initiate Encl. 5.38, Restoration of Power, to regain power to the Main Feeder Buses.


CRO-607 fnl - j Page 1 of 14   REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-607 Activate the SSF From the SSF Control Room
CRO-607 fnl - j Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-607 Activate the SSF From the SSF Control Room CANDIDATE EXAMINER
 
CANDIDATE     EXAMINER  


CRO-607 fnl - j Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:   Activate The SSF From the SSF Control Room Alternate Path:
CRO-607 fnl - j Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
No Facility JPM #:
Activate The SSF From the SSF Control Room Alternate Path:
CRO-047 K/A Rating(s):
No Facility JPM #:
System: 062 K/A: A2.11 Rating:   3.7/4.1 Task Standard:
CRO-047 K/A Rating(s):
Power is swapped and the SSF D/G is emergency started. Flow is established to the RCP seals using the SSF-RCMU system. Flow is established to the SGs using the SSF ASW system. Preferred Evaluation Location:
System: 062 K/A:     A2.11 Rating: 3.7/4.1 Task Standard:
Preferred Evaluation Method:
Power is swapped and the SSF D/G is emergency started. Flow is established to the RCP seals using the SSF-RCMU system. Flow is established to the SGs using the SSF ASW system.
Simulator
Preferred Evaluation Location:                                 Preferred Evaluation Method:
_____ In-Plant __X ___     Perform _____ Simulate __X__
Simulator _____ In-Plant __X ___                               Perform _____ Simulate __X__


==References:==
==References:==


AP/0/A/1700/25 Validation Time:
AP/0/A/1700/25 Validation Time: 12 minutes                                     Time Critical: YES
1 2 minutes       Time Critical: YES ====================================================================================
====================================================================================
Candidate:
Candidate:     _______________________________________                       Time Start: _________
_______________________________________
NAME                                           Time Finish: ________
Time Start: __
Performance Rating: SAT ______ UNSAT ______                             Performance Time: _________
_______    NAME       Time Finish: ________
Performance Rating:   SAT ______ UNSAT ______
Performance Time
: _________
Examiner: ______________________________          ____________________________________/________
Examiner: ______________________________          ____________________________________/________
NAME     SIGNATURE                           DATE
NAME                                     SIGNATURE                   DATE
====================================================================================
====================================================================================
COMMENTS CRO-607 fnl - j Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS:
COMMENTS
: 1. None  
 
CRO-607 fnl - j Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. None


CRO-607 fnl - j Page 4 of 14 Tools/Equipment/Procedures Needed:
CRO-607 fnl - j Page 4 of 14 Tools/Equipment/Procedures Needed:
Line 755: Line 817:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 3 was operating at 100% power Unit 3 TD EFDWP is out of service Tornado warnings are in affect AP/0/A/1700/006 (Natural Disaster) in progress You are pre-staged in the SSF Control Room and in communication with the Unit 3 Control Room as directed by AP/0/A/1700/006 (Natural Disaster).
Unit 3 Reactor has just tripped and the unit has experienced a complete loss of all AC power AP/0/A/1700/025 (SSF EOP) has been initiated INITIATING CUES:
The CRS calls and informs you of the following:
* Unit 3 has lost all AC power
* SSF RCMU feed and SSF ASW feed to the SGs are required
* The breaker transfers have NOT been performed
* Begin AP/25 actions starting at Step 4.5 THIS JPM IS TIME CRITICAL


Unit 3 was operating at 100% power
CRO-607 fnl - j Page 5 of 14 START TIME: _______
TIME CRITICAL TIME STARTS ________                                              CRITICAL STEP
___ SAT STEP 1:      Step 4.5 Perform the following on the affected unit:
* Open 3XSF-F5A (3XSF NORM FDR BKR FROM 3X8) and remove Kirk Key                                                        ___ UNSAT
* Using Kirk Key, close 1, 2, 3XSF-F3A (1, 2, 3XSF EMERG FDR BKR FROM OXSF)
STANDARD:    Student: Locates and opens NORMAL FDR BKR FROM 1, 2, 3X8 is by rotating breaker switch to the OFF position and removes the Kirk Key.
Student locates EMERG FDR BKR FROM OXSF inserts the Kirk Key and closed the breaker by rotating breaker switch to the ON position.
Continues to Step 4.6 Cue: As operator performs the key/breaker operation, indicate to operator the appropriate component positions.
NOTE: Kirk Key must be rotated 1/2 turn to be removed.
COMMENTS:
STEP 2:      Step 4.6 Verify SSF D/G is operating
___ SAT STANDARD:    Determines the D/G is not operating and continues to step 4.6 RNO (GOTO to Step 4.8)
___ UNSAT Continues to step 4.8 COMMENTS:


Unit 3 TD EFDWP is out of service
CRO-607 fnl - j Page 6 of 14 STEP 3:        Step 4.8                                                          CRITICAL STEP Depress DIESEL EMERGENCY START push button.
___ SAT STANDARD      The SSF Control Room DIESEL EMERGENCY START pushbutton is pressed.
___ UNSAT Continues to Step 4.9 Cue: Allow  12 sec for the D/G to reach rated speed.
COMMENTS:
STEP 4:        Step 4.9 Verify SSF D/G operating.
___ SAT STANDARD:      Candidate reports by indications and sound that D/G is operating.
Continues to Step 4.10
___ UNSAT COMMENTS:
STEP 5:        Step 4.10 Open breaker OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T).                                                              ___ SAT STANDARD:      The green TRIP pushbutton on the SSF OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T) control switch is pressed.              ___ UNSAT Continues to Step 4.11 Cue: Inform student that the green light for OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T) is on and the red light is off.
COMMENTS:


Tornado warning s are in affect AP/0/A/1700/006 (Natural Disaster) in progress
CRO-607 fnl - j Page 7 of 14 STEP 6:        Step 4.11 Verify open OTS1-0 (SSF ALT. POWER SUPPLY BKR OTS1-0).
___ SAT STANDARD:      Determine that OTS1-0 (SSF ALT. POWER SUPPLY BKR OTS1-0) is open by verify that the green open light is lit and the red closed light is off.                                                                        ___ UNSAT Continues to Step 4.12 COMMENTS:
STEP 7:        Step 4.12 WHEN 3 seconds have elapsed THEN continue.
___ SAT STANDARD:      Wait three (3) seconds after OTS1-1 is opened and continue.
Continues to Step 4.13
___ UNSAT COMMENTS:
STEP 8:        Step 4.13                                                                  CRITICAL STEP Close breaker OTS1-4 (DIESEL GEN BREAKER).
___ SAT STANDARD:      The red CLOSE pushbutton on the SSF Control Room OTS1-4 (DIESEL GEN BREAKER) switch is depressed.                                    ___ UNSAT Continues to Step 4.14 Cue: After student closes in diesel generator breaker, inform him/her that red light is on and green light is off.
COMMENTS:


You are pre
CRO-607 fnl - j Page 8 of 14 STEP 9:      Step 4.14 Verify Diesel Engine Service Water Pump operating.
-staged in the SSF Control Room and in communication with the Unit 3 Control Room as directed by AP/0/A/1700/006 (Natural Disaster).
___ SAT STANDARD:    Determine that the Diesel Engine Service Water Pump operating by observing the red ON light lit.
Unit 3 Reactor has just tripped and the unit has experienced a complete loss of all AC power AP/0/A/1700/025 (SSF EOP) has been initiated INITIATING CUES:
Continues to Step 4.15                                            ___ UNSAT Cue: Indicate that the Diesel Engine Service Water Pump red light is on.
The CR S call s and informs you of the following:
COMMENTS:
Unit 3 has lost all AC power  SSF RCMU feed and SSF ASW feed to the SGs are required  The breaker transfer s have NOT been performed Begin AP/25 actions starting at Step 4.5 THIS JPM IS TIME CRITICAL
STEP 10:     Step 4.15                                                        CRITICAL STEP Start the SSF ASW Pump.
 
___ SAT STANDARD:     SSF ASW PUMP red ON pushbutton is depressed.
CRO-607 fnl - j Page 5 of 14  START TIME: _______
Continues to Step 4.16
TIME CRITICAL TIME STARTS ________
___ UNSAT Cue: After ASW pump ON pushbutton is pressed, inform student of the following:
STEP 1: Step 4.5  Perform the following on the affected unit:  Open 3XSF-F5A (3XSF NORM FDR BKR FROM 3X8) and remove Kirk Key  Using Kirk Key, close 1, 2, 3XSF
* ASW pump red light is on and green light is off.
-F3A (1, 2, 3XSF EMERG FDR BKR FROM OXSF)  STANDARD: Student: Locates and opens NORMAL FDR BKR FROM 1, 2, 3X8 is by rotating breaker switch to the OFF position and removes the Kirk Key. Student locates EMERG FDR BKR FROM OXSF inserts the Kirk Key and closed the breaker by rotating breaker switch to the ON position. Continues to Step 4.6 Cue: As operator performs the key/breaker operation, indicate to operator the appropriate component positions.
* SSF Control Room AUX SER WTR PUMP AMPS meter indicates on scale.
NOTE: Kirk Key must be rotated 1/2 turn to be removed.
COMMENTS:
COMMENTS:         CRITICAL STEP
STEP 11:      Step 4.16 Verify any of the following required:
___ SAT
___ SAT
___ UNSAT   STEP 2: Step 4.6 Verify SSF D/G is operating STANDARD: Determines the D/G is not operating and continues to step 4.6 RNO (GOTO to Step 4.8)
* SSF RCMU feed
Continues to step 4.8 COMMENTS:               ___ SAT 
* SSF ASW feed to SGs
___ UNSAT STANDARD:     Determine that SSF RCMU and SSF ASW are still required.
Continues to Step 4.17 COMMENTS:


___ UNSAT CRO-607 fnl - j Page 6 of 14   STEP 3: Step 4.8 Depress DIESEL EMERGENCY START push button.
CRO-607 fnl - j Page 9 of 14 STEP 12:       Step 4.17 PERFORM the following on all affected units:
STANDARD  The SSF Control Room DIESEL EMERGENCY START pushbutton is pressed.
Continues to Step 4.9 Cue: Allow  12 sec for the D/G to reach rated speed
. COMMENTS:         CRITICAL STEP
___ SAT
___ SAT
___ UNSAT  STEP 4:  Step 4.9  Verify SSF D/G operating.
* Encl 5.1A (Emergency Operation of SSF Systems Unit 1) (PS)
STANDARD: Candidate reports by indications and sound that D/G is operating.
* Encl 5.1B (Emergency Operation of SSF Systems Unit 2) (PS)
Continues to Step 4.10 COMMENTS:
* Encl 5.1C (Emergency Operation of SSF Systems Unit 3) (PS)   ___ UNSAT STANDARD:     Obtains Control room copy of Encl 5.1C (Emergency Operation of SSF Systems Unit 3).
___ SAT
Continues to Step 1 of Encl 5.1C.
___ UNSAT  STEP 5:  Step 4.10 Open breaker OTS1
-1 (SSF NORMAL POWER SUPPLY BREAKER B2T). STANDARD: The green TRIP pushbutton on the SSF OTS1
-1 (SSF NORMAL POWER SUPPLY BREAKER B2T) control switch is pressed.
Continues to Step 4.11 Cue: Inform student that the green light for OTS1
-1 (SSF NORMAL POWER SUPPLY BREAKER B2T) is on and the red light is off.
COMMENTS:                ___ SAT        ___ UNSAT CRO-607 fnl - j Page 7 of 14  STEP 6:  Step 4.11 Verify open OTS1
-0 (SSF ALT. POWER SUPPLY BKR OTS1
-0). STANDARD: Determine that OTS1
-0 (SSF ALT. POWER SUPPLY BKR OTS1
-0) is open by verify that the green open light is lit and the red closed light is off. Continues to Step 4.12 COMMENTS:                ___ SAT
___ UNSAT  STEP 7:  Step 4.12  WHEN 3 seconds have elapsed THEN continue. STANDARD: Wait three (3) seconds after OTS1
-1 is opened and continue.
Continues to Step 4.13 COMMENTS:                ___ SAT
___ UNSAT   STEP 8:  Step 4.13 Close breaker OTS1
-4 (DIESEL GEN BREAKER).
STANDARD: The red CLOSE pushbutton on the SSF Control Room OTS1
-4 (DIESEL GEN BREAKER) switch is depressed.
Continues to Step 4.
14 Cue: After student closes in diesel generator breaker, inform him/her that red light is on and green light is off.
COMMENTS:          CRITICAL STEP
___ SAT
___ UNSAT CRO-607 fnl - j Page 8 of 14  STEP 9:  Step 4.14 Verify Diesel Engine Service Water Pump operating.
STANDARD: Determine that the Diesel Engine Service Water Pump operating by observing the red ON light lit.
Continues to Step 4.15 Cue: Indicate that the Diesel Engine Service Water Pump red light is on.
COMMENTS:                ___ SAT
___ UNSAT  STEP 10:  Step 4.15 Start the SSF ASW Pump.
STANDARD: SSF ASW PUMP red ON pushbutton is depressed. Continues to Step 4.16 Cue: After ASW pump ON pushbutton is pressed, inform student of the following:
ASW pump red light is on and green light is off. SSF Control Room AUX SER WTR PUMP AMPS meter indicates on scale.
COMMENTS:
COMMENTS:
CRITICAL STEP
STEP 13:       Step 1 Verify SSF RCMU is required for Unit 3.
___ SAT        ___ UNSAT  STEP 1 1: Step 4.16 Verify any of the following required:
___ SAT STANDARD:     Determine that SSF RCMU is required for Unit 3.
SSF RCMU feed  SSF ASW feed to SGs STANDARD: Determine that SSF RCMU and SSF ASW are still required.
Continues to step 3.                                             ___ UNSAT COMMENTS:
Continues to Step 4.17 COMMENTS:               ___ SAT   
STEP 14:      Step 2.                                                          CRITICAL STEP Position OVERRIDE RC MAKEUP PUMP switch to START.
___ SAT STANDARD:      OVERRIDE RC MAKEUP PUMP switch is rotated to the START position.
Continues to step 3.
___ UNSAT NOTE: Allow 9 seconds for the following valves to stroke from the time the OVERRIDE switch is operated, and then as soon as the 9 second stroke time is complete the time-critical time #1 is complete.
CRITICAL TIME #1 _________ 20 minutes COMMENTS:


___ UNSAT CRO-607 fnl - j Page 9 of 14   STEP 1 2: Step 4.17 PERFORM the following on all affected units:  Encl 5.1A (Emergency Operation of SSF Systems Unit 1) (PS)  Encl 5.1B (Emergency Operation of SSF Systems Unit 2) (PS)  Encl 5.1C (Emergency Operation of SSF Systems Unit 3) (PS)  STANDARD: Obtains Control room copy of Encl 5.1C (Emergency Operation of SSF Systems Unit 3). Continues to Step 1 of Encl 5.1C.
CRO-607 fnl - j Page 10 of 14 STEP 15:         Step 3                                                                 CRITICAL STEP Select CLOSE for the following valves:
COMMENTS:
___ SAT
___ UNSAT  STEP 1 3:  Step 1 Verify SSF RCMU is required for Unit 3.
STANDARD: Determine that SSF RCMU is required for Unit 3.
Continues to step 3.
COMMENTS:                ___ SAT
___ UNSAT  STEP 1 4:  Step 2. Position OVERRIDE RC MAKEUP PUMP switch to START.
STANDARD: OVERRIDE RC MAKEUP PUMP switch is rotated to the START position.
Continues to step 3.
NOTE: Allow  9 seconds for the following valves to stroke from the time the OVERRIDE switch is operated, and then as soon as the 9 second stroke time is complete the time
-critical time #1 is complete.
CRITICAL TIME #1 _________
20 minutes COMMENTS:         CRITICAL STEP
___ SAT
___ SAT
___ UNSAT CRO-607 fnl - j Page 10 of 14  STEP 1 5:  Step 3   Select CLOSE for the following valves:
* 3HP-3
3HP-3  3HP-20 3HP-4 STANDARD: Student: Presses the green CLOSE button for the following:
* 3HP-20
3HP-3 3HP-20 3HP-4 Continues to step 6.
* 3HP-4
___ UNSAT STANDARD:       Student: Presses the green CLOSE button for the following:
* 3HP-3
* 3HP-20
* 3HP-4 Continues to step 6.
Cue: Initial indication for valve position is red light is on and green light is off for all valves. During valve travel, both the red and green lights are on.
Cue: Initial indication for valve position is red light is on and green light is off for all valves. During valve travel, both the red and green lights are on.
COMMENTS:
COMMENTS:
CRITICAL STEP
STEP 16:        Step 4 Verify SSF ASW is required to feed Unit 3 SGs.
___ SAT STANDARD:        Determine that SSF ASW is required to feed Unit 3 SGs.
Continues to step 5.
___ UNSAT COMMENTS:
 
CRO-607 fnl - j Page 11 of 14 STEP 17:        Step 5                                                              CRITICAL STEP Open the following valves:
___ SAT
___ SAT
___ UNSAT  STEP 16:  Step 4 Verify SSF ASW is required to feed Unit 3 SGs.
* 3CCW-287
STANDARD: Determine that SSF ASW is required to feed Unit 3 SGs.
* 3CCW-269 (throttle valve)
Continues to step
___ UNSAT STANDARD:       Red OPEN button is pressed for 3CCW-287.
: 5.
Red OPEN button is pressed and held (throttle valve) for 3CCW-269 Continues to Step 6 Cue: After allowing  25 seconds for valve stroke time, inform the student the Red light is ON and the Green light is OFF.
COMMENTS:                ___ SAT
Cue: After allowing  12 seconds for valve stroke time inform student the Green light is OFF and the Red light is ON.
___ UNSAT CRO-607 fnl - j Page 11 of 14  STEP 17:  Step 5 Open the following valves:
3CCW-287 3CCW-269 (throttle valve)
STANDARD: Red OPEN button is pressed for 3CCW-287. Red OPEN button is pressed and held (throttle valve) for 3CCW
-269 Continues to Step 6 Cue: After allowing  25 seconds for valve stroke time, inform the student the Red light is ON and the Green light is OFF.
Cue: After allowing  12 seconds for valve stroke time inform student the Green light is OFF and the Red light is ON.
COMMENTS:
COMMENTS:
CRITICAL STEP
NOTE                                      CRITICAL STEP
___ SAT 
* For high decay heat cores, aggressive feeding up to a maximum of 425 gpm may be required.                                                                       ___ SAT
 
* For very low decay heat cores, no feeding may be required.
___ UNSAT  NOTE  For high decay heat cores, aggressive feeding up to a maximum of 425 gpm may be required. For very low decay heat cores, no feeding may be required.
* SSF ASW flow gauge has a 60 gpm low flow cut off.
SSF ASW flow gauge has a 60 gpm low flow cut off.
___ UNSAT STEP 18:       Step 6 IAAT RCS pressure is NOT within 1950 - 2250 psig, THEN throttle 3CCW-268, as necessary, to maintain RCS pressure 1950
STEP 18: Step 6 IAAT RCS pressure is NOT within 1950  
                - 2250 psig.
- 2250 psig, THEN throttle 3CCW
STANDARD:       ASW Pump to SG Supply, 3CCW-268, is THROTTLED OPEN and RCS pressure is monitored.
-268, as necessary, to maintain RCS pressure 1950  
- 2250 psig.
STANDARD: ASW Pump to SG Supply, 3CCW
-268, is THROTTLED OPEN and RCS pressure is monitored.
Continues to Step 7 Cue: Indicate that RCS pressure is 2375 psig Cue: After allowing  14 sec for valve stroke time, indicate to operator that ASW flow is  400 gpm and RCS pressure is 2235 slowly decreasing.
Continues to Step 7 Cue: Indicate that RCS pressure is 2375 psig Cue: After allowing  14 sec for valve stroke time, indicate to operator that ASW flow is  400 gpm and RCS pressure is 2235 slowly decreasing.
CRITICAL TIME #2 __________
CRITICAL TIME #2 __________ 14 minutes COMMENTS:
14 minutes COMMENTS:
CRITICAL STEP
___ SAT        ___ UNSAT CRO-607 fnl - j Page 12 of 14  STEP 19:  Step 7 WHEN  THEN select CLOSE on 3RC
-4. STANDARD: Determine that RCS pressure is < 2350 and select CLOSE on 3RC
-4. Cue: Indicate that RCS pressure is 23 30 psig C ue: When 3RC-4 has been closed, inform the candidate that another operator will complete this procedure.
COMMENTS:      END TASK        ___ SAT 


___ UNSAT STOP TIME: ____________
CRO-607 fnl - j Page 12 of 14 STEP 19:      Step 7 WHEN RCS pressure  2350 psig,
___ SAT THEN select CLOSE on 3RC-4.
STANDARD:      Determine that RCS pressure is < 2350 and select CLOSE on 3RC-4.
___ UNSAT Cue: Indicate that RCS pressure is 2330 psig Cue: When 3RC-4 has been closed, inform the candidate that another operator will complete this procedure.
COMMENTS:
END TASK STOP TIME: ____________


CRO-607 fnl - j Page 13 of 14 CRITICAL STEP EXPLANATIONS:
CRO-607 fnl - j Page 13 of 14 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 1 Must be performed to power the SSF from the Diesel/Generator.
STEP #                                         Explanation 1   Must be performed to power the SSF from the Diesel/Generator.
3 Must be performed to start the diesel and get power for the SSF.
3   Must be performed to start the diesel and get power for the SSF.
8 Necessary to power the SSF loads.
8   Necessary to power the SSF loads.
10 Starts the SSF ASWP 14 Starts the SSF RCMU pump (TCA 20 minutes) 15 Necessary to achieve RCS pressure control.
10   Starts the SSF ASWP 14   Starts the SSF RCMU pump (TCA 20 minutes) 15   Necessary to achieve RCS pressure control.
17 Necessary to lineup the SSF ASW to supply the SGs.
17   Necessary to lineup the SSF ASW to supply the SGs.
18 Necessary to lineup the SSF ASW to supply the SGs.
18   Necessary to lineup the SSF ASW to supply the SGs. (TCA 14 minutes)
(TCA 14 minutes
)              


j   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
j CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 3 was operating at 100% power
Unit 3 was operating at 100% power Unit 3 TD EFDWP is out of service Tornado warnings are in affect AP/0/A/1700/006 (Natural Disaster) in progress You are pre-staged in the SSF Control Room and in communication with the Unit 3 Control Room as directed by AP/0/A/1700/006 (Natural Disaster).
 
Unit 3 TD EFDWP is out of service
 
Tornado warnings are in affect
 
AP/0/A/1700/006 (Natural Disaster) in progress
 
You are pre-staged in the SSF Control Room and in communication with the Unit 3 Control Room as directed by AP/0/A/1700/006 (Natural Disaster).
Unit 3 Reactor has just tripped and the unit has experienced a complete loss of all AC power AP/0/A/1700/025 (SSF EOP) has been initiated INITIATING CUES:
Unit 3 Reactor has just tripped and the unit has experienced a complete loss of all AC power AP/0/A/1700/025 (SSF EOP) has been initiated INITIATING CUES:
The CRS calls and informs you of the following:
The CRS calls and informs you of the following:
Unit 3 has lost all AC power SSF RCMU feed and SSF ASW feed to the SGs are required The breaker transfer s have NOT been performed Begin AP/25 actions starting at Step 4.5 THIS JPM IS TIME CRITICAL
* Unit 3 has lost all AC power
* SSF RCMU feed and SSF ASW feed to the SGs are required
* The breaker transfers have NOT been performed
* Begin AP/25 actions starting at Step 4.5 THIS JPM IS TIME CRITICAL


CRO-803 R0 - g Page 1 of 13   REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-803 Perform Required Actions For A Turbine Building Flood
CRO-803 R0 - g Page 1 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-803 Perform Required Actions For A Turbine Building Flood CANDIDATE EXAMINER


CANDIDATE     EXAMINER   
CRO-803 R0 - g Page 2 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Perform Required Actions For A Turbine Building Flood Alternate Path:
Yes Facility JPM #:
CRO-060 K/A Rating(s):
System: APE BW/A07 K/A:     AA1.3 Rating: 3.3/3.5 Task Standard:
Perform required actions for a Turbine Building Flood in accordance with AP/10, Uncontrollable Flooding of Turbine Building Preferred Evaluation Location:                                          Preferred Evaluation Method:
Simulator __X__ In-Plant __ ___                                          Perform __X___ Simulate ____


CRO-803 R0 - g Page 2 of 13  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:   Perform Required Actions For A Turbine Building Flood
==References:==


Alternate Path:
AP/10, Uncontrollable Flooding of Turbine Building Validation Time: 15 minutes                                              Time Critical: NO
Yes  Facility JPM #:
=====================================================================================
CRO-060  K/A Rating(s):
Candidate:     ______________________________________                          Time Start: _____________
System: APE BW/A07 K/A:  AA1.3 Rating:    3.3/3.5  Task Standard:
NAME                                            Time Finish: ____________
Perform required actions for a Turbine Building Flood in accordance with AP/10, Uncontrollable Flooding of Turbine Building Preferred Evaluation Location:
Performance Rating: SAT ______ UNSAT ______                                      Performance Time _______
Preferred Evaluation Method:
Examiner: ______________________________                ____________________________________/________
Simulator __X__ In-Plant __ ___      Perform __X___ Simulate ____ 
NAME                                            SIGNATURE                    DATE
=====================================================================================
COMMENTS


==References:==
CRO-803 R0 - g Page 3 of 13 SIMULATOR OPERATOR INSTRUCTIONS:
 
: 1. RECALL Snap 219
AP/10, Uncontrollable Flooding of Turbine Building Validation Time:
: 2. IMPORT files for CRO-803
15 minutes        Time Critical: NO =====================================================================================
: 3. Go to RUN


Candidate:
CRO-803 R0 - g Page 4 of 13 Tools/Equipment/Procedures Needed:
______________________________________
Time Start: _____________    NAME      Time Finish: ____________  Performance Rating:  SAT ______ UNSAT ______
Performance Time ____
___
Examiner: ______________________________          ____________________________________/________
NAME      SIGNATURE                            DATE
=====================================================================================
COMMENTS CRO-803 R0 - g Page 3 of 13 SIMULATOR OPERATOR INSTRUCTIONS:
: 1. RECALL Snap 219  2. IMPORT files for CRO-803
: 3. Go to RUN CRO-803 R0 - g Page 4 of 13 Tools/Equipment/Procedures Needed:
AP/10, Uncontrollable Flooding of Turbine Building READ TO OPERATOR DIRECTION TO TRAINEE:
AP/10, Uncontrollable Flooding of Turbine Building READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITION S:
INITIAL CONDITIONS:
Unit 1 was operating at 100% power
Unit 1 was operating at 100% power Unit 2 is in cold shutdown.
The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water level is rising.
Unit 1 has been tripped and the EOP is being completed by other team members.
INITIATING CUES:
The CRS directs you to refer to Unit 1 AP/10, Uncontrollable Flooding of Turbine Building, and perform required actions.


