ML14084A051: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CRO-115 fnl - a | {{#Wiki_filter:CRO-115 fnl - a Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-115 Withdraw Control Rod Group One to 50% | ||
CANDIDATE EXAMINER | |||
CRO-115 fnl - a Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | |||
No | Latch Group 7 Control rods and withdraw Safety Rod Group 1 to 50% | ||
CRO-111 | Alternate Path: | ||
System: 001 K/A: | No Facility JPM #: | ||
Latch Group 7 Control Rod and withdraw Safety Rod Group 1 To 50% | CRO-111 K/A Rating(s): | ||
in accordance with OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50% | System: 001 K/A: A4.06 Rating: 2.9/3.2 Task Standard: | ||
Latch Group 7 Control Rod and withdraw Safety Rod Group 1 To 50% in accordance with OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) | |||
Preferred Evaluation Method: | Preferred Evaluation Location: Preferred Evaluation Method: | ||
Simulator | Simulator __X ___ In-Plant ___ ___ Perform __X___ Simulate __ __ | ||
__X ___ In-Plant ___ ___ | |||
==References:== | ==References:== | ||
OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50% | OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) | ||
OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1) | |||
20 min. | Validation Time: 20 min. Time Critical: No | ||
Candidate: | ==================================================================================== | ||
_______________________________________ | Candidate: _______________________________________ Time Start: _______________ | ||
Time Start: | NAME Time Finish: ______________ | ||
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________ | |||
Performance Time | Examiner: ______________________________ ___________________________________/_________ | ||
: _________ | NAME SIGNATURE DATE | ||
Examiner: ______________________________ | ==================================================================================== | ||
Comments | |||
Comments CRO-115 fnl - a | CRO-115 fnl - a Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS | ||
: 1. RECALL Snap 213 | : 1. RECALL Snap 213 | ||
READ TO OPERATOR DIRECTIONS TO STUDENT | : 2. Go To RUN | ||
CRO-115 fnl - a Page 4 of 10 Tools/Equipment/Procedures Needed OP/1/A./1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) | |||
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | |||
INITIAL CONDITIONS Unit 1 startup in progress following a 28 day refueling outage Tc = 536ºF RCS pressure = 2155 psig OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1) is in progress at step 2.6.5 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) is in progress and has been completed through step 4.8 (Groups 1 through 6 have been manually latched). | |||
INITIATING CUE The Control Room SRO directs you to continue with OP1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) beginning at Step 4.9. | |||
Latch of groups 1 - 6 is complete. Manual Latch of Group 7 is required. | |||
CRO-115 fnl - a Page 5 of 10 START TIME: _______ | |||
STEP 1: Step 4.9 Perform latch and PI alignment of Group 7, as follows: CRITICAL STEP 4.9.1 Ensure GROUP SELECT SWITCH to 7. | |||
___ SAT STANDARD: Ensures Group Select Switch selected to Group 7 COMMENTS: | |||
___ UNSAT STEP 2: Step 4.9.2 Verify only Group 7 CONTROL ON lights are ON. (PI panel) | |||
___ SAT STANDARD: Verifies only Group 7 lights are ON COMMENTS: ___ UNSAT STEP 3: Step 4.9.3 *CRITICAL STEP IF Manual Latch and PI Alignment desired, perform the following: (R.M.) | |||
CRO-115 fnl - a | |||
STEP 1: Step 4.9 Perform latch and PI alignment of Group 7, as follows: | |||
4.9.1 | |||
STANDARD: Ensures Group Select Switch selected to Group 7 COMMENTS: | |||
STANDARD: Verifies only Group 7 lights are ON COMMENTS: | |||
A. *Ensure LATCH MANUAL is ON. | A. *Ensure LATCH MANUAL is ON. | ||
B. *Ensure IN LIMIT BYPASS is ON. | B. *Ensure IN LIMIT BYPASS is ON. | ||
C. | C. *Insert Group 7 for 5 seconds. | ||
D. Verify all 0% lights ON for Group 7. (PI Panel) | |||
E. *Ensure LATCH MANUAL is OFF. | E. *Ensure LATCH MANUAL is OFF. | ||
F. *Ensure IN LIMIT BYPASS is OFF. | F. *Ensure IN LIMIT BYPASS is OFF. ___ SAT G. Select RPI RESET. | ||
G. Select RPI RESET. H. Verify Group 7 API/RPI indications agree. (PI Panel) | H. Verify Group 7 API/RPI indications agree. (PI Panel) | ||
STANDARD: Candidate performs A | STANDARD: Candidate performs A - H above to manually latch the Group 7 rods | ||
- H above to manually latch the Group 7 rods COMMENTS: | ___ UNSAT COMMENTS: | ||
CRO-115 fnl - a Page 6 of 10 STEP 4: Step 4.9.4 IF Auto Latch and PI Alignment desired STANDARD: Determine that Auto latch is NOT desired and continue to Step 4.10. | |||
COMMENTS: | COMMENTS: | ||
___ SAT | |||
___ UNSAT STEP 5: Step 4.10 Reset Group 8 RPI, as follows: | |||
4.10.1 Ensure GROUP SELECT SWITCH to 8. | 4.10.1 Ensure GROUP SELECT SWITCH to 8. | ||
STANDARD: Candidate places the Group Select Switch to Group 8 COMMENTS: | ___ SAT STANDARD: Candidate places the Group Select Switch to Group 8 COMMENTS: | ||
STANDARD: Candidate verifies that only the Group 8 lights are ON COMMENTS: | ___ UNSAT STEP 6: Step 4.10.2 Verify Group 8 CONTROL ON lights are ON. (PI panel) | ||
___ UNSAT | ___ SAT STANDARD: Candidate verifies that only the Group 8 lights are ON COMMENTS: ___ UNSAT STEP 7: Step 4.10.3 Select RPI RESET | ||
___ SAT STANDARD: Candidate depresses the RPI reset selector | |||
STANDARD: Candidate uses toggle switch to confirm that API/RPI indications agree. | ___ UNSAT COMMENTS: | ||
COMMENTS: | |||
STANDARD: Candidate depresses the FAULT RESET selector. | CRO-115 fnl - a Page 7 of 10 STEP 8: Step 4.10.4 Verify Group 8 API/RPI indications agree. (PI Panel) | ||
___ SAT STANDARD: Candidate uses toggle switch to confirm that API/RPI indications agree. | |||
___ UNSAT COMMENTS: | |||
STEP 9: Step 4.11 Select FAULT RESET. | |||
STANDARD: Candidate depresses the FAULT RESET selector. ___ SAT COMMENTS: | |||
___ UNSAT NOTE: | |||
For the purpose of this procedure, an extended forced outage is an outage greater than 92 days where the Reactor Vessel Head is NOT removed. SR 3.1.4.2 requires the Control Rods to be tested for movement prior to entry into MODE 2. | |||
STEP 10: Step 4.12 | |||
___ SAT IF OWPG requires the Control Rods to be withdrawn due to an extended forced outage, perform PT/1/A/0600/015 (Control Rod Movement) for testing CRD Groups 1 thru 7 during unit startup. | |||
___ UNSAT STANDARD: Candidate determines from initiating cue that this startup is not from a forced outage of greater than 92 days and therefore this step is N/A. | |||
EXAMINER CUE: If asked, this startup is a return to power following a 28 day refueling outage. | |||
COMMENTS: | COMMENTS: | ||
CRO-115 fnl - a Page 8 of 10 STEP 11: Step 4.13 Select Group 1, as follows: CRITICAL STEP 4.13.1 Ensure GROUP SELECT SWITCH to 1. | |||
STANDARD: Candidate selects Group 1 on GROUP SELECT SWITCH. | |||
___ SAT COMMENTS: | |||
___ UNSAT STEP 12: Step 4.13.2: | |||
4.13.1 Ensure GROUP SELECT SWITCH to 1. | Verify only Group 1 CONTROL ON lights are ON. (PI panel) | ||
STANDARD: Candidate selects Group 1 on GROUP SELECT SWITCH. | STANDARD: Candidate verifies only the Group 1 lights are ON. ___ SAT COMMENTS: | ||
COMMENTS: | ___ UNSAT STEP 13: Step 4.13.3: CRITICAL STEP Ensure Group 1 at 50%. | ||
___ SAT STANDARD: Candidate withdraws the Group 1 rods to 50%. | |||
STANDARD: Candidate verifies only the Group 1 lights are ON. | |||
___ UNSAT | |||
: Ensure Group 1 at 50%. | |||
STANDARD: Candidate withdraws the Group 1 rods to 50%. | |||
Examiner note: The candidate should update the SRO/crew when starting to withdraw Group 1 control rods. (not critical) | Examiner note: The candidate should update the SRO/crew when starting to withdraw Group 1 control rods. (not critical) | ||
COMMENTS: | ___ UNSAT COMMENTS: | ||
STEP 14: Step 4.13.4: | |||
Place GROUP SELECT SWITCH to OFF. | |||
STANDARD: Candidate places the GROUP SELECT SWITCH to OFF. ___ SAT COMMENTS: | |||
STANDARD: Candidate places the GROUP | ___ UNSAT END TASK TIME STOP: ________ | ||
COMMENTS: | |||
___ UNSAT | |||
CRO-115 fnl - a | CRO-115 fnl - a Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to latch Group 7 of rods. If performed incorrectly the results would be the inability to withdraw Group 7 during the startup. | ||
If performed incorrectly the results would be the inability to withdraw Group 7 during the startup. | 3 This step is required to latch Group 7 of rods. If performed incorrectly the results would be the inability to withdraw Group 7 during the startup. | ||
3 This step is required to latch Group 7 of rods. If performed incorrectly the results would be the inability to withdraw Group 7 during the startup. | 11 This step is required to select the correct group of rods for withdrawal. | ||
13 This step is required withdraw the Group 1 rods to 50% as directed.. | |||
a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | |||
INITIAL CONDITIONS Unit 1 startup in progress following a 28 day refueling outage Tc = 536ºF RCS pressure = 2155 psig OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1) is in progress at step 2.6.5 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) is in progress and has been completed through step 4.8 (Groups 1 through 6 have been manually latched). | |||
INITIATING CUE The Control Room SRO directs you to continue with OP1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) beginning at Step 4.9. | |||
Latch of groups 1 - 6 is complete. Manual Latch of Group 7 is required. | |||
CRO- | CRO-223 fnl - b Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-223 BYPASS ES SUBSYSTEM 2 CANDIDATE EXAMINER | ||
CRO-223 fnl - b Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | |||
Remove ES Subsystem 2 from service. | |||
Alternate Path: | Alternate Path: | ||
No | No Facility JPM #: | ||
CRO-223 | CRO-223 K/A Rating(s): | ||
System: | System: 013 K/A: A4.02 Rating: 4.3/4.4 Task Standard: | ||
The candidate will remove the ES Subsystem 2 from service in accordance with OP/1/A/1105/014 Enclosure 4.9 (Removal and restoration of ES channels | The candidate will remove the ES Subsystem 2 from service in accordance with OP/1/A/1105/014 Enclosure 4.9 (Removal and restoration of ES channels) beginning with step 3.3. | ||
) beginning with step 3.3 | Preferred Evaluation Location: Preferred Evaluation Method: | ||
Simulator __X___ In-Plant ______ Perform __X___ Simulate __ __ | |||
Preferred Evaluation Method: | |||
Simulator | |||
__X___ In-Plant ______ | |||
==References:== | ==References:== | ||
OP/1/A/1105/014 Enclosure 4. | OP/1/A/1105/014 Enclosure 4.9 (Removal and restoration of ES channels) | ||
9 (Removal and restoration of ES channels | Validation Time: 15 min. Time Critical: No | ||
==================================================================================== | |||
15 min. | Candidate: _______________________________________ Time Start: _______________ | ||
Candidate: | NAME Time Finish: ______________ | ||
_______________________________________ | Performance Rating: SAT ______ UNSAT ______ Performance Time: _________ | ||
Time Start: _______________ | Examiner: ______________________________ ___________________________________/_________ | ||
Performance Rating: | NAME SIGNATURE DATE | ||
Performance Time | ==================================================================================== | ||
: _________ | Comments | ||
Comments CRO- | CRO-223 fnl - b Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS: | ||
: 1. Recall IC-41 | : 1. Recall IC-41 | ||
: 2. Verify the Examiner has the ES cabinet key (#317) and both ES bypass keys (#316). | |||
: 3. Ensure all breaker flags are in the current plant condition. | : 3. Ensure all breaker flags are in the current plant condition. | ||
: 4. Go to RUN. | : 4. Go to RUN. | ||
CRO-223 fnl - b Page 4 of 10 Tools/Equipment/Procedures Needed: | |||
OP/1/A/1105/014 Enclosure 4.9 Removal and restoration of ES channels READ TO OPERATOR DIRECTIONS TO STUDENT: | |||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
The Unit 1 Reactor is at 100% power. | The Unit 1 Reactor is at 100% power. | ||
A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service. | A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service. | ||
The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power. | The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power. | ||
The CRS has determined that Unit 1 ES Subsystem 2 is NOT required per Tech Specs | The CRS has determined that Unit 1 ES Subsystem 2 is NOT required per Tech Specs INITIATING CUE: | ||
The CRS directs you to remove ES Subsystem 2 from service using OP/1/A/1105/014 .9. | |||
CRO-223 fnl - b Page 5 of 10 START TIME: _______ | |||
STEP 1: Step 2.1 NOTE: Equipment failure can be indicated by deviation alarm, fault alarm, hardware fail, etc... or notification by Maintenance. ___ SAT Verify one of the following: | |||
* A procedure requires bypassing Voter(s), tripping of ES ___ UNSAT channels, bypassing DHPIAS, or bypassing DLPIAS. | |||
* Equipment failure requires bypassing Voter(s), tripping of ES channels, bypassing DHPIAS, or bypassing DLPIAS. | |||
STANDARD: Determine that the second bullet is satisfied and sign it off. | |||
COMMENTS: | |||
STEP 2: Step 3.1 IF removal of both ES subsystems from service is required during outages, perform Section 4 "Removal Of Both ES Subsystems" ___ SAT STANDARD: Determine step does not apply and N/As step. | |||
___ UNSAT COMMENTS: | |||
STEP 3: Step 3.2 NOTE: ES Subsystem 1 includes ES Input channels A1, B1, and C1 along with ES Voter Odd 1 and ES Voter Even 1. ___ SAT IF removal of any or all of only ES Subsystem 1 channels from service is required, perform Section 5 "Removal Of Only ES Subsystem 1" | |||
___ UNSAT STANDARD: Determine step does not apply and N/As step. | |||
COMMENTS: | |||
STEP 4: Step 3.3 If removal of any or all of Only ES subsystem 2 channels from service is required, perform Section 6 Removal of Only ES Subsystem 2 ___ SAT STANDARD: Candidate proceeds to Section 6 | |||
___ UNSAT COMMENTS: | |||
CRO- | CRO-223 fnl - b Page 6 of 10 STEP 5: Step 6.1: | ||
IF Unit 1 ES Subsystem 2 is NOT required per TS 3.3.5 and 3.3.7, ___ SAT perform the following to remove from service any or all of only Unit 1 ES Subsystem 2 channels. | |||
STANDARD: Candidate determines that ES Subsystem 2 is not required by TS 3.3.5 ___ UNSAT and 3.3.7 COMMENTS: | |||
STEP 6: Step 6.1.1 IF Unit 1 ES Subsystem 1 is required per TS 3.3.5 and 3.3.7, verify the following: ___ SAT | |||
* Voter Odd 1 NOT bypassed (1SA-7) | |||
STANDARD: | * Voter Even 1 NOT bypassed (1SA-7) | ||
COMMENTS: | * ES channel A1 operable or tripped (1SA-7) ___ UNSAT | ||
* ES channel B1 operable or tripped (1SA-7) | |||
* ES channel C1 operable or tripped (1SA-7) | |||
STANDARD: The candidate determines that the Unit 1 ES Subsystem is required per TS 3.3.5 and 3.3.7 and verifies there are no alarms present on ISA-7. | |||
* Voter Odd 1 NOT bypassed (1SA-7/D1) | |||
* Voter Even 1 NOT bypassed (1SA-7/E1) | |||
* ES channel A1 operable or tripped (1SA-7/A1) | |||
* ES channel B1 operable or tripped (1SA-7/B1) | |||
* ES channel C1 operable or tripped (1SA-7/C1) | |||
Examiner cue: Candidate may elect to perform a STAT alarm test to help ensure no alarms are present on 1SA-7. If asked, give him permission (as CR SRO) to perform alarm test. (The other RO will be required to help perform the test). | |||
COMMENTS: | |||
STEP 7: Step 6.1.2.A Declare Unit 1 ES Subsystem 2 channels inoperable | |||
___ SAT STANDARD: Candidate reports that procedure requires declaration of ES Subsystem 2 channels inoperable Cue: Acknowledge Unit 1 ES Subsystem 2 channel inoperable. | |||
___ UNSAT COMMENTS: | |||
CRO-223 fnl - b Page 7 of 10 STEP 8: Step 6.1.2.B Obtain MAN BYPASS 2 Key #316 (2 keys are required to bypass both ___ SAT voters). | |||
STANDARD: Candidate obtains correct keys (examiner provides) | |||
___ UNSAT Cue: Provide the candidate with the correct keys. Keys are normally kept in the key locker in the WCC. | |||
COMMENTS: | |||
STEP 9: Step 6.1.2.C CRITICAL STEP IF bypassing Odd Voter 2, place MAN BYPASS 2 keyswitch in "BYP". | |||
(Cabinet 12) ___ SAT STANDARD: Candidate places the MAN BYPASS 2 keyswitch in Cabinet 12 in the BYP position | |||
___ UNSAT COMMENTS: | |||
STEP 10: Step 6.1.2.D CRITICAL STEP IF bypassing Even Voter 2, place MAN BYPASS 2 keyswitch in "BYP". | |||
(Cabinet 14) ___ SAT STANDARD: Candidate places the MAN BYPASS 2 keyswitch in Cabinet 14 in the BYP position and returns and signs step 3.3 | |||
___ UNSAT Examiner note: When this step is complete, candidate may indicate task is complete. If so, ask that they continue. | |||
COMMENTS: | |||
STEP 11: Step 3.4 If trip of ES input channels is required, perform one of the following: ___ SAT STANDARD: Candidate NAs this step COMMENTS: ___ UNSAT | |||
Cue: Provide the candidate with the correct keys. | |||
Keys are normally kept in the key locker in the WCC. | |||
COMMENTS: ___ SAT | |||
CRO-223 fnl - b Page 8 of 10 STEP 12: Step 3.5 If bypassing DHPIAS is required, perform Section 10... ___ SAT STANDARD: Candidate NAs this step | |||
STANDARD: Candidate | ___ UNSAT COMMENTS: | ||
STEP 13: Step 3.6 If bypassing DLPIAS is required, perform Section 11... ___ SAT STANDARD: Candidate NAs this step | |||
___ UNSAT COMMENTS: | |||
STEP 14: Step 3.7 If any ES channel was removed from service due to equipment failure, ___ SAT perform Section 12. | |||
STANDARD: Candidate determines that no ES channel was removed and NAs this step ___ UNSAT COMMENTS: | |||
STEP 15: Step 3.7 WHEN notified by I&E, restore ES channels by performing Section 13... ___ SAT STANDARD: NO actions are required Cue: Another operator will continue with this procedure. ___ UNSAT COMMENTS: | |||
TIME STOP: ________ | |||
CRO-223 fnl - b Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP # Explanation 9 This step is critical because it is part 1 of removing all of ES Subsystem 2 from service 10 This step is critical because it is part 2 of removing all of ES Subsystem 2 from service | |||
b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | |||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
The Unit 1 Reactor is at 100% power. | The Unit 1 Reactor is at 100% power. | ||
A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service. | A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service. | ||
The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power. | The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power. | ||
The CRS has determined that Unit 1 ES Subsystem 2 is NOT required per Tech Specs INITIATING CUE: | |||
The CRS has determined that Unit 1 ES Subsystem 2 is NOT required per Tech Specs | The CRS directs you to remove ES Subsystem 2 from service using OP/1/A/1105/014 .9. | ||
INITIATING CUE: | |||
The CRS directs you to remove ES Subsystem 2 from service using OP/1/A/1105/014 | |||
CRO-404 fnl - c Page 1 of 11 | CRO-404 fnl - c Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-404 Alignment of Condensate Recirc CANDIDATE EXAMINER | ||
CRO-404 fnl - c Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | |||
Establish Alignment of Condensate Recirc and set flow. | |||
Alternate Path: | Alternate Path: | ||
Yes | Yes Facility JPM #: | ||
CRO-404 | CRO-404 K/A Rating(s): | ||
System: APE054 K/A: G2.1.20 Rating: | System: APE054 K/A: G2.1.20 Rating: 4.6/4.6 Task Standard: | ||
4.6/4.6 | Condensate recirculation flow of 2300-6000 gpm is established. | ||
Condensate recirculation flow of 2300 | Preferred Evaluation Location: Preferred Evaluation Method: | ||
-6000 gpm is established | Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____ | ||
Simulator __X__ In-Plant __ ___ | |||
==References:== | ==References:== | ||
EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5. | EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5.23 (Alignment of Condensate Recirc). | ||
23 (Alignment of Condensate Recirc). | Validation Time: 10 minutes Time Critical: NO | ||
Validation Time: | ==================================================================================== | ||
Candidate: _______________________________________ Time Start: _________ | |||
NAME Time Finish: ________ | |||
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________ | |||
Examiner: ______________________________ ____________________________________/________ | |||
NAME SIGNATURE DATE | |||
==================================================================================== | |||
COMMENTS | |||
CRO-404 fnl - c Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS: | |||
: 1. RECALL Snap 214 | |||
: 2. IMPORT files for CRO-404 | |||
: 3. Go to RUN | |||
CRO-404 fnl - c Page 4 of 11 Tools/Equipment/Procedures Needed: | |||
EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5.23 (Alignment of Condensate Recirc) | |||
EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5. | |||
23 (Alignment of Condensate Recirc) | |||
READ TO OPERATOR DIRECTION TO TRAINEE: | READ TO OPERATOR DIRECTION TO TRAINEE: | ||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator | Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator. | ||
. | During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 RCPs. | ||
During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 | The SGTR tab is in progress and is completed up to step 107. | ||
. | |||
The SGTR tab is in progress and is completed up to step | |||
INITIATING CUES: | INITIATING CUES: | ||
The CRS directs you to perform Enclosure 5. | The CRS directs you to perform Enclosure 5.23 (Alignment of Condensate Recirc). | ||
23 (Alignment of Condensate Recirc | |||
). | |||
CRO-404 fnl - c Page 5 of 11 START TIME: _______ | |||
STEP 1: Step 1. | |||
Verify any HWP operating. | |||
___ SAT STANDARD: Determine the 1A HWP is operating (located on 1AB1) by observing the red run light illuminated and pump amps are on scale. | |||
Continues to Step | Continues to Step 2 | ||
___ UNSAT COMMENTS: | |||
STEP 2: Step 24 Verify any CBP operating. | |||
___ SAT STANDARD: Determine that NO CBP is operating by observing the green off lights on 1AB1 are illuminated for each CBP and then perform the RNO. | |||
Continues to Step 2 RNO ___ UNSAT COMMENTS: | |||
STEP 3: Step 2 RNO | |||
___ SAT GO TO Step 7. | |||
STANDARD: Continues to Step 7 | |||
___ UNSAT COMMENTS: | |||
___ UNSAT | CRO-404 fnl - c Page 6 of 11 STEP 4: Step 7 Ensure two HWPs operating | ||
STANDARD: Rotate the 1C COND BOOSTER PUMP switch (located on 1AB1 | ___ SAT STANDARD: Determines that only the 1A HWP is operating, per step 1. | ||
) to the START position. Observes that the pump does not start by noting the green stop light remains illuminated and the red start light remains OFF. Continues to RNO to Step 8 | ___ UNSAT Rotates the 1B HWP switch (located on 1AB1) to the START position, verifies the red ON light illuminates, and verifies pump amps increase and return to normal. | ||
COMMENTS: | OR Rotates the 1C HWP switch (located on 1AB1) to the START position, verifies the red ON light illuminates, and verifies pump amps increase and return to normal. | ||
Continues to Step 8 COMMENTS: | |||
ALTERNATE PATH | |||
___ SAT STEP 5: Step 8 Start the 1C COND BOOSTER PUMP. | |||
___ UNSAT STANDARD: Rotate the 1C COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes that the pump does not start by noting the green stop light remains illuminated and the red start light remains OFF. | |||
Continues to RNO to Step 8 Note: The 1C Cond Booster Pump will not start. | |||
COMMENTS: | |||
CRO-404 fnl - c Page 7 of 11 STEP 6: RNO: Step 8 CRITICAL STEP Start one available CBP. | |||
___ SAT STANDARD: Rotates the 1A COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes the pump starts by observing the Red run light illuminated and pump amps increase and then return to normal. ___ UNSAT OR Rotates the 1B COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes the pump starts by observing the Red run light illuminated and pump amps increase and then return to normal. | |||
) to the START position. Observes the pump starts by observing the Red run light illuminated and pump amps increase and then return to normal. | Continues to Step 9 COMMENTS: | ||
OR Rotates the | STEP 7: Step 9 Stop one operating HWP. | ||
Continues to Step 9 | ___ SAT STANDARD: Rotates the switch for a running HWP (Either 1A, 1B, or 1C) to the OFF position. Verifies the Red run light OFF, and the Green stop light illuminated. ___ UNSAT Examiner note: 1SA-8/C-2 (FDW PUMP SEAL DIFFERENCTIAL PRESSURE LOW) will actuate. This is an expected alarm. | ||
Continues to Step 10 COMMENTS: | |||
STEP 8: Step 10 ___ SAT Place the control switch for one secured HWP in AUTO STANDARD: Places a non running HWP switch (1A or 1B) to AUTO. ___ UNSAT Continues to Step 11 COMMENTS: | |||
CRO-404 fnl - c Page 8 of 11 STEP 9: Step 11 Place the control switch for one secured CBP in AUTO. ___ SAT STANDARD: Places the non running CBP (1A or 1B) switch in AUTO. | |||
Continues to Step 12 ___ UNSAT NOTE: 1C CBP switch should NOT be selected since the pump will not start. | |||
COMMENTS: | |||
STEP 10: Step 12 Perform the following: | |||
___ SAT | ___ SAT | ||
* Position HWP LOAD SHED DEFEAT switch to a running HWP. | |||
STANDARD: | * Position CBP LOAD SHED DEFEAT switch to a running CBP | ||
___ UNSAT STANDARD: Positions the HWP LOAD SHED DEFEAT switch to the running HWP, (1A, 1B, or 1C) | |||
Positions the CBP LOAD SHED DEFEAT switch to the running CBP, (1A or 1B ) | |||
Continues to Step | Continues to Step 13 COMMENTS: | ||
STEP 11: Step 13 Place the following in MANUAL: | |||
___ SAT | ___ SAT | ||
* 1FDW-53 | |||
* 1FDW-65 STANDARD: Locate the Moore controller on 1VB3 for each valve listed above and ___ UNSAT determine they are in MANUAL by the MANUAL light being Lit. | |||
Continues to Step 14 COMMENTS: | |||
CRO-404 fnl - c Page 9 of 11 STEP 12: Step 14 CRITICAL STEP Establish 2300-6000 gpm total recirc flow with one of the following: | |||
-6000 gpm total recirc flow with one of the following | |||
___ SAT | ___ SAT | ||
___ UNSAT | * 1FDW-53 | ||
* 1FDW-65 | |||
