ML14223B122: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(10 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/13/2014
| issue date = 08/13/2014
| title = TMI, Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications to Adopt TSTF-523 Generic Letter 2008-01, Managing Gas Accumulation, Rev 2, Using the Consolidated Line Item Improvement Pro
| title = TMI, Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications to Adopt TSTF-523 Generic Letter 2008-01, Managing Gas Accumulation, Rev 2, Using the Consolidated Line Item Improvement Pro
| author name = Lamb J G
| author name = Lamb J
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000289
| docket = 05000289
| license number = DPR-050
| license number = DPR-050
| contact person = Lamb J G
| contact person = Lamb J
| case reference number = TAC MF4435
| case reference number = TAC MF4435
| document type = Acceptance Review Letter
| document type = Acceptance Review Letter
| page count = 3
| page count = 3
| project = TAC:MF4435
| project = TAC:MF4435
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:Michael J. Pacilio Senior Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 13, 2014 Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: THREE MILE ISLAND NUCLEAR STATION, UNIT 1 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-523, "GENERIC LETTER 2008-01, MANAGING GAS ACCUMULATION," REVISION 2, USING THE CONSOLIDATED LINE ITEM IMPROVEMENT PROCESS (TAG NO. MF4435) Dear Mr. Pacilio: By letter dated July 10, 2014, (Agencywide Documents Access and Management System Accession No. ML 14191 A059), Exelon Generation Company, LLC requested an amendment to Renewed Facility Operating License No. DPR-50 for Three Mile Island Nuclear Station (TMI), Unit 1. The proposed amendment would modify technical specification (TS) requirements to address the U.S. Nuclear Regulatory Commission (NRC) generic letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," as described in the BWN, this was stated as Technical Specification Task Force (TSTF) Traveler TSTF-523, Revision 2, "Generic Letter 2008-01, Managing Gas Accumulation." TMI committed to submit this proposed change (if it were deemed necessary based upon evaluation) by letter dated October 14, 2008 (ADAMS Accession No. ML082880706). The purpose of this letter is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (1 0 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment M. Pacilio -2-in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. If you have any questions, please contact me at (301) 415-3100 or via e-mail at John.Lamb@ nrc.gov. Docket No. 50-289 cc: Distribution via Listserv . Lamb, Senior Project Manager Licensing Branch 1-2 Di
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 13, 2014 Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
* ion of Operating Reactor Licensing Office of Nuclear Reactor Regulation M. Pacilio -2-in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. If you have any questions, please contact me at (301) 415-3100 or via e-mail at John. Lamb@nrc.gov. Docket No. 50-289 cc: Distribution via Listserv DISTRIBUTION: RidsNrrDorllp11-2 Resource LPLI-2 R/F RidsNrrPMThree Mile Island Resource RidsNrrLAABaxter Resource RidsNrrDoriDpr Resource RidsRgn1 MaiiCenter Resource RidsAcrsAcnw MaiiCTR Resource RidsNrrDssStsb Resource MHenderson, NRR/DORLILA PUBLIC ADAMS Accession No* ML 142238122 .. OFFICE LPL 1-2/PM LPL 1-2/PM NAME RGiadney Jlamb DATE 08/11/2014 08/11/14 Sincerely, IRA! John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation *via email LPL3-1/LA* LPL 1-2/BC(A) LPL 1-2/PM MHenderson RSchaaf Jlamb 08/13/14 08/13/14 08/13/14 OFFICIAL RECORD COPY 
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
}}
 
==SUBJECT:==
THREE MILE ISLAND NUCLEAR STATION, UNIT 1 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-523, "GENERIC LETTER 2008-01, MANAGING GAS ACCUMULATION," REVISION 2, USING THE CONSOLIDATED LINE ITEM IMPROVEMENT PROCESS (TAG NO.
MF4435)
 
==Dear Mr. Pacilio:==
 
By letter dated July 10, 2014, (Agencywide Documents Access and Management System Accession No. ML14191A059), Exelon Generation Company, LLC requested an amendment to Renewed Facility Operating License No. DPR-50 for Three Mile Island Nuclear Station (TMI),
Unit 1. The proposed amendment would modify technical specification (TS) requirements to address the U.S. Nuclear Regulatory Commission (NRC) generic letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," as described in the BWN, this was stated as Technical Specification Task Force (TSTF) Traveler TSTF-523, Revision 2, "Generic Letter 2008-01, Managing Gas Accumulation." TMI committed to submit this proposed change (if it were deemed necessary based upon evaluation) by letter dated October 14, 2008 (ADAMS Accession No. ML082880706).
The purpose of this letter is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (1 0 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment
 
M. Pacilio                                     in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
If you have any questions, please contact me at (301) 415-3100 or via e-mail at John.Lamb@ nrc.gov.
                                                          . Lamb, Senior Project Manager Licensing Branch 1-2 Di
* ion of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 cc: Distribution via Listserv
 
*       .. ML142238122                                  *via email OFFICE LPL 1-2/PM             LPL 1-2/PM       LPL3-1/LA*       LPL 1-2/BC(A)     LPL 1-2/PM NAME        RGiadney          Jlamb            MHenderson       RSchaaf           Jlamb DATE        08/11/2014        08/11/14          08/13/14         08/13/14         08/13/14}}

Latest revision as of 02:35, 4 November 2019

TMI, Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications to Adopt TSTF-523 Generic Letter 2008-01, Managing Gas Accumulation, Rev 2, Using the Consolidated Line Item Improvement Pro
ML14223B122
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/13/2014
From: John Lamb
Plant Licensing Branch 1
To: Pacilio M
Exelon Generation Co
Lamb J
References
TAC MF4435
Download: ML14223B122 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 13, 2014 Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-523, "GENERIC LETTER 2008-01, MANAGING GAS ACCUMULATION," REVISION 2, USING THE CONSOLIDATED LINE ITEM IMPROVEMENT PROCESS (TAG NO.

MF4435)

Dear Mr. Pacilio:

By letter dated July 10, 2014, (Agencywide Documents Access and Management System Accession No. ML14191A059), Exelon Generation Company, LLC requested an amendment to Renewed Facility Operating License No. DPR-50 for Three Mile Island Nuclear Station (TMI),

Unit 1. The proposed amendment would modify technical specification (TS) requirements to address the U.S. Nuclear Regulatory Commission (NRC) generic letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," as described in the BWN, this was stated as Technical Specification Task Force (TSTF) Traveler TSTF-523, Revision 2, "Generic Letter 2008-01, Managing Gas Accumulation." TMI committed to submit this proposed change (if it were deemed necessary based upon evaluation) by letter dated October 14, 2008 (ADAMS Accession No. ML082880706).

The purpose of this letter is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (1 0 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment

M. Pacilio in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415-3100 or via e-mail at John.Lamb@ nrc.gov.

. Lamb, Senior Project Manager Licensing Branch 1-2 Di

  • ion of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-289 cc: Distribution via Listserv
  • .. ML142238122 *via email OFFICE LPL 1-2/PM LPL 1-2/PM LPL3-1/LA* LPL 1-2/BC(A) LPL 1-2/PM NAME RGiadney Jlamb MHenderson RSchaaf Jlamb DATE 08/11/2014 08/11/14 08/13/14 08/13/14 08/13/14