Unit 2 is in cold shutdown.
CRO-803 R0 - g Page 5 of 13 START TIME: _______
STEP 1:          Step 4.1 Trip the Rx.
___ SAT STANDARD:        Depress the Rx trip pushbutton on 1UB1. Verify the RX is tripped by observing all control rods are inserted.
___ UNSAT Continue to Step 4.2.
COMMENTS:
NOTE                                      CRITICAL STEP Tripping the CCW pumps will cause loss of condenser vacuum which will result in TBVs failing closed and trip of the MFDWPs.                                                  ___ SAT STEP 2:          Step 4.2 Ensure all CCW pumps are shutdown.                                     ___ UNSAT STANDARD:        The 1A, 1B, and 1C CCW pump switches are rotated to the TRIP position and verify the red close lights extinguish and the white open lights illuminate. (located on 1AB3)
Continue to Step 4.3.
COMMENTS:


The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water level is rising.
CRO-803 R0 - g Page 6 of 13 STEP 3:  Step 4.3                                                            CRITICAL STEP Press both of the following on the TURB BLDG FLOOD EMER CLOSING ALL CCWP DISCH VALVES control switch:                        ___ SAT
* CLOSE 1
* CLOSE 2
___ UNSAT STANDARD: "CLOSE 1" and "CLOSE 2" on the TURB BLDG FLOOD EMER CLOSING ALL CCWP DISCH VALVES control switch are both depressed. (located on 1AB3)
Continue to Step 4.4.
COMMENTS:
STEP 4:  Step 4.4 Verify all CCW pump discharge valves are closed.
___ SAT STANDARD: The green CLOSED lights for 1CCW-10, 11, and 13 are verified illuminated and the red OPEN lights for the same valves are verified extinguished. (located on 1AB3)                                      ___ UNSAT Determine that 1CCW-12 is NOT closed by observing the red open light is lit on 1AB3.
Continue to Step 4.4 RNO.
COMMENTS:


Unit 1 has been tripped and the EOP is being completed by other team members. INITIATING CUES:
CRO-803 R0 - g Page 7 of 13 ALTERNATE PATH NOTE The control switches for the CCW pump discharge valves do not seal-in. The valves act    ___ SAT as throttle valves unless the associated CCW pump switch is in the TRIP position.
The CRS directs you to refer to Unit 1 AP/10, Uncontrollable Flooding of Turbine Building, and perform required actions.
STEP 5:          Step 4.4 RNO
___ UNSAT Dispatch an operator to ensure all CCW pump discharge valves are closed (Equipment Rm):
* 1XS1-F2C (1CCW-10 Bkr 1A CCW Pump Disch)
* 1XS1-F3C (1CCW-13 Bkr 1D CCW Pump Disch)
* 1XS2-F2D (1CCW-11 Bkr 1B CCW Pump Disch)
* 1XS3-2E (1CCW-12 Bkr 1C CCW Pump Disch)
STANDARD:         An operator is dispatched to the Equipment Room to ensure 1CCW-12 is closed.
Continue to Step 4.5.
Booth cue: After 2 minutes call as the NEO and inform candidate that 1CCW-12 will NOT close.
COMMENTS:
NOTE Field tasks that may affect multiple units should be coordinated with Unit 2 and Unit 3.
___ SAT STEP 6:          Step 4.5 Dispatch operators to ensure all three flood doors are closed and in the SECURED position from the AB side (A-1, at Unit 1, 2, and 3 stairwell    ___ UNSAT entrances to TB): {2}
* Unit 1 Flood Door
* Unit 2 Flood Door
* Unit 3 Flood Door STANDARD:        Dispatch an NEO to ensure all three flood doors are closed and in the SECURED position from the AB side.
Continue to Step 4.6.
Booth cue: When called, inform candidate that an operator has been dispatched.
COMMENTS:


CRO-803 R0 - g Page 5 of 13   START TIME: _______
CRO-803 R0 - g Page 8 of 13 STEP 7:     Step 4.6 Verify LPI decay heat removal is in progress.
STEP 1: Step 4.1 Trip the Rx. STANDARD: Depress the Rx trip pushbutton on 1UB1. Verify the RX is tripped by observing all control rods are inserted. Continue to Step  
___ SAT STANDARD:   Determine LPI pumps are NOT operating by observing pumps switch indications on 1UB2.
 
___ UNSAT Continue to Step 4.6 RNO GO TO Step 4.8.
===4.2. COMMENTS===
COMMENTS:
STEP 8:      Step 4.8 Dispatch an operator to position the waterbox discharge valve switches (T-3, East of condenser catwalk):                                      ___ SAT
* 1CCW-20 (1A1) switch to HAND
* 1CCW-20 (1A1) switch to CLOSE                                      ___ UNSAT
* 1CCW-21 (1A2) switch to HAND
* 1CCW-21 (1A2) switch to CLOSE
* 1CCW-22 (1B1) switch to HAND
* 1CCW-22 (1B1) switch to CLOSE
* 1CCW-23 (1B2) switch to HAND
* 1CCW-23 (1B2) switch to CLOSE
* 1CCW-24 (1C1) switch to HAND
* 1CCW-24 (1C1) switch to CLOSE
* 1CCW-25 (1C2) switch to HAND
* 1CCW-25 (1C2) switch to CLOSE STANDARD:    Candidate should dispatch an operator to place the above valves to HAND and CLOSE.
Continue to Step 4.9.
Booth Cue: When called, inform candidate that an operator has been dispatched.
COMMENTS:


CRO-803 R0 - g Page 9 of 13 STEP 9:      Step 4.9 Make a PA announcement of the event including restrictions on entry into TB basement due to electrical hazard.                            ___ SAT STANDARD:    PA announcement is made using the Control Room phone.
___ UNSAT Continue to Step 4.10.
COMMENTS:
STEP 10:    Step 4.10 Begin attempts to locate and isolate the source of the flooding.
___ SAT STANDARD:    Dispatch operators to locate and isolate the source of the flooding.
Continue to Step 4.11.                                                ___ UNSAT Booth Cue: When called, inform candidate that an operator has been dispatched.
COMMENTS:
STEP 11:    Step 4.11 Ensure all Unit 1 ESV pumps are shutdown:
___ SAT
___ SAT
___ UNSAT   NOTE Tripping the CCW pumps will cause loss of condenser vacuum which will result in TBVs failing closed and trip of the MFDWPs.
* 1A ESV Pump
STEP 2:  Step 4.2 Ensure all CCW pumps are shutdown.
* 1C ESV Pump
STANDARD: The 1A, 1B, and 1C CCW pump switches are rotated to the TRIP position and verify the red close lights extinguish and the white open lights illuminate
* 1B ESV Pump                                                      ___ UNSAT STANDARD:    Stop ALL Unit 1 ESV pumps by rotating their pumps switches to stop and verify that the red on light extinguishes and the white open light illuminates. (located on 1AB3)
. (located on 1AB3)
Continue to Step 4.12.
Continue to Step  
COMMENTS:
 
===4.3. COMMENTS===
CRITICAL STEP
___ SAT
___ UNSAT CRO-803 R0 - g Page 6 of 13  STEP 3:  Step 4.3 Press both of the following on the TURB BLDG FLOOD EMER CLOSING ALL CCWP DISCH VALVES control switch:
CLOSE 1  CLOSE 2  STANDARD: "CLOSE 1" and "CLOSE 2" on the TURB BLDG FLOOD EMER CLOSING ALL CCWP DISCH VALVES control switch are both depressed. (located on 1AB3)
Continue to Step
 
===4.4. COMMENTS===


CRITICAL STEP
CRO-803 R0 - g Page 10 of 13 ALTERNATE PATH STEP 12:     Step 4.12 Verify all CCW pump discharge valves were successfully closed in       ___ SAT earlier steps.
___ SAT        ___ UNSAT  STEP 4:  Step 4.4 Verify all CCW pump discharge valves are closed.
STANDARD:   Verify that 1CCW-10, 11, and 13 are closed by observing that the green ___ UNSAT closed light is lit for each valve. (located on 1AB3)
STANDARD: The green CLOSED lights for 1CCW
-10, 11, and 13 are verified illuminated and the red OPEN lights for the same valves are verified extinguished. (located on 1AB3)
Determine that 1CCW-12 is NOT closed by observing the red open light is lit on 1AB3.
Continue to Step 4.4 RNO. COMMENTS:
___ SAT
___ UNSAT CRO-803 R0 - g Page 7 of 13 ALTERNATE PATH NOTE The control switches for the CCW pump discharge valves do not seal
-in. The valves act as throttle valves unless the associated CCW pump switch is in the TRIP position. STEP 5:  Step 4.4 RNO Dispatch an operator to ensure all CCW pump discharge valves are closed (Equipment Rm):
1XS1-F2C (1CCW-10 Bkr 1A CCW Pump Disch) 1XS1-F3C (1CCW-13 Bkr 1D CCW Pump Disch) 1X S2-F2D (1CCW-11 Bkr 1B CCW Pump Disch) 1XS3-2E (1CCW-12 Bkr 1C CCW Pump Disch)
STANDARD: An operator is dispatched to the Equipment Room to ensure 1CCW-12 is closed.
Continue to Step 4.5. Booth cue:  After 2 minutes call as the NEO and inform candidate that 1CCW-12 will NOT close.
COMMENTS:                ___ SAT        ___ UNSAT  NOTE Field tasks that may affect multiple units should be coordinated with Unit 2 and Unit 3.
STEP 6:  Step 4.5 Dispatch operators to ensure all three flood doors are closed and in the SECURED position from the AB side (A-1, at Unit 1, 2, and 3 stairwell entrances to TB): {2}
Unit 1 Flood Door Unit 2 Flood Door Unit 3 Flood Door STANDARD: Dispatch an NEO to ensure all three flood doors are closed and in the SECURED position from the AB side
.
Continue to Step 4.6. Booth cue: When called, inform candidate that an operator has been dispatched.
COMMENTS:                ___ SAT
___ UNSAT CRO-803 R0 - g Page 8 of 13  STEP 7:  Step 4.6 Verify LPI decay heat removal is in progress.
STANDARD: Determine LPI pumps are NOT operating by observing pumps switch indications on 1UB2.
Continue to Step 4.6 RNO GO TO Step 4.8.
COMMENTS:                ___ SAT        ___ UNSAT  STEP 8:  Step 4.8 Dispatch an operator to position the waterbox discharge valve switches (T-3, East of condenser catwalk):
1CCW-20 (1A1) switch to HAND 1CCW-20 (1A1) switch to CLOSE 1CCW-21 (1A2) switch to HAND 1CCW-21 (1A2) switch to CLOSE 1CCW-22 (1B1) switch to HAND 1CCW-22 (1B1) switch to CLOSE 1CCW-23 (1B2) switch to HAND 1CCW-23 (1B2) switch to CLOSE 1CCW-24 (1C1) switch to HAND 1CCW-24 (1C1) switch to CLOSE 1CCW-25 (1C2) switch to HAND 1CCW-25 (1C2) switch to CLOSE STANDARD: Candidate should dispatch an operator to place the above valves to HAND and CLOSE
.
Continue to Step 4.9. Booth Cue: When called, inform candidate that an operator has been dispatched.
COMMENTS:                ___ SAT
___ UNSAT CRO-803 R0 - g Page 9 of 13  STEP 9:  Step 4.9 Make a PA announcement of the event including restrictions on entry into TB basement due to electrical hazard.
STANDARD: PA announcement is made using the Control Room phone.
Continue to Step 4.10. COMMENTS:
___ SAT
___ UNSAT  STEP 10:  Step 4.10 Begin attempt s to locate and isolate the source of the flooding. STANDARD: Dispatch operators to locate and isolate the source of the flooding.
Continue to Step 4.11. Booth Cue: When called, inform candidate that an operator has been dispatched.
COMMENTS:                ___ SAT        ___ UNSAT  STEP 11:  Step 4.1 1 Ensure all Unit 1 ESV pumps are shutdown:  1A ESV Pump 1C ESV Pump 1B ESV Pump STANDARD: Stop ALL Unit 1 ESV pumps by rotating their pumps switches to stop and verify that the red on light extinguishes and the white open light illuminate
: s. (located on 1AB3)
Continue to Step 4.12. COMMENTS:                ___ SAT
___ UNSAT CRO-803 R0 - g Page 10 of 13  ALTERNATE PATH STEP 12:  Step 4.1 2 Verify all CCW pump discharge valves were successfully closed in earlier steps.
STANDARD: Verify that 1CCW-10, 11, and 13 are closed by observing that the green closed light is lit for each valve. (located on 1AB3)
Determine that 1CCW-12 is still open by observing red open indication light is lit on 1AB3 or observing open indication on the OAC.
Determine that 1CCW-12 is still open by observing red open indication light is lit on 1AB3 or observing open indication on the OAC.
Continue to Step 4.12 RNO. COMMENTS:
Continue to Step 4.12 RNO.
___ SAT        ___ UNSAT  STEP 1 3: Step 4.1 2 RNO Dispatch an operator to perform the following (ESV Trench, Intake):
COMMENTS:
Remove pipe cap at 1CCW
CRITICAL STEP STEP 13:     Step 4.12 RNO Dispatch an operator to perform the following (ESV Trench, Intake):     ___ SAT
-26 (CCW Inlet High Point Vent). {4}
* Remove pipe cap at 1CCW-26 (CCW Inlet High Point Vent). {4}
Open 1CCW-26 (CCW Inlet High Point Vent). Remove pipe cap at 1CCW
* Open 1CCW-26 (CCW Inlet High Point Vent).
-28 (CCW Inlet High Point Vent). {4}
___ UNSAT
Open 1CCW-28 (CCW Inlet High Point Vent). STANDAR D: Candidate should dispatch an operator to position the above valves as directed.
* Remove pipe cap at 1CCW-28 (CCW Inlet High Point Vent). {4}
Continue to Step 4.13 Booth Cue: When called, inform candidate that an operator has been dispatched
* Open 1CCW-28 (CCW Inlet High Point Vent).
. COMMENTS:         CRITICAL STEP
STANDARD:   Candidate should dispatch an operator to position the above valves as directed.
___ SAT 
Continue to Step 4.13 Booth Cue: When called, inform candidate that an operator has been dispatched.
COMMENTS:


___ UNSAT CRO-803 R0 - g Page 11 of 13   STEP 1 4: Step 4.1 3 Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW Pumps). STANDARD: Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW Pumps). Continue to Step 4.1 4. Booth Cue: When called, inform candidate that an operator has been dispatched.
CRO-803 R0 - g Page 11 of 13 STEP 14:     Step 4.13 Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW Pumps).
COMMENTS:               ___ SAT
___ SAT STANDARD:     Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW Pumps).
___ UNSAT  STEP 1 5  Step 4.1 4 IAAT HPSW is NOT available, THEN ensure Encl 5.31 (Temporarily Charging the HPSW System) of Unit 1 EOP has been initiated.
___ UNSAT Continue to Step 4.14.
STANDARD: Determine that HPSW is available by observing the HPSW Jockey pump operating and level in the EWST
Booth Cue: When called, inform candidate that an operator has been dispatched.
.                         Continue to Step 4.1 5. COMMENTS:                 ___ SAT        ___ UNSAT  STEP 1 6: Step 4.1 5 Coordinate with WCC/TSC to perform the following:
COMMENTS:
Recover damaged equipment.
STEP 15      Step 4.14 IAAT HPSW is NOT available, THEN ensure Encl 5.31 (Temporarily Charging the HPSW System) of Unit 1 EOP has been initiated.                                     ___ SAT STANDARD:     Determine that HPSW is available by observing the HPSW Jockey pump operating and level in the EWST.                                   ___ UNSAT Continue to Step 4.15.
Remove water from accessible sumps.
COMMENTS:
STANDARD: Candidate should call the WCC/TSC and discuss the following:
STEP 16:     Step 4.15 Coordinate with WCC/TSC to perform the following:
Recover damaged equipment.
* Recover damaged equipment.                                     ___ SAT
Remove water from accessible sumps.
* Remove water from accessible sumps.
Cue: Inform candidate that another RO will complete this procedure. This t ask is complete COMMENTS:     END TASK         ___ SAT
___ UNSAT STANDARD:     Candidate should call the WCC/TSC and discuss the following:
___ UNSAT  STOP TIME: ____________
* Recover damaged equipment.
* Remove water from accessible sumps.
Cue: Inform candidate that another RO will complete this procedure. This task is complete COMMENTS:
END TASK STOP TIME: ____________


CRO-803 R0 - g Page 12 of 13 CRITICAL STEP EXPLANATIONS:
CRO-803 R0 - g Page 12 of 13 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 2 Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement.
STEP #                                     Explanation 2   Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement.
3 Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement.
3   Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement.
13 Necessary to ensure CCW inlet piping is vented to break siphon.
13   Necessary to ensure CCW inlet piping is vented to break siphon.


g   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 was operating at 100% power
Unit 1 was operating at 100% power Unit 2 is in cold shutdown.
 
The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water level is rising.
Unit 2 is in cold shutdown.
 
The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water level is rising.
 
Unit 1 has been tripped and the EOP is being completed by other team members.
Unit 1 has been tripped and the EOP is being completed by other team members.
INITIATING CUES:
INITIATING CUES:
The CRS directs you to refer to Unit 1 AP/10, Uncontrollable Flooding of Turbine Building, and perform required actions.
The CRS directs you to refer to Unit 1 AP/10, Uncontrollable Flooding of Turbine Building, and perform required actions.


CRO-90 3 R 0 - h Page 1 of 16   REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-9 0 3  Release GWD Tank
CRO-903 R0 - h Page 1 of 16 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-903 Release GWD Tank CANDIDATE EXAMINER


CANDIDATE      EXAMINER 
CRO-903 R0 - h Page 2 of 16 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
 
Release GWD Tank Alternate Path:
CRO-90 3 R 0 - h Page 2 of 16   REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Release GWD Tank Alternate Path:
Yes Facility JPM #:
Yes Facility JPM #:
CRO-903 K/A Rating(s):
CRO-903 K/A Rating(s):
System: 071 K/A:     A4.26 Rating: 3.1/3.9 Task Standard:
System: 071 K/A: A4.26 Rating:   3.1/3.9 Task Standard:
Release a GWD tank correctly using OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release) and terminate the release when unexpected results are noted.
Release a GWD tank correctly using OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release) and terminate the release when unexpected results are noted.
Preferred Evaluation Location:
Preferred Evaluation Location:                                     Preferred Evaluation Method:
Preferred Evaluation Method:
Simulator __X__ In-Plant __ ___                                   Perform __X___ Simulate ____
Simulator __X__ In-Plant __ ___     Perform __X___ Simulate ____


==References:==
==References:==


OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release)
OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release)
Validation Time:
Validation Time: 30 minutes                                       Time Critical: NO
30 minutes       Time Critical: NO =====================================================================================
=====================================================================================
Candidate:
Candidate:     _______________________________________                           Time Start: ________
_______________________________________
NAME                                       Time Finish: ________
Time Start: ________
Performance Rating: SAT ______ UNSAT ______                               Performance Time ______
NAME     Time Finish: ________
Examiner: ______________________________           ____________________________________/________
Performance Rating:   SAT ______ UNSAT ______
NAME                                       SIGNATURE                   DATE
Performance Time
=====================================================================================
______
COMMENTS
Examiner: ______________________________         ____________________________________/________
 
NAME     SIGNATURE                           DATE
CRO-903 R0 - h Page 3 of 16 SIMULATOR OPERATOR INSTRUCTIONS:
=====================================================================================
: 1. RECALL SNAP 201
COMMENTS CRO-90 3 R 0 - h Page 3 of 16 SIMULATOR OPERATOR INSTRUCTIONS:
: 2. Go to RUN
: 1. RECALL SNAP 201 2. Go to RUN CRO-90 3 R 0 - h Page 4 of 16 Tools/Equipment/Procedures Needed:
 
OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release)
CRO-903 R0 - h Page 4 of 16 Tools/Equipment/Procedures Needed:
& 4.10 (GWD Tank Sample Request) PT/0/A/230/001 (Radiation Monitor Check)
OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) & 4.10 (GWD Tank Sample Request)
PT/0/A/230/001 (Radiation Monitor Check)
READ TO OPERATOR DIRECTION TO TRAINEE:
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Release of D GWD tank is desired No other GWRs in progress.
OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to step 3.9 INITIATING CUES:
CRS directs you to complete the release of the D GWD tank beginning at step 3.9 of Enclosure 4.9 (GWD Tank Release).