___ UNSAT STANDARD: Candidate locates the Moore controller for 1FDW-53 or 1FDW-65 and using the manual loader adjusts one to a total recirc flow of 2300-6000 gpm. | |||
Note: Controller must be selected to the P position to observe flow. | |||
Cue: Inform candidate that another RO will complete this enclosure and this JPM is finished | |||
. | |||
COMMENTS: | |||
STOP TIME: ____________ | |||
CRO-404 fnl - c Page 10 of 11 CRITICAL STEP EXPLANATIONS: | |||
STEP # Explanation 6 Required to properly align Condensate recirc. | |||
12 Required to establish proper flow for Condensate recirc. | |||
c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | |||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator | Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator. | ||
. | During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 RCPs. | ||
During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 | The SGTR tab is in progress and is completed up to step 107. | ||
. | |||
The SGTR tab is in progress and is completed up to step | |||
INITIATING CUES: | INITIATING CUES: | ||
The CRS directs you to perform Enclosure 5.23 (Alignment of Condensate Recirc). | |||
CRO-414 fnl - d Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-414 SWAPPING LPI MODES - HIGH PRESSURE MODE TO LPI NORMAL DECAY HEAT MODE CANDIDATE EXAMINER | |||
CRO-414 fnl - d Page 1 of 11 | |||
CANDIDATE | |||
CRO-414 fnl - d Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | CRO-414 fnl - d Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | ||
Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode Alternate Path: | |||
No | No Facility JPM #: | ||
CRO-092 | CRO-092 K/A Rating(s): | ||
System: 005 K/A: A4.01 Rating: | System: 005 K/A: A4.01 Rating: 3.6*/3.4 Task Standard: | ||
Swap LPI from High Pressure Mode to Normal Mode by procedure. | Swap LPI from High Pressure Mode to Normal Mode by procedure. | ||
Preferred Evaluation Location: | Preferred Evaluation Location: Preferred Evaluation Method: | ||
Preferred Evaluation Method: | Simulator __X__ In-Plant ____ Perform __X___ Simulate __ __ | ||
Simulator | |||
__X__ In-Plant ____ | |||
==References:== | ==References:== | ||
OP/1/A/1104/004, Enclosure 4. | OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode) | ||
15 (Swapping LPI Modes | OP/1/A/1104/004, Enclosure 4.44 (Controlling LPI Cooler Outlet Temperature) | ||
- LPI High Pressure Mode to LPI Normal Mode) | Validation Time: 40 minutes Time Critical: NO | ||
OP/1/A/1104/004, Enclosure 4. | ==================================================================================== | ||
Validation Time: | Candidate: _______________________________________ Time Start: _________ | ||
40 minutes | NAME Time Finish: ________ | ||
Candidate: | Performance Rating: SAT ______ UNSAT ______ Performance Time: _________ | ||
_______________________________________ | Examiner: ______________________________ ____________________________________/________ | ||
Time Start: | NAME SIGNATURE DATE | ||
==================================================================================== | |||
Performance Rating: | COMMENTS | ||
Performance Time | |||
: _________ | CRO-414 fnl - d Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS: | ||
Examiner: ______________________________ | : 1. RECALL SNAP 215 | ||
NAME | : 2. Place simulator to RUN | ||
: 3. When asked manipulate the following LP vales using the valve program: | |||
COMMENTS CRO-414 fnl - d Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS: | * OPEN 1LP-4 | ||
: 1. RECALL SNAP 215 | * CLOSE 1LP-73, 1LP-74, and 1LP-75 | ||
-75 | |||
CRO-414 fnl - d Page 4 of 11 Tools/Equipment/Procedures Needed: | CRO-414 fnl - d Page 4 of 11 Tools/Equipment/Procedures Needed: | ||
15 (Swapping LPI Modes | OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - High Pressure Mode to LPI Normal Mode) | ||
- High Pressure Mode to LPI Normal Mode) OP/1/A/1104/004, Enclosure 4. | OP/1/A/1104/004, Enclosure 4.44 (Controlling LPI Cooler Outlet Temperature) | ||
READ TO OPERATOR DIRECTION TO TRAINEE: | READ TO OPERATOR DIRECTION TO TRAINEE: | ||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 shutdown in progress INITIATING CUES: | Unit 1 shutdown in progress INITIATING CUES: | ||
The | The CRS directs you to perform OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2.3. | ||
15 (Swapping LPI Modes | ALL associated White tags have been removed. | ||
- LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2. | |||
CRO-414 fnl - d Page 5 of 11 START TIME: _______ | |||
CRO-414 fnl - d Page 5 of 11 | STEP 1: Step 2.3 CRITICAL STEP Position: | ||
STEP 1: | ___ SAT | ||
Open 1LP-6 (1C LPI PUMP SUCTION (A HDR). | * Open 1LP-5 (1A LPI PUMP SUCTION). | ||
Open 1LP-7 (1C LPI PUMP SUCTION (B HDR). | * Open 1LP-6 (1C LPI PUMP SUCTION (A HDR). | ||
Open 1LP-8 (1B LPI PUMP SUCTION). | * Open 1LP-7 (1C LPI PUMP SUCTION (B HDR). ___ UNSAT | ||
STANDARD: Remove the cover from the switches for the following valves and OPEN them by placing their respective switches in the open position. | * Open 1LP-8 (1B LPI PUMP SUCTION). | ||
1LP-5 (1A LPI PUMP SUCTION) | STANDARD: Remove the cover from the switches for the following valves and OPEN them by placing their respective switches in the open position. | ||
* 1LP-5 (1A LPI PUMP SUCTION) | |||
Verify red light illuminates and green light goes off. | Verify red light illuminates and green light goes off. | ||
1LP-6 (1C LPI PUMP SUCTION (A HDR) | * 1LP-6 (1C LPI PUMP SUCTION (A HDR) | ||
Verify red light illuminates and green light goes off. | Verify red light illuminates and green light goes off. | ||
1LP-7 (1C LPI PUMP SUCTION (B HDR) | * 1LP-7 (1C LPI PUMP SUCTION (B HDR) | ||
Verify red light illuminates and green light goes off. | Verify red light illuminates and green light goes off. | ||
1LP-8 (1B LPI PUMP SUCTION) | * 1LP-8 (1B LPI PUMP SUCTION) | ||
Verify red light illuminates and green light goes off. | Verify red light illuminates and green light goes off. | ||
COMMENTS: | COMMENTS: | ||
STEP 2: Step 2.4 CRITICAL STEP Position: | |||
___ SAT | ___ SAT | ||
* Open 1LP-4 (Return Manual Block). (A-61) | |||
-61) | STANDARD: Dispatch an NEO to open 1LP-4. | ||
___ UNSAT Booth Cue: Open 1LP-4 by using the Valve program and using time compression inform the candidate that 1LP-4 is open. | |||
COMMENTS: | |||
CRO-414 fnl - d Page 6 of 11 STEP 3: Step 2.5 CRITICAL STEP Ensure: | |||
-61) | ___ SAT | ||
-61) | * Close 1LP-73 (1B LPI Cooler Switchover Disch Block). (A-1-108) | ||
1LP-73 (1B LPI Cooler Switchover Disch Block). (A 108) | * Close 1LP-74 (B Clr Disch Blk To A Pmp). (A-61) | ||
-61) | * Close 1LP-75 (1B LPI Cooler Disch Block To 1C LPI Pump). (A-61) ___ UNSAT STANDARD: Dispatch an NEO to CLOSE: | ||
-61) | * 1LP-73 (1B LPI Cooler Switchover Disch Block). (A-1-108) | ||
* 1LP-74 (B Clr Disch Blk To A Pmp). (A-61) | |||
* 1LP-75 (1B LPI Cooler Disch Block To 1C LPI Pump). (A-61) | |||
Booth cue: CLOSE 1LP-73, 1LP-74, and 1LP-75 by using the Valve program and using time compression inform the candidate that the valves are CLOSED. | |||
COMMENTS: | COMMENTS: | ||
CRITICAL STEP | STEP 4: Step 2.6 CRITICAL STEP Close 1LP-14 (1B LPI Cooler Outlet) | ||
___ SAT | ___ SAT STANDARD: CLOSE 1LP-14 it by placing the switch in the close position and observe green closed light lit. | ||
___ UNSAT | ___ UNSAT Note: Valve has a long stroke time (1:50 sec) | ||
COMMENTS: | |||
STEP 5: Step 2.7 Record 1A LPI cooler outlet temperature ________°F. | |||
___ SAT STANDARD: Locate the 1A LPI cooler outlet temperature indicator on 1UB2 and record 1A LPI cooler outlet temperature on the procedure. | |||
___ UNSAT COMMENTS: | |||
CRO-414 fnl - d Page 7 of 11 STEP 6: Step 2.8 Ensure open 1LP-9 (1C LPIP DISCH TO 1A LPI HDR). | |||
___ SAT STANDARD: Determine 1LP-9 located on 1UB2 is OPEN by verifying the red OPEN light illuminated. | |||
___ UNSAT COMMENTS: | |||
STEP 7: Step 2.9 CRITICAL STEP Open 1LP-10 (1C LPIP DISCH TO 1B LPI HDR). | |||
STANDARD: Open 1LP-10 located on 1UB2 by taking the switch to the OPEN position and verifying the red OPEN light illuminates and the green CLOSE light goes out. COMMENTS: | ___ SAT STANDARD: Open 1LP-10 located on 1UB2 by taking the switch to the OPEN position and verifying the red OPEN light illuminates and the green CLOSE light goes out. ___ UNSAT COMMENTS: | ||
STEP 8: Step 2.10 CRITICAL STEP Open 1LP-14 (1B LPI COOLER OUTLET). | |||
___ SAT STANDARD: Open 1LP-14 located on 1UB2 by taking the switch to the OPEN position and verifying the red OPEN light illuminates and the green CLOSE light goes out. ___ UNSAT Note: Valve has a long stroke time (1:50 sec) | |||
COMMENTS: | |||
STANDARD: | CRO-414 fnl - d Page 8 of 11 NOTE: Do NOT exceed 6000 gpm LPSW flow per cooler. | ||
___ SAT STEP 9: Step 2.11 Adjust LPSW flow to 1B LPI Coolers per Enclosure 4.44 "Controlling LPI Cooler Outlet Temperature" to match 1B DH Cooler outlet temperature to 1A DH Cooler outlet temperature. ___ UNSAT STANDARD: Refer to Enclosure 4.44 "Controlling LPI Cooler Outlet Temperature". | |||
COMMENTS: | COMMENTS: | ||
STEP 10: Enclosure 4.44 Step 1.1 IF RCS Cooldown in progress, review Section 3. | |||
___ SAT STANDARD: Candidate reviews section 3. | |||
COMMENTS: ___ UNSAT STEP 11: Enclosure 4.44 Step 1.2 IF RCS Heatup in progress, review Section 4. | |||
___ SAT STANDARD: Determine step does not apply and N/A step. | |||
COMMENTS: ___ UNSAT | |||
STANDARD: | |||
CRO-414 fnl - d Page 9 of 11 NOTE: | |||
If in LPI is in SERIES MODE, LPSW flow should be established to both LPI coolers The following steps may be performed as many times as required. ___ SAT This enclosure can be performed in any sequence or any order. | |||
This enclosure can be performed in any sequence or any order. | |||
The preference of use for LPSW is as follows: | The preference of use for LPSW is as follows: | ||
-1LPSW-251 and/or 1LPSW-252 in automatic (Step 2.1 and/or Step 2.5). | -1LPSW-251 and/or 1LPSW-252 in automatic (Step 2.1 and/or Step 2.5). ___ UNSAT | ||
-1LPSW-251 and/or 1LPSW-252 in manual (Step 2.2 and/or Step 2.6). | -1LPSW-251 and/or 1LPSW-252 in manual (Step 2.2 and/or Step 2.6). | ||
-1LPSW-4 and/or 1LPSW-5 (Step 2.3 and/or Step 2.7). | -1LPSW-4 and/or 1LPSW-5 (Step 2.3 and/or Step 2.7). | ||
LPSW Leakage Accumulator level is a function of LPSW System pressure. When LPSW flow to LPI Coolers is significantly changed, LPSW Leakage Accumulator level will increase and may exceed the limits of SR 3.7.7.1 until LPSW system pressure stabilizes. As a result, momentary entry into TS 3.7.7 may be necessary. | LPSW Leakage Accumulator level is a function of LPSW System pressure. When LPSW flow to LPI Coolers is significantly changed, LPSW Leakage Accumulator level will increase and may exceed the limits of SR 3.7.7.1 until LPSW system pressure stabilizes. | ||
STEP 12: | As a result, momentary entry into TS 3.7.7 may be necessary. | ||
COMMENTS: | STEP 12: Enclosure 4.44 Steps 2.1 - 2.4 LPSW to 1A LPI Cooler STANDARD: Candidate should determine that these steps do NOT apply and continue to Step 2.5. | ||
-252 Controller Setpoint as required. | COMMENTS: | ||
STANDARD: Adjust LPSW flow to 1B LPI Coolers by positioning 1LPSW | STEP 12: Enclosure 4.44 Step 2.5 CRITICAL STEP IF 1LPSW-252 (1B LPI COOLER LPSW CONTROL) is in "AUTO", | ||
-252 Controller Setpoint so that 1B DH Cooler outlet temperature is approaching 1A DH Cooler outlet temperature (Temperature as noted at step 2.7). COMMENTS: | position 1LPSW-252 Controller Setpoint as required. ___ SAT STANDARD: Adjust LPSW flow to 1B LPI Coolers by positioning 1LPSW-252 Controller Setpoint so that 1B DH Cooler outlet temperature is approaching 1A DH Cooler outlet temperature (Temperature as noted at ___ UNSAT step 2.7). | ||
COMMENTS: | |||
END TASK STOP TIME: ____________ | |||
CRO-414 fnl - d Page 10 of 11 | CRO-414 fnl - d Page 10 of 11 CRITICAL STEP EXPLANATIONS: | ||
STEP # Explanation 1 Step is required to provide the correct flow path. | STEP # Explanation 1 Step is required to provide the correct flow path. | ||
2 Step is required to provide the correct flow path. | 2 Step is required to provide the correct flow path. | ||
3 Step is required to provide the correct flow path. | 3 Step is required to provide the correct flow path. | ||
4 Step is required to provide the correct flow path. | 4 Step is required to provide the correct flow path. | ||
7 Step is required to provide the correct flow path. | 7 Step is required to provide the correct flow path. | ||
8 Step is required to provide the correct flow path. | 8 Step is required to provide the correct flow path. | ||
12 Step is required to ensure proper thermal transition to 1B LPI Cooler. | 12 Step is required to ensure proper thermal transition to 1B LPI Cooler. | ||
Note: All valves on the valve lineup may not be needed to successfully complete the task. | Note: All valves on the valve lineup may not be needed to successfully complete the task. | ||
d | d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 shutdown in progress | Unit 1 shutdown in progress INITIATING CUES: | ||
The CRS directs you to perform OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2.3. | |||
INITIATING CUES: | |||
The CRS directs you to perform OP/1/A/1104/004, Enclosure 4. | |||
15 (Swapping LPI Modes | |||
- LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2.3. | |||
ALL associated White tags have been removed. | ALL associated White tags have been removed. | ||
CRO-508 fnl - e Page 1 of 9 | CRO-508 fnl - e Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-508 ES Channels 5 and 6 Recovery CANDIDATE EXAMINER | ||
CANDIDATE | |||
CRO-508 fnl - e Page 2 of 9 | CRO-508 fnl - e Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | ||
No | ES Channels 5 and 6 Recovery Alternate Path: | ||
New | No Facility JPM #: | ||
System: 103 K/A: | New K/A Rating(s): | ||
System: 103 K/A: A4.04 Rating: 3.5*/3.5* | |||
Task Standard: | |||
ES Channels 5 and 6 are returned to normal using EOP Enclosure 5.41 (ES Recovery). | ES Channels 5 and 6 are returned to normal using EOP Enclosure 5.41 (ES Recovery). | ||
Preferred Evaluation Location: | Preferred Evaluation Location: Preferred Evaluation Method: | ||
Simulator __X__ In-Plant __ ___ | Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____ | ||
==References:== | ==References:== | ||
EOP Encl. 5.41 (ES Recovery) | EOP Encl. 5.41 (ES Recovery) | ||
Validation Time | Validation Time: 10 minutes Time Critical: NO | ||
: 10 minutes | ==================================================================================== | ||
Candidate: _______________________________________ Time Start: _________ | |||
NAME Time Finish: ________ | |||
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________ | |||
Examiner: ______________________________ ____________________________________/________ | |||
NAME SIGNATURE DATE | |||
==================================================================================== | |||
COMMENTS | |||
CRO-508 fnl - e Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS: | |||
: 1. RECALL Snap 216 | |||
: 2. IMPORT files for CRO-508 | |||
: 3. Go to RUN | |||
CRO-508 fnl - e Page 4 of 9 Tools/Equipment/Procedures Needed: | |||
: 1. RECALL Snap 216 | |||
-508 | |||
EOP Encl. 5.41 (ES Recovery) | EOP Encl. 5.41 (ES Recovery) | ||
READ TO OPERATOR DIRECTION TO TRAINEE: | READ TO OPERATOR DIRECTION TO TRAINEE: | ||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
A MSLB has occurred. | |||
ES Channels 1 - 6 have actuated on High RB pressure. | |||
EOP Encl. 5.1 (ES Actuation) is complete ALL ES Channels are being reset EOP Encl. 5.41 (ES Recovery) is complete through step 40 INITIATING CUES: | |||
The CRS directs you to continue in EOP Encl. 5.41 (ES Recovery) beginning at step 41. | |||
CRO-508 fnl - e Page 5 of 9 START TIME: _______ | |||
STEP 1: Step 41 Verify reset of any of the following is desired: ___ SAT | |||
* ES Channel 5 | |||
* ES Channel 6 | |||
___ UNSAT STANDARD: Determines, from Initiating Cue, that reset of ES Channels 5 and 6 is desired. | |||
COMMENTS: | |||
CRO-508 fnl - e Page 5 of 9 | STEP 2: Step 42 Verify Stat Alarms have cleared: | ||
STEP 1: | ___ SAT | ||
ES Channel 5 ES Channel 6 STANDARD: Determines, from Initiating Cue, that reset of ES Channels 5 and 6 is desired. | * 1SA-7/A-1 (1A1 ES TRIP) | ||
* 1SA-7/B-1 (1B1 ES TRIP) | |||
* 1SA-7/C-1 (1C1 ES TRIP) | |||
* 1SA-7/A-2 (1A2 ES TRIP) ___ UNSAT | |||
* 1SA-7/B-2 (1B2 ES TRIP) | |||
* 1SA-7/C-2 (1C2 ES TRIP) | |||
STANDARD: Determine that all of the above statalarms on 1SA-7 are clear by observing that their respective window lights are NOT illuminated. | |||
COMMENTS: | COMMENTS: | ||
STEP 3: Step 43 CRTICAL STEP Perform the following to reset ES (1UB1): | |||
___ SAT | |||
* Depress RESET for CH 5. | |||
* Depress RESET for CH 6. | |||
___ UNSAT STANDARD: Candidate depresses the RESET pushbuttons for Channels 5 and 6 located on 1UB1 COMMENTS: | |||
CRO-508 fnl - e Page 6 of 9 STEP 4: Step 44 Verify: | |||
___ SAT | ___ SAT | ||
___ UNSAT | * CH 5 TRIPPED light off | ||
* CH 6 TRIPPED light off | |||
___ UNSAT STANDARD: Candidate locates ES Channels 5 and 6 and verifies that their respective lights are no longer lit/illuminated. | |||
COMMENTS: | |||
STEP 5: Step 45 Open: | |||
___ SAT | ___ SAT | ||
___ UNSAT | * 1CC-7 | ||
* 1CC-8 | |||
___ UNSAT STANDARD: Candidate verifies 1CC-7 and 1CC-8 are OPEN by observing RED lights ON and GREEN lights OFF. | |||
COMMENTS: | COMMENTS: | ||
STEP 6: Step 46 | |||
___ SAT | ___ SAT Ensure one CC pump is running in the ON position. | ||
STANDARD: Candidate verifies only one CC pump is running. | STANDARD: Candidate verifies only one CC pump is running. | ||
___ UNSAT COMMENTS: | |||
CRO-508 fnl - e Page 7 of 9 STEP 7: Step 47 Ensure one CC pump off and in AUTO. | |||
___ SAT STANDARD: Candidate ensures the standby CC pump control switch is in the AUTO position. ___ UNSAT COMMENTS: | |||
STEP 8: Step 48 CRTICAL STEP Position the following switches to LOW: | |||
___ SAT | |||
* 1A RBCU | |||
* 1B RBCU | |||
* 1C RBCU | |||
___ UNSAT STANDARD: Candidate places the speed control switches for RBCUs 1A, 1B, & 1C to the LOW position. | |||
COMMENTS: | COMMENTS: | ||
___ SAT | STEP 9: Step 49 CRTICAL STEP Depress the following PUSH TO RET TO NORMAL AFT ES RESET | ||
___ UNSAT | ___ SAT pushbuttons: | ||
* 1A RBCU ES RESET | |||
* 1B RBCU ES RESET | |||
* 1C RBCU ES RESET ___ UNSAT STANDARD: Candidate depresses the following PUSH TO RET TO NORMAL AFT ES RESET pushbuttons for RBCUs 1A, 1B, & 1C Examiners Cue: Another operator will continue with this procedure. | |||
COMMENTS: | |||
END TASK STOP TIME: ____________ | |||
CRO-508 fnl - e Page 8 of 9 CRITICAL STEP EXPLANATIONS: | |||
STEP # Explanation 3 This step is required to reset the ES channels 5 & 6 so the associated components can be re-aligned for normal operation. | |||
. | 8 This step is required to return the RBCUs to a normal alignment. | ||
9 This step is required to return the RBCUs to a normal alignment. | |||
e CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | |||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
A MSLB has occurred. | A MSLB has occurred. | ||
ES Channels 1 | ES Channels 1 - 6 have actuated on High RB pressure. | ||
- 6 have actuated on High RB pressure. | EOP Encl. 5.1 (ES Actuation) is complete ALL ES Channels are being reset EOP Encl. 5.41 (ES Recovery) is complete through step 40 INITIATING CUES: | ||
EOP Encl. 5.1 (ES Actuation) is complete ALL ES Channels are being reset EOP Encl. 5.41 (ES Recovery) is complete through step 40 | The CRS directs you to continue in EOP Encl. 5.41 (ES Recovery) beginning at step 41. | ||
CRO-606 fnl - f Page 1 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-606 Energize Main Feeder Busses From CT-5 CANDIDATE EXAMINER | |||
CRO-606 fnl - f Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | |||
. | Energize Main Feeder Busses From CT-5 Alternate Path: | ||
Yes Facility JPM #: | |||
CRO-008 K/A Rating(s): | |||
System: 055 K/A: EA2.03 Rating: 3.9/4.7 Task Standard: | |||
Energize Main Feeder Busses from CT-5. | |||
Preferred Evaluation Location: Preferred Evaluation Method: | |||
Simulator __X___ In-Plant ______ Perform __X__ Simulate _____ | |||
==References:== | |||
EOP, Encl 5.38 (Restoration of Power) | |||
Validation Time: 15 minutes Time Critical: No | |||
==================================================================================== | |||
Candidate: _______________________________________ Time Start: _________ | |||
NAME Time Finish: ________ | |||
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________ | |||
Examiner: ______________________________ ____________________________________/________ | |||
NAME SIGNATURE DATE | |||
==================================================================================== | |||
COMMENTS | |||
CRO-606 fnl - f Page 3 of 15 SIMULATOR OPERATOR INSTRUCTIONS: | |||
: 1. RECALL Snap 218 | |||
CRO- | : 2. IMPORT Files for CRO-606 | ||
: 3. Place simulator in RUN | |||
CRO-606 fnl - f Page 4 of 15 Tools/Equipment/Procedures Needed: | |||
EOP, Encl 5.38 (Restoration of Power) | EOP, Encl 5.38 (Restoration of Power) | ||
READ TO OPERATOR DIRECTION TO TRAINEE: | READ TO OPERATOR DIRECTION TO TRAINEE: | ||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 experienced a unit trip followed by a lockout on CT | Unit 1 experienced a unit trip followed by a lockout on CT-1. | ||
-1. | Blackout tab of the EOP in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power). | ||
Blackout tab of the EOP in progress | INITIATING CUES: | ||
The CRS directs you to initiate Encl. 5.38, Restoration of Power, to regain power to the Main Feeder Buses. | |||
CRO-606 fnl - f Page 5 of 15 START TIME: _______ | |||
STEP 1: Step 1 Verify power has been restored. | |||
___ SAT STANDARD: Determine power has NOT been restored by observing MFB voltage on 1AB1. Perform RNO step. | |||
Continue to Step 2 | |||
___ UNSAT COMMENTS: | |||
STEP 2: Step 1 RNO GO TO Step 3. | |||
___ SAT STANDARD: GO TO Step 3. | |||
COMMENTS: | |||
___ UNSAT STEP 3: Step 3 CRITICAL STEP Place 1HP-31 in HAND and reduce demand to 0. | |||
___ SAT STANDARD: Place 1HP-31 in HAND and reduce demand to 0 using the toggle switch. | |||
Located on 1UB1. | |||
Continue to Step 4 | |||
___ UNSAT COMMENTS: | |||
STEP 4: Step 4 Close 1HP-21. | |||
___ SAT STANDARD: Close 1HP-21 by rotating the switch to the closed position on 1UB2. | |||
Continue to Step 5 COMMENTS: ___ UNSAT | |||
CRO-606 fnl - f Page 6 of 15 STEP 5: Step 5 Verify any of the following energized: | |||
* MFB1 ___ SAT | |||
* MFB2 STANDARD: Observes that zero (0) volts are indicated on both MFBs meters located on 1AB1. ___ UNSAT Continue to Step 5 RNO COMMENTS: | |||
STEP 6: Step 5 RNO GO TO Step 8. | |||
___ SAT STANDARD: GO TO Step 8. | |||
COMMENTS: ___ UNSAT STEP 7: Step 8 Verify CT-1 indicates 4160 volts. | |||
___ SAT STANDARD: Observes that zero (0) volts is indicated on CT-1 on 1AB1. | |||
Continue to Step 8 RNO COMMENTS: ___ UNSAT STEP 8: Step 8 RNO GO TO Step 18. | |||
___ SAT STANDARD: GO TO Step 18. | |||
COMMENTS: ___ UNSAT STEP 9: Step 18 Verify both Standby Bus #1 and Standby Bus #2 are de-energized. | |||
___ SAT STANDARD: Observes that zero (0) volts is indicated both Standby Buses located on 2AB3. | |||
Continue to Step 19 | |||
___ UNSAT COMMENTS: | |||
CRO-606 fnl - f Page 7 of 15 STEP 10: Step 19 Verify all Keowee units operating. | |||
___ SAT STANDARD: Determine that Keowee Unit 2 is Emergency Lockout by observing the Statalarm 2SA-18/A1. | |||
Continue to Step 19 RNO | |||
___ UNSAT COMMENTS: | |||
STEP 11: Step 19 RNO | |||
: 1. Emergency start Keowee units: | |||
___ SAT | |||
* KEOWEE EMER START CHANNEL A | |||
* KEOWEE EMER START CHANNEL B | |||
: 2. IF NO Keowee units are operating, ___ UNSAT THEN GO TO Step 38. | |||
STANDARD: Place the KEOWEE EMER START CHANNEL A and B switches to start located on 1UB1. | |||
COMMENTS: | |||
STEP 12: Step 20 Verify both Keowee units in Oconee Control (statalarms on): | |||
___ SAT | |||
STANDARD: Determine that Keowee Unit 2 is Emergency Lockout by observing the Statalarm 2SA-18/A1. Continue to Step 19 RNO | * UNIT 1 OCONEE CONTROL (2SA-17/E-1) | ||
KEOWEE EMER START CHANNEL A KEOWEE EMER START CHANNEL B | * UNIT 2 OCONEE CONTROL (2SA-18/E-1) | ||
: 2. IF NO Keowee units are operating, THEN GO TO Step | ___ UNSAT STANDARD: Determine neither Statalarm above is actuated. | ||
COMMENTS: | Continue to Step 20 RNO COMMENTS: | ||
UNIT 1 OCONEE CONTROL (2SA | STEP 13: Step 20 RNO Notify Keowee Operator to place both Keowee units Master Transfer | ||
-17/E-1) | ___ SAT switches to remote. | ||
-18/E-1) | |||
Continue to Step 20 RNO | |||
STANDARD: Call the Keowee Operator and ask that both Keowee units Master Transfer switches be place to remote. | STANDARD: Call the Keowee Operator and ask that both Keowee units Master Transfer switches be place to remote. | ||
Continue to Step 21 | ___ UNSAT Continue to Step 21 COMMENTS: | ||
STANDARD: Determine that only KHU 1 is operating. | |||
Continue to Step 21 RNO | CRO-606 fnl - f Page 8 of 15 STEP 14: Step 21 Verify both Keowee units operating. | ||
: 2. IF UNIT 2 EMER FDR ACB 4 is closed, AND Unit 2 Keowee is NOT operating, THEN open UNIT 2 EMER FDR ACB | ___ SAT STANDARD: Determine that only KHU 1 is operating. | ||
Continue to Step 21 RNO | |||
-3 and ACB-4 are OPEN, Continue to Step 22 | ___ UNSAT COMMENTS: | ||
STEP 15: Step 21 RNO | |||
Unit 1 | : 1. IF UNIT 1 EMER FDR ACB 3 is closed, AND Unit 1 Keowee is NOT | ||
-3 and determine it did NOT close. | ___ SAT operating, THEN open UNIT 1 EMER FDR ACB 3. | ||
: 2. IF UNIT 2 EMER FDR ACB 4 is closed, AND Unit 2 Keowee is NOT operating, THEN open UNIT 2 EMER FDR ACB 4. | |||
STANDARD: Determine 4160 volt power has NOT been restored to the MFB by observing the U | ___ UNSAT STANDARD: Determine that BOTH ACB-3 and ACB-4 are OPEN, Continue to Step 22 COMMENTS: | ||
-1 FDR BUS VOLTS meters on 1AB1. | ALTERNATE PATH STEP 16: Step 22 ___ SAT Ensure one of the following is closed for an operating Keowee unit: | ||
Continue to step | Unit 1 Unit 2 ___ UNSAT UNIT 1 UNIT 1 EMER FDR EMER FDR ACB-3 ACB-4 STANDARD: Attempt to close ACB-3 and determine it did NOT close. | ||
Continues to step 23 COMMENTS: | |||
STANDARD: Determine CT | STEP 17: Step 23 Verify 4160 volt power has been restored to the MFB. | ||
