ML14339A624: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14339A624
| number = ML14339A624
| issue date = 11/24/2014
| issue date = 11/24/2014
| title = Dominion Energy Kewaunee, Inc., Updated Safety Analysis Report (Usar), Rev 25
| title = Updated Safety Analysis Report (Usar), Rev 25
| author name =  
| author name =  
| author affiliation = Dominion Energy Kewaunee, Inc
| author affiliation = Dominion Energy Kewaunee, Inc
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:~Domi nioniDominion Energy Kewaunee, Inc.5000 Dominion Boulevard, Glen Allen, VA 23060Web -Address: www.dom.comNovember 24, 2014U. S. Nuclear Regulatory CommissionAttention: Document Control DeskWashington, DC 20555Serial No. 14-572KPS/LIC/CDS: ROLicense No. DPR-43Docket No. 50-30572-64DOMINION ENERGY KEWAUNEE. INC.KEWAUNEE POWER STATIONUPDATED SAFETY ANALYSIS REPORT, REVISION 25Pursuant to 10 CFR 50.71(e), Dominion Energy Kewaunee, Inc. (DEK) submitsRevision 25 to the Updated Safety Analysis Report (USAR) for Kewaunee PowerStation.Two CD-ROMs are included with this submittal. The first CD-ROM is labeled,"Kewaunee Power Station Updated Safety Analysis Report Revision 25, November2014." The first CD-ROM contains the following files:000001002003004005006007008009010011012013014015016017018019020021022023KPS USAR Frontmatter.pdfKPS USAR Chapter l.pdfKPS USAR Chapter 2.pdfKPS USAR Chapter 3.pdfKPS USAR Chapter 4.pdfKPS USAR Chapter 5.pdfKPS USAR Chapter 6.pdfKPS USAR Chapter 7.pdfKPS USAR Chapter 8.pdfKPS USAR Chapter 9.pdfKPS USAR Chapter 10.pdfKPS USAR Chapter 11 .pdfKPS USAR Chapter 12.pdfKPS USAR Chapter 13.pdfKPS USAR Chapter 14.pdfKPS USAR Chapter 15.pdfKPS USAR Appendix A.pdfKPS USAR Appendix B.pdfKPS USAR Appendix C.pdfKPS USAR Appendix D.pdfKPS USAR Appendix E.pdfKPS USAR Appendix F.pdfKPS USAR Appendix G.pdfKPS USAR Appendix H.pdf1,030,144 bytes, publicly available.18,485,248 bytes, publicly available.15,079,424 bytes, publicly available.505,856 bytes, publicly available.49,152 bytes, publicly available.4,685,824 bytes, publicly available.268,288 bytes, publicly available.126,976 bytes, publicly available.18,608,128 bytes, publicly available.34,390,016 bytes, publicly available.2,283,520 bytes, publicly available.31,217,664 bytes, publicly available.110,592 bytes, publicly available.40,960 bytes, publicly available.358,400 bytes, publicly available.317,440 bytes, publicly available.3,819,520 bytes, publicly available.647,168 bytes, publicly available.51,200 bytes, publicly available.40,960 bytes, publicly available.8,091,648 bytes, publicly available.38,912 bytes, publicly available.57,344 bytes, publicly available.40,960 bytes, publicly available.1__5fA SS" a,tAos%
{{#Wiki_filter:Dominion Energy Kewaunee, Inc.
Serial No. 14-572KPS USAR Revision 25Page 2 of 3The second CD-ROM included with this submittal contains two files. These files providethe most recent revisions of the KPS Fire Protection Program documents. Thesedocuments are the Fire Protection Program Plan (FPPP) and the Fire ProtectionProgram Analysis (FPPA). These fire protection program documents are "incorporatedby reference" into the KPS USAR. The second CD-ROM is labeled, "Kewaunee PowerStation Fire Protection Program Documents, October 2014," and contains the followingfiles:024 KPS FPPP Rev 14 600,064 bytes, publicly available.025 KPS FPPA Rev 12 7,116,800 bytes, publicly available.The KPS Technical Requirements Manual (TRM) is also incorporated by reference intothe KPS USAR. Changes to the TRM were included in the most recent submittal ofchanges to the KPS Technical Specification (TS) Bases. TS Bases changesimplemented without prior NRC approval are required by TS 5.5.12, "TechnicalSpecifications (TS) Bases Control Program," to be submitted to the NRC on a frequencyconsistent with 10 CFR 50.71(e). The most recent submittal of KPS TS Bases andTRM changes was by letter dated April 3, 2014 (Reference 1).Should you have any questions, please contact Mr. Craig Sly at (804) 273-2784.Very truly yours,Mark D. SartainVice President -Nuclear EngineeringDominion Energy KewauneeCOMMONWEALTH OF VIRGINIA ) I Notary PublicI Commonwealth of VirginiaReg. # 7518653COUNTY OF HENRICO ) a ommission Expires December 31, 20ff,2The foregoing document was acknowledged before me, in and for the County and Commonwealthaforesaid, today by Mark D. Sartain, who is Vice President Nuclear Engineering of Dominion EnergyKewaunee, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoingdocument in behalf of that Company, and that the statements in the document are true to the best of hisknowledge and belief.Acknowledged before me this ../!day of 2014.My Commission Expires: -eA[.. Notary Public Serial No. 14-572KPS USAR Revision 25Page 3 of 3
5000 Dominion Boulevard, Glen Allen, VA 23060                              ~Domi      nioni Web -Address: www.dom.com November 24, 2014 U. S. Nuclear Regulatory Commission                                        Serial No.     14-572 Attention: Document Control Desk                                            KPS/LIC/CDS:       RO Washington, DC 20555                                                        License No. DPR-43 Docket No.     50-305 72-64 DOMINION ENERGY KEWAUNEE. INC.
KEWAUNEE POWER STATION UPDATED SAFETY ANALYSIS REPORT, REVISION 25 Pursuant to 10 CFR 50.71(e), Dominion Energy Kewaunee, Inc. (DEK) submits Revision 25 to the Updated Safety Analysis Report (USAR) for Kewaunee Power Station.
Two CD-ROMs are included with this submittal.                   The first CD-ROM is labeled, "Kewaunee Power Station Updated Safety Analysis Report Revision 25, November 2014." The first CD-ROM contains the following files:
000      KPS  USAR     Frontmatter.pdf            1,030,144 bytes, publicly available.
001      KPS  USAR    Chapter l.pdf              18,485,248 bytes, publicly available.
002      KPS  USAR    Chapter 2.pdf              15,079,424 bytes, publicly available.
003      KPS  USAR    Chapter 3.pdf                505,856 bytes, publicly available.
004      KPS  USAR    Chapter 4.pdf                  49,152 bytes, publicly available.
005      KPS  USAR    Chapter 5.pdf              4,685,824 bytes, publicly available.
006      KPS  USAR    Chapter 6.pdf                268,288 bytes, publicly available.
007      KPS  USAR    Chapter 7.pdf                126,976 bytes, publicly available.
008      KPS  USAR    Chapter 8.pdf              18,608,128 bytes, publicly available.
009      KPS  USAR    Chapter 9.pdf              34,390,016 bytes, publicly available.
010      KPS  USAR    Chapter 10.pdf              2,283,520 bytes, publicly available.
011      KPS  USAR    Chapter 11 .pdf            31,217,664 bytes, publicly available.
012      KPS  USAR    Chapter 12.pdf                110,592 bytes, publicly available.
013      KPS  USAR    Chapter 13.pdf                40,960 bytes, publicly available.
014      KPS  USAR    Chapter 14.pdf                358,400 bytes, publicly available.
015      KPS  USAR    Chapter 15.pdf                317,440 bytes, publicly available.
016      KPS  USAR    Appendix A.pdf              3,819,520 bytes, publicly available.
017      KPS  USAR    Appendix B.pdf                647,168 bytes, publicly available.
018      KPS  USAR    Appendix C.pdf                51,200 bytes, publicly available.
019      KPS  USAR    Appendix D.pdf                40,960 bytes, publicly available.
020      KPS  USAR    Appendix E.pdf              8,091,648 bytes, publicly available.
021      KPS  USAR    Appendix F.pdf                38,912 bytes, publicly available.
022      KPS  USAR    Appendix G.pdf                57,344 bytes, publicly available.
023      KPS  USAR    Appendix H.pdf                40,960 bytes, publicly available.
1__5 fA SS
                                                                                                      " a, tAos%
 