Release of "
CRO-903 R0 - h Page 5 of 16 START TIME: _______
D" GWD tank is desired
NOTE: If N2 was added to the most recently released GWD tank until 1RIA-37 indicated       CRITICAL STEP
 
< 700 cpm, OR if the tanks' radioactivity was < 2.1E-05 Ci / ml when it was released, the GWD piping is considered "purged".                                                         ___ SAT STEP 1:         Step 3.9 3.9 Adjust 1RIA-37 setpoints for release as follows:                       ___ UNSAT 3.9.1 Perform one of the following:
No other GWRs in progress.
OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to step 3.9  INITIATING CUES:
CRS directs you to complete the release of the "
D" GWD tank beginning at step 3.9 of Enclosure 4.9 (GWD Tank Release)
 
CRO-90 3 R 0 - h Page 5 of 16   START TIME: _______
NOTE: If N2 was added to the most recently released GWD tank until 1RIA
-37 indicated < 700 cpm, OR if the tanks' radioactivity was < 2.1E
-05 GWD piping is considered "purged".
STEP 1: Step 3.9 3.9 Adjust 1RIA
-37 setpoints for release as follows:
3.9.1 Perform one of the following:
A. IF all of the following:
A. IF all of the following:
Calculated setpoints are < 1E+07 CPM 1RIA-37 operable GWD piping purged {15}
* Calculated setpoints are < 1E+07 CPM
* 1RIA-37 operable
* GWD piping purged {15}
set alarms as follows:
set alarms as follows:
Set 1RIA-37 Alert setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1)
* Set 1RIA-37 Alert setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1)
Set 1RIA-37 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1)
* Set 1RIA-37 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1)
NOTE: If GWD piping NOT purged on most recent release, RP independently verifies release data and 1RIA
NOTE: If GWD piping NOT purged on most recent release, RP independently verifies release data and 1RIA-37 setpoint is set at zero to allow the tank to be released. {15}
-37 setpoint is set at zero to allow the tank to be released. {15}
B. IF any of the following:
B. IF any of the following:
Calculated setpoints are > 1E+07 CPM 1RIA-37 out-of-service GWD piping NOT purged {15}
* Calculated setpoints are > 1E+07 CPM
* 1RIA-37 out-of-service
* GWD piping NOT purged {15}
over-ride 1RIA-37 setpoints as follows:
over-ride 1RIA-37 setpoints as follows:
Set 1RIA-37 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
* Set 1RIA-37 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
Set 1RIA-37 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check)
* Set 1RIA-37 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
. STANDARD: Refer to PT/0/A/0230/001 (Radiation Monitor Check) Encl. 13.6 (1RIA
STANDARD:       Refer to PT/0/A/0230/001 (Radiation Monitor Check) Encl. 13.6 (1RIA-37 and 1RIA-38 Setpoints) and using the RIA Screen insert the calculated 1RIA-37 setpoint of 2.73 E5 CPM Continue to Step 3.10 COMMENTS:
-37 and 1RIA-38 Setpoints) and using the RIA Screen insert the calculated 1RIA-37 setpoint of 2.73 E5 CPM Continue to Step 3.
10 COMMENTS:         CRITICAL STEP
___ SAT 


___ UNSAT CRO-90 3 R 0 - h Page 6 of 16   STEP 2: Step 3.10 3.10 Adjust 1RIA
CRO-903 R0 - h Page 6 of 16 STEP 2:       Step 3.10                                                               CRITICAL STEP 3.10 Adjust 1RIA-38 setpoints for release as follows:
-38 setpoints for release as follows:
3.10.1 Perform one of the following:                                     ___ SAT A. IF calculated setpoints are < 1E+06 CPM AND 1RIA-38 operable, set alarms as follows:
3.10.1 Perform one of the following:
* Set 1RIA-38 Alert setpoint at _______________cpm per           ___ UNSAT PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8)
A. IF calculated setpoints are < 1E+06 CPM AND 1RIA-38 operable, set alarms as follows:
* Set 1RIA-38 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8)
Set 1RIA-38 Alert setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8)
NOTE: Due to type of radiation 1RIA-38 monitors, it is NOT sensitive enough to perform an adequate N2 purge.
Set 1RIA-38 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8)
NOTE: Due to type of radiation 1RIA
-38 monitors, it is NOT sensitive enough to perform an adequate N2 purge.
B. IF calculated setpoints are > 1E+06 CPM OR 1RIA-38 out of service, over-ride 1RIA-38 setpoints as follows:
B. IF calculated setpoints are > 1E+06 CPM OR 1RIA-38 out of service, over-ride 1RIA-38 setpoints as follows:
Set 1RIA-38 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
* Set 1RIA-38 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
Set 1RIA-38 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
* Set 1RIA-38 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
STANDARD: Refer to PT/0/A/0230/001 (Radiation Monitor Check) Encl. 13.6 (1RIA
STANDARD:     Refer to PT/0/A/0230/001 (Radiation Monitor Check) Encl. 13.6 (1RIA-37 and 1RIA-38 Setpoints) and using the RIA Screen insert the calculated 1RIA-38 setpoint of 324 CPM.
-37 and 1RIA-38 Setpoints) and using the RIA Screen insert the calculated 1RIA-38 setpoint of 324 CPM. Continue to Step 3.
Continue to Step 3.11 COMMENTS:
11 COMMENTS:         CRITICAL STEP
STEP 3:       Step 3.11 Ensure GWR DISCHARGE FLOW CONTROL in "HAND".
___ SAT        ___ UNSAT  STEP 3: Step 3.11 Ensure GWR DISCHARGE FLOW CONTROL in "HAND".
___ SAT STANDARD:     Ensure GWR DISCHARGE FLOW CONTROL in "HAND" located on 1AB3.
STANDARD: Ensure GWR DISCHARGE FLOW CONTROL in "HAND" located on 1AB3. Continue to Step 3.
Continue to Step 3.12                                                   ___ UNSAT COMMENTS:
12 COMMENTS:               ___ SAT
 
___ UNSAT CRO-90 3 R 0 - h Page 7 of 16   STEP 4: Step 3.12 Verify GWR DISCHARGE FLOW CONTROL "CLOSED" STANDARD: Verify GWR DISCHARGE FLOW CONTROL CLOSED located on 1AB3.
CRO-903 R0 - h Page 7 of 16 STEP 4:   Step 3.12 Verify GWR DISCHARGE FLOW CONTROL "CLOSED"
Continue to Step 3.
___ SAT STANDARD: Verify GWR DISCHARGE FLOW CONTROL CLOSED located on 1AB3.
13  COMMENTS:               ___ SAT        ___ UNSAT  STEP 5: Step 3.13 Remove "Purged / Not Purged" CR tag from GWR DISCHARGE FLOW CONTROL. STANDARD: Remove "Purged / Not Purged" CR tag from GWR DISCHARGE FLOW CONTROL located on 1AB3.
Continue to Step 3.13
Continue to Step 3.
___ UNSAT COMMENTS:
14 COMMENTS:               ___ SAT
STEP 5:   Step 3.13 Remove "Purged / Not Purged" CR tag from GWR DISCHARGE FLOW CONTROL.                                                                 ___ SAT STANDARD: Remove "Purged / Not Purged" CR tag from GWR DISCHARGE FLOW CONTROL located on 1AB3.
___ UNSAT  STEP 6: Step 3.14 Notify Unit 3 CR to perform the following:
___ UNSAT Continue to Step 3.14 COMMENTS:
Begin periodically monitoring all three Unit 3 GWD tanks to determine if pressure in any tank is decreasing unexpectedly. {12}
STEP 6:   Step 3.14 Notify Unit 3 CR to perform the following:
Place a note on turnover sheet "If 3RIA
* Begin periodically monitoring all three Unit 3 GWD tanks to           ___ SAT determine if pressure in any tank is decreasing unexpectedly. {12}
-45 alarms or GWD tank pressure in any tank is decreasing unexpectedly, notify Unit 1 CR to terminate GWD tank release".
* Place a note on turnover sheet "If 3RIA-45 alarms or GWD tank pressure in any tank is decreasing unexpectedly, notify Unit 1 CR to ___ UNSAT terminate GWD tank release".
STANDARD: Notify Unit 3 CR to begin periodically monitoring all three Unit 3 GWD tanks to determine if pressure in any tank is decreasing unexpectedly Notify Unit 3 CR to place above note on the turnover sheet Continue to Step 3.
STANDARD: Notify Unit 3 CR to begin periodically monitoring all three Unit 3 GWD tanks to determine if pressure in any tank is decreasing unexpectedly Notify Unit 3 CR to place above note on the turnover sheet Continue to Step 3.15 COMMENTS:
15 COMMENTS:               ___ SAT
 
___ UNSAT CRO-90 3 R 0 - h Page 8 of 16   STEP 7: Step 3.15 Notify Unit 2 CR to place a note on turnover sheet "If 2RIA
CRO-903 R0 - h Page 8 of 16 STEP 7:   Step 3.15 Notify Unit 2 CR to place a note on turnover sheet "If 2RIA-45 alarms, notify Unit 1 CR to terminate GWD tank release".                       ___ SAT STANDARD: Notify Unit 2 CR to place above note on the turnover sheet.
-45 alarms, notify Unit 1 CR to terminate GWD tank release".
Continue to Step 3.16                                                 ___ UNSAT COMMENTS:
STANDARD: Notify Unit 2 CR to place above note on the turnover sheet.
STEP 8:   Step 3.16 Begin monitoring all four Unit 1 GWD tanks to determine if pressure in any tank is decreasing unexpectedly.                                   ___ SAT STANDARD: Begin monitoring GWD tank pressures on chart recorder on 1VB2 or OAC.
Continue to Step 3.
___ UNSAT Continue to Step 3.17 COMMENTS:
16   COMMENTS:
STEP 9:   Step 3.17 IF 1RIA-37 NOT in service AND the tank being released is  2.1E-05 Ci
___ SAT        ___ UNSAT  STEP 8: Step 3.16 Begin monitoring all four Unit 1 GWD tanks to determine if pressure in any tank is decreasing unexpectedly.
          / ml, notify RP to prepare to survey GWD piping at 1RIA-37. {15}       ___ SAT
STANDARD: Begin monitoring GWD tank pressures on chart recorder on 1VB2 or OAC. Continue to Step 3.
________________________ _____
17 COMMENTS:               ___ SAT        ___ UNSAT  STEP 9: Step 3.17 IF 1RIA-37 NOT in service AND the -/ ml, notify RP to prepare to survey GWD piping at 1RIA
Person Notified           Date STANDARD: Determine 1RIA-37 is in service and N/A step 3.17.                     ___ UNSAT Continue to Step 3.18 COMMENTS:
-37. {15} ________________________
 
_____  Person Notified Date STANDARD: Determine 1RIA
CRO-903 R0 - h Page 9 of 16 STEP 10:  Step 3.18 IF AT ANY TIME any tank is decreasing unexpectedly, perform the following:                                                         ___ SAT 3.18.1 Close GWR DISCHARGE FLOW CONTROL.
-37 is in service and N/A step 3.17.
3.18.2 Notify RP to initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences) due to potential unplanned       ___ UNSAT radioactive effluent release.
Continue to Step 3.
________________________                 _____
18   COMMENTS:               ___ SAT
Person Notified                         Date 3.18.3 Go To Section 4 (GWR Termination).
___ UNSAT CRO-90 3 R 0 - h Page 9 of 16   STEP 10:  Step 3.18 IF AT ANY TIME any tank is decreasing unexpectedly, perform the following:
3.18.1 Close GWR DISCHARGE FLOW CONTROL.
3.18.2 Notify RP to initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences) due to potential unplanned radioactive effluent release.
________________________
_____ Person Notified Date 3.18.3 Go To Section 4 (GWR Termination).
STANDARD: Determine IAAT step is not met at this time.
STANDARD: Determine IAAT step is not met at this time.
Continue to Step 3.
Continue to Step 3.19 COMMENTS:
19   COMMENTS:               ___ SAT        ___ UNSAT  STEP 1 1:  Step 3.19 IF AT ANY TIME desired to terminate release, perform the following:
STEP 11:  Step 3.19 IF AT ANY TIME desired to terminate release, perform the following:
3.19.1 Close GWR DISCHARGE FLOW CONTROL.
3.19.1 Close GWR DISCHARGE FLOW CONTROL.                           ___ SAT 3.19.2 Go To Section 4 (GWR Termination).
3.19.2 Go To Section 4 (GWR Termination).
STANDARD: Determine IAAT step is not met at this time.                       ___ UNSAT Continue to Step 3.20 COMMENTS:
STANDARD: Determine IAAT step is not met at this time.
 
Continue to Step 3.
CRO-903 R0 - h Page 10 of 16 STEP 12:     Step 3.20                                                         CRITICAL STEP Open GWD-100 (Decay Tanks Discharge Header Block). (A-2-209/E 13' N of Door)                                                         ___ SAT STANDARD:     Dispatch NEO to Open GWD-100 (Decay Tanks Discharge Header Block).                                                           ___ UNSAT Continue to Step 3.21 Booth Note: GWD-100 is OPEN.
20 COMMENTS:
Cue: Inform candidate that GWD-100 is open.
___ SAT
___ UNSAT CRO-90 3 R 0 - h Page 10 of 16   STEP 1 2: Step 3.20 Open GWD-100 (Decay Tanks Discharge Header Block). (A 209/E 13' N of Door)
STANDARD: Dispatch NEO to Open GWD
-100 (Decay Tanks Discharge Header Block). Continue to Step 3.
21 Booth Note: GWD
-100 is OPEN.
Cue: Inform candidate that GWD
-100 is open.
COMMENTS:
COMMENTS:
CRITICAL STEP
STEP 13:      Steps 3.21 - 3.23 IF releasing GWD Tank A, perform the following
___ SAT STANDARD:    Determine NOT releasing GWD Tank A, B, and C and N/A steps 3.21, 3.22, and 3.23.
Continue to Step 3.24
___ UNSAT COMMENTS:
STEP 14:      Step 3.24                                                        CRITICAL STEP IF releasing GWD Tank D perform the following:
___ SAT
___ SAT
___ UNSAT  STEP 1 3:  Steps 3.21 - 3.23 IF releasing GWD Tank A , perform the following-STANDARD: Determine NOT releasing GWD Tank A, B, and C and N/A steps 3.
* Open GWD-205 (Decay Tank 1D Discharge Block) (IRW Building)
21, 3.22, and 3.23. Continue to Step 3.
* Place GWD-207 (D INTERIM GWD TANK DISCH) switch to "OPEN"
24 COMMENTS:                ___ SAT        ___ UNSAT  STEP 1 4:  Step 3.24 IF releasing GWD Tank
___ UNSAT STANDARD:     Dispatch NEO to open GWD-205 (Decay Tank 1D Discharge Block).
'D' perform the following:
Cue: Inform candidate that GWD-205 is open.
Open GWD-205 (Decay Tank 1 D Discharge Block)
Locate GWD-207 (D INTERIM GWD TANK DISCH) on 1AB3 and place switch to "OPEN" Continue to Step 3.25 COMMENTS:
(IRW Building)
 
Place GWD-207 ('D' INTERIM GWD TANK DISCH) switch to "OPEN" STANDARD: Dispatch NEO to open GWD-205 (Decay Tank 1 D Discharge Block)
CRO-903 R0 - h Page 11 of 16 NOTE: Station Limit release rates, per SLC 16.11, will NOT be exceeded if recommended release rates per Enclosure 4.10 (GWD Tank Sample Request) are followed.
. Cue: Inform candidate that GWD
___ SAT The following approval levels are required for releases: {10}{13}
-205 is open. Locate GWD
All Station Releases in Progress (including this one) Required Level of Approval 1 GWR in progress through P/A/C filter at                                        ___ UNSAT 1/3 Station Limit ( 30 day holdup)                              SRO 1 GWR in progress at 1/3 Station Limit
-207 ("D" INTERIM GWD TANK DISCH) on 1AB3 and place switch to "OPEN" Continue to Step 3.
(< 30 day holdup OR released without P/A/C filter)                OSM 1 GWR in progress at 2/3 Station Limit                            OSM 2 GWRs in progress at 1/3 Station Limit each                      OSM 3 GWRs in progress at 1/3 Station Limit each                      OSM STEP 15:        Step 3.25 Circle Required Level of Approval above based on Release Conditions.
25 COMMENTS:         CRITICAL STEP
STANDARD:      Circle SRO on enclosure.
Continue to Step 3.26 COMMENTS:
STEP 16:        Step 3.26 Record approval granted for release:
___ SAT
___ SAT
___ UNSAT CRO-90 3 R 0 - h Page 11 of 16  NOTE:  Station Limit release rates, per SLC 16.11, will NOT be exceeded if  recommended release rates per Enclosure 4.10 (GWD Tank Sample Request) are followed.
________________________       _________ / _____
The following approval levels are required for releases: {10}{13}
Approval                       Date         Time STANDARD:       Place approval name and date and time on enclosure.                     ___ UNSAT Continue to Step 3.27 Cue: Approval is granted for release by Tracy Lemons at current Date/Time.
All Station Releases in Progress (including this one) Required Level of Approval 1 GWR in progress through P/A/C filter at SRO  1 GWR in progress at 1/3 Station Limit
COMMENTS:
(< 30 day holdup OR released without P/A/C filter)
 
OSM  1 GWR in progress at 2/3 Station Limit OSM  2 GWRs in progress at 1/3 Station Limit each    OSM  3 GWRs in progress at 1/3 Station Limit each OSM  STEP 15:  Step 3.25 Circle Required Level of Approval above based on Release Conditions.
CRO-903 R0 - h Page 12 of 16 STEP 17:  Step 3.27 IF tank holdup < 30 days, perform the following STANDARD: Determine tank has been held up greater than 30 days and N/A steps   ___ SAT 3.27.1 - 3.27.2.
STANDARD: Circle SRO on enclosure.
Continue to Step 3.28
Continue to Step 3.
___ UNSAT COMMENTS:
26  COMMENTS:
STEP 18:  Step 3.28 IF tank is released without processing through a P/A/C filter AND Projected 31 day average gaseous effluent organ dose > limit, perform ___ SAT the following STANDARD: Determine tank is being released through a P/A/C filter and N/A steps 3.28.1 - 3.28.4.
___ SAT
___ UNSAT Continue to Step 3.29 COMMENTS:
___ UNSAT  STEP 16:  Step 3.26 Record approval granted for release:
STEP 19:  Step 3.29 Record recommended Release Rate from Enclosure 4.10 (GWD Tank Sample Request):                                                     ___ SAT
________________________
______________ cfm STANDARD: Record recommended Release Rate from Enclosure 4.10 (GWD Tank Sample Request):                                                     ___ UNSAT
_________ / _____ Approval   Date           Time STANDARD: Place approval name and date and time on enclosure. Continue to Step 3.
__4.19 E4____ cfm Continue to Step 3.30 COMMENTS:
27 Cue: Approval is granted for release by Tracy Lemons at current Date/Time.
COMMENTS:               ___ SAT        ___ UNSAT CRO-90 3 R 0 - h Page 12 of 16   STEP 17:  Step 3.27 IF tank holdup <
30 days, perform the following-STANDARD: Determine tank has been held up greater than 30 days and N/A steps 3.27.1 - 3.27.2. Continue to Step 3.
28  COMMENTS:               ___ SAT        ___ UNSAT  STEP 18:  Step 3.28 IF tank is released without processing through a P/A/C filter AND Projected 31 day average gaseous effluent organ dose
> limit, perform the following-STANDARD: Determine tank is being released through a P/A/C filter and N/A steps 3.28.1 - 3.28.4. Continue to Step 3.
29 COMMENTS:               ___ SAT
___ UNSAT  STEP 19:  Step 3.29 Record recommended Release Rate from Enclosure 4.10 (GWD Tank Sample Request):
______________ cfm STANDARD: Record recommended Release Rate from Enclosure 4.10 (GWD Tank Sample Request):
__4.19 E4____ cfm Continue to Step 3.
30   COMMENTS:
___ SAT
___ UNSAT CRO-90 3 R 0 - h Page 13 of 16  NOTE:  With Unit 1 PRV system shutdown, RIA-32 sample point for '1 PRV System Filter Discharge' is sampling air in piping between Unit 1 PRV discharge and Unit Vent, NOT the general area {2}
During or just after GWD Release RIA
-32 counts may increase while selected to '1 PRV System Filter Discharge' causing 1SA
-8/B-9 "Process Monitor Radiation High" to alarm.
STEP 2 0:  Step 3.30 Place the following note on Unit 1 Turnover sheet:
  "Just after or during a GWD release, 1SA
-8/B-9 may alarm from RIA
-32 sample point selected to '1 PRV System Filter Discharge'. IF 1SA-8/B-9 is due to RIA '1 PRV System Filter Discharge', it can be considered an expected alarm".
STANDARD: Candidate should indicate that the above note will be placed on the turnover sheet.
Continue to Step 3.
31  COMMENTS:               ___ SAT        ___ UNSAT  STEP 2 1:  Step 3.31 Adjust GWR DISCHARGE FLOW CONTROL to obtain desired release rate. STANDARD: Slowly adjust the manual loading knob to obtain the desired release rate. Continue to Step 3.
32  Note:  Actual release rate will be much less than the maximum flow rate allowed by the release permit.
Flow is monitored on VB1 recorder 1MSCCR0001 COMMENTS:
CRITICAL STEP


___ SAT
CRO-903 R0 - h Page 13 of 16 NOTE: With Unit 1 PRV system shutdown, RIA-32 sample point for '1 PRV System Filter Discharge' is sampling air in piping between Unit 1 PRV discharge and Unit Vent, NOT the general area {2}                                                                        ___ SAT During or just after GWD Release RIA-32 counts may increase while selected to '1 PRV System Filter Discharge' causing 1SA-8/B-9 "Process Monitor Radiation High" to alarm.
___ UNSAT STEP 20:          Step 3.30 Place the following note on Unit 1 Turnover sheet:
                  "Just after or during a GWD release, 1SA-8/B-9 may alarm from RIA-32 sample point selected to '1 PRV System Filter Discharge'. IF 1SA-8/B-9 is due to RIA '1 PRV System Filter Discharge', it can be considered an expected alarm".
STANDARD:        Candidate should indicate that the above note will be placed on the turnover sheet.
Continue to Step 3.31 COMMENTS:
STEP 21:          Step 3.31                                                                CRITICAL STEP Adjust GWR DISCHARGE FLOW CONTROL to obtain desired release rate.
___ SAT STANDARD:        Slowly adjust the manual loading knob to obtain the desired release rate.
Continue to Step 3.32
___ UNSAT Note:    Actual release rate will be much less than the maximum flow rate allowed by the release permit. Flow is monitored on VB1 recorder 1MSCCR0001 COMMENTS:


___ UNSAT CRO-90 3 R 0 - h Page 14 of 16   ALTERNATE PATH STEP 2 2: Step 3.32 Record "Begin GWR # _________" in Unit Log.
CRO-903 R0 - h Page 14 of 16 ALTERNATE PATH STEP 22:         Step 3.32 Record "Begin GWR # _________" in Unit Log.                           ___ SAT STANDARD:       Candidate should indicate a Unit log entry would be made.
STANDARD: Candidate should indicate a Unit log entry would be made.
___ UNSAT Note: The B GWD tank will decrease instead of the D. The candidate should note this while monitoring the tank pressures and then perform IAAT Step 3.18.
Note: The "B" GWD tank will decrease instead of the D. The candidate should note this while monitoring the tank pressures and then perform IAAT Step 3.18.
Candidate may also perform the IAAT because he notes that a release is occurring but the D tank pressure is not decreasing. In both cases unexpected results were noted.
Candidate may also perform the IAAT because he notes that a release is occurring but the "D" tank pressure is not decreasing. In both cases unexpected results were noted.
COMMENTS:
COMMENTS:
___ SAT
STEP 23:       Step 3.18                                                           *CRITICAL STEP IF AT ANY TIME any tank is decreasing unexpectedly, perform the following:                                                             ___ SAT 3.18.1 Close GWR DISCHARGE FLOW CONTROL.
___ UNSAT  STEP 2 3: Step 3.18 IF AT ANY TIME any tank is decreasing unexpectedly, perform the following:
3.18.2 Notify RP to initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences) due to potential unplanned           ___ UNSAT radioactive effluent release.
3.18.1 Close GWR DISCHARGE FLOW CONTROL.
________________________                 _____
3.18.2 Notify RP to initiate SRPMP 8
Person Notified                         Date 3.18.3 Go To Section 4 (GWR Termination).
-02 (Investigation of Unusual Radiological Occurrences) due to potential unplanned radioactive effluent release.
STANDARD:       Determine IAAT step is met because the B GWD Tank pressure is decreasing.
________________________
                *Close GWR DISCHARGE FLOW CONTROL.
_____ Person Notified Date 3.18.3 Go To Section 4 (GWR Termination).
Notify RP initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences)
STANDARD: Determine IAAT step is met because the "B" GWD Tank pressure is decreasing.
*Close GWR DISCHARGE FLOW CONTROL.
Notify RP initiate SRPMP 8
-02 (Investigation of Unusual Radiological Occurrences)
Go To Section 4 (GWR Termination).
Go To Section 4 (GWR Termination).
Cue: Another operator will complete this procedure.
Cue: Another operator will complete this procedure.
COMMENTS:       END TASK   *CRITICAL STEP
COMMENTS:
___ SAT
END TASK STOP TIME: ____________
___ UNSAT  STOP TIME: ____________


CRO-90 3 R 0 - h Page 15 of 16 CRITICAL STEP EXPLANATIONS:
CRO-903 R0 - h Page 15 of 16 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 1 Required to set RIA to prevent station release above limits.
STEP #                                     Explanation 1   Required to set RIA to prevent station release above limits.
2 Required to set RIA to prevent station release above limits.
2   Required to set RIA to prevent station release above limits.
12 Required to align release flow path.
12   Required to align release flow path.
14 Required to align release flow path.
14   Required to align release flow path.
21 Required to align release flow path.
21   Required to align release flow path.
23 Required to stop the release of the wrong tank.
23   Required to stop the release of the wrong tank.


h   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Release of "
Release of D GWD tank is desired No other GWRs in progress.
D" GWD tank is desired
OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to step 3.9 INITIATING CUES:
CRS directs you to complete the release of the D GWD tank beginning at step 3.9 of Enclosure 4.9 (GWD Tank Release).