-4 indicates zero volts on meter located on 1AB3. | ___ SAT STANDARD: Determine 4160 volt power has NOT been restored to the MFB by observing the U-1 FDR BUS VOLTS meters on 1AB1. | ||
Continue to Step 25 RNO | Continue to step 23 RNO | ||
___ UNSAT COMMENTS: | |||
CRO-606 fnl - f Page 9 of 15 STEP 18: Step 23 RNO GO TO Step 25 | |||
___ SAT STANDARD: GO TO Step 25 COMMENTS: ___ UNSAT STEP 19: Step 25 Verify CT-4 indicates 4160 volts. | |||
___ SAT STANDARD: Determine CT-4 indicates zero volts on meter located on 1AB3. | |||
Continue to Step 25 RNO | |||
___ UNSAT COMMENTS: | |||
STEP 20: Step 25 RNO GO TO Step 38. | |||
___ SAT STANDARD: GO TO Step 38. | |||
___ UNSAT COMMENTS: | |||
STEP 21: Step 38 IAAT CT-5 indicates 4160 volts, | |||
___ SAT THEN GO TO Step 55. | |||
STANDARD: Determine that approximately 4160 volts is indicated on the CT-5 voltage meter located on 1AB1 and then GO TO Step 55 ___ UNSAT COMMENTS: | |||
CRO-606 fnl - f Page 10 of 15 STEP 22: Step 55 CRITICAL STEP Place the following switches in MAN: | |||
___ SAT | |||
* MFB1 AUTO/MAN | |||
* MFB2 AUTO/MAN | |||
* STANDBY 1 AUTO/MAN ___ UNSAT | |||
* STANDBY 2 AUTO/MAN STANDARD: Rotates the AUTO/MAN selector switch to the MANUAL position for each of the switches listed above. | |||
Continue to Step 56 Examiner note: Various Statalarms will actuate as these switches are manipulated. | |||
They are expected. | |||
COMMENTS: | |||
STEP 23: Step 56 Open the following breakers: | |||
___ SAT | |||
* N11 MFB1 NORMAL FDR | |||
* N21 MFB2 NORMAL FDR | |||
* E11 MFB1 STARTUP FDR ___ UNSAT | |||
* E21 MFB2 STARTUP FDR STANDARD: Verify each of the above breakers is OPEN by observing the white breaker open light is LIT on 1AB1. | |||
Continue to Step 57 COMMENTS: | |||
STEP 24: Step 57 *CRITICAL STEP Place the following switches in MAN: | |||
___ SAT | |||
* *CT4 BUS 1 AUTO/MAN | |||
* *CT4 BUS 2 AUTO/MAN | |||
* CT5 BUS 1 AUTO/MAN ___ UNSAT | |||
* CT5 BUS 2 AUTO/MAN STANDARD: Rotates the AUTO/MAN selector switch to the MANUAL position for each of the switches listed above located on 2AB3. | |||
Continue to Step 58 COMMENTS: | |||
CRO-606 fnl - f Page 11 of 15 STEP 25: Step 58 Open the following breakers: | |||
___ SAT | |||
* SK1 CT4 STBY BUS 1 FEEDER | |||
* SK2 CT4 STDY BUS 2 FEEDER | |||
___ UNSAT STANDARD: Verify each of the above breakers is OPEN by observing the white breaker open light is LIT on 2AB3. | |||
Continue to Step 59 COMMENTS: | |||
STEP 26: Step 59 CRITICAL STEP Close the following breakers: | |||
___ SAT | |||
* SL1 CT5 STBY BUS 1 FEEDER | |||
* SL2 CT5 STBY BUS 2 FEEDER | |||
___ UNSAT STANDARD: Go to the CLOSED position for each of the switches listed above located on 1AB3.. | |||
Continue to Step 60 COMMENTS: | |||
STEP 27: Step 60 CRITICAL STEP Place the following switches in AUTO: | |||
___ SAT | ___ SAT | ||
* CT5 BUS 1 AUTO/MAN | |||
* CT5 BUS 2 AUTO/MAN | |||
___ UNSAT STANDARD: Rotates the AUTO/MAN selector switch to the AUTO position for each of the switches listed above. | |||
Continue to Step 61 COMMENTS: | |||
Continue to Step | |||
CRO-606 fnl - f Page 12 of 15 STEP 28: Step 61 Verify Standby Bus #1 energized. | |||
___ SAT STANDARD: Observes that 4160 volts are indicated for Standby Bus #1 located on 2AB3. | |||
Continue to Step | Continue to Step 62 ___ UNSAT COMMENTS: | ||
STEP 29: Step 62 Notify CR SRO in each unit where a blackout exists that Standby Bus #1 is energized. ___ SAT STANDARD: Notifies CR SRO that Standby Bus #1 is energized located on 2AB3. | |||
Continue to Step 63 | |||
___ UNSAT Cue: If asked, inform candidate that only Unit 1 is affected. | |||
COMMENTS: | |||
STEP 30: Step 63 CRITICAL STEP Close the following breakers: | |||
___ SAT | |||
* S11 STBY BUS 1 TO MFB1 | |||
* S21 STBY BUS 2 TO MFB2 | |||
___ UNSAT STANDARD: Goes to the CLOSED position for each of the switches listed above. | |||
Continue to Step 64 Note: Only 1 of the Stby Busses must be energized to restore power to MFBs. | |||
COMMENTS: | |||
STEP 31: Step 64 Verify any of the following energized: | |||
___ SAT | |||
* 1TC | |||
* 1TD | |||
* 1TE ___ UNSAT STANDARD: Observes that 4160 volts indicated on either MFB voltmeters or OAC. | |||
Continue to Step 65 COMMENTS: | |||
CRO-606 fnl - f Page 13 of 15 STEP 32: Step 65 Notify Unit 1 CR SRO of status of 4160V SWGR. | |||
___ SAT STANDARD: Notifies CR SRO of status of 4160V SWGR | |||
___ UNSAT COMMENTS: | |||
END TASK STOP TIME: ____________ | |||
STANDARD: Notifies CR SRO of status of 4160V SWGR | |||
CRO-606 fnl - f Page 14 of 15 CRITICAL STEP EXPLANATIONS: | |||
STEP # Explanation 3 Step is required to protect the RCP seals. | STEP # Explanation 3 Step is required to protect the RCP seals. | ||
22 Step is required to satisfy power switching logic. | 22 Step is required to satisfy power switching logic. | ||
24 Step is required to satisfy power switching logic. | 24 Step is required to satisfy power switching logic. | ||
26 Step is required to energize the Main Feeder Bus. | 26 Step is required to energize the Main Feeder Bus. | ||
27 Step is required to provide undervoltage protection | 27 Step is required to provide undervoltage protection. | ||
30 Step is required to energize the Main Feeder Bus. | |||
f | f CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 experienced a unit trip followed by a lockout on CT | Unit 1 experienced a unit trip followed by a lockout on CT-1. | ||
-1. | Blackout tab of the EOP in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power). | ||
Blackout tab of the EOP in progress | |||
The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power). | |||
INITIATING CUES: | INITIATING CUES: | ||
The CRS directs you to initiate Encl. 5.38, Restoration of Power, to regain power to the Main Feeder Buses. | The CRS directs you to initiate Encl. 5.38, Restoration of Power, to regain power to the Main Feeder Buses. | ||
CRO-607 fnl - j Page 1 of 14 | CRO-607 fnl - j Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-607 Activate the SSF From the SSF Control Room CANDIDATE EXAMINER | ||
CANDIDATE | |||
CRO-607 fnl - j Page 2 of 14 | CRO-607 fnl - j Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | ||
No | Activate The SSF From the SSF Control Room Alternate Path: | ||
CRO-047 | No Facility JPM #: | ||
System: 062 K/A: | CRO-047 K/A Rating(s): | ||
Power is swapped and the SSF D/G is emergency started. Flow is established to the RCP seals using the SSF-RCMU system. Flow is established to the SGs using the SSF ASW system. Preferred Evaluation Location: | System: 062 K/A: A2.11 Rating: 3.7/4.1 Task Standard: | ||
Preferred Evaluation Method: | Power is swapped and the SSF D/G is emergency started. Flow is established to the RCP seals using the SSF-RCMU system. Flow is established to the SGs using the SSF ASW system. | ||
Simulator | Preferred Evaluation Location: Preferred Evaluation Method: | ||
_____ In-Plant __X ___ | Simulator _____ In-Plant __X ___ Perform _____ Simulate __X__ | ||
==References:== | ==References:== | ||
AP/0/A/1700/25 Validation Time: | AP/0/A/1700/25 Validation Time: 12 minutes Time Critical: YES | ||
==================================================================================== | |||
Candidate: | Candidate: _______________________________________ Time Start: _________ | ||
_______________________________________ | NAME Time Finish: ________ | ||
Time Start: | Performance Rating: SAT ______ UNSAT ______ Performance Time: _________ | ||
Performance Rating: | |||
Performance Time | |||
: _________ | |||
Examiner: ______________________________ ____________________________________/________ | Examiner: ______________________________ ____________________________________/________ | ||
NAME | NAME SIGNATURE DATE | ||
==================================================================================== | |||
COMMENTS CRO-607 fnl - j Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS: | COMMENTS | ||
: 1. None | |||
CRO-607 fnl - j Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS: | |||
: 1. None | |||
CRO-607 fnl - j Page 4 of 14 Tools/Equipment/Procedures Needed: | CRO-607 fnl - j Page 4 of 14 Tools/Equipment/Procedures Needed: | ||
Line 755: | Line 817: | ||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 3 was operating at 100% power Unit 3 TD EFDWP is out of service Tornado warnings are in affect AP/0/A/1700/006 (Natural Disaster) in progress You are pre-staged in the SSF Control Room and in communication with the Unit 3 Control Room as directed by AP/0/A/1700/006 (Natural Disaster). | |||
Unit 3 Reactor has just tripped and the unit has experienced a complete loss of all AC power AP/0/A/1700/025 (SSF EOP) has been initiated INITIATING CUES: | |||
The CRS calls and informs you of the following: | |||
* Unit 3 has lost all AC power | |||
* SSF RCMU feed and SSF ASW feed to the SGs are required | |||
* The breaker transfers have NOT been performed | |||
* Begin AP/25 actions starting at Step 4.5 THIS JPM IS TIME CRITICAL | |||
CRO-607 fnl - j Page 5 of 14 START TIME: _______ | |||
TIME CRITICAL TIME STARTS ________ CRITICAL STEP | |||
___ SAT STEP 1: Step 4.5 Perform the following on the affected unit: | |||
* Open 3XSF-F5A (3XSF NORM FDR BKR FROM 3X8) and remove Kirk Key ___ UNSAT | |||
* Using Kirk Key, close 1, 2, 3XSF-F3A (1, 2, 3XSF EMERG FDR BKR FROM OXSF) | |||
STANDARD: Student: Locates and opens NORMAL FDR BKR FROM 1, 2, 3X8 is by rotating breaker switch to the OFF position and removes the Kirk Key. | |||
Student locates EMERG FDR BKR FROM OXSF inserts the Kirk Key and closed the breaker by rotating breaker switch to the ON position. | |||
Continues to Step 4.6 Cue: As operator performs the key/breaker operation, indicate to operator the appropriate component positions. | |||
NOTE: Kirk Key must be rotated 1/2 turn to be removed. | |||
COMMENTS: | |||
STEP 2: Step 4.6 Verify SSF D/G is operating | |||
___ SAT STANDARD: Determines the D/G is not operating and continues to step 4.6 RNO (GOTO to Step 4.8) | |||
___ UNSAT Continues to step 4.8 COMMENTS: | |||
CRO-607 fnl - j Page 6 of 14 STEP 3: Step 4.8 CRITICAL STEP Depress DIESEL EMERGENCY START push button. | |||
___ SAT STANDARD The SSF Control Room DIESEL EMERGENCY START pushbutton is pressed. | |||
___ UNSAT Continues to Step 4.9 Cue: Allow 12 sec for the D/G to reach rated speed. | |||
COMMENTS: | |||
STEP 4: Step 4.9 Verify SSF D/G operating. | |||
___ SAT STANDARD: Candidate reports by indications and sound that D/G is operating. | |||
Continues to Step 4.10 | |||
___ UNSAT COMMENTS: | |||
STEP 5: Step 4.10 Open breaker OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T). ___ SAT STANDARD: The green TRIP pushbutton on the SSF OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T) control switch is pressed. ___ UNSAT Continues to Step 4.11 Cue: Inform student that the green light for OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T) is on and the red light is off. | |||
COMMENTS: | |||
CRO-607 fnl - j Page 7 of 14 STEP 6: Step 4.11 Verify open OTS1-0 (SSF ALT. POWER SUPPLY BKR OTS1-0). | |||
___ SAT STANDARD: Determine that OTS1-0 (SSF ALT. POWER SUPPLY BKR OTS1-0) is open by verify that the green open light is lit and the red closed light is off. ___ UNSAT Continues to Step 4.12 COMMENTS: | |||
STEP 7: Step 4.12 WHEN 3 seconds have elapsed THEN continue. | |||
___ SAT STANDARD: Wait three (3) seconds after OTS1-1 is opened and continue. | |||
Continues to Step 4.13 | |||
___ UNSAT COMMENTS: | |||
STEP 8: Step 4.13 CRITICAL STEP Close breaker OTS1-4 (DIESEL GEN BREAKER). | |||
___ SAT STANDARD: The red CLOSE pushbutton on the SSF Control Room OTS1-4 (DIESEL GEN BREAKER) switch is depressed. ___ UNSAT Continues to Step 4.14 Cue: After student closes in diesel generator breaker, inform him/her that red light is on and green light is off. | |||
COMMENTS: | |||
CRO-607 fnl - j Page 8 of 14 STEP 9: Step 4.14 Verify Diesel Engine Service Water Pump operating. | |||
- | ___ SAT STANDARD: Determine that the Diesel Engine Service Water Pump operating by observing the red ON light lit. | ||
Continues to Step 4.15 ___ UNSAT Cue: Indicate that the Diesel Engine Service Water Pump red light is on. | |||
COMMENTS: | |||
STEP 10: Step 4.15 CRITICAL STEP Start the SSF ASW Pump. | |||
___ SAT STANDARD: SSF ASW PUMP red ON pushbutton is depressed. | |||
Continues to Step 4.16 | |||
___ UNSAT Cue: After ASW pump ON pushbutton is pressed, inform student of the following: | |||
STEP | * ASW pump red light is on and green light is off. | ||
* SSF Control Room AUX SER WTR PUMP AMPS meter indicates on scale. | |||
COMMENTS: | |||
COMMENTS: | STEP 11: Step 4.16 Verify any of the following required: | ||
___ SAT | ___ SAT | ||
___ UNSAT | * SSF RCMU feed | ||
Continues to | * SSF ASW feed to SGs | ||
___ UNSAT STANDARD: Determine that SSF RCMU and SSF ASW are still required. | |||
Continues to Step 4.17 COMMENTS: | |||
CRO-607 fnl - j Page 9 of 14 STEP 12: Step 4.17 PERFORM the following on all affected units: | |||
___ SAT | ___ SAT | ||
* Encl 5.1A (Emergency Operation of SSF Systems Unit 1) (PS) | |||
* Encl 5.1B (Emergency Operation of SSF Systems Unit 2) (PS) | |||
* Encl 5.1C (Emergency Operation of SSF Systems Unit 3) (PS) ___ UNSAT STANDARD: Obtains Control room copy of Encl 5.1C (Emergency Operation of SSF Systems Unit 3). | |||
Continues to Step 1 of Encl 5.1C. | |||
___ UNSAT | |||
STANDARD: | |||
COMMENTS: | COMMENTS: | ||
STEP 13: Step 1 Verify SSF RCMU is required for Unit 3. | |||
___ SAT STANDARD: Determine that SSF RCMU is required for Unit 3. | |||
Continues to step 3. ___ UNSAT COMMENTS: | |||
Continues to | STEP 14: Step 2. CRITICAL STEP Position OVERRIDE RC MAKEUP PUMP switch to START. | ||
___ SAT STANDARD: OVERRIDE RC MAKEUP PUMP switch is rotated to the START position. | |||
Continues to step 3. | |||
___ UNSAT NOTE: Allow 9 seconds for the following valves to stroke from the time the OVERRIDE switch is operated, and then as soon as the 9 second stroke time is complete the time-critical time #1 is complete. | |||
CRITICAL TIME #1 _________ 20 minutes COMMENTS: | |||
CRO-607 fnl - j Page 10 of 14 STEP 15: Step 3 CRITICAL STEP Select CLOSE for the following valves: | |||
___ SAT | ___ SAT | ||
* 3HP-3 | |||
* 3HP-20 | |||
3HP-3 | * 3HP-4 | ||
___ UNSAT STANDARD: Student: Presses the green CLOSE button for the following: | |||
* 3HP-3 | |||
* 3HP-20 | |||
* 3HP-4 Continues to step 6. | |||
Cue: Initial indication for valve position is red light is on and green light is off for all valves. During valve travel, both the red and green lights are on. | Cue: Initial indication for valve position is red light is on and green light is off for all valves. During valve travel, both the red and green lights are on. | ||
COMMENTS: | COMMENTS: | ||
CRITICAL STEP | STEP 16: Step 4 Verify SSF ASW is required to feed Unit 3 SGs. | ||
___ SAT STANDARD: Determine that SSF ASW is required to feed Unit 3 SGs. | |||
Continues to step 5. | |||
___ UNSAT COMMENTS: | |||
CRO-607 fnl - j Page 11 of 14 STEP 17: Step 5 CRITICAL STEP Open the following valves: | |||
___ SAT | ___ SAT | ||
* 3CCW-287 | |||
* 3CCW-269 (throttle valve) | |||
___ UNSAT STANDARD: Red OPEN button is pressed for 3CCW-287. | |||
Red OPEN button is pressed and held (throttle valve) for 3CCW-269 Continues to Step 6 Cue: After allowing 25 seconds for valve stroke time, inform the student the Red light is ON and the Green light is OFF. | |||
Cue: After allowing 12 seconds for valve stroke time inform student the Green light is OFF and the Red light is ON. | |||
3CCW-287 | |||
STANDARD: Red OPEN button is pressed for 3CCW-287. Red OPEN button is pressed and held (throttle valve) for 3CCW | |||
-269 Continues to Step 6 | |||
Cue: | |||
COMMENTS: | COMMENTS: | ||
CRITICAL STEP | NOTE CRITICAL STEP | ||
* For high decay heat cores, aggressive feeding up to a maximum of 425 gpm may be required. ___ SAT | |||
* For very low decay heat cores, no feeding may be required. | |||
* SSF ASW flow gauge has a 60 gpm low flow cut off. | |||
SSF ASW flow gauge has a 60 gpm low flow cut off. | ___ UNSAT STEP 18: Step 6 IAAT RCS pressure is NOT within 1950 - 2250 psig, THEN throttle 3CCW-268, as necessary, to maintain RCS pressure 1950 | ||
STEP 18: | - 2250 psig. | ||
- 2250 psig, THEN throttle 3CCW | STANDARD: ASW Pump to SG Supply, 3CCW-268, is THROTTLED OPEN and RCS pressure is monitored. | ||
-268, as necessary, to maintain RCS pressure 1950 | |||
- 2250 psig. | |||
STANDARD: ASW Pump to SG Supply, 3CCW | |||
-268, is THROTTLED OPEN and RCS pressure is monitored. | |||
Continues to Step 7 Cue: Indicate that RCS pressure is 2375 psig Cue: After allowing 14 sec for valve stroke time, indicate to operator that ASW flow is 400 gpm and RCS pressure is 2235 slowly decreasing. | Continues to Step 7 Cue: Indicate that RCS pressure is 2375 psig Cue: After allowing 14 sec for valve stroke time, indicate to operator that ASW flow is 400 gpm and RCS pressure is 2235 slowly decreasing. | ||
CRITICAL TIME #2 __________ | CRITICAL TIME #2 __________ 14 minutes COMMENTS: | ||
14 minutes COMMENTS: | |||
___ UNSAT STOP TIME: ____________ | CRO-607 fnl - j Page 12 of 14 STEP 19: Step 7 WHEN RCS pressure 2350 psig, | ||
___ SAT THEN select CLOSE on 3RC-4. | |||
STANDARD: Determine that RCS pressure is < 2350 and select CLOSE on 3RC-4. | |||
___ UNSAT Cue: Indicate that RCS pressure is 2330 psig Cue: When 3RC-4 has been closed, inform the candidate that another operator will complete this procedure. | |||
COMMENTS: | |||
END TASK STOP TIME: ____________ | |||
CRO-607 fnl - j Page 13 of 14 | CRO-607 fnl - j Page 13 of 14 CRITICAL STEP EXPLANATIONS: | ||
STEP # Explanation 1 Must be performed to power the SSF from the Diesel/Generator. | STEP # Explanation 1 Must be performed to power the SSF from the Diesel/Generator. | ||
3 Must be performed to start the diesel and get power for the SSF. | 3 Must be performed to start the diesel and get power for the SSF. | ||
8 Necessary to power the SSF loads. | 8 Necessary to power the SSF loads. | ||
10 Starts the SSF ASWP 14 Starts the SSF RCMU pump (TCA 20 minutes) 15 Necessary to achieve RCS pressure control. | 10 Starts the SSF ASWP 14 Starts the SSF RCMU pump (TCA 20 minutes) 15 Necessary to achieve RCS pressure control. | ||
17 Necessary to lineup the SSF ASW to supply the SGs. | 17 Necessary to lineup the SSF ASW to supply the SGs. | ||
18 Necessary to lineup the SSF ASW to supply the SGs. | 18 Necessary to lineup the SSF ASW to supply the SGs. (TCA 14 minutes) | ||
(TCA 14 minutes | |||
) | |||
j | j CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 3 was operating at 100% power | Unit 3 was operating at 100% power Unit 3 TD EFDWP is out of service Tornado warnings are in affect AP/0/A/1700/006 (Natural Disaster) in progress You are pre-staged in the SSF Control Room and in communication with the Unit 3 Control Room as directed by AP/0/A/1700/006 (Natural Disaster). | ||
Unit 3 TD EFDWP is out of service | |||
Tornado warnings are in affect | |||
AP/0/A/1700/006 (Natural Disaster) in progress | |||
You are pre-staged in the SSF Control Room and in communication with the Unit 3 Control Room as directed by AP/0/A/1700/006 (Natural Disaster). | |||
Unit 3 Reactor has just tripped and the unit has experienced a complete loss of all AC power AP/0/A/1700/025 (SSF EOP) has been initiated INITIATING CUES: | Unit 3 Reactor has just tripped and the unit has experienced a complete loss of all AC power AP/0/A/1700/025 (SSF EOP) has been initiated INITIATING CUES: | ||
The CRS calls and informs you of the following: | The CRS calls and informs you of the following: | ||
Unit 3 has lost all AC power | * Unit 3 has lost all AC power | ||
* SSF RCMU feed and SSF ASW feed to the SGs are required | |||
* The breaker transfers have NOT been performed | |||
* Begin AP/25 actions starting at Step 4.5 THIS JPM IS TIME CRITICAL | |||
CRO-803 R0 - g Page 1 of 13 | CRO-803 R0 - g Page 1 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-803 Perform Required Actions For A Turbine Building Flood CANDIDATE EXAMINER | ||
CRO-803 R0 - g Page 2 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | |||
Perform Required Actions For A Turbine Building Flood Alternate Path: | |||
Yes Facility JPM #: | |||
CRO-060 K/A Rating(s): | |||
System: APE BW/A07 K/A: AA1.3 Rating: 3.3/3.5 Task Standard: | |||
Perform required actions for a Turbine Building Flood in accordance with AP/10, Uncontrollable Flooding of Turbine Building Preferred Evaluation Location: Preferred Evaluation Method: | |||
Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____ | |||
==References:== | |||
AP/10, Uncontrollable Flooding of Turbine Building Validation Time: 15 minutes Time Critical: NO | |||
===================================================================================== | |||
Candidate: ______________________________________ Time Start: _____________ | |||
NAME Time Finish: ____________ | |||
Performance Rating: SAT ______ UNSAT ______ Performance Time _______ | |||
Examiner: ______________________________ ____________________________________/________ | |||
NAME SIGNATURE DATE | |||
===================================================================================== | |||
COMMENTS | |||
CRO-803 R0 - g Page 3 of 13 SIMULATOR OPERATOR INSTRUCTIONS: | |||
: 1. RECALL Snap 219 | |||
: 2. IMPORT files for CRO-803 | |||
: 3. Go to RUN | |||
CRO-803 R0 - g Page 4 of 13 Tools/Equipment/Procedures Needed: | |||
AP/10, Uncontrollable Flooding of Turbine Building READ TO OPERATOR DIRECTION TO TRAINEE: | AP/10, Uncontrollable Flooding of Turbine Building READ TO OPERATOR DIRECTION TO TRAINEE: | ||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL | INITIAL CONDITIONS: | ||
Unit 1 was operating at 100% power | Unit 1 was operating at 100% power Unit 2 is in cold shutdown. | ||
The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water level is rising. | |||
Unit 1 has been tripped and the EOP is being completed by other team members. | |||
INITIATING CUES: | |||
The CRS directs you to refer to Unit 1 AP/10, Uncontrollable Flooding of Turbine Building, and perform required actions. | |||
CRO-803 R0 - g Page 5 of 13 START TIME: _______ | |||
STEP 1: Step 4.1 Trip the Rx. | |||
___ SAT STANDARD: Depress the Rx trip pushbutton on 1UB1. Verify the RX is tripped by observing all control rods are inserted. | |||
___ UNSAT Continue to Step 4.2. | |||
COMMENTS: | |||
NOTE CRITICAL STEP Tripping the CCW pumps will cause loss of condenser vacuum which will result in TBVs failing closed and trip of the MFDWPs. ___ SAT STEP 2: Step 4.2 Ensure all CCW pumps are shutdown. ___ UNSAT STANDARD: The 1A, 1B, and 1C CCW pump switches are rotated to the TRIP position and verify the red close lights extinguish and the white open lights illuminate. (located on 1AB3) | |||
Continue to Step 4.3. | |||
COMMENTS: | |||
The | CRO-803 R0 - g Page 6 of 13 STEP 3: Step 4.3 CRITICAL STEP Press both of the following on the TURB BLDG FLOOD EMER CLOSING ALL CCWP DISCH VALVES control switch: ___ SAT | ||
* CLOSE 1 | |||
* CLOSE 2 | |||
___ UNSAT STANDARD: "CLOSE 1" and "CLOSE 2" on the TURB BLDG FLOOD EMER CLOSING ALL CCWP DISCH VALVES control switch are both depressed. (located on 1AB3) | |||
Continue to Step 4.4. | |||
COMMENTS: | |||
STEP 4: Step 4.4 Verify all CCW pump discharge valves are closed. | |||
___ SAT STANDARD: The green CLOSED lights for 1CCW-10, 11, and 13 are verified illuminated and the red OPEN lights for the same valves are verified extinguished. (located on 1AB3) ___ UNSAT Determine that 1CCW-12 is NOT closed by observing the red open light is lit on 1AB3. | |||
Continue to Step 4.4 RNO. | |||
COMMENTS: | |||
CRO-803 R0 - g Page 7 of 13 ALTERNATE PATH NOTE The control switches for the CCW pump discharge valves do not seal-in. The valves act ___ SAT as throttle valves unless the associated CCW pump switch is in the TRIP position. | |||
STEP 5: Step 4.4 RNO | |||
___ UNSAT Dispatch an operator to ensure all CCW pump discharge valves are closed (Equipment Rm): | |||
* 1XS1-F2C (1CCW-10 Bkr 1A CCW Pump Disch) | |||
* 1XS1-F3C (1CCW-13 Bkr 1D CCW Pump Disch) | |||
* 1XS2-F2D (1CCW-11 Bkr 1B CCW Pump Disch) | |||
* 1XS3-2E (1CCW-12 Bkr 1C CCW Pump Disch) | |||
STANDARD: An operator is dispatched to the Equipment Room to ensure 1CCW-12 is closed. | |||
Continue to Step 4.5. | |||
Booth cue: After 2 minutes call as the NEO and inform candidate that 1CCW-12 will NOT close. | |||
COMMENTS: | |||
NOTE Field tasks that may affect multiple units should be coordinated with Unit 2 and Unit 3. | |||
___ SAT STEP 6: Step 4.5 Dispatch operators to ensure all three flood doors are closed and in the SECURED position from the AB side (A-1, at Unit 1, 2, and 3 stairwell ___ UNSAT entrances to TB): {2} | |||
* Unit 1 Flood Door | |||
* Unit 2 Flood Door | |||
* Unit 3 Flood Door STANDARD: Dispatch an NEO to ensure all three flood doors are closed and in the SECURED position from the AB side. | |||
Continue to Step 4.6. | |||
Booth cue: When called, inform candidate that an operator has been dispatched. | |||
COMMENTS: | |||
CRO-803 R0 - g Page | CRO-803 R0 - g Page 8 of 13 STEP 7: Step 4.6 Verify LPI decay heat removal is in progress. | ||
STEP | ___ SAT STANDARD: Determine LPI pumps are NOT operating by observing pumps switch indications on 1UB2. | ||
___ UNSAT Continue to Step 4.6 RNO GO TO Step 4.8. | |||
COMMENTS: | |||
STEP 8: Step 4.8 Dispatch an operator to position the waterbox discharge valve switches (T-3, East of condenser catwalk): ___ SAT | |||
* 1CCW-20 (1A1) switch to HAND | |||
* 1CCW-20 (1A1) switch to CLOSE ___ UNSAT | |||
* 1CCW-21 (1A2) switch to HAND | |||
* 1CCW-21 (1A2) switch to CLOSE | |||
* 1CCW-22 (1B1) switch to HAND | |||
* 1CCW-22 (1B1) switch to CLOSE | |||
* 1CCW-23 (1B2) switch to HAND | |||
* 1CCW-23 (1B2) switch to CLOSE | |||
* 1CCW-24 (1C1) switch to HAND | |||
* 1CCW-24 (1C1) switch to CLOSE | |||
* 1CCW-25 (1C2) switch to HAND | |||
* 1CCW-25 (1C2) switch to CLOSE STANDARD: Candidate should dispatch an operator to place the above valves to HAND and CLOSE. | |||
Continue to Step 4.9. | |||
Booth Cue: When called, inform candidate that an operator has been dispatched. | |||
COMMENTS: | |||
