Line 3: Line 3:
| issue date = 05/15/2015
| issue date = 05/15/2015
| title = Response to Ft. Calhoun Notice of Violation and NRC Inspection Report 05000285/2015010
| title = Response to Ft. Calhoun Notice of Violation and NRC Inspection Report 05000285/2015010
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Cortopassi L
| addressee name = Cortopassi L
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:May 15, 2015   EA-15-020  
{{#Wiki_filter:UNITED STATES
                              NUCLEAR REGULATORY COMMISSION
                                                REGION IV
Lou Cortopassi, Vice President
                                            1600 E LAMAR BLVD
  and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4
                                        ARLINGTON, TX 76011-4511
P.O. Box 550  
                                            May 15, 2015
Fort Calhoun, NE 68023-0550  
EA-15-020
SUBJECT: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION REPORT 05000285/2015010
Lou Cortopassi, Vice President
Dear Mr. Cortopassi:  
  and Chief Nuclear Officer
Omaha Public Power District
Thank you for your letter, dated April 23, 2015 (ML15113B248), in which you responded to NRC Inspection Report 05000285/2015010 and Notice of Violation, dated March 30, 2015 (ML15089A393). The violation involved the failure to:  
Fort Calhoun Station FC-2-4
* provide information to the Commission required by statute or Commission regulation, order or license condition that was complete and accurate in all material respects * conduct a medical examination of an applicant/licensed operator using guidance in American National Standards Institute/American Nuclear Society (ANSI/ANS) Standard 3.4-1996, "Medical Certification and Monitoring of Personnel Requiring Operator Licenses for Nuclear Power Plants* test for the ability to detect products of combustion by provocation testing per ANSI/ANS Standard 3.4-1996, "Medical Certification and Monitoring of Personnel Requiring Operator Licenses for Nuclear Power Plants
P.O. Box 550
After reviewing the information you provided in your response to the Notice of Violation and in the additional supplemental information provided, we have concluded that your completed and proposed actions appear to adequately address the regulatory noncompliances described in the  
Fort Calhoun, NE 68023-0550
Notice of Violation. We will review your implementation of these corrective actions during a  
SUBJECT:         RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION
future inspection to determine whether full compliance has been restored and whether  
                REPORT 05000285/2015010
compliance will be maintained. UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 
Dear Mr. Cortopassi:
L. Coropassi - 2 - 
Thank you for your letter, dated April 23, 2015 (ML15113B248), in which you responded to
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.    Sincerely,
NRC Inspection Report 05000285/2015010 and Notice of Violation, dated March 30, 2015
(ML15089A393). The violation involved the failure to:
/RA/ 
    *   provide information to the Commission required by statute or Commission regulation,
Vincent G. Gaddy, Chief
        order or license condition that was complete and accurate in all material respects
Operations Branch Division of Reactor Safety 
    *   conduct a medical examination of an applicant/licensed operator using guidance in
Docket No. 50-285
        American National Standards Institute/American Nuclear Society (ANSI/ANS)
License No. DPR-40
        Standard 3.4-1996, Medical Certification and Monitoring of Personnel Requiring
cc:  Electronic Distribution for Fort Calhoun Station
        Operator Licenses for Nuclear Power Plants
    *   test for the ability to detect products of combustion by provocation testing per ANSI/ANS
        Standard 3.4-1996, Medical Certification and Monitoring of Personnel Requiring
        Operator Licenses for Nuclear Power Plants
After reviewing the information you provided in your response to the Notice of Violation and in
the additional supplemental information provided, we have concluded that your completed and
proposed actions appear to adequately address the regulatory noncompliances described in the
Notice of Violation. We will review your implementation of these corrective actions during a
future inspection to determine whether full compliance has been restored and whether
compliance will be maintained.


   ML15135A119  SUNSI Review By: TBuchanan ADAMS Yes    No Publicly Available  Non-Publicly Available  Non-Sensitive Sensitive Keyword: RGN-002 OFFICE OE:OB C:OB     NAME TBuchanan VGaddy     SIGNATURE /RA/ VGG for /RA/     DATE 5/15/15 5/15/15      
L. Coropassi                                  -2-
Letter to Lou Cortopassi from Vincent G. Gaddy, dated May 15, 2015  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
SUBJECT: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION REPORT 05000285/2015010
made available electronically for public inspection in the NRC Public Document Room or from
DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov)  
the NRCs Agencywide Documents Access Management System (ADAMS), accessible from the
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)  
NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
DRS Director (Anton.Vegel@nrc.gov)  
                                                Sincerely,
DRS Deputy Director (Jeff.Clark@nrc.gov)
                                                /RA/
Senior Resident Inspector (Max.Schneider@nrc.gov) Resident Inspector (Brian.Cummings@nrc.gov) FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)  
                                                Vincent G. Gaddy, Chief
Branch Chief, DRP/D (Goeff.Miller@nrc.gov)  
                                                Operations Branch
Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)  
                                                Division of Reactor Safety
Project Engineer, DRP/D (Brian.Parks@nrc.gov) Project Engineer, DRP/D (Jan.Tice@nrc.gov) RIV Public Affairs Officer (Victor.Dricks@nrc.gov)  
Docket No. 50-285
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)  
License No. DPR-40
NRR Project Manager (Fred.Lyon@nrc.gov)  
cc: Electronic Distribution for Fort Calhoun Station
Team Leader, DRS/TSS (Don.Allen@nrc.gov  
 