No other GWRs in progress.
NLO-400 fnl - i Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-400 Station ASW Pump Alignment CANDIDATE EXAMINER


OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to  
NLO-400 fnl - i Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Align and start the Station ASW Pump Alternate Path:
No Facility JPM #:
NLO-017 K/A Rating(s):
System: B/WE04 K/A:      EA1.1 Rating: 4.4/4.2 Task Standard:
Perform EOP Encl. 5.10 Station ASW Pump Alignment for valve and breaker alignment required to provide Station ASW to the SGs.
Preferred Evaluation Location:                                        Preferred Evaluation Method:
Simulator __ __ In-Plant __ X ___                                    Perform __ ___ Simulate __X__


step 3.9  INITIATING CUES:
==References:==
CRS directs you to complete the release of the "
D" GWD tank beginning at step 3.9 of Enclosure 4.9 (GWD Tank Release)


NLO-4 00 fnl - i Page 1 of 12    REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NL O-4 00 Station ASW Pump Alignment
EOP Encl. 5.10 Station ASW Pump Alignment OP/0/A/1107/011 Removal And Restoration Of Auxiliary Electrical Equipment Validation Time: 16 minutes                                          Time Critical: NO
====================================================================================
Candidate:      _______________________________________                            Time Start: _________
NAME                                                Time Finish: ________
Performance Rating: SAT ______ UNSAT ______                                  Performance Time: _________
Examiner: ______________________________            ____________________________________/________
NAME                                        SIGNATURE                    DATE
====================================================================================
COMMENTS


CANDIDATE      EXAMINER NLO-4 00 fnl - i Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Align and start the Station ASW Pump  Alternate Path
NLO-400 fnl - i Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS None
:  No  Facility JPM #
:  NL O-017  K/A Rating(s
):  System: B/WE04 K/A:  E A1.1 Rating:    4.4/4.2  Task Standard
: Perform EOP Encl. 5.10 "Station ASW Pump Alignment" for valve and breaker alignment required to provide Station ASW to the SGs. Preferred Evaluation Location
:    Preferred Evaluation Method
:  Simulator
__ __ In-Plant __ X ___      Perform __ ___ Simulate __X__  References
: EOP Encl. 5.10 Station ASW Pump Alignment OP/0/A/1107/011 Removal And Restoration Of Auxiliary Electrical Equipment


Validation Time:
NLO-400 fnl - i Page 4 of 12 Tools/Equipment/Procedures Needed:
16 minutes        Time Critical:  NO ====================================================================================
600 volt breaker rackout tool EP/1/A/1800/001 Enclosure 5.10 Station ASW Pump Alignment OP/0/A/1107/011 Removal And Restoration Of Auxiliary Electrical Equipment .5 Rack In 600 Volt Breaker READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Candidate:
INITIAL CONDITIONS Unit 1 was operating at 100% power The SSF is OOS BOTH Standby Buses are energized from CT-5 Unit 1 trips due to a loss of all Main and Emergency Feedwater HPI Forced Cooling is established The EOP HPI CD Tab in progress HPI forced cooling flow is determined to be inadequate INITIATING CUES The CRS directs you to perform EOP Enclosure 5.10 Station ASW Pump Alignment to align and then start the Station ASW Pump.
_______________________________________
Time Start: __
_______    NAME      Time Finish: ________
Performance Rating
:  SAT ______ UNSAT ______
Performance Time
: _________
Examiner: ______________________________          ____________________________________/________
NAME      SIGNATURE                            DATE ====================================================================================
COMMENTS NLO-4 00 fnl - i Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS None   


NLO-4 00 fnl - i Page 4 of 12 Tools/Equipment/Procedures Needed
NLO-400 fnl - i Page 5 of 12 START TIME: _______
: 600 volt breaker rackout tool EP/1/A/1800/001 Enclosure 5.10 Station ASW Pump Alignment OP/0/A/1107/011 Removal And Restoration Of Auxiliary Electrical Equipment Enclosure 4.5 Rack In 600 Volt Breaker READ TO OPERATOR DIRECTION TO TRAINEE
NOTE All equipment operated in the following steps is located in A-1-128, ASW Pump Rm.
___ SAT STEP 1:         Step 1 Obtain racking equipment and pipe wrench from EOP equipment locker U2AB1 (A-1, hallway near U2 elevator lobby).
STANDARD:      Student locates the equipment locker containing the required racking and  ___ UNSAT protective equipment.
* Safety glasses
* Face shield
* Hard hat
* Rubber gloves with leather protectors
* Flame-resistant clothing
* Pipe wrench
* Breaker racking tool Continue to Step 2 NOTE: This step may be simulated and discussed, at the discretion of the evaluator.
Cue: Inform the student that for this JPM, it is not necessary to break the security seal on the locker for demonstrating equipment to be utilized.
COMMENTS:
STEP 2:        Step 2                                                                  CRITICAL STEP Open CCW-99 (Aux Service Water Pump Suction).
___ SAT STANDARD:      Candidate locates CCW-99 and simulates rotating handwheel counterclockwise to the open position.
Continue to Step 3                                                        ___ UNSAT Cue: After the student locates and simulates placing CCW-99 in the open position, inform student CCW-99 position indicator is pointing to the "open" position.
COMMENTS:


I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you
NLO-400 fnl - i Page 6 of 12 STEP 3:        Step 3                                                                      CRITICAL STEP Open CCW-247 (Aux Service Water Pump Recirc).
___ SAT STANDARD:      Candidate locates CCW-247 and simulates rotating chain operator in the counterclockwise direction by pulling chain operator until handwheel comes to a hard stop.                                                          ___ UNSAT Continue to Step 4 Cue: After student locates and simulates placing CCW-247 in the open position, inform student that CCW-247 is at a counterclockwise hard stop position.
COMMENTS:
STEP 4:        Step 4                                                                      CRITICAL STEP Open CCW-308 (Aux Service Water Pump Vent).
___ SAT STANDARD:      Candidate locates CCW-308 on top of the Station ASW pump, removes pipe cap with simulated wrench from EOP Locker, pulls the locking pin and simulates rotating the 90&deg; valve until the lever is parallel to the vent piping to the open position.                                                  ___ UNSAT Continue to Step 5 Cue: After student simulates opening CCW-308, inform him/her that a solid stream of water is issuing from the valve.
COMMENTS:
STEP 5:        Step 5                                                                      *CRITICAL STEP WHEN all air is vented from Station ASW Pump, THEN close CCW-308.
___ SAT STANDARD:      Candidate recognizes from previous instructor cue that all air is vented from Station ASW pump and simulates rotating CCW-308 clockwise to the closed position.
Continue to Step 6                                                            ___ UNSAT
*Note: Replacing the pipe cap in not critical.
Cue: After student simulates closing CCW-308, inform him/her that water flow has stopped and CCW-308 is at a clockwise hard stop position.
COMMENTS:


indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
NLO-400 fnl - i Page 7 of 12 STEP 6:        Step 6                                                                CRITICAL STEP Rack in ASWS-6B (STATION ASW PUMP BKR) ( ASW 4160/600V SWGR ASWS-6).                                                          ___ SAT STANDARD:      Candidate simulates donning protective clothing/equipment and simulates racking in ASW pump breaker (ASWS-6B).
INITIAL CONDITIONS Unit 1 was operating at 100% power
Continue to Step 7                                                      ___ UNSAT Cue: After the student simulates racking in the breaker, inform student that the STATION AUX SERVICE WATER PUMP Switch green "Trip" indicating light is ON.
Cue: If the candidate asks, provide him/her with a copy of OP/0/A/1107/011 Enclosure 4.5 (not critical)
COMMENTS:
STEP 7:        Step 7 Close ASW SWGR FDR (ASW Swgr Fdr From B1T- Unit 10) (ASW 4160/600V Swgr ASWS-5).                                                ___ SAT STANDARD:      Candidate verifies that ASW SWGR FDR From B1T- Unit 10 is closed.
Continue to Step 8
___ UNSAT NOTE: This breaker is normally closed.
Cue: After student locates breaker, inform student that the two red CLOSED lights are lit and that the white OPEN light is off.
COMMENTS:
STEP 8:        Step 8 IAAT AP/6 (Natural Disaster) directs restoring the Station ASW pump to standby, THEN GO TO Step 14.                                            ___ SAT STANDARD:      Candidate determines from cue that this step does not apply and continues to Step 9.
___ UNSAT Cue: If the candidate asks, inform him/her that AP/06 is NOT in progress.
COMMENTS:


The SSF is OOS BOTH Standby Buses are energized from CT-5 Unit 1 trips due to a loss of all Main and Emergency Feedwater
NLO-400 fnl - i Page 8 of 12 STEP 9:      Step 9                                                                CRITICAL STEP WHEN notified that Standby Bus #1 is energized, AND notified to start the Station ASW pump, THEN perform the following (ASW 4160/600V        ___ SAT SWGR ASWS-5):
 
A. Close ASW TRANSFORMER FDR (ASW SWITCHGEAR TRANSFORMER FEEDER).
HPI Forced Cooling is established
___ UNSAT B. Close STATION ASW PUMP SW (STATION ASW PUMP CONTROL SWITCH) (ASW 4160V SWGR ASWX-5).
 
STANDARD:     Candidate should recognize from the Initial Conditions that Standby Bus #1 is energized and the CRS has directed him/her to start the Station ASW Pump.
The EOP HPI CD Tab in progress
Candidate locates and closes ASW Switchgear Transformer Feeder breaker on ASWS-5 by simulating rotating the handle to the closed position.
 
Cue: After candidate simulates closing the breaker, inform him/her that the red "closed" light is ON and the green "trip" light is OFF.
HPI forced cooling flow is determined to be inadequate
Candidate locates Station ASW Pump Switch on ASWS-5 and simulates rotating the handle to the CLOSED position.
 
Continue to Step 10 Cue: After candidate simulates closing the breaker, inform him/her that the Station ASW Pump Switch red CLOSED light is ON and the green TRIP light is OFF.
INITIATING CUES The CR S directs you to perform EOP Enclosure 5.10 "Station ASW Pump Alignment" to align and then start the Station ASW Pump
COMMENTS:
.
STEP 10:     Step 10 Close CCW-309 (Aux Service Water Pump Disch Drain) (12 West of ASW pump).                                                             ___ SAT STANDARD:     Candidate locates CCW-309 and simulates closing CCW-309 by rotating the valve handwheel in a clockwise direction to a hard stop.
NLO-4 00 fnl - i Page 5 of 12  START TIME: _______
Continue to Step 11                                                    ___ UNSAT Cue: Inform candidate that CCW-309 handwheel is fully clockwise and at a hard stop position.
NOTE All equipment operated in the following steps is located in A 128, ASW Pump Rm.
STEP 1:  Step 1 Obtain racking equipment and pipe wrench from EOP equipment locker U2AB1 (A-1, hallway near U2 elevator lobby).
STANDARD: Student locates the equipment locker containing the required racking and protective equipment.
Safety glasses Face shield Hard hat  Rubber gloves with leather protectors Flame-resistant clothing Pipe wrench Breaker racking tool Continue to Step 2 NOTE:  This step may be simulated and discussed, at the discretion of the evaluator.
Cue:  Inform the student that for this JPM, it is not necessary to break the security seal on the locker for demonstrating equipment to be utilized.
COMMENTS:                ___ SAT        ___ UNSAT  STEP 2:  Step 2 Open CCW-99 (Aux Service Water Pump Suction). STANDARD: Candidate locates CCW
-99 and simulates rotating handwheel counterclockwise to the open position
. Continue to Step 3 Cue: After the student locates and simulates placing CCW
-99 in the open position, inform student CCW
-99 position indicator is pointing to the "open" position.
COMMENTS:          CRITICAL STEP
___ SAT
___ UNSAT NLO-4 00 fnl - i Page 6 of 12  STEP 3:  Step 3 Open CCW-247 (A ux Service Water Pump Recirc). STANDARD: Candidate locates CCW
-247 and simulates rotating chain operator in the counterclockwise direction by pulling chain operator until handwheel comes to a hard stop
. Continue to Step Cue: After student locates and simulates placing CCW
-247 in the open position, inform student that CCW
-247 is at a counterclockwise hard stop position.
COMMENTS:         CRITICAL STEP
___ SAT
___ UNSAT  STEP 4: Step 4 Open CCW-308 (A ux Service Water Pump V ent). STANDARD: Candidate locates CCW
-308 on top of the Station ASW pump, removes pipe cap with simulated wrench from EOP Locker, pull s the locking pin and simulates rotating the 90
&deg; valve until the lever is parallel to the vent piping to the open position
. Continue to Step Cue: After student simulates opening CCW
-308, inform him/her that a solid stream of water is issuing from the valve.
COMMENTS:
COMMENTS:
CRITICAL STEP
___ SAT 


___ UNSAT  STEP 5:  Step 5 WHEN all air is vented from Station ASW Pump, THEN close CCW-308. STANDARD: Candidate recognizes from previous instructor cue that all air is vented from Station ASW pump and simulates rotating CCW
NLO-400 fnl - i Page 9 of 12 STEP 11:       Step 11                                                                     CRITICAL STEP Perform the following:
-308 clockwise to the close d position.
A. Position CCW-101 (Aux Service Water Pump Discharge) only one
Continue to Step 6  *Note: Replacing the pipe cap in not critical.
___ SAT turn open.
Cue:  After student simulates closing CCW
-308, inform him/her that water flow has stopped and CCW
-308 is at a clockwise hard stop position
. COMMENTS:          *CRITICAL STEP
___ SAT
___ UNSAT NLO-4 00 fnl - i Page 7 of 12  STEP 6:  Step 6 Rack in ASWS
-6B (STATION ASW PUMP BKR) ( ASW 4160/600V SWGR ASWS-6). STANDARD: Candidate simulates donning protective clothing
/equipment and simulates racking in ASW pump breaker (ASWS
-6B). Continue to Step 7  C ue:  After the student simulates racking in the breaker, inform student that the STATION AUX SERVICE WATER PUMP Switch green "Trip" indicating light is ON. Cue:  If the candidate asks, provide him/her with a copy of OP/0/A/1107/011 Enclosure 4.5 (not critical)
COMMENTS:          CRITICAL STEP
___ SAT
___ UNSAT  STEP 7:  Step 7 Close ASW SWGR FDR (ASW Swgr F dr From B1T- Unit 10) (ASW 4160/600V Swgr ASWS-5). STANDARD: Candidate verifies that "ASW SWGR FDR From B1T
- Unit 10" is closed.
Continue to Step 8  N OTE:  This breaker is normally closed
. Cue:  After student locates breaker, inform student that the two red CLOSED lights are lit and that the white OPEN light is off.
COMMENTS:                ___ SAT 
 
___ UNSAT  STEP 8:  Step 8 IAAT AP/6 (Natural Disaster) directs restoring the Station ASW pump to standby, THEN GO TO Step 14. STANDARD: Candidate determines from cue that this step does not apply and continues to Step 9. C ue:  If the candidate asks, inform him/her that AP/06 is NOT in progress
.
COMMENTS:                ___ SAT
___ UNSAT NLO-4 00 fnl - i Page 8 of 12  STEP 9:  Step 9 WHEN notified that Standby Bus #1 is energized, AND notified to start the Station ASW pump, THEN perform the following (ASW 4160/600V SWGR ASWS-5): A. Close ASW TRANSFORMER FDR (ASW SWITCHGEAR TRANSFORMER FEEDER).
B. Close STATION ASW PUMP SW (STATION ASW PUMP CONTROL SWITCH) (ASW 4160V SWGR ASWX
-5). STANDARD: Candidate should recognize from the Initial Conditions that Stan dby  Bus #1 is energized and the CRS has directed him/her to start the Station ASW Pump
. Candidate locates and closes ASW Switchgear Transformer Feeder breaker on ASWS
-5 by simulating rotating the handle to the closed position. Cue:  After candidate simulates closing the breaker, inform him/her that the red "closed" light is ON and the green "trip" light is OFF
. Candidate locates Station ASW Pump Switch on ASWS
-5 and simulates rotating the handle to the CLOSED position.
Continue to Step 10  Cue:  After candidate simulates closing the breaker, inform him/her that the Station ASW Pump Switch red CLOSED light is ON and the green TRIP light is OFF.
COMMENTS:          CRITICAL STEP
___ SAT
___ UNSAT  STEP 10:  Step 10 Close CCW-309 (A ux Service Water Pump Disch Drain) (12' West of ASW pump).
STANDARD: Candidate locates CCW
-309 and simulates closing CCW
-309 by rotating the valve handwheel in a clockwise direction to a hard stop
. Continue to Step 11  C ue:  Inform candidate that CCW
-309 handwheel is fully clockwise and at a hard stop position.
COMMENTS:                ___ SAT
___ UNSAT NLO-4 00 fnl - i Page 9 of 12   STEP 11: Step 11 Perform the following:
A. Position CCW
-101 (Aux Service Water Pump Discharge) only one turn open.
B. Open CCW-101 an additional one turn open at a rate of one quarter turn every 15 seconds.
B. Open CCW-101 an additional one turn open at a rate of one quarter turn every 15 seconds.
C. WHEN 5 minutes have elapsed, THEN slowly open CCW
C. WHEN 5 minutes have elapsed, THEN slowly open CCW-101 until               ___ UNSAT full open STANDARD:     Candidate locates CCW-101 and simulates opening the valve one turn by rotating the valve operator in the counterclockwise direction by pulling on the chain operator.
-101 until full open STANDARD: Candidate locates CCW
Candidate opens CCW-101 an additional on turn open at a rate of one quarter turn every 15 seconds.
-101 and simulates opening the valve one turn by rotating the valve operator in the counterclockwise direction by pulling on the chain operator.
Candidate opens CCW
-101 an additional on turn open at a rate of one quarter turn every 15 seconds.
When 5 minutes have elapsed, candidate slowly opens CCW-101 until full open.
When 5 minutes have elapsed, candidate slowly opens CCW-101 until full open.
Continue to Step 12 Cue: After the candidate has correctly explained how to perform steps A & B, inform him her that 5 minutes have elapsed (time compression).
Continue to Step 12 Cue: After the candidate has correctly explained how to perform steps A & B, inform him her that 5 minutes have elapsed (time compression).
Cue: Inform candidate that CCW
Cue: Inform candidate that CCW-101 handwheel is at a hard stop after following the sequence correctly.
-101 handwheel is at a hard stop after following the sequence correctly
. COMMENTS:        CRITICAL STEP
___ SAT
___ UNSAT  STEP 1 2:  Step 12 Verify Turbine Building flood is in progress.
STANDARD: Candidate determines from the Initial Conditions that a Turbine Building flood is NOT in progress.
Continue to Step 12 R N O  COMMENTS:              ___ SAT
___ UNSAT NLO-4 00 fnl - i Page 10 of 12  STEP 1 3:  Step 12 RNO Notify CRO that Station ASW Pump is operating.
STANDARD: Candidate contacts the Unit 1 Control Room by radio or phone and informs them that the Station ASW Pump is operating.
COMMENTS:
COMMENTS:
END TASK        ___ SAT
STEP 12:      Step 12 Verify Turbine Building flood is in progress.
___ UNSAT   STOP TIME: ____________
___ SAT STANDARD:      Candidate determines from the Initial Conditions that a Turbine Building flood is NOT in progress.
___ UNSAT Continue to Step 12 RNO COMMENTS:


NLO-4 00 fnl - i Page 11 of 12 CRITICAL STEP EXPLANATIONS STEP # Explanation 2 Necessary to align flowpath 3 Necessary to align flowpath 4 Necessary to vent the pump 5 Necessary to stop venting the pump 6 Necessary to provide power to the pump
NLO-400 fnl - i Page 10 of 12 STEP 13:    Step 12 RNO Notify CRO that Station ASW Pump is operating.
. 9 Necessary to provide power to the pump
___ SAT STANDARD:  Candidate contacts the Unit 1 Control Room by radio or phone and informs them that the Station ASW Pump is operating.
. 11 Necessary to provide flowpath.
___ UNSAT COMMENTS:
END TASK STOP TIME: ____________


CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
NLO-400 fnl - i Page 11 of 12 CRITICAL STEP EXPLANATIONS STEP #                                    Explanation 2   Necessary to align flowpath 3  Necessary to align flowpath 4  Necessary to vent the pump 5  Necessary to stop venting the pump 6  Necessary to provide power to the pump.
INITIAL CONDITIONS Unit 1 was operating at 100% power
9  Necessary to provide power to the pump.
11  Necessary to provide flowpath.


The SSF is OOS BOTH Standby Buses are energized from CT
i CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
-5 Unit 1 trips due to a loss of all Main and Emergency Feedwater
INITIAL CONDITIONS Unit 1 was operating at 100% power The SSF is OOS BOTH Standby Buses are energized from CT-5 Unit 1 trips due to a loss of all Main and Emergency Feedwater HPI Forced Cooling is established The EOP HPI CD Tab in progress HPI forced cooling flow is determined to be inadequate INITIATING CUES The CRS directs you to perform EOP Enclosure 5.10 Station ASW Pump Alignment to align and then start the Station ASW Pump.


HPI Forced Cooling is established
NLO-700 fnl - k Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-700 Restoration of ICS Auto Power CANDIDATE EXAMINER


The EOP HPI CD Tab in progress
NLO-700 fnl - k Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Restoration of ICS AUTO Power Alternate Path:
Yes Facility JPM #:
NLO-700 K/A Rating(s):
System: BW/A02 K/A:      AA1.3 Rating: 3.4/3.6 Task Standard:
ICS AUTO power is restored per AP/1/A/1700/023, Loss of ICS Power.
Preferred Evaluation Location:                                        Preferred Evaluation Method:
Simulator __ __ In-Plant __ X ___                                    Perform __ ___ Simulate __X _


HPI forced cooling flow is determined to be inadequate
==References:==
 
INITIATING CUES The CR S directs you to perform EOP Enclosure 5.10 "Station ASW Pump Alignment" to align and then start the Station ASW Pump
.
NLO-700 fnl - k Page 1 of 9    REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NL O-700  Restoration of ICS Auto Power CANDIDATE      EXAMINER 


NLO-700 fnl - k Page 2 of 9  REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:  Restoration of ICS AUTO Power Alternate Path:
AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) Rev. 20 Validation Time: 16 minutes                                          Time Critical: NO
Yes  Facility JPM #:
===================================================================================
NLO-700  K/A Rating(s):
Candidate:      _______________________________________                            Time Start: _________
System: BW/A02 K/A:  AA1.3 Rating:   3.4/3.6  Task Standard:
NAME                                                Time Finish: ________
ICS AUTO power is restored per AP/1/A/1700/023, Loss of ICS Power.
Performance Rating: SAT ______ UNSAT ______                                  Performance Time: _________
Preferred Evaluation Location:
Examiner: ______________________________            ____________________________________/________
Preferred Evaluation Method:
NAME                                          SIGNATURE                    DATE
Simulator
===================================================================================
__ __ In-Plant __ X ___      Perform __ ___ Simulate __X _ 
COMMENTS


==References:==
NLO-700 fnl - k Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:
NONE


NLO-700 fnl - k Page 4 of 9 Tools/Equipment/Procedures Needed:
AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power)
AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power)
Rev. 20  Validation Time
: 16 minutes        Time Critical
:  NO ===================================================================================
Candidate:
_______________________________________
Time Start: _____
____    NAME      Time Finish: ________
Performance Rating:  SAT ______ UNSAT ______
Performance Time
: _________
Examiner: ______________________________          ____________________________________/________
NAME      SIGNATURE                            DATE
===================================================================================
COMMENTS NLO-700 fnl - k Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:
NONE NLO-700 fnl - k Page 4 of 9 Tools/Equipment/Procedures Needed:
AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power)
READ TO OPERATOR DIRECTION TO TRAINEE:
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 operating at 100% power 1SA-2/B-11 (ICS AUTO POWER FAILURE) is actuated INITIATING CUES:
The CRS directs you to use AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) to restore ICS AUTO power on Unit 1.