CRO-803 R0 - g Page 9 of 13 STEP 9: Step 4.9 Make a PA announcement of the event including restrictions on entry into TB basement due to electrical hazard. ___ SAT STANDARD: PA announcement is made using the Control Room phone. | |||
___ UNSAT Continue to Step 4.10. | |||
COMMENTS: | |||
STEP 10: Step 4.10 Begin attempts to locate and isolate the source of the flooding. | |||
___ SAT STANDARD: Dispatch operators to locate and isolate the source of the flooding. | |||
Continue to Step 4.11. ___ UNSAT Booth Cue: When called, inform candidate that an operator has been dispatched. | |||
COMMENTS: | |||
STEP 11: Step 4.11 Ensure all Unit 1 ESV pumps are shutdown: | |||
___ SAT | ___ SAT | ||
___ UNSAT | * 1A ESV Pump | ||
* 1C ESV Pump | |||
* 1B ESV Pump ___ UNSAT STANDARD: Stop ALL Unit 1 ESV pumps by rotating their pumps switches to stop and verify that the red on light extinguishes and the white open light illuminates. (located on 1AB3) | |||
. (located on 1AB3) | Continue to Step 4.12. | ||
Continue to Step | COMMENTS: | ||
CRO-803 R0 - g Page 10 of 13 ALTERNATE PATH STEP 12: Step 4.12 Verify all CCW pump discharge valves were successfully closed in ___ SAT earlier steps. | |||
STANDARD: Verify that 1CCW-10, 11, and 13 are closed by observing that the green ___ UNSAT closed light is lit for each valve. (located on 1AB3) | |||
STANDARD: Verify that 1CCW-10, 11, and 13 are closed by observing that the green closed light is lit for each valve. (located on 1AB3) | |||
Determine that 1CCW-12 is still open by observing red open indication light is lit on 1AB3 or observing open indication on the OAC. | Determine that 1CCW-12 is still open by observing red open indication light is lit on 1AB3 or observing open indication on the OAC. | ||
Continue to Step 4.12 RNO. COMMENTS: | Continue to Step 4.12 RNO. | ||
COMMENTS: | |||
Remove pipe cap at 1CCW | CRITICAL STEP STEP 13: Step 4.12 RNO Dispatch an operator to perform the following (ESV Trench, Intake): ___ SAT | ||
-26 (CCW Inlet High Point Vent). {4} | * Remove pipe cap at 1CCW-26 (CCW Inlet High Point Vent). {4} | ||
Open 1CCW-26 (CCW Inlet High Point Vent). Remove pipe cap at 1CCW | * Open 1CCW-26 (CCW Inlet High Point Vent). | ||
-28 (CCW Inlet High Point Vent). {4} | ___ UNSAT | ||
Open 1CCW-28 (CCW Inlet High Point Vent). | * Remove pipe cap at 1CCW-28 (CCW Inlet High Point Vent). {4} | ||
Continue to Step 4.13 | * Open 1CCW-28 (CCW Inlet High Point Vent). | ||
STANDARD: Candidate should dispatch an operator to position the above valves as directed. | |||
Continue to Step 4.13 Booth Cue: When called, inform candidate that an operator has been dispatched. | |||
COMMENTS: | |||
CRO-803 R0 - g Page 11 of 13 STEP 14: Step 4.13 Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW Pumps). | |||
COMMENTS: | ___ SAT STANDARD: Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW Pumps). | ||
___ UNSAT Continue to Step 4.14. | |||
STANDARD: Determine that HPSW is available by observing the HPSW Jockey pump operating and level in the EWST | Booth Cue: When called, inform candidate that an operator has been dispatched. | ||
. | COMMENTS: | ||
Recover damaged equipment. | STEP 15 Step 4.14 IAAT HPSW is NOT available, THEN ensure Encl 5.31 (Temporarily Charging the HPSW System) of Unit 1 EOP has been initiated. ___ SAT STANDARD: Determine that HPSW is available by observing the HPSW Jockey pump operating and level in the EWST. ___ UNSAT Continue to Step 4.15. | ||
Remove water from accessible sumps. | COMMENTS: | ||
STANDARD: Candidate should call the WCC/TSC and discuss the following: | STEP 16: Step 4.15 Coordinate with WCC/TSC to perform the following: | ||
Recover damaged equipment. | * Recover damaged equipment. ___ SAT | ||
Remove water from accessible sumps. | * Remove water from accessible sumps. | ||
Cue: Inform candidate that another RO will complete this procedure. This | ___ UNSAT STANDARD: Candidate should call the WCC/TSC and discuss the following: | ||
* Recover damaged equipment. | |||
* Remove water from accessible sumps. | |||
Cue: Inform candidate that another RO will complete this procedure. This task is complete COMMENTS: | |||
END TASK STOP TIME: ____________ | |||
CRO-803 R0 - g Page 12 of 13 | CRO-803 R0 - g Page 12 of 13 CRITICAL STEP EXPLANATIONS: | ||
STEP # Explanation 2 Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement. | STEP # Explanation 2 Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement. | ||
3 Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement. | 3 Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement. | ||
13 Necessary to ensure CCW inlet piping is vented to break siphon. | 13 Necessary to ensure CCW inlet piping is vented to break siphon. | ||
g | g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 was operating at 100% power | Unit 1 was operating at 100% power Unit 2 is in cold shutdown. | ||
The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water level is rising. | |||
Unit 2 is in cold shutdown. | |||
The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water level is rising. | |||
Unit 1 has been tripped and the EOP is being completed by other team members. | Unit 1 has been tripped and the EOP is being completed by other team members. | ||
INITIATING CUES: | INITIATING CUES: | ||
The CRS directs you to refer to Unit 1 AP/10, Uncontrollable Flooding of Turbine Building, and perform required actions. | The CRS directs you to refer to Unit 1 AP/10, Uncontrollable Flooding of Turbine Building, and perform required actions. | ||
CRO- | CRO-903 R0 - h Page 1 of 16 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-903 Release GWD Tank CANDIDATE EXAMINER | ||
CRO-903 R0 - h Page 2 of 16 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | |||
Release GWD Tank Alternate Path: | |||
CRO- | Yes Facility JPM #: | ||
Yes | CRO-903 K/A Rating(s): | ||
CRO-903 | System: 071 K/A: A4.26 Rating: 3.1/3.9 Task Standard: | ||
System: 071 K/A: | |||
Release a GWD tank correctly using OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release) and terminate the release when unexpected results are noted. | Release a GWD tank correctly using OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release) and terminate the release when unexpected results are noted. | ||
Preferred Evaluation Location: | Preferred Evaluation Location: Preferred Evaluation Method: | ||
Preferred Evaluation Method: | Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____ | ||
Simulator __X__ In-Plant __ ___ | |||
==References:== | ==References:== | ||
OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release) | OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release) | ||
Validation Time: | Validation Time: 30 minutes Time Critical: NO | ||
30 minutes | ===================================================================================== | ||
Candidate: | Candidate: _______________________________________ Time Start: ________ | ||
_______________________________________ | NAME Time Finish: ________ | ||
Time Start: ________ | Performance Rating: SAT ______ UNSAT ______ Performance Time ______ | ||
NAME | Examiner: ______________________________ ____________________________________/________ | ||
Performance Rating: | NAME SIGNATURE DATE | ||
Performance Time | ===================================================================================== | ||
______ | COMMENTS | ||
Examiner: ______________________________ | |||
NAME | CRO-903 R0 - h Page 3 of 16 SIMULATOR OPERATOR INSTRUCTIONS: | ||
: 1. RECALL SNAP 201 | |||
COMMENTS CRO- | : 2. Go to RUN | ||
: 1. RECALL SNAP 201 | |||
OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) | CRO-903 R0 - h Page 4 of 16 Tools/Equipment/Procedures Needed: | ||
OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) & 4.10 (GWD Tank Sample Request) | |||
PT/0/A/230/001 (Radiation Monitor Check) | |||
READ TO OPERATOR DIRECTION TO TRAINEE: | READ TO OPERATOR DIRECTION TO TRAINEE: | ||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Release of D GWD tank is desired No other GWRs in progress. | |||
OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to step 3.9 INITIATING CUES: | |||
CRS directs you to complete the release of the D GWD tank beginning at step 3.9 of Enclosure 4.9 (GWD Tank Release). | |||
CRO-903 R0 - h Page 5 of 16 START TIME: _______ | |||
NOTE: If N2 was added to the most recently released GWD tank until 1RIA-37 indicated CRITICAL STEP | |||
< 700 cpm, OR if the tanks' radioactivity was < 2.1E-05 Ci / ml when it was released, the GWD piping is considered "purged". ___ SAT STEP 1: Step 3.9 3.9 Adjust 1RIA-37 setpoints for release as follows: ___ UNSAT 3.9.1 Perform one of the following: | |||
CRO- | |||
NOTE: If N2 was added to the most recently released GWD tank until 1RIA | |||
-37 indicated < 700 cpm, OR if the tanks' radioactivity was < 2.1E | |||
-05 GWD piping is considered "purged". | |||
STEP 1: | |||
-37 setpoints for release as follows: | |||
3.9.1 Perform one of the following: | |||
A. IF all of the following: | A. IF all of the following: | ||
Calculated setpoints are < 1E+07 CPM 1RIA-37 operable | * Calculated setpoints are < 1E+07 CPM | ||
* 1RIA-37 operable | |||
* GWD piping purged {15} | |||
set alarms as follows: | set alarms as follows: | ||
Set 1RIA-37 Alert setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1) | * Set 1RIA-37 Alert setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1) | ||
Set 1RIA-37 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1) | * Set 1RIA-37 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1) | ||
NOTE: If GWD piping NOT purged on most recent release, RP independently verifies release data and 1RIA | NOTE: If GWD piping NOT purged on most recent release, RP independently verifies release data and 1RIA-37 setpoint is set at zero to allow the tank to be released. {15} | ||
-37 setpoint is set at zero to allow the tank to be released. {15} | |||
B. IF any of the following: | B. IF any of the following: | ||
Calculated setpoints are > 1E+07 CPM | * Calculated setpoints are > 1E+07 CPM | ||
* 1RIA-37 out-of-service | |||
* GWD piping NOT purged {15} | |||
over-ride 1RIA-37 setpoints as follows: | over-ride 1RIA-37 setpoints as follows: | ||
Set 1RIA-37 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check). | * Set 1RIA-37 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check). | ||
Set 1RIA-37 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check) | * Set 1RIA-37 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check). | ||
STANDARD: Refer to PT/0/A/0230/001 (Radiation Monitor Check) Encl. 13.6 (1RIA-37 and 1RIA-38 Setpoints) and using the RIA Screen insert the calculated 1RIA-37 setpoint of 2.73 E5 CPM Continue to Step 3.10 COMMENTS: | |||
-37 and 1RIA-38 Setpoints) | |||
10 | |||
CRO-903 R0 - h Page 6 of 16 STEP 2: Step 3.10 CRITICAL STEP 3.10 Adjust 1RIA-38 setpoints for release as follows: | |||
-38 setpoints for release as follows: | 3.10.1 Perform one of the following: ___ SAT A. IF calculated setpoints are < 1E+06 CPM AND 1RIA-38 operable, set alarms as follows: | ||
3.10.1 Perform one of the following: | * Set 1RIA-38 Alert setpoint at _______________cpm per ___ UNSAT PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8) | ||
A. IF calculated setpoints are < 1E+06 CPM AND 1RIA-38 | * Set 1RIA-38 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8) | ||
Set 1RIA-38 Alert setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8) | NOTE: Due to type of radiation 1RIA-38 monitors, it is NOT sensitive enough to perform an adequate N2 purge. | ||
Set 1RIA-38 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8) | |||
NOTE: Due to type of radiation 1RIA | |||
-38 monitors, it is NOT sensitive enough to perform an adequate N2 purge. | |||
B. IF calculated setpoints are > 1E+06 CPM OR 1RIA-38 out of service, over-ride 1RIA-38 setpoints as follows: | B. IF calculated setpoints are > 1E+06 CPM OR 1RIA-38 out of service, over-ride 1RIA-38 setpoints as follows: | ||
Set 1RIA-38 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check). | * Set 1RIA-38 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check). | ||
Set 1RIA-38 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check). | * Set 1RIA-38 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check). | ||
STANDARD: Refer to PT/0/A/0230/001 (Radiation Monitor Check) Encl. 13.6 (1RIA | STANDARD: Refer to PT/0/A/0230/001 (Radiation Monitor Check) Encl. 13.6 (1RIA-37 and 1RIA-38 Setpoints) and using the RIA Screen insert the calculated 1RIA-38 setpoint of 324 CPM. | ||
-37 and 1RIA-38 Setpoints) | Continue to Step 3.11 COMMENTS: | ||
11 COMMENTS: | STEP 3: Step 3.11 Ensure GWR DISCHARGE FLOW CONTROL in "HAND". | ||
___ SAT STANDARD: Ensure GWR DISCHARGE FLOW CONTROL in "HAND" located on 1AB3. | |||
STANDARD: Ensure GWR DISCHARGE FLOW CONTROL in "HAND" located on 1AB3. Continue to Step 3. | Continue to Step 3.12 ___ UNSAT COMMENTS: | ||
12 COMMENTS: | |||
CRO-903 R0 - h Page 7 of 16 STEP 4: Step 3.12 Verify GWR DISCHARGE FLOW CONTROL "CLOSED" | |||
Continue to Step 3. | ___ SAT STANDARD: Verify GWR DISCHARGE FLOW CONTROL CLOSED located on 1AB3. | ||
Continue to Step 3.13 | |||
Continue to Step 3. | ___ UNSAT COMMENTS: | ||
14 COMMENTS: | STEP 5: Step 3.13 Remove "Purged / Not Purged" CR tag from GWR DISCHARGE FLOW CONTROL. ___ SAT STANDARD: Remove "Purged / Not Purged" CR tag from GWR DISCHARGE FLOW CONTROL located on 1AB3. | ||
___ UNSAT Continue to Step 3.14 COMMENTS: | |||
Begin periodically monitoring all three Unit 3 GWD tanks to determine if pressure in any tank is decreasing unexpectedly. {12} | STEP 6: Step 3.14 Notify Unit 3 CR to perform the following: | ||
Place a note on turnover sheet "If 3RIA | * Begin periodically monitoring all three Unit 3 GWD tanks to ___ SAT determine if pressure in any tank is decreasing unexpectedly. {12} | ||
-45 alarms or GWD tank pressure in any tank is decreasing unexpectedly, notify Unit 1 CR to terminate GWD tank release". | * Place a note on turnover sheet "If 3RIA-45 alarms or GWD tank pressure in any tank is decreasing unexpectedly, notify Unit 1 CR to ___ UNSAT terminate GWD tank release". | ||
STANDARD: Notify Unit 3 CR to begin periodically monitoring all three Unit 3 GWD tanks to determine if pressure in any tank is decreasing unexpectedly Notify Unit 3 CR to place above note on the turnover sheet Continue to Step 3. | STANDARD: Notify Unit 3 CR to begin periodically monitoring all three Unit 3 GWD tanks to determine if pressure in any tank is decreasing unexpectedly Notify Unit 3 CR to place above note on the turnover sheet Continue to Step 3.15 COMMENTS: | ||
15 COMMENTS: | |||
CRO-903 R0 - h Page 8 of 16 STEP 7: Step 3.15 Notify Unit 2 CR to place a note on turnover sheet "If 2RIA-45 alarms, notify Unit 1 CR to terminate GWD tank release". ___ SAT STANDARD: Notify Unit 2 CR to place above note on the turnover sheet. | |||
-45 alarms, notify Unit 1 CR to terminate GWD tank release". | Continue to Step 3.16 ___ UNSAT COMMENTS: | ||
STANDARD: Notify Unit 2 CR to place above note on the turnover sheet. | STEP 8: Step 3.16 Begin monitoring all four Unit 1 GWD tanks to determine if pressure in any tank is decreasing unexpectedly. ___ SAT STANDARD: Begin monitoring GWD tank pressures on chart recorder on 1VB2 or OAC. | ||
Continue to Step 3. | ___ UNSAT Continue to Step 3.17 COMMENTS: | ||
16 | STEP 9: Step 3.17 IF 1RIA-37 NOT in service AND the tank being released is 2.1E-05 Ci | ||
/ ml, notify RP to prepare to survey GWD piping at 1RIA-37. {15} ___ SAT | |||
STANDARD: Begin monitoring GWD tank pressures on chart recorder on 1VB2 or OAC. Continue to Step 3. | ________________________ _____ | ||
17 COMMENTS: | Person Notified Date STANDARD: Determine 1RIA-37 is in service and N/A step 3.17. ___ UNSAT Continue to Step 3.18 COMMENTS: | ||
-37. {15} ________________________ | |||
CRO-903 R0 - h Page 9 of 16 STEP 10: Step 3.18 IF AT ANY TIME any tank is decreasing unexpectedly, perform the following: ___ SAT 3.18.1 Close GWR DISCHARGE FLOW CONTROL. | |||
-37 is in service and N/A step 3.17. | 3.18.2 Notify RP to initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences) due to potential unplanned ___ UNSAT radioactive effluent release. | ||
Continue to Step 3. | ________________________ _____ | ||
18 | Person Notified Date 3.18.3 Go To Section 4 (GWR Termination). | ||
3.18.1 | |||
3.18.2 | |||
________________________ | |||
STANDARD: Determine IAAT step is not met at this time. | STANDARD: Determine IAAT step is not met at this time. | ||
Continue to Step 3. | Continue to Step 3.19 COMMENTS: | ||
19 | STEP 11: Step 3.19 IF AT ANY TIME desired to terminate release, perform the following: | ||
3.19.1 | 3.19.1 Close GWR DISCHARGE FLOW CONTROL. ___ SAT 3.19.2 Go To Section 4 (GWR Termination). | ||
3.19.2 | STANDARD: Determine IAAT step is not met at this time. ___ UNSAT Continue to Step 3.20 COMMENTS: | ||
STANDARD: Determine IAAT step is not met at this time. | |||
Continue to Step 3. | CRO-903 R0 - h Page 10 of 16 STEP 12: Step 3.20 CRITICAL STEP Open GWD-100 (Decay Tanks Discharge Header Block). (A-2-209/E 13' N of Door) ___ SAT STANDARD: Dispatch NEO to Open GWD-100 (Decay Tanks Discharge Header Block). ___ UNSAT Continue to Step 3.21 Booth Note: GWD-100 is OPEN. | ||
20 COMMENTS: | Cue: Inform candidate that GWD-100 is open. | ||
STANDARD: Dispatch NEO to Open GWD | |||
-100 (Decay Tanks Discharge Header Block). Continue to Step 3. | |||
21 | |||
-100 is OPEN. | |||
Cue: Inform candidate that GWD | |||
-100 is open. | |||
COMMENTS: | COMMENTS: | ||
CRITICAL STEP | STEP 13: Steps 3.21 - 3.23 IF releasing GWD Tank A, perform the following | ||
___ SAT STANDARD: Determine NOT releasing GWD Tank A, B, and C and N/A steps 3.21, 3.22, and 3.23. | |||
Continue to Step 3.24 | |||
___ UNSAT COMMENTS: | |||
STEP 14: Step 3.24 CRITICAL STEP IF releasing GWD Tank D perform the following: | |||
___ SAT | ___ SAT | ||
* Open GWD-205 (Decay Tank 1D Discharge Block) (IRW Building) | |||
* Place GWD-207 (D INTERIM GWD TANK DISCH) switch to "OPEN" | |||
___ UNSAT STANDARD: Dispatch NEO to open GWD-205 (Decay Tank 1D Discharge Block). | |||
Cue: Inform candidate that GWD-205 is open. | |||
Open GWD-205 (Decay Tank | Locate GWD-207 (D INTERIM GWD TANK DISCH) on 1AB3 and place switch to "OPEN" Continue to Step 3.25 COMMENTS: | ||
(IRW Building) | |||
Place GWD-207 ( | CRO-903 R0 - h Page 11 of 16 NOTE: Station Limit release rates, per SLC 16.11, will NOT be exceeded if recommended release rates per Enclosure 4.10 (GWD Tank Sample Request) are followed. | ||
___ SAT The following approval levels are required for releases: {10}{13} | |||
-205 is open. Locate GWD | All Station Releases in Progress (including this one) Required Level of Approval 1 GWR in progress through P/A/C filter at ___ UNSAT 1/3 Station Limit ( 30 day holdup) SRO 1 GWR in progress at 1/3 Station Limit | ||
-207 ( | (< 30 day holdup OR released without P/A/C filter) OSM 1 GWR in progress at 2/3 Station Limit OSM 2 GWRs in progress at 1/3 Station Limit each OSM 3 GWRs in progress at 1/3 Station Limit each OSM STEP 15: Step 3.25 Circle Required Level of Approval above based on Release Conditions. | ||
25 | STANDARD: Circle SRO on enclosure. | ||
Continue to Step 3.26 COMMENTS: | |||
STEP 16: Step 3.26 Record approval granted for release: | |||
___ SAT | ___ SAT | ||
________________________ _________ / _____ | |||
Approval Date Time STANDARD: Place approval name and date and time on enclosure. ___ UNSAT Continue to Step 3.27 Cue: Approval is granted for release by Tracy Lemons at current Date/Time. | |||
COMMENTS: | |||
CRO-903 R0 - h Page 12 of 16 STEP 17: Step 3.27 IF tank holdup < 30 days, perform the following STANDARD: Determine tank has been held up greater than 30 days and N/A steps ___ SAT 3.27.1 - 3.27.2. | |||
Continue to Step 3.28 | |||
___ UNSAT COMMENTS: | |||
STEP 18: Step 3.28 IF tank is released without processing through a P/A/C filter AND Projected 31 day average gaseous effluent organ dose > limit, perform ___ SAT the following STANDARD: Determine tank is being released through a P/A/C filter and N/A steps 3.28.1 - 3.28.4. | |||
___ UNSAT Continue to Step 3.29 COMMENTS: | |||
STEP 19: Step 3.29 Record recommended Release Rate from Enclosure 4.10 (GWD Tank Sample Request): ___ SAT | |||
________________________ | ______________ cfm STANDARD: Record recommended Release Rate from Enclosure 4.10 (GWD Tank Sample Request): ___ UNSAT | ||
_________ / _____ Approval | __4.19 E4____ cfm Continue to Step 3.30 COMMENTS: | ||
27 Cue: Approval is granted for release by Tracy Lemons at current Date/Time. | |||
COMMENTS: | |||
30 days, perform the following | |||
29 COMMENTS: | |||
______________ cfm STANDARD: Record recommended Release Rate from Enclosure 4.10 (GWD Tank Sample Request): | |||
__4.19 E4____ cfm Continue to Step 3. | |||
30 | |||
___ SAT | CRO-903 R0 - h Page 13 of 16 NOTE: With Unit 1 PRV system shutdown, RIA-32 sample point for '1 PRV System Filter Discharge' is sampling air in piping between Unit 1 PRV discharge and Unit Vent, NOT the general area {2} ___ SAT During or just after GWD Release RIA-32 counts may increase while selected to '1 PRV System Filter Discharge' causing 1SA-8/B-9 "Process Monitor Radiation High" to alarm. | ||
___ UNSAT STEP 20: Step 3.30 Place the following note on Unit 1 Turnover sheet: | |||
"Just after or during a GWD release, 1SA-8/B-9 may alarm from RIA-32 sample point selected to '1 PRV System Filter Discharge'. IF 1SA-8/B-9 is due to RIA '1 PRV System Filter Discharge', it can be considered an expected alarm". | |||
STANDARD: Candidate should indicate that the above note will be placed on the turnover sheet. | |||
Continue to Step 3.31 COMMENTS: | |||
STEP 21: Step 3.31 CRITICAL STEP Adjust GWR DISCHARGE FLOW CONTROL to obtain desired release rate. | |||
___ SAT STANDARD: Slowly adjust the manual loading knob to obtain the desired release rate. | |||
Continue to Step 3.32 | |||
___ UNSAT Note: Actual release rate will be much less than the maximum flow rate allowed by the release permit. Flow is monitored on VB1 recorder 1MSCCR0001 COMMENTS: | |||
CRO-903 R0 - h Page 14 of 16 ALTERNATE PATH STEP 22: Step 3.32 Record "Begin GWR # _________" in Unit Log. ___ SAT STANDARD: Candidate should indicate a Unit log entry would be made. | |||
STANDARD: Candidate should indicate a Unit log entry would be made. | ___ UNSAT Note: The B GWD tank will decrease instead of the D. The candidate should note this while monitoring the tank pressures and then perform IAAT Step 3.18. | ||
Note: The | Candidate may also perform the IAAT because he notes that a release is occurring but the D tank pressure is not decreasing. In both cases unexpected results were noted. | ||
Candidate may also perform the IAAT because he notes that a release is occurring but the | |||
COMMENTS: | COMMENTS: | ||
STEP 23: Step 3.18 *CRITICAL STEP IF AT ANY TIME any tank is decreasing unexpectedly, perform the following: ___ SAT 3.18.1 Close GWR DISCHARGE FLOW CONTROL. | |||
3.18.2 Notify RP to initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences) due to potential unplanned ___ UNSAT radioactive effluent release. | |||
3.18.1 | ________________________ _____ | ||
3.18.2 | Person Notified Date 3.18.3 Go To Section 4 (GWR Termination). | ||
-02 (Investigation of Unusual Radiological Occurrences) due to potential unplanned radioactive effluent release. | STANDARD: Determine IAAT step is met because the B GWD Tank pressure is decreasing. | ||
________________________ | *Close GWR DISCHARGE FLOW CONTROL. | ||
Notify RP initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences) | |||
STANDARD: Determine IAAT step is met because the | |||
Notify RP initiate SRPMP 8 | |||
-02 (Investigation of Unusual Radiological Occurrences) | |||
Go To Section 4 (GWR Termination). | Go To Section 4 (GWR Termination). | ||
Cue: Another operator will complete this procedure. | Cue: Another operator will complete this procedure. | ||
COMMENTS: | COMMENTS: | ||
END TASK STOP TIME: ____________ | |||
CRO- | CRO-903 R0 - h Page 15 of 16 CRITICAL STEP EXPLANATIONS: | ||
STEP # Explanation 1 Required to set RIA to prevent station release above limits. | STEP # Explanation 1 Required to set RIA to prevent station release above limits. | ||
2 Required to set RIA to prevent station release above limits. | 2 Required to set RIA to prevent station release above limits. | ||
12 Required to align release flow path. | 12 Required to align release flow path. | ||
14 Required to align release flow path. | 14 Required to align release flow path. | ||
21 Required to align release flow path. | 21 Required to align release flow path. | ||
23 Required to stop the release of the wrong tank. | 23 Required to stop the release of the wrong tank. | ||
h | h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Release of | Release of D GWD tank is desired No other GWRs in progress. | ||
D | OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to step 3.9 INITIATING CUES: | ||
CRS directs you to complete the release of the D GWD tank beginning at step 3.9 of Enclosure 4.9 (GWD Tank Release). | |||
NLO-400 fnl - i Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-400 Station ASW Pump Alignment CANDIDATE EXAMINER | |||
NLO-400 fnl - i Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | |||
Align and start the Station ASW Pump Alternate Path: | |||
No Facility JPM #: | |||
NLO-017 K/A Rating(s): | |||
System: B/WE04 K/A: EA1.1 Rating: 4.4/4.2 Task Standard: | |||
Perform EOP Encl. 5.10 Station ASW Pump Alignment for valve and breaker alignment required to provide Station ASW to the SGs. | |||
Preferred Evaluation Location: Preferred Evaluation Method: | |||
Simulator __ __ In-Plant __ X ___ Perform __ ___ Simulate __X__ | |||
==References:== | |||
EOP Encl. 5.10 Station ASW Pump Alignment OP/0/A/1107/011 Removal And Restoration Of Auxiliary Electrical Equipment Validation Time: 16 minutes Time Critical: NO | |||
==================================================================================== | |||
Candidate: _______________________________________ Time Start: _________ | |||
NAME Time Finish: ________ | |||
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________ | |||
Examiner: ______________________________ ____________________________________/________ | |||