Serial No. 14-572 KPS USAR Revision 25 Page 2 of 3 The second CD-ROM included with this submittal contains two files. These files provide the most recent revisions of the KPS Fire Protection Program documents. These documents are the Fire Protection Program Plan (FPPP) and the Fire Protection Program Analysis (FPPA). These fire protection program documents are "incorporated by reference" into the KPS USAR. The second CD-ROM is labeled, "Kewaunee Power Station Fire Protection Program Documents, October 2014," and contains the following files:
024   KPS FPPP Rev 14                                 600,064 bytes, publicly available.
025   KPS FPPA Rev 12                               7,116,800 bytes, publicly available.
The KPS Technical Requirements Manual (TRM) is also incorporated by reference into the KPS USAR. Changes to the TRM were included in the most recent submittal of changes to the KPS Technical Specification (TS) Bases.                             TS Bases changes implemented without prior NRC approval are required by TS 5.5.12, "Technical Specifications (TS) Bases Control Program," to be submitted to the NRC on a frequency consistent with 10 CFR 50.71(e). The most recent submittal of KPS TS Bases and TRM changes was by letter dated April 3, 2014 (Reference 1).
Should you have any questions, please contact Mr. Craig Sly at (804) 273-2784.
Very truly yours, Mark D. Sartain Vice President - Nuclear Engineering Dominion Energy Kewaunee COMMONWEALTH OF VIRGINIA           )                 II            Notary Public Commonwealth of Virginia COUNTY OF HENRICO                   )                   a         Reg.Expires ommission   # 7518653 December 31, 20ff,2 The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President Nuclear Engineering of Dominion Energy Kewaunee, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this ..   /!day of   "vA4/,'*r                  2014.
My Commission Expires:               SNoa*wbic,
                                        -eA[..
Notary Public
 