Unit 1 operating at 100% power
NLO-700 fnl - k Page 5 of 9 START TIME: _______
 
STEP 1:         Step 1 Verify the following breakers closed (Unit 1 Cable Rm):
1SA-2/B-11 (ICS AUTO POWER FAILURE) is actuated INITIATING CUES:
* 1KRA breaker #1 (100A 1P, POWER PANELBOARD 1KI)               ___ SAT
The C RS directs you to use AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) to restore ICS AUTO power on Unit 1.
* 1KI BREAKER #1 (30A 1P, AUTO POWER (ICS))
NLO-700 fnl - k Page 5 of 9   START TIME: _______
___ UNSAT STANDARD:       Locate 1KRA panel board and breaker #1 and verify it is closed.
STEP 1: Step 1 Verify the following breakers closed (Unit 1 Cable Rm):
Cue: Indicate to the candidate that 1KRA breaker #1 is CLOSED.
1KRA breaker #1 (100A 1P, POWER PANELBOARD 1KI) 1KI BREAKER #1 (30A 1P, AUTO POWER (ICS))
Locate 1KI panel board and breaker #1 and verify it is closed.
STANDARD: Locate 1KRA panel board and breaker #1 and verify it is closed
Cue: Indicate to the candidate that 1KI breaker #1 is tripped OPEN.
. Cue: Indicate to the candidate that 1KRA breaker #1 is CLOSED.
Continue Step 1 RNO.
Locate 1KI panel board and breaker
COMMENTS:
#1 and verify it is closed
STEP 2:         Step 1 RNO
. Cue: Indicate to the candidate that 1K I breaker #1 is tripped OPEN. Continue Step 1 RNO
: 1. Reset and close the affected breakers (Unit 1 Cable Rm):
. COMMENTS:               ___ SAT
___ SAT
___ UNSAT  STEP 2: Step 1 RNO 1. Reset and close the affected breakers (Unit 1 Cable Rm):
_____1KI BREAKER #1 (30A 1P, AUTO POWER (ICS))
_____1KI BREAKER #1 (30A 1P, AUTO POWER (ICS))
: 2. IF either of the above breakers fail to close-
: 2. IF either of the above breakers fail to close
: 3. WHEN both of the above breakers are closed THEN continue. STANDARD: 1. Reset s and close s 1KI BREAKER #1 by taking the breaker to the     open position and then closing it.
___ UNSAT
: 3. WHEN both of the above breakers are closed THEN continue.
STANDARD:       1. Resets and closes 1KI BREAKER #1 by taking the breaker to the open position and then closing it.
: 2. Step does not apply. Both breakers are closed.
: 2. Step does not apply. Both breakers are closed.
: 3. Determine both breakers are closed and continue.
: 3. Determine both breakers are closed and continue.
Cue: Indicate to the candidate that 1K I breaker #1 is CLOSED.
Cue: Indicate to the candidate that 1KI breaker #1 is CLOSED.
Continue to Step 2.
COMMENTS:


Continue to Step
NLO-700 fnl - k Page 6 of 9 ALTERNATE PATH STEP 3:         Step 2
: 2. COMMENTS:                ___ SAT
___ SAT Contact Unit 1 CR to verify ICS AUTO power has been restored as indicated by 1SA-2/B-11 (ICS AUTO POWER FAILURE) off.
___ UNSAT NLO-700 fnl - k Page 6 of 9   ALTERNATE PATH STEP 3: Step 2 Contact Unit 1 CR to verify ICS AUTO power has been restored as indicated by 1SA-2/B-11 (ICS AUTO POWER FAILURE) off.
___ UNSAT STANDARD:       Contacts Unit 1 CR to verify ICS AUTO power has been restored as indicated by 1SA-2/B-11 (ICS AUTO POWER FAILURE) off.
STANDARD: Contacts Unit 1 CR to verify ICS AUTO power has been restored as indicated by 1SA-2/B-11 (ICS AUTO POWER FAILURE) off.
Cue: Inform candidate that 1SA-2/B-11 (ICS AUTO POWER FAILURE) remains actuated.
Cue: Inform candidate that 1SA-2/B-11 (ICS AUTO POWER FAILURE) remains actuated. Continue to Step 2 RNO. COMMENTS:
Continue to Step 2 RNO.
___ SAT
COMMENTS:
___ UNSAT  STEP 4: Step 2 RNO IF ICS AUTO power has NOT been restored, THEN bypass 1KI inverter as follows
STEP 4:         Step 2 RNO IF ICS AUTO power has NOT been restored, THEN bypass 1KI inverter as follows: (BYP SW 1KI cabinet, Unit 1 Equip Rm, Southwest of col Q72):                                             ___ SAT STANDARD:       Determine ICS AUTO power has NOT been restored by actuation of 1SA-2/B-11 (ICS AUTO POWER FAILURE) in previous step                   ___ UNSAT THEN bypasses 1KI inverter as follows: (BYP SW 1KI cabinet, Unit 1 Equip Rm, Southwest of col Q72): (steps 5, 6, & 7 below)
: (BYP SW 1KI cabinet, U nit 1 Equip Rm, Southwest of col Q72):   STANDARD: Determine ICS AUTO power has NOT been restored by actuation of 1SA-2/B-11 (ICS AUTO POWER FAILURE) in previous step THEN bypass es 1KI inverter as follows
COMMENTS:
: (BYP SW 1KI cabinet, U nit 1 Equip Rm, Southwest of col Q72
STEP 5:         Step 2 RNO A                                                           CRITICAL TASK A. Position SW#1 OFF(left switch).
): (steps 5, 6, &
___ SAT STANDARD:       Positions SW#1 OFF (left switch).
7 below)   COMMENTS:                 ___ SAT
Cue: Indicate to the candidate that SW#1 is OFF.                                       ___ UNSAT COMMENTS:
___ UNSAT  STEP 5: Step 2 RNO A A. Position SW#1 OFF(left switch).
STANDARD: Positions SW#1 OFF (left switch).
Cue: Indicate to the candidate that SW#1 is OFF. COMMENTS:          CRITICAL TASK
___ SAT
___ UNSAT NLO-700 fnl - k Page 7 of 9  STEP 6:  Step 2 RNO B B. Position SW#3 OFF (right switch).
STANDARD: Positions SW#3 OFF (right switch).
Cue: Indicate to the candidate that SW#3 is OFF. COMMENTS:         CRITICAL TASK
___ SAT
___ UNSAT  STEP 7:  Step 2 RNO C C. Position SW#2 ON (center switch).


STANDARD: Positions SW#2 ON (center switch).
NLO-700 fnl - k Page 7 of 9 STEP 6:        Step 2 RNO B                                                              CRITICAL TASK B. Position SW#3 OFF (right switch).
Cue: Indicate to the candidate that SW#2 is ON. Continue to Step 3.
___ SAT STANDARD:       Positions SW#3 OFF (right switch).
COMMENTS:         CRITICAL TASK
Cue: Indicate to the candidate that SW#3 is OFF.                                            ___ UNSAT COMMENTS:
STEP 7:        Step 2 RNO C                                                              CRITICAL TASK C. Position SW#2 ON (center switch).
___ SAT STANDARD:      Positions SW#2 ON (center switch).
Cue: Indicate to the candidate that SW#2 is ON.
___ UNSAT Continue to Step 3.
COMMENTS:
STEP 8:        Step 3 Notify Unit 1 CR that all applicable steps of this enclosure have been completed.                                                                  ___ SAT STANDARD:      Using a phone or radio, Notify Unit 1 CR that all applicable steps of this enclosure have been completed.                                              ___ UNSAT Cue: Inform candidate that the Control Room has been notified.
COMMENTS:
END TASK STOP TIME: ____________


___ SAT
NLO-700 fnl - k Page 8 of 9 CRITICAL STEP EXPLANATIONS:
___ UNSAT  STEP 8:  Step 3 Notify Unit 1 CR that all applicable steps of this enclosure have been completed.
STEP #                                    Explanation 5    Step is required in proper sequence to align power to the 1KI bus.
STANDARD: Using a phone or radio, Notify Unit 1 CR that all applicable steps of this enclosure have been completed.
6    Step is required in proper sequence to align power to the 1KI bus.
Cue: Inform candidate that the Control Room has been notified.
7    Step is required in proper sequence to align power to the 1KI bus.
COMMENTS:      END TASK        ___ SAT
___ UNSAT  STOP TIME: ____________


NLO-700 fnl - k Page 8 of 9  CRITICAL STEP EXPLANATIONS:
k CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
STEP # Explanation 5 Step is required in proper sequence to align power to the 1KI bus.
6 Step is required in proper sequence to align power to the 1KI bus. 7 Step is required in proper sequence to align power to the 1KI bus.
 
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 operating at 100% power
Unit 1 operating at 100% power 1SA-2/B-11 (ICS AUTO POWER FAILURE) is actuated INITIATING CUES:
 
The CRS directs you to use AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) to restore ICS AUTO power on Unit 1.}}
1SA-2/B-11 (ICS AUTO POWER FAILURE) is actuated INITIATING CUES:
The C RS directs you to use AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) to restore ICS AUTO power on Unit 1.}}

Revision as of 06:34, 4 November 2019

Iinitial Exam 2013-302 Final Sim In-Plant JPMs
ML14084A051
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/21/2014
From:
NRC/RGN-II
To:
Duke Energy Corp
References
50-269/13-302, 50-270/13-302, 50-287/13-302, CRO-115 50-269/13-302, 50-270/13-302, 50-287/13-302
Download: ML14084A051 (130)


Text

CRO-115 fnl - a Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-115 Withdraw Control Rod Group One to 50%

CANDIDATE EXAMINER

CRO-115 fnl - a Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Latch Group 7 Control rods and withdraw Safety Rod Group 1 to 50%

Alternate Path:

No Facility JPM #:

CRO-111 K/A Rating(s):

System: 001 K/A: A4.06 Rating: 2.9/3.2 Task Standard:

Latch Group 7 Control Rod and withdraw Safety Rod Group 1 To 50% in accordance with OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X ___ In-Plant ___ ___ Perform __X___ Simulate __ __

References:

OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)

OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1)

Validation Time: 20 min. Time Critical: No

========================================================================

Candidate: _______________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

========================================================================

Comments

CRO-115 fnl - a Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS

1. RECALL Snap 213
2. Go To RUN

CRO-115 fnl - a Page 4 of 10 Tools/Equipment/Procedures Needed OP/1/A./1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 1 startup in progress following a 28 day refueling outage Tc = 536ºF RCS pressure = 2155 psig OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1) is in progress at step 2.6.5 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) is in progress and has been completed through step 4.8 (Groups 1 through 6 have been manually latched).

INITIATING CUE The Control Room SRO directs you to continue with OP1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) beginning at Step 4.9.

Latch of groups 1 - 6 is complete. Manual Latch of Group 7 is required.

CRO-115 fnl - a Page 5 of 10 START TIME: _______

STEP 1: Step 4.9 Perform latch and PI alignment of Group 7, as follows: CRITICAL STEP 4.9.1 Ensure GROUP SELECT SWITCH to 7.

___ SAT STANDARD: Ensures Group Select Switch selected to Group 7 COMMENTS:

___ UNSAT STEP 2: Step 4.9.2 Verify only Group 7 CONTROL ON lights are ON. (PI panel)

___ SAT STANDARD: Verifies only Group 7 lights are ON COMMENTS: ___ UNSAT STEP 3: Step 4.9.3 *CRITICAL STEP IF Manual Latch and PI Alignment desired, perform the following: (R.M.)

A. *Ensure LATCH MANUAL is ON.

B. *Ensure IN LIMIT BYPASS is ON.

C. *Insert Group 7 for 5 seconds.

D. Verify all 0% lights ON for Group 7. (PI Panel)

E. *Ensure LATCH MANUAL is OFF.

F. *Ensure IN LIMIT BYPASS is OFF. ___ SAT G. Select RPI RESET.

H. Verify Group 7 API/RPI indications agree. (PI Panel)

STANDARD: Candidate performs A - H above to manually latch the Group 7 rods

___ UNSAT COMMENTS:

CRO-115 fnl - a Page 6 of 10 STEP 4: Step 4.9.4 IF Auto Latch and PI Alignment desired STANDARD: Determine that Auto latch is NOT desired and continue to Step 4.10.

COMMENTS:

___ SAT

___ UNSAT STEP 5: Step 4.10 Reset Group 8 RPI, as follows:

4.10.1 Ensure GROUP SELECT SWITCH to 8.

___ SAT STANDARD: Candidate places the Group Select Switch to Group 8 COMMENTS:

___ UNSAT STEP 6: Step 4.10.2 Verify Group 8 CONTROL ON lights are ON. (PI panel)

___ SAT STANDARD: Candidate verifies that only the Group 8 lights are ON COMMENTS: ___ UNSAT STEP 7: Step 4.10.3 Select RPI RESET

___ SAT STANDARD: Candidate depresses the RPI reset selector

___ UNSAT COMMENTS:

CRO-115 fnl - a Page 7 of 10 STEP 8: Step 4.10.4 Verify Group 8 API/RPI indications agree. (PI Panel)

___ SAT STANDARD: Candidate uses toggle switch to confirm that API/RPI indications agree.

___ UNSAT COMMENTS:

STEP 9: Step 4.11 Select FAULT RESET.

STANDARD: Candidate depresses the FAULT RESET selector. ___ SAT COMMENTS:

___ UNSAT NOTE:

For the purpose of this procedure, an extended forced outage is an outage greater than 92 days where the Reactor Vessel Head is NOT removed. SR 3.1.4.2 requires the Control Rods to be tested for movement prior to entry into MODE 2.

STEP 10: Step 4.12

___ SAT IF OWPG requires the Control Rods to be withdrawn due to an extended forced outage, perform PT/1/A/0600/015 (Control Rod Movement) for testing CRD Groups 1 thru 7 during unit startup.

___ UNSAT STANDARD: Candidate determines from initiating cue that this startup is not from a forced outage of greater than 92 days and therefore this step is N/A.

EXAMINER CUE: If asked, this startup is a return to power following a 28 day refueling outage.

COMMENTS:

CRO-115 fnl - a Page 8 of 10 STEP 11: Step 4.13 Select Group 1, as follows: CRITICAL STEP 4.13.1 Ensure GROUP SELECT SWITCH to 1.

STANDARD: Candidate selects Group 1 on GROUP SELECT SWITCH.

___ SAT COMMENTS:

___ UNSAT STEP 12: Step 4.13.2:

Verify only Group 1 CONTROL ON lights are ON. (PI panel)

STANDARD: Candidate verifies only the Group 1 lights are ON. ___ SAT COMMENTS:

___ UNSAT STEP 13: Step 4.13.3: CRITICAL STEP Ensure Group 1 at 50%.

___ SAT STANDARD: Candidate withdraws the Group 1 rods to 50%.

Examiner note: The candidate should update the SRO/crew when starting to withdraw Group 1 control rods. (not critical)

___ UNSAT COMMENTS:

STEP 14: Step 4.13.4:

Place GROUP SELECT SWITCH to OFF.

STANDARD: Candidate places the GROUP SELECT SWITCH to OFF. ___ SAT COMMENTS:

___ UNSAT END TASK TIME STOP: ________

CRO-115 fnl - a Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to latch Group 7 of rods. If performed incorrectly the results would be the inability to withdraw Group 7 during the startup.

3 This step is required to latch Group 7 of rods. If performed incorrectly the results would be the inability to withdraw Group 7 during the startup.

11 This step is required to select the correct group of rods for withdrawal.

13 This step is required withdraw the Group 1 rods to 50% as directed..

a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 1 startup in progress following a 28 day refueling outage Tc = 536ºF RCS pressure = 2155 psig OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1) is in progress at step 2.6.5 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) is in progress and has been completed through step 4.8 (Groups 1 through 6 have been manually latched).

INITIATING CUE The Control Room SRO directs you to continue with OP1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) beginning at Step 4.9.

Latch of groups 1 - 6 is complete. Manual Latch of Group 7 is required.

CRO-223 fnl - b Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-223 BYPASS ES SUBSYSTEM 2 CANDIDATE EXAMINER

CRO-223 fnl - b Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Remove ES Subsystem 2 from service.

Alternate Path:

No Facility JPM #:

CRO-223 K/A Rating(s):

System: 013 K/A: A4.02 Rating: 4.3/4.4 Task Standard:

The candidate will remove the ES Subsystem 2 from service in accordance with OP/1/A/1105/014 Enclosure 4.9 (Removal and restoration of ES channels) beginning with step 3.3.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X___ In-Plant ______ Perform __X___ Simulate __ __

References:

OP/1/A/1105/014 Enclosure 4.9 (Removal and restoration of ES channels)

Validation Time: 15 min. Time Critical: No

========================================================================

Candidate: _______________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

========================================================================

Comments

CRO-223 fnl - b Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall IC-41
2. Verify the Examiner has the ES cabinet key (#317) and both ES bypass keys (#316).
3. Ensure all breaker flags are in the current plant condition.
4. Go to RUN.

CRO-223 fnl - b Page 4 of 10 Tools/Equipment/Procedures Needed:

OP/1/A/1105/014 Enclosure 4.9 Removal and restoration of ES channels READ TO OPERATOR DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The Unit 1 Reactor is at 100% power.

A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service.

The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power.

The CRS has determined that Unit 1 ES Subsystem 2 is NOT required per Tech Specs INITIATING CUE:

The CRS directs you to remove ES Subsystem 2 from service using OP/1/A/1105/014 .9.

CRO-223 fnl - b Page 5 of 10 START TIME: _______

STEP 1: Step 2.1 NOTE: Equipment failure can be indicated by deviation alarm, fault alarm, hardware fail, etc... or notification by Maintenance. ___ SAT Verify one of the following:

  • A procedure requires bypassing Voter(s), tripping of ES ___ UNSAT channels, bypassing DHPIAS, or bypassing DLPIAS.
  • Equipment failure requires bypassing Voter(s), tripping of ES channels, bypassing DHPIAS, or bypassing DLPIAS.

STANDARD: Determine that the second bullet is satisfied and sign it off.

COMMENTS:

STEP 2: Step 3.1 IF removal of both ES subsystems from service is required during outages, perform Section 4 "Removal Of Both ES Subsystems" ___ SAT STANDARD: Determine step does not apply and N/As step.

___ UNSAT COMMENTS:

STEP 3: Step 3.2 NOTE: ES Subsystem 1 includes ES Input channels A1, B1, and C1 along with ES Voter Odd 1 and ES Voter Even 1. ___ SAT IF removal of any or all of only ES Subsystem 1 channels from service is required, perform Section 5 "Removal Of Only ES Subsystem 1"

___ UNSAT STANDARD: Determine step does not apply and N/As step.

COMMENTS:

STEP 4: Step 3.3 If removal of any or all of Only ES subsystem 2 channels from service is required, perform Section 6 Removal of Only ES Subsystem 2 ___ SAT STANDARD: Candidate proceeds to Section 6

___ UNSAT COMMENTS:

CRO-223 fnl - b Page 6 of 10 STEP 5: Step 6.1:

IF Unit 1 ES Subsystem 2 is NOT required per TS 3.3.5 and 3.3.7, ___ SAT perform the following to remove from service any or all of only Unit 1 ES Subsystem 2 channels.

STANDARD: Candidate determines that ES Subsystem 2 is not required by TS 3.3.5 ___ UNSAT and 3.3.7 COMMENTS:

STEP 6: Step 6.1.1 IF Unit 1 ES Subsystem 1 is required per TS 3.3.5 and 3.3.7, verify the following: ___ SAT

  • Voter Odd 1 NOT bypassed (1SA-7)
  • Voter Even 1 NOT bypassed (1SA-7)

STANDARD: The candidate determines that the Unit 1 ES Subsystem is required per TS 3.3.5 and 3.3.7 and verifies there are no alarms present on ISA-7.

  • Voter Odd 1 NOT bypassed (1SA-7/D1)
  • Voter Even 1 NOT bypassed (1SA-7/E1)

Examiner cue: Candidate may elect to perform a STAT alarm test to help ensure no alarms are present on 1SA-7. If asked, give him permission (as CR SRO) to perform alarm test. (The other RO will be required to help perform the test).

COMMENTS:

STEP 7: Step 6.1.2.A Declare Unit 1 ES Subsystem 2 channels inoperable

___ SAT STANDARD: Candidate reports that procedure requires declaration of ES Subsystem 2 channels inoperable Cue: Acknowledge Unit 1 ES Subsystem 2 channel inoperable.

___ UNSAT COMMENTS:

CRO-223 fnl - b Page 7 of 10 STEP 8: Step 6.1.2.B Obtain MAN BYPASS 2 Key #316 (2 keys are required to bypass both ___ SAT voters).

STANDARD: Candidate obtains correct keys (examiner provides)

___ UNSAT Cue: Provide the candidate with the correct keys. Keys are normally kept in the key locker in the WCC.

COMMENTS:

STEP 9: Step 6.1.2.C CRITICAL STEP IF bypassing Odd Voter 2, place MAN BYPASS 2 keyswitch in "BYP".

(Cabinet 12) ___ SAT STANDARD: Candidate places the MAN BYPASS 2 keyswitch in Cabinet 12 in the BYP position

___ UNSAT COMMENTS:

STEP 10: Step 6.1.2.D CRITICAL STEP IF bypassing Even Voter 2, place MAN BYPASS 2 keyswitch in "BYP".

(Cabinet 14) ___ SAT STANDARD: Candidate places the MAN BYPASS 2 keyswitch in Cabinet 14 in the BYP position and returns and signs step 3.3

___ UNSAT Examiner note: When this step is complete, candidate may indicate task is complete. If so, ask that they continue.

COMMENTS:

STEP 11: Step 3.4 If trip of ES input channels is required, perform one of the following: ___ SAT STANDARD: Candidate NAs this step COMMENTS: ___ UNSAT

CRO-223 fnl - b Page 8 of 10 STEP 12: Step 3.5 If bypassing DHPIAS is required, perform Section 10... ___ SAT STANDARD: Candidate NAs this step

___ UNSAT COMMENTS:

STEP 13: Step 3.6 If bypassing DLPIAS is required, perform Section 11... ___ SAT STANDARD: Candidate NAs this step

___ UNSAT COMMENTS:

STEP 14: Step 3.7 If any ES channel was removed from service due to equipment failure, ___ SAT perform Section 12.

STANDARD: Candidate determines that no ES channel was removed and NAs this step ___ UNSAT COMMENTS:

STEP 15: Step 3.7 WHEN notified by I&E, restore ES channels by performing Section 13... ___ SAT STANDARD: NO actions are required Cue: Another operator will continue with this procedure. ___ UNSAT COMMENTS:

TIME STOP: ________

CRO-223 fnl - b Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP # Explanation 9 This step is critical because it is part 1 of removing all of ES Subsystem 2 from service 10 This step is critical because it is part 2 of removing all of ES Subsystem 2 from service

b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The Unit 1 Reactor is at 100% power.

A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service.

The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power.

The CRS has determined that Unit 1 ES Subsystem 2 is NOT required per Tech Specs INITIATING CUE:

The CRS directs you to remove ES Subsystem 2 from service using OP/1/A/1105/014 .9.

CRO-404 fnl - c Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-404 Alignment of Condensate Recirc CANDIDATE EXAMINER

CRO-404 fnl - c Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Establish Alignment of Condensate Recirc and set flow.

Alternate Path:

Yes Facility JPM #:

CRO-404 K/A Rating(s):

System: APE054 K/A: G2.1.20 Rating: 4.6/4.6 Task Standard:

Condensate recirculation flow of 2300-6000 gpm is established.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____

References:

EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5.23 (Alignment of Condensate Recirc).

Validation Time: 10 minutes Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-404 fnl - c Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL Snap 214
2. IMPORT files for CRO-404
3. Go to RUN

CRO-404 fnl - c Page 4 of 11 Tools/Equipment/Procedures Needed:

EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5.23 (Alignment of Condensate Recirc)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator.

During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 RCPs.

The SGTR tab is in progress and is completed up to step 107.

INITIATING CUES:

The CRS directs you to perform Enclosure 5.23 (Alignment of Condensate Recirc).

CRO-404 fnl - c Page 5 of 11 START TIME: _______

STEP 1: Step 1.

Verify any HWP operating.

___ SAT STANDARD: Determine the 1A HWP is operating (located on 1AB1) by observing the red run light illuminated and pump amps are on scale.

Continues to Step 2

___ UNSAT COMMENTS:

STEP 2: Step 24 Verify any CBP operating.

___ SAT STANDARD: Determine that NO CBP is operating by observing the green off lights on 1AB1 are illuminated for each CBP and then perform the RNO.

Continues to Step 2 RNO ___ UNSAT COMMENTS:

STEP 3: Step 2 RNO

___ SAT GO TO Step 7.

STANDARD: Continues to Step 7

___ UNSAT COMMENTS:

CRO-404 fnl - c Page 6 of 11 STEP 4: Step 7 Ensure two HWPs operating

___ SAT STANDARD: Determines that only the 1A HWP is operating, per step 1.

___ UNSAT Rotates the 1B HWP switch (located on 1AB1) to the START position, verifies the red ON light illuminates, and verifies pump amps increase and return to normal.

OR Rotates the 1C HWP switch (located on 1AB1) to the START position, verifies the red ON light illuminates, and verifies pump amps increase and return to normal.

Continues to Step 8 COMMENTS:

ALTERNATE PATH

___ SAT STEP 5: Step 8 Start the 1C COND BOOSTER PUMP.

___ UNSAT STANDARD: Rotate the 1C COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes that the pump does not start by noting the green stop light remains illuminated and the red start light remains OFF.

Continues to RNO to Step 8 Note: The 1C Cond Booster Pump will not start.

COMMENTS:

CRO-404 fnl - c Page 7 of 11 STEP 6: RNO: Step 8 CRITICAL STEP Start one available CBP.

___ SAT STANDARD: Rotates the 1A COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes the pump starts by observing the Red run light illuminated and pump amps increase and then return to normal. ___ UNSAT OR Rotates the 1B COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes the pump starts by observing the Red run light illuminated and pump amps increase and then return to normal.

Continues to Step 9 COMMENTS:

STEP 7: Step 9 Stop one operating HWP.

___ SAT STANDARD: Rotates the switch for a running HWP (Either 1A, 1B, or 1C) to the OFF position. Verifies the Red run light OFF, and the Green stop light illuminated. ___ UNSAT Examiner note: 1SA-8/C-2 (FDW PUMP SEAL DIFFERENCTIAL PRESSURE LOW) will actuate. This is an expected alarm.