NAME SIGNATURE DATE | |||
==================================================================================== | |||
COMMENTS | |||
NLO-400 fnl - i Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS None | |||
NLO-400 fnl - i Page 4 of 12 Tools/Equipment/Procedures Needed: | |||
600 volt breaker rackout tool EP/1/A/1800/001 Enclosure 5.10 Station ASW Pump Alignment OP/0/A/1107/011 Removal And Restoration Of Auxiliary Electrical Equipment .5 Rack In 600 Volt Breaker READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | |||
INITIAL CONDITIONS Unit 1 was operating at 100% power The SSF is OOS BOTH Standby Buses are energized from CT-5 Unit 1 trips due to a loss of all Main and Emergency Feedwater HPI Forced Cooling is established The EOP HPI CD Tab in progress HPI forced cooling flow is determined to be inadequate INITIATING CUES The CRS directs you to perform EOP Enclosure 5.10 Station ASW Pump Alignment to align and then start the Station ASW Pump. | |||
NLO- | NLO-400 fnl - i Page 5 of 12 START TIME: _______ | ||
: | NOTE All equipment operated in the following steps is located in A-1-128, ASW Pump Rm. | ||
___ SAT STEP 1: Step 1 Obtain racking equipment and pipe wrench from EOP equipment locker U2AB1 (A-1, hallway near U2 elevator lobby). | |||
STANDARD: Student locates the equipment locker containing the required racking and ___ UNSAT protective equipment. | |||
* Safety glasses | |||
* Face shield | |||
* Hard hat | |||
* Rubber gloves with leather protectors | |||
* Flame-resistant clothing | |||
* Pipe wrench | |||
* Breaker racking tool Continue to Step 2 NOTE: This step may be simulated and discussed, at the discretion of the evaluator. | |||
Cue: Inform the student that for this JPM, it is not necessary to break the security seal on the locker for demonstrating equipment to be utilized. | |||
COMMENTS: | |||
STEP 2: Step 2 CRITICAL STEP Open CCW-99 (Aux Service Water Pump Suction). | |||
___ SAT STANDARD: Candidate locates CCW-99 and simulates rotating handwheel counterclockwise to the open position. | |||
Continue to Step 3 ___ UNSAT Cue: After the student locates and simulates placing CCW-99 in the open position, inform student CCW-99 position indicator is pointing to the "open" position. | |||
COMMENTS: | |||
NLO-400 fnl - i Page 6 of 12 STEP 3: Step 3 CRITICAL STEP Open CCW-247 (Aux Service Water Pump Recirc). | |||
___ SAT STANDARD: Candidate locates CCW-247 and simulates rotating chain operator in the counterclockwise direction by pulling chain operator until handwheel comes to a hard stop. ___ UNSAT Continue to Step 4 Cue: After student locates and simulates placing CCW-247 in the open position, inform student that CCW-247 is at a counterclockwise hard stop position. | |||
COMMENTS: | |||
STEP 4: Step 4 CRITICAL STEP Open CCW-308 (Aux Service Water Pump Vent). | |||
___ SAT STANDARD: Candidate locates CCW-308 on top of the Station ASW pump, removes pipe cap with simulated wrench from EOP Locker, pulls the locking pin and simulates rotating the 90° valve until the lever is parallel to the vent piping to the open position. ___ UNSAT Continue to Step 5 Cue: After student simulates opening CCW-308, inform him/her that a solid stream of water is issuing from the valve. | |||
COMMENTS: | |||
STEP 5: Step 5 *CRITICAL STEP WHEN all air is vented from Station ASW Pump, THEN close CCW-308. | |||
___ SAT STANDARD: Candidate recognizes from previous instructor cue that all air is vented from Station ASW pump and simulates rotating CCW-308 clockwise to the closed position. | |||
Continue to Step 6 ___ UNSAT | |||
*Note: Replacing the pipe cap in not critical. | |||
Cue: After student simulates closing CCW-308, inform him/her that water flow has stopped and CCW-308 is at a clockwise hard stop position. | |||
COMMENTS: | |||
NLO-400 fnl - i Page 7 of 12 STEP 6: Step 6 CRITICAL STEP Rack in ASWS-6B (STATION ASW PUMP BKR) ( ASW 4160/600V SWGR ASWS-6). ___ SAT STANDARD: Candidate simulates donning protective clothing/equipment and simulates racking in ASW pump breaker (ASWS-6B). | |||
Continue to Step 7 ___ UNSAT Cue: After the student simulates racking in the breaker, inform student that the STATION AUX SERVICE WATER PUMP Switch green "Trip" indicating light is ON. | |||
Cue: If the candidate asks, provide him/her with a copy of OP/0/A/1107/011 Enclosure 4.5 (not critical) | |||
COMMENTS: | |||
STEP 7: Step 7 Close ASW SWGR FDR (ASW Swgr Fdr From B1T- Unit 10) (ASW 4160/600V Swgr ASWS-5). ___ SAT STANDARD: Candidate verifies that ASW SWGR FDR From B1T- Unit 10 is closed. | |||
Continue to Step 8 | |||
___ UNSAT NOTE: This breaker is normally closed. | |||
Cue: After student locates breaker, inform student that the two red CLOSED lights are lit and that the white OPEN light is off. | |||
COMMENTS: | |||
STEP 8: Step 8 IAAT AP/6 (Natural Disaster) directs restoring the Station ASW pump to standby, THEN GO TO Step 14. ___ SAT STANDARD: Candidate determines from cue that this step does not apply and continues to Step 9. | |||
___ UNSAT Cue: If the candidate asks, inform him/her that AP/06 is NOT in progress. | |||
COMMENTS: | |||
NLO-400 fnl - i Page 8 of 12 STEP 9: Step 9 CRITICAL STEP WHEN notified that Standby Bus #1 is energized, AND notified to start the Station ASW pump, THEN perform the following (ASW 4160/600V ___ SAT SWGR ASWS-5): | |||
A. Close ASW TRANSFORMER FDR (ASW SWITCHGEAR TRANSFORMER FEEDER). | |||
___ UNSAT B. Close STATION ASW PUMP SW (STATION ASW PUMP CONTROL SWITCH) (ASW 4160V SWGR ASWX-5). | |||
STANDARD: Candidate should recognize from the Initial Conditions that Standby Bus #1 is energized and the CRS has directed him/her to start the Station ASW Pump. | |||
Candidate locates and closes ASW Switchgear Transformer Feeder breaker on ASWS-5 by simulating rotating the handle to the closed position. | |||
Cue: After candidate simulates closing the breaker, inform him/her that the red "closed" light is ON and the green "trip" light is OFF. | |||
Candidate locates Station ASW Pump Switch on ASWS-5 and simulates rotating the handle to the CLOSED position. | |||
Continue to Step 10 Cue: After candidate simulates closing the breaker, inform him/her that the Station ASW Pump Switch red CLOSED light is ON and the green TRIP light is OFF. | |||
COMMENTS: | |||
STEP 10: Step 10 Close CCW-309 (Aux Service Water Pump Disch Drain) (12 West of ASW pump). ___ SAT STANDARD: Candidate locates CCW-309 and simulates closing CCW-309 by rotating the valve handwheel in a clockwise direction to a hard stop. | |||
Continue to Step 11 ___ UNSAT Cue: Inform candidate that CCW-309 handwheel is fully clockwise and at a hard stop position. | |||
STANDARD: | |||
- | |||
- | |||
COMMENTS: | |||
- | |||
- | |||
COMMENTS: | COMMENTS: | ||
NLO-400 fnl - i Page 9 of 12 STEP 11: Step 11 CRITICAL STEP Perform the following: | |||
A. Position CCW-101 (Aux Service Water Pump Discharge) only one | |||
___ SAT turn open. | |||
A. Position CCW | |||
-101 (Aux Service Water Pump Discharge) only one turn open. | |||
B. Open CCW-101 an additional one turn open at a rate of one quarter turn every 15 seconds. | B. Open CCW-101 an additional one turn open at a rate of one quarter turn every 15 seconds. | ||
C. WHEN 5 minutes have elapsed, THEN slowly open CCW | C. WHEN 5 minutes have elapsed, THEN slowly open CCW-101 until ___ UNSAT full open STANDARD: Candidate locates CCW-101 and simulates opening the valve one turn by rotating the valve operator in the counterclockwise direction by pulling on the chain operator. | ||
-101 until full open STANDARD: Candidate locates CCW | Candidate opens CCW-101 an additional on turn open at a rate of one quarter turn every 15 seconds. | ||
-101 and simulates opening the valve one turn by rotating the valve operator in the counterclockwise direction by pulling on the chain operator. | |||
Candidate opens CCW | |||
-101 an additional on turn open at a rate of one quarter turn every 15 seconds. | |||
When 5 minutes have elapsed, candidate slowly opens CCW-101 until full open. | When 5 minutes have elapsed, candidate slowly opens CCW-101 until full open. | ||
Continue to Step 12 | Continue to Step 12 Cue: After the candidate has correctly explained how to perform steps A & B, inform him her that 5 minutes have elapsed (time compression). | ||
Cue: | Cue: Inform candidate that CCW-101 handwheel is at a hard stop after following the sequence correctly. | ||
-101 handwheel is at a hard stop after following the sequence correctly | |||
COMMENTS: | COMMENTS: | ||
STEP 12: Step 12 Verify Turbine Building flood is in progress. | |||
___ UNSAT | ___ SAT STANDARD: Candidate determines from the Initial Conditions that a Turbine Building flood is NOT in progress. | ||
___ UNSAT Continue to Step 12 RNO COMMENTS: | |||
NLO- | NLO-400 fnl - i Page 10 of 12 STEP 13: Step 12 RNO Notify CRO that Station ASW Pump is operating. | ||
___ SAT STANDARD: Candidate contacts the Unit 1 Control Room by radio or phone and informs them that the Station ASW Pump is operating. | |||
___ UNSAT COMMENTS: | |||
END TASK STOP TIME: ____________ | |||
i | NLO-400 fnl - i Page 11 of 12 CRITICAL STEP EXPLANATIONS STEP # Explanation 2 Necessary to align flowpath 3 Necessary to align flowpath 4 Necessary to vent the pump 5 Necessary to stop venting the pump 6 Necessary to provide power to the pump. | ||
9 Necessary to provide power to the pump. | |||
11 Necessary to provide flowpath. | |||
The SSF is OOS BOTH Standby Buses are energized from CT | i CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | ||
-5 Unit 1 trips due to a loss of all Main and Emergency Feedwater | INITIAL CONDITIONS Unit 1 was operating at 100% power The SSF is OOS BOTH Standby Buses are energized from CT-5 Unit 1 trips due to a loss of all Main and Emergency Feedwater HPI Forced Cooling is established The EOP HPI CD Tab in progress HPI forced cooling flow is determined to be inadequate INITIATING CUES The CRS directs you to perform EOP Enclosure 5.10 Station ASW Pump Alignment to align and then start the Station ASW Pump. | ||
NLO-700 fnl - k Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-700 Restoration of ICS Auto Power CANDIDATE EXAMINER | |||
NLO-700 fnl - k Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: | |||
Restoration of ICS AUTO Power Alternate Path: | |||
Yes Facility JPM #: | |||
NLO-700 K/A Rating(s): | |||
System: BW/A02 K/A: AA1.3 Rating: 3.4/3.6 Task Standard: | |||
ICS AUTO power is restored per AP/1/A/1700/023, Loss of ICS Power. | |||
Preferred Evaluation Location: Preferred Evaluation Method: | |||
Simulator __ __ In-Plant __ X ___ Perform __ ___ Simulate __X _ | |||
==References:== | |||
AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) Rev. 20 Validation Time: 16 minutes Time Critical: NO | |||
=================================================================================== | |||
Candidate: _______________________________________ Time Start: _________ | |||
NAME Time Finish: ________ | |||
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________ | |||
Examiner: ______________________________ ____________________________________/________ | |||
NAME SIGNATURE DATE | |||
=================================================================================== | |||
COMMENTS | |||
NLO-700 fnl - k Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS: | |||
NONE | |||
NLO-700 fnl - k Page 4 of 9 Tools/Equipment/Procedures Needed: | |||
AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) | AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) | ||
READ TO OPERATOR DIRECTION TO TRAINEE: | READ TO OPERATOR DIRECTION TO TRAINEE: | ||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | ||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 operating at 100% power 1SA-2/B-11 (ICS AUTO POWER FAILURE) is actuated INITIATING CUES: | |||
The CRS directs you to use AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) to restore ICS AUTO power on Unit 1. | |||
NLO-700 fnl - k Page 5 of 9 START TIME: _______ | |||
STEP 1: Step 1 Verify the following breakers closed (Unit 1 Cable Rm): | |||
* 1KRA breaker #1 (100A 1P, POWER PANELBOARD 1KI) ___ SAT | |||
* 1KI BREAKER #1 (30A 1P, AUTO POWER (ICS)) | |||
NLO-700 fnl - k Page 5 of 9 | ___ UNSAT STANDARD: Locate 1KRA panel board and breaker #1 and verify it is closed. | ||
STEP 1: | Cue: Indicate to the candidate that 1KRA breaker #1 is CLOSED. | ||
1KRA breaker #1 (100A 1P, POWER PANELBOARD 1KI) 1KI BREAKER #1 (30A 1P, AUTO POWER (ICS)) | Locate 1KI panel board and breaker #1 and verify it is closed. | ||
STANDARD: Locate 1KRA panel board and breaker #1 and verify it is closed | Cue: Indicate to the candidate that 1KI breaker #1 is tripped OPEN. | ||
Continue Step 1 RNO. | |||
Locate 1KI panel board and breaker | COMMENTS: | ||
STEP 2: Step 1 RNO | |||
: 1. Reset and close the affected breakers (Unit 1 Cable Rm): | |||
___ SAT | |||
_____1KI BREAKER #1 (30A 1P, AUTO POWER (ICS)) | _____1KI BREAKER #1 (30A 1P, AUTO POWER (ICS)) | ||
: 2. IF either of the above breakers fail to close | : 2. IF either of the above breakers fail to close | ||
: 3. WHEN both of the above breakers are closed THEN continue. STANDARD: 1. | ___ UNSAT | ||
: 3. WHEN both of the above breakers are closed THEN continue. | |||
STANDARD: 1. Resets and closes 1KI BREAKER #1 by taking the breaker to the open position and then closing it. | |||
: 2. Step does not apply. Both breakers are closed. | : 2. Step does not apply. Both breakers are closed. | ||
: 3. Determine both breakers are closed and continue. | : 3. Determine both breakers are closed and continue. | ||
Cue: Indicate to the candidate that | Cue: Indicate to the candidate that 1KI breaker #1 is CLOSED. | ||
Continue to Step 2. | |||
COMMENTS: | |||
NLO-700 fnl - k Page 6 of 9 ALTERNATE PATH STEP 3: Step 2 | |||
___ SAT Contact Unit 1 CR to verify ICS AUTO power has been restored as indicated by 1SA-2/B-11 (ICS AUTO POWER FAILURE) off. | |||
___ UNSAT STANDARD: Contacts Unit 1 CR to verify ICS AUTO power has been restored as indicated by 1SA-2/B-11 (ICS AUTO POWER FAILURE) off. | |||
STANDARD: Contacts Unit 1 CR to verify ICS AUTO power has been restored as indicated by 1SA-2/B-11 (ICS AUTO POWER FAILURE) off. | Cue: Inform candidate that 1SA-2/B-11 (ICS AUTO POWER FAILURE) remains actuated. | ||
Cue: Inform candidate that 1SA-2/B-11 (ICS AUTO POWER FAILURE) remains actuated. Continue to Step 2 RNO. COMMENTS: | Continue to Step 2 RNO. | ||
COMMENTS: | |||
STEP 4: Step 2 RNO IF ICS AUTO power has NOT been restored, THEN bypass 1KI inverter as follows: (BYP SW 1KI cabinet, Unit 1 Equip Rm, Southwest of col Q72): ___ SAT STANDARD: Determine ICS AUTO power has NOT been restored by actuation of 1SA-2/B-11 (ICS AUTO POWER FAILURE) in previous step ___ UNSAT THEN bypasses 1KI inverter as follows: (BYP SW 1KI cabinet, Unit 1 Equip Rm, Southwest of col Q72): (steps 5, 6, & 7 below) | |||
: (BYP SW 1KI cabinet, | COMMENTS: | ||
: (BYP SW 1KI cabinet, | STEP 5: Step 2 RNO A CRITICAL TASK A. Position SW#1 OFF(left switch). | ||
): (steps 5, 6, & | ___ SAT STANDARD: Positions SW#1 OFF (left switch). | ||
7 below) | Cue: Indicate to the candidate that SW#1 is OFF. ___ UNSAT COMMENTS: | ||
STANDARD: Positions SW#1 OFF (left switch). | |||
Cue: Indicate to the candidate that SW#1 is OFF. | |||
___ UNSAT | |||
STANDARD: Positions SW#2 ON (center switch). | NLO-700 fnl - k Page 7 of 9 STEP 6: Step 2 RNO B CRITICAL TASK B. Position SW#3 OFF (right switch). | ||
Cue: Indicate to the candidate that SW#2 is ON. Continue to Step 3. | ___ SAT STANDARD: Positions SW#3 OFF (right switch). | ||
COMMENTS: | Cue: Indicate to the candidate that SW#3 is OFF. ___ UNSAT COMMENTS: | ||
STEP 7: Step 2 RNO C CRITICAL TASK C. Position SW#2 ON (center switch). | |||
___ SAT STANDARD: Positions SW#2 ON (center switch). | |||
Cue: Indicate to the candidate that SW#2 is ON. | |||
___ UNSAT Continue to Step 3. | |||
COMMENTS: | |||
STEP 8: Step 3 Notify Unit 1 CR that all applicable steps of this enclosure have been completed. ___ SAT STANDARD: Using a phone or radio, Notify Unit 1 CR that all applicable steps of this enclosure have been completed. ___ UNSAT Cue: Inform candidate that the Control Room has been notified. | |||
COMMENTS: | |||
END TASK STOP TIME: ____________ | |||
NLO-700 fnl - k Page 8 of 9 CRITICAL STEP EXPLANATIONS: | |||
STEP # Explanation 5 Step is required in proper sequence to align power to the 1KI bus. | |||
6 Step is required in proper sequence to align power to the 1KI bus. | |||
7 Step is required in proper sequence to align power to the 1KI bus. | |||
k CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) | |||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
Unit 1 operating at 100% power | Unit 1 operating at 100% power 1SA-2/B-11 (ICS AUTO POWER FAILURE) is actuated INITIATING CUES: | ||
The CRS directs you to use AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) to restore ICS AUTO power on Unit 1.}} | |||
1SA-2/B-11 (ICS AUTO POWER FAILURE) is actuated INITIATING CUES: | |||
The |
Revision as of 06:34, 4 November 2019
ML14084A051 | |
Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 03/21/2014 |
From: | NRC/RGN-II |
To: | Duke Energy Corp |
References | |
50-269/13-302, 50-270/13-302, 50-287/13-302, CRO-115 50-269/13-302, 50-270/13-302, 50-287/13-302 | |
Download: ML14084A051 (130) | |
Text
CRO-115 fnl - a Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-115 Withdraw Control Rod Group One to 50%
CANDIDATE EXAMINER
CRO-115 fnl - a Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Latch Group 7 Control rods and withdraw Safety Rod Group 1 to 50%
Alternate Path:
No Facility JPM #:
CRO-111 K/A Rating(s):
System: 001 K/A: A4.06 Rating: 2.9/3.2 Task Standard:
Latch Group 7 Control Rod and withdraw Safety Rod Group 1 To 50% in accordance with OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __X ___ In-Plant ___ ___ Perform __X___ Simulate __ __
References:
OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)
OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1)
Validation Time: 20 min. Time Critical: No
========================================================================
Candidate: _______________________________________ Time Start: _______________
NAME Time Finish: ______________
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________
Examiner: ______________________________ ___________________________________/_________
NAME SIGNATURE DATE
========================================================================
Comments
CRO-115 fnl - a Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS
- 1. RECALL Snap 213
- 2. Go To RUN
CRO-115 fnl - a Page 4 of 10 Tools/Equipment/Procedures Needed OP/1/A./1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%)
READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS Unit 1 startup in progress following a 28 day refueling outage Tc = 536ºF RCS pressure = 2155 psig OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1) is in progress at step 2.6.5 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) is in progress and has been completed through step 4.8 (Groups 1 through 6 have been manually latched).
INITIATING CUE The Control Room SRO directs you to continue with OP1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) beginning at Step 4.9.
Latch of groups 1 - 6 is complete. Manual Latch of Group 7 is required.
CRO-115 fnl - a Page 5 of 10 START TIME: _______
STEP 1: Step 4.9 Perform latch and PI alignment of Group 7, as follows: CRITICAL STEP 4.9.1 Ensure GROUP SELECT SWITCH to 7.
___ SAT STANDARD: Ensures Group Select Switch selected to Group 7 COMMENTS:
___ UNSAT STEP 2: Step 4.9.2 Verify only Group 7 CONTROL ON lights are ON. (PI panel)
___ SAT STANDARD: Verifies only Group 7 lights are ON COMMENTS: ___ UNSAT STEP 3: Step 4.9.3 *CRITICAL STEP IF Manual Latch and PI Alignment desired, perform the following: (R.M.)
A. *Ensure LATCH MANUAL is ON.
B. *Ensure IN LIMIT BYPASS is ON.
C. *Insert Group 7 for 5 seconds.
D. Verify all 0% lights ON for Group 7. (PI Panel)
E. *Ensure LATCH MANUAL is OFF.
F. *Ensure IN LIMIT BYPASS is OFF. ___ SAT G. Select RPI RESET.
H. Verify Group 7 API/RPI indications agree. (PI Panel)
STANDARD: Candidate performs A - H above to manually latch the Group 7 rods
___ UNSAT COMMENTS:
CRO-115 fnl - a Page 6 of 10 STEP 4: Step 4.9.4 IF Auto Latch and PI Alignment desired STANDARD: Determine that Auto latch is NOT desired and continue to Step 4.10.
COMMENTS:
___ SAT
___ UNSAT STEP 5: Step 4.10 Reset Group 8 RPI, as follows:
4.10.1 Ensure GROUP SELECT SWITCH to 8.
___ SAT STANDARD: Candidate places the Group Select Switch to Group 8 COMMENTS:
___ UNSAT STEP 6: Step 4.10.2 Verify Group 8 CONTROL ON lights are ON. (PI panel)
___ SAT STANDARD: Candidate verifies that only the Group 8 lights are ON COMMENTS: ___ UNSAT STEP 7: Step 4.10.3 Select RPI RESET
___ SAT STANDARD: Candidate depresses the RPI reset selector
___ UNSAT COMMENTS:
CRO-115 fnl - a Page 7 of 10 STEP 8: Step 4.10.4 Verify Group 8 API/RPI indications agree. (PI Panel)
___ SAT STANDARD: Candidate uses toggle switch to confirm that API/RPI indications agree.
___ UNSAT COMMENTS:
STEP 9: Step 4.11 Select FAULT RESET.
STANDARD: Candidate depresses the FAULT RESET selector. ___ SAT COMMENTS:
___ UNSAT NOTE:
For the purpose of this procedure, an extended forced outage is an outage greater than 92 days where the Reactor Vessel Head is NOT removed. SR 3.1.4.2 requires the Control Rods to be tested for movement prior to entry into MODE 2.
STEP 10: Step 4.12
___ SAT IF OWPG requires the Control Rods to be withdrawn due to an extended forced outage, perform PT/1/A/0600/015 (Control Rod Movement) for testing CRD Groups 1 thru 7 during unit startup.
___ UNSAT STANDARD: Candidate determines from initiating cue that this startup is not from a forced outage of greater than 92 days and therefore this step is N/A.
EXAMINER CUE: If asked, this startup is a return to power following a 28 day refueling outage.
COMMENTS:
CRO-115 fnl - a Page 8 of 10 STEP 11: Step 4.13 Select Group 1, as follows: CRITICAL STEP 4.13.1 Ensure GROUP SELECT SWITCH to 1.
STANDARD: Candidate selects Group 1 on GROUP SELECT SWITCH.
___ SAT COMMENTS:
___ UNSAT STEP 12: Step 4.13.2:
Verify only Group 1 CONTROL ON lights are ON. (PI panel)
STANDARD: Candidate verifies only the Group 1 lights are ON. ___ SAT COMMENTS:
___ UNSAT STEP 13: Step 4.13.3: CRITICAL STEP Ensure Group 1 at 50%.
___ SAT STANDARD: Candidate withdraws the Group 1 rods to 50%.
Examiner note: The candidate should update the SRO/crew when starting to withdraw Group 1 control rods. (not critical)
___ UNSAT COMMENTS:
STEP 14: Step 4.13.4:
Place GROUP SELECT SWITCH to OFF.
STANDARD: Candidate places the GROUP SELECT SWITCH to OFF. ___ SAT COMMENTS:
___ UNSAT END TASK TIME STOP: ________
CRO-115 fnl - a Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to latch Group 7 of rods. If performed incorrectly the results would be the inability to withdraw Group 7 during the startup.
3 This step is required to latch Group 7 of rods. If performed incorrectly the results would be the inability to withdraw Group 7 during the startup.
11 This step is required to select the correct group of rods for withdrawal.
13 This step is required withdraw the Group 1 rods to 50% as directed..
a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Unit 1 startup in progress following a 28 day refueling outage Tc = 536ºF RCS pressure = 2155 psig OP/1/A/1102/001 (Controlling Procedure For Unit Startup) Enclosure 4.7 (Unit Startup From 532°F/2155 psig to MODE 1) is in progress at step 2.6.5 OP/1/A/1105/019 (Control Rod Drive System) Encl. 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) is in progress and has been completed through step 4.8 (Groups 1 through 6 have been manually latched).
INITIATING CUE The Control Room SRO directs you to continue with OP1/A/1105/019 (Control Rod Drive System) Enclosure 4.3 (Withdrawal Of Safety Rod Group 1 To 50%) beginning at Step 4.9.
Latch of groups 1 - 6 is complete. Manual Latch of Group 7 is required.
CRO-223 fnl - b Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-223 BYPASS ES SUBSYSTEM 2 CANDIDATE EXAMINER
CRO-223 fnl - b Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Remove ES Subsystem 2 from service.
Alternate Path:
No Facility JPM #:
CRO-223 K/A Rating(s):
System: 013 K/A: A4.02 Rating: 4.3/4.4 Task Standard:
The candidate will remove the ES Subsystem 2 from service in accordance with OP/1/A/1105/014 Enclosure 4.9 (Removal and restoration of ES channels) beginning with step 3.3.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __X___ In-Plant ______ Perform __X___ Simulate __ __
References:
OP/1/A/1105/014 Enclosure 4.9 (Removal and restoration of ES channels)
Validation Time: 15 min. Time Critical: No
========================================================================
Candidate: _______________________________________ Time Start: _______________
NAME Time Finish: ______________
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________
Examiner: ______________________________ ___________________________________/_________
NAME SIGNATURE DATE
========================================================================
Comments
CRO-223 fnl - b Page 3 of 10 SIMULATOR OPERATOR INSTRUCTIONS:
- 1. Recall IC-41
- 3. Ensure all breaker flags are in the current plant condition.
- 4. Go to RUN.
CRO-223 fnl - b Page 4 of 10 Tools/Equipment/Procedures Needed:
OP/1/A/1105/014 Enclosure 4.9 Removal and restoration of ES channels READ TO OPERATOR DIRECTIONS TO STUDENT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
The Unit 1 Reactor is at 100% power.
A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service.
The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power.
The CRS has determined that Unit 1 ES Subsystem 2 is NOT required per Tech Specs INITIATING CUE:
The CRS directs you to remove ES Subsystem 2 from service using OP/1/A/1105/014 .9.
CRO-223 fnl - b Page 5 of 10 START TIME: _______
STEP 1: Step 2.1 NOTE: Equipment failure can be indicated by deviation alarm, fault alarm, hardware fail, etc... or notification by Maintenance. ___ SAT Verify one of the following:
- A procedure requires bypassing Voter(s), tripping of ES ___ UNSAT channels, bypassing DHPIAS, or bypassing DLPIAS.