Serial No. 14-572 KPS USAR Revision 25 Page 3 of 3


==References:==
==References:==
: 1. Letter from J. T. Stafford (DEK) to NRC Document Control Desk, "TechnicalSpecification Bases Changes and Technical Requirements Manual Changes,"dated April 3, 2014.
: 1. Letter from J. T. Stafford (DEK) to NRC Document Control Desk, "Technical Specification Bases Changes and Technical Requirements Manual Changes,"
dated April 3, 2014.


==Enclosures:==
==Enclosures:==
: 1. CD-ROM labeled, "Kewaunee Power Station Updated Safety Analysis Report,Revision 25, November 2014."2. CD-ROM labeled, "Kewaunee Power Station Fire Protection ProgramDocuments, October 2014."Commitments made in this letter: Nonecc: U.S. Nuclear Regulatory Commission (w/ one CD-ROM set)Region III2443 Warrenville RoadSuite 210Lisle, IL 60532-4352Mr. W. C. Huffman, Project Manager (w/ one CD-ROM set)U.S. Nuclear Regulatory CommissionOne White Flint North, Mail Stop 08-Dl 511555 Rockville PikeRockville, MD 20852-2738Theodore R. Smith, Decommissioning Project Manager (w/ one CD-ROM set)U.S. Nuclear Regulatory CommissionTwo White Flint North, Mail Stop T8-F0511555 Rockville PikeRockville, MD 20852-2738}}
: 1. CD-ROM labeled, "Kewaunee Power Station Updated Safety Analysis Report, Revision 25, November 2014."
: 2. CD-ROM labeled, "Kewaunee           Power Station Fire Protection Program Documents, October 2014."
Commitments made in this letter: None cc:   U.S. Nuclear Regulatory Commission (w/ one CD-ROM set)
Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. W. C. Huffman, Project Manager (w/ one CD-ROM set)
U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-Dl 5 11555 Rockville Pike Rockville, MD 20852-2738 Theodore R. Smith, Decommissioning Project Manager (w/ one CD-ROM set)
U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop T8-F05 11555 Rockville Pike Rockville, MD 20852-2738}}

Latest revision as of 23:59, 3 November 2019

Updated Safety Analysis Report (Usar), Rev 25
ML14339A624
Person / Time
Site: Kewaunee  Dominion icon.png
Issue date: 11/24/2014
From:
Dominion Energy Kewaunee
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML14339A626 List:
References
14-572
Download: ML14339A624 (3)


Text

Dominion Energy Kewaunee, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 ~Domi nioni Web -Address: www.dom.com November 24, 2014 U. S. Nuclear Regulatory Commission Serial No.14-572 Attention: Document Control Desk KPS/LIC/CDS: RO Washington, DC 20555 License No. DPR-43 Docket No. 50-305 72-64 DOMINION ENERGY KEWAUNEE. INC.

KEWAUNEE POWER STATION UPDATED SAFETY ANALYSIS REPORT, REVISION 25 Pursuant to 10 CFR 50.71(e), Dominion Energy Kewaunee, Inc. (DEK) submits Revision 25 to the Updated Safety Analysis Report (USAR) for Kewaunee Power Station.