Continues to Step 10 COMMENTS:

STEP 8: Step 10 ___ SAT Place the control switch for one secured HWP in AUTO STANDARD: Places a non running HWP switch (1A or 1B) to AUTO. ___ UNSAT Continues to Step 11 COMMENTS:

CRO-404 fnl - c Page 8 of 11 STEP 9: Step 11 Place the control switch for one secured CBP in AUTO. ___ SAT STANDARD: Places the non running CBP (1A or 1B) switch in AUTO.

Continues to Step 12 ___ UNSAT NOTE: 1C CBP switch should NOT be selected since the pump will not start.

COMMENTS:

STEP 10: Step 12 Perform the following:

___ SAT

  • Position HWP LOAD SHED DEFEAT switch to a running HWP.
  • Position CBP LOAD SHED DEFEAT switch to a running CBP

___ UNSAT STANDARD: Positions the HWP LOAD SHED DEFEAT switch to the running HWP, (1A, 1B, or 1C)

Positions the CBP LOAD SHED DEFEAT switch to the running CBP, (1A or 1B )

Continues to Step 13 COMMENTS:

STEP 11: Step 13 Place the following in MANUAL:

___ SAT

  • 1FDW-65 STANDARD: Locate the Moore controller on 1VB3 for each valve listed above and ___ UNSAT determine they are in MANUAL by the MANUAL light being Lit.

Continues to Step 14 COMMENTS:

CRO-404 fnl - c Page 9 of 11 STEP 12: Step 14 CRITICAL STEP Establish 2300-6000 gpm total recirc flow with one of the following:

___ SAT

___ UNSAT STANDARD: Candidate locates the Moore controller for 1FDW-53 or 1FDW-65 and using the manual loader adjusts one to a total recirc flow of 2300-6000 gpm.

Note: Controller must be selected to the P position to observe flow.

Cue: Inform candidate that another RO will complete this enclosure and this JPM is finished

.

COMMENTS:

STOP TIME: ____________

CRO-404 fnl - c Page 10 of 11 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 6 Required to properly align Condensate recirc.

12 Required to establish proper flow for Condensate recirc.

c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator.

During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 RCPs.

The SGTR tab is in progress and is completed up to step 107.

INITIATING CUES:

The CRS directs you to perform Enclosure 5.23 (Alignment of Condensate Recirc).

CRO-414 fnl - d Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-414 SWAPPING LPI MODES - HIGH PRESSURE MODE TO LPI NORMAL DECAY HEAT MODE CANDIDATE EXAMINER

CRO-414 fnl - d Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode Alternate Path:

No Facility JPM #:

CRO-092 K/A Rating(s):

System: 005 K/A: A4.01 Rating: 3.6*/3.4 Task Standard:

Swap LPI from High Pressure Mode to Normal Mode by procedure.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant ____ Perform __X___ Simulate __ __

References:

OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode)

OP/1/A/1104/004, Enclosure 4.44 (Controlling LPI Cooler Outlet Temperature)

Validation Time: 40 minutes Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-414 fnl - d Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL SNAP 215
2. Place simulator to RUN
3. When asked manipulate the following LP vales using the valve program:

CRO-414 fnl - d Page 4 of 11 Tools/Equipment/Procedures Needed:

OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - High Pressure Mode to LPI Normal Mode)

OP/1/A/1104/004, Enclosure 4.44 (Controlling LPI Cooler Outlet Temperature)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 shutdown in progress INITIATING CUES:

The CRS directs you to perform OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2.3.

ALL associated White tags have been removed.

CRO-414 fnl - d Page 5 of 11 START TIME: _______

STEP 1: Step 2.3 CRITICAL STEP Position:

___ SAT

STANDARD: Remove the cover from the switches for the following valves and OPEN them by placing their respective switches in the open position.

Verify red light illuminates and green light goes off.

Verify red light illuminates and green light goes off.

Verify red light illuminates and green light goes off.

Verify red light illuminates and green light goes off.

COMMENTS:

STEP 2: Step 2.4 CRITICAL STEP Position:

___ SAT

  • Open 1LP-4 (Return Manual Block). (A-61)

STANDARD: Dispatch an NEO to open 1LP-4.

___ UNSAT Booth Cue: Open 1LP-4 by using the Valve program and using time compression inform the candidate that 1LP-4 is open.

COMMENTS:

CRO-414 fnl - d Page 6 of 11 STEP 3: Step 2.5 CRITICAL STEP Ensure:

___ SAT

  • Close 1LP-73 (1B LPI Cooler Switchover Disch Block). (A-1-108)
  • Close 1LP-74 (B Clr Disch Blk To A Pmp). (A-61)
  • Close 1LP-75 (1B LPI Cooler Disch Block To 1C LPI Pump). (A-61) ___ UNSAT STANDARD: Dispatch an NEO to CLOSE:
  • 1LP-73 (1B LPI Cooler Switchover Disch Block). (A-1-108)
  • 1LP-74 (B Clr Disch Blk To A Pmp). (A-61)

Booth cue: CLOSE 1LP-73, 1LP-74, and 1LP-75 by using the Valve program and using time compression inform the candidate that the valves are CLOSED.

COMMENTS:

STEP 4: Step 2.6 CRITICAL STEP Close 1LP-14 (1B LPI Cooler Outlet)

___ SAT STANDARD: CLOSE 1LP-14 it by placing the switch in the close position and observe green closed light lit.

___ UNSAT Note: Valve has a long stroke time (1:50 sec)

COMMENTS:

STEP 5: Step 2.7 Record 1A LPI cooler outlet temperature ________°F.

___ SAT STANDARD: Locate the 1A LPI cooler outlet temperature indicator on 1UB2 and record 1A LPI cooler outlet temperature on the procedure.

___ UNSAT COMMENTS:

CRO-414 fnl - d Page 7 of 11 STEP 6: Step 2.8 Ensure open 1LP-9 (1C LPIP DISCH TO 1A LPI HDR).

___ SAT STANDARD: Determine 1LP-9 located on 1UB2 is OPEN by verifying the red OPEN light illuminated.

___ UNSAT COMMENTS:

STEP 7: Step 2.9 CRITICAL STEP Open 1LP-10 (1C LPIP DISCH TO 1B LPI HDR).

___ SAT STANDARD: Open 1LP-10 located on 1UB2 by taking the switch to the OPEN position and verifying the red OPEN light illuminates and the green CLOSE light goes out. ___ UNSAT COMMENTS:

STEP 8: Step 2.10 CRITICAL STEP Open 1LP-14 (1B LPI COOLER OUTLET).

___ SAT STANDARD: Open 1LP-14 located on 1UB2 by taking the switch to the OPEN position and verifying the red OPEN light illuminates and the green CLOSE light goes out. ___ UNSAT Note: Valve has a long stroke time (1:50 sec)

COMMENTS:

CRO-414 fnl - d Page 8 of 11 NOTE: Do NOT exceed 6000 gpm LPSW flow per cooler.

___ SAT STEP 9: Step 2.11 Adjust LPSW flow to 1B LPI Coolers per Enclosure 4.44 "Controlling LPI Cooler Outlet Temperature" to match 1B DH Cooler outlet temperature to 1A DH Cooler outlet temperature. ___ UNSAT STANDARD: Refer to Enclosure 4.44 "Controlling LPI Cooler Outlet Temperature".

COMMENTS:

STEP 10: Enclosure 4.44 Step 1.1 IF RCS Cooldown in progress, review Section 3.

___ SAT STANDARD: Candidate reviews section 3.

COMMENTS: ___ UNSAT STEP 11: Enclosure 4.44 Step 1.2 IF RCS Heatup in progress, review Section 4.

___ SAT STANDARD: Determine step does not apply and N/A step.

COMMENTS: ___ UNSAT

CRO-414 fnl - d Page 9 of 11 NOTE:

If in LPI is in SERIES MODE, LPSW flow should be established to both LPI coolers The following steps may be performed as many times as required. ___ SAT This enclosure can be performed in any sequence or any order.

The preference of use for LPSW is as follows:

-1LPSW-251 and/or 1LPSW-252 in automatic (Step 2.1 and/or Step 2.5). ___ UNSAT

-1LPSW-251 and/or 1LPSW-252 in manual (Step 2.2 and/or Step 2.6).

-1LPSW-4 and/or 1LPSW-5 (Step 2.3 and/or Step 2.7).

LPSW Leakage Accumulator level is a function of LPSW System pressure. When LPSW flow to LPI Coolers is significantly changed, LPSW Leakage Accumulator level will increase and may exceed the limits of SR 3.7.7.1 until LPSW system pressure stabilizes.

As a result, momentary entry into TS 3.7.7 may be necessary.

STEP 12: Enclosure 4.44 Steps 2.1 - 2.4 LPSW to 1A LPI Cooler STANDARD: Candidate should determine that these steps do NOT apply and continue to Step 2.5.

COMMENTS:

STEP 12: Enclosure 4.44 Step 2.5 CRITICAL STEP IF 1LPSW-252 (1B LPI COOLER LPSW CONTROL) is in "AUTO",

position 1LPSW-252 Controller Setpoint as required. ___ SAT STANDARD: Adjust LPSW flow to 1B LPI Coolers by positioning 1LPSW-252 Controller Setpoint so that 1B DH Cooler outlet temperature is approaching 1A DH Cooler outlet temperature (Temperature as noted at ___ UNSAT step 2.7).

COMMENTS:

END TASK STOP TIME: ____________

CRO-414 fnl - d Page 10 of 11 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 1 Step is required to provide the correct flow path.

2 Step is required to provide the correct flow path.

3 Step is required to provide the correct flow path.

4 Step is required to provide the correct flow path.

7 Step is required to provide the correct flow path.

8 Step is required to provide the correct flow path.

12 Step is required to ensure proper thermal transition to 1B LPI Cooler.

Note: All valves on the valve lineup may not be needed to successfully complete the task.

d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 shutdown in progress INITIATING CUES:

The CRS directs you to perform OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2.3.

ALL associated White tags have been removed.

CRO-508 fnl - e Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-508 ES Channels 5 and 6 Recovery CANDIDATE EXAMINER

CRO-508 fnl - e Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

ES Channels 5 and 6 Recovery Alternate Path:

No Facility JPM #:

New K/A Rating(s):

System: 103 K/A: A4.04 Rating: 3.5*/3.5*

Task Standard:

ES Channels 5 and 6 are returned to normal using EOP Enclosure 5.41 (ES Recovery).

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____

References:

EOP Encl. 5.41 (ES Recovery)

Validation Time: 10 minutes Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-508 fnl - e Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL Snap 216
2. IMPORT files for CRO-508
3. Go to RUN

CRO-508 fnl - e Page 4 of 9 Tools/Equipment/Procedures Needed:

EOP Encl. 5.41 (ES Recovery)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A MSLB has occurred.

ES Channels 1 - 6 have actuated on High RB pressure.

EOP Encl. 5.1 (ES Actuation) is complete ALL ES Channels are being reset EOP Encl. 5.41 (ES Recovery) is complete through step 40 INITIATING CUES:

The CRS directs you to continue in EOP Encl. 5.41 (ES Recovery) beginning at step 41.

CRO-508 fnl - e Page 5 of 9 START TIME: _______

STEP 1: Step 41 Verify reset of any of the following is desired: ___ SAT

  • ES Channel 5
  • ES Channel 6

___ UNSAT STANDARD: Determines, from Initiating Cue, that reset of ES Channels 5 and 6 is desired.

COMMENTS:

STEP 2: Step 42 Verify Stat Alarms have cleared:

___ SAT

STANDARD: Determine that all of the above statalarms on 1SA-7 are clear by observing that their respective window lights are NOT illuminated.

COMMENTS:

STEP 3: Step 43 CRTICAL STEP Perform the following to reset ES (1UB1):

___ SAT

  • Depress RESET for CH 5.
  • Depress RESET for CH 6.

___ UNSAT STANDARD: Candidate depresses the RESET pushbuttons for Channels 5 and 6 located on 1UB1 COMMENTS:

CRO-508 fnl - e Page 6 of 9 STEP 4: Step 44 Verify:

___ SAT

  • CH 5 TRIPPED light off
  • CH 6 TRIPPED light off

___ UNSAT STANDARD: Candidate locates ES Channels 5 and 6 and verifies that their respective lights are no longer lit/illuminated.

COMMENTS:

STEP 5: Step 45 Open:

___ SAT

___ UNSAT STANDARD: Candidate verifies 1CC-7 and 1CC-8 are OPEN by observing RED lights ON and GREEN lights OFF.

COMMENTS:

STEP 6: Step 46

___ SAT Ensure one CC pump is running in the ON position.

STANDARD: Candidate verifies only one CC pump is running.

___ UNSAT COMMENTS:

CRO-508 fnl - e Page 7 of 9 STEP 7: Step 47 Ensure one CC pump off and in AUTO.

___ SAT STANDARD: Candidate ensures the standby CC pump control switch is in the AUTO position. ___ UNSAT COMMENTS:

STEP 8: Step 48 CRTICAL STEP Position the following switches to LOW:

___ SAT

  • 1A RBCU
  • 1B RBCU
  • 1C RBCU

___ UNSAT STANDARD: Candidate places the speed control switches for RBCUs 1A, 1B, & 1C to the LOW position.

COMMENTS:

STEP 9: Step 49 CRTICAL STEP Depress the following PUSH TO RET TO NORMAL AFT ES RESET

___ SAT pushbuttons:

  • 1A RBCU ES RESET
  • 1B RBCU ES RESET
  • 1C RBCU ES RESET ___ UNSAT STANDARD: Candidate depresses the following PUSH TO RET TO NORMAL AFT ES RESET pushbuttons for RBCUs 1A, 1B, & 1C Examiners Cue: Another operator will continue with this procedure.

COMMENTS:

END TASK STOP TIME: ____________

CRO-508 fnl - e Page 8 of 9 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 This step is required to reset the ES channels 5 & 6 so the associated components can be re-aligned for normal operation.

8 This step is required to return the RBCUs to a normal alignment.

9 This step is required to return the RBCUs to a normal alignment.

e CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A MSLB has occurred.

ES Channels 1 - 6 have actuated on High RB pressure.

EOP Encl. 5.1 (ES Actuation) is complete ALL ES Channels are being reset EOP Encl. 5.41 (ES Recovery) is complete through step 40 INITIATING CUES:

The CRS directs you to continue in EOP Encl. 5.41 (ES Recovery) beginning at step 41.

CRO-606 fnl - f Page 1 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-606 Energize Main Feeder Busses From CT-5 CANDIDATE EXAMINER

CRO-606 fnl - f Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Energize Main Feeder Busses From CT-5 Alternate Path:

Yes Facility JPM #:

CRO-008 K/A Rating(s):

System: 055 K/A: EA2.03 Rating: 3.9/4.7 Task Standard:

Energize Main Feeder Busses from CT-5.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X___ In-Plant ______ Perform __X__ Simulate _____

References:

EOP, Encl 5.38 (Restoration of Power)

Validation Time: 15 minutes Time Critical: No

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-606 fnl - f Page 3 of 15 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL Snap 218
2. IMPORT Files for CRO-606
3. Place simulator in RUN

CRO-606 fnl - f Page 4 of 15 Tools/Equipment/Procedures Needed:

EOP, Encl 5.38 (Restoration of Power)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 experienced a unit trip followed by a lockout on CT-1.

Blackout tab of the EOP in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).

INITIATING CUES:

The CRS directs you to initiate Encl. 5.38, Restoration of Power, to regain power to the Main Feeder Buses.

CRO-606 fnl - f Page 5 of 15 START TIME: _______

STEP 1: Step 1 Verify power has been restored.

___ SAT STANDARD: Determine power has NOT been restored by observing MFB voltage on 1AB1. Perform RNO step.

Continue to Step 2

___ UNSAT COMMENTS:

STEP 2: Step 1 RNO GO TO Step 3.

___ SAT STANDARD: GO TO Step 3.

COMMENTS:

___ UNSAT STEP 3: Step 3 CRITICAL STEP Place 1HP-31 in HAND and reduce demand to 0.

___ SAT STANDARD: Place 1HP-31 in HAND and reduce demand to 0 using the toggle switch.

Located on 1UB1.

Continue to Step 4

___ UNSAT COMMENTS:

STEP 4: Step 4 Close 1HP-21.

___ SAT STANDARD: Close 1HP-21 by rotating the switch to the closed position on 1UB2.

Continue to Step 5 COMMENTS: ___ UNSAT

CRO-606 fnl - f Page 6 of 15 STEP 5: Step 5 Verify any of the following energized:

  • MFB2 STANDARD: Observes that zero (0) volts are indicated on both MFBs meters located on 1AB1. ___ UNSAT Continue to Step 5 RNO COMMENTS:

STEP 6: Step 5 RNO GO TO Step 8.

___ SAT STANDARD: GO TO Step 8.

COMMENTS: ___ UNSAT STEP 7: Step 8 Verify CT-1 indicates 4160 volts.

___ SAT STANDARD: Observes that zero (0) volts is indicated on CT-1 on 1AB1.

Continue to Step 8 RNO COMMENTS: ___ UNSAT STEP 8: Step 8 RNO GO TO Step 18.

___ SAT STANDARD: GO TO Step 18.

COMMENTS: ___ UNSAT STEP 9: Step 18 Verify both Standby Bus #1 and Standby Bus #2 are de-energized.

___ SAT STANDARD: Observes that zero (0) volts is indicated both Standby Buses located on 2AB3.

Continue to Step 19

___ UNSAT COMMENTS:

CRO-606 fnl - f Page 7 of 15 STEP 10: Step 19 Verify all Keowee units operating.

___ SAT STANDARD: Determine that Keowee Unit 2 is Emergency Lockout by observing the Statalarm 2SA-18/A1.

Continue to Step 19 RNO

___ UNSAT COMMENTS:

STEP 11: Step 19 RNO

1. Emergency start Keowee units:

___ SAT

  • KEOWEE EMER START CHANNEL A
  • KEOWEE EMER START CHANNEL B
2. IF NO Keowee units are operating, ___ UNSAT THEN GO TO Step 38.

STANDARD: Place the KEOWEE EMER START CHANNEL A and B switches to start located on 1UB1.

COMMENTS:

STEP 12: Step 20 Verify both Keowee units in Oconee Control (statalarms on):

___ SAT

  • UNIT 1 OCONEE CONTROL (2SA-17/E-1)
  • UNIT 2 OCONEE CONTROL (2SA-18/E-1)

___ UNSAT STANDARD: Determine neither Statalarm above is actuated.

Continue to Step 20 RNO COMMENTS:

STEP 13: Step 20 RNO Notify Keowee Operator to place both Keowee units Master Transfer

___ SAT switches to remote.

STANDARD: Call the Keowee Operator and ask that both Keowee units Master Transfer switches be place to remote.

___ UNSAT Continue to Step 21 COMMENTS:

CRO-606 fnl - f Page 8 of 15 STEP 14: Step 21 Verify both Keowee units operating.

___ SAT STANDARD: Determine that only KHU 1 is operating.

Continue to Step 21 RNO

___ UNSAT COMMENTS:

STEP 15: Step 21 RNO

1. IF UNIT 1 EMER FDR ACB 3 is closed, AND Unit 1 Keowee is NOT

___ SAT operating, THEN open UNIT 1 EMER FDR ACB 3.

2. IF UNIT 2 EMER FDR ACB 4 is closed, AND Unit 2 Keowee is NOT operating, THEN open UNIT 2 EMER FDR ACB 4.

___ UNSAT STANDARD: Determine that BOTH ACB-3 and ACB-4 are OPEN, Continue to Step 22 COMMENTS:

ALTERNATE PATH STEP 16: Step 22 ___ SAT Ensure one of the following is closed for an operating Keowee unit:

Unit 1 Unit 2 ___ UNSAT UNIT 1 UNIT 1 EMER FDR EMER FDR ACB-3 ACB-4 STANDARD: Attempt to close ACB-3 and determine it did NOT close.

Continues to step 23 COMMENTS:

STEP 17: Step 23 Verify 4160 volt power has been restored to the MFB.

___ SAT STANDARD: Determine 4160 volt power has NOT been restored to the MFB by observing the U-1 FDR BUS VOLTS meters on 1AB1.

Continue to step 23 RNO

___ UNSAT COMMENTS:

CRO-606 fnl - f Page 9 of 15 STEP 18: Step 23 RNO GO TO Step 25

___ SAT STANDARD: GO TO Step 25 COMMENTS: ___ UNSAT STEP 19: Step 25 Verify CT-4 indicates 4160 volts.

___ SAT STANDARD: Determine CT-4 indicates zero volts on meter located on 1AB3.

Continue to Step 25 RNO

___ UNSAT COMMENTS:

STEP 20: Step 25 RNO GO TO Step 38.

___ SAT STANDARD: GO TO Step 38.

___ UNSAT COMMENTS:

STEP 21: Step 38 IAAT CT-5 indicates 4160 volts,

___ SAT THEN GO TO Step 55.

STANDARD: Determine that approximately 4160 volts is indicated on the CT-5 voltage meter located on 1AB1 and then GO TO Step 55 ___ UNSAT COMMENTS:

CRO-606 fnl - f Page 10 of 15 STEP 22: Step 55 CRITICAL STEP Place the following switches in MAN:

___ SAT

  • MFB1 AUTO/MAN
  • MFB2 AUTO/MAN
  • STANDBY 1 AUTO/MAN ___ UNSAT
  • STANDBY 2 AUTO/MAN STANDARD: Rotates the AUTO/MAN selector switch to the MANUAL position for each of the switches listed above.

Continue to Step 56 Examiner note: Various Statalarms will actuate as these switches are manipulated.

They are expected.

COMMENTS:

STEP 23: Step 56 Open the following breakers:

___ SAT

  • N11 MFB1 NORMAL FDR
  • N21 MFB2 NORMAL FDR
  • E11 MFB1 STARTUP FDR ___ UNSAT
  • E21 MFB2 STARTUP FDR STANDARD: Verify each of the above breakers is OPEN by observing the white breaker open light is LIT on 1AB1.

Continue to Step 57 COMMENTS:

STEP 24: Step 57 *CRITICAL STEP Place the following switches in MAN:

___ SAT

  • *CT4 BUS 1 AUTO/MAN
  • *CT4 BUS 2 AUTO/MAN
  • CT5 BUS 1 AUTO/MAN ___ UNSAT
  • CT5 BUS 2 AUTO/MAN STANDARD: Rotates the AUTO/MAN selector switch to the MANUAL position for each of the switches listed above located on 2AB3.

Continue to Step 58 COMMENTS:

CRO-606 fnl - f Page 11 of 15 STEP 25: Step 58 Open the following breakers:

___ SAT

  • SK1 CT4 STBY BUS 1 FEEDER
  • SK2 CT4 STDY BUS 2 FEEDER

___ UNSAT STANDARD: Verify each of the above breakers is OPEN by observing the white breaker open light is LIT on 2AB3.

Continue to Step 59 COMMENTS:

STEP 26: Step 59 CRITICAL STEP Close the following breakers:

___ SAT

  • SL1 CT5 STBY BUS 1 FEEDER
  • SL2 CT5 STBY BUS 2 FEEDER

___ UNSAT STANDARD: Go to the CLOSED position for each of the switches listed above located on 1AB3..

Continue to Step 60 COMMENTS:

STEP 27: Step 60 CRITICAL STEP Place the following switches in AUTO:

___ SAT

  • CT5 BUS 1 AUTO/MAN
  • CT5 BUS 2 AUTO/MAN

___ UNSAT STANDARD: Rotates the AUTO/MAN selector switch to the AUTO position for each of the switches listed above.

Continue to Step 61 COMMENTS:

CRO-606 fnl - f Page 12 of 15 STEP 28: Step 61 Verify Standby Bus #1 energized.

___ SAT STANDARD: Observes that 4160 volts are indicated for Standby Bus #1 located on 2AB3.

Continue to Step 62 ___ UNSAT COMMENTS:

STEP 29: Step 62 Notify CR SRO in each unit where a blackout exists that Standby Bus #1 is energized. ___ SAT STANDARD: Notifies CR SRO that Standby Bus #1 is energized located on 2AB3.

Continue to Step 63

___ UNSAT Cue: If asked, inform candidate that only Unit 1 is affected.

COMMENTS:

STEP 30: Step 63 CRITICAL STEP Close the following breakers:

___ SAT

  • S11 STBY BUS 1 TO MFB1
  • S21 STBY BUS 2 TO MFB2

___ UNSAT STANDARD: Goes to the CLOSED position for each of the switches listed above.

Continue to Step 64 Note: Only 1 of the Stby Busses must be energized to restore power to MFBs.

COMMENTS:

STEP 31: Step 64 Verify any of the following energized:

___ SAT

  • 1TC
  • 1TD
  • 1TE ___ UNSAT STANDARD: Observes that 4160 volts indicated on either MFB voltmeters or OAC.