- Equipment failure requires bypassing Voter(s), tripping of ES channels, bypassing DHPIAS, or bypassing DLPIAS.
STANDARD: Determine that the second bullet is satisfied and sign it off.
COMMENTS:
STEP 2: Step 3.1 IF removal of both ES subsystems from service is required during outages, perform Section 4 "Removal Of Both ES Subsystems" ___ SAT STANDARD: Determine step does not apply and N/As step.
___ UNSAT COMMENTS:
STEP 3: Step 3.2 NOTE: ES Subsystem 1 includes ES Input channels A1, B1, and C1 along with ES Voter Odd 1 and ES Voter Even 1. ___ SAT IF removal of any or all of only ES Subsystem 1 channels from service is required, perform Section 5 "Removal Of Only ES Subsystem 1"
___ UNSAT STANDARD: Determine step does not apply and N/As step.
COMMENTS:
STEP 4: Step 3.3 If removal of any or all of Only ES subsystem 2 channels from service is required, perform Section 6 Removal of Only ES Subsystem 2 ___ SAT STANDARD: Candidate proceeds to Section 6
___ UNSAT COMMENTS:
CRO-223 fnl - b Page 6 of 10 STEP 5: Step 6.1:
IF Unit 1 ES Subsystem 2 is NOT required per TS 3.3.5 and 3.3.7, ___ SAT perform the following to remove from service any or all of only Unit 1 ES Subsystem 2 channels.
STANDARD: Candidate determines that ES Subsystem 2 is not required by TS 3.3.5 ___ UNSAT and 3.3.7 COMMENTS:
STEP 6: Step 6.1.1 IF Unit 1 ES Subsystem 1 is required per TS 3.3.5 and 3.3.7, verify the following: ___ SAT
- Voter Odd 1 NOT bypassed (1SA-7)
- Voter Even 1 NOT bypassed (1SA-7)
STANDARD: The candidate determines that the Unit 1 ES Subsystem is required per TS 3.3.5 and 3.3.7 and verifies there are no alarms present on ISA-7.
- Voter Odd 1 NOT bypassed (1SA-7/D1)
- Voter Even 1 NOT bypassed (1SA-7/E1)
Examiner cue: Candidate may elect to perform a STAT alarm test to help ensure no alarms are present on 1SA-7. If asked, give him permission (as CR SRO) to perform alarm test. (The other RO will be required to help perform the test).
COMMENTS:
STEP 7: Step 6.1.2.A Declare Unit 1 ES Subsystem 2 channels inoperable
___ SAT STANDARD: Candidate reports that procedure requires declaration of ES Subsystem 2 channels inoperable Cue: Acknowledge Unit 1 ES Subsystem 2 channel inoperable.
___ UNSAT COMMENTS:
CRO-223 fnl - b Page 7 of 10 STEP 8: Step 6.1.2.B Obtain MAN BYPASS 2 Key #316 (2 keys are required to bypass both ___ SAT voters).
STANDARD: Candidate obtains correct keys (examiner provides)
___ UNSAT Cue: Provide the candidate with the correct keys. Keys are normally kept in the key locker in the WCC.
COMMENTS:
STEP 9: Step 6.1.2.C CRITICAL STEP IF bypassing Odd Voter 2, place MAN BYPASS 2 keyswitch in "BYP".
(Cabinet 12) ___ SAT STANDARD: Candidate places the MAN BYPASS 2 keyswitch in Cabinet 12 in the BYP position
___ UNSAT COMMENTS:
STEP 10: Step 6.1.2.D CRITICAL STEP IF bypassing Even Voter 2, place MAN BYPASS 2 keyswitch in "BYP".
(Cabinet 14) ___ SAT STANDARD: Candidate places the MAN BYPASS 2 keyswitch in Cabinet 14 in the BYP position and returns and signs step 3.3
___ UNSAT Examiner note: When this step is complete, candidate may indicate task is complete. If so, ask that they continue.
COMMENTS:
STEP 11: Step 3.4 If trip of ES input channels is required, perform one of the following: ___ SAT STANDARD: Candidate NAs this step COMMENTS: ___ UNSAT
CRO-223 fnl - b Page 8 of 10 STEP 12: Step 3.5 If bypassing DHPIAS is required, perform Section 10... ___ SAT STANDARD: Candidate NAs this step
___ UNSAT COMMENTS:
STEP 13: Step 3.6 If bypassing DLPIAS is required, perform Section 11... ___ SAT STANDARD: Candidate NAs this step
___ UNSAT COMMENTS:
STEP 14: Step 3.7 If any ES channel was removed from service due to equipment failure, ___ SAT perform Section 12.
STANDARD: Candidate determines that no ES channel was removed and NAs this step ___ UNSAT COMMENTS:
STEP 15: Step 3.7 WHEN notified by I&E, restore ES channels by performing Section 13... ___ SAT STANDARD: NO actions are required Cue: Another operator will continue with this procedure. ___ UNSAT COMMENTS:
TIME STOP: ________
CRO-223 fnl - b Page 9 of 10 CRITICAL STEP EXPLANATIONS STEP # Explanation 9 This step is critical because it is part 1 of removing all of ES Subsystem 2 from service 10 This step is critical because it is part 2 of removing all of ES Subsystem 2 from service
b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
The Unit 1 Reactor is at 100% power.
A failure has occurred in ES subsystem 2 that will require ALL the subsystem 2 to be removed from service.
The failure did NOT result in an actuation of any ES equipment nor did it result in any change in reactor power.
The CRS has determined that Unit 1 ES Subsystem 2 is NOT required per Tech Specs INITIATING CUE:
The CRS directs you to remove ES Subsystem 2 from service using OP/1/A/1105/014 .9.
CRO-404 fnl - c Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-404 Alignment of Condensate Recirc CANDIDATE EXAMINER
CRO-404 fnl - c Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Establish Alignment of Condensate Recirc and set flow.
Alternate Path:
Yes Facility JPM #:
CRO-404 K/A Rating(s):
System: APE054 K/A: G2.1.20 Rating: 4.6/4.6 Task Standard:
Condensate recirculation flow of 2300-6000 gpm is established.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____
References:
EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5.23 (Alignment of Condensate Recirc).
Validation Time: 10 minutes Time Critical: NO
========================================================================
Candidate: _______________________________________ Time Start: _________
NAME Time Finish: ________
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________
Examiner: ______________________________ ____________________________________/________
NAME SIGNATURE DATE
========================================================================
COMMENTS
CRO-404 fnl - c Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS:
- 1. RECALL Snap 214
- 2. IMPORT files for CRO-404
- 3. Go to RUN
CRO-404 fnl - c Page 4 of 11 Tools/Equipment/Procedures Needed:
EP/1/A/1800/001 (Emergency Operating Procedure) Enclosure 5.23 (Alignment of Condensate Recirc)
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator.
During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 RCPs.
The SGTR tab is in progress and is completed up to step 107.
INITIATING CUES:
The CRS directs you to perform Enclosure 5.23 (Alignment of Condensate Recirc).
CRO-404 fnl - c Page 5 of 11 START TIME: _______
STEP 1: Step 1.
Verify any HWP operating.
___ SAT STANDARD: Determine the 1A HWP is operating (located on 1AB1) by observing the red run light illuminated and pump amps are on scale.
Continues to Step 2
___ UNSAT COMMENTS:
STEP 2: Step 24 Verify any CBP operating.
___ SAT STANDARD: Determine that NO CBP is operating by observing the green off lights on 1AB1 are illuminated for each CBP and then perform the RNO.
Continues to Step 2 RNO ___ UNSAT COMMENTS:
STEP 3: Step 2 RNO
___ SAT GO TO Step 7.
STANDARD: Continues to Step 7
___ UNSAT COMMENTS:
CRO-404 fnl - c Page 6 of 11 STEP 4: Step 7 Ensure two HWPs operating
___ SAT STANDARD: Determines that only the 1A HWP is operating, per step 1.
___ UNSAT Rotates the 1B HWP switch (located on 1AB1) to the START position, verifies the red ON light illuminates, and verifies pump amps increase and return to normal.
OR Rotates the 1C HWP switch (located on 1AB1) to the START position, verifies the red ON light illuminates, and verifies pump amps increase and return to normal.
Continues to Step 8 COMMENTS:
ALTERNATE PATH
___ SAT STEP 5: Step 8 Start the 1C COND BOOSTER PUMP.
___ UNSAT STANDARD: Rotate the 1C COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes that the pump does not start by noting the green stop light remains illuminated and the red start light remains OFF.
Continues to RNO to Step 8 Note: The 1C Cond Booster Pump will not start.
COMMENTS:
CRO-404 fnl - c Page 7 of 11 STEP 6: RNO: Step 8 CRITICAL STEP Start one available CBP.
___ SAT STANDARD: Rotates the 1A COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes the pump starts by observing the Red run light illuminated and pump amps increase and then return to normal. ___ UNSAT OR Rotates the 1B COND BOOSTER PUMP switch (located on 1AB1) to the START position. Observes the pump starts by observing the Red run light illuminated and pump amps increase and then return to normal.
Continues to Step 9 COMMENTS:
STEP 7: Step 9 Stop one operating HWP.
___ SAT STANDARD: Rotates the switch for a running HWP (Either 1A, 1B, or 1C) to the OFF position. Verifies the Red run light OFF, and the Green stop light illuminated. ___ UNSAT Examiner note: 1SA-8/C-2 (FDW PUMP SEAL DIFFERENCTIAL PRESSURE LOW) will actuate. This is an expected alarm.
Continues to Step 10 COMMENTS:
STEP 8: Step 10 ___ SAT Place the control switch for one secured HWP in AUTO STANDARD: Places a non running HWP switch (1A or 1B) to AUTO. ___ UNSAT Continues to Step 11 COMMENTS:
CRO-404 fnl - c Page 8 of 11 STEP 9: Step 11 Place the control switch for one secured CBP in AUTO. ___ SAT STANDARD: Places the non running CBP (1A or 1B) switch in AUTO.
Continues to Step 12 ___ UNSAT NOTE: 1C CBP switch should NOT be selected since the pump will not start.
COMMENTS:
STEP 10: Step 12 Perform the following:
___ SAT
___ UNSAT STANDARD: Positions the HWP LOAD SHED DEFEAT switch to the running HWP, (1A, 1B, or 1C)
Positions the CBP LOAD SHED DEFEAT switch to the running CBP, (1A or 1B )
Continues to Step 13 COMMENTS:
STEP 11: Step 13 Place the following in MANUAL:
___ SAT
- 1FDW-65 STANDARD: Locate the Moore controller on 1VB3 for each valve listed above and ___ UNSAT determine they are in MANUAL by the MANUAL light being Lit.
Continues to Step 14 COMMENTS:
CRO-404 fnl - c Page 9 of 11 STEP 12: Step 14 CRITICAL STEP Establish 2300-6000 gpm total recirc flow with one of the following:
___ SAT
___ UNSAT STANDARD: Candidate locates the Moore controller for 1FDW-53 or 1FDW-65 and using the manual loader adjusts one to a total recirc flow of 2300-6000 gpm.
Note: Controller must be selected to the P position to observe flow.
Cue: Inform candidate that another RO will complete this enclosure and this JPM is finished
.
COMMENTS:
STOP TIME: ____________
CRO-404 fnl - c Page 10 of 11 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 6 Required to properly align Condensate recirc.
12 Required to establish proper flow for Condensate recirc.
c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Unit 1 was operating at 100% power when a SGTR occurred in the 1B Steam Generator.
During the associated Unit 1 shutdown, a reactor trip occurred due to a loss of all 4 RCPs.
The SGTR tab is in progress and is completed up to step 107.
INITIATING CUES:
The CRS directs you to perform Enclosure 5.23 (Alignment of Condensate Recirc).
CRO-414 fnl - d Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-414 SWAPPING LPI MODES - HIGH PRESSURE MODE TO LPI NORMAL DECAY HEAT MODE CANDIDATE EXAMINER
CRO-414 fnl - d Page 2 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode Alternate Path:
No Facility JPM #:
CRO-092 K/A Rating(s):
System: 005 K/A: A4.01 Rating: 3.6*/3.4 Task Standard:
Swap LPI from High Pressure Mode to Normal Mode by procedure.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __X__ In-Plant ____ Perform __X___ Simulate __ __
References:
OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode)
OP/1/A/1104/004, Enclosure 4.44 (Controlling LPI Cooler Outlet Temperature)
Validation Time: 40 minutes Time Critical: NO
========================================================================
Candidate: _______________________________________ Time Start: _________
NAME Time Finish: ________
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________
Examiner: ______________________________ ____________________________________/________
NAME SIGNATURE DATE
========================================================================
COMMENTS
CRO-414 fnl - d Page 3 of 11 SIMULATOR OPERATOR INSTRUCTIONS:
- 1. RECALL SNAP 215
- 2. Place simulator to RUN
- 3. When asked manipulate the following LP vales using the valve program:
- OPEN 1LP-4
CRO-414 fnl - d Page 4 of 11 Tools/Equipment/Procedures Needed:
OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - High Pressure Mode to LPI Normal Mode)
OP/1/A/1104/004, Enclosure 4.44 (Controlling LPI Cooler Outlet Temperature)
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 shutdown in progress INITIATING CUES:
The CRS directs you to perform OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2.3.
ALL associated White tags have been removed.
CRO-414 fnl - d Page 5 of 11 START TIME: _______
STEP 1: Step 2.3 CRITICAL STEP Position:
___ SAT
STANDARD: Remove the cover from the switches for the following valves and OPEN them by placing their respective switches in the open position.
Verify red light illuminates and green light goes off.
Verify red light illuminates and green light goes off.
Verify red light illuminates and green light goes off.
Verify red light illuminates and green light goes off.
COMMENTS:
STEP 2: Step 2.4 CRITICAL STEP Position:
___ SAT
- Open 1LP-4 (Return Manual Block). (A-61)
STANDARD: Dispatch an NEO to open 1LP-4.
___ UNSAT Booth Cue: Open 1LP-4 by using the Valve program and using time compression inform the candidate that 1LP-4 is open.
COMMENTS:
CRO-414 fnl - d Page 6 of 11 STEP 3: Step 2.5 CRITICAL STEP Ensure:
___ SAT
- Close 1LP-74 (B Clr Disch Blk To A Pmp). (A-61)
- Close 1LP-75 (1B LPI Cooler Disch Block To 1C LPI Pump). (A-61) ___ UNSAT STANDARD: Dispatch an NEO to CLOSE:
- 1LP-74 (B Clr Disch Blk To A Pmp). (A-61)
Booth cue: CLOSE 1LP-73, 1LP-74, and 1LP-75 by using the Valve program and using time compression inform the candidate that the valves are CLOSED.
COMMENTS:
STEP 4: Step 2.6 CRITICAL STEP Close 1LP-14 (1B LPI Cooler Outlet)
___ SAT STANDARD: CLOSE 1LP-14 it by placing the switch in the close position and observe green closed light lit.
___ UNSAT Note: Valve has a long stroke time (1:50 sec)
COMMENTS:
STEP 5: Step 2.7 Record 1A LPI cooler outlet temperature ________°F.
___ SAT STANDARD: Locate the 1A LPI cooler outlet temperature indicator on 1UB2 and record 1A LPI cooler outlet temperature on the procedure.
___ UNSAT COMMENTS:
CRO-414 fnl - d Page 7 of 11 STEP 6: Step 2.8 Ensure open 1LP-9 (1C LPIP DISCH TO 1A LPI HDR).
___ SAT STANDARD: Determine 1LP-9 located on 1UB2 is OPEN by verifying the red OPEN light illuminated.
___ UNSAT COMMENTS:
STEP 7: Step 2.9 CRITICAL STEP Open 1LP-10 (1C LPIP DISCH TO 1B LPI HDR).
___ SAT STANDARD: Open 1LP-10 located on 1UB2 by taking the switch to the OPEN position and verifying the red OPEN light illuminates and the green CLOSE light goes out. ___ UNSAT COMMENTS:
STEP 8: Step 2.10 CRITICAL STEP Open 1LP-14 (1B LPI COOLER OUTLET).
___ SAT STANDARD: Open 1LP-14 located on 1UB2 by taking the switch to the OPEN position and verifying the red OPEN light illuminates and the green CLOSE light goes out. ___ UNSAT Note: Valve has a long stroke time (1:50 sec)
COMMENTS:
CRO-414 fnl - d Page 8 of 11 NOTE: Do NOT exceed 6000 gpm LPSW flow per cooler.
___ SAT STEP 9: Step 2.11 Adjust LPSW flow to 1B LPI Coolers per Enclosure 4.44 "Controlling LPI Cooler Outlet Temperature" to match 1B DH Cooler outlet temperature to 1A DH Cooler outlet temperature. ___ UNSAT STANDARD: Refer to Enclosure 4.44 "Controlling LPI Cooler Outlet Temperature".
COMMENTS:
STEP 10: Enclosure 4.44 Step 1.1 IF RCS Cooldown in progress, review Section 3.
___ SAT STANDARD: Candidate reviews section 3.
COMMENTS: ___ UNSAT STEP 11: Enclosure 4.44 Step 1.2 IF RCS Heatup in progress, review Section 4.
___ SAT STANDARD: Determine step does not apply and N/A step.
COMMENTS: ___ UNSAT
CRO-414 fnl - d Page 9 of 11 NOTE:
If in LPI is in SERIES MODE, LPSW flow should be established to both LPI coolers The following steps may be performed as many times as required. ___ SAT This enclosure can be performed in any sequence or any order.
The preference of use for LPSW is as follows:
-1LPSW-251 and/or 1LPSW-252 in automatic (Step 2.1 and/or Step 2.5). ___ UNSAT
-1LPSW-251 and/or 1LPSW-252 in manual (Step 2.2 and/or Step 2.6).
-1LPSW-4 and/or 1LPSW-5 (Step 2.3 and/or Step 2.7).
LPSW Leakage Accumulator level is a function of LPSW System pressure. When LPSW flow to LPI Coolers is significantly changed, LPSW Leakage Accumulator level will increase and may exceed the limits of SR 3.7.7.1 until LPSW system pressure stabilizes.
As a result, momentary entry into TS 3.7.7 may be necessary.
STEP 12: Enclosure 4.44 Steps 2.1 - 2.4 LPSW to 1A LPI Cooler STANDARD: Candidate should determine that these steps do NOT apply and continue to Step 2.5.
COMMENTS:
STEP 12: Enclosure 4.44 Step 2.5 CRITICAL STEP IF 1LPSW-252 (1B LPI COOLER LPSW CONTROL) is in "AUTO",
position 1LPSW-252 Controller Setpoint as required. ___ SAT STANDARD: Adjust LPSW flow to 1B LPI Coolers by positioning 1LPSW-252 Controller Setpoint so that 1B DH Cooler outlet temperature is approaching 1A DH Cooler outlet temperature (Temperature as noted at ___ UNSAT step 2.7).
COMMENTS:
END TASK STOP TIME: ____________
CRO-414 fnl - d Page 10 of 11 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 1 Step is required to provide the correct flow path.
2 Step is required to provide the correct flow path.
3 Step is required to provide the correct flow path.
4 Step is required to provide the correct flow path.
7 Step is required to provide the correct flow path.
8 Step is required to provide the correct flow path.
12 Step is required to ensure proper thermal transition to 1B LPI Cooler.
Note: All valves on the valve lineup may not be needed to successfully complete the task.
d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Unit 1 shutdown in progress INITIATING CUES:
The CRS directs you to perform OP/1/A/1104/004, Enclosure 4.15 (Swapping LPI Modes - LPI High Pressure Mode to LPI Normal Mode) beginning at Step 2.3.
ALL associated White tags have been removed.
CRO-508 fnl - e Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-508 ES Channels 5 and 6 Recovery CANDIDATE EXAMINER
CRO-508 fnl - e Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
ES Channels 5 and 6 Recovery Alternate Path:
No Facility JPM #:
New K/A Rating(s):
System: 103 K/A: A4.04 Rating: 3.5*/3.5*
Task Standard:
ES Channels 5 and 6 are returned to normal using EOP Enclosure 5.41 (ES Recovery).
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____
References:
Validation Time: 10 minutes Time Critical: NO
========================================================================
Candidate: _______________________________________ Time Start: _________
NAME Time Finish: ________
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________
Examiner: ______________________________ ____________________________________/________
NAME SIGNATURE DATE
========================================================================
COMMENTS
CRO-508 fnl - e Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:
- 1. RECALL Snap 216
- 2. IMPORT files for CRO-508
- 3. Go to RUN
CRO-508 fnl - e Page 4 of 9 Tools/Equipment/Procedures Needed:
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
A MSLB has occurred.
ES Channels 1 - 6 have actuated on High RB pressure.
EOP Encl. 5.1 (ES Actuation) is complete ALL ES Channels are being reset EOP Encl. 5.41 (ES Recovery) is complete through step 40 INITIATING CUES:
The CRS directs you to continue in EOP Encl. 5.41 (ES Recovery) beginning at step 41.
CRO-508 fnl - e Page 5 of 9 START TIME: _______
STEP 1: Step 41 Verify reset of any of the following is desired: ___ SAT
- ES Channel 5
- ES Channel 6
___ UNSAT STANDARD: Determines, from Initiating Cue, that reset of ES Channels 5 and 6 is desired.
COMMENTS:
STEP 2: Step 42 Verify Stat Alarms have cleared:
___ SAT
STANDARD: Determine that all of the above statalarms on 1SA-7 are clear by observing that their respective window lights are NOT illuminated.
COMMENTS:
STEP 3: Step 43 CRTICAL STEP Perform the following to reset ES (1UB1):
___ SAT
- Depress RESET for CH 5.
- Depress RESET for CH 6.
___ UNSAT STANDARD: Candidate depresses the RESET pushbuttons for Channels 5 and 6 located on 1UB1 COMMENTS:
CRO-508 fnl - e Page 6 of 9 STEP 4: Step 44 Verify:
___ SAT
- CH 5 TRIPPED light off
- CH 6 TRIPPED light off
___ UNSAT STANDARD: Candidate locates ES Channels 5 and 6 and verifies that their respective lights are no longer lit/illuminated.
COMMENTS:
STEP 5: Step 45 Open:
___ SAT
___ UNSAT STANDARD: Candidate verifies 1CC-7 and 1CC-8 are OPEN by observing RED lights ON and GREEN lights OFF.
COMMENTS:
STEP 6: Step 46
___ SAT Ensure one CC pump is running in the ON position.
STANDARD: Candidate verifies only one CC pump is running.
___ UNSAT COMMENTS:
CRO-508 fnl - e Page 7 of 9 STEP 7: Step 47 Ensure one CC pump off and in AUTO.
___ SAT STANDARD: Candidate ensures the standby CC pump control switch is in the AUTO position. ___ UNSAT COMMENTS:
STEP 8: Step 48 CRTICAL STEP Position the following switches to LOW:
___ SAT
- 1A RBCU
- 1B RBCU
- 1C RBCU
___ UNSAT STANDARD: Candidate places the speed control switches for RBCUs 1A, 1B, & 1C to the LOW position.
COMMENTS:
STEP 9: Step 49 CRTICAL STEP Depress the following PUSH TO RET TO NORMAL AFT ES RESET
___ SAT pushbuttons:
- 1A RBCU ES RESET
- 1B RBCU ES RESET
- 1C RBCU ES RESET ___ UNSAT STANDARD: Candidate depresses the following PUSH TO RET TO NORMAL AFT ES RESET pushbuttons for RBCUs 1A, 1B, & 1C Examiners Cue: Another operator will continue with this procedure.
COMMENTS:
END TASK STOP TIME: ____________
CRO-508 fnl - e Page 8 of 9 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 3 This step is required to reset the ES channels 5 & 6 so the associated components can be re-aligned for normal operation.
8 This step is required to return the RBCUs to a normal alignment.
9 This step is required to return the RBCUs to a normal alignment.
e CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
A MSLB has occurred.
ES Channels 1 - 6 have actuated on High RB pressure.
EOP Encl. 5.1 (ES Actuation) is complete ALL ES Channels are being reset EOP Encl. 5.41 (ES Recovery) is complete through step 40 INITIATING CUES:
The CRS directs you to continue in EOP Encl. 5.41 (ES Recovery) beginning at step 41.
CRO-606 fnl - f Page 1 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-606 Energize Main Feeder Busses From CT-5 CANDIDATE EXAMINER
CRO-606 fnl - f Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Energize Main Feeder Busses From CT-5 Alternate Path:
Yes Facility JPM #:
CRO-008 K/A Rating(s):
System: 055 K/A: EA2.03 Rating: 3.9/4.7 Task Standard:
Energize Main Feeder Busses from CT-5.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __X___ In-Plant ______ Perform __X__ Simulate _____
References:
EOP, Encl 5.38 (Restoration of Power)
Validation Time: 15 minutes Time Critical: No
========================================================================
Candidate: _______________________________________ Time Start: _________
NAME Time Finish: ________
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________
Examiner: ______________________________ ____________________________________/________
NAME SIGNATURE DATE
========================================================================
COMMENTS
CRO-606 fnl - f Page 3 of 15 SIMULATOR OPERATOR INSTRUCTIONS:
- 1. RECALL Snap 218
- 2. IMPORT Files for CRO-606
- 3. Place simulator in RUN
CRO-606 fnl - f Page 4 of 15 Tools/Equipment/Procedures Needed:
EOP, Encl 5.38 (Restoration of Power)
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 experienced a unit trip followed by a lockout on CT-1.
Blackout tab of the EOP in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).
INITIATING CUES:
The CRS directs you to initiate Encl. 5.38, Restoration of Power, to regain power to the Main Feeder Buses.
CRO-606 fnl - f Page 5 of 15 START TIME: _______
STEP 1: Step 1 Verify power has been restored.
___ SAT STANDARD: Determine power has NOT been restored by observing MFB voltage on 1AB1. Perform RNO step.
Continue to Step 2
___ UNSAT COMMENTS:
STEP 2: Step 1 RNO GO TO Step 3.
___ SAT STANDARD: GO TO Step 3.
COMMENTS:
___ UNSAT STEP 3: Step 3 CRITICAL STEP Place 1HP-31 in HAND and reduce demand to 0.
___ SAT STANDARD: Place 1HP-31 in HAND and reduce demand to 0 using the toggle switch.
Located on 1UB1.
Continue to Step 4
___ UNSAT COMMENTS:
STEP 4: Step 4 Close 1HP-21.
___ SAT STANDARD: Close 1HP-21 by rotating the switch to the closed position on 1UB2.
Continue to Step 5 COMMENTS: ___ UNSAT
CRO-606 fnl - f Page 6 of 15 STEP 5: Step 5 Verify any of the following energized:
- MFB1 ___ SAT
- MFB2 STANDARD: Observes that zero (0) volts are indicated on both MFBs meters located on 1AB1. ___ UNSAT Continue to Step 5 RNO COMMENTS:
STEP 6: Step 5 RNO GO TO Step 8.
___ SAT STANDARD: GO TO Step 8.
COMMENTS: ___ UNSAT STEP 7: Step 8 Verify CT-1 indicates 4160 volts.
___ SAT STANDARD: Observes that zero (0) volts is indicated on CT-1 on 1AB1.
Continue to Step 8 RNO COMMENTS: ___ UNSAT STEP 8: Step 8 RNO GO TO Step 18.
___ SAT STANDARD: GO TO Step 18.
COMMENTS: ___ UNSAT STEP 9: Step 18 Verify both Standby Bus #1 and Standby Bus #2 are de-energized.
___ SAT STANDARD: Observes that zero (0) volts is indicated both Standby Buses located on 2AB3.
Continue to Step 19
___ UNSAT COMMENTS:
CRO-606 fnl - f Page 7 of 15 STEP 10: Step 19 Verify all Keowee units operating.
___ SAT STANDARD: Determine that Keowee Unit 2 is Emergency Lockout by observing the Statalarm 2SA-18/A1.
Continue to Step 19 RNO
___ UNSAT COMMENTS:
STEP 11: Step 19 RNO
- 1. Emergency start Keowee units:
___ SAT
- KEOWEE EMER START CHANNEL A
- KEOWEE EMER START CHANNEL B
- 2. IF NO Keowee units are operating, ___ UNSAT THEN GO TO Step 38.
STANDARD: Place the KEOWEE EMER START CHANNEL A and B switches to start located on 1UB1.
COMMENTS:
STEP 12: Step 20 Verify both Keowee units in Oconee Control (statalarms on):
___ SAT
- UNIT 1 OCONEE CONTROL (2SA-17/E-1)
- UNIT 2 OCONEE CONTROL (2SA-18/E-1)
___ UNSAT STANDARD: Determine neither Statalarm above is actuated.
Continue to Step 20 RNO COMMENTS:
STEP 13: Step 20 RNO Notify Keowee Operator to place both Keowee units Master Transfer
___ SAT switches to remote.
STANDARD: Call the Keowee Operator and ask that both Keowee units Master Transfer switches be place to remote.
___ UNSAT Continue to Step 21 COMMENTS:
CRO-606 fnl - f Page 8 of 15 STEP 14: Step 21 Verify both Keowee units operating.