RIV RITS Coordinator (Marisa.Herrera@nrc.gov) RIV Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
 
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
ML15135A119
OEWebResource@nrc.gov  
   SUNSI Review       ADAMS                Publicly Available      Non-Sensitive    Keyword:
OEWEB Resource (Sue.Bogle@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) RIV/ETA: OEDO (Michael.Waters@nrc.gov)  
By: TBuchanan         Yes No           Non-Publicly Available  Sensitive       RGN-002
RIV RSLO (Bill.Maier@nrc.gov)  
OFFICE       OE:OB           C:OB
NAME         TBuchanan       VGaddy
SIGNATURE /RA/ VGG for       /RA/
DATE         5/15/15         5/15/15
                                     
Letter to Lou Cortopassi from Vincent G. Gaddy, dated May 15, 2015
SUBJECT:       RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION
              REPORT 05000285/2015010
DISTRIBUTION:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Resident Inspector (Brian.Cummings@nrc.gov)
FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)
Branch Chief, DRP/D (Goeff.Miller@nrc.gov)
Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/TSS (Don.Allen@nrc.gov
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
OEWebResource@nrc.gov
OEWEB Resource (Sue.Bogle@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
}}
}}

Latest revision as of 11:15, 31 October 2019

Response to Ft. Calhoun Notice of Violation and NRC Inspection Report 05000285/2015010
ML15135A119
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/15/2015
From: Vincent Gaddy
Operations Branch IV
To: Cortopassi L
Omaha Public Power District
References
EA-15-020 IR2015010
Download: ML15135A119 (3)


See also: IR 05000285/2015010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

May 15, 2015

EA-15-020

Lou Cortopassi, Vice President

and Chief Nuclear Officer

Omaha Public Power District

Fort Calhoun Station FC-2-4

P.O. Box 550

Fort Calhoun, NE 68023-0550

SUBJECT: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION

REPORT 05000285/2015010

Dear Mr. Cortopassi:

Thank you for your letter, dated April 23, 2015 (ML15113B248), in which you responded to

NRC Inspection Report 05000285/2015010 and Notice of Violation, dated March 30, 2015

(ML15089A393). The violation involved the failure to:

  • provide information to the Commission required by statute or Commission regulation,

order or license condition that was complete and accurate in all material respects

  • conduct a medical examination of an applicant/licensed operator using guidance in

American National Standards Institute/American Nuclear Society (ANSI/ANS)

Standard 3.4-1996, Medical Certification and Monitoring of Personnel Requiring

Operator Licenses for Nuclear Power Plants

  • test for the ability to detect products of combustion by provocation testing per ANSI/ANS

Standard 3.4-1996, Medical Certification and Monitoring of Personnel Requiring

Operator Licenses for Nuclear Power Plants

After reviewing the information you provided in your response to the Notice of Violation and in

the additional supplemental information provided, we have concluded that your completed and

proposed actions appear to adequately address the regulatory noncompliances described in the

Notice of Violation. We will review your implementation of these corrective actions during a

future inspection to determine whether full compliance has been restored and whether

compliance will be maintained.

L. Coropassi -2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the NRCs Agencywide Documents Access Management System (ADAMS), accessible from the

NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket No. 50-285

License No. DPR-40

cc: Electronic Distribution for Fort Calhoun Station

ML15135A119

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: TBuchanan Yes No Non-Publicly Available Sensitive RGN-002

OFFICE OE:OB C:OB

NAME TBuchanan VGaddy

SIGNATURE /RA/ VGG for /RA/

DATE 5/15/15 5/15/15

Letter to Lou Cortopassi from Vincent G. Gaddy, dated May 15, 2015

SUBJECT: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION

REPORT 05000285/2015010

DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Max.Schneider@nrc.gov)

Resident Inspector (Brian.Cummings@nrc.gov)

FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)

Branch Chief, DRP/D (Goeff.Miller@nrc.gov)

Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

RIV Public Affairs Officer (Victor.Dricks@nrc.gov)

RIV Public Affairs Officer (Lara.Uselding@nrc.gov)

NRR Project Manager (Fred.Lyon@nrc.gov)

Team Leader, DRS/TSS (Don.Allen@nrc.gov

RIV RITS Coordinator (Marisa.Herrera@nrc.gov)

RIV Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

OEWebResource@nrc.gov

OEWEB Resource (Sue.Bogle@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)