Continue to Step 65 COMMENTS:

CRO-606 fnl - f Page 13 of 15 STEP 32: Step 65 Notify Unit 1 CR SRO of status of 4160V SWGR.

___ SAT STANDARD: Notifies CR SRO of status of 4160V SWGR

___ UNSAT COMMENTS:

END TASK STOP TIME: ____________

CRO-606 fnl - f Page 14 of 15 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 Step is required to protect the RCP seals.

22 Step is required to satisfy power switching logic.

24 Step is required to satisfy power switching logic.

26 Step is required to energize the Main Feeder Bus.

27 Step is required to provide undervoltage protection.

30 Step is required to energize the Main Feeder Bus.

f CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 experienced a unit trip followed by a lockout on CT-1.

Blackout tab of the EOP in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).

INITIATING CUES:

The CRS directs you to initiate Encl. 5.38, Restoration of Power, to regain power to the Main Feeder Buses.

CRO-607 fnl - j Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-607 Activate the SSF From the SSF Control Room CANDIDATE EXAMINER

CRO-607 fnl - j Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Activate The SSF From the SSF Control Room Alternate Path:

No Facility JPM #:

CRO-047 K/A Rating(s):

System: 062 K/A: A2.11 Rating: 3.7/4.1 Task Standard:

Power is swapped and the SSF D/G is emergency started. Flow is established to the RCP seals using the SSF-RCMU system. Flow is established to the SGs using the SSF ASW system.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _____ In-Plant __X ___ Perform _____ Simulate __X__

References:

AP/0/A/1700/25 Validation Time: 12 minutes Time Critical: YES

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

CRO-607 fnl - j Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS:

1. None

CRO-607 fnl - j Page 4 of 14 Tools/Equipment/Procedures Needed:

AP/0/A/1700/025 (SSF EOP)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 3 was operating at 100% power Unit 3 TD EFDWP is out of service Tornado warnings are in affect AP/0/A/1700/006 (Natural Disaster) in progress You are pre-staged in the SSF Control Room and in communication with the Unit 3 Control Room as directed by AP/0/A/1700/006 (Natural Disaster).

Unit 3 Reactor has just tripped and the unit has experienced a complete loss of all AC power AP/0/A/1700/025 (SSF EOP) has been initiated INITIATING CUES:

The CRS calls and informs you of the following:

  • Unit 3 has lost all AC power
  • SSF RCMU feed and SSF ASW feed to the SGs are required
  • The breaker transfers have NOT been performed
  • Begin AP/25 actions starting at Step 4.5 THIS JPM IS TIME CRITICAL

CRO-607 fnl - j Page 5 of 14 START TIME: _______

TIME CRITICAL TIME STARTS ________ CRITICAL STEP

___ SAT STEP 1: Step 4.5 Perform the following on the affected unit:

  • Open 3XSF-F5A (3XSF NORM FDR BKR FROM 3X8) and remove Kirk Key ___ UNSAT
  • Using Kirk Key, close 1, 2, 3XSF-F3A (1, 2, 3XSF EMERG FDR BKR FROM OXSF)

STANDARD: Student: Locates and opens NORMAL FDR BKR FROM 1, 2, 3X8 is by rotating breaker switch to the OFF position and removes the Kirk Key.

Student locates EMERG FDR BKR FROM OXSF inserts the Kirk Key and closed the breaker by rotating breaker switch to the ON position.

Continues to Step 4.6 Cue: As operator performs the key/breaker operation, indicate to operator the appropriate component positions.

NOTE: Kirk Key must be rotated 1/2 turn to be removed.

COMMENTS:

STEP 2: Step 4.6 Verify SSF D/G is operating

___ SAT STANDARD: Determines the D/G is not operating and continues to step 4.6 RNO (GOTO to Step 4.8)

___ UNSAT Continues to step 4.8 COMMENTS:

CRO-607 fnl - j Page 6 of 14 STEP 3: Step 4.8 CRITICAL STEP Depress DIESEL EMERGENCY START push button.

___ SAT STANDARD The SSF Control Room DIESEL EMERGENCY START pushbutton is pressed.

___ UNSAT Continues to Step 4.9 Cue: Allow 12 sec for the D/G to reach rated speed.

COMMENTS:

STEP 4: Step 4.9 Verify SSF D/G operating.

___ SAT STANDARD: Candidate reports by indications and sound that D/G is operating.

Continues to Step 4.10

___ UNSAT COMMENTS:

STEP 5: Step 4.10 Open breaker OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T). ___ SAT STANDARD: The green TRIP pushbutton on the SSF OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T) control switch is pressed. ___ UNSAT Continues to Step 4.11 Cue: Inform student that the green light for OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T) is on and the red light is off.

COMMENTS:

CRO-607 fnl - j Page 7 of 14 STEP 6: Step 4.11 Verify open OTS1-0 (SSF ALT. POWER SUPPLY BKR OTS1-0).

___ SAT STANDARD: Determine that OTS1-0 (SSF ALT. POWER SUPPLY BKR OTS1-0) is open by verify that the green open light is lit and the red closed light is off. ___ UNSAT Continues to Step 4.12 COMMENTS:

STEP 7: Step 4.12 WHEN 3 seconds have elapsed THEN continue.

___ SAT STANDARD: Wait three (3) seconds after OTS1-1 is opened and continue.

Continues to Step 4.13

___ UNSAT COMMENTS:

STEP 8: Step 4.13 CRITICAL STEP Close breaker OTS1-4 (DIESEL GEN BREAKER).

___ SAT STANDARD: The red CLOSE pushbutton on the SSF Control Room OTS1-4 (DIESEL GEN BREAKER) switch is depressed. ___ UNSAT Continues to Step 4.14 Cue: After student closes in diesel generator breaker, inform him/her that red light is on and green light is off.

COMMENTS:

CRO-607 fnl - j Page 8 of 14 STEP 9: Step 4.14 Verify Diesel Engine Service Water Pump operating.

___ SAT STANDARD: Determine that the Diesel Engine Service Water Pump operating by observing the red ON light lit.

Continues to Step 4.15 ___ UNSAT Cue: Indicate that the Diesel Engine Service Water Pump red light is on.

COMMENTS:

STEP 10: Step 4.15 CRITICAL STEP Start the SSF ASW Pump.

___ SAT STANDARD: SSF ASW PUMP red ON pushbutton is depressed.

Continues to Step 4.16

___ UNSAT Cue: After ASW pump ON pushbutton is pressed, inform student of the following:

  • ASW pump red light is on and green light is off.
  • SSF Control Room AUX SER WTR PUMP AMPS meter indicates on scale.

COMMENTS:

STEP 11: Step 4.16 Verify any of the following required:

___ SAT

  • SSF RCMU feed
  • SSF ASW feed to SGs

___ UNSAT STANDARD: Determine that SSF RCMU and SSF ASW are still required.

Continues to Step 4.17 COMMENTS:

CRO-607 fnl - j Page 9 of 14 STEP 12: Step 4.17 PERFORM the following on all affected units:

___ SAT

  • Encl 5.1A (Emergency Operation of SSF Systems Unit 1) (PS)
  • Encl 5.1B (Emergency Operation of SSF Systems Unit 2) (PS)
  • Encl 5.1C (Emergency Operation of SSF Systems Unit 3) (PS) ___ UNSAT STANDARD: Obtains Control room copy of Encl 5.1C (Emergency Operation of SSF Systems Unit 3).

Continues to Step 1 of Encl 5.1C.

COMMENTS:

STEP 13: Step 1 Verify SSF RCMU is required for Unit 3.

___ SAT STANDARD: Determine that SSF RCMU is required for Unit 3.

Continues to step 3. ___ UNSAT COMMENTS:

STEP 14: Step 2. CRITICAL STEP Position OVERRIDE RC MAKEUP PUMP switch to START.

___ SAT STANDARD: OVERRIDE RC MAKEUP PUMP switch is rotated to the START position.

Continues to step 3.

___ UNSAT NOTE: Allow 9 seconds for the following valves to stroke from the time the OVERRIDE switch is operated, and then as soon as the 9 second stroke time is complete the time-critical time #1 is complete.

CRITICAL TIME #1 _________ 20 minutes COMMENTS:

CRO-607 fnl - j Page 10 of 14 STEP 15: Step 3 CRITICAL STEP Select CLOSE for the following valves:

___ SAT

___ UNSAT STANDARD: Student: Presses the green CLOSE button for the following:

  • 3HP-4 Continues to step 6.

Cue: Initial indication for valve position is red light is on and green light is off for all valves. During valve travel, both the red and green lights are on.

COMMENTS:

STEP 16: Step 4 Verify SSF ASW is required to feed Unit 3 SGs.

___ SAT STANDARD: Determine that SSF ASW is required to feed Unit 3 SGs.

Continues to step 5.

___ UNSAT COMMENTS:

CRO-607 fnl - j Page 11 of 14 STEP 17: Step 5 CRITICAL STEP Open the following valves:

___ SAT

___ UNSAT STANDARD: Red OPEN button is pressed for 3CCW-287.

Red OPEN button is pressed and held (throttle valve) for 3CCW-269 Continues to Step 6 Cue: After allowing 25 seconds for valve stroke time, inform the student the Red light is ON and the Green light is OFF.

Cue: After allowing 12 seconds for valve stroke time inform student the Green light is OFF and the Red light is ON.

COMMENTS:

NOTE CRITICAL STEP

  • For high decay heat cores, aggressive feeding up to a maximum of 425 gpm may be required. ___ SAT
  • For very low decay heat cores, no feeding may be required.
  • SSF ASW flow gauge has a 60 gpm low flow cut off.

___ UNSAT STEP 18: Step 6 IAAT RCS pressure is NOT within 1950 - 2250 psig, THEN throttle 3CCW-268, as necessary, to maintain RCS pressure 1950

- 2250 psig.

STANDARD: ASW Pump to SG Supply, 3CCW-268, is THROTTLED OPEN and RCS pressure is monitored.

Continues to Step 7 Cue: Indicate that RCS pressure is 2375 psig Cue: After allowing 14 sec for valve stroke time, indicate to operator that ASW flow is 400 gpm and RCS pressure is 2235 slowly decreasing.

CRITICAL TIME #2 __________ 14 minutes COMMENTS:

CRO-607 fnl - j Page 12 of 14 STEP 19: Step 7 WHEN RCS pressure 2350 psig,

___ SAT THEN select CLOSE on 3RC-4.

STANDARD: Determine that RCS pressure is < 2350 and select CLOSE on 3RC-4.

___ UNSAT Cue: Indicate that RCS pressure is 2330 psig Cue: When 3RC-4 has been closed, inform the candidate that another operator will complete this procedure.

COMMENTS:

END TASK STOP TIME: ____________

CRO-607 fnl - j Page 13 of 14 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 1 Must be performed to power the SSF from the Diesel/Generator.

3 Must be performed to start the diesel and get power for the SSF.

8 Necessary to power the SSF loads.

10 Starts the SSF ASWP 14 Starts the SSF RCMU pump (TCA 20 minutes) 15 Necessary to achieve RCS pressure control.

17 Necessary to lineup the SSF ASW to supply the SGs.

18 Necessary to lineup the SSF ASW to supply the SGs. (TCA 14 minutes)

j CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 3 was operating at 100% power Unit 3 TD EFDWP is out of service Tornado warnings are in affect AP/0/A/1700/006 (Natural Disaster) in progress You are pre-staged in the SSF Control Room and in communication with the Unit 3 Control Room as directed by AP/0/A/1700/006 (Natural Disaster).

Unit 3 Reactor has just tripped and the unit has experienced a complete loss of all AC power AP/0/A/1700/025 (SSF EOP) has been initiated INITIATING CUES:

The CRS calls and informs you of the following:

  • Unit 3 has lost all AC power
  • SSF RCMU feed and SSF ASW feed to the SGs are required
  • The breaker transfers have NOT been performed
  • Begin AP/25 actions starting at Step 4.5 THIS JPM IS TIME CRITICAL

CRO-803 R0 - g Page 1 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-803 Perform Required Actions For A Turbine Building Flood CANDIDATE EXAMINER

CRO-803 R0 - g Page 2 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Perform Required Actions For A Turbine Building Flood Alternate Path:

Yes Facility JPM #:

CRO-060 K/A Rating(s):

System: APE BW/A07 K/A: AA1.3 Rating: 3.3/3.5 Task Standard:

Perform required actions for a Turbine Building Flood in accordance with AP/10, Uncontrollable Flooding of Turbine Building Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____

References:

AP/10, Uncontrollable Flooding of Turbine Building Validation Time: 15 minutes Time Critical: NO

=========================================================================

Candidate: ______________________________________ Time Start: _____________

NAME Time Finish: ____________

Performance Rating: SAT ______ UNSAT ______ Performance Time _______

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

=========================================================================

COMMENTS

CRO-803 R0 - g Page 3 of 13 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL Snap 219
2. IMPORT files for CRO-803
3. Go to RUN

CRO-803 R0 - g Page 4 of 13 Tools/Equipment/Procedures Needed:

AP/10, Uncontrollable Flooding of Turbine Building READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 was operating at 100% power Unit 2 is in cold shutdown.

The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water level is rising.

Unit 1 has been tripped and the EOP is being completed by other team members.

INITIATING CUES:

The CRS directs you to refer to Unit 1 AP/10, Uncontrollable Flooding of Turbine Building, and perform required actions.

CRO-803 R0 - g Page 5 of 13 START TIME: _______

STEP 1: Step 4.1 Trip the Rx.

___ SAT STANDARD: Depress the Rx trip pushbutton on 1UB1. Verify the RX is tripped by observing all control rods are inserted.

___ UNSAT Continue to Step 4.2.

COMMENTS:

NOTE CRITICAL STEP Tripping the CCW pumps will cause loss of condenser vacuum which will result in TBVs failing closed and trip of the MFDWPs. ___ SAT STEP 2: Step 4.2 Ensure all CCW pumps are shutdown. ___ UNSAT STANDARD: The 1A, 1B, and 1C CCW pump switches are rotated to the TRIP position and verify the red close lights extinguish and the white open lights illuminate. (located on 1AB3)

Continue to Step 4.3.

COMMENTS:

CRO-803 R0 - g Page 6 of 13 STEP 3: Step 4.3 CRITICAL STEP Press both of the following on the TURB BLDG FLOOD EMER CLOSING ALL CCWP DISCH VALVES control switch: ___ SAT

  • CLOSE 1
  • CLOSE 2

___ UNSAT STANDARD: "CLOSE 1" and "CLOSE 2" on the TURB BLDG FLOOD EMER CLOSING ALL CCWP DISCH VALVES control switch are both depressed. (located on 1AB3)

Continue to Step 4.4.

COMMENTS:

STEP 4: Step 4.4 Verify all CCW pump discharge valves are closed.

___ SAT STANDARD: The green CLOSED lights for 1CCW-10, 11, and 13 are verified illuminated and the red OPEN lights for the same valves are verified extinguished. (located on 1AB3) ___ UNSAT Determine that 1CCW-12 is NOT closed by observing the red open light is lit on 1AB3.

Continue to Step 4.4 RNO.

COMMENTS:

CRO-803 R0 - g Page 7 of 13 ALTERNATE PATH NOTE The control switches for the CCW pump discharge valves do not seal-in. The valves act ___ SAT as throttle valves unless the associated CCW pump switch is in the TRIP position.

STEP 5: Step 4.4 RNO

___ UNSAT Dispatch an operator to ensure all CCW pump discharge valves are closed (Equipment Rm):

STANDARD: An operator is dispatched to the Equipment Room to ensure 1CCW-12 is closed.

Continue to Step 4.5.

Booth cue: After 2 minutes call as the NEO and inform candidate that 1CCW-12 will NOT close.

COMMENTS:

NOTE Field tasks that may affect multiple units should be coordinated with Unit 2 and Unit 3.

___ SAT STEP 6: Step 4.5 Dispatch operators to ensure all three flood doors are closed and in the SECURED position from the AB side (A-1, at Unit 1, 2, and 3 stairwell ___ UNSAT entrances to TB): {2}

  • Unit 1 Flood Door
  • Unit 2 Flood Door
  • Unit 3 Flood Door STANDARD: Dispatch an NEO to ensure all three flood doors are closed and in the SECURED position from the AB side.

Continue to Step 4.6.

Booth cue: When called, inform candidate that an operator has been dispatched.

COMMENTS:

CRO-803 R0 - g Page 8 of 13 STEP 7: Step 4.6 Verify LPI decay heat removal is in progress.

___ SAT STANDARD: Determine LPI pumps are NOT operating by observing pumps switch indications on 1UB2.

___ UNSAT Continue to Step 4.6 RNO GO TO Step 4.8.

COMMENTS:

STEP 8: Step 4.8 Dispatch an operator to position the waterbox discharge valve switches (T-3, East of condenser catwalk): ___ SAT

  • 1CCW-20 (1A1) switch to CLOSE ___ UNSAT
  • 1CCW-25 (1C2) switch to CLOSE STANDARD: Candidate should dispatch an operator to place the above valves to HAND and CLOSE.

Continue to Step 4.9.

Booth Cue: When called, inform candidate that an operator has been dispatched.

COMMENTS:

CRO-803 R0 - g Page 9 of 13 STEP 9: Step 4.9 Make a PA announcement of the event including restrictions on entry into TB basement due to electrical hazard. ___ SAT STANDARD: PA announcement is made using the Control Room phone.

___ UNSAT Continue to Step 4.10.

COMMENTS:

STEP 10: Step 4.10 Begin attempts to locate and isolate the source of the flooding.

___ SAT STANDARD: Dispatch operators to locate and isolate the source of the flooding.

Continue to Step 4.11. ___ UNSAT Booth Cue: When called, inform candidate that an operator has been dispatched.

COMMENTS:

STEP 11: Step 4.11 Ensure all Unit 1 ESV pumps are shutdown:

___ SAT

  • 1A ESV Pump
  • 1C ESV Pump
  • 1B ESV Pump ___ UNSAT STANDARD: Stop ALL Unit 1 ESV pumps by rotating their pumps switches to stop and verify that the red on light extinguishes and the white open light illuminates. (located on 1AB3)

Continue to Step 4.12.

COMMENTS:

CRO-803 R0 - g Page 10 of 13 ALTERNATE PATH STEP 12: Step 4.12 Verify all CCW pump discharge valves were successfully closed in ___ SAT earlier steps.

STANDARD: Verify that 1CCW-10, 11, and 13 are closed by observing that the green ___ UNSAT closed light is lit for each valve. (located on 1AB3)

Determine that 1CCW-12 is still open by observing red open indication light is lit on 1AB3 or observing open indication on the OAC.

Continue to Step 4.12 RNO.

COMMENTS:

CRITICAL STEP STEP 13: Step 4.12 RNO Dispatch an operator to perform the following (ESV Trench, Intake): ___ SAT

  • Remove pipe cap at 1CCW-26 (CCW Inlet High Point Vent). {4}

___ UNSAT

  • Remove pipe cap at 1CCW-28 (CCW Inlet High Point Vent). {4}

STANDARD: Candidate should dispatch an operator to position the above valves as directed.

Continue to Step 4.13 Booth Cue: When called, inform candidate that an operator has been dispatched.

COMMENTS:

CRO-803 R0 - g Page 11 of 13 STEP 14: Step 4.13 Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW Pumps).

___ SAT STANDARD: Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW Pumps).

___ UNSAT Continue to Step 4.14.

Booth Cue: When called, inform candidate that an operator has been dispatched.

COMMENTS:

STEP 15 Step 4.14 IAAT HPSW is NOT available, THEN ensure Encl 5.31 (Temporarily Charging the HPSW System) of Unit 1 EOP has been initiated. ___ SAT STANDARD: Determine that HPSW is available by observing the HPSW Jockey pump operating and level in the EWST. ___ UNSAT Continue to Step 4.15.

COMMENTS:

STEP 16: Step 4.15 Coordinate with WCC/TSC to perform the following:

  • Recover damaged equipment. ___ SAT
  • Remove water from accessible sumps.

___ UNSAT STANDARD: Candidate should call the WCC/TSC and discuss the following:

  • Recover damaged equipment.
  • Remove water from accessible sumps.

Cue: Inform candidate that another RO will complete this procedure. This task is complete COMMENTS:

END TASK STOP TIME: ____________

CRO-803 R0 - g Page 12 of 13 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 2 Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement.

3 Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement.

13 Necessary to ensure CCW inlet piping is vented to break siphon.

g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 was operating at 100% power Unit 2 is in cold shutdown.

The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water level is rising.

Unit 1 has been tripped and the EOP is being completed by other team members.

INITIATING CUES:

The CRS directs you to refer to Unit 1 AP/10, Uncontrollable Flooding of Turbine Building, and perform required actions.

CRO-903 R0 - h Page 1 of 16 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-903 Release GWD Tank CANDIDATE EXAMINER

CRO-903 R0 - h Page 2 of 16 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Release GWD Tank Alternate Path:

Yes Facility JPM #:

CRO-903 K/A Rating(s):

System: 071 K/A: A4.26 Rating: 3.1/3.9 Task Standard:

Release a GWD tank correctly using OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release) and terminate the release when unexpected results are noted.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____

References:

OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release)

Validation Time: 30 minutes Time Critical: NO

=========================================================================

Candidate: _______________________________________ Time Start: ________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time ______

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

=========================================================================

COMMENTS

CRO-903 R0 - h Page 3 of 16 SIMULATOR OPERATOR INSTRUCTIONS:

1. RECALL SNAP 201
2. Go to RUN

CRO-903 R0 - h Page 4 of 16 Tools/Equipment/Procedures Needed:

OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) & 4.10 (GWD Tank Sample Request)

PT/0/A/230/001 (Radiation Monitor Check)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Release of D GWD tank is desired No other GWRs in progress.

OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to step 3.9 INITIATING CUES:

CRS directs you to complete the release of the D GWD tank beginning at step 3.9 of Enclosure 4.9 (GWD Tank Release).

CRO-903 R0 - h Page 5 of 16 START TIME: _______

NOTE: If N2 was added to the most recently released GWD tank until 1RIA-37 indicated CRITICAL STEP

< 700 cpm, OR if the tanks' radioactivity was < 2.1E-05 Ci / ml when it was released, the GWD piping is considered "purged". ___ SAT STEP 1: Step 3.9 3.9 Adjust 1RIA-37 setpoints for release as follows: ___ UNSAT 3.9.1 Perform one of the following:

A. IF all of the following:

  • Calculated setpoints are < 1E+07 CPM
  • GWD piping purged {15}

set alarms as follows:

  • Set 1RIA-37 Alert setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1)
  • Set 1RIA-37 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1)

NOTE: If GWD piping NOT purged on most recent release, RP independently verifies release data and 1RIA-37 setpoint is set at zero to allow the tank to be released. {15}

B. IF any of the following:

  • Calculated setpoints are > 1E+07 CPM
  • GWD piping NOT purged {15}

over-ride 1RIA-37 setpoints as follows:

  • Set 1RIA-37 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
  • Set 1RIA-37 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).

STANDARD: Refer to PT/0/A/0230/001 (Radiation Monitor Check) Encl. 13.6 (1RIA-37 and 1RIA-38 Setpoints) and using the RIA Screen insert the calculated 1RIA-37 setpoint of 2.73 E5 CPM Continue to Step 3.10 COMMENTS:

CRO-903 R0 - h Page 6 of 16 STEP 2: Step 3.10 CRITICAL STEP 3.10 Adjust 1RIA-38 setpoints for release as follows:

3.10.1 Perform one of the following: ___ SAT A. IF calculated setpoints are < 1E+06 CPM AND 1RIA-38 operable, set alarms as follows:

  • Set 1RIA-38 Alert setpoint at _______________cpm per ___ UNSAT PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8)
  • Set 1RIA-38 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8)

NOTE: Due to type of radiation 1RIA-38 monitors, it is NOT sensitive enough to perform an adequate N2 purge.

B. IF calculated setpoints are > 1E+06 CPM OR 1RIA-38 out of service, over-ride 1RIA-38 setpoints as follows:

  • Set 1RIA-38 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
  • Set 1RIA-38 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).

STANDARD: Refer to PT/0/A/0230/001 (Radiation Monitor Check) Encl. 13.6 (1RIA-37 and 1RIA-38 Setpoints) and using the RIA Screen insert the calculated 1RIA-38 setpoint of 324 CPM.

Continue to Step 3.11 COMMENTS:

STEP 3: Step 3.11 Ensure GWR DISCHARGE FLOW CONTROL in "HAND".

___ SAT STANDARD: Ensure GWR DISCHARGE FLOW CONTROL in "HAND" located on 1AB3.

Continue to Step 3.12 ___ UNSAT COMMENTS:

CRO-903 R0 - h Page 7 of 16 STEP 4: Step 3.12 Verify GWR DISCHARGE FLOW CONTROL "CLOSED"

___ SAT STANDARD: Verify GWR DISCHARGE FLOW CONTROL CLOSED located on 1AB3.

Continue to Step 3.13

___ UNSAT COMMENTS:

STEP 5: Step 3.13 Remove "Purged / Not Purged" CR tag from GWR DISCHARGE FLOW CONTROL. ___ SAT STANDARD: Remove "Purged / Not Purged" CR tag from GWR DISCHARGE FLOW CONTROL located on 1AB3.

___ UNSAT Continue to Step 3.14 COMMENTS:

STEP 6: Step 3.14 Notify Unit 3 CR to perform the following:

  • Begin periodically monitoring all three Unit 3 GWD tanks to ___ SAT determine if pressure in any tank is decreasing unexpectedly. {12}
  • Place a note on turnover sheet "If 3RIA-45 alarms or GWD tank pressure in any tank is decreasing unexpectedly, notify Unit 1 CR to ___ UNSAT terminate GWD tank release".

STANDARD: Notify Unit 3 CR to begin periodically monitoring all three Unit 3 GWD tanks to determine if pressure in any tank is decreasing unexpectedly Notify Unit 3 CR to place above note on the turnover sheet Continue to Step 3.15 COMMENTS:

CRO-903 R0 - h Page 8 of 16 STEP 7: Step 3.15 Notify Unit 2 CR to place a note on turnover sheet "If 2RIA-45 alarms, notify Unit 1 CR to terminate GWD tank release". ___ SAT STANDARD: Notify Unit 2 CR to place above note on the turnover sheet.

Continue to Step 3.16 ___ UNSAT COMMENTS:

STEP 8: Step 3.16 Begin monitoring all four Unit 1 GWD tanks to determine if pressure in any tank is decreasing unexpectedly. ___ SAT STANDARD: Begin monitoring GWD tank pressures on chart recorder on 1VB2 or OAC.

___ UNSAT Continue to Step 3.17 COMMENTS:

STEP 9: Step 3.17 IF 1RIA-37 NOT in service AND the tank being released is 2.1E-05 Ci

/ ml, notify RP to prepare to survey GWD piping at 1RIA-37. {15} ___ SAT

________________________ _____

Person Notified Date STANDARD: Determine 1RIA-37 is in service and N/A step 3.17. ___ UNSAT Continue to Step 3.18 COMMENTS:

CRO-903 R0 - h Page 9 of 16 STEP 10: Step 3.18 IF AT ANY TIME any tank is decreasing unexpectedly, perform the following: ___ SAT 3.18.1 Close GWR DISCHARGE FLOW CONTROL.

3.18.2 Notify RP to initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences) due to potential unplanned ___ UNSAT radioactive effluent release.

________________________ _____

Person Notified Date 3.18.3 Go To Section 4 (GWR Termination).

STANDARD: Determine IAAT step is not met at this time.

Continue to Step 3.19 COMMENTS:

STEP 11: Step 3.19 IF AT ANY TIME desired to terminate release, perform the following:

3.19.1 Close GWR DISCHARGE FLOW CONTROL. ___ SAT 3.19.2 Go To Section 4 (GWR Termination).

STANDARD: Determine IAAT step is not met at this time. ___ UNSAT Continue to Step 3.20 COMMENTS:

CRO-903 R0 - h Page 10 of 16 STEP 12: Step 3.20 CRITICAL STEP Open GWD-100 (Decay Tanks Discharge Header Block). (A-2-209/E 13' N of Door) ___ SAT STANDARD: Dispatch NEO to Open GWD-100 (Decay Tanks Discharge Header Block). ___ UNSAT Continue to Step 3.21 Booth Note: GWD-100 is OPEN.

Cue: Inform candidate that GWD-100 is open.

COMMENTS:

STEP 13: Steps 3.21 - 3.23 IF releasing GWD Tank A, perform the following

___ SAT STANDARD: Determine NOT releasing GWD Tank A, B, and C and N/A steps 3.21, 3.22, and 3.23.

Continue to Step 3.24

___ UNSAT COMMENTS:

STEP 14: Step 3.24 CRITICAL STEP IF releasing GWD Tank D perform the following:

___ SAT

  • Open GWD-205 (Decay Tank 1D Discharge Block) (IRW Building)
  • Place GWD-207 (D INTERIM GWD TANK DISCH) switch to "OPEN"

___ UNSAT STANDARD: Dispatch NEO to open GWD-205 (Decay Tank 1D Discharge Block).

Cue: Inform candidate that GWD-205 is open.

Locate GWD-207 (D INTERIM GWD TANK DISCH) on 1AB3 and place switch to "OPEN" Continue to Step 3.25 COMMENTS:

CRO-903 R0 - h Page 11 of 16 NOTE: Station Limit release rates, per SLC 16.11, will NOT be exceeded if recommended release rates per Enclosure 4.10 (GWD Tank Sample Request) are followed.

___ SAT The following approval levels are required for releases: {10}{13}

All Station Releases in Progress (including this one) Required Level of Approval 1 GWR in progress through P/A/C filter at ___ UNSAT 1/3 Station Limit ( 30 day holdup) SRO 1 GWR in progress at 1/3 Station Limit

(< 30 day holdup OR released without P/A/C filter) OSM 1 GWR in progress at 2/3 Station Limit OSM 2 GWRs in progress at 1/3 Station Limit each OSM 3 GWRs in progress at 1/3 Station Limit each OSM STEP 15: Step 3.25 Circle Required Level of Approval above based on Release Conditions.

STANDARD: Circle SRO on enclosure.

Continue to Step 3.26 COMMENTS:

STEP 16: Step 3.26 Record approval granted for release:

___ SAT

________________________ _________ / _____

Approval Date Time STANDARD: Place approval name and date and time on enclosure. ___ UNSAT Continue to Step 3.27 Cue: Approval is granted for release by Tracy Lemons at current Date/Time.

COMMENTS:

CRO-903 R0 - h Page 12 of 16 STEP 17: Step 3.27 IF tank holdup < 30 days, perform the following STANDARD: Determine tank has been held up greater than 30 days and N/A steps ___ SAT 3.27.1 - 3.27.2.

Continue to Step 3.28

___ UNSAT COMMENTS:

STEP 18: Step 3.28 IF tank is released without processing through a P/A/C filter AND Projected 31 day average gaseous effluent organ dose > limit, perform ___ SAT the following STANDARD: Determine tank is being released through a P/A/C filter and N/A steps 3.28.1 - 3.28.4.

___ UNSAT Continue to Step 3.29 COMMENTS:

STEP 19: Step 3.29 Record recommended Release Rate from Enclosure 4.10 (GWD Tank Sample Request): ___ SAT

______________ cfm STANDARD: Record recommended Release Rate from Enclosure 4.10 (GWD Tank Sample Request): ___ UNSAT

__4.19 E4____ cfm Continue to Step 3.30 COMMENTS:

CRO-903 R0 - h Page 13 of 16 NOTE: With Unit 1 PRV system shutdown, RIA-32 sample point for '1 PRV System Filter Discharge' is sampling air in piping between Unit 1 PRV discharge and Unit Vent, NOT the general area {2} ___ SAT During or just after GWD Release RIA-32 counts may increase while selected to '1 PRV System Filter Discharge' causing 1SA-8/B-9 "Process Monitor Radiation High" to alarm.

___ UNSAT STEP 20: Step 3.30 Place the following note on Unit 1 Turnover sheet:

"Just after or during a GWD release, 1SA-8/B-9 may alarm from RIA-32 sample point selected to '1 PRV System Filter Discharge'. IF 1SA-8/B-9 is due to RIA '1 PRV System Filter Discharge', it can be considered an expected alarm".

STANDARD: Candidate should indicate that the above note will be placed on the turnover sheet.

Continue to Step 3.31 COMMENTS:

STEP 21: Step 3.31 CRITICAL STEP Adjust GWR DISCHARGE FLOW CONTROL to obtain desired release rate.

___ SAT STANDARD: Slowly adjust the manual loading knob to obtain the desired release rate.

Continue to Step 3.32

___ UNSAT Note: Actual release rate will be much less than the maximum flow rate allowed by the release permit. Flow is monitored on VB1 recorder 1MSCCR0001 COMMENTS:

CRO-903 R0 - h Page 14 of 16 ALTERNATE PATH STEP 22: Step 3.32 Record "Begin GWR # _________" in Unit Log. ___ SAT STANDARD: Candidate should indicate a Unit log entry would be made.

___ UNSAT Note: The B GWD tank will decrease instead of the D. The candidate should note this while monitoring the tank pressures and then perform IAAT Step 3.18.

Candidate may also perform the IAAT because he notes that a release is occurring but the D tank pressure is not decreasing. In both cases unexpected results were noted.

COMMENTS:

STEP 23: Step 3.18 *CRITICAL STEP IF AT ANY TIME any tank is decreasing unexpectedly, perform the following: ___ SAT 3.18.1 Close GWR DISCHARGE FLOW CONTROL.

3.18.2 Notify RP to initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences) due to potential unplanned ___ UNSAT radioactive effluent release.

________________________ _____

Person Notified Date 3.18.3 Go To Section 4 (GWR Termination).

STANDARD: Determine IAAT step is met because the B GWD Tank pressure is decreasing.

  • Close GWR DISCHARGE FLOW CONTROL.

Notify RP initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences)

Go To Section 4 (GWR Termination).

Cue: Another operator will complete this procedure.

COMMENTS:

END TASK STOP TIME: ____________

CRO-903 R0 - h Page 15 of 16 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 1 Required to set RIA to prevent station release above limits.

2 Required to set RIA to prevent station release above limits.

12 Required to align release flow path.

14 Required to align release flow path.

21 Required to align release flow path.

23 Required to stop the release of the wrong tank.

h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Release of D GWD tank is desired No other GWRs in progress.

OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to step 3.9 INITIATING CUES:

CRS directs you to complete the release of the D GWD tank beginning at step 3.9 of Enclosure 4.9 (GWD Tank Release).

NLO-400 fnl - i Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-400 Station ASW Pump Alignment CANDIDATE EXAMINER

NLO-400 fnl - i Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Align and start the Station ASW Pump Alternate Path:

No Facility JPM #:

NLO-017 K/A Rating(s):

System: B/WE04 K/A: EA1.1 Rating: 4.4/4.2 Task Standard:

Perform EOP Encl. 5.10 Station ASW Pump Alignment for valve and breaker alignment required to provide Station ASW to the SGs.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __ __ In-Plant __ X ___ Perform __ ___ Simulate __X__

References:

EOP Encl. 5.10 Station ASW Pump Alignment OP/0/A/1107/011 Removal And Restoration Of Auxiliary Electrical Equipment Validation Time: 16 minutes Time Critical: NO

========================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS

NLO-400 fnl - i Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS None

NLO-400 fnl - i Page 4 of 12 Tools/Equipment/Procedures Needed:

600 volt breaker rackout tool EP/1/A/1800/001 Enclosure 5.10 Station ASW Pump Alignment OP/0/A/1107/011 Removal And Restoration Of Auxiliary Electrical Equipment .5 Rack In 600 Volt Breaker READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 1 was operating at 100% power The SSF is OOS BOTH Standby Buses are energized from CT-5 Unit 1 trips due to a loss of all Main and Emergency Feedwater HPI Forced Cooling is established The EOP HPI CD Tab in progress HPI forced cooling flow is determined to be inadequate INITIATING CUES The CRS directs you to perform EOP Enclosure 5.10 Station ASW Pump Alignment to align and then start the Station ASW Pump.

NLO-400 fnl - i Page 5 of 12 START TIME: _______

NOTE All equipment operated in the following steps is located in A-1-128, ASW Pump Rm.

___ SAT STEP 1: Step 1 Obtain racking equipment and pipe wrench from EOP equipment locker U2AB1 (A-1, hallway near U2 elevator lobby).

STANDARD: Student locates the equipment locker containing the required racking and ___ UNSAT protective equipment.

  • Safety glasses
  • Face shield
  • Hard hat
  • Rubber gloves with leather protectors
  • Flame-resistant clothing
  • Pipe wrench
  • Breaker racking tool Continue to Step 2 NOTE: This step may be simulated and discussed, at the discretion of the evaluator.

Cue: Inform the student that for this JPM, it is not necessary to break the security seal on the locker for demonstrating equipment to be utilized.

COMMENTS:

STEP 2: Step 2 CRITICAL STEP Open CCW-99 (Aux Service Water Pump Suction).

___ SAT STANDARD: Candidate locates CCW-99 and simulates rotating handwheel counterclockwise to the open position.

Continue to Step 3 ___ UNSAT Cue: After the student locates and simulates placing CCW-99 in the open position, inform student CCW-99 position indicator is pointing to the "open" position.

COMMENTS:

NLO-400 fnl - i Page 6 of 12 STEP 3: Step 3 CRITICAL STEP Open CCW-247 (Aux Service Water Pump Recirc).

___ SAT STANDARD: Candidate locates CCW-247 and simulates rotating chain operator in the counterclockwise direction by pulling chain operator until handwheel comes to a hard stop. ___ UNSAT Continue to Step 4 Cue: After student locates and simulates placing CCW-247 in the open position, inform student that CCW-247 is at a counterclockwise hard stop position.

COMMENTS:

STEP 4: Step 4 CRITICAL STEP Open CCW-308 (Aux Service Water Pump Vent).

___ SAT STANDARD: Candidate locates CCW-308 on top of the Station ASW pump, removes pipe cap with simulated wrench from EOP Locker, pulls the locking pin and simulates rotating the 90° valve until the lever is parallel to the vent piping to the open position. ___ UNSAT Continue to Step 5 Cue: After student simulates opening CCW-308, inform him/her that a solid stream of water is issuing from the valve.

COMMENTS:

STEP 5: Step 5 *CRITICAL STEP WHEN all air is vented from Station ASW Pump, THEN close CCW-308.

___ SAT STANDARD: Candidate recognizes from previous instructor cue that all air is vented from Station ASW pump and simulates rotating CCW-308 clockwise to the closed position.

Continue to Step 6 ___ UNSAT

  • Note: Replacing the pipe cap in not critical.

Cue: After student simulates closing CCW-308, inform him/her that water flow has stopped and CCW-308 is at a clockwise hard stop position.

COMMENTS:

NLO-400 fnl - i Page 7 of 12 STEP 6: Step 6 CRITICAL STEP Rack in ASWS-6B (STATION ASW PUMP BKR) ( ASW 4160/600V SWGR ASWS-6). ___ SAT STANDARD: Candidate simulates donning protective clothing/equipment and simulates racking in ASW pump breaker (ASWS-6B).

Continue to Step 7 ___ UNSAT Cue: After the student simulates racking in the breaker, inform student that the STATION AUX SERVICE WATER PUMP Switch green "Trip" indicating light is ON.

Cue: If the candidate asks, provide him/her with a copy of OP/0/A/1107/011 Enclosure 4.5 (not critical)

COMMENTS:

STEP 7: Step 7 Close ASW SWGR FDR (ASW Swgr Fdr From B1T- Unit 10) (ASW 4160/600V Swgr ASWS-5). ___ SAT STANDARD: Candidate verifies that ASW SWGR FDR From B1T- Unit 10 is closed.

Continue to Step 8

___ UNSAT NOTE: This breaker is normally closed.

Cue: After student locates breaker, inform student that the two red CLOSED lights are lit and that the white OPEN light is off.

COMMENTS:

STEP 8: Step 8 IAAT AP/6 (Natural Disaster) directs restoring the Station ASW pump to standby, THEN GO TO Step 14. ___ SAT STANDARD: Candidate determines from cue that this step does not apply and continues to Step 9.

___ UNSAT Cue: If the candidate asks, inform him/her that AP/06 is NOT in progress.

COMMENTS:

NLO-400 fnl - i Page 8 of 12 STEP 9: Step 9 CRITICAL STEP WHEN notified that Standby Bus #1 is energized, AND notified to start the Station ASW pump, THEN perform the following (ASW 4160/600V ___ SAT SWGR ASWS-5):

A. Close ASW TRANSFORMER FDR (ASW SWITCHGEAR TRANSFORMER FEEDER).

___ UNSAT B. Close STATION ASW PUMP SW (STATION ASW PUMP CONTROL SWITCH) (ASW 4160V SWGR ASWX-5).

STANDARD: Candidate should recognize from the Initial Conditions that Standby Bus #1 is energized and the CRS has directed him/her to start the Station ASW Pump.

Candidate locates and closes ASW Switchgear Transformer Feeder breaker on ASWS-5 by simulating rotating the handle to the closed position.

Cue: After candidate simulates closing the breaker, inform him/her that the red "closed" light is ON and the green "trip" light is OFF.

Candidate locates Station ASW Pump Switch on ASWS-5 and simulates rotating the handle to the CLOSED position.

Continue to Step 10 Cue: After candidate simulates closing the breaker, inform him/her that the Station ASW Pump Switch red CLOSED light is ON and the green TRIP light is OFF.

COMMENTS:

STEP 10: Step 10 Close CCW-309 (Aux Service Water Pump Disch Drain) (12 West of ASW pump). ___ SAT STANDARD: Candidate locates CCW-309 and simulates closing CCW-309 by rotating the valve handwheel in a clockwise direction to a hard stop.

Continue to Step 11 ___ UNSAT Cue: Inform candidate that CCW-309 handwheel is fully clockwise and at a hard stop position.

COMMENTS:

NLO-400 fnl - i Page 9 of 12 STEP 11: Step 11 CRITICAL STEP Perform the following:

A. Position CCW-101 (Aux Service Water Pump Discharge) only one

___ SAT turn open.

B. Open CCW-101 an additional one turn open at a rate of one quarter turn every 15 seconds.

C. WHEN 5 minutes have elapsed, THEN slowly open CCW-101 until ___ UNSAT full open STANDARD: Candidate locates CCW-101 and simulates opening the valve one turn by rotating the valve operator in the counterclockwise direction by pulling on the chain operator.

Candidate opens CCW-101 an additional on turn open at a rate of one quarter turn every 15 seconds.

When 5 minutes have elapsed, candidate slowly opens CCW-101 until full open.

Continue to Step 12 Cue: After the candidate has correctly explained how to perform steps A & B, inform him her that 5 minutes have elapsed (time compression).

Cue: Inform candidate that CCW-101 handwheel is at a hard stop after following the sequence correctly.

COMMENTS:

STEP 12: Step 12 Verify Turbine Building flood is in progress.

___ SAT STANDARD: Candidate determines from the Initial Conditions that a Turbine Building flood is NOT in progress.

___ UNSAT Continue to Step 12 RNO COMMENTS:

NLO-400 fnl - i Page 10 of 12 STEP 13: Step 12 RNO Notify CRO that Station ASW Pump is operating.

___ SAT STANDARD: Candidate contacts the Unit 1 Control Room by radio or phone and informs them that the Station ASW Pump is operating.

___ UNSAT COMMENTS:

END TASK STOP TIME: ____________

NLO-400 fnl - i Page 11 of 12 CRITICAL STEP EXPLANATIONS STEP # Explanation 2 Necessary to align flowpath 3 Necessary to align flowpath 4 Necessary to vent the pump 5 Necessary to stop venting the pump 6 Necessary to provide power to the pump.

9 Necessary to provide power to the pump.

11 Necessary to provide flowpath.

i CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 1 was operating at 100% power The SSF is OOS BOTH Standby Buses are energized from CT-5 Unit 1 trips due to a loss of all Main and Emergency Feedwater HPI Forced Cooling is established The EOP HPI CD Tab in progress HPI forced cooling flow is determined to be inadequate INITIATING CUES The CRS directs you to perform EOP Enclosure 5.10 Station ASW Pump Alignment to align and then start the Station ASW Pump.

NLO-700 fnl - k Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-700 Restoration of ICS Auto Power CANDIDATE EXAMINER

NLO-700 fnl - k Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Restoration of ICS AUTO Power Alternate Path:

Yes Facility JPM #:

NLO-700 K/A Rating(s):

System: BW/A02 K/A: AA1.3 Rating: 3.4/3.6 Task Standard:

ICS AUTO power is restored per AP/1/A/1700/023, Loss of ICS Power.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __ __ In-Plant __ X ___ Perform __ ___ Simulate __X _

References:

AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) Rev. 20 Validation Time: 16 minutes Time Critical: NO

=======================================================================

Candidate: _______________________________________ Time Start: _________

NAME Time Finish: ________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

=======================================================================

COMMENTS

NLO-700 fnl - k Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:

NONE

NLO-700 fnl - k Page 4 of 9 Tools/Equipment/Procedures Needed:

AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 operating at 100% power 1SA-2/B-11 (ICS AUTO POWER FAILURE) is actuated INITIATING CUES:

The CRS directs you to use AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) to restore ICS AUTO power on Unit 1.

NLO-700 fnl - k Page 5 of 9 START TIME: _______

STEP 1: Step 1 Verify the following breakers closed (Unit 1 Cable Rm):

  • 1KRA breaker #1 (100A 1P, POWER PANELBOARD 1KI) ___ SAT
  • 1KI BREAKER #1 (30A 1P, AUTO POWER (ICS))

___ UNSAT STANDARD: Locate 1KRA panel board and breaker #1 and verify it is closed.

Cue: Indicate to the candidate that 1KRA breaker #1 is CLOSED.

Locate 1KI panel board and breaker #1 and verify it is closed.

Cue: Indicate to the candidate that 1KI breaker #1 is tripped OPEN.

Continue Step 1 RNO.

COMMENTS:

STEP 2: Step 1 RNO

1. Reset and close the affected breakers (Unit 1 Cable Rm):

___ SAT

_____1KI BREAKER #1 (30A 1P, AUTO POWER (ICS))

2. IF either of the above breakers fail to close

___ UNSAT

3. WHEN both of the above breakers are closed THEN continue.

STANDARD: 1. Resets and closes 1KI BREAKER #1 by taking the breaker to the open position and then closing it.

2. Step does not apply. Both breakers are closed.
3. Determine both breakers are closed and continue.

Cue: Indicate to the candidate that 1KI breaker #1 is CLOSED.

Continue to Step 2.

COMMENTS:

NLO-700 fnl - k Page 6 of 9 ALTERNATE PATH STEP 3: Step 2

___ SAT Contact Unit 1 CR to verify ICS AUTO power has been restored as indicated by 1SA-2/B-11 (ICS AUTO POWER FAILURE) off.

___ UNSAT STANDARD: Contacts Unit 1 CR to verify ICS AUTO power has been restored as indicated by 1SA-2/B-11 (ICS AUTO POWER FAILURE) off.

Cue: Inform candidate that 1SA-2/B-11 (ICS AUTO POWER FAILURE) remains actuated.

Continue to Step 2 RNO.

COMMENTS:

STEP 4: Step 2 RNO IF ICS AUTO power has NOT been restored, THEN bypass 1KI inverter as follows: (BYP SW 1KI cabinet, Unit 1 Equip Rm, Southwest of col Q72): ___ SAT STANDARD: Determine ICS AUTO power has NOT been restored by actuation of 1SA-2/B-11 (ICS AUTO POWER FAILURE) in previous step ___ UNSAT THEN bypasses 1KI inverter as follows: (BYP SW 1KI cabinet, Unit 1 Equip Rm, Southwest of col Q72): (steps 5, 6, & 7 below)

COMMENTS:

STEP 5: Step 2 RNO A CRITICAL TASK A. Position SW#1 OFF(left switch).

___ SAT STANDARD: Positions SW#1 OFF (left switch).

Cue: Indicate to the candidate that SW#1 is OFF. ___ UNSAT COMMENTS:

NLO-700 fnl - k Page 7 of 9 STEP 6: Step 2 RNO B CRITICAL TASK B. Position SW#3 OFF (right switch).

___ SAT STANDARD: Positions SW#3 OFF (right switch).

Cue: Indicate to the candidate that SW#3 is OFF. ___ UNSAT COMMENTS:

STEP 7: Step 2 RNO C CRITICAL TASK C. Position SW#2 ON (center switch).

___ SAT STANDARD: Positions SW#2 ON (center switch).

Cue: Indicate to the candidate that SW#2 is ON.

___ UNSAT Continue to Step 3.

COMMENTS:

STEP 8: Step 3 Notify Unit 1 CR that all applicable steps of this enclosure have been completed. ___ SAT STANDARD: Using a phone or radio, Notify Unit 1 CR that all applicable steps of this enclosure have been completed. ___ UNSAT Cue: Inform candidate that the Control Room has been notified.

COMMENTS:

END TASK STOP TIME: ____________

NLO-700 fnl - k Page 8 of 9 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 5 Step is required in proper sequence to align power to the 1KI bus.

6 Step is required in proper sequence to align power to the 1KI bus.

7 Step is required in proper sequence to align power to the 1KI bus.

k CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 operating at 100% power 1SA-2/B-11 (ICS AUTO POWER FAILURE) is actuated INITIATING CUES:

The CRS directs you to use AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) to restore ICS AUTO power on Unit 1.