___ SAT STANDARD: Determine that only KHU 1 is operating.
Continue to Step 21 RNO
___ UNSAT COMMENTS:
STEP 15: Step 21 RNO
- 1. IF UNIT 1 EMER FDR ACB 3 is closed, AND Unit 1 Keowee is NOT
___ SAT operating, THEN open UNIT 1 EMER FDR ACB 3.
- 2. IF UNIT 2 EMER FDR ACB 4 is closed, AND Unit 2 Keowee is NOT operating, THEN open UNIT 2 EMER FDR ACB 4.
___ UNSAT STANDARD: Determine that BOTH ACB-3 and ACB-4 are OPEN, Continue to Step 22 COMMENTS:
ALTERNATE PATH STEP 16: Step 22 ___ SAT Ensure one of the following is closed for an operating Keowee unit:
Unit 1 Unit 2 ___ UNSAT UNIT 1 UNIT 1 EMER FDR EMER FDR ACB-3 ACB-4 STANDARD: Attempt to close ACB-3 and determine it did NOT close.
Continues to step 23 COMMENTS:
STEP 17: Step 23 Verify 4160 volt power has been restored to the MFB.
___ SAT STANDARD: Determine 4160 volt power has NOT been restored to the MFB by observing the U-1 FDR BUS VOLTS meters on 1AB1.
Continue to step 23 RNO
___ UNSAT COMMENTS:
CRO-606 fnl - f Page 9 of 15 STEP 18: Step 23 RNO GO TO Step 25
___ SAT STANDARD: GO TO Step 25 COMMENTS: ___ UNSAT STEP 19: Step 25 Verify CT-4 indicates 4160 volts.
___ SAT STANDARD: Determine CT-4 indicates zero volts on meter located on 1AB3.
Continue to Step 25 RNO
___ UNSAT COMMENTS:
STEP 20: Step 25 RNO GO TO Step 38.
___ SAT STANDARD: GO TO Step 38.
___ UNSAT COMMENTS:
STEP 21: Step 38 IAAT CT-5 indicates 4160 volts,
___ SAT THEN GO TO Step 55.
STANDARD: Determine that approximately 4160 volts is indicated on the CT-5 voltage meter located on 1AB1 and then GO TO Step 55 ___ UNSAT COMMENTS:
CRO-606 fnl - f Page 10 of 15 STEP 22: Step 55 CRITICAL STEP Place the following switches in MAN:
___ SAT
- MFB1 AUTO/MAN
- MFB2 AUTO/MAN
- STANDBY 1 AUTO/MAN ___ UNSAT
- STANDBY 2 AUTO/MAN STANDARD: Rotates the AUTO/MAN selector switch to the MANUAL position for each of the switches listed above.
Continue to Step 56 Examiner note: Various Statalarms will actuate as these switches are manipulated.
They are expected.
COMMENTS:
STEP 23: Step 56 Open the following breakers:
___ SAT
- N11 MFB1 NORMAL FDR
- N21 MFB2 NORMAL FDR
- E11 MFB1 STARTUP FDR ___ UNSAT
- E21 MFB2 STARTUP FDR STANDARD: Verify each of the above breakers is OPEN by observing the white breaker open light is LIT on 1AB1.
Continue to Step 57 COMMENTS:
STEP 24: Step 57 *CRITICAL STEP Place the following switches in MAN:
___ SAT
- *CT4 BUS 1 AUTO/MAN
- *CT4 BUS 2 AUTO/MAN
- CT5 BUS 1 AUTO/MAN ___ UNSAT
- CT5 BUS 2 AUTO/MAN STANDARD: Rotates the AUTO/MAN selector switch to the MANUAL position for each of the switches listed above located on 2AB3.
Continue to Step 58 COMMENTS:
CRO-606 fnl - f Page 11 of 15 STEP 25: Step 58 Open the following breakers:
___ SAT
- SK1 CT4 STBY BUS 1 FEEDER
- SK2 CT4 STDY BUS 2 FEEDER
___ UNSAT STANDARD: Verify each of the above breakers is OPEN by observing the white breaker open light is LIT on 2AB3.
Continue to Step 59 COMMENTS:
STEP 26: Step 59 CRITICAL STEP Close the following breakers:
___ SAT
- SL1 CT5 STBY BUS 1 FEEDER
- SL2 CT5 STBY BUS 2 FEEDER
___ UNSAT STANDARD: Go to the CLOSED position for each of the switches listed above located on 1AB3..
Continue to Step 60 COMMENTS:
STEP 27: Step 60 CRITICAL STEP Place the following switches in AUTO:
___ SAT
- CT5 BUS 1 AUTO/MAN
- CT5 BUS 2 AUTO/MAN
___ UNSAT STANDARD: Rotates the AUTO/MAN selector switch to the AUTO position for each of the switches listed above.
Continue to Step 61 COMMENTS:
CRO-606 fnl - f Page 12 of 15 STEP 28: Step 61 Verify Standby Bus #1 energized.
___ SAT STANDARD: Observes that 4160 volts are indicated for Standby Bus #1 located on 2AB3.
Continue to Step 62 ___ UNSAT COMMENTS:
STEP 29: Step 62 Notify CR SRO in each unit where a blackout exists that Standby Bus #1 is energized. ___ SAT STANDARD: Notifies CR SRO that Standby Bus #1 is energized located on 2AB3.
Continue to Step 63
___ UNSAT Cue: If asked, inform candidate that only Unit 1 is affected.
COMMENTS:
STEP 30: Step 63 CRITICAL STEP Close the following breakers:
___ SAT
- S11 STBY BUS 1 TO MFB1
- S21 STBY BUS 2 TO MFB2
___ UNSAT STANDARD: Goes to the CLOSED position for each of the switches listed above.
Continue to Step 64 Note: Only 1 of the Stby Busses must be energized to restore power to MFBs.
COMMENTS:
STEP 31: Step 64 Verify any of the following energized:
___ SAT
- 1TC
- 1TD
- 1TE ___ UNSAT STANDARD: Observes that 4160 volts indicated on either MFB voltmeters or OAC.
Continue to Step 65 COMMENTS:
CRO-606 fnl - f Page 13 of 15 STEP 32: Step 65 Notify Unit 1 CR SRO of status of 4160V SWGR.
___ SAT STANDARD: Notifies CR SRO of status of 4160V SWGR
___ UNSAT COMMENTS:
END TASK STOP TIME: ____________
CRO-606 fnl - f Page 14 of 15 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 3 Step is required to protect the RCP seals.
22 Step is required to satisfy power switching logic.
24 Step is required to satisfy power switching logic.
26 Step is required to energize the Main Feeder Bus.
27 Step is required to provide undervoltage protection.
30 Step is required to energize the Main Feeder Bus.
f CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Unit 1 experienced a unit trip followed by a lockout on CT-1.
Blackout tab of the EOP in progress The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).
INITIATING CUES:
The CRS directs you to initiate Encl. 5.38, Restoration of Power, to regain power to the Main Feeder Buses.
CRO-607 fnl - j Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-607 Activate the SSF From the SSF Control Room CANDIDATE EXAMINER
CRO-607 fnl - j Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Activate The SSF From the SSF Control Room Alternate Path:
No Facility JPM #:
CRO-047 K/A Rating(s):
System: 062 K/A: A2.11 Rating: 3.7/4.1 Task Standard:
Power is swapped and the SSF D/G is emergency started. Flow is established to the RCP seals using the SSF-RCMU system. Flow is established to the SGs using the SSF ASW system.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator _____ In-Plant __X ___ Perform _____ Simulate __X__
References:
AP/0/A/1700/25 Validation Time: 12 minutes Time Critical: YES
========================================================================
Candidate: _______________________________________ Time Start: _________
NAME Time Finish: ________
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________
Examiner: ______________________________ ____________________________________/________
NAME SIGNATURE DATE
========================================================================
COMMENTS
CRO-607 fnl - j Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS:
- 1. None
CRO-607 fnl - j Page 4 of 14 Tools/Equipment/Procedures Needed:
AP/0/A/1700/025 (SSF EOP)
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 3 was operating at 100% power Unit 3 TD EFDWP is out of service Tornado warnings are in affect AP/0/A/1700/006 (Natural Disaster) in progress You are pre-staged in the SSF Control Room and in communication with the Unit 3 Control Room as directed by AP/0/A/1700/006 (Natural Disaster).
Unit 3 Reactor has just tripped and the unit has experienced a complete loss of all AC power AP/0/A/1700/025 (SSF EOP) has been initiated INITIATING CUES:
The CRS calls and informs you of the following:
- Unit 3 has lost all AC power
- SSF RCMU feed and SSF ASW feed to the SGs are required
- The breaker transfers have NOT been performed
- Begin AP/25 actions starting at Step 4.5 THIS JPM IS TIME CRITICAL
CRO-607 fnl - j Page 5 of 14 START TIME: _______
TIME CRITICAL TIME STARTS ________ CRITICAL STEP
___ SAT STEP 1: Step 4.5 Perform the following on the affected unit:
- Open 3XSF-F5A (3XSF NORM FDR BKR FROM 3X8) and remove Kirk Key ___ UNSAT
- Using Kirk Key, close 1, 2, 3XSF-F3A (1, 2, 3XSF EMERG FDR BKR FROM OXSF)
STANDARD: Student: Locates and opens NORMAL FDR BKR FROM 1, 2, 3X8 is by rotating breaker switch to the OFF position and removes the Kirk Key.
Student locates EMERG FDR BKR FROM OXSF inserts the Kirk Key and closed the breaker by rotating breaker switch to the ON position.
Continues to Step 4.6 Cue: As operator performs the key/breaker operation, indicate to operator the appropriate component positions.
NOTE: Kirk Key must be rotated 1/2 turn to be removed.
COMMENTS:
STEP 2: Step 4.6 Verify SSF D/G is operating
___ SAT STANDARD: Determines the D/G is not operating and continues to step 4.6 RNO (GOTO to Step 4.8)
___ UNSAT Continues to step 4.8 COMMENTS:
CRO-607 fnl - j Page 6 of 14 STEP 3: Step 4.8 CRITICAL STEP Depress DIESEL EMERGENCY START push button.
___ SAT STANDARD The SSF Control Room DIESEL EMERGENCY START pushbutton is pressed.
___ UNSAT Continues to Step 4.9 Cue: Allow 12 sec for the D/G to reach rated speed.
COMMENTS:
STEP 4: Step 4.9 Verify SSF D/G operating.
___ SAT STANDARD: Candidate reports by indications and sound that D/G is operating.
Continues to Step 4.10
___ UNSAT COMMENTS:
STEP 5: Step 4.10 Open breaker OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T). ___ SAT STANDARD: The green TRIP pushbutton on the SSF OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T) control switch is pressed. ___ UNSAT Continues to Step 4.11 Cue: Inform student that the green light for OTS1-1 (SSF NORMAL POWER SUPPLY BREAKER B2T) is on and the red light is off.
COMMENTS:
CRO-607 fnl - j Page 7 of 14 STEP 6: Step 4.11 Verify open OTS1-0 (SSF ALT. POWER SUPPLY BKR OTS1-0).
___ SAT STANDARD: Determine that OTS1-0 (SSF ALT. POWER SUPPLY BKR OTS1-0) is open by verify that the green open light is lit and the red closed light is off. ___ UNSAT Continues to Step 4.12 COMMENTS:
STEP 7: Step 4.12 WHEN 3 seconds have elapsed THEN continue.
___ SAT STANDARD: Wait three (3) seconds after OTS1-1 is opened and continue.
Continues to Step 4.13
___ UNSAT COMMENTS:
STEP 8: Step 4.13 CRITICAL STEP Close breaker OTS1-4 (DIESEL GEN BREAKER).
___ SAT STANDARD: The red CLOSE pushbutton on the SSF Control Room OTS1-4 (DIESEL GEN BREAKER) switch is depressed. ___ UNSAT Continues to Step 4.14 Cue: After student closes in diesel generator breaker, inform him/her that red light is on and green light is off.
COMMENTS:
CRO-607 fnl - j Page 8 of 14 STEP 9: Step 4.14 Verify Diesel Engine Service Water Pump operating.
___ SAT STANDARD: Determine that the Diesel Engine Service Water Pump operating by observing the red ON light lit.
Continues to Step 4.15 ___ UNSAT Cue: Indicate that the Diesel Engine Service Water Pump red light is on.
COMMENTS:
STEP 10: Step 4.15 CRITICAL STEP Start the SSF ASW Pump.
___ SAT STANDARD: SSF ASW PUMP red ON pushbutton is depressed.
Continues to Step 4.16
___ UNSAT Cue: After ASW pump ON pushbutton is pressed, inform student of the following:
- ASW pump red light is on and green light is off.
- SSF Control Room AUX SER WTR PUMP AMPS meter indicates on scale.
COMMENTS:
STEP 11: Step 4.16 Verify any of the following required:
___ SAT
- SSF RCMU feed
- SSF ASW feed to SGs
___ UNSAT STANDARD: Determine that SSF RCMU and SSF ASW are still required.
Continues to Step 4.17 COMMENTS:
CRO-607 fnl - j Page 9 of 14 STEP 12: Step 4.17 PERFORM the following on all affected units:
___ SAT
- Encl 5.1A (Emergency Operation of SSF Systems Unit 1) (PS)
- Encl 5.1B (Emergency Operation of SSF Systems Unit 2) (PS)
- Encl 5.1C (Emergency Operation of SSF Systems Unit 3) (PS) ___ UNSAT STANDARD: Obtains Control room copy of Encl 5.1C (Emergency Operation of SSF Systems Unit 3).
Continues to Step 1 of Encl 5.1C.
COMMENTS:
STEP 13: Step 1 Verify SSF RCMU is required for Unit 3.
___ SAT STANDARD: Determine that SSF RCMU is required for Unit 3.
Continues to step 3. ___ UNSAT COMMENTS:
STEP 14: Step 2. CRITICAL STEP Position OVERRIDE RC MAKEUP PUMP switch to START.
___ SAT STANDARD: OVERRIDE RC MAKEUP PUMP switch is rotated to the START position.
Continues to step 3.
___ UNSAT NOTE: Allow 9 seconds for the following valves to stroke from the time the OVERRIDE switch is operated, and then as soon as the 9 second stroke time is complete the time-critical time #1 is complete.
CRITICAL TIME #1 _________ 20 minutes COMMENTS:
CRO-607 fnl - j Page 10 of 14 STEP 15: Step 3 CRITICAL STEP Select CLOSE for the following valves:
___ SAT
___ UNSAT STANDARD: Student: Presses the green CLOSE button for the following:
- 3HP-4 Continues to step 6.
Cue: Initial indication for valve position is red light is on and green light is off for all valves. During valve travel, both the red and green lights are on.
COMMENTS:
STEP 16: Step 4 Verify SSF ASW is required to feed Unit 3 SGs.
___ SAT STANDARD: Determine that SSF ASW is required to feed Unit 3 SGs.
Continues to step 5.
___ UNSAT COMMENTS:
CRO-607 fnl - j Page 11 of 14 STEP 17: Step 5 CRITICAL STEP Open the following valves:
___ SAT
- 3CCW-269 (throttle valve)
___ UNSAT STANDARD: Red OPEN button is pressed for 3CCW-287.
Red OPEN button is pressed and held (throttle valve) for 3CCW-269 Continues to Step 6 Cue: After allowing 25 seconds for valve stroke time, inform the student the Red light is ON and the Green light is OFF.
Cue: After allowing 12 seconds for valve stroke time inform student the Green light is OFF and the Red light is ON.
COMMENTS:
NOTE CRITICAL STEP
- For high decay heat cores, aggressive feeding up to a maximum of 425 gpm may be required. ___ SAT
- For very low decay heat cores, no feeding may be required.
- SSF ASW flow gauge has a 60 gpm low flow cut off.
___ UNSAT STEP 18: Step 6 IAAT RCS pressure is NOT within 1950 - 2250 psig, THEN throttle 3CCW-268, as necessary, to maintain RCS pressure 1950
- 2250 psig.
STANDARD: ASW Pump to SG Supply, 3CCW-268, is THROTTLED OPEN and RCS pressure is monitored.
Continues to Step 7 Cue: Indicate that RCS pressure is 2375 psig Cue: After allowing 14 sec for valve stroke time, indicate to operator that ASW flow is 400 gpm and RCS pressure is 2235 slowly decreasing.
CRITICAL TIME #2 __________ 14 minutes COMMENTS:
CRO-607 fnl - j Page 12 of 14 STEP 19: Step 7 WHEN RCS pressure 2350 psig,
___ SAT THEN select CLOSE on 3RC-4.
STANDARD: Determine that RCS pressure is < 2350 and select CLOSE on 3RC-4.
___ UNSAT Cue: Indicate that RCS pressure is 2330 psig Cue: When 3RC-4 has been closed, inform the candidate that another operator will complete this procedure.
COMMENTS:
END TASK STOP TIME: ____________
CRO-607 fnl - j Page 13 of 14 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 1 Must be performed to power the SSF from the Diesel/Generator.
3 Must be performed to start the diesel and get power for the SSF.
8 Necessary to power the SSF loads.
10 Starts the SSF ASWP 14 Starts the SSF RCMU pump (TCA 20 minutes) 15 Necessary to achieve RCS pressure control.
17 Necessary to lineup the SSF ASW to supply the SGs.
18 Necessary to lineup the SSF ASW to supply the SGs. (TCA 14 minutes)
j CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Unit 3 was operating at 100% power Unit 3 TD EFDWP is out of service Tornado warnings are in affect AP/0/A/1700/006 (Natural Disaster) in progress You are pre-staged in the SSF Control Room and in communication with the Unit 3 Control Room as directed by AP/0/A/1700/006 (Natural Disaster).
Unit 3 Reactor has just tripped and the unit has experienced a complete loss of all AC power AP/0/A/1700/025 (SSF EOP) has been initiated INITIATING CUES:
The CRS calls and informs you of the following:
- Unit 3 has lost all AC power
- SSF RCMU feed and SSF ASW feed to the SGs are required
- The breaker transfers have NOT been performed
- Begin AP/25 actions starting at Step 4.5 THIS JPM IS TIME CRITICAL
CRO-803 R0 - g Page 1 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-803 Perform Required Actions For A Turbine Building Flood CANDIDATE EXAMINER
CRO-803 R0 - g Page 2 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Perform Required Actions For A Turbine Building Flood Alternate Path:
Yes Facility JPM #:
CRO-060 K/A Rating(s):
System: APE BW/A07 K/A: AA1.3 Rating: 3.3/3.5 Task Standard:
Perform required actions for a Turbine Building Flood in accordance with AP/10, Uncontrollable Flooding of Turbine Building Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____
References:
AP/10, Uncontrollable Flooding of Turbine Building Validation Time: 15 minutes Time Critical: NO
=========================================================================
Candidate: ______________________________________ Time Start: _____________
NAME Time Finish: ____________
Performance Rating: SAT ______ UNSAT ______ Performance Time _______
Examiner: ______________________________ ____________________________________/________
NAME SIGNATURE DATE
=========================================================================
COMMENTS
CRO-803 R0 - g Page 3 of 13 SIMULATOR OPERATOR INSTRUCTIONS:
- 1. RECALL Snap 219
- 2. IMPORT files for CRO-803
- 3. Go to RUN
CRO-803 R0 - g Page 4 of 13 Tools/Equipment/Procedures Needed:
AP/10, Uncontrollable Flooding of Turbine Building READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 was operating at 100% power Unit 2 is in cold shutdown.
The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water level is rising.
Unit 1 has been tripped and the EOP is being completed by other team members.
INITIATING CUES:
The CRS directs you to refer to Unit 1 AP/10, Uncontrollable Flooding of Turbine Building, and perform required actions.
CRO-803 R0 - g Page 5 of 13 START TIME: _______
STEP 1: Step 4.1 Trip the Rx.
___ SAT STANDARD: Depress the Rx trip pushbutton on 1UB1. Verify the RX is tripped by observing all control rods are inserted.
___ UNSAT Continue to Step 4.2.
COMMENTS:
NOTE CRITICAL STEP Tripping the CCW pumps will cause loss of condenser vacuum which will result in TBVs failing closed and trip of the MFDWPs. ___ SAT STEP 2: Step 4.2 Ensure all CCW pumps are shutdown. ___ UNSAT STANDARD: The 1A, 1B, and 1C CCW pump switches are rotated to the TRIP position and verify the red close lights extinguish and the white open lights illuminate. (located on 1AB3)
Continue to Step 4.3.
COMMENTS:
CRO-803 R0 - g Page 6 of 13 STEP 3: Step 4.3 CRITICAL STEP Press both of the following on the TURB BLDG FLOOD EMER CLOSING ALL CCWP DISCH VALVES control switch: ___ SAT
- CLOSE 1
- CLOSE 2
___ UNSAT STANDARD: "CLOSE 1" and "CLOSE 2" on the TURB BLDG FLOOD EMER CLOSING ALL CCWP DISCH VALVES control switch are both depressed. (located on 1AB3)
Continue to Step 4.4.
COMMENTS:
STEP 4: Step 4.4 Verify all CCW pump discharge valves are closed.
___ SAT STANDARD: The green CLOSED lights for 1CCW-10, 11, and 13 are verified illuminated and the red OPEN lights for the same valves are verified extinguished. (located on 1AB3) ___ UNSAT Determine that 1CCW-12 is NOT closed by observing the red open light is lit on 1AB3.
Continue to Step 4.4 RNO.
COMMENTS:
CRO-803 R0 - g Page 7 of 13 ALTERNATE PATH NOTE The control switches for the CCW pump discharge valves do not seal-in. The valves act ___ SAT as throttle valves unless the associated CCW pump switch is in the TRIP position.
STEP 5: Step 4.4 RNO
___ UNSAT Dispatch an operator to ensure all CCW pump discharge valves are closed (Equipment Rm):
STANDARD: An operator is dispatched to the Equipment Room to ensure 1CCW-12 is closed.
Continue to Step 4.5.
Booth cue: After 2 minutes call as the NEO and inform candidate that 1CCW-12 will NOT close.
COMMENTS:
NOTE Field tasks that may affect multiple units should be coordinated with Unit 2 and Unit 3.
___ SAT STEP 6: Step 4.5 Dispatch operators to ensure all three flood doors are closed and in the SECURED position from the AB side (A-1, at Unit 1, 2, and 3 stairwell ___ UNSAT entrances to TB): {2}
- Unit 1 Flood Door
- Unit 2 Flood Door
- Unit 3 Flood Door STANDARD: Dispatch an NEO to ensure all three flood doors are closed and in the SECURED position from the AB side.
Continue to Step 4.6.
Booth cue: When called, inform candidate that an operator has been dispatched.
COMMENTS:
CRO-803 R0 - g Page 8 of 13 STEP 7: Step 4.6 Verify LPI decay heat removal is in progress.
___ SAT STANDARD: Determine LPI pumps are NOT operating by observing pumps switch indications on 1UB2.
___ UNSAT Continue to Step 4.6 RNO GO TO Step 4.8.
COMMENTS:
STEP 8: Step 4.8 Dispatch an operator to position the waterbox discharge valve switches (T-3, East of condenser catwalk): ___ SAT
- 1CCW-20 (1A1) switch to HAND
- 1CCW-20 (1A1) switch to CLOSE ___ UNSAT
- 1CCW-21 (1A2) switch to HAND
- 1CCW-21 (1A2) switch to CLOSE
- 1CCW-22 (1B1) switch to HAND
- 1CCW-22 (1B1) switch to CLOSE
- 1CCW-23 (1B2) switch to HAND
- 1CCW-23 (1B2) switch to CLOSE
- 1CCW-24 (1C1) switch to HAND
- 1CCW-24 (1C1) switch to CLOSE
- 1CCW-25 (1C2) switch to HAND
- 1CCW-25 (1C2) switch to CLOSE STANDARD: Candidate should dispatch an operator to place the above valves to HAND and CLOSE.
Continue to Step 4.9.
Booth Cue: When called, inform candidate that an operator has been dispatched.
COMMENTS:
CRO-803 R0 - g Page 9 of 13 STEP 9: Step 4.9 Make a PA announcement of the event including restrictions on entry into TB basement due to electrical hazard. ___ SAT STANDARD: PA announcement is made using the Control Room phone.
___ UNSAT Continue to Step 4.10.
COMMENTS:
STEP 10: Step 4.10 Begin attempts to locate and isolate the source of the flooding.
___ SAT STANDARD: Dispatch operators to locate and isolate the source of the flooding.
Continue to Step 4.11. ___ UNSAT Booth Cue: When called, inform candidate that an operator has been dispatched.
COMMENTS:
STEP 11: Step 4.11 Ensure all Unit 1 ESV pumps are shutdown:
___ SAT
- 1A ESV Pump
- 1C ESV Pump
- 1B ESV Pump ___ UNSAT STANDARD: Stop ALL Unit 1 ESV pumps by rotating their pumps switches to stop and verify that the red on light extinguishes and the white open light illuminates. (located on 1AB3)
Continue to Step 4.12.
COMMENTS:
CRO-803 R0 - g Page 10 of 13 ALTERNATE PATH STEP 12: Step 4.12 Verify all CCW pump discharge valves were successfully closed in ___ SAT earlier steps.
STANDARD: Verify that 1CCW-10, 11, and 13 are closed by observing that the green ___ UNSAT closed light is lit for each valve. (located on 1AB3)
Determine that 1CCW-12 is still open by observing red open indication light is lit on 1AB3 or observing open indication on the OAC.
Continue to Step 4.12 RNO.
COMMENTS:
CRITICAL STEP STEP 13: Step 4.12 RNO Dispatch an operator to perform the following (ESV Trench, Intake): ___ SAT
___ UNSAT
STANDARD: Candidate should dispatch an operator to position the above valves as directed.
Continue to Step 4.13 Booth Cue: When called, inform candidate that an operator has been dispatched.
COMMENTS:
CRO-803 R0 - g Page 11 of 13 STEP 14: Step 4.13 Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW Pumps).
___ SAT STANDARD: Dispatch an operator to perform Encl 5.1 (Isolation of SSW to CCW Pumps).
___ UNSAT Continue to Step 4.14.
Booth Cue: When called, inform candidate that an operator has been dispatched.
COMMENTS:
STEP 15 Step 4.14 IAAT HPSW is NOT available, THEN ensure Encl 5.31 (Temporarily Charging the HPSW System) of Unit 1 EOP has been initiated. ___ SAT STANDARD: Determine that HPSW is available by observing the HPSW Jockey pump operating and level in the EWST. ___ UNSAT Continue to Step 4.15.
COMMENTS:
STEP 16: Step 4.15 Coordinate with WCC/TSC to perform the following:
- Recover damaged equipment. ___ SAT
- Remove water from accessible sumps.
___ UNSAT STANDARD: Candidate should call the WCC/TSC and discuss the following:
- Recover damaged equipment.
- Remove water from accessible sumps.
Cue: Inform candidate that another RO will complete this procedure. This task is complete COMMENTS:
END TASK STOP TIME: ____________
CRO-803 R0 - g Page 12 of 13 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 2 Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement.
3 Necessary to attempt to terminate the flooding and not contribute to the water level in the TB basement.
13 Necessary to ensure CCW inlet piping is vented to break siphon.
g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Unit 1 was operating at 100% power Unit 2 is in cold shutdown.
The 2A1 condenser inlet expansion joint has ruptured and Turbine Building Basement water level is rising.
Unit 1 has been tripped and the EOP is being completed by other team members.
INITIATING CUES:
The CRS directs you to refer to Unit 1 AP/10, Uncontrollable Flooding of Turbine Building, and perform required actions.
CRO-903 R0 - h Page 1 of 16 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-903 Release GWD Tank CANDIDATE EXAMINER
CRO-903 R0 - h Page 2 of 16 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Release GWD Tank Alternate Path:
Yes Facility JPM #:
CRO-903 K/A Rating(s):
System: 071 K/A: A4.26 Rating: 3.1/3.9 Task Standard:
Release a GWD tank correctly using OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release) and terminate the release when unexpected results are noted.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __X__ In-Plant __ ___ Perform __X___ Simulate ____
References:
OP/1&2/A/1104/018 Encl. 4.9 (GWD Tank Release)
Validation Time: 30 minutes Time Critical: NO
=========================================================================
Candidate: _______________________________________ Time Start: ________
NAME Time Finish: ________
Performance Rating: SAT ______ UNSAT ______ Performance Time ______
Examiner: ______________________________ ____________________________________/________
NAME SIGNATURE DATE
=========================================================================
COMMENTS
CRO-903 R0 - h Page 3 of 16 SIMULATOR OPERATOR INSTRUCTIONS:
- 1. RECALL SNAP 201
- 2. Go to RUN
CRO-903 R0 - h Page 4 of 16 Tools/Equipment/Procedures Needed:
OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) & 4.10 (GWD Tank Sample Request)
PT/0/A/230/001 (Radiation Monitor Check)
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Release of D GWD tank is desired No other GWRs in progress.
OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to step 3.9 INITIATING CUES:
CRS directs you to complete the release of the D GWD tank beginning at step 3.9 of Enclosure 4.9 (GWD Tank Release).
CRO-903 R0 - h Page 5 of 16 START TIME: _______
NOTE: If N2 was added to the most recently released GWD tank until 1RIA-37 indicated CRITICAL STEP
< 700 cpm, OR if the tanks' radioactivity was < 2.1E-05 Ci / ml when it was released, the GWD piping is considered "purged". ___ SAT STEP 1: Step 3.9 3.9 Adjust 1RIA-37 setpoints for release as follows: ___ UNSAT 3.9.1 Perform one of the following:
A. IF all of the following:
- Calculated setpoints are < 1E+07 CPM
- GWD piping purged {15}
set alarms as follows:
- Set 1RIA-37 Alert setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1)
- Set 1RIA-37 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.7.1)
NOTE: If GWD piping NOT purged on most recent release, RP independently verifies release data and 1RIA-37 setpoint is set at zero to allow the tank to be released. {15}
B. IF any of the following:
- Calculated setpoints are > 1E+07 CPM
- 1RIA-37 out-of-service
- GWD piping NOT purged {15}
over-ride 1RIA-37 setpoints as follows:
- Set 1RIA-37 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
- Set 1RIA-37 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
STANDARD: Refer to PT/0/A/0230/001 (Radiation Monitor Check) Encl. 13.6 (1RIA-37 and 1RIA-38 Setpoints) and using the RIA Screen insert the calculated 1RIA-37 setpoint of 2.73 E5 CPM Continue to Step 3.10 COMMENTS:
CRO-903 R0 - h Page 6 of 16 STEP 2: Step 3.10 CRITICAL STEP 3.10 Adjust 1RIA-38 setpoints for release as follows:
3.10.1 Perform one of the following: ___ SAT A. IF calculated setpoints are < 1E+06 CPM AND 1RIA-38 operable, set alarms as follows:
- Set 1RIA-38 Alert setpoint at _______________cpm per ___ UNSAT PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8)
- Set 1RIA-38 High setpoint at _______________cpm per PT/0/A/0230/001 (Radiation Monitor Check). (from Step 3.8)
NOTE: Due to type of radiation 1RIA-38 monitors, it is NOT sensitive enough to perform an adequate N2 purge.
B. IF calculated setpoints are > 1E+06 CPM OR 1RIA-38 out of service, over-ride 1RIA-38 setpoints as follows:
- Set 1RIA-38 Alert setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
- Set 1RIA-38 High setpoint at zero per PT/0/A/0230/001 (Radiation Monitor Check).
STANDARD: Refer to PT/0/A/0230/001 (Radiation Monitor Check) Encl. 13.6 (1RIA-37 and 1RIA-38 Setpoints) and using the RIA Screen insert the calculated 1RIA-38 setpoint of 324 CPM.
Continue to Step 3.11 COMMENTS:
STEP 3: Step 3.11 Ensure GWR DISCHARGE FLOW CONTROL in "HAND".
___ SAT STANDARD: Ensure GWR DISCHARGE FLOW CONTROL in "HAND" located on 1AB3.
Continue to Step 3.12 ___ UNSAT COMMENTS:
CRO-903 R0 - h Page 7 of 16 STEP 4: Step 3.12 Verify GWR DISCHARGE FLOW CONTROL "CLOSED"
___ SAT STANDARD: Verify GWR DISCHARGE FLOW CONTROL CLOSED located on 1AB3.
Continue to Step 3.13
___ UNSAT COMMENTS:
STEP 5: Step 3.13 Remove "Purged / Not Purged" CR tag from GWR DISCHARGE FLOW CONTROL. ___ SAT STANDARD: Remove "Purged / Not Purged" CR tag from GWR DISCHARGE FLOW CONTROL located on 1AB3.
___ UNSAT Continue to Step 3.14 COMMENTS:
STEP 6: Step 3.14 Notify Unit 3 CR to perform the following:
- Begin periodically monitoring all three Unit 3 GWD tanks to ___ SAT determine if pressure in any tank is decreasing unexpectedly. {12}
- Place a note on turnover sheet "If 3RIA-45 alarms or GWD tank pressure in any tank is decreasing unexpectedly, notify Unit 1 CR to ___ UNSAT terminate GWD tank release".
STANDARD: Notify Unit 3 CR to begin periodically monitoring all three Unit 3 GWD tanks to determine if pressure in any tank is decreasing unexpectedly Notify Unit 3 CR to place above note on the turnover sheet Continue to Step 3.15 COMMENTS:
CRO-903 R0 - h Page 8 of 16 STEP 7: Step 3.15 Notify Unit 2 CR to place a note on turnover sheet "If 2RIA-45 alarms, notify Unit 1 CR to terminate GWD tank release". ___ SAT STANDARD: Notify Unit 2 CR to place above note on the turnover sheet.
Continue to Step 3.16 ___ UNSAT COMMENTS:
STEP 8: Step 3.16 Begin monitoring all four Unit 1 GWD tanks to determine if pressure in any tank is decreasing unexpectedly. ___ SAT STANDARD: Begin monitoring GWD tank pressures on chart recorder on 1VB2 or OAC.
___ UNSAT Continue to Step 3.17 COMMENTS:
STEP 9: Step 3.17 IF 1RIA-37 NOT in service AND the tank being released is 2.1E-05 Ci
/ ml, notify RP to prepare to survey GWD piping at 1RIA-37. {15} ___ SAT
________________________ _____
Person Notified Date STANDARD: Determine 1RIA-37 is in service and N/A step 3.17. ___ UNSAT Continue to Step 3.18 COMMENTS:
CRO-903 R0 - h Page 9 of 16 STEP 10: Step 3.18 IF AT ANY TIME any tank is decreasing unexpectedly, perform the following: ___ SAT 3.18.1 Close GWR DISCHARGE FLOW CONTROL.
3.18.2 Notify RP to initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences) due to potential unplanned ___ UNSAT radioactive effluent release.
________________________ _____
Person Notified Date 3.18.3 Go To Section 4 (GWR Termination).
STANDARD: Determine IAAT step is not met at this time.
Continue to Step 3.19 COMMENTS:
STEP 11: Step 3.19 IF AT ANY TIME desired to terminate release, perform the following:
3.19.1 Close GWR DISCHARGE FLOW CONTROL. ___ SAT 3.19.2 Go To Section 4 (GWR Termination).
STANDARD: Determine IAAT step is not met at this time. ___ UNSAT Continue to Step 3.20 COMMENTS:
CRO-903 R0 - h Page 10 of 16 STEP 12: Step 3.20 CRITICAL STEP Open GWD-100 (Decay Tanks Discharge Header Block). (A-2-209/E 13' N of Door) ___ SAT STANDARD: Dispatch NEO to Open GWD-100 (Decay Tanks Discharge Header Block). ___ UNSAT Continue to Step 3.21 Booth Note: GWD-100 is OPEN.
Cue: Inform candidate that GWD-100 is open.
COMMENTS:
STEP 13: Steps 3.21 - 3.23 IF releasing GWD Tank A, perform the following
___ SAT STANDARD: Determine NOT releasing GWD Tank A, B, and C and N/A steps 3.21, 3.22, and 3.23.
Continue to Step 3.24
___ UNSAT COMMENTS:
STEP 14: Step 3.24 CRITICAL STEP IF releasing GWD Tank D perform the following:
___ SAT
- Open GWD-205 (Decay Tank 1D Discharge Block) (IRW Building)
- Place GWD-207 (D INTERIM GWD TANK DISCH) switch to "OPEN"
___ UNSAT STANDARD: Dispatch NEO to open GWD-205 (Decay Tank 1D Discharge Block).
Cue: Inform candidate that GWD-205 is open.
Locate GWD-207 (D INTERIM GWD TANK DISCH) on 1AB3 and place switch to "OPEN" Continue to Step 3.25 COMMENTS:
CRO-903 R0 - h Page 11 of 16 NOTE: Station Limit release rates, per SLC 16.11, will NOT be exceeded if recommended release rates per Enclosure 4.10 (GWD Tank Sample Request) are followed.
___ SAT The following approval levels are required for releases: {10}{13}
All Station Releases in Progress (including this one) Required Level of Approval 1 GWR in progress through P/A/C filter at ___ UNSAT 1/3 Station Limit ( 30 day holdup) SRO 1 GWR in progress at 1/3 Station Limit
(< 30 day holdup OR released without P/A/C filter) OSM 1 GWR in progress at 2/3 Station Limit OSM 2 GWRs in progress at 1/3 Station Limit each OSM 3 GWRs in progress at 1/3 Station Limit each OSM STEP 15: Step 3.25 Circle Required Level of Approval above based on Release Conditions.
STANDARD: Circle SRO on enclosure.
Continue to Step 3.26 COMMENTS:
STEP 16: Step 3.26 Record approval granted for release:
___ SAT
________________________ _________ / _____
Approval Date Time STANDARD: Place approval name and date and time on enclosure. ___ UNSAT Continue to Step 3.27 Cue: Approval is granted for release by Tracy Lemons at current Date/Time.
COMMENTS:
CRO-903 R0 - h Page 12 of 16 STEP 17: Step 3.27 IF tank holdup < 30 days, perform the following STANDARD: Determine tank has been held up greater than 30 days and N/A steps ___ SAT 3.27.1 - 3.27.2.
Continue to Step 3.28
___ UNSAT COMMENTS:
STEP 18: Step 3.28 IF tank is released without processing through a P/A/C filter AND Projected 31 day average gaseous effluent organ dose > limit, perform ___ SAT the following STANDARD: Determine tank is being released through a P/A/C filter and N/A steps 3.28.1 - 3.28.4.
___ UNSAT Continue to Step 3.29 COMMENTS:
STEP 19: Step 3.29 Record recommended Release Rate from Enclosure 4.10 (GWD Tank Sample Request): ___ SAT
______________ cfm STANDARD: Record recommended Release Rate from Enclosure 4.10 (GWD Tank Sample Request): ___ UNSAT
__4.19 E4____ cfm Continue to Step 3.30 COMMENTS:
CRO-903 R0 - h Page 13 of 16 NOTE: With Unit 1 PRV system shutdown, RIA-32 sample point for '1 PRV System Filter Discharge' is sampling air in piping between Unit 1 PRV discharge and Unit Vent, NOT the general area {2} ___ SAT During or just after GWD Release RIA-32 counts may increase while selected to '1 PRV System Filter Discharge' causing 1SA-8/B-9 "Process Monitor Radiation High" to alarm.
___ UNSAT STEP 20: Step 3.30 Place the following note on Unit 1 Turnover sheet:
"Just after or during a GWD release, 1SA-8/B-9 may alarm from RIA-32 sample point selected to '1 PRV System Filter Discharge'. IF 1SA-8/B-9 is due to RIA '1 PRV System Filter Discharge', it can be considered an expected alarm".
STANDARD: Candidate should indicate that the above note will be placed on the turnover sheet.
Continue to Step 3.31 COMMENTS:
STEP 21: Step 3.31 CRITICAL STEP Adjust GWR DISCHARGE FLOW CONTROL to obtain desired release rate.
___ SAT STANDARD: Slowly adjust the manual loading knob to obtain the desired release rate.
Continue to Step 3.32
___ UNSAT Note: Actual release rate will be much less than the maximum flow rate allowed by the release permit. Flow is monitored on VB1 recorder 1MSCCR0001 COMMENTS:
CRO-903 R0 - h Page 14 of 16 ALTERNATE PATH STEP 22: Step 3.32 Record "Begin GWR # _________" in Unit Log. ___ SAT STANDARD: Candidate should indicate a Unit log entry would be made.
___ UNSAT Note: The B GWD tank will decrease instead of the D. The candidate should note this while monitoring the tank pressures and then perform IAAT Step 3.18.
Candidate may also perform the IAAT because he notes that a release is occurring but the D tank pressure is not decreasing. In both cases unexpected results were noted.
COMMENTS:
STEP 23: Step 3.18 *CRITICAL STEP IF AT ANY TIME any tank is decreasing unexpectedly, perform the following: ___ SAT 3.18.1 Close GWR DISCHARGE FLOW CONTROL.
3.18.2 Notify RP to initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences) due to potential unplanned ___ UNSAT radioactive effluent release.
________________________ _____
Person Notified Date 3.18.3 Go To Section 4 (GWR Termination).
STANDARD: Determine IAAT step is met because the B GWD Tank pressure is decreasing.
- Close GWR DISCHARGE FLOW CONTROL.
Notify RP initiate SRPMP 8-02 (Investigation of Unusual Radiological Occurrences)
Go To Section 4 (GWR Termination).
Cue: Another operator will complete this procedure.
COMMENTS:
END TASK STOP TIME: ____________
CRO-903 R0 - h Page 15 of 16 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 1 Required to set RIA to prevent station release above limits.
2 Required to set RIA to prevent station release above limits.
12 Required to align release flow path.
14 Required to align release flow path.
21 Required to align release flow path.
23 Required to stop the release of the wrong tank.
h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Release of D GWD tank is desired No other GWRs in progress.
OP/1&2/A/1104/018, Enclosure 4.9 (GWD Tank Release) is in progress and completed up to step 3.9 INITIATING CUES:
CRS directs you to complete the release of the D GWD tank beginning at step 3.9 of Enclosure 4.9 (GWD Tank Release).
NLO-400 fnl - i Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-400 Station ASW Pump Alignment CANDIDATE EXAMINER
NLO-400 fnl - i Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Align and start the Station ASW Pump Alternate Path:
No Facility JPM #:
NLO-017 K/A Rating(s):
System: B/WE04 K/A: EA1.1 Rating: 4.4/4.2 Task Standard:
Perform EOP Encl. 5.10 Station ASW Pump Alignment for valve and breaker alignment required to provide Station ASW to the SGs.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __ __ In-Plant __ X ___ Perform __ ___ Simulate __X__
References:
EOP Encl. 5.10 Station ASW Pump Alignment OP/0/A/1107/011 Removal And Restoration Of Auxiliary Electrical Equipment Validation Time: 16 minutes Time Critical: NO
========================================================================
Candidate: _______________________________________ Time Start: _________
NAME Time Finish: ________
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________
Examiner: ______________________________ ____________________________________/________
NAME SIGNATURE DATE
========================================================================
COMMENTS
NLO-400 fnl - i Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS None
NLO-400 fnl - i Page 4 of 12 Tools/Equipment/Procedures Needed:
600 volt breaker rackout tool EP/1/A/1800/001 Enclosure 5.10 Station ASW Pump Alignment OP/0/A/1107/011 Removal And Restoration Of Auxiliary Electrical Equipment .5 Rack In 600 Volt Breaker READ TO OPERATOR DIRECTION TO TRAINEE I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS Unit 1 was operating at 100% power The SSF is OOS BOTH Standby Buses are energized from CT-5 Unit 1 trips due to a loss of all Main and Emergency Feedwater HPI Forced Cooling is established The EOP HPI CD Tab in progress HPI forced cooling flow is determined to be inadequate INITIATING CUES The CRS directs you to perform EOP Enclosure 5.10 Station ASW Pump Alignment to align and then start the Station ASW Pump.
NLO-400 fnl - i Page 5 of 12 START TIME: _______
NOTE All equipment operated in the following steps is located in A-1-128, ASW Pump Rm.
___ SAT STEP 1: Step 1 Obtain racking equipment and pipe wrench from EOP equipment locker U2AB1 (A-1, hallway near U2 elevator lobby).
STANDARD: Student locates the equipment locker containing the required racking and ___ UNSAT protective equipment.
- Safety glasses
- Face shield
- Hard hat
- Rubber gloves with leather protectors
- Flame-resistant clothing
- Pipe wrench
- Breaker racking tool Continue to Step 2 NOTE: This step may be simulated and discussed, at the discretion of the evaluator.
Cue: Inform the student that for this JPM, it is not necessary to break the security seal on the locker for demonstrating equipment to be utilized.
COMMENTS:
STEP 2: Step 2 CRITICAL STEP Open CCW-99 (Aux Service Water Pump Suction).
___ SAT STANDARD: Candidate locates CCW-99 and simulates rotating handwheel counterclockwise to the open position.
Continue to Step 3 ___ UNSAT Cue: After the student locates and simulates placing CCW-99 in the open position, inform student CCW-99 position indicator is pointing to the "open" position.
COMMENTS:
NLO-400 fnl - i Page 6 of 12 STEP 3: Step 3 CRITICAL STEP Open CCW-247 (Aux Service Water Pump Recirc).
___ SAT STANDARD: Candidate locates CCW-247 and simulates rotating chain operator in the counterclockwise direction by pulling chain operator until handwheel comes to a hard stop. ___ UNSAT Continue to Step 4 Cue: After student locates and simulates placing CCW-247 in the open position, inform student that CCW-247 is at a counterclockwise hard stop position.
COMMENTS:
STEP 4: Step 4 CRITICAL STEP Open CCW-308 (Aux Service Water Pump Vent).
___ SAT STANDARD: Candidate locates CCW-308 on top of the Station ASW pump, removes pipe cap with simulated wrench from EOP Locker, pulls the locking pin and simulates rotating the 90° valve until the lever is parallel to the vent piping to the open position. ___ UNSAT Continue to Step 5 Cue: After student simulates opening CCW-308, inform him/her that a solid stream of water is issuing from the valve.
COMMENTS:
STEP 5: Step 5 *CRITICAL STEP WHEN all air is vented from Station ASW Pump, THEN close CCW-308.
___ SAT STANDARD: Candidate recognizes from previous instructor cue that all air is vented from Station ASW pump and simulates rotating CCW-308 clockwise to the closed position.
Continue to Step 6 ___ UNSAT
- Note: Replacing the pipe cap in not critical.
Cue: After student simulates closing CCW-308, inform him/her that water flow has stopped and CCW-308 is at a clockwise hard stop position.
COMMENTS:
NLO-400 fnl - i Page 7 of 12 STEP 6: Step 6 CRITICAL STEP Rack in ASWS-6B (STATION ASW PUMP BKR) ( ASW 4160/600V SWGR ASWS-6). ___ SAT STANDARD: Candidate simulates donning protective clothing/equipment and simulates racking in ASW pump breaker (ASWS-6B).
Continue to Step 7 ___ UNSAT Cue: After the student simulates racking in the breaker, inform student that the STATION AUX SERVICE WATER PUMP Switch green "Trip" indicating light is ON.
Cue: If the candidate asks, provide him/her with a copy of OP/0/A/1107/011 Enclosure 4.5 (not critical)
COMMENTS:
STEP 7: Step 7 Close ASW SWGR FDR (ASW Swgr Fdr From B1T- Unit 10) (ASW 4160/600V Swgr ASWS-5). ___ SAT STANDARD: Candidate verifies that ASW SWGR FDR From B1T- Unit 10 is closed.
Continue to Step 8
___ UNSAT NOTE: This breaker is normally closed.
Cue: After student locates breaker, inform student that the two red CLOSED lights are lit and that the white OPEN light is off.
COMMENTS:
STEP 8: Step 8 IAAT AP/6 (Natural Disaster) directs restoring the Station ASW pump to standby, THEN GO TO Step 14. ___ SAT STANDARD: Candidate determines from cue that this step does not apply and continues to Step 9.
___ UNSAT Cue: If the candidate asks, inform him/her that AP/06 is NOT in progress.
COMMENTS:
NLO-400 fnl - i Page 8 of 12 STEP 9: Step 9 CRITICAL STEP WHEN notified that Standby Bus #1 is energized, AND notified to start the Station ASW pump, THEN perform the following (ASW 4160/600V ___ SAT SWGR ASWS-5):
A. Close ASW TRANSFORMER FDR (ASW SWITCHGEAR TRANSFORMER FEEDER).
___ UNSAT B. Close STATION ASW PUMP SW (STATION ASW PUMP CONTROL SWITCH) (ASW 4160V SWGR ASWX-5).
STANDARD: Candidate should recognize from the Initial Conditions that Standby Bus #1 is energized and the CRS has directed him/her to start the Station ASW Pump.
Candidate locates and closes ASW Switchgear Transformer Feeder breaker on ASWS-5 by simulating rotating the handle to the closed position.
Cue: After candidate simulates closing the breaker, inform him/her that the red "closed" light is ON and the green "trip" light is OFF.
Candidate locates Station ASW Pump Switch on ASWS-5 and simulates rotating the handle to the CLOSED position.
Continue to Step 10 Cue: After candidate simulates closing the breaker, inform him/her that the Station ASW Pump Switch red CLOSED light is ON and the green TRIP light is OFF.
COMMENTS:
STEP 10: Step 10 Close CCW-309 (Aux Service Water Pump Disch Drain) (12 West of ASW pump). ___ SAT STANDARD: Candidate locates CCW-309 and simulates closing CCW-309 by rotating the valve handwheel in a clockwise direction to a hard stop.
Continue to Step 11 ___ UNSAT Cue: Inform candidate that CCW-309 handwheel is fully clockwise and at a hard stop position.
COMMENTS:
NLO-400 fnl - i Page 9 of 12 STEP 11: Step 11 CRITICAL STEP Perform the following:
A. Position CCW-101 (Aux Service Water Pump Discharge) only one
___ SAT turn open.
B. Open CCW-101 an additional one turn open at a rate of one quarter turn every 15 seconds.
C. WHEN 5 minutes have elapsed, THEN slowly open CCW-101 until ___ UNSAT full open STANDARD: Candidate locates CCW-101 and simulates opening the valve one turn by rotating the valve operator in the counterclockwise direction by pulling on the chain operator.
Candidate opens CCW-101 an additional on turn open at a rate of one quarter turn every 15 seconds.
When 5 minutes have elapsed, candidate slowly opens CCW-101 until full open.
Continue to Step 12 Cue: After the candidate has correctly explained how to perform steps A & B, inform him her that 5 minutes have elapsed (time compression).
Cue: Inform candidate that CCW-101 handwheel is at a hard stop after following the sequence correctly.
COMMENTS:
STEP 12: Step 12 Verify Turbine Building flood is in progress.
___ SAT STANDARD: Candidate determines from the Initial Conditions that a Turbine Building flood is NOT in progress.
___ UNSAT Continue to Step 12 RNO COMMENTS:
NLO-400 fnl - i Page 10 of 12 STEP 13: Step 12 RNO Notify CRO that Station ASW Pump is operating.
___ SAT STANDARD: Candidate contacts the Unit 1 Control Room by radio or phone and informs them that the Station ASW Pump is operating.
___ UNSAT COMMENTS:
END TASK STOP TIME: ____________
NLO-400 fnl - i Page 11 of 12 CRITICAL STEP EXPLANATIONS STEP # Explanation 2 Necessary to align flowpath 3 Necessary to align flowpath 4 Necessary to vent the pump 5 Necessary to stop venting the pump 6 Necessary to provide power to the pump.
9 Necessary to provide power to the pump.
11 Necessary to provide flowpath.
i CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS Unit 1 was operating at 100% power The SSF is OOS BOTH Standby Buses are energized from CT-5 Unit 1 trips due to a loss of all Main and Emergency Feedwater HPI Forced Cooling is established The EOP HPI CD Tab in progress HPI forced cooling flow is determined to be inadequate INITIATING CUES The CRS directs you to perform EOP Enclosure 5.10 Station ASW Pump Alignment to align and then start the Station ASW Pump.
NLO-700 fnl - k Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE NLO-700 Restoration of ICS Auto Power CANDIDATE EXAMINER
NLO-700 fnl - k Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:
Restoration of ICS AUTO Power Alternate Path:
Yes Facility JPM #:
NLO-700 K/A Rating(s):
System: BW/A02 K/A: AA1.3 Rating: 3.4/3.6 Task Standard:
ICS AUTO power is restored per AP/1/A/1700/023, Loss of ICS Power.
Preferred Evaluation Location: Preferred Evaluation Method:
Simulator __ __ In-Plant __ X ___ Perform __ ___ Simulate __X _
References:
AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) Rev. 20 Validation Time: 16 minutes Time Critical: NO
=======================================================================
Candidate: _______________________________________ Time Start: _________
NAME Time Finish: ________
Performance Rating: SAT ______ UNSAT ______ Performance Time: _________
Examiner: ______________________________ ____________________________________/________
NAME SIGNATURE DATE
=======================================================================
COMMENTS
NLO-700 fnl - k Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:
NONE
NLO-700 fnl - k Page 4 of 9 Tools/Equipment/Procedures Needed:
AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power)
READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 operating at 100% power 1SA-2/B-11 (ICS AUTO POWER FAILURE) is actuated INITIATING CUES:
The CRS directs you to use AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) to restore ICS AUTO power on Unit 1.
NLO-700 fnl - k Page 5 of 9 START TIME: _______
STEP 1: Step 1 Verify the following breakers closed (Unit 1 Cable Rm):
- 1KRA breaker #1 (100A 1P, POWER PANELBOARD 1KI) ___ SAT
- 1KI BREAKER #1 (30A 1P, AUTO POWER (ICS))
___ UNSAT STANDARD: Locate 1KRA panel board and breaker #1 and verify it is closed.
Cue: Indicate to the candidate that 1KRA breaker #1 is CLOSED.
Locate 1KI panel board and breaker #1 and verify it is closed.
Cue: Indicate to the candidate that 1KI breaker #1 is tripped OPEN.
Continue Step 1 RNO.
COMMENTS:
STEP 2: Step 1 RNO
- 1. Reset and close the affected breakers (Unit 1 Cable Rm):
___ SAT
_____1KI BREAKER #1 (30A 1P, AUTO POWER (ICS))
- 2. IF either of the above breakers fail to close
___ UNSAT
- 3. WHEN both of the above breakers are closed THEN continue.
STANDARD: 1. Resets and closes 1KI BREAKER #1 by taking the breaker to the open position and then closing it.
- 2. Step does not apply. Both breakers are closed.
- 3. Determine both breakers are closed and continue.
Cue: Indicate to the candidate that 1KI breaker #1 is CLOSED.
Continue to Step 2.
COMMENTS:
NLO-700 fnl - k Page 6 of 9 ALTERNATE PATH STEP 3: Step 2
___ SAT Contact Unit 1 CR to verify ICS AUTO power has been restored as indicated by 1SA-2/B-11 (ICS AUTO POWER FAILURE) off.
___ UNSAT STANDARD: Contacts Unit 1 CR to verify ICS AUTO power has been restored as indicated by 1SA-2/B-11 (ICS AUTO POWER FAILURE) off.
Cue: Inform candidate that 1SA-2/B-11 (ICS AUTO POWER FAILURE) remains actuated.
Continue to Step 2 RNO.
COMMENTS:
STEP 4: Step 2 RNO IF ICS AUTO power has NOT been restored, THEN bypass 1KI inverter as follows: (BYP SW 1KI cabinet, Unit 1 Equip Rm, Southwest of col Q72): ___ SAT STANDARD: Determine ICS AUTO power has NOT been restored by actuation of 1SA-2/B-11 (ICS AUTO POWER FAILURE) in previous step ___ UNSAT THEN bypasses 1KI inverter as follows: (BYP SW 1KI cabinet, Unit 1 Equip Rm, Southwest of col Q72): (steps 5, 6, & 7 below)
COMMENTS:
STEP 5: Step 2 RNO A CRITICAL TASK A. Position SW#1 OFF(left switch).
___ SAT STANDARD: Positions SW#1 OFF (left switch).
Cue: Indicate to the candidate that SW#1 is OFF. ___ UNSAT COMMENTS:
NLO-700 fnl - k Page 7 of 9 STEP 6: Step 2 RNO B CRITICAL TASK B. Position SW#3 OFF (right switch).
___ SAT STANDARD: Positions SW#3 OFF (right switch).
Cue: Indicate to the candidate that SW#3 is OFF. ___ UNSAT COMMENTS:
STEP 7: Step 2 RNO C CRITICAL TASK C. Position SW#2 ON (center switch).
___ SAT STANDARD: Positions SW#2 ON (center switch).
Cue: Indicate to the candidate that SW#2 is ON.
___ UNSAT Continue to Step 3.
COMMENTS:
STEP 8: Step 3 Notify Unit 1 CR that all applicable steps of this enclosure have been completed. ___ SAT STANDARD: Using a phone or radio, Notify Unit 1 CR that all applicable steps of this enclosure have been completed. ___ UNSAT Cue: Inform candidate that the Control Room has been notified.
COMMENTS:
END TASK STOP TIME: ____________
NLO-700 fnl - k Page 8 of 9 CRITICAL STEP EXPLANATIONS:
STEP # Explanation 5 Step is required in proper sequence to align power to the 1KI bus.
6 Step is required in proper sequence to align power to the 1KI bus.
7 Step is required in proper sequence to align power to the 1KI bus.
k CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Unit 1 operating at 100% power 1SA-2/B-11 (ICS AUTO POWER FAILURE) is actuated INITIATING CUES:
The CRS directs you to use AP/1/A/1700/023 (Loss of ICS Power) Enclosure 5.2 (Restoration of ICS AUTO Power) to restore ICS AUTO power on Unit 1.