Two CD-ROMs are included with this submittal. The first CD-ROM is labeled, "Kewaunee Power Station Updated Safety Analysis Report Revision 25, November 2014." The first CD-ROM contains the following files:

000 KPS USAR Frontmatter.pdf 1,030,144 bytes, publicly available.

001 KPS USAR Chapter l.pdf 18,485,248 bytes, publicly available.

002 KPS USAR Chapter 2.pdf 15,079,424 bytes, publicly available.

003 KPS USAR Chapter 3.pdf 505,856 bytes, publicly available.

004 KPS USAR Chapter 4.pdf 49,152 bytes, publicly available.

005 KPS USAR Chapter 5.pdf 4,685,824 bytes, publicly available.

006 KPS USAR Chapter 6.pdf 268,288 bytes, publicly available.

007 KPS USAR Chapter 7.pdf 126,976 bytes, publicly available.

008 KPS USAR Chapter 8.pdf 18,608,128 bytes, publicly available.

009 KPS USAR Chapter 9.pdf 34,390,016 bytes, publicly available.

010 KPS USAR Chapter 10.pdf 2,283,520 bytes, publicly available.

011 KPS USAR Chapter 11 .pdf 31,217,664 bytes, publicly available.

012 KPS USAR Chapter 12.pdf 110,592 bytes, publicly available.

013 KPS USAR Chapter 13.pdf 40,960 bytes, publicly available.

014 KPS USAR Chapter 14.pdf 358,400 bytes, publicly available.

015 KPS USAR Chapter 15.pdf 317,440 bytes, publicly available.

016 KPS USAR Appendix A.pdf 3,819,520 bytes, publicly available.

017 KPS USAR Appendix B.pdf 647,168 bytes, publicly available.

018 KPS USAR Appendix C.pdf 51,200 bytes, publicly available.

019 KPS USAR Appendix D.pdf 40,960 bytes, publicly available.

020 KPS USAR Appendix E.pdf 8,091,648 bytes, publicly available.

021 KPS USAR Appendix F.pdf 38,912 bytes, publicly available.

022 KPS USAR Appendix G.pdf 57,344 bytes, publicly available.

023 KPS USAR Appendix H.pdf 40,960 bytes, publicly available.

1__5 fA SS

" a, tAos%

Serial No.14-572 KPS USAR Revision 25 Page 2 of 3 The second CD-ROM included with this submittal contains two files. These files provide the most recent revisions of the KPS Fire Protection Program documents. These documents are the Fire Protection Program Plan (FPPP) and the Fire Protection Program Analysis (FPPA). These fire protection program documents are "incorporated by reference" into the KPS USAR. The second CD-ROM is labeled, "Kewaunee Power Station Fire Protection Program Documents, October 2014," and contains the following files:

024 KPS FPPP Rev 14 600,064 bytes, publicly available.

025 KPS FPPA Rev 12 7,116,800 bytes, publicly available.

The KPS Technical Requirements Manual (TRM) is also incorporated by reference into the KPS USAR. Changes to the TRM were included in the most recent submittal of changes to the KPS Technical Specification (TS) Bases. TS Bases changes implemented without prior NRC approval are required by TS 5.5.12, "Technical Specifications (TS) Bases Control Program," to be submitted to the NRC on a frequency consistent with 10 CFR 50.71(e). The most recent submittal of KPS TS Bases and TRM changes was by letter dated April 3, 2014 (Reference 1).

Should you have any questions, please contact Mr. Craig Sly at (804) 273-2784.

Very truly yours, Mark D. Sartain Vice President - Nuclear Engineering Dominion Energy Kewaunee COMMONWEALTH OF VIRGINIA ) II Notary Public Commonwealth of Virginia COUNTY OF HENRICO ) a Reg.Expires ommission # 7518653 December 31, 20ff,2 The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President Nuclear Engineering of Dominion Energy Kewaunee, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this .. /!day of "vA4/,'*r 2014.

My Commission Expires: SNoa*wbic,

-eA[..

Notary Public

Serial No.14-572 KPS USAR Revision 25 Page 3 of 3

References:

1. Letter from J. T. Stafford (DEK) to NRC Document Control Desk, "Technical Specification Bases Changes and Technical Requirements Manual Changes,"

dated April 3, 2014.

Enclosures:

1. CD-ROM labeled, "Kewaunee Power Station Updated Safety Analysis Report, Revision 25, November 2014."
2. CD-ROM labeled, "Kewaunee Power Station Fire Protection Program Documents, October 2014."

Commitments made in this letter: None cc: U.S. Nuclear Regulatory Commission (w/ one CD-ROM set)

Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. W. C. Huffman, Project Manager (w/ one CD-ROM set)

U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-Dl 5 11555 Rockville Pike Rockville, MD 20852-2738 Theodore R. Smith, Decommissioning Project Manager (w/ one CD-ROM set)

U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop T8-F05 11555 Rockville Pike Rockville, MD 20